Advanced weakening and supporting coupling operation method for overhead top coal at end of fully mechanized caving face

By obtaining coal samples for physical and mechanical tests and numerical simulations, the hydraulic coal breaking parameters were determined, and combined with passive support technology, the problem that the suspended top coal at the end of the fully mechanized caving face was difficult to collapse was solved, and the timely collapse of the top coal was achieved. The collapse and surrounding rock are stable, which improves the coal resource recovery rate and coal mine safety.

CN118757154AInactive Publication Date: 2024-10-11HUATING COAL GRP CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411223298.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In fully mechanized caving working faces, the suspended roof coal at the end is difficult to collapse in time, resulting in an excessively long suspended length, which poses safety hazards and waste of coal resources. Existing technologies such as deep hole explosive blasting have shortcomings such as high cost and poor controllability. , it is difficult to accurately grasp the parameters of hydraulic fracturing and carbon dioxide fracturing, resulting in insufficient collapse.

Method used

By obtaining coal samples for physical and mechanical tests, a numerical simulation model was established, and discrete element numerical simulation software was used to determine the optimal parameter range for hydraulic coal breaking. Hydraulic coal breaking operations were implemented based on on-site construction conditions, and passive support equipment was added to promote The top coal collapses, and the support parameters of the mining tunnel are optimized to ensure the stability of the surrounding rock.

Benefits of technology

It achieves timely and sufficient collapse of the top coal, reduces the suspended area, reduces the risk of ground pressure impact, improves the coal resource recovery rate, and ensures safe production of coal mines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757154A_ABST
    Figure CN118757154A_ABST
Patent Text Reader

Abstract

The invention discloses a fully mechanized caving face end suspended top coal advanced weakening and supporting coupling operation method, and belongs to the technical field of mining engineering. The advanced weakening and supporting coupling operation method for the suspended top coal at the end of the fully mechanized caving face comprises the following steps: acquiring basic mechanical parameters of a standard rock sample; acquiring parameter ranges of optimal hydraulic coal breaking water pressure, angle, height and coal breaking position when the top coal with the suspended end caves; the optimal hydraulic coal breaking weakening and mining roadway support combined control technical parameters of the end suspended top coal of the large-dip-angle fully mechanized caving face are obtained; according to the technical parameters of hydraulic coal breaking weakening and mining roadway supporting combined control, hydraulic coal breaking operation is conducted on the fully mechanized caving face site, and passive supporting equipment is erected in a mining roadway. According to the advanced weakening and supporting coupling operation method for the suspended top coal at the end of the fully mechanized caving face, the high-pressure water jet coal breaking technology can be introduced into treatment of the suspended top coal at the end of the fully mechanized caving face.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining engineering, and in particular to a method for coupling an operation of advanced weakening and supporting of suspended top coal at the end of a fully-mechanized caving working face. Background Art

[0002] As the main technical means for mining thick coal seams in my country, the comprehensive mechanized top coal caving mining technology has the advantages of high production and high efficiency, low consumption and safety, and low cost. When the thick coal seam fully mechanized caving working face adopts fully mechanized caving mining, a fully mechanized caving working face with a mining height of two to three meters is first arranged along the bottom plate of the coal seam. After the coal of the bottom fully mechanized caving working face is mined, the upper top coal is immediately caved. Improving the recovery rate of coal resources and ensuring the safe production of the fully mechanized caving working face are difficult problems that need to be continuously studied in fully mechanized caving mining. The key to solving this problem lies in the study of the law of top coal caving.

[0003] In the actual application of fully mechanized top coal caving, due to a series of factors such as the high strength of the coal body itself and the large inclination of the coal seam, it is difficult for the top coal to collapse in time and fully. In particular, the end-hanging top coal is easy to form a large area of ​​end-hanging top coal under the coupling effect of the mining tunnel support and the coal pillar support. As the fully mechanized top coal caving face continues to advance, when the length of the end-hanging top coal in the goaf increases to a critical value, the end-hanging top coal will suddenly collapse in a large area. The strong dynamic pressure generated will induce impact ground pressure, hurricanes and other dynamic disasters in the fully mechanized top coal caving face, which will have a great impact on the safe production of coal mines; at the same time, the large-scale suspension of the end-hanging top coal of the fully mechanized top coal caving face not only causes a waste of coal resources, but also easily leads to a series of problems such as gas accumulation at the end. Therefore, it is necessary to take technical measures to enable the end-hanging top coal of the fully mechanized top coal caving face to collapse fully and timely and reduce the suspension length.

