LNG three-wall metal low-temperature storage tank foundation and construction method thereof
Through the elevated double-layer plate foundation structure and layered pouring method, the problems of large load, low temperature and high safety performance of the LNG storage tank foundation are solved, the stability and safety are improved, and risks such as settlement and tilt are avoided. It meets the requirements for bearing capacity and frost resistance under high load and low temperature environments.
Patent Information
- Application Number
- CN202411130591.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-10-11
AI Technical Summary
Due to the requirements of large load, low temperature and high safety performance during the construction process of LNG three-wall metal cryogenic storage tanks, existing technology cannot meet the requirements for foundation stability and safety, and there are risks such as settlement, tilt, and instability.
Adopt an elevated double-layer slab foundation structure, including pile raft foundation, frame columns and foundation roof. Through the overall construction of cast-in-place piles and foundation bottom plate, combined with the layered pouring of frame columns and roof, precise positioning of pre-embedded tension straps and frost-resistant concrete Use to ensure the stability and safety of the foundation.
It improves the stability and safety of the LNG storage tank foundation, avoids settlement, tilt, instability and other phenomena, meets the load-bearing capacity and anti-freeze requirements under high load and low temperature environments, and ensures construction quality and efficiency.
Smart Images

Figure CN118756744A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of storage tank foundations, and in particular to an LNG three-wall metal cryogenic storage tank foundation and a construction method thereof. Background Art
[0002] As a clean and environmentally friendly energy, liquefied natural gas (LNG) has the advantages of low consumption, full combustion, low pollution, convenience, speed and safety. It has been rapidly applied in modern urban gas pipelines and important chemical industries in industrial parks. In order to give full play to the supply distribution center effect, LNG peak-shaving storage and transportation tanks are often built to store LNG. Therefore, the foundation construction of LNG three-wall metal cryogenic storage tanks has become an important infrastructure construction in gas storage stations.
[0003] Low-temperature LNG storage tanks are mainly used to store liquefied natural gas with a boiling point of -162°C. Since LNG is flammable and explosive, once a tank leaks, it will pose an immeasurable threat to the surrounding environment. During the construction process, not only the design standards of the tank itself are high, but also the construction quality requirements of the basic components that support the tank are also high. As an important part of the LNG storage tank, the stability and safety of the foundation can prevent the gas tank from settling, tilting, and instability, thereby avoiding other disasters. The construction of the LNG tank foundation is affected by the construction environment, high-standard seismic requirements, large load-bearing capacity, high settlement requirements, ventilation and heat exchange at the bottom of the foundation, etc., so the construction process is relatively complex compared to ordinary geotechnical foundations. Summary of the invention
[0004] The purpose of the present invention is to provide a LNG three-wall metal cryogenic storage tank foundation and a construction method thereof to meet the requirements of the LNG three-wall metal cryogenic storage tank such as high deadweight, low temperature, and safety performance.
[0005] To achieve the above-mentioned purpose, according to one aspect of the present invention, there is provided an LNG three-wall metal cryogenic storage tank foundation, wherein the storage tank foundation type is an elevated double-layer slab foundation, including a pile raft foundation, a frame column and a foundation top plate, wherein the pile raft foundation consists of two parts: a cast-in-place pile and a foundation bottom plate, frame columns are respectively arranged in the middle and above the periphery of the foundation bottom plate, a foundation top plate is arranged on the top of the frame columns, a concealed straight beam is arranged in the middle of the foundation top plate at the top of the frame column, and a concealed ring beam is arranged on the outer circle of the foundation top plate; a circle of tie straps are pre-buried at the top of the foundation top plate corresponding to the outer container and the main container, and the LNG storage tank equipment is located on the elevated double-layer slab foundation top plate and fixed by tie straps.
[0006] Furthermore, the frame columns above the middle of the foundation slab are spaced 2.7m apart in both directions, with a specification of 750×750mm; the frame columns outside the foundation slab are evenly distributed at 15° on the outer edge of the foundation slab, and the frame columns are 3.2m high, of which 1.4m are buried underground and the net height of the exposed part is 1.8m.
