Method for monitoring precooler fault in aircraft bleed air system
Through numerical simulation and QAR data analysis, the corresponding relationship between the internal leakage of the aircraft bleed air system and the temperature difference is established, which solves the problems of inaccurate and high cost precooler internal leakage detection in the existing technology, and achieves rapid fault diagnosis on the wing. and improved maintenance efficiency.
Patent Information
- Application Number
- CN202410738046.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-06-07
AI Technical Summary
The existing method of detecting internal leakage of the precooler of the aircraft bleed air system requires disassembling components for out-of-situ testing, which cannot be directly applied to actual operating conditions in route operations. In addition, the detection cost is high and the amount of manual operation is large, resulting in inaccurate detection and high costs. .
The numerical simulation method is used to establish the simulation correspondence between the internal leakage amount and the temperature difference. The relationship between the internal leakage amount and the temperature difference under actual operating conditions is obtained by combining the aircraft QAR data. The on-wing precooler fault can be quickly judged through the computer program without the need for Remove the precooler to reduce repair costs and increase accuracy.
It is possible to quickly and accurately determine precooler internal leakage faults during aircraft operation, ensuring flight safety, extending engine life, reducing maintenance costs, and improving route maintenance efficiency.
Smart Images

Figure CN118758495A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of aviation, and in particular to a method for monitoring a precooler failure in an aircraft bleed air system. Background Art
[0002] During aircraft operation, when the precooler (PCE) of the aircraft bleed air system has an internal leakage failure, the PCE inlet and PCE exhaust near the engine blades will continue to blow out hot air. Since the temperature of this hot air is as high as 200℃ to 300℃, it will burn the engine blades for a long time after leaking from the PCE, thus significantly reducing the on-wing life of the engine.
[0003] At the same time, the design data provided by the precooler supplier clearly stipulates the allowable leakage standards of PCE under specific working conditions when tested using specific ground tooling. When the amount of PCE internal leakage is small, that is, it does not exceed the standard, it has little impact on the normal operation of airline aircraft. When the amount of PCE internal leakage exceeds the standard, that is, when an internal leakage failure occurs, it is very easy to cause single-engine bleed air failure, thereby affecting the normal operation of airline aircraft. Therefore, it is very important to accurately monitor the PCE internal leakage in the aircraft bleed air system, determine if the PCE has a fault, and then repair or replace it in time.
[0004] However, if Figure 1 As shown, the internal leakage fault inspection method provided in the PCE component maintenance manual requires first removing the PCE from the aircraft, and then placing the disassembled PCE into a specific tooling to perform an off-site test under test conditions. It is not directly applicable to the judgment of excessive internal leakage of the on-wing PCE under actual conditions in route operations.
[0005] Moreover, if Figure 1 As shown, the PCE internal leakage fault detection method provided in the aforementioned component maintenance manual includes at least two steps: visual inspection and hot edge leakage test. Among them, the visual inspection requires manual visual inspection to confirm that the PCE is complete, undamaged, and has no scratches or dents, the heat sink of the cooling element is in good condition, the connection end is in good condition, and the connection components are installed correctly. In addition, the hot edge leakage test step requires manual operation to use connection caps T01, T02 and T03 to connect PCE port A with the air pressure source, port B with the pressure gauge, and port C with the air valve, seal port D through connection cap T04, and adjust the air pressure source pressure to a predetermined value before placing the PCE in the water tank, and then gradually adjust the air pressure source pressure to a predetermined value and maintain it for a predetermined time, and then determine that the PCE internal leakage amount does not exceed the standard by detecting that the PCE internal leakage flow is within the allowable range and observing that there are no bubbles in the water tank, so as to judge that the PCE has not failed.
[0006] As can be seen from the above, the existing PCE internal leakage fault detection method not only requires disassembling the PCE for off-site detection, but also performs PCE internal leakage detection under test conditions different from actual working conditions. There is a possibility of inaccurate PCE internal leakage detection, and therefore it cannot be directly applied to the judgment of excessive PCE internal leakage in route operations. In addition, as can be seen from the above description, the existing PCE internal leakage fault detection method requires the construction of detection tooling, which is costly, and involves a large amount of manual judgment and operation work, which is a huge workload, and the labor cost and time cost are also very high. Summary of the invention
[0007] Therefore, in order to overcome the problem that the existing precooler internal leakage detection method cannot be directly applied to the on-wing precooler internal leakage fault judgment in route operation and the detection workload is large, the present application proposes a method for monitoring precooler faults in an aircraft bleed air system.