[0004] The method to solve the problem of the top coal being difficult to fall down at the end of the fully-mechanized caving working face is mainly to weaken the top coal at the end of the fully-mechanized caving working face in advance, so as to make the top coal at the end of the fully-mechanized caving working face fall down in time under the mining pressure. At present, various top coal weakening methods are mainly adopted, such as deep hole explosive blasting, hydraulic fracturing, carbon dioxide fracturing and static expansion agent fracturing. The above technologies can solve the problem of the top coal being difficult to fall down at the end of the fully-mechanized caving working face to a certain extent, but the deep hole blasting technology has the disadvantages of high cost, poor controllability, large amount of dust and high risk of gas explosion.

[0005] In the existing technology, the problem of the difficulty of collapsing the suspended top coal at the end of the fully-mechanized caving working face is solved by hydraulic fracturing, carbon dioxide fracturing and static expansion agent fracturing. Although it has the advantages of safe and green technology and good pre-cracking effect in hard and dense rock formations, it relies too much on empirical values ​​to determine the technical parameters of high-pressure water jet coal breaking, and it is difficult to grasp the accuracy of the hydraulic coal breaking technical parameters, making it difficult for the suspended top coal at the end of the fully-mechanized caving working face to collapse fully and timely. The suspended length of the suspended top coal at the end is relatively long, posing a great safety hazard. Summary of the invention

[0006] The purpose of the present invention is to overcome the problems in the prior art and provide a method for coupling the advance weakening and support of the suspended top coal at the end of the fully-mechanized caving working face, which can enable the suspended top coal at the end to collapse fully and timely during the mining process of the fully-mechanized caving working face. A support scheme for the mining tunnel after the top coal is weakened is considered and provided, which is suitable for the treatment of large-area suspended top coal at the end of the fully-mechanized caving working face.

[0007] The present invention provides a method for coupling operation of advanced weakening and support of suspended top coal at the end of a fully-mechanized caving working face, comprising the following steps: Obtain coal body, interlayer gangue, and coal seam top and bottom plate samples at the fully mechanized caving working face to prepare standard rock block samples, and conduct physical and mechanical tests on the standard rock block samples to obtain the basic mechanical parameters of the standard rock block samples, providing a basis for the mechanical parameters of the numerical simulation model; According to the mechanical parameters of the numerical simulation model, the numerical simulation model was established using discrete element numerical simulation software. According to the production geological conditions of the fully-mechanized caving working face, hydraulic coal breaking was carried out on the fully-mechanized caving working face, so as to simulate the collapse behavior of the top coal with the end hanging in the air, so as to obtain the best parameter range of hydraulic pressure, angle, height and coal breaking position for hydraulic coal breaking when the top coal with the end hanging in the air collapses. Combined with the on-site construction conditions and the parameter range of hydraulic coal breaking, the best technical parameters for hydraulic coal breaking and weakening of the top suspended coal at the end of the large-angle fully-mechanized caving working face and the joint control of the mining tunnel support are obtained; Based on the technical parameters of hydraulic coal breaking weakening and mining tunnel support joint control, hydraulic coal breaking operations are carried out on site at the fully mechanized caving working face and passive support equipment is set up in the mining tunnel.

[0008] Preferably, when using discrete element numerical simulation software to simulate hydraulic coal breaking in a fully mechanized caving working face, passive supports with different mechanical parameters are added in the mining tunnel to analyze the stability of the surrounding rock and obtain the optimal support parameter range when the surrounding rock of the mining tunnel is stable.

[0009] Preferably, the mining tunnel is a trapezoidal structure that is wider at the bottom and narrower at the top, and the inner wall of the mining tunnel is supported by anchor rods, roof anchor cables and side anchor cables for combined anchor mesh support.

[0010] Preferably, when adding passive support to the mining tunnel within the weakened area of ​​hydraulic coal breaking of the end suspended top coal, a single hydraulic prop is added on the basis of the original support, and a double-lift support is set up in conjunction with the cross top beam and the hinged top beam.

[0011] Preferably, the on-site construction conditions include the deformation of the mining tunnel, the remaining space of the mining tunnel, the layout of the transfer machine and support equipment, and the overall dimensions of the drilling rig and the high-pressure water pump.

[0012] Preferably, when obtaining the parameter range of hydraulic coal breaking, discrete element numerical simulation software is used to simulate the mining tunnel under the original support conditions, and the Rockbolt unit of the discrete element numerical simulation software is used in the numerical simulation model and assigned specific parameters to realize the simulation of the anchor rod in the mining tunnel, and the Cable unit of the discrete element numerical simulation software is used and assigned specific parameters to realize the simulation of the roof anchor cable and side anchor cable in the mining tunnel.

[0013] Preferably, when conducting physical and mechanical tests on standard rock block samples, the standard rock block samples are of cylindrical structure, and uniaxial compression, tension and shear mechanical tests are conducted on the standard rock block samples. The mechanical parameters of compressive strength, tensile strength, shear strength, bulk modulus, shear modulus, cohesion and internal friction angle of the standard rock block are directly obtained through the tests or obtained through subsequent calculations.