[0007] Furthermore, a 1000mmx700mm (width×height) concealed straight beam with a vertical and horizontal spacing of 2.7m is set at the top of the frame column in the middle of the foundation top plate, and a 1000mmx700mm (width×height) concealed ring beam is set at the outer circle of the foundation top plate.
[0008] According to another aspect of the present invention, there is provided a construction method for the above-mentioned LNG three-wall metal cryogenic storage tank foundation, comprising: Step 1: The cast-in-place piles and the foundation slab pile raft foundation are constructed together; Measure and place the cast-in-place pile position and drill the hole, clean the hole twice after hoisting the steel cage, then pour concrete and perform pile foundation maintenance; excavate the foundation slab, remove the floating pile head of the cast-in-place pile, reserve a section of the main reinforcement on the top, pour the foundation cushion, install the foundation slab reinforcement, install the foundation slab formwork, insert the frame column reinforcement, and then pour the foundation slab as a whole; Step 2: The frame columns and foundation top plate are constructed separately in a single operation; Set up the foundation top plate support scaffolding, install the frame column steel bars and frame column formwork, and then pour the frame column concrete; install the foundation top plate steel bars, install the tie strap embedded parts and top plate formwork, pour the foundation top plate concrete, then remove the formwork, and remove the scaffolding after the concrete is cured; Step 3: Pulling belt construction; A circle of positioning bars is set on the bottom reinforcement of the foundation top plate according to the tie belt layout drawing, and the tie belt is arranged and positioned according to the design requirements of the drawing, with the center point vertically placed on the steel mesh at the bottom of the top plate; After the tie base is positioned, vertical positioning short steel bars and horizontal rectangular positioning hoops are respectively set around the sides of the foundation top plate and bottom plate and on the upper surface to fix it. The positioning steel bars and the top plate and bottom plate steel bars are firmly welded with dissimilar steel welding rods, and the welds are polished and rust-free and then painted with anti-corrosion paint; Use a level and total station to measure and place points and monitor at all times to ensure the installation accuracy of the embedded tie straps. When pouring concrete, the vibrating rod should avoid the steel bars and the positioned embedded tie straps.
[0009] Furthermore, the foundation bottom plate has a diameter of 33.2m and a thickness of 1.2m; the foundation top plate has a diameter of 29.8m and a thickness of 1m, and the frame columns are 3.2m high.
[0010] Furthermore, the concrete grade of the tank foundation is C40, the concrete impermeability grade of the foundation top plate supporting the tank body is ≥P12, and the antifreeze grade is ≥D100.
[0011] Furthermore, the layered thickness of the foundation bottom plate is controlled at 400mm and is cast in three layers; the layered thickness of the foundation top plate is controlled at 500mm and is cast in two layers.
[0012] Furthermore, drainage holes are reserved at the top and bottom of the side forms of the foundation bottom plate and the foundation top plate to push the surface seepage water to the surroundings along the direction of concrete pouring and vibration and discharge it through the drainage holes.
[0013] Furthermore, the temperature of large-volume concrete entering the mold is controlled within 35°C, the maximum temperature rise is less than 50°C, and the temperature is measured at least twice per shift; the temperature difference between the inside and outside is required to be less than 25°C, the temperature difference between the concrete surface and the environment is less than 20°C, the cooling rate is less than 2°C / d, and the temperature is measured at least 4 times / d; when the temperature difference between the ambient temperature and the temperature at a position 40mm to 100mm within the surface of the concrete casting or the upper temperature measuring point is less than 20°C, the temperature measurement work is completed.
[0014] Furthermore, a bottom insulation layer is formed at the bottom of the main container of the storage tank using foam glass bricks and pearl sand concrete ring beams.
[0015] The present invention analyzes the requirements of the foundation from the specifications and composition of the tank, studies and selects the type and design of the tank foundation, and finally selects the elevated double-layer plate foundation of "pile raft foundation + frame column + top plate", which increases the stability and safety of the foundation, thereby preventing the gas tank from settling, tilting, instability and other phenomena, thereby avoiding other disasters. It solves the problem of heavy weight, low temperature, high safety performance requirements, and high requirements for foundation concrete quality, bearing capacity and settlement of LNG three-wall metal cryogenic storage tanks.