[0008] This application solves the above technical problems through the following technical solutions:
[0009] Specifically, according to one aspect of the present application, a method for monitoring a precooler failure in an aircraft bleed air system is provided, wherein the aircraft bleed air system is supplied with air by an auxiliary bleed air subsystem, the method comprising the following steps:
[0010] The temperature difference between the simulated precooler and the simulated air conditioning component at different internal leakage amounts under simulated working conditions is calculated using a numerical simulation method, thereby obtaining a simulated corresponding relationship between the internal leakage amount and the temperature difference;
[0011] The QAR data of each flight segment of the aircraft is obtained, and the actual working condition of the precooler in each flight segment is extracted from the QAR data, and the actual corresponding relationship between the internal leakage and the temperature difference under the actual working condition is obtained based on the simulated corresponding relationship between the internal leakage and the temperature difference under the simulated working condition;
[0012] Obtaining an actual internal leakage threshold value under actual working conditions based on a test internal leakage threshold value of the precooler under test working conditions; and
[0013] The actual temperature difference threshold value corresponding to the actual internal leakage threshold value is calculated using the actual corresponding relationship, thereby determining that the precooler is faulty when the actual temperature difference between the precooler and the air conditioning component is lower than the actual temperature difference threshold value.
[0014] The method for monitoring precooler failures in an aircraft bleed air system provided in the present application combines numerical simulation technology with engineering practice experience. There is no need to remove the precooler from the aircraft for off-site testing. The internal leakage of the precooler can be quickly determined when the aircraft precooler is on the wing. The internal leakage failure of the precooler can be determined in time in combination with the test internal leakage threshold, thereby ensuring flight safety and greatly improving the service life of the aircraft.
[0015] Moreover, this method combines the working principle and working process of the aircraft bleed air system, and uses numerical simulation technology to establish a simulation correspondence model between the internal leakage and the temperature difference, which has high reusability. In addition, the actual correspondence between the internal leakage and the temperature difference is obtained by extracting the actual working conditions from the QAR data, which conforms to the actual situation and has high accuracy.
[0016] In addition, the method provided in the present application is more convenient for judging precooler failure. The PCE leakage situation in each flight segment can be known without disassembling the PCE. It also takes into account the actual working conditions of the aircraft bleed air system and conforms to the actual situation. Therefore, it has a higher accuracy rate and is more convenient for PCE performance trend analysis and route operation and maintenance.
[0017] According to one embodiment of the present application, the method further includes extracting the precooler temperature and the air conditioning component temperature under actual working conditions from the QAR data, and obtaining the actual temperature difference through difference calculation.
[0018] According to one embodiment of the present application, the method further includes replacing the precooler when it is determined that the precooler is faulty. Judging whether the amount of internal leakage of the precooler has reached a level that requires replacement based on a dynamic replacement standard. When it is determined that the precooler has an internal leakage fault, the faulty precooler is replaced in a timely manner, thereby effectively reducing maintenance costs and improving route maintenance efficiency.
[0019] According to one embodiment of the present application, the step of calculating the temperature difference between the simulated precooler and the simulated air conditioning component at different internal leakage amounts under simulated working conditions includes:
[0020] Computational fluid dynamics modeling of the aircraft bleed air system is performed to obtain the aircraft bleed air system model, the operating parameters of the aircraft bleed air system model under simulated working conditions are set, and the internal leakage of the simulated precooler in the aircraft bleed air system model is continuously adjusted. The simulated precooler temperature and the temperature of the simulated air-conditioning component corresponding to each internal leakage in the aircraft bleed air system model are obtained through numerical simulation calculation, thereby obtaining the temperature difference between the simulated precooler and the simulated air-conditioning component at different internal leakage amounts.
[0021] According to one embodiment of the present application, the step of calculating the temperature difference between the simulated precooler and the simulated air conditioning component at different internal leakage amounts under simulated working conditions also includes:
[0022] The equivalent thermal resistance method is used to equate the thermal conductivity resistance of the simulated bleed air duct, the thermal conductivity resistance of the insulation layer and the convective heat transfer resistance on the surface of the insulation layer in the aircraft bleed air system model to the convective heat transfer resistance of the pipe wall under the third type of boundary conditions in the numerical simulation method, thereby calculating the convective heat transfer coefficient of the outer surface of the entire simulated bleed air duct based on the equivalent convective heat transfer resistance.