[0014] Preferably, as the fully mechanized caving working face advances, the collapse effect of the suspended top coal at the end is monitored in real time, and the technical parameters of hydraulic coal weakening and joint control of mining tunnel support are continuously optimized according to the actual collapse effect.

[0015] Compared with the prior art, the beneficial effects of the present invention are: a method for coupling advance weakening and support of the suspended top coal at the end of a fully-mechanized caving working face of the present invention can introduce high-pressure water jet coal breaking technology into the management of the suspended top coal at the end of a fully-mechanized caving working face, and pre-weaken the coal body by hydraulically creating coal-breaking holes, so that the suspended top coal at the end can be fully and timely collapsed during the mining process of the fully-mechanized caving working face. A support plan for the mining tunnel after the top coal is weakened is considered and provided, which is suitable for the management of large-area suspended top coal at the end of a fully-mechanized caving working face.

[0016] The high-pressure rotating water jet coal breaking technology is used to weaken the suspended top coal at the end of the fully-mechanized caving face in advance to weaken the mechanical strength of the coal body, so as to achieve timely and sufficient collapse of the suspended top coal at the end, solve the problem of large-scale suspension of the suspended top coal at the end of the fully-mechanized caving face, and improve the recovery rate of coal resources, with significant results. The advanced weakening and support coupling operation method of the suspended top coal at the end of the fully-mechanized caving face considers the stability control problem of the surrounding rock of the mining roadway after the top coal is weakened in the mining roadway, and adds passive support on the basis of the original support, while ensuring the full collapse of the suspended top coal at the end and the stability of the surrounding rock of the mining roadway. The advanced weakening and support coupling operation method of the suspended top coal at the end of the fully-mechanized caving face can significantly reduce the suspended area of ​​the suspended top coal at the end, and control the large deformation of the surrounding rock of the mining roadway near the end, so as to reduce the impact ground pressure caused by the large-scale collapse of the suspended top coal at the end and the safety hazards such as hurricane in the fully-mechanized caving face. The mining tunnel is set as a trapezoidal structure that is wide at the bottom and narrow at the top, and the inner wall of the mining tunnel is supported by anchor rods, top anchor cables, and side anchor cables for anchor net cable combination support, which can improve the stability of the mining tunnel and prevent the inner wall of the mining tunnel from collapsing. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of the plane of the fully mechanized caving working face mining engineering of the present invention.

[0018] Figure 2 It is a structural schematic diagram of the original support section of the mining tunnel of the fully mechanized caving working face of the present invention.

[0019] Figure 3 It is a structural schematic diagram of the advanced hydraulic coal breaking operation and drilling equipment arrangement of the fully mechanized caving working face of the present invention.

[0020] Figure 4 It is a schematic diagram of the structure along the direction of the mining tunnel of the present invention.

[0021] Figure 5 A schematic diagram of the structure of adding passive support to the mining tunnel of the present invention.

[0022] Description of Figure Numbers.

[0023] 1. Comprehensive caving working face, 2. Mining tunnel, 3. End suspended top coal, 4. Goaf, 5. Anchor rod, 6. Top anchor cable, 7. Side anchor cable, 8. Tunnel top coal, 9. Direct top of coal seam, 10. Drilling rig, 11. High-pressure water pump, 12. Drill rod, 13. Hydraulic breaking of coal holes, 14. Cross top beam, 15. Articulated top beam, 16. Single hydraulic support. DETAILED DESCRIPTION

[0024] The following is combined with Figure 1-Figure 5 , the specific implementation of the present invention is described in detail, but it should be understood that the protection scope of the present invention is not limited by the specific implementation. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0025] like Figure 1-Figure 5 As shown, the method for coupling the advanced weakening and support of the suspended top coal at the end of the fully-mechanized caving working face provided by the present invention comprises the following steps: At the fully mechanized caving working face 1, samples of coal body, interlayer gangue, and coal seam top and bottom plates were obtained to prepare standard rock block samples, and physical and mechanical tests were carried out on the standard rock block samples to obtain the basic mechanical parameters of the standard rock block samples, providing a basis for the mechanical parameters of the numerical simulation model; According to the mechanical parameters of the numerical simulation model, the numerical simulation model is established by using discrete element numerical simulation software. According to the production geological conditions of the fully-mechanized caving working face 1, hydraulic coal breaking is carried out on the fully-mechanized caving working face 1, so as to simulate the collapse behavior of the top coal 3 with the end hanging in the air, so as to obtain the parameter range of the best hydraulic coal breaking pressure, angle, height and coal breaking position when the top coal 3 with the end hanging in the air collapses; Combined with the on-site construction conditions and the parameter range of hydraulic coal breaking, the best hydraulic coal breaking and weakening technical parameters of the end suspended top coal 3 of the large-angle fully-mechanized caving working face 1 and the support joint control technical parameters of the mining tunnel 2 are obtained; According to the hydraulic coal breaking weakening and mining tunnel 2 support joint control technical parameters, hydraulic coal breaking operations are carried out on site at the fully mechanized caving working face 1 and passive support equipment is set up in mining tunnel 2.

