A method for detecting sediment thickness of bored piles
Through the combination of mud circulation system and rubber particles, the complex operation and inaccurate measurement of drilling pile sediment thickness detection is solved, and fast and accurate detection is achieved. It is suitable for a variety of situations and is economical, environmentally friendly and circulating. Features of utilization.
Patent Information
- Application Number
- CN202411241617.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-09-05
AI Technical Summary
The existing drilling pile slag thickness detection methods have problems such as complex operation, inaccurate measurement, high cost and easy equipment damage, making it difficult to achieve fast, accurate and recyclable detection.
The detection method based on the mud circulation system is adopted. By filling rubber particles and filters with year-on-year gravity, the slurry pump is used to circulate holes to calculate the number of rubber particles to determine the thickness of the pile bottom sediment, simplify operation and improve detection efficiency.
It realizes fast and accurate pile foundation sediment thickness detection, reduces inspection costs, is suitable for mud systems and pile foundation types of various densities, and the equipment is easy to carry and not easily damaged, with economic feasibility and environmental protection advantages.
Smart Images

Figure CN118758237B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of engineering construction, and in particular to a method for detecting the thickness of bored pile sediment. Background Art
[0002] Bored piles are a basic structural engineering method with mature construction technology, high bearing capacity and wide application range. However, due to the particularity of this method, its bearing capacity is easily affected by construction factors. If the sediment at the bottom of the pile is too thick, it will affect the bearing capacity of the pile and the quality of the project. Therefore, it is necessary to accurately measure the thickness of the sediment at the bottom of the pile during the construction process to determine whether the thickness of the sediment at the bottom of the pile meets the requirements of the specification.
[0003] At present, "measuring rope + heavy hammer" is mostly used to measure the thickness of pile bottom sediment, but the measured values are often inconsistent, and the real data of sediment thickness is not clearly reflected, which will cause misjudgment, and this method has certain requirements on the experience level of the surveyor. A Chinese patent (application number: 202222287271) discloses a bored pile sediment thickness measuring tool and measuring device, which can solve the technical problems of high cost of using professional measuring equipment and instability of the hanging hammer method in the prior art. However, the test rod of the patent is easy to pierce into the sediment or embed into a depression at the bottom of the hole, and the accuracy of the detection data cannot be guaranteed by a single test rod; A Chinese patent (application number: 202222408031.3) discloses a bored pile sediment thickness detection device, in which the top screw fixes the guide sleeve and the metal cone to reduce the possibility of the metal cone tilting, reduce the measurement error, and improve the accuracy of the sediment thickness measurement. However, the design of the patented device is complex and the manufacturing cost is relatively high. At the same time, if the top of the sediment is not flat, the measured sediment thickness will also have errors. The measuring metal cone may be corroded if it is not cleaned in time after contact with the sediment due to its own material, which is not conducive to the environmentally friendly recycling of the measuring cone material.
[0004] In summary, how to adopt a bored cast-in-place pile sediment thickness detection technology that is easy to operate, easy to carry, efficient and accurate, not easy to damage, and recyclable has become a difficult problem that needs to be solved urgently. Summary of the invention
[0005] In view of the above-mentioned shortcomings, the present application provides a bored cast-in-place pile sediment thickness detection technology, which is used to solve the problems that most bored cast-in-place pile sediment thickness detection devices have complex and cumbersome structures, cannot quickly and accurately measure the pile foundation sediment thickness, are laborious to operate, and have low detection efficiency.
[0006] In order to solve the above technical problems, the present invention provides a method for detecting sediment thickness of bored cast-in-place piles. The detection method is based on a mud circulation system. The mud circulation system includes a pile hole, a sedimentation tank connected to the pile hole through a connecting groove, and a mud pool. The mud pool is provided with a mud pump for conveying mud into the pile hole. The method is characterized in that it includes the following steps:
[0007] S1: Determine the specific gravity of the sediment according to the formation properties and prepare the filling solution;
[0008] S2: preparing rubber particles that can be filled with solution;
[0009] S3: preparing a filter screen; the mesh size of the filter screen is smaller than the nominal diameter of the rubber particles;
[0010] S4: Laying the filter screen; Laying the filter screen at the bottom of the mud tank and the sedimentation tank;
[0011] S5: placing the rubber particles filled with the solution into the mud pool and calculating the unidimensional density of the rubber particles;
[0012]
[0013] Where: n represents the total number of rubber particles; V1 represents the volume of bored piles; V2 represents the sum of the volumes of the mud tank and the sedimentation tank;
[0014] S6: Start the mud pump to circulate the mud and clean the hole;
[0015] S7: Turn off the mud pump to recover the filter screen and record the number of rubber particles n2 in the filter screen;
[0016] S8: Calculate the number of rubber particles in the bored pile n1, and calculate the thickness of the pile bottom sediment L in combination with the pore size parameters;
[0017] n1= n- n2;
[0018] L = n1 / (pπr 2 );
[0019] Where r is the radius of the pile hole.