[0023] According to one embodiment of the present application, the method further includes using a data analysis method to analyze and count multiple operating conditions when the aircraft bleed air system actually works normally, so as to obtain a general simulated operating condition.
[0024] The method provided in the present application uses numerical simulation technology, based on the actual configuration of the aircraft bleed air system and the precooler, and based on the working principle of the aircraft bleed air system, to simplify the aircraft bleed air system, thereby obtaining a simplified model of the aircraft bleed air system, which greatly reduces the amount of calculation. In addition, the method provided in the present application combines actual experience to obtain a more general simulation condition, simplifies the heat exchange in the simulated aircraft bleed air pipeline, and solves the convective heat transfer coefficient in the pipeline by the equivalent resistance method.
[0025] According to one embodiment of the present application, the operating condition parameters of the simulated operating condition, the actual operating condition and the test operating condition include bleed air temperature, air conditioning component flow, air conditioning component pressure and air conditioning component temperature.
[0026] According to one embodiment of the present application, the step of extracting the actual operating conditions of the precooler in each flight segment from the QAR data includes calculating the mean of the bleed air temperature, the mean of the air-conditioning component flow, the mean of the air-conditioning component pressure and the mean of the air-conditioning component temperature in each flight segment, thereby forming the actual operating conditions corresponding to each flight segment.
[0027] According to one embodiment of the present application, the step of obtaining the actual internal leakage threshold includes using the hot air density calculation formula to calculate the hot air density corresponding to the actual working conditions, and taking the product value of the hot air density and the test internal leakage threshold as the actual internal leakage threshold.
[0028] According to one embodiment of the present application, the step of obtaining the actual corresponding relationship between the internal leakage amount and the temperature difference includes setting the hot air density unchanged, and based on the air-conditioning component flow and the air-conditioning component temperature corresponding to the actual working conditions, using a linear interpolation method to linearly calculate the simulated corresponding relationship, thereby obtaining the actual corresponding relationship between the internal leakage amount and the temperature difference.
[0029] According to one embodiment of the present application, the actual temperature difference is the difference between the temperature at the outlet of the hot side of the precooler and the temperature at the inlet of the air conditioning component.
[0030] According to another aspect of the present application, a computer program product is provided, including a computer program, and when the computer program is executed by a machine, the method of any one of the aforementioned embodiments is executed.
[0031] On the basis of conforming to the common sense in the art, the above-mentioned preferred conditions can be arbitrarily combined to obtain the preferred embodiments of the present application.
[0032] The beneficial technical effects and advantages that can be achieved by the method for monitoring precooler failure in an aircraft bleed air system and the computer program product according to the above-mentioned embodiment of the present application are:
[0033] By using numerical simulation technology and combining the working principle and working process of the aircraft bleed air system, a simplified model of the aircraft bleed air system is established with high reusability. By analyzing multiple actual working conditions of the aircraft bleed air system to obtain a universal benchmark working condition, numerical simulation technology is used to analyze the changes in related temperatures at different internal leakage amounts under the benchmark working condition, so as to match the relationship between different internal leakage amounts and temperature changes by using simulation means, and then reflect the internal leakage amount through temperature changes, which has a wide range of applications;
[0034] Moreover, combined with the test internal leakage threshold in the precooler design data, a temperature standard, i.e., a temperature threshold, is formed when the internal leakage exceeds the standard and needs to be replaced. Therefore, based on the QAR data including temperature data obtained, it is possible to detect and judge in advance whether the internal leakage of the precooler of the route aircraft exceeds the standard, and form a dynamic judgment standard, so as to timely detect the internal leakage of the precooler, which can effectively reduce the maintenance cost and improve the efficiency of route maintenance. In addition, in the process of precooler fault monitoring, the operating parameters under actual working conditions are always considered, so that the precooler fault monitoring results are more accurate.
[0035] At the same time, there is no need to remove the precooler from the aircraft for off-site testing. The internal leakage of the precooler can be quickly determined when the aircraft precooler is on the wing. Combined with the test internal leakage threshold, the internal leakage fault of the precooler in any flight segment can be discovered in time, thereby ensuring flight safety and aircraft service life, and making it easier to analyze the performance trend of the precooler and conduct route operation and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 A schematic diagram of off-site detection of precooler failure according to an existing method.