[0016] The pile raft foundation adopts an improved "two-step method" construction method, which combines the performance advantages of pile foundation and raft slab to meet the high requirements of LNG three-wall metal cryogenic storage tanks for foundation bearing capacity, stability, safety, and concrete low-temperature resistance.
[0017] The large-volume concrete of the elevated double-layer slab adopts the construction method of "continuous pouring in layers" of raft slab, frame column and top slab, and establishes control measures to effectively avoid the occurrence of cracks, uneven settlement, freezing and thawing due to low temperature in the construction of low-temperature large-volume concrete foundation, thereby ensuring the construction quality.
[0018] The positioning and fixing installation of the embedded tie belt adopts the method of setting a circle of positioning ribs from the base, setting vertical positioning short steel bars and horizontal rectangular positioning hoops on the sides and upper surface of the bottom plate to fix it, and then using heterogeneous steel welding rods to weld the positioning steel bars and the top plate and bottom plate steel bars firmly, and then brushing anti-corrosion paint after grinding and derusting the weld joints, which can quickly and effectively meet the quality requirements of the embedded internal and external tie belts, ensure the smooth and accurate installation of the LNG storage tank in one time, and prevent the impact of carburization on the construction quality of the stainless steel tie belt. Improve the construction efficiency and ensure the construction quality.
[0019] The bottom insulation layer is formed by using foam glass bricks + pearl sand concrete ring beam at the bottom of the main container of the storage tank. The elevated top plate uses concrete with an anti-freeze grade of not less than D100 and the overhead clear height is designed to be 1.8m. The hardened ground is designed as a waterproof and non-flammable concrete floor to enhance ventilation, moisture isolation, frost resistance and insulation, and effectively avoid changes in the mechanical properties of the concrete foundation caused by repeated freezing and thawing of concrete and uneven frost heave and settlement of the foundation soil. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is the basic diagram of the LNG three-wall metal cryogenic storage tank described in the present invention; Figure 2 It is the design drawing of the elevated double-layer slab foundation of the present invention; Figure 3 It is the layout diagram of the top plate tie straps of the foundation; Figure 4 It is a detailed drawing of the drawstring structure; Figure 5 It is a three-dimensional stereogram of the foundation of the LNG three-wall metal cryogenic storage tank described in the present invention; Figure 6 It is a three-dimensional anatomical diagram of the foundation of the LNG three-wall metal cryogenic storage tank described in the present invention.
[0021] In the figure, 1- cast-in-place piles, 2- foundation bottom plate, 3- foundation top plate, 4- hidden beam, 5- ring beam, 6- main container tie strap, 7- outer container tie strap. DETAILED DESCRIPTION
[0022] The technical solution claimed in the present invention is described in detail below in conjunction with a relatively specific embodiment.
[0023] 1. Basic selection of LNG three-wall metal cryogenic storage tank In view of the heavy weight, low temperature and high safety requirements of LNG three-wall metal cryogenic storage tanks, the design selected an elevated slab foundation and made improvements on this basis, using a pile raft slab foundation to replace the traditional multi-pile cap slab, so that the cast-in-place piles and the bottom plate form an "integrated" pile raft foundation with better stress resistance. The final tank foundation type design is an elevated double-layer slab foundation of "pile raft foundation + frame column + top plate". The foundation of the LNG three-wall metal cryogenic storage tank can be seen in Figure 1 shown.
[0024] The advantages of the elevated double-layer slab foundation selected in the present invention can be summarized as follows: 1) The entire LNG storage tank equipment is located on the top plate of the elevated slab foundation, and the double-layer plates are suspended by frame columns, which can be naturally ventilated and moisture-proof; 2) The foundation bottom plate adopts a pile raft foundation, which not only has good seismic performance and strong bearing capacity, but also has uniform force and conduction force, and can effectively suppress uneven settlement of the foundation; 3) The construction is fast, the construction period is short, the economy is good, and the safety is high.