[0026] The working principle of the above embodiment is briefly described: In step 1: Based on the on-site situation of the fully mechanized caving working face 1, the mining engineering plan, the coal seam column diagram, and the operation procedures of the mining roadway 2 and the fully mechanized caving working face 1, the layout and support of the end hanging top coal 3, the fully mechanized caving working face 1 and the mining roadway 2 are summarized to provide a basis for the subsequent establishment of the numerical simulation model. Figure 1 As shown, firstly, mining tunnel 2 is excavated. The cross-section of mining tunnel 2 is trapezoidal, with the cross-section size of 5.4m in width at the bottom, 4.4m in width at the top, and 3.7m in height. It adopts anchor mesh cable joint support. Then, mining is carried out on fully mechanized caving working face 1. The average coal seam inclination of the fully mechanized caving working face is 30°, the coal seam burial depth at the upper end is 630m, the average coal seam thickness is 7m, the designed mining height of fully mechanized caving working face 1 is 2.7m, the top coal caving height is 4.3m, the mining and caving ratio is 1:1.6, and the daily advance of fully mechanized caving working face 1 is 4.8m. The direct top 9 of the coal seam is 4.4m thick sandy mudstone. Figure 2 As shown in the figure, the anchor rod 5 used for the support of the mining roadway 2 has a specification of MSGLW-700 / φ22mm×L2600mm, the top anchor rod 12 has a row spacing of 780mm×800mm, 6 anchor rods 12 are arranged in each row, the side anchor rod 12 has a row spacing of 640mm×800mm, 6 anchor rods are arranged in each row; the top anchor cable 6 has a specification of φ22mm×5300mm, the row spacing is 1400mm×800mm, 3 anchor rods are arranged in each row; the two side anchor cables 7 have a specification of φ22mm×4300mm, 1 anchor rod is arranged in each row, and the row spacing is 800mm. The original support system of the mining roadway 2 belongs to conventional support, and the support strength matching problem after the top coal is weakened is not considered.

[0027] In step 2: in the fully mechanized caving working face 1, mainly the coal body, coal seam gangue and coal seam roof and floor are sampled. The original coal rock blocks obtained must be of sufficient size. In the laboratory, the original coal rock blocks are processed into cylindrical standard specimens of φ50mm×100mm, φ50mm×25mm, and φ50mm×50mm, and uniaxial compression, tension, and shear mechanical tests are carried out respectively. The mechanical parameters directly obtained through the experiment or subsequently calculated include: compressive (tensile, shear) strength, bulk modulus, shear modulus, cohesion, internal friction angle, etc.

[0028] In step 3: according to the production geological conditions of the fully mechanized caving working face 1 (the production geological conditions mainly involve geological structure, stratum lithology, mineral resources and other aspects, these factors directly affect the development and utilization of mineral resources and the management of geological environment), the discrete element numerical simulation software is selected to construct the numerical calculation model of the fully mechanized caving working face 1. The required material parameters are block mechanical parameters and joint surface mechanical parameters. The discrete element numerical simulation software can intuitively analyze the collapse characteristics of the top coal. Based on the block mechanical parameters obtained in step 2, the mechanical parameters of the joint surface are derived as shown in the following formula: ; .

[0029] In the formula, k s , kn are the normal stiffness and shear stiffness of the joint surface, respectively; K and G are the bulk modulus and shear modulus of the block, respectively, GPa / m 2 ; is the minimum side length of the block.

[0030] The mechanical parameters of the blocks and joints were imported into the model to simulate the excavation of the fully-mechanized top-coal caving working face 1, and the mechanical parameters in the model were continuously adjusted. Ultimately, the periodic pressure situation of the fully-mechanized top-coal caving working face 1, the stress distribution of the surrounding rock in the end area, the maximum hanging length of the suspended top coal 3 at the end, and the collapse characteristics in the simulation were roughly consistent with the on-site situation, thus completing the establishment of a numerical model of the fully-mechanized top-coal caving working face 1 with a large dip angle.