[0037] Figure 2 This is a schematic diagram of an existing aircraft bleed air system.
[0038] Figures 3A to 3B for Figure 2 A simplified schematic diagram of an existing aircraft bleed air system with air supplied by the auxiliary bleed air subsystem.
[0039] Figure 4 A flowchart of a method for monitoring a precooler failure in an aircraft bleed air system according to a preferred embodiment of the present application. And
[0040] Figure 5 Based on Figure 4 A curve diagram showing the simulated corresponding relationship between the internal leakage and the temperature difference obtained by the method in FIG. DETAILED DESCRIPTION
[0041] In order to make the purpose, technical solutions and advantages of the present application clearer, the technical solutions in the implementation mode of the present application will be clearly and completely described below in conjunction with the accompanying drawings showing multiple embodiments according to the present application. It should be understood that all other embodiments obtained by ordinary technicians in this field without spending creative work based on the embodiments recorded in the present application will fall within the scope of protection of the present application.
[0042] Existing aircraft bleed air systems such as Figure 2 As shown in the figure, under normal working conditions, the bleed air system bleeds air from the port of the engine compressor, and then the air flow is supplied to the left and right bleed air pipelines through the fan bleed air valve (FAV) after adjusting the pressure through the pressure regulating shut-off valve (PRSOV) and the temperature through the PCE, and finally distributed to the downstream air use system on each side of the left and right bleed air pipelines. In addition, the left and right bleed air pipelines are connected by a cross-bleed air valve, and when one side of the bleed air fails and is shut down, the bleed air on the other side can be supplied to the downstream left and right air use systems at the same time.
[0043] When the engine is not used for air supply, but the auxiliary bleed air subsystem (APU) is used for air supply, the ball check valve (CBV) is opened and the PRSOV is closed, the PCE and FAV are not working, and the high-pressure hot air flow provided by the APU will be distributed to the downstream air system after passing through the air conditioning package (PACK). Therefore, the aircraft bleed air system with only APU air supply can be simplified as follows: Figure 3A As shown, it includes an APU located in the air supply pipeline O and used for air supply, a PACK located in the pipeline P downstream of the APU and used for receiving the supply air flow, a PRSOV located in the bypass E of the pipeline where the APU and PACK are located and in a closed state, and a PCE located between the PRSOV and the bypass inlet and in a non-working state.
[0044] The inventors of the present application have found that it is more appropriate to detect whether the PCE has internal leakage and whether the internal leakage exceeds the standard when the PCE is not in operation. Figure 3A and Figure 3B A specific analysis is conducted on the aircraft bleed air system when only APU is supplying air, when the PCE is normal and when the PCE has an internal leakage fault.
[0045] When the APU has not started to supply air, the pressure and temperature of the air in pipeline P and bypass E are close to the ambient pressure and temperature; when the APU starts to supply air and the PACK works normally, the high-pressure hot air from the APU quickly enters pipeline P through pipeline O to provide air input for the PACK. At this time, since the PRSOV is closed and the PCE is not working, bypass E can be simplified to a closed state; when the APU supplies air and the PACK reaches a steady state, such as Figure 3AAs shown in the figure, the PACK inlet temperature PIT in the pipeline P is basically consistent with the temperature of the APU high-pressure hot air. The bypass E reaches a thermal equilibrium state and the temperature field therein is distributed in a gradient. At this time, the PCE hot outlet edge temperature BT is directly related to the temperature drop gradient based on the pipeline heat transfer coefficient. The temperature difference between the PCE hot outlet edge temperature BT and the PACK inlet temperature PIT is large. When an internal leakage fault occurs in the PCE, such as Figure 3B As shown, the thermal equilibrium state in bypass E is broken, and hot air passes through PCE to the external environment at a certain flow rate. At this time, the hot air flow rate passing through PCE increases, and the temperature difference between the PCE hot outlet edge temperature BT and the PACK inlet temperature PIT decreases.
[0046] From the above analysis, it can be seen that when the PCE is within the allowable internal leakage range and the APU air supply conditions are the same, the temperature difference between the PCE and the PACK has a certain relationship with the internal leakage of the PCE. Therefore, the relationship between the temperature difference between the PCE and the PACK and the internal leakage of the PCE can be obtained through the fluid mechanics numerical simulation method, so as to monitor the internal leakage of the PCE according to the obtained temperature difference between the PCE and the PACK, and then promptly discover the internal leakage fault of the PCE and replace the faulty PCE in time.