[0020] In a preferred embodiment: the specific gravity of the filling solution is adapted to the specific gravity of the sediment.
[0021] In a preferred embodiment: the specific gravity of the filling solution is not greater than 2.80 g / cm 3 .
[0022] In a preferred embodiment: step S3 specifically includes the following steps:
[0023] S3.1: preparing a rubber particle shell; the rubber particle shell is made of a colored rubber film;
[0024] S3.2: Filling the spherical shell with the solution: using a syringe to inject the prepared filling solution into the spherical shell of the rubber particles to form rubber particles.
[0025] In a preferred embodiment: the unit density of the rubber particles should not be less than 6.18.
[0026] In a preferred embodiment: when the bored pile is an end-bearing pile and the measured pile bottom sediment thickness L is greater than 50 mm, steps S7 to S8 need to be circulated to perform secondary hole cleaning.
[0027] In a preferred embodiment: when the bored pile is a friction pile, when the measured pile bottom sediment thickness L is greater than 100 mm, steps S7 to S8 need to be circulated to perform secondary hole cleaning.
[0028] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:
[0029] 1. The present invention puts rubber particles filled with a solution having the same specific gravity as the sediment into the hole cleaning mud for circulation, and obtains the thickness of the pile foundation sediment by combining the unilateral density of the rubber particles with the interception of the filter screen. This method does not require cumbersome detection operations and has a high accuracy rate.
[0030] 2. The present invention can quickly and accurately determine whether the thickness of pile foundation sediment meets the requirements. If the first hole cleaning does not meet the requirements, the hole cleaning operation can be continued until the sediment detection thickness meets the requirements. The rubber particles flow with the mud circulation system, and simple detection calculations can be performed after the circulation operation is completed without unnecessary operating steps. The whole process is fast and efficient.
[0031] 3. The rubber particles of the present invention can be applied to mud circulation systems of various densities, and their density can change with the density of the injected mud. Therefore, the detection technology of the present invention can be applied to various pile foundation types.
[0032] 4. The present invention has good economic feasibility, is simple and easy to carry, is not easy to damage and can be mass-produced, and has the advantages of simple operation and recyclability. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 This is a schematic diagram of the slurry circulation operation of bored cast-in-place piles;
[0034] Figure 2 This is a schematic diagram of the mud circulation before the bored pile is cleaned;
[0035] Figure 3 Schematic diagram of mud circulation after cleaning the bored pile hole. DETAILED DESCRIPTION
[0036] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making creative work are within the scope of protection of the present invention.
[0037] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0038] In the description of the present invention, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installed", "provided with", "mounted / connected", "connected", etc. should be understood in a broad sense. For example, "connection" can be a wall-mounted connection, a detachable connection, or an integral connection. It can be a mechanical connection or an electrical connection. It can be a direct connection or an indirect connection through an intermediate medium. It can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0039] refer to Figure 1-Figure 3 This embodiment provides a method for detecting sediment thickness of bored piles. The method is based on a mud circulation system. The mud circulation system includes a pile hole 11, a sedimentation tank 121 connected to the pile hole 11 through a connecting groove 10, and a mud pool 122. The mud pool 121 is provided with a mud pump 13 for transferring mud 15 into the pile hole 11. The method is characterized in that the method includes the following steps:
[0040] S1: Determine the specific gravity of the sediment according to the formation properties and prepare the filling solution;
[0041] S2: preparing rubber particles 142 that can be filled with a solution;
[0042] S3: preparing a filter screen; the mesh size of the filter screen 141 is smaller than the nominal diameter of the rubber particles 142;
[0043] S4: Laying the filter screen; laying the filter screen 141 at the bottom of the mud pool 122 and the sedimentation tank 121;
[0044] S5: The rubber particles filled with solution are placed in the mud pool 122, and the unilateral density of the rubber particles is calculated;
[0045]
[0046] Where: n represents the total number of rubber particles; V1 represents the volume of bored piles; V2 represents the sum of the volumes of the mud tank and the sedimentation tank;
[0047] S6: Start the mud pump 13 to circulate mud and clean the hole;
[0048] S7: Turn off the mud pump 13 to recover the filter screen 141, and record the number n2 of rubber particles 142 in the filter screen 141;
[0049] S8: Calculate the number of rubber particles n1 within the pile hole 11, and calculate the pile bottom sediment thickness L in combination with the pore size parameters;
[0050] n1= n- n2;
[0051] L = n1 / (pπr 2 );
[0052] Where r is the radius of the pile hole.
