Method and system for testing overflowing capacity of conical valve

By accurately adjusting the pressure of the cone valve and collecting data, the problems of tedious and inaccurate traditional testing methods are solved, the scientific evaluation of the flow capacity of the cone valve is achieved, and the testing accuracy and product quality are improved.

CN118758588AActive Publication Date: 2024-10-11HARBIN ELECTRIC MASCH RES INST CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410767781.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-14
Publication Date
2024-10-11
Estimated Expiration
2044-06-14

AI Technical Summary

Technical Problem

The traditional conical valve flow capacity testing method is cumbersome, time-consuming and labor-intensive, and the accuracy and reliability are difficult to guarantee. It lacks scientific and effective data processing and analysis methods, making it difficult to accurately evaluate the conical valve's flow capacity.

Method used

By extracting test demand information, accurately adjust the inlet and outlet pressure of the cone valve, record the working status and related parameters in real time, collect data under different opening and pressure conditions, use formulas to calculate the target pressure and pressure adjustment gradient, and conduct data analysis to Evaluate the flow capacity of a cone valve.

Benefits of technology

The precision and accuracy of the test are improved, the flow characteristics, pressure loss and cavitation characteristics of the cone valve are comprehensively evaluated, deficiencies in design and performance are discovered, design and performance are optimized, and product quality is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0004893092510000021
    Figure BDA0004893092510000021
  • Figure BDA0004893092510000022
    Figure BDA0004893092510000022
  • Figure BDA0004893092510000031
    Figure BDA0004893092510000031
Patent Text Reader

Abstract

The invention provides a conical valve overflowing capacity testing method and system, and relates to the technical field of conical valve overflowing capacity testing, and the method comprises the steps: obtaining a testing opening value corresponding to a conical valve; performing target pressure adjustment on the inlet pressure and the outlet pressure of the conical valve at the test initial moment corresponding to each opening value, and starting test operation and data recording to obtain first data information; the outlet pressure of the conical valve is increased until cavitation bubbles in a cavity of the conical valve disappear, and second data information is obtained; the inlet pressure of the conical valve is increased, and third data information in the state that the inlet pressure of the conical valve is increased is recorded; the overflowing capacity of the conical valve is evaluated according to the first data information, the second data information and the third data information, and an evaluation result is obtained.The overflowing capacity of the conical valve is evaluated and improved, the performance stability and reliability of the conical valve can be improved, and therefore the product quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention provides a method and system for testing the flow capacity of a cone valve. The present invention relates to the technical field of flow capacity testing, and in particular to the technical field of flow capacity testing of a cone valve. Background Art

[0002] In fluid control systems, the cone valve is a common control element, and the stability and reliability of its performance are crucial to the operation of the entire system. The flow capacity of the cone valve, that is, its ability to control the fluid flow and pressure under different working conditions, is one of the important indicators to measure its performance. However, in practical applications, due to the complexity of fluid properties and the diversity of working environments, the flow capacity of the cone valve is often affected by many factors, such as the opening of the cone valve, the flow rate of the fluid, and the pressure. In order to accurately evaluate the flow capacity of the cone valve, the traditional test method usually requires multiple tests on the cone valve under different working conditions and record the relevant data parameters. However, this method has the following shortcomings: first, the test process is cumbersome and requires a lot of time and manpower; second, due to the complexity and uncontrollability of the test environment, the accuracy and reliability of the test results are difficult to guarantee; finally, there is a lack of scientific and effective methods and means for the processing and analysis of test data, and it is difficult to obtain accurate evaluation results. Summary of the invention

[0003] The present invention provides a method and system for testing the flow capacity of a conical valve, which is used to solve the problem that in practical applications, due to the complexity of fluid properties and the diversity of working environments, the flow capacity of the conical valve is often affected by multiple factors, such as the opening of the conical valve, the flow rate of the fluid, pressure, etc. In order to accurately evaluate the flow capacity of the conical valve, the traditional testing method usually requires multiple tests on the conical valve under different working conditions and records the relevant data parameters. However, this method has the problems of cumbersome testing process, requiring a lot of time and manpower, and it is difficult to guarantee the accuracy and reliability of the test results. There is a lack of scientific and effective methods and means for the processing and analysis of test data, making it difficult to obtain accurate evaluation results:

[0004] The present invention provides a method and system for testing the flow capacity of a cone valve. The method for testing the flow capacity of a cone valve includes:

[0005] Extracting test requirement information, and obtaining a test opening value corresponding to the cone valve according to the test requirement information;

[0006] At the test initial moment corresponding to each opening value, target pressure adjustment is performed on the inlet pressure and the outlet pressure of the cone valve, and the test operation and data recording are started to obtain first data information;

[0007] Increasing the outlet pressure of the conical valve until the cavitation bubbles in the cavity of the conical valve disappear, and acquiring second data information;

[0008] increasing the inlet pressure of the conical valve and recording third data information when the inlet pressure of the conical valve is increased;

[0009] The flow capacity of the cone valve is evaluated according to the first data information, the second data information and the third data information, and an evaluation result is obtained.

[0010] Further, at the test initial moment corresponding to each opening value, the inlet pressure and the outlet pressure of the cone valve are adjusted to target pressure, and the test operation and data recording are started to obtain first data information, including:

[0011] Extract the test opening value of the cone valve corresponding to the current test;

[0012] Obtaining a target inlet pressure value and a target outlet pressure value of the conical valve according to a test opening value of the conical valve;

[0013] The inlet pressure of the conical valve is adjusted to a target inlet pressure value; wherein the target inlet pressure value is obtained by the following formula:

[0014] P mr =P min -α·(P max -P min )

[0015] Among them, P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max represents the maximum working pressure corresponding to the rated working pressure range of the cone valve; α represents the first adjustment coefficient; and the first adjustment coefficient is obtained by the following formula:

[0016]

[0017] Among them, ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve;

[0018] The outlet pressure of the conical valve is adjusted to a target outlet pressure value; wherein the target outlet pressure value is obtained by the following formula:

[0019] Pmc =(1+β)·P min

[0020] Among them, P mc Indicates the target outlet pressure value; P min represents the minimum working pressure corresponding to the rated working pressure range of the cone valve; β represents the second adjustment coefficient; and the second adjustment coefficient is obtained by the following formula:

[0021]

[0022] Among them, P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve; P mr Indicates the target inlet pressure value;

[0023] When the test operation is stable, collect the vibration signal and cavitation image under the working condition when the test operation is stable, and record the current inlet and outlet pressure and flow data of the cone valve;

[0024] The vibration signal, the cavitation image, and the inlet and outlet pressure and flow data of the cone valve are used as the first data information.