[0025] 2. LNG three-wall metal cryogenic storage tank foundation construction process Construction of bored pile foundation → excavation → pile cutting (prefabrication of formwork and reinforcement) → pouring of foundation slab cushion layer → installation of slab reinforcement → installation of slab formwork → installation of frame column reinforcement → pouring of foundation slab concrete → erection of foundation top slab supporting scaffolding → installation of frame column formwork → pouring of frame column concrete → installation of foundation top slab reinforcement → installation of tie straps → installation of foundation top slab formwork → construction of top slab concrete → foundation maintenance → removal of formwork → removal of scaffolding.
[0026] 2.1 Construction of cast-in-place piles and pile raft foundation (1) Pile raft foundation structure and two-step construction method The pile raft foundation is constructed using the “two-step method”. The first step is to construct underground bored piles, reserve steel bars at the pile heads, and dig out the piles and chisel out the pile heads after full-age maintenance. The second step is to construct the base plate of the above-ground tank foundation.
[0027] (2) Construction process of pile raft foundation The present invention is based on the optimization and improvement of the two-step method, and adopts a pile raft foundation integral construction method for the cast-in-place piles and the foundation bottom plate.
[0028] The construction process of pile raft foundation is as follows: measuring and placing pile positions → rotary drilling to form holes → hoisting and placing steel cages → secondary hole cleaning → pouring concrete → pile foundation maintenance → earth excavation → removing floating piles at pile heads → pouring foundation cushion layer → installing steel bars for foundation slab → installing formwork for foundation slab → inserting steel bars for frame columns → pouring the foundation slab as a whole.
[0029] (3) Advantages of pile raft foundation construction The pile raft foundation consists of two parts: cast-in-place piles (or pile foundations) and foundation slabs (or raft slabs). It is a hybrid foundation that enhances the overall stiffness, bearing capacity, stability and overall seismic resistance of the foundation.
[0030] After the bored pile is excavated and the pile head is removed, a 35d long anchor is reserved for the top main reinforcement and is anchored into the foundation slab and cast together with the foundation slab. This can effectively combine the bored pile and the foundation slab into an integral structure. This ensures that it can withstand the upper vertical load while also withstanding the horizontal load caused by wind load and seismic load, and can also control uneven settlement of the foundation.
[0031] 2.2 Elevated double-layer slab foundation construction (1) Elevated double-layer slab foundation structure The base plate of the elevated double-layer slab foundation has a diameter of 33.2m and a thickness of 1.2m, the top plate has a diameter of 29.8m and a thickness of 1m, and the middle frame column is 3.2m high, of which 1.4m is buried underground and the net height of the exposed part is 1.8m. The cast-in-place piles are constructed together with the foundation base plate, and the frame columns and top plate are constructed separately as elevated plates.
[0032] The upper foundation platform of the tank should be able to meet the bearing capacity requirements of the LNG three-wall metal storage tank under the combined conditions of four load effects: normal operation, water pressure test, tank emptying and maintenance, and earthquake action. The base plate of the elevated double-layer slab foundation has a diameter of 33.2m and a thickness of 1.2m. A 750×750mm frame column with a vertical and horizontal spacing of 2.7m is set above the middle of the base plate. A circle of frame columns around the base plate are evenly distributed at 15° on a circle with a diameter of 28.7m. The frame columns are 3.2m high, of which 1.4m is buried underground and the net height of the exposed part is 1.8m. A 1m thick tank foundation top plate with a diameter of 29.8m is set on the frame column. A 1000mmx700mm (width×height) concealed straight beam with a vertical and horizontal spacing of 2.7m is set on the top of the frame column in the middle of the top plate, and a 1000mmx700mm (width×height) concealed ring beam is set on the outer circle (see Figure 2 ).
[0033] (2) Construction process of elevated slab foundation top plate Erection of foundation top plate supporting scaffolding → installation of frame column reinforcement → installation of frame column formwork → pouring of frame column concrete → installation of foundation top plate reinforcement → installation of top plate foundation tie strap embedded parts → installation of top plate formwork → pouring of top plate concrete → removal of formwork → concrete curing → removal of scaffolding construction.
[0034] (3) Construction requirements for elevated slab foundation As a special structural form, mastering the construction requirements of elevated slab foundation is of great significance to enhancing the reliability of the structure.