[0047] Based on the above concept, the present application provides a method for monitoring PCE failure in an aircraft bleed air system, the aircraft bleed air system being supplied with air by an auxiliary bleed air subsystem, such as Figure 4 As shown, the method comprises the following steps:
[0048] S1. Calculate the temperature difference between the simulated PCE and the simulated PACK at different internal leakage amounts under simulated working conditions using a numerical simulation method, thereby obtaining a simulated corresponding relationship between the internal leakage amount and the temperature difference;
[0049] S2, obtaining the QAR data of each flight segment of the aircraft, and extracting the actual working condition of the PCE in each flight segment from the QAR data, and obtaining the actual corresponding relationship between the internal leakage amount and the temperature difference under the actual working condition based on the simulated corresponding relationship between the internal leakage amount and the temperature difference under the simulated working condition;
[0050] S3, obtaining an actual internal leakage threshold under actual working conditions based on the test internal leakage threshold of the PCE under the test working conditions; and
[0051] S4. Calculate the actual temperature difference threshold value corresponding to the actual internal leakage threshold value by using the actual corresponding relationship, and thereby determine that the PCE fails when the actual temperature difference between the PCE and the PACK is lower than the actual temperature difference threshold value.
[0052] In step S1, according to Figure 3A and Figure 3BA simplified aircraft bleed air system with APU bleed air and PACK working normally is used. Based on the actual configuration of PCE, numerical simulation software is used to carry out computational fluid dynamics (CFD) two-dimensional simulation of the aircraft bleed air system. Specifically, it includes computational fluid dynamics modeling of the aircraft bleed air system to obtain an aircraft bleed air system model, setting the operating parameters of the aircraft bleed air system model under simulated working conditions, and continuously adjusting the internal leakage of the simulated PCE in the aircraft bleed air system model. Through numerical simulation calculations, the simulated PCE temperature and the simulated PACK temperature corresponding to each internal leakage in the aircraft bleed air system model are obtained, thereby obtaining the following Figure 5 The temperature difference between the simulated PCE and the simulated PACK at different internal leakage amounts is shown. Exemplarily, the numerical simulation software is StarCCM+ software. Preferably, the simulated working condition is a more general PCE working condition obtained by analyzing and counting multiple working conditions when the aircraft bleed air system actually works normally using a data analysis method.
[0053] As can be seen from the above, the temperature gradient distribution in the bypass E is related to the pipeline heat exchange coefficient. Therefore, optionally, in step S1, when the aircraft bleed air system is subjected to computational fluid dynamics modeling, the heat exchange in the aircraft bleed air pipeline is simplified in combination with actual conditions to solve the pipeline heat exchange coefficient. Specifically, since the APU bleed air pipeline is wrapped with an insulation layer and its flow rate to the PACK is relatively large, the APU to PACK pipeline can be set to be approximately adiabatic. The pipeline portion from the bypass E inlet to the PCE hot outlet edge temperature BT has only system leakage and a very small flow rate, so the heat exchange between this portion of the pipeline and the external environment can be ignored. Therefore, when performing CFD modeling, the equivalent thermal resistance method can be used to equate the thermal conductivity resistance of the simulated bleed air duct in the aircraft bleed air system model, the thermal conductivity resistance of the insulation layer, and the convective heat transfer resistance on the surface of the insulation layer to the convective heat transfer resistance under the third type of boundary conditions of the pipe wall in the numerical simulation method. The convective heat transfer coefficient of the outer surface of the entire simulated bleed air duct can be calculated based on the equivalent convective heat transfer resistance, and the temperature gradient can be determined.
[0054] Among them, the thermal resistance of the pipe wall of the simulated air duct is calculated based on the corresponding outer radius of the pipe, the inner radius of the pipe, the thermal conductivity of the pipe wall material and the pipe length data using the cylindrical coordinate heat conduction formula in fluid mechanics. The thermal conductivity resistance of the insulation layer and the convective heat transfer resistance on the surface of the insulation layer are obtained based on experience. The equivalent thermal resistance is the sum of the thermal resistance of the pipe wall, the thermal conductivity resistance of the insulation layer and the convective heat transfer resistance on the surface of the insulation layer. The aforementioned pipeline heat transfer coefficient directly related to the temperature drop gradient is the reciprocal of the equivalent thermal resistance.