[0025] Further, the outlet pressure of the conical valve is increased until the cavitation bubbles in the cavity of the conical valve disappear, and second data information is obtained, including:

[0026] Extracting the target inlet pressure value and the target outlet pressure;

[0027] Extract the test opening value of the cone valve corresponding to the current test;

[0028] According to the test opening value of the conical valve combined with the target inlet pressure value and the target outlet pressure, the upper limit value and the lower limit value of the pressure regulation gradient corresponding to a single pressure regulation in the process of increasing the outlet pressure of the conical valve are obtained; wherein the upper limit value and the lower limit value of the pressure regulation gradient of the increase in the outlet pressure of the conical valve are obtained by the following formula:

[0029]

[0030] Among them, P cup Indicates the upper limit of the pressure adjustment gradient of the cone valve outlet pressure increase; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; α indicates the first adjustment coefficient; β indicates the second adjustment coefficient;

[0031]

[0032] Among them, P cdown Indicates the lower limit of the pressure adjustment gradient; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P cup Indicates the upper limit of the pressure adjustment gradient;

[0033] The pressure regulating gradient is set according to the upper and lower limits of the pressure gradient of the increased outlet pressure of the cone valve;

[0034] The outlet pressure of the conical valve is increased and adjusted according to the pressure adjustment gradient until the cavitation bubbles in the cavity of the conical valve disappear;

[0035] The vibration signal and cavitation image when the cavitation bubbles disappear in the cavity and the inlet and outlet pressure and flow data of the cone valve are collected as the second data information.

[0036] Further, increasing the inlet pressure of the conical valve and recording third data information when the inlet pressure of the conical valve is increased includes:

[0037] Extract test requirement information;

[0038] Acquire a first outlet test pressure, a second outlet test pressure, and a third outlet test pressure corresponding to the conical valve according to the test requirement information;

[0039] According to the first outlet test pressure, the second outlet test pressure and the third outlet test pressure, a first pressure boosting gradient range, a second pressure boosting gradient range and a third pressure boosting gradient range corresponding to the inlet pressure of the conical valve are set;

[0040] setting a first boosting gradient according to the first boosting gradient range, increasing the inlet pressure of the conical valve according to the first boosting gradient until the outlet pressure of the conical valve reaches a first outlet test pressure, and recording a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure;

[0041] setting a second pressurization gradient according to the second pressurization gradient range, increasing the inlet pressure of the conical valve according to the second pressurization gradient until the outlet pressure of the conical valve reaches a second outlet test pressure, and recording a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure;

[0042] setting a third boost gradient according to the third boost gradient range, increasing the inlet pressure of the conical valve according to the third boost gradient until the outlet pressure of the conical valve reaches a third outlet test pressure, and recording a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the third outlet test pressure;

[0043] The data parameters corresponding to the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure, the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure, and the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure are taken as the third data information.

[0044] Furthermore, the first boost gradient range, the second boost gradient range and the third boost gradient range are obtained by the following formula:

[0045]

[0046] Among them, P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P cup Indicates the upper limit value of the pressure regulation gradient at which the outlet pressure of the cone valve increases;

[0047]

[0048] Among them, P rdown01 represents the lower limit value corresponding to the first boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P rup01 Indicates the upper limit value corresponding to the first boost gradient range;

[0049]

[0050] Among them, P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; Pmr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P c02 Indicates the second outlet test pressure; P rup01 Indicates the upper limit value corresponding to the first boost gradient range;

[0051]

[0052] Among them, P rdown02 represents the lower limit value corresponding to the second boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve;

[0053]

[0054] Among them, P rup03 represents the upper limit value corresponding to the third boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve;

[0055]

[0056] Among them, P rdown03 represents the lower limit value corresponding to the third boost gradient range; P rup03 represents the upper limit value corresponding to the third boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully open.

[0057] Furthermore, the conical valve flow capacity testing system comprises:

[0058] An opening value extraction module is used to extract test requirement information and obtain a test opening value corresponding to the cone valve according to the test requirement information;

[0059] A first data acquisition module is used to adjust the inlet pressure and the outlet pressure of the cone valve to a target pressure at the test initial moment corresponding to each opening value, and start the test operation and data recording to obtain first data information;

[0060] A second data acquisition module is used to increase the outlet pressure of the conical valve until the cavitation bubbles in the cavity of the conical valve disappear, and acquire second data information;

[0061] A third data acquisition module, used for increasing the inlet pressure of the conical valve and recording third data information when the inlet pressure of the conical valve is increased;

[0062] The capacity evaluation module is used to evaluate the flow capacity of the cone valve according to the first data information, the second data information and the third data information, and obtain an evaluation result.

[0063] Furthermore, the first data acquisition module includes:

[0064] A test opening value extraction module is used to extract the test opening value of the cone valve corresponding to the current test;

[0065] A pressure value acquisition module, used for acquiring a target inlet pressure value and a target outlet pressure value of the conical valve according to a test opening value of the conical valve;

[0066] The inlet pressure adjustment calculation module is used to adjust the inlet pressure of the conical valve to a target inlet pressure value; wherein the target inlet pressure value is obtained by the following formula:

[0067] P mr =P min -α·(P max -P min )

[0068] Among them, P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max represents the maximum working pressure corresponding to the rated working pressure range of the cone valve; α represents the first adjustment coefficient; and the first adjustment coefficient is obtained by the following formula:

[0069]

[0070] Among them, ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve;

[0071] The outlet pressure adjustment calculation module is used to adjust the outlet pressure of the conical valve to a target outlet pressure value; wherein the target outlet pressure value is obtained by the following formula:

[0072] P mc =(1+β)·P min

[0073] Among them, P mc Indicates the target outlet pressure value; P min represents the minimum working pressure corresponding to the rated working pressure range of the cone valve; β represents the second adjustment coefficient; and the second adjustment coefficient is obtained by the following formula:

[0074]

[0075] Among them, P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve; P mr Indicates the target inlet pressure value;

[0076] The data recording module is used to collect the vibration signal and cavitation image under the working condition when the test is running stably, and record the current inlet and outlet pressure and flow data of the cone valve;

[0077] The vibration signal, the cavitation image, and the inlet and outlet pressure and flow data of the cone valve are used as the first data information.