[0035] In order to form a complete plate→beam→column force transmission system, the upper foundation platform of the tank is simplified into a reinforced concrete plate frame, and concealed straight beams and concealed ring beams with equal vertical and horizontal spacing are set on the outer circle. The top plate is divided into 2.7m×2.7m unit plates to transfer loads in a specific structural force transmission form.
[0036] The steel bar sizes of the circular top plate and the concealed straight beams and concealed ring beams with equal spacing in the vertical and horizontal directions are different. They should be numbered one by one according to the material list during processing and prefabrication, and arranged in order according to the numbers during installation. This can not only speed up the construction progress, but also ensure the construction quality. The concealed ring beam can be used as the anchor point of the tank wall tie to meet the functional requirements of the tank foundation, and at the same time can effectively reduce the problem of excessive stress concentration caused by uneven local column arrangement.
[0037] 3 tanks of low temperature mass concrete construction 3.1 Basic structure form The large volume concrete of the elevated double-layer plate tank foundation consists of two parts: one is the foundation bottom plate, with a diameter of 33.2m and a thickness of 1.2m; the other is the foundation top plate, with a diameter of 29.8m and a thickness of 1m.
[0038] In order to ensure the safe construction of large-volume concrete of the top slab, the construction method of "sequential layered and pushed continuous pouring" is selected for construction, that is, the raft foundation, frame columns, and foundation top slab are constructed separately and in sequence, and the top slab is constructed after the frame columns have finally set, and the raft foundation and frame columns are used to support the top slab load.
[0039] Taking into account the environmental conditions of the construction site with the lowest temperature in winter of -35.9℃ and the impact of possible special low temperature conditions on the tank foundation, combined with the relevant requirements for large-volume concrete, it is determined that the concrete grade of the tank foundation is C40, the concrete impermeability grade of the foundation top slab supporting the tank body is ≥P12, and the antifreeze grade is ≥D100.
[0040] 2.3.2 Mass concrete construction methods and requirements (1) Concrete pouring method The raft slab is 1200mm thick, with a layer thickness of 400mm, and is cast in three layers. The top slab is 1000mm thick, with a layer thickness of 500mm, and is cast in two layers.
[0041] The pouring is carried out from north to south in a continuous manner, that is, according to the method of "one slope, pouring in layers, step by step, and in one go".
[0042] (2) Requirements for concrete pouring construction The concrete is poured and vibrated continuously in layers, allowed to flow naturally, and vibrated in the direction of flow. Do not over-vibrate to prevent missed vibrations.
[0043] When vibrating concrete, the vibrating rod should be inserted straight up and down into the concrete, vibrating evenly, inserting quickly and pulling out slowly, and it is strictly forbidden to collide with steel bars, formwork, embedded parts, etc. When vibrating the upper layer, the front end of the vibrating rod should be at least 50mm immersed in the lower layer of concrete. When the concrete surface is covered with slurry and no bubbles are generated, the vibration is finished, and the vibrating rod should be moved to the next vibration point. The distance between the two vibration points should not be greater than 50cm, so as to ensure the density of the concrete.
[0044] Drainage holes are reserved at the top and bottom of the foundation side formwork to push the surface seepage to the surrounding areas along the direction of concrete pouring and vibration, and discharge it through the drainage holes.
[0045] (3) Concrete surface flatness control When pouring concrete, use a laser level to control the elevation throughout the process. Before the initial setting, use a scraper to level and gently press according to the elevation line. Before the final setting, use a polisher to level and press several times to eliminate shrinkage cracks in time, avoid permanent cracks, and ensure the flatness of the tank bottom plate installation.
[0046] (4) Concrete curing Large-volume concrete curing usually adopts heat preservation and moisture-retaining covering method. Spray curing is carried out before the initial setting of concrete; before the final setting of concrete, it is covered and cured after being flattened and polished. First, cover with a layer of plastic film with an overlap width of ≥15cm, and then sprinkle water for curing. Then, cover the film and side form with felt, and water the surface for curing.