[0055] After the model is established, the operating parameters of the simulated operating conditions need to be set in step S1. The operating parameters generally include bleed air temperature, PACK flow, PACK pressure and PACK temperature. Optionally, different APU bleed air temperatures, PACK inlet pressures, PACK inlet flows and PACK inlet temperatures can be adjusted as needed to obtain the results under different operating conditions.
[0056] After completing the model establishment and working condition setting, the internal leakage value is continuously adjusted to obtain the following through numerical simulation calculation method: Figure 5 The simulated correspondence between the internal leakage of the simulated precooler and the temperature difference is shown in the figure. Under the simulated working conditions, Figure 3A and Figure 5 As shown in the figure, when the PCE internal leakage is zero, the temperature difference between the PCE hot outlet edge temperature BT and the PACK inlet temperature PIT is the largest; when the PCE internal leakage increases within a certain range, the temperature difference between the PCE hot outlet edge temperature BT and the PACK inlet temperature PIT gradually decreases; when the PCE internal leakage increases to a certain value, the temperature difference between the PCE hot outlet edge temperature BT and the PACK inlet temperature PIT is small, and then the increase in internal leakage has no obvious effect on the steady-state temperature. The CFD simulation results are consistent with the results of qualitative analysis, indicating that the simulated correspondence between the internal leakage and the temperature difference is consistent with the actual situation.
[0057] In step S2, after each flight segment is completed, the quick access recorder (QAR) data from the aircraft wireless quick access recorder (WQAR) will be transmitted to the ground via a wireless network. The QAR data contains a continuous record of the PCE hot edge outlet temperature and PACK inlet temperature data under the APU air supply before takeoff, and records the APU bleed air temperature, APU bleed air pressure, PCE upstream pressure, PACK inlet temperature, PACK inlet flow and PACK inlet pressure data. Therefore, after the original QAR data is decoded with reference to the ARINC specification, the specific actual working conditions corresponding to each flight segment and the PCE temperature and PACK temperature under the specific actual working conditions can be extracted from the file generated after decoding.
[0058] Specifically, for each flight segment, the step of extracting the PCE temperature and PACK temperature under specific actual operating conditions from the file generated after decoding includes filtering out the columns where the bleed air temperature data, PACK inlet flow data, PACK inlet pressure data, PACK inlet temperature data and PCE hot edge outlet temperature data are located according to the table header name in the decoded file, and then extracting the corresponding columns from the file to form a data table, thereby obtaining the operating parameter data corresponding to the specific actual operating condition, thereby forming the specific actual operating condition.
[0059] Optionally, considering that the actual working conditions before the aircraft takes off are relatively stable, for each flight segment, the average of the bleed air temperature, the average of the PACK inlet flow rate, the average of the PACK inlet pressure, and the average of the PACK inlet temperature can be calculated to form the actual working conditions corresponding to each flight segment. At the same time, the average of the PCE hot edge outlet temperature can be calculated to obtain the average of the temperature difference between the PCE hot edge outlet temperature and the PACK inlet temperature under the corresponding actual working conditions.
[0060] In step S2, the step of obtaining the actual corresponding relationship between the internal leakage and the temperature difference includes setting the hot air density unchanged, and using a linear interpolation method to linearly calculate the simulated corresponding relationship obtained in step S1 based on the PACK inlet flow and PACK inlet temperature corresponding to the actual working condition, so as to obtain the actual corresponding relationship between the internal leakage and the temperature difference under the corresponding actual working condition. Optionally, when determining the internal leakage threshold under different actual working conditions, the temperature difference threshold corresponding to the internal leakage threshold under different actual working conditions can be calculated respectively using the actual corresponding relationship under different actual working conditions, and then the PCE internal leakage fault under different actual working conditions is monitored in time, thereby forming a dynamic replacement standard for different actual working conditions.
[0061] In step S3, the PCE design manual provides the test internal leakage threshold of the PCE under the test condition, and the test internal leakage threshold is the volume flow rate. Therefore, according to the principle of allowing the leakage ratio to remain unchanged, the hot air density calculation formula can be used to calculate the hot air density corresponding to the actual working condition, and then the hot air density is multiplied by the test internal leakage threshold to obtain the actual internal leakage threshold. Among them, the calculation formula of the hot air density ρ is as follows:
[0062]
[0063] Among them, P is the actual pressure of hot air, P 0 is the standard physical atmospheric pressure, and T is the hot air temperature in Celsius.