[0078] Furthermore, the second data acquisition module includes:

[0079] A pressure extraction module, used to extract the target inlet pressure value and the target outlet pressure;

[0080] A test opening value extraction module is used to extract the test opening value of the cone valve corresponding to the current test;

[0081] A limit value adjustment calculation module is used to obtain the upper limit value and lower limit value of the pressure adjustment gradient corresponding to a single pressure adjustment in the process of increasing the outlet pressure of the conical valve according to the test opening value of the conical valve combined with the target inlet pressure value and the target outlet pressure; wherein the upper limit value and lower limit value of the pressure adjustment gradient of the increase in the outlet pressure of the conical valve are obtained by the following formula:

[0082]

[0083] Among them, P cup Indicates the upper limit of the pressure adjustment gradient of the cone valve outlet pressure increase; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P minIndicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; α indicates the first adjustment coefficient; β indicates the second adjustment coefficient;

[0084]

[0085] Among them, P cdown Indicates the lower limit of the pressure adjustment gradient; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P cup Indicates the upper limit of the pressure adjustment gradient;

[0086] A gradient setting module, used to set a pressure regulating gradient according to an upper limit value and a lower limit value of a pressure gradient of an outlet pressure increase of the conical valve;

[0087] An increase regulation module, used for increasing and regulating the outlet pressure of the conical valve according to the pressure regulation gradient until the cavitation bubbles in the cavity of the conical valve disappear;

[0088] The second acquisition module is used to collect the vibration signal and cavitation image when the cavitation bubbles disappear in the cavity and the inlet and outlet pressure and flow data of the cone valve as the second data information.

[0089] Furthermore, the third data acquisition module includes:

[0090] Test pressure acquisition module, used to extract test requirement information;

[0091] Acquire a first outlet test pressure, a second outlet test pressure, and a third outlet test pressure corresponding to the conical valve according to the test requirement information;

[0092] A range setting module, used for setting a first pressure boosting gradient range, a second pressure boosting gradient range and a third pressure boosting gradient range corresponding to the inlet pressure of the conical valve according to the first outlet test pressure, the second outlet test pressure and the third outlet test pressure;

[0093] a first test recording module, configured to set a first boost gradient according to the first boost gradient range, increase the inlet pressure of the conical valve according to the first boost gradient until the outlet pressure of the conical valve reaches a first outlet test pressure, and record a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure;

[0094] a second test recording module, configured to set a second boost gradient according to the second boost gradient range, increase the inlet pressure of the conical valve according to the second boost gradient until the outlet pressure of the conical valve reaches a second outlet test pressure, and record a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure;

[0095] a third test recording module, configured to set a third boost gradient according to the third boost gradient range, increase the inlet pressure of the conical valve according to the third boost gradient until the outlet pressure of the conical valve reaches a third outlet test pressure, and record a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the third outlet test pressure;

[0096] The third acquisition module is used to use the data parameters corresponding to the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure, the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure, and the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure as the third data information.

[0097] Furthermore, the range setting module includes:

[0098] A first upper limit calculation module, used to calculate an upper limit value corresponding to a first boost gradient range;

[0099]

[0100] Among them, P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P cup Indicates the upper limit value of the pressure regulation gradient at which the outlet pressure of the cone valve increases;

[0101] A first lower limit calculation module, used to calculate a lower limit value corresponding to a first boost gradient range;

[0102]

[0103] Among them, P rdown01 represents the lower limit value corresponding to the first boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P rup01 Indicates the upper limit value corresponding to the first boost gradient range;

[0104] A second upper limit calculation module, used to calculate an upper limit value corresponding to a second boost gradient range;

[0105]

[0106] Among them, P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P c02 Indicates the second outlet test pressure; P rup01 Indicates the upper limit value corresponding to the first boost gradient range;

[0107] A second lower limit calculation module, used to calculate the lower limit value corresponding to the second boost gradient range;

[0108]

[0109] Among them, P rdown02 represents the lower limit value corresponding to the second boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve;

[0110] A third upper limit calculation module, used to calculate an upper limit value corresponding to a third boost gradient range;

[0111]

[0112] Among them, P rup03 represents the upper limit value corresponding to the third boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve;

[0113] A third lower limit calculation module, used to calculate the lower limit value corresponding to the third boost gradient range;

[0114]

[0115] Among them, P rdown03 represents the lower limit value corresponding to the third boost gradient range; Prup03 represents the upper limit value corresponding to the third boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully open.

[0116] Beneficial effects of the present invention: By precisely adjusting the inlet and outlet pressures of the conical valve, and recording the working status and related parameters of the conical valve in real time, the precision and accuracy of the test can be improved. By collecting and analyzing the operating data of the conical valve under different openings and different pressure conditions, the flow capacity of the conical valve can be comprehensively evaluated, including flow characteristics, pressure loss, cavitation characteristics and other aspects. According to the evaluation results, the deficiencies in the design and performance of the conical valve can be found, providing a scientific basis for design optimization and performance improvement. By comparing the evaluation results of different conical valves, users can choose a conical valve model and specification that is more suitable for their application requirements. By evaluating and improving the flow capacity of the conical valve, the performance stability and reliability of the conical valve can be improved, thereby improving the quality of the product. BRIEF DESCRIPTION OF THE DRAWINGS

[0117] Figure 1 It is a schematic diagram of a method for testing the flow capacity of a cone valve;

[0118] Figure 2 A schematic diagram of a conical valve flow capacity test system. DETAILED DESCRIPTION

[0119] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0120] In one embodiment of the present invention, a method and system for testing the flow capacity of a cone valve are provided. The method for testing the flow capacity of a cone valve comprises:

[0121] Extracting test requirement information, and obtaining a test opening value corresponding to the cone valve according to the test requirement information;

[0122] At the test initial moment corresponding to each opening value, target pressure adjustment is performed on the inlet pressure and the outlet pressure of the cone valve, and the test operation and data recording are started to obtain first data information;

[0123] Increasing the outlet pressure of the conical valve until the cavitation bubbles in the cavity of the conical valve disappear, and acquiring second data information;

[0124] increasing the inlet pressure of the conical valve and recording third data information when the inlet pressure of the conical valve is increased;

[0125] The flow capacity of the cone valve is evaluated according to the first data information, the second data information and the third data information, and an evaluation result is obtained.

[0126] The working principle of the above technical solution is: clarify the purpose and requirements of the test, and extract specific test demand information related to the flow capacity assessment of the cone valve, such as the expected test opening range, pressure adjustment range, etc. According to the extracted test demand information, determine the opening value of the cone valve in different test scenarios. These opening values ​​will be used as the basic parameters of the test to simulate the operating state of the cone valve under different working conditions. At the initial moment of the test corresponding to each set opening value, the inlet pressure and outlet pressure of the cone valve are accurately adjusted to achieve the predetermined target pressure value. Start the test operation, so that the cone valve starts to work under this pressure condition, and start the data recording device to record the working state and related parameters of the cone valve in real time. These data are called first data information. After the cone valve has been running stably for a period of time, gradually increase the outlet pressure of the cone valve to observe whether cavitation occurs inside the cone valve (that is, bubbles or gas appear in the liquid). When it is observed that the cavitation bubbles in the cone valve cavity disappear, record the outlet pressure value and related data at this time. These data are called second data information. After the outlet pressure reaches the cavitation vanishing point, the inlet pressure of the conical valve is further increased to simulate the operation state of the conical valve under high pressure conditions. In the process of increasing the inlet pressure, the inlet pressure value, flow rate, pressure loss and other related data of the conical valve are recorded in real time. These data are called third data information. The first data information, the second data information and the third data information are summarized and processed and analyzed using data analysis tools or algorithms. According to the analysis results, the flow capacity of the conical valve is evaluated, including the evaluation of flow characteristics, pressure loss, cavitation characteristics and other aspects. The evaluation results are obtained to provide a scientific basis for the design optimization, performance improvement or selection of the conical valve.