[0031] In the model, hydraulic coal breaking simulation is performed on the suspended top coal 3 at the upper end of the mining tunnel 2 in the advanced section, and the layout position and diameter L of the hydraulic coal breaking hole 13 are calculated. 1 、Width L 2 , the angle with the vertical direction and the spacing L in the direction of mining tunnel 2 3 A number of combination schemes were formulated for simulation, and the collapse characteristics of the suspended top coal 3 at the end after the coal body was mined within the initial mining height range when the fully-mechanized caving working face 1 was advanced to the position of the hydraulic coal breaking hole 13 when different schemes were adopted, as well as the maximum suspended length of the suspended top coal 3 at the end when the fully-mechanized caving working face 1 continued to advance forward were analyzed, so as to obtain the optimal hydraulic coal breaking technical parameter range, so that the maximum suspended length of the suspended top coal 3 at the end of the fully-mechanized caving working face 1 within the range of parameters was less than the maximum length actually allowed on site.

[0032] The above simulation for obtaining the optimal hydraulic coal breaking technical parameter range is carried out under the original support conditions of the mining roadway 2. In the model, the Rockbolt unit (anchor unit) is used and specific parameters are assigned to simulate the anchor 5, and the Cable unit (steel cable unit) is used and specific parameters are assigned to simulate the top anchor 6 and the side anchor 7. Considering the support of the anchor 5, top anchor 6 and side anchor 7 of the mining roadway 2 and the weakening coupling effect of hydraulic coal breaking on the end hanging top coal 3, the advancement process of the fully mechanized caving working face 1 is simulated. When the fully-mechanized caving working face 1 advances to the position of the hydraulic coal breaking hole 13, the top coal collapses immediately after the coal body within the initial mining height range is mined, and the collapse effect of the suspended top coal 3 at the end is analyzed at this time; when the fully-mechanized caving working face 1 continues to advance forward, the hanging length of the suspended top coal 3 at the end continues to increase until it breaks, and the maximum hanging length of the suspended top coal 3 at the end is recorded at this time. When its length is within the maximum hanging length of the suspended top coal 3 at the end required on site of the fully-mechanized caving working face 1, the optimal hydraulic coal breaking technical parameter range is obtained.

[0033] When the parameters within the above-mentioned hydraulic coal breaking technical parameter range are used to advance weaken the end hanging top coal 3, the anchor body is destroyed and the strength of the end hanging top coal 3 is weakened, which will inevitably have an adverse effect on the surrounding rock control of the mining tunnel 2. At this time, it is necessary to adjust the support scheme of the mining tunnel 2 to match the support strength required by the surrounding rock after the end hanging top coal 3 is weakened. It is difficult to achieve good results by strengthening the support of the anchor rod 5, the top anchor cable 6 and the side anchor cable 7 on the basis of the original support of the mining tunnel 2, or by grouting to strengthen the strength of the anchor body, and it may even further strengthen the strength of the end hanging top coal 3. Therefore, it is considered to increase passive support to strengthen the control of the roof of the mining tunnel 2, and select a single hydraulic support 16 to cooperate with the cross top beam 14 and the hinged top beam 15 to set up a double-lift support within the length L5 of the hydraulic coal breaking weakening area. In the simulation, the influence range of the advance support pressure of the fully mechanized caving working face 1 is obtained and analyzed, and the length of the advance support section of the mining roadway 2 is determined, which is the length L5 of the weakened area of ​​the hydraulic coal breaking of the end suspended top coal 3. In the simulation, the Liner unit (liner unit) is used and specific parameters are given to simulate the single hydraulic support 16, the cross top beam 14 and the hinged top beam 15, and the control effect of the arrangement position and center spacing of different single hydraulic support 16 on the roof of the mining roadway 2 after the hydraulic coal breaking technology is adopted is analyzed to ensure that the surrounding rock within the range of L5 from the advance fully mechanized caving working face 1 of the mining roadway 2 can meet the safety production requirements under the influence of the advance support pressure and periodic pressure, and the end suspended top coal 3 can smoothly collapse without hanging the top after entering the goaf 4 and the passive support is removed, and the optimal passive support parameter range is obtained at this time.

[0034] In step 4: According to the simulation results of step 3, Figure 3 , Figure 4As shown, the edge of the hydraulic coal-breaking hole 13 is determined to be tangent to the immediate roof 9 of the coal seam and the side of the coal pillar of the mining roadway 2, and the mechanical connection between the end suspended top coal 3 and the coal pillar and the immediate roof 9 of the coal seam is cut off. The diameter L1 of the hydraulic coal-breaking hole 13 is 3m, the width L2 is 0.5m, and the center spacing L3 is 3m. The hydraulic coal-breaking hole 13 is inclined toward the goaf 4, and the angle θ with the vertical direction is 30°; the drilling rig 10 and the high-pressure water pump 11 can be arranged at a minimum distance L4 of 10m from the fully mechanized caving working face 1, and the height H1 of the drilling rig 10 is The length L5 of the weakened area of ​​the suspended top coal 3 at the end is 65m. As the fully-mechanized top coal 1 continues to advance, the length L5 of the weakened area of ​​the suspended top coal 3 at the end is reduced to a fixed length of 40m.