[0064] In step S4, the precooler temperature and the air conditioning component temperature under actual working conditions are extracted from the QAR data, and the actual temperature difference is obtained by difference calculation, so that when the actual temperature difference is lower than the actual temperature difference threshold, it is judged that the precooler is faulty, and the faulty precooler is replaced in time. Alternatively, the mean value of the precooler temperature and the mean value of the air conditioning component temperature under actual working conditions are extracted from the QAR data, and the actual temperature difference mean is obtained by difference calculation, so that when the actual temperature difference mean is lower than the actual temperature difference threshold, it is judged that the precooler is faulty, and the faulty precooler is replaced in time.
[0065] When facing a new flight segment, the specific actual operating conditions of the flight segment can be compared with the operating conditions corresponding to the actual corresponding relationship to determine the corresponding specific actual corresponding relationship; the specific actual operating conditions of the flight segment can be compared with the operating conditions corresponding to the actual internal leakage threshold to determine the corresponding specific actual internal leakage threshold; the specific temperature difference threshold is obtained through the specific actual internal leakage threshold and the specific actual corresponding relationship, so as to judge whether the precooler is faulty according to whether the actual temperature difference of the flight segment is the specific temperature difference threshold, and then judge whether the precooler needs to be replaced.
[0066] Optionally, the method further includes distinguishing normal segments and abnormal segments with precooler internal leakage based on the flight line aircraft operation fault records. The upstream and downstream temperature, pressure and flow data of the precooler in the segments with and without internal leakage exceeding the standard are screened out using QAR data, and the numerical simulation results are corrected using the aforementioned data, thereby directly obtaining the temperature difference threshold when the actual precooler is working.
[0067] In addition, the present application also provides a computer program product, including a computer program, which performs any one of the methods described herein when the computer program is executed by a machine.
[0068] According to the method and computer program product provided by the present application, there is no need to remove the precooler from the aircraft for off-site testing. The internal leakage of the precooler can be quickly determined when the aircraft precooler is on the wing. Combined with the test internal leakage threshold, the internal leakage fault of the precooler in any flight segment can be discovered in time, thereby ensuring flight safety and aircraft service life, and making it easier to analyze the performance trend of the precooler and conduct route operation and maintenance.
[0069] Moreover, by using numerical simulation technology and combining the working principle and working process of the aircraft bleed air system, a simplified model of the aircraft bleed air system is established, which has high reusability. By analyzing multiple actual working conditions of the aircraft bleed air system, a universal benchmark working condition is obtained, and then the numerical simulation technology is used to analyze the changes in the relevant temperature under different internal leakage amounts under the benchmark working condition, so as to match the relationship between different internal leakage amounts and temperature changes by using simulation means, and then reflect the internal leakage amount through the temperature change, which has a wide range of applications.
[0070] In addition, combined with the test internal leakage threshold in the precooler design data, the temperature standard when the internal leakage exceeds the standard and needs to be replaced is formed, that is, the temperature threshold. Therefore, according to the QAR data including temperature data obtained, it is possible to discover and judge in advance whether the internal leakage of the route aircraft precooler exceeds the standard, and form a dynamic judgment standard, so as to timely discover the internal leakage of the precooler, which can effectively reduce the maintenance cost and improve the efficiency of route maintenance. Moreover, in the process of precooler fault monitoring, the actual working conditions are always taken into account, making the precooler fault monitoring results more accurate.
[0071] Although the specific implementation methods of the present application are described above, those skilled in the art should understand that these are only examples, and the protection scope of the present application is defined by the appended claims. Those skilled in the art may make various changes or modifications to these implementation methods without departing from the principles and essence of the present application, but these changes and modifications all fall within the protection scope of the present application.