[0047] A dedicated person is responsible for regular watering and record keeping during the maintenance work. The moisturizing maintenance lasts for at least 14 days. The integrity of the film is checked frequently to ensure that the concrete surface remains moist at all times. The formwork can only be removed when the maximum temperature difference between the surrounding environment and the concrete surface is less than 20°C.
[0048] (5) Temperature monitoring and control of concrete When pouring and curing large-volume concrete, the maximum temperature rise in the concrete body, the temperature difference between the inside and the surface, the cooling rate and the changes in the ambient temperature must be monitored according to the temperature measurement plan. If there are any abnormalities, moisture retention and thermal insulation measures should be strengthened in time to avoid surface cracks and through cracks in the concrete caused by temperature stress and tensile and compressive stress caused by excessive temperature difference between the inside and the outside, so as to ensure the quality of the concrete.
[0049] ① Monitoring point layout The bottom plate and top plate of the elevated double-layer plate tank foundation are both circular foundations with uniform thickness. They are arranged in plane according to the KZ1 distribution axis. The temperature test area is set up with temperature measuring wires at the intersection of the axis, arranged from north to south and from east to west, with a spacing of 2.7m. Each temperature measurement position has three measuring points along the lower, middle and upper parts. The upper temperature measuring point of the concrete is arranged at 50mm from the upper surface of the concrete; the lower temperature measuring point is arranged at 50mm from the bottom surface of the concrete. It should be installed vertically and firmly to avoid impact and touching the temperature measuring elements and lead wires during pouring concrete and vibration.
[0050] ②Temperature monitoring requirements The temperature of large-volume concrete entering the mold is required to be controlled within 35℃, the maximum temperature rise is less than 50℃, and the temperature is measured at least twice / shift; the temperature difference between the inside and outside is required to be less than 25℃, the temperature difference between the concrete surface and the environment is required to be less than 20℃, the cooling rate is less than 2℃ / d, and the temperature is measured at least 4 times / d.
[0051] When the temperature difference between the ambient temperature and the temperature at a position 40mm to 100mm inside the surface of the concrete casting or the upper temperature measuring point is less than 20℃, the temperature measurement work is completed.
[0052] 4. Pull-on construction (1) Requirements for pre-buried tie belt construction 1) Requirements for setting embedded tie straps According to the function and force requirements of LNG three-wall metal storage tanks, pre-buried tie straps are evenly distributed around the periphery of the main container and the outer container, with the tie strap plane facing the center of the foundation circle. Through the connection of the inner and outer tie straps, the LNG storage tank body is effectively fixed on the circular foundation top plate.
[0053] 2) Requirements for allowable error of embedded tie straps ① Circumferential direction: ±10mm; ②Verticality: The error of the pull belt buried in the foundation for every 300mm is within ±3mm; ③ Assembly height of the drawstring end: within ±12mm of the marked height dimension; ④ The deflection angle of the pull belt is within ±5° with the point at which it is located as the center.
[0054] LNG tank foundation tie strap layout and detailed drawings are shown in Figure 4 and Figure 5 shown.
[0055] 3) Quality requirements for embedded tie straps It is not allowed to weld the tie straps to the foundation steel bars in the foundation reinforced concrete to prevent carburization from affecting the construction quality of the stainless steel tie straps.
[0056] 4) Positioning and fixing method of embedded tie straps and quality assurance measures ① Set a circle of positioning bars on the bottom reinforcement of the top plate according to the tie strap layout drawing, arrange and position the tie strap according to the design requirements of the drawing, and place the center point vertically on the steel mesh at the bottom of the top plate.
[0057] ② After the pull strap base is positioned, short vertical positioning steel bars and horizontal rectangular positioning hoops are set around the sides of the bottom plate and on the upper surface to fix it. The positioning steel bars and the top and bottom plate steel bars are firmly welded with dissimilar steel welding rods. The welds are polished and derusted and then painted with anti-corrosion paint.
[0058] ③ Use a level and a total station to measure and place points and monitor at all times to ensure the installation accuracy of the embedded tie. When pouring concrete, the vibrating rod should avoid the steel bars and the already positioned embedded tie.