[0053] In addition, step S3 specifically also includes the following steps:
[0054] S3.1: preparing a rubber particle shell; the rubber particle shell is made of a colored rubber film;
[0055] S3.2: Filling the spherical shell with the solution: Use a syringe to inject the prepared solution into the spherical shell of the rubber particles to form rubber particles.
[0056] Among them, the spherical shell of the rubber particles prepared in step S3.1 has a certain toughness, and the spherical shell of the rubber particles is made of a colored rubber film for easy observation. The solution filled in the spherical shell can be prepared in advance or configured through the on-site mud gravity parameters, and the prepared solution is injected into the rubber particle shell with a syringe to form rubber particles. It should be noted that the specific gravity of the solution injected into the rubber particle shell must be compatible with the specific gravity of the sediment, and ensure that the prepared rubber particles can be evenly suspended in the mud and enter and exit the circulation system with the mud. The technical parameter requirements of rubber particles should be determined according to the properties of the formation. Under normal circumstances, the specific gravity of the solution is not greater than 2.80g / cm 3 The specific gravity of the solution in this embodiment is 2.7 g / cm 3 Perform parameter calculation.
[0057] During the preparation for the inspection work, it is necessary to first use a mud mixer to make slurry, and set up a mud pool 122 and a sedimentation tank 121 according to the distribution of bored piles. This embodiment uses a concrete pit with an inner clearance size of 6m×6m×1.2m, and uses a partition in the middle to separate the mud pool 122 and the sedimentation tank 121. The height of the partition is lower than the depth of the concrete pit. Then, the prepared rubber particles 142 are placed in the mud pool 122, and the mud pump 13 is started to send the mud 15 mixed with the rubber particles 142 to the bottom of the pile hole 11 through the grouting pipe 131. A continuous stream of mud is sent into the pile hole, causing the liquid level in the hole to rise. As the mud level in the pile hole 11 rises to a predetermined height, it overflows the casing overflow port at the top of the pile and flows back to the sedimentation tank 121 along the connecting groove 10 for sedimentation. The precipitated mud flows into the mud pool 122 again and re-enters the pile hole 11 along the pipe 131 to realize mud circulation. The circulating mud is used to support the hole wall, and the sediment at the bottom of the pile hole 11 is continuously carried to the sedimentation tank 121 to realize the cleaning of the pile foundation.
[0058] Before the hole is cleaned, a layer of filter screen 141 needs to be laid at the bottom of the mud pool 122 and the sedimentation tank 121. The filter screen 141 is used to filter and extract the mud 15 carrying rubber particles 142 after the hole is cleaned. The mesh size of the filter screen 141 should be designed according to the size of the rubber particles 142 to ensure that it can accurately filter out the small rubber particles. Since before the first hole cleaning, the sum of the number of rubber particles in the mud pool 122 and the number of rubber particles 142 in the borehole is the total number of rubber particles n put into the circulation system, the value of n in this embodiment is 500 for illustration. Next, the unilateral density of the rubber particles p=n / (V1+ V2) is calculated; wherein n represents the total number of rubber particles 142, V1 represents the volume of the bored pile, and V2 represents the sum of the volumes of the mud pool and the sedimentation tank. Since the bored pile used in this embodiment has a hole size of 2m in diameter and 12m in depth, the internal clearance size of the matching mud pool 122 and sedimentation pool 121 is 6m×6m×1.2m. The actual value of V1 is 37.7 The actual value of V2 is 43.2 Substituting the specific value into the formula, we get p=6.18. Then, start the mud pump 13 to clean the hole for the first time. After the first hole cleaning is completed, recycle the filter screen 141, and it can be obtained that the number of rubber particles n2 filtered in the mud pool 122 and the sedimentation tank 121 is 498. Comparing this number of rubber particles with the total number of 500 rubber particles put into the mud circulation system, it can be obtained that the number of rubber particles n1 left in the borehole is 2. Then, according to the calculated unilateral density parameter p=6.18, combined with the formula L= n1 / (pπr 2) It can be concluded that the sediment thickness L at the bottom of the pile hole 11 is 0.1m. According to the current technical specifications for building pile foundations, for end-bearing piles, the sediment thickness should not be greater than 50mm, and for friction piles, the sediment thickness should not be greater than 100mm. The sediment at the bottom of the pile foundation in this example meets the requirements of the specifications. When the bored pile is an end-bearing pile, and the measured sediment thickness L at the bottom of the pile is greater than 50mm, steps S7 to S8 need to be cycled for secondary hole cleaning. When the bored pile is a friction pile, and the measured sediment thickness L at the bottom of the pile is greater than 100mm, steps S7 to S8 need to be cycled for secondary hole cleaning.