[0127] The effect of the above technical solution is: by accurately adjusting the inlet and outlet pressures of the cone valve, and recording the working status and related parameters of the cone valve in real time, the precision and accuracy of the test can be improved. By collecting and analyzing the operating data of the cone valve under different openings and different pressure conditions, the flow capacity of the cone valve can be comprehensively evaluated, including flow characteristics, pressure loss, cavitation characteristics and other aspects. According to the evaluation results, the deficiencies in the design and performance of the cone valve can be found, providing a scientific basis for design optimization and performance improvement. By comparing the evaluation results of different cone valves, users can choose cone valve models and specifications that are more suitable for their application needs. By evaluating and improving the flow capacity of the cone valve, the performance stability and reliability of the cone valve can be improved, thereby improving the quality of the product.

[0128] In one embodiment of the present invention, at the test initial moment corresponding to each opening value, the inlet pressure and the outlet pressure of the conical valve are adjusted to a target pressure, and the test operation and data recording are started to obtain first data information, including:

[0129] Extract the test opening value of the cone valve corresponding to the current test;

[0130] Obtaining a target inlet pressure value and a target outlet pressure value of the conical valve according to a test opening value of the conical valve;

[0131] The inlet pressure of the conical valve is adjusted to a target inlet pressure value; wherein the target inlet pressure value is obtained by the following formula:

[0132] P mr =P min -α·(P max -P min )

[0133] Among them, P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max represents the maximum working pressure corresponding to the rated working pressure range of the cone valve; α represents the first adjustment coefficient; and the first adjustment coefficient is obtained by the following formula:

[0134]

[0135] Among them, ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve;

[0136] The outlet pressure of the conical valve is adjusted to a target outlet pressure value; wherein the target outlet pressure value is obtained by the following formula:

[0137] P mc =(1+β)·P min

[0138] Among them, P mc Indicates the target outlet pressure value; P min represents the minimum working pressure corresponding to the rated working pressure range of the cone valve; β represents the second adjustment coefficient; and the second adjustment coefficient is obtained by the following formula:

[0139]

[0140] Among them, P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve; P mr Indicates the target inlet pressure value;

[0141] When the test operation is stable, collect the vibration signal and cavitation image under the working condition when the test operation is stable, and record the current inlet and outlet pressure and flow data of the cone valve;

[0142] The vibration signal, the cavitation image, and the inlet and outlet pressure and flow data of the cone valve are used as the first data information.

[0143] The working principle of the above technical solution is as follows: before starting the test, first determine the test opening value of the cone valve corresponding to the current test, and this value will serve as the basis for subsequent pressure adjustment and data analysis. According to the rated working pressure range (Pmin to Pmax) of the cone valve and the current test opening value (ωc), the target inlet pressure value (Pmr) is calculated by a specific adjustment coefficient (α). Among them, the calculation of α takes into account the opening value (ωe) and the rated working pressure range corresponding to the cone valve fully open. The inlet pressure of the cone valve is adjusted to the calculated target inlet pressure value (Pmr) to ensure that the cone valve operates at a predetermined pressure during the test. Similarly, based on the rated working pressure range (Pmin to Pmax) of the cone valve and the calculated target inlet pressure value (Pmr), the target outlet pressure value (Pmc) is calculated by another specific adjustment coefficient (β). The outlet pressure of the cone valve is adjusted to the calculated target outlet pressure value (Pmc) to ensure that the inlet and outlet pressures of the cone valve are within the preset range during the test. By using the P in the formula max -P min The fluctuation difference of working pressure can be calculated by and It can be calculated or <0.5, the adjustment coefficients in two different cases are calculated by α·(P max -P min ) can calculate the influence coefficient of different adjustment coefficients on the fluctuation difference of the working pressure of the target inlet pressure value, through It can be calculated that The minimum value of The adjustment coefficient of the proportion of the maximum value is relatively speaking. The larger the minimum value of , the larger the second adjustment coefficient, and the larger the target outlet pressure value. This formula allows the adjustment coefficient to change with the actual situation, greatly improving the flexibility and accuracy of the adjustment; after the test operation is stable, start collecting the vibration signal and cavitation image of the cone valve during operation. These signals and images reflect the operating status of the cone valve under specific working conditions. At the same time, record the current inlet and outlet pressure and flow data of the cone valve. These data provide the real-time performance of the cone valve during the test. The collected vibration signal, cavitation image, and inlet and outlet pressure and flow data are saved as the first data information for subsequent analysis and evaluation.

[0144] The effect of the above technical solution is: by calculating the target inlet pressure value and the target outlet pressure value, and accurately adjusting the inlet and outlet pressures of the cone valve, it can ensure that the test is carried out under the predetermined pressure conditions, thereby improving the accuracy and reliability of the test. The collected vibration signals and cavitation images can intuitively reflect the operating status of the cone valve under specific working conditions, and provide rich data support for evaluating the performance of the cone valve. The recorded inlet and outlet pressure and flow data can provide a scientific basis for the design optimization, performance improvement or selection of the cone valve, and help users make more reasonable decisions. Through the automated control and data acquisition system, the test process can be completed quickly and accurately, and the test data can be obtained in real time, thereby improving the test efficiency. By evaluating and analyzing the performance of the cone valve under different working conditions, potential problems can be discovered and improved in a timely manner, thereby promoting the improvement of product quality. Since the target inlet pressure value is dynamically calculated based on the current test opening value, this method can ensure that the cone valve can be effectively tested within its rated working pressure range at different openings. This helps to improve the accuracy and reliability of the test. By limiting the target inlet pressure value within the rated working pressure range of the cone valve, this method can avoid damage to the cone valve caused by excessive pressure, thereby ensuring the safety of the test process. The introduction of the first adjustment coefficient (α) makes the calculation of the target inlet pressure value more flexible. By adjusting the calculation formula of the first adjustment coefficient, the distribution of the target inlet pressure value can be adjusted according to actual needs to adapt to different test scenarios and test requirements. Since the calculation of the target inlet pressure value is based on the rated working pressure range of the cone valve and the current test opening value, the method has a certain degree of predictability. Before the test, the target inlet pressure value at each opening can be pre-calculated according to the specifications and test requirements of the cone valve to guide the test process. By automatically calculating the target inlet pressure value, this method simplifies the test process, reduces the possibility of human intervention and errors, and improves the test efficiency. The above formula provides a dynamic, safe, flexible, predictable and efficient method for calculating the target inlet pressure value, which is of great significance for improving the accuracy and reliability of the cone valve test. The calculation of the target outlet pressure value and the second adjustment coefficient not only takes into account the rated working pressure range (P min To P max ), and also combined with the target inlet pressure value (P mr ), so as to more comprehensively reflect the outlet pressure requirement of the cone valve under specific working conditions. The introduction of the second adjustment coefficient (β) makes the target outlet pressure value (P mc ) can be adjusted according to the target inlet pressure value (P mr) changes. This dynamic adjustment helps to ensure that the conical valve can maintain stable performance under different working conditions. By limiting the target outlet pressure value to the rated working pressure range of the conical valve, the method can avoid excessive outlet pressure from causing damage to the system, thereby ensuring the safety of the system. By reasonably setting the calculation formula of the second adjustment coefficient, the distribution of the target outlet pressure value can be optimized so that the conical valve can achieve the best performance under specific working conditions. By automatically calculating the target outlet pressure value, the method simplifies the operation process, reduces the possibility of human intervention and errors, and improves work efficiency. Since the calculation of the target outlet pressure value is based on the rated working pressure range of the conical valve, the target inlet pressure value and the second adjustment coefficient, the method has a certain degree of predictability. Before testing or operation, the target outlet pressure value can be pre-calculated according to the specifications, working conditions and target inlet pressure value of the conical valve to guide the actual operation. The above formula provides a method for calculating the target outlet pressure value by comprehensively considering the working pressure range and target inlet pressure value of the conical valve, which has technical effects such as dynamic adjustment, high safety, performance optimization, simplified operation and strong predictability.