[0035] In step 5: firstly, a single support column 16, a cross top beam 14 and an articulated top beam 15 are erected within a distance L5 of the advanced fully mechanized caving working face 1 by using conventional construction methods. Secondly, a drilling rig 10 and a high-pressure water pump 11 are arranged 10m away from the fully mechanized caving working face in the mining tunnel 2. A large-diameter (φ100mm) jet drilling hole is constructed in the tunnel top coal 8 at an angle of 30° with the horizontal direction using a drill rod 12 (which is hollow inside and can complete drilling and jetting operations). After the drilling is completed, a high-pressure jet fluid is input into the drill rod 12 using the high-pressure water pump 11. The high-speed jet fluid is rotated and sprayed through the jet nozzle on the drill rod 12 to impact and crush the coal body. The retreat of the drill rod 12 is controlled to form a cylindrical hydraulic coal-breaking cavity 13 in the tunnel top coal 8 and a large number of cracks are generated inside the coal body. The crushed coal-water mixture flows out through the annulus of the drill rod 12 and the borehole and is collected. The drilling rig 10 and the high-pressure water pump 11 are pushed forward in turn. After all hydraulic coal-breaking operations in the hydraulic coal-breaking weakening area are completed, the hydraulic coal-breaking equipment is withdrawn. With the continuous advancement of the fully mechanized caving working face 1, the advance support equipment is continuously moved forward, and hydraulic coal breaking operations are carried out periodically. The operation cycle is flexibly adjusted according to the actual situation on site.

[0036] Under the weakening effect of the hydraulic coal-breaking cavities 13 formed by the high-speed rotating jet fluid, the incidental cracks generated, and the water on the coal body, the strength of the suspended top coal 3 at the end is significantly weakened. With the continuous advancement of the fully-mechanized caving working face 1, the collapse effect of the suspended top coal 3 at the end and the maximum suspended length of the suspended top coal 3 at the end are monitored in real time, and the arrangement position, diameter L1, width L2, spacing L3 and angle θ with the vertical direction of the hydraulic coal-breaking cavities 13 are corrected; according to the on-site construction conditions, the arrangement position of the drilling rig 10 and the high-pressure water pump 11, the length of the drill rod 12 and the deflection angle along the direction of the mining roadway 2 are flexibly adjusted; according to the law of mine pressure manifestation in the fully-mechanized caving working face 1 and the law of surrounding rock deformation in the mining roadway 2 and combined with numerical simulation, the selection and center spacing of the single hydraulic support 16, the cross top beam 14 and the articulated top beam 15 are changed. Through the above-mentioned adjustments, the technical parameters of hydraulic coal breaking and weakening and tunnel support are further optimized to ensure that the suspended top coal 3 at the end can collapse in time and the maximum suspended length of the suspended top coal 3 at the end meets the expected target, forming a hydraulic coal breaking and weakening and tunnel support joint control technical plan that meets the target large-angle comprehensive caving working face 1 site.

[0037] The method for coupling advance weakening and support of the suspended top coal at the end of the fully-mechanized caving working face of the present invention can introduce high-pressure water jet coal breaking technology into the treatment of the suspended top coal 3 at the end of the fully-mechanized caving working face 1, and pre-weaken the coal body by hydraulically creating coal-breaking holes, so that the suspended top coal 3 at the end can be fully and timely collapsed during the mining process of the fully-mechanized caving working face 1. A support scheme for the mining tunnel 2 after the top coal is weakened is considered and provided, which is suitable for the treatment of large-area suspended top coal 3 at the end of the fully-mechanized caving working face 1.

[0038] As a preferred solution, Figure 2 As shown, when using discrete element numerical simulation software to simulate the hydraulic coal breaking of the fully mechanized caving working face 1, by adding passive supports with different mechanical parameters in the mining tunnel 2, the stability of the surrounding rock is analyzed, and the optimal support parameter range when the surrounding rock of the mining tunnel 2 is stable is obtained.

[0039] As a preferred solution, Figure 1 As shown, the mining tunnel 2 is a trapezoidal structure that is wide at the bottom and narrow at the top, and the inner wall of the mining tunnel 2 is supported by anchor rods 5, top plate anchor cables 6 and side anchor cables 7. The mining tunnel 2 is set as a trapezoidal structure that is wide at the bottom and narrow at the top, and the inner wall of the mining tunnel 2 is supported by anchor rods 5, top plate anchor cables 6 and side anchor cables 7. The stability of the mining tunnel 2 can be improved and the inner wall of the mining tunnel 2 can be prevented from collapsing.