[0059] The above is only a preferred specific implementation of the present invention, but the design concept of the present invention is not limited to this. Any technician familiar with the technical field who uses this concept to make non-substantial changes to the present invention within the technical scope disclosed by the present invention shall be deemed to infringe the protection scope of the present invention.
Claims
1. A method for detecting sediment thickness of bored piles, the method being based on a mud circulation system, the mud circulation system comprising a pile hole, a sedimentation tank connected to the pile hole through a connecting groove, and a mud pool, the mud pool being provided with a mud pump for conveying mud into the pile hole, characterized in that: The detection method comprises the following steps: S1: Determine the specific gravity of the sediment according to the formation properties and prepare the filling solution; S2: preparing rubber particles that can be filled with solution; S3: preparing a filter screen; the mesh size of the filter screen is smaller than the nominal diameter of the rubber particles; S4: Laying the filter screen; Laying the filter screen at the bottom of the mud tank and the sedimentation tank; S5: placing the rubber particles filled with the solution into the mud pool, and calculating the cubic density of the rubber particles; Where: n represents the total number of rubber particles; V1 represents the volume of bored piles; V2 represents the sum of the volumes of the mud tank and the sedimentation tank; S6: Start the mud pump to circulate the mud and clean the hole; S7: Turn off the mud pump to recover the filter screen and record the number of rubber particles n2 in the filter screen; S8: Calculate the number of rubber particles n1 in the bored pile, and calculate the thickness of the pile bottom sediment L in combination with the hole diameter parameter; n1=n-n2; L=n1 / (pπr 2 ); Where r is the radius of the pile hole.
2. A method for detecting sediment thickness of bored piles according to claim 1, characterized in that: The specific gravity of the filling solution is adapted to the specific gravity of the sediment.
3. A method for detecting sediment thickness of bored piles according to claim 2, characterized in that: The specific gravity of the filling solution is not greater than 2.80 g / cm 3 .
4. A method for detecting sediment thickness of bored piles according to claim 1, characterized in that: The step S3 specifically includes the following steps: S3.1: preparing a rubber particle shell; the rubber particle shell is made of a colored rubber film; S3.2: Filling the spherical shell with the solution: using a syringe to inject the prepared filling solution into the spherical shell of the rubber particles to form rubber particles.
5. A method for detecting sediment thickness of bored piles according to claim 1, characterized in that: When the bored pile is an end-bearing pile and the measured pile bottom sediment thickness L is greater than 50 mm, steps S7 to S8 need to be circulated to perform secondary hole cleaning.
6. A method for detecting sediment thickness of bored piles according to claim 1, characterized in that: When the bored pile is a friction pile, when the measured pile bottom sediment thickness L is greater than 100 mm, it is necessary to loop steps S7 to S8 to perform secondary hole cleaning.
Citation Information
Patent Citations
Cast-in-situ bored pile sediment thickness measuring tool and measuring device
CN218233586U
Cast-in-situ bored pile sediment thickness detection device
CN218511641U
Method for testing bulk density and porosity of cement paste and device thereof
CN102768167A
Secondary hole cleaning method for separating sediment of large-diameter ultra-deep punching pile by sucking slurry in inner air pipe
CN102979469A
Air lift reverse circulation borehole cleaning method
CN105937377A