[0145] In one embodiment of the present invention, the outlet pressure of the conical valve is increased until the cavitation bubbles in the cavity of the conical valve disappear, and the second data information is obtained, including:

[0146] Extracting the target inlet pressure value and the target outlet pressure;

[0147] Extract the test opening value of the cone valve corresponding to the current test;

[0148] According to the test opening value of the conical valve combined with the target inlet pressure value and the target outlet pressure, the upper limit value and the lower limit value of the pressure regulation gradient corresponding to a single pressure regulation in the process of increasing the outlet pressure of the conical valve are obtained; wherein the upper limit value and the lower limit value of the pressure regulation gradient of the increase in the outlet pressure of the conical valve are obtained by the following formula:

[0149]

[0150] Among them, P cup Indicates the upper limit of the pressure adjustment gradient of the cone valve outlet pressure increase; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; α indicates the first adjustment coefficient; β indicates the second adjustment coefficient;

[0151]

[0152] Among them, P cdown Indicates the lower limit of the pressure adjustment gradient; Pmc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P cup Indicates the upper limit of the pressure adjustment gradient;

[0153] The pressure regulating gradient is set according to the upper and lower limits of the pressure gradient of the increased outlet pressure of the cone valve;

[0154] The outlet pressure of the conical valve is increased and adjusted according to the pressure adjustment gradient until the cavitation bubbles in the cavity of the conical valve disappear;

[0155] The vibration signal and cavitation image when the cavitation bubbles disappear in the cavity and the inlet and outlet pressure and flow data of the cone valve are collected as the second data information.

[0156] The working principle of the above technical solution is: extract the target inlet pressure value (P mr ) and target outlet pressure value (P mc ), and the test opening value of the cone valve corresponding to the current test (ω c ). Combined with the target inlet pressure value (P mr ), target outlet pressure value (P mc ), the minimum working pressure corresponding to the rated working pressure range of the cone valve (P min ), as well as the first adjustment coefficient (α) and the second adjustment coefficient (β), the pressure adjustment gradient upper limit value (P cup ) and the lower limit (P cdown ). According to the calculated pressure adjustment gradient upper limit value (P cup ) and the lower limit (P cdown ), set the pressure regulation gradient of the cone valve outlet pressure increase. This is usually achieved through a control system to ensure that the pressure regulation is carried out within the set gradient range. According to the set pressure regulation gradient, the outlet pressure of the cone valve is gradually increased. This process is usually automated, and the control system monitors the outlet pressure and gradually increases it according to the set gradient. During the process of increasing the outlet pressure, continue to observe whether cavitation bubbles appear in the cone valve cavity. When the cavitation bubbles disappear, it means that the performance of the cone valve under this condition has reached a critical point. When the cavitation bubbles disappear in the cavity, collect the vibration signal, cavitation image, and inlet and outlet pressure and flow data of the cone valve. These data are called second data information, which reflect the performance of the cone valve under specific conditions.

[0157] The effect of the above technical solution is: by setting the upper and lower limits of the pressure adjustment gradient, the process of increasing the outlet pressure of the cone valve can be accurately controlled, ensuring that the test process is carried out within the predetermined pressure range, and improving the accuracy and reliability of the test. By continuously observing the cavitation phenomenon in the cone valve cavity, the critical point of the performance change of the cone valve can be accurately captured, providing an important basis for evaluating the performance of the cone valve. The collected vibration signals, cavitation images, and inlet and outlet pressure and flow data provide rich data support for the performance evaluation of the cone valve, which helps to discover potential problems and make improvements. By analyzing the second data information, the performance of the cone valve under different working conditions can be understood, providing a scientific basis for the design optimization and performance improvement of the cone valve. The automated control and data acquisition system improves the test efficiency, and can quickly and accurately complete the test process and obtain the required data. By introducing the target outlet pressure value (Pmc) and the target inlet pressure value (Pmr), as well as the rated working pressure range (Pmin to Pmax) of the cone valve, the upper and lower limits of the pressure adjustment gradient can be dynamically calculated. This ensures that the cone valve can maintain an appropriate pressure change range under different working conditions. The setting of the upper limit (Pcup) and lower limit (Pcdown) of the pressure regulation gradient helps prevent the outlet pressure from being too high or too low, thereby avoiding possible system damage or performance degradation. It can be calculated that [(P min -P mr ),(P mc -P min )] has a minimum value in [(P min -P mr ),(P mc -P min )] The adjustment coefficient of the proportion of the maximum value, relatively speaking, [(P min -P mr ),(P mc -P min )], the larger the minimum value is, the larger the upper limit of the pressure adjustment gradient is. The influence coefficient of the minimum value of (α, β) in the maximum value of (α, β) can be calculated. Relatively speaking, the larger the minimum value of (α, β), the smaller the upper limit of the pressure regulation gradient. The lower limit value of the pressure regulation gradient calculated by the upper limit value affected by the first regulation coefficient combined with the proportion of the target inlet pressure value in the target outlet pressure value can be calculated. The larger the value, the cdownThe smaller the pressure, the better. This ensures the safe operation of the cone valve and the system in which it is located. The performance of the cone valve can be optimized by reasonably setting the upper and lower limits of the pressure regulation gradient. For example, in a system that requires a fast response, a narrower gradient range can be set to increase the response speed; while in a system that requires a stable output, a wider gradient range can be set to reduce pressure fluctuations. Since the upper and lower limits of the pressure regulation gradient are calculated based on parameters such as the rated working pressure range, target outlet pressure value, and target inlet pressure value of the cone valve, they have a certain degree of predictability. This allows operators to pre-set a suitable gradient range as needed, thereby achieving effective control of the cone valve outlet pressure. By automatically calculating the upper and lower limits of the pressure regulation gradient, the operation process is simplified and the possibility of human intervention and error is reduced. At the same time, this also facilitates the maintenance of the cone valve, because operators can monitor and evaluate the performance status of the cone valve based on these values.