[0040] As a preferred solution, Figure 1As shown, when passive support is added to the mining tunnel 2 within the weakened area of ​​the hydraulically broken coal 3 at the end, a single hydraulic prop 16 is added on the basis of the original support, and a double-lift support is set up in conjunction with the cross top beam 14 and the hinged top beam 15. Passive support is added to the mining tunnel 2 within the weakened area of ​​the hydraulically broken coal 3 at the end, and a DW-35 single hydraulic prop 16 is added on the basis of the original support, and a double-lift support is set up in conjunction with the DJB600×600 cross top beam 14 and the HDJB-1200 hinged top beam 15. The support arrangement is as shown in the figure. Figure 5 As shown, the center spacing of the cross top beam 14 is 1800mm×1800mm, with three frames in each row, connected by hinged top beams 15 along the direction of the mining roadway 2, and connected by hinged top beams 15 along the center line of the mining roadway 2 and between the two rows near the mining side; a single hydraulic support 16 is set on the bottom plate of each vertical mining roadway 2 below the cross top beam 14 and the hinged top beam 15, and the top plate of the single hydraulic support 16 at the side is 400mm away from the roadway side. By adding a single hydraulic support 16 on the basis of the original support and cooperating with the cross top beam 14 and the hinged top beam 15 to set up a double-lifting shed support, it is possible to effectively prevent roof collapse accidents caused by roof breakage and ensure the stability of the surrounding rock.

[0041] As a preferred solution, Figure 1 As shown, the on-site construction conditions include the deformation of the mining tunnel 2, the remaining space of the mining tunnel 2, the layout of the transfer machine and the support equipment, and the external dimensions of the drilling rig 10 and the high-pressure water pump 11.

[0042] As a preferred solution, Figure 2 As shown, when obtaining the parameter range of hydraulic coal breaking, the discrete element numerical simulation software is used to simulate the mining tunnel 2 under the original support conditions. The Rockbolt unit of the discrete element numerical simulation software used in the numerical simulation model is assigned specific parameters to achieve the simulation of the anchor 5 in the mining tunnel 2, and the Cable unit of the discrete element numerical simulation software is used and assigned specific parameters to achieve the simulation of the roof anchor 6 and the side anchor 7 in the mining tunnel 2. When the fully-mechanized caving working face 1 advances to the position of the hydraulic coal breaking hole 13, after the coal body within the initial mining height range is mined, the top coal collapses immediately, and the collapse effect of the top coal 3 suspended at the end is analyzed at this time; when the fully-mechanized caving working face 1 continues to advance forward, the suspended length of the top coal 3 suspended at the end continues to increase until it breaks, and the maximum suspended length of the top coal 3 suspended at the end is recorded at this time. When its length is within the maximum suspended length of the top coal 3 suspended at the end required on site of the fully-mechanized caving working face 1, the optimal hydraulic coal breaking technical parameter range is obtained.

[0043] As a preferred solution, when conducting physical and mechanical tests on standard rock block samples, the standard rock block samples are cylindrical structures, and uniaxial compression, tension and shear mechanical tests are conducted on the standard rock block samples, and the mechanical parameters of compressive strength, tensile strength, shear strength, bulk modulus, shear modulus, cohesion and internal friction angle of the standard rock block are directly obtained through the test or obtained through subsequent calculations. The obtained coal rock block must be of sufficient size, and the original coal rock block is processed into cylindrical standard samples of φ50mm×100mm, φ50mm×25mm, and φ50mm×50mm in the laboratory. Using the cylindrical standard sample for mechanical testing can not only improve the operational convenience of the mechanical test, but also make the obtained mechanical parameters more representative.

[0044] As a preferred solution, Figure 3 As shown, with the advancement of the fully mechanized caving working face 1, the collapse effect of the suspended top coal 3 at the end is monitored in real time, and the technical parameters of hydraulic coal breaking and weakening and joint control of the support of the mining tunnel 2 are continuously optimized according to the actual collapse effect.

[0045] As a preferred solution, Figure 1 As shown, when the fully-mechanized caving working face 1 under other engineering geological conditions is concerned, the above initial conditions and parameters are changed. For the fully-mechanized caving working face 1 under other engineering geological conditions, after changing a series of initial conditions and parameters, the above steps are studied to effectively solve the problem of the suspended top coal 3 at the end, and to obtain the support parameters for the stability of the surrounding rock of the weakened mining roadway 2, forming a technical solution for the joint control of the advanced hydraulic coal breaking of the suspended top coal 3 at the end of the fully-mechanized caving working face 1 and the support of the mining roadway 2 under different complex conditions.