[0059] 5 tank foundation low temperature concrete construction 5.1 Basic structure form Taking into account the local environmental conditions with the lowest winter temperature of -35.9℃ and the impact of possible special low temperature conditions on the tank foundation, combined with the relevant requirements for large-volume concrete, it is determined that the concrete grade of the tank foundation is C40, the concrete impermeability grade of the foundation top slab supporting the tank body is ≥P12, and the antifreeze grade is ≥D100.
[0060] 5.2 Measures and requirements for preventing concrete from low temperature damage (1) When the LNG storage tank is in operation, in order to prevent the cold energy of LNG from being transferred to the concrete foundation through the bottom of the storage tank, a foam glass brick + pearl sand concrete ring beam is used at the bottom of the main container of the storage tank to form a bottom insulation layer. The thickness of the foam glass brick is 800mm.
[0061] (2) The frost resistance grade of the elevated roof should be no less than D100 concrete to avoid changes in the mechanical properties of the concrete foundation caused by repeated freezing and thawing of the concrete.
[0062] (3) In order to prevent the low-temperature natural gas from damaging the soil around the foundation and the base bearing layer and causing uneven settlement of the foundation, the hardened ground between the periphery of the tank foundation and the liquid diversion ditch is designed to be an impermeable and non-flammable concrete floor.
[0063] (4) In order to ensure that the temperature of the soil around the foundation is higher than the freezing temperature, the clearance between the bottom surface of the elevated slab foundation top plate and the natural ground is designed to be 1.8m to enhance ventilation and moisture isolation.
[0064] This technology has been applied in the foundation construction of LNG tanks in the natural gas storage facility construction project in Karamay undertaken by Sinochem Second Construction Group Co., Ltd. Through the analysis, research and design of the requirements for the foundation of the specifications and composition structure of the LNG three-wall metal cryogenic storage tank, the elevated double-layer plate foundation type of "pile raft foundation + frame column + top plate" was finally selected for construction, and the "two-step method" pile raft foundation construction was adopted. The large-volume concrete of the elevated double-layer plate selected the construction method of "sequential layered and continuous pouring" of the raft plate, frame column, and top plate, which is orderly, fast, safe and efficient, with high quality and time saving. The top plate formwork support system was reduced from a super-dangerous project to a dangerous project, which reduced the construction risk, shortened the construction period, and the technology was safe, reliable, economical and practical; at the same time, this method effectively controlled the flatness of the tank foundation top plate and the quality of the embedded internal and external tie bands, ensuring the smooth and accurate installation of the LNG tank, meeting the requirements of the heavy weight, low temperature and safety performance of the LNG three-wall metal cryogenic storage tank, and was well received by all sectors of society, with obvious social benefits, and broad prospects for promotion in similar domestic projects.
Claims
1. A LNG three-wall metal cryogenic storage tank foundation, characterized in that: The tank foundation type is an elevated double-layer slab foundation, including a pile raft foundation, frame columns and a foundation top plate. The pile raft foundation consists of two parts: a cast-in-place pile and a foundation bottom plate. Frame columns are respectively arranged in the middle and above the outer periphery of the foundation bottom plate, a foundation top plate is arranged on the top of the frame columns, a concealed straight beam is arranged on the top of the frame column in the middle of the foundation top plate, and a concealed ring beam is arranged on the outer circle of the foundation top plate; a circle of tie straps are pre-buried on the top of the foundation top plate corresponding to the outer container and the main container, and the LNG storage tank equipment is located on the elevated double-layer slab foundation top plate and fixed by tie straps.
2. The LNG three-wall metal cryogenic storage tank foundation according to claim 1 is characterized in that: The frame columns above the middle of the foundation slab are spaced 2.7m apart in both directions, with a specification of 750×750mm. The frame columns outside the foundation slab are evenly distributed at 15° on the outer edge of the foundation slab, with a height of 3.2m, of which 1.4m is buried underground and the net height of the exposed part is 1.8m.
3. The LNG three-wall metal cryogenic storage tank foundation according to claim 1 is characterized in that: In the middle of the foundation top plate, a 1000mmx700mm (width×height) concealed straight beam with a vertical and horizontal spacing of 2.7m is set on the top of the frame column, and a 1000mmx700mm (width×height) concealed ring beam is set on the outer circle of the foundation top plate.