[0158] In one embodiment of the present invention, increasing the inlet pressure of the conical valve and recording third data information when the inlet pressure of the conical valve is increased includes:

[0159] Extract test requirement information;

[0160] Acquire a first outlet test pressure, a second outlet test pressure, and a third outlet test pressure corresponding to the conical valve according to the test requirement information;

[0161] According to the first outlet test pressure, the second outlet test pressure and the third outlet test pressure, a first pressure boosting gradient range, a second pressure boosting gradient range and a third pressure boosting gradient range corresponding to the inlet pressure of the conical valve are set;

[0162] setting a first boosting gradient according to the first boosting gradient range, increasing the inlet pressure of the conical valve according to the first boosting gradient until the outlet pressure of the conical valve reaches a first outlet test pressure, and recording a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure;

[0163] setting a second pressurization gradient according to the second pressurization gradient range, increasing the inlet pressure of the conical valve according to the second pressurization gradient until the outlet pressure of the conical valve reaches a second outlet test pressure, and recording a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure;

[0164] setting a third boost gradient according to the third boost gradient range, increasing the inlet pressure of the conical valve according to the third boost gradient until the outlet pressure of the conical valve reaches a third outlet test pressure, and recording a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the third outlet test pressure;

[0165] The data parameters corresponding to the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure, the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure, and the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure are taken as the third data information.

[0166] The working principle of the above technical solution is as follows: before starting the test, first extract the test requirement information, which usually includes the rated parameters of the cone valve, the expected test range, the outlet pressure point to be tested, etc. According to the test requirement information, determine the first outlet test pressure, the second outlet test pressure and the third outlet test pressure corresponding to the cone valve. These test pressure points represent the key points that need to be paid attention to during the test. According to each outlet test pressure point, set the first boost gradient range, the second boost gradient range and the third boost gradient range corresponding to the inlet pressure of the cone valve. These gradient ranges ensure that the pressure increase is gradual during the test, thereby avoiding sudden impact on the cone valve. Set the first boost gradient according to the first boost gradient range, and gradually increase the inlet pressure of the cone valve until the outlet pressure of the cone valve reaches the first outlet test pressure. In this process, record the vibration signal, cavitation image and inlet and outlet pressure values ​​of the cone valve when the outlet pressure reaches the test pressure point. Set the second boost gradient according to the second boost gradient range, and repeat the above process until the outlet pressure reaches the second outlet test pressure. The third boost gradient is set according to the third boost gradient range, and the above steps are continued until the outlet pressure reaches the third outlet test pressure. All data collected during the test (including vibration signals, cavitation images, and inlet and outlet pressure values) are sorted according to the corresponding outlet test pressure points, and the data are stored as the third data information.

[0167] The effect of the above technical solution is: by setting different pressure increase gradient ranges, the process of increasing the inlet pressure of the conical valve can be accurately controlled to ensure that the test process is carried out within the predetermined pressure range, thereby improving the accuracy and reliability of the test. By testing the performance of the conical valve at different outlet test pressure points, the performance of the conical valve under different working conditions can be comprehensively evaluated, providing an important basis for product design and optimization. During the test, a large amount of data such as vibration signals, cavitation images, and inlet and outlet pressure values ​​were collected. These data provide rich data support for the performance evaluation of the conical valve, which helps to discover potential problems and make improvements. By analyzing the third data information, the performance change trend of the conical valve under different pressures can be understood, providing a scientific basis for the design optimization and performance improvement of the conical valve. The automated control and data acquisition system improves the test efficiency, can quickly and accurately complete the test process and obtain the required data, and shortens the product development cycle.

[0168] In one embodiment of the present invention, the first boost gradient range, the second boost gradient range and the third boost gradient range are obtained by the following formula:

[0169]

[0170] Among them, P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P cup Indicates the upper limit value of the pressure regulation gradient at which the outlet pressure of the cone valve increases;

[0171]

[0172] Among them, P rdown01 represents the lower limit value corresponding to the first boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P rup01 Indicates the upper limit value corresponding to the first boost gradient range;

[0173]

[0174] Among them, P rup02 represents the upper limit value corresponding to the second boost gradient range; ω cIndicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P c02 Indicates the second outlet test pressure; P rup01 Indicates the upper limit value corresponding to the first boost gradient range;

[0175]

[0176] Among them, P rdown02 represents the lower limit value corresponding to the second boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve;

[0177]

[0178] Among them, P rup03 represents the upper limit value corresponding to the third boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve;

[0179]

[0180] Among them, P rdown03 represents the lower limit value corresponding to the third boost gradient range; P rup03 represents the upper limit value corresponding to the third boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully open.

[0181] The working principle of the above technical solution is: the upper limit value (P rup01 ) is calculated taking into account the test opening of the cone valve (ω c ), full opening (ω e ), target inlet pressure (P mr ), target outlet pressure (P mc ) and the first outlet test pressure (P c01At the same time, the upper limit value (Pcup) of the pressure regulation gradient of the outlet pressure increase is also referred to ensure the rationality of the pressure increase. rdown01 ) is based on the upper limit value (P rup01 ) and the current test opening (ω c ) and other parameters to ensure the stability of pressure increase. rup02 ) is calculated by taking into account the same parameters as the first pressure gradient range, and also taking into account the second outlet test pressure (P c02 ) in order to set a suitable pressure increase gradient before reaching the second test point.

[0182] Lower limit (P rdown02 ) is based on the upper limit value (P rup02 ) and other related parameters. The upper limit value (P rup03 ) is calculated based on the upper limit of the first two boost gradient ranges (P rup01 and P rup02 ), and the test opening of the cone valve (ω c ) and other parameters to ensure that the pressure increase gradient before reaching the third test point is coordinated with the first two test stages. rdown03 ) and the upper limit value of the third boost gradient range (P rup03 ) and other relevant parameters. These calculated pressure increase gradient ranges are used to control the increase process of the cone valve inlet pressure, ensuring that the test process is carried out within the predetermined pressure range and that the appropriate pressure increase gradient can be set for different test stages.