Claims
1. A method for monitoring a precooler failure in an aircraft bleed air system, wherein: The aircraft bleed air system is supplied with air by an auxiliary bleed air subsystem, and the method comprises the following steps: The temperature difference between the simulated precooler and the simulated air conditioning component at different internal leakage amounts under simulated working conditions is calculated using a numerical simulation method, thereby obtaining a simulated corresponding relationship between the internal leakage amount and the temperature difference; Acquire QAR data of each flight segment of the aircraft, extract the actual working condition of the precooler in each flight segment from the QAR data, and obtain the actual corresponding relationship between the internal leakage and the temperature difference under the actual working condition based on the simulated corresponding relationship between the internal leakage and the temperature difference under the simulated working condition; Obtaining an actual internal leakage threshold value under the actual working condition based on a test internal leakage threshold value of the precooler under the test working condition; and The actual temperature difference threshold value corresponding to the actual internal leakage threshold value is calculated using the actual corresponding relationship, and thus when the actual temperature difference between the precooler and the air conditioning component is lower than the actual temperature difference threshold value, it is determined that the precooler is faulty.
2. The method according to claim 1, further comprising: The precooler temperature and the air conditioning component temperature under the actual working condition are extracted from the QAR data, and the actual temperature difference is obtained by difference calculation.
3. The method according to claim 1, further comprising: When it is determined that the precooler fails, the precooler is replaced.
4. The method according to claim 1, wherein: The step of calculating the temperature difference between the simulated precooler and the simulated air conditioning component at different internal leakage amounts under simulated working conditions comprises: Computational fluid dynamics modeling is performed on the aircraft bleed air system to obtain an aircraft bleed air system model, the operating parameters of the aircraft bleed air system model under simulated operating conditions are set, and the internal leakage of the simulated precooler in the aircraft bleed air system model is continuously adjusted. The simulated precooler temperature and the simulated air-conditioning component temperature corresponding to each internal leakage in the aircraft bleed air system model are obtained through numerical simulation calculation, thereby obtaining the temperature difference between the simulated precooler and the simulated air-conditioning component at different internal leakage amounts.
5. The method according to claim 4, wherein: The step of calculating the temperature difference between the simulated precooler and the simulated air conditioning component at different internal leakage amounts under the simulated working condition also includes: The equivalent thermal resistance method is used to equate the thermal conductivity resistance of the simulated bleed air duct, the thermal conductivity resistance of the insulation layer and the convective heat transfer resistance on the surface of the insulation layer in the aircraft bleed air system model to the convective heat transfer resistance under the third type boundary condition of the pipe wall in the numerical simulation method, thereby calculating the convective heat transfer coefficient of the outer surface of the entire simulated bleed air duct based on the equivalent convective heat transfer resistance.
6. The method according to claim 1, further comprising: The data analysis method is used to analyze and count multiple working conditions when the aircraft bleed air system actually works normally, so as to obtain the universal simulated working condition.
7. The method according to claim 1, wherein: The operating condition parameters of the simulated operating condition, the actual operating condition and the test operating condition include bleed air temperature, air conditioning component flow, air conditioning component pressure and air conditioning component temperature.
8. The method according to claim 7, wherein: The steps of extracting the actual working condition from the QAR data include: The average value of the bleed air temperature, the average value of the air conditioning component flow rate, the average value of the air conditioning component pressure and the average value of the air conditioning component temperature in each flight segment are calculated, thereby forming an actual working condition corresponding to each flight segment.
9. The method according to claim 1, wherein: The step of obtaining the actual internal leakage threshold comprises: The hot air density corresponding to the actual working condition is calculated using a hot air density calculation formula, and the product value of the hot air density and the test internal leakage threshold is used as the actual internal leakage threshold.
10. The method according to claim 1, wherein: The steps of obtaining the actual corresponding relationship between the internal leakage and the temperature difference include: The hot air density is assumed to remain substantially unchanged, and based on the air conditioning component flow and the air conditioning component temperature corresponding to the actual working conditions, the simulated corresponding relationship is linearly calculated using a linear interpolation method to obtain the actual corresponding relationship between the internal leakage amount and the temperature difference.
11. A method according to any one of the preceding claims, wherein: The actual temperature difference is the difference between the temperature at the hot side outlet of the precooler and the temperature at the inlet of the air conditioning component.
12. A computer program product, comprising a computer program, wherein when the computer program is executed by a machine, the method according to any one of claims 1 to 11 is performed.
Citation Information
Patent Citations
Alarming method and system and monitoring terminal applied to airplane
CN106628248A
Large-temperature-difference precooler performance testing device
CN114486309A
Method for predicting a bleed air system fault
US20140309846A1
System for handling a fault of an aircraft and a method and computer equipment for achieving the same
US20180165657A1