4. The construction method of the LNG three-wall metal cryogenic storage tank foundation according to any one of claims 1 to 3, characterized in that: include: Step 1: The cast-in-place piles and the foundation slab pile raft foundation are constructed together; Measure and place the cast-in-place pile position and drill the hole, clean the hole twice after hoisting the steel cage, then pour concrete and perform pile foundation maintenance; excavate the foundation slab, remove the floating pile head of the cast-in-place pile, reserve a section of the main reinforcement on the top, pour the foundation cushion, install the foundation slab reinforcement, install the foundation slab formwork, insert the frame column reinforcement, and then pour the foundation slab as a whole; Step 2: The frame columns and foundation top plate are constructed separately in a single operation; Set up the foundation top plate support scaffolding, install the frame column steel bars and frame column formwork, and then pour the frame column concrete; install the foundation top plate steel bars, install the tie strap embedded parts and top plate formwork, pour the foundation top plate concrete, then remove the formwork, and remove the scaffolding after the concrete is cured; Step 3: Pulling belt construction; A circle of positioning bars is set on the bottom reinforcement of the foundation top plate according to the tie belt layout drawing, and the tie belt is arranged and positioned according to the design requirements of the drawing, with the center point vertically placed on the steel mesh at the bottom of the top plate; After the tie base is positioned, vertical positioning short steel bars and horizontal rectangular positioning hoops are respectively set around the sides of the foundation top plate and bottom plate and on the upper surface to fix it. The positioning steel bars and the top plate and bottom plate steel bars are firmly welded with dissimilar steel welding rods, and the welds are polished and rust-free and then painted with anti-corrosion paint; Use a level and total station to measure and place points and monitor at all times to ensure the installation accuracy of the embedded tie straps. When pouring concrete, the vibrating rod should avoid the steel bars and the positioned embedded tie straps.
5. The LNG three-wall metal cryogenic storage tank foundation construction method according to claim 4 is characterized in that: The foundation bottom plate has a diameter of 33.2m and a thickness of 1.2m; the foundation top plate has a diameter of 29.8m and a thickness of 1m, and the frame columns are 3.2m high.
6. The LNG three-wall metal cryogenic storage tank foundation construction method according to claim 5 is characterized in that: The concrete grade of the tank foundation is C40, the concrete impermeability grade of the foundation top slab supporting the tank body is ≥P12, and the antifreeze grade is ≥D100.
7. The LNG three-wall metal cryogenic storage tank foundation construction method according to claim 5 or 6, characterized in that: The layer thickness of the foundation bottom plate is controlled at 400mm and is cast in three layers; the layer thickness of the foundation top plate is controlled at 500mm and is cast in two layers.
8. The LNG three-wall metal cryogenic storage tank foundation construction method according to claim 7 is characterized in that: Drainage holes are reserved at the top and bottom of the side formwork of the foundation slab and foundation top slab to push the surface seepage water to the surrounding areas along the direction of concrete pouring and vibration, and discharge it through the drainage holes.
9. The LNG three-wall metal cryogenic storage tank foundation construction method according to claim 4 or 8, characterized in that: The temperature of large-volume concrete entering the mold is controlled within 35℃, the maximum temperature rise is less than 50℃, and the temperature is measured at least twice / shift; the temperature difference between the inside and outside is required to be less than 25℃, the temperature difference between the concrete surface and the environment is less than 20℃, the cooling rate is less than 2℃ / d, and the temperature is measured at least 4 times / d; when the temperature difference between the ambient temperature and the temperature at a position 40mm to 100mm within the surface of the concrete casting or the upper temperature measuring point is less than 20℃, the temperature measurement work is completed.
10. The LNG three-wall metal cryogenic storage tank foundation construction method according to claim 9 is characterized in that: Foam glass bricks and pearl sand concrete ring beams are used to form the bottom insulation layer at the bottom of the main container of the tank.
Citation Information
Cited By
Anchor belt plate construction method for annular frame beam of large double-wall storage tank foundation
CN120683882A
Waterproof structure of storage tank and foundation
CN120797726A