[0183] The effect of the above technical solution is: by calculating the pressure increase gradient range according to the current opening of the cone valve, the target pressure and the test point, the process of increasing the pressure at the inlet of the cone valve can be accurately controlled to ensure that the test process is carried out within the predetermined pressure range, thereby improving the accuracy and reliability of the test. Reasonable pressure increase gradient setting can prevent the cone valve from being subjected to sudden pressure shock during the test, thereby reducing the risk of equipment damage or personal injury during the test and improving the safety of the test. Testing within different pressure increase gradient ranges can collect more performance data of the cone valve under different pressures, provide rich data support for the performance evaluation of the cone valve, and help to discover potential problems and make improvements. By analyzing the test data, the performance change trend of the cone valve under different pressures can be understood, providing a scientific basis for the design optimization and performance improvement of the cone valve, which is helpful to improve the overall performance of the product. Through the automated control and data acquisition system, combined with the precisely set pressure increase gradient range, the test process can be completed quickly and accurately and the required data can be obtained, which improves the test efficiency and shortens the product development cycle. By defining multiple pressure increase gradient ranges, the cone valve can be precisely controlled under different working conditions. This helps ensure that the pressure change of the cone valve during testing or operation can be carried out within the predetermined gradient range, thereby improving the stability and reliability of the system. Since the pressure increase gradient range is calculated based on dynamic factors such as the current test opening (ωc) and the target pressure value (Pmr, Pmc), the formula The influence coefficient of ωc's proportion in ωe can be calculated. The larger the The smaller the value is, the smaller the upper or lower limit of the pressure adjustment gradient corresponding to the formula is. The influence coefficient of the proportion of ωc in ωe and min(P rup01 ,P rup02 ) at max(P rup01 ,P rup02) corresponds to the upper or lower limit of the pressure gradient range of the corresponding formula affected by the influence coefficient of the proportion in the pressure gradient range. Therefore, these ranges can adapt to the needs of the conical valve under different working conditions. This dynamic adaptability enables the conical valve to maintain optimal performance under various working conditions. By setting the upper and lower limits of the pressure gradient range, the conical valve can be prevented from having too high or too low pressure during testing or operation, thereby protecting the system from damage. This safety design helps to extend the service life of the conical valve and reduce the maintenance cost of the system. Since the pressure gradient range is calculated based on a series of measurable parameters (such as test opening, target pressure value, etc.), these ranges have a certain degree of predictability. This allows operators to pre-set the appropriate pressure gradient range as needed, thereby achieving effective control of the outlet pressure of the conical valve. By automatically calculating the upper and lower limits of the pressure gradient range, the operation process is simplified and the possibility of human intervention and errors is reduced. At the same time, this also facilitates the maintenance of the conical valve, because operators can monitor and evaluate the performance status of the conical valve based on these ranges.

[0184] In one embodiment of the present invention, the conical valve flow capacity testing system comprises:

[0185] An opening value extraction module is used to extract test requirement information and obtain a test opening value corresponding to the cone valve according to the test requirement information;

[0186] A first data acquisition module is used to adjust the inlet pressure and the outlet pressure of the cone valve to a target pressure at the test initial moment corresponding to each opening value, and start the test operation and data recording to obtain first data information;

[0187] A second data acquisition module is used to increase the outlet pressure of the conical valve until the cavitation bubbles in the cavity of the conical valve disappear, and acquire second data information;

[0188] A third data acquisition module, used for increasing the inlet pressure of the conical valve and recording third data information when the inlet pressure of the conical valve is increased;

[0189] The capacity evaluation module is used to evaluate the flow capacity of the cone valve according to the first data information, the second data information and the third data information, and obtain an evaluation result.

[0190] The working principle of the above technical solution is: clarify the purpose and requirements of the test, and extract specific test demand information related to the flow capacity assessment of the cone valve, such as the expected test opening range, pressure adjustment range, etc. According to the extracted test demand information, determine the opening value of the cone valve in different test scenarios. These opening values ​​will be used as the basic parameters of the test to simulate the operating state of the cone valve under different working conditions. At the initial moment of the test corresponding to each set opening value, the inlet pressure and outlet pressure of the cone valve are accurately adjusted to achieve the predetermined target pressure value. Start the test operation, so that the cone valve starts to work under this pressure condition, and start the data recording device to record the working state and related parameters of the cone valve in real time. These data are called first data information. After the cone valve has been running stably for a period of time, gradually increase the outlet pressure of the cone valve to observe whether cavitation occurs inside the cone valve (that is, bubbles or gas appear in the liquid). When it is observed that the cavitation bubbles in the cone valve cavity disappear, record the outlet pressure value and related data at this time. These data are called second data information. After the outlet pressure reaches the cavitation vanishing point, the inlet pressure of the conical valve is further increased to simulate the operation state of the conical valve under high pressure conditions. In the process of increasing the inlet pressure, the inlet pressure value, flow rate, pressure loss and other related data of the conical valve are recorded in real time. These data are called third data information. The first data information, the second data information and the third data information are summarized and processed and analyzed using data analysis tools or algorithms. According to the analysis results, the flow capacity of the conical valve is evaluated, including the evaluation of flow characteristics, pressure loss, cavitation characteristics and other aspects. The evaluation results are obtained to provide a scientific basis for the design optimization, performance improvement or selection of the conical valve.

[0191] The effect of the above technical solution is: by accurately adjusting the inlet and outlet pressures of the cone valve, and recording the working status and related parameters of the cone valve in real time, the precision and accuracy of the test can be improved. By collecting and analyzing the operating data of the cone valve under different openings and different pressure conditions, the flow capacity of the cone valve can be comprehensively evaluated, including flow characteristics, pressure loss, cavitation characteristics and other aspects. According to the evaluation results, the deficiencies in the design and performance of the cone valve can be found, providing a scientific basis for design optimization and performance improvement. By comparing the evaluation results of different cone valves, users can choose cone valve models and specifications that are more suitable for their application needs. By evaluating and improving the flow capacity of the cone valve, the performance stability and reliability of the cone valve can be improved, thereby improving the quality of the product.