[0046] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for coupling the advanced weakening and support of the suspended top coal at the end of a fully-mechanized caving working face, characterized in that: The following steps are involved: At the fully mechanized caving working face (1), samples of coal bodies, interlayers, and the top and bottom plates of coal seams are obtained on site to prepare standard rock samples. Physical and mechanical tests are then carried out on the standard rock samples to obtain the basic mechanical parameters of the standard rock samples, which provide a basis for the mechanical parameters of the numerical simulation model. According to the mechanical parameters of the numerical simulation model, a numerical simulation model is established using discrete element numerical simulation software, and according to the production geological conditions of the fully-mechanized caving working face (1), hydraulic coal breaking is performed on the fully-mechanized caving working face (1), thereby simulating the collapse behavior of the end suspended top coal (3), so as to obtain the optimal parameter range of hydraulic coal breaking water pressure, angle, height and coal breaking position when the end suspended top coal (3) collapses; Combined with the on-site construction conditions and the parameter range of hydraulic coal breaking, the best technical parameters for the end hanging top coal (3) hydraulic coal breaking weakening and the mining roadway (2) support joint control of the large-angle fully-mechanized caving working face (1) are obtained; Based on the hydraulic coal breaking weakening and mining roadway (2) support joint control technical parameters, hydraulic coal breaking operations are carried out on site at the fully mechanized caving working face (1) and passive support equipment is set up in the mining roadway (2).

2. The method for coupling the advanced weakening and support of the suspended top coal at the end of the fully mechanized caving working face according to claim 1 is characterized in that: When simulating the hydraulic coal breaking of the fully mechanized caving working face (1) using discrete element numerical simulation software, passive supports with different mechanical parameters are added in the mining tunnel (2) to analyze the stability of the surrounding rock, thereby obtaining the optimal support parameter range when the surrounding rock of the mining tunnel (2) is stable.

3. The method for coupling the advanced weakening and support of the suspended top coal at the end of the fully mechanized caving working face as claimed in claim 1 is characterized in that: The mining tunnel (2) is a trapezoidal structure that is wide at the bottom and narrow at the top. Anchor rods (5), roof anchor cables (6) and side anchor cables (7) are used to carry out anchor-net-cable joint support on the inner wall of the mining tunnel (2).

4. The method for coupling the advanced weakening and support of the suspended top coal at the end of the fully mechanized caving working face as claimed in claim 2 is characterized in that: When passive support is added to the mining tunnel (2) within the weakened area of ​​hydraulic coal breaking of the end suspended top coal (3), a single hydraulic support (16) is added on the basis of the original support, and a double-lift support is set up in conjunction with a cross top beam (14) and a hinged top beam (15).

5. The method for coupling the advanced weakening and support of the suspended top coal at the end of the fully mechanized caving working face as claimed in claim 1 is characterized in that: The on-site construction conditions include the deformation of the mining tunnel (2), the remaining space of the mining tunnel (2), the arrangement of the transfer machine and the support equipment, and the external dimensions of the drilling rig (10) and the high-pressure water pump (11).

6. The method for coupling the advanced weakening and support of the suspended top coal at the end of the fully mechanized caving working face as claimed in claim 1 is characterized in that: When the parameter range of hydraulic coal breaking is obtained, the discrete element numerical simulation software is used to simulate the mining tunnel (2) under the original support conditions. The Rockbolt unit of the discrete element numerical simulation software is used in the numerical simulation model and specific parameters are assigned to achieve the simulation of the anchor rod (5) in the mining tunnel (2). The Cable unit of the discrete element numerical simulation software is used and specific parameters are assigned to achieve the simulation of the roof anchor cable (6) and the side anchor cable (7) in the mining tunnel (2).

7. The method for coupling the advanced weakening and support of the suspended top coal at the end of the fully mechanized caving working face as claimed in claim 1 is characterized in that: When conducting physical and mechanical tests on standard rock block samples, the standard rock block samples are cylindrical structures, and uniaxial compression, tension and shear mechanical tests are carried out on the standard rock block samples. The mechanical parameters of the compressive strength, tensile strength, shear strength, bulk modulus, shear modulus, cohesion and internal friction angle of the standard rock block are directly obtained through the tests or obtained through subsequent calculations.

8. The method for coupling the advanced weakening and support of the suspended top coal at the end of the fully mechanized caving working face as claimed in claim 1 is characterized in that: As the fully mechanized caving working face (1) advances, the collapse effect of the suspended top coal (3) at the end is monitored in real time, and the technical parameters of hydraulic coal weakening and joint control of the mining tunnel (2) support are continuously optimized according to the actual collapse effect.

Citation Information

Patent Citations

  • Method for controlling mining field strength and mine pressure through ground presplitting high-position inclination coal pillar structure

    CN113338931A

  • Hard roof primary caving deep hole blasting parameter intelligent optimization method

    CN116556950A

  • Repeated mining roadway prestress support and mining stress numerical simulation method

    CN116933375A

  • Hydraulic coal extraction and slotting combined coal face end suspended top coal falling method

    CN117345237A

  • Design method for mining upper protective seam close to total rock for use in coal-bed mining

    WO2017185723A1