[0192] In one embodiment of the present invention, the first data acquisition module includes:

[0193] A test opening value extraction module is used to extract the test opening value of the cone valve corresponding to the current test;

[0194] A pressure value acquisition module, used for acquiring a target inlet pressure value and a target outlet pressure value of the conical valve according to a test opening value of the conical valve;

[0195] The inlet pressure adjustment calculation module is used to adjust the inlet pressure of the conical valve to a target inlet pressure value; wherein the target inlet pressure value is obtained by the following formula:

[0196] P mr =P min -α·(P max -P min )

[0197] Among them, P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max represents the maximum working pressure corresponding to the rated working pressure range of the cone valve; α represents the first adjustment coefficient; and the first adjustment coefficient is obtained by the following formula:

[0198]

[0199] Among them, ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve;

[0200] The outlet pressure adjustment calculation module is used to adjust the outlet pressure of the conical valve to a target outlet pressure value; wherein the target outlet pressure value is obtained by the following formula:

[0201] P mc =(1+β)·P min

[0202] Among them, P mc Indicates the target outlet pressure value; P min represents the minimum working pressure corresponding to the rated working pressure range of the cone valve; β represents the second adjustment coefficient; and the second adjustment coefficient is obtained by the following formula:

[0203]

[0204] Among them, P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve; P mrIndicates the target inlet pressure value;

[0205] The data recording module is used to collect the vibration signal and cavitation image under the working condition when the test is running stably, and record the current inlet and outlet pressure and flow data of the cone valve;

[0206] The vibration signal, the cavitation image, and the inlet and outlet pressure and flow data of the cone valve are used as the first data information.

[0207] The working principle of the above technical solution is: before starting the test, first determine the test opening value of the cone valve corresponding to the current test, and this value will serve as the basis for subsequent pressure adjustment and data analysis. min To P max ) and the current test opening value (ω c ), the target inlet pressure value (P mr ). Among them, the calculation of α takes into account the corresponding opening value (ω) when the cone valve is fully opened e ) and rated working pressure range. Adjust the inlet pressure of the cone valve to the calculated target inlet pressure value (P mr ) to ensure that the cone valve operates at the predetermined pressure during the test. Also based on the rated working pressure range (P min To P max ) and the calculated target inlet pressure value (P mr ), and the target outlet pressure value (P mc ). Adjust the outlet pressure of the cone valve to the calculated target outlet pressure value (P mc ) to ensure that the inlet and outlet pressures of the cone valve are within the preset range during the test. After the test runs stably, start collecting the vibration signal and cavitation image of the cone valve during operation. These signals and images reflect the operating status of the cone valve under specific working conditions. At the same time, record the current inlet and outlet pressure and flow data of the cone valve. These data provide the real-time performance of the cone valve during the test. The collected vibration signal, cavitation image, inlet and outlet pressure and flow data are saved as the first data information for subsequent analysis and evaluation.

[0208] The effect of the above technical solution is: by calculating the target inlet pressure value and the target outlet pressure value, and accurately adjusting the inlet and outlet pressures of the conical valve, it can be ensured that the test is carried out under predetermined pressure conditions, thereby improving the accuracy and reliability of the test. The collected vibration signals and cavitation images can intuitively reflect the operating status of the conical valve under specific working conditions, and provide rich data support for evaluating the performance of the conical valve. The recorded inlet and outlet pressure and flow data can provide a scientific basis for the design optimization, performance improvement or selection of the conical valve, helping users make more reasonable decisions. Through the automated control and data acquisition system, the test process can be completed quickly and accurately, and the test data can be obtained in real time, thereby improving the test efficiency. By evaluating and analyzing the performance of the conical valve under different working conditions, potential problems can be discovered and improved in a timely manner, thereby promoting the improvement of product quality.

[0209] In one embodiment of the present invention, the second data acquisition module includes:

[0210] A pressure extraction module, used to extract the target inlet pressure value and the target outlet pressure;

[0211] A test opening value extraction module is used to extract the test opening value of the cone valve corresponding to the current test;

[0212] A limit value adjustment calculation module is used to obtain the upper limit value and lower limit value of the pressure adjustment gradient corresponding to a single pressure adjustment in the process of increasing the outlet pressure of the conical valve according to the test opening value of the conical valve combined with the target inlet pressure value and the target outlet pressure; wherein the upper limit value and lower limit value of the pressure adjustment gradient of the increase in the outlet pressure of the conical valve are obtained by the following formula:

[0213]

[0214] Among them, P cup Indicates the upper limit of the pressure adjustment gradient of the cone valve outlet pressure increase; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; α indicates the first adjustment coefficient; β indicates the second adjustment coefficient;

[0215]

[0216] Among them, P cdown Indicates the lower limit of the pressure adjustment gradient; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P cup Indicates the upper limit of the pressure adjustment gradient;

[0217] A gradient setting module, used to set a pressure regulating gradient according to an upper limit value and a lower limit value of a pressure gradient of an outlet pressure increase of the conical valve;

[0218] An increase regulation module, used for increasing and regulating the outlet pressure of the conical valve according to the pressure regulation gradient until the cavitation bubbles in the cavity of the conical valve disappear;

[0219] The second acquisition module is used to collect the vibration signal and cavitation image when the cavitation bubbles disappear in the cavity and the inlet and outlet pressure and flow data of the cone valve as the second data information.

[0220] The working principle of the above technical solution is: extract the target inlet pressure value (P mr ) and target outlet pressure value (P mc ), and the test opening value of the cone valve corresponding to the current test (ω c ). Combined with the target inlet pressure value (P mr ), target outlet pressure value (P mc ), the minimum working pressure corresponding to the rated working pressure range of the cone valve (P min ), as well as the first adjustment coefficient (α) and the second adjustment coefficient (β), the pressure adjustment gradient upper limit value (P cup ) and the lower limit (P cdown ). According to the calculated pressure adjustment gradient upper limit value (P cup ) and the lower limit (P cdown ), set the pressure regulation gradient of the cone valve outlet pressure increase. This is usually achieved through a control system to ensure that the pressure regulation is carried out within the set gradient range. According to the set pressure regulation gradient, the outlet pressure of the cone valve is gradually increased. This process is usually automated, and the control system monitors the outlet pressure and gradually increases it according to the set gradient. During the process of increasing the outlet pressure, continue to observe whether cavitation bubbles appear in the cone valve cavity. When the cavitation bubbles disappear, it means that the performance of the cone valve under this condition has reached a critical point. When the cavitation bubbles disappear in the cavity, collect the vibration signal, cavitation image, and inlet and outlet pressure and flow data of the cone valve. These data are called second data information, which reflect the performance of the cone valve under specific conditions.

[0221] The effect of the above technical solution is: by setting the upper and lower limits of the pressure adjustment gradient, the process of increasing the outlet pressure of the conical valve can be accurately controlled to ensure that the test process is carried out within the predetermined pressure range, thereby improving the accuracy and reliability of the test. By continuously observing the cavitation phenomenon in the conical valve cavity, the critical point of the performance change of the conical valve can be accurately captured, providing an important basis for evaluating the performance of the conical valve. The collected vibration signals, cavitation images, and inlet and outlet pressure and flow data provide rich data support for the performance evaluation of the conical valve, which helps to discover potential problems and make improvements. By analyzing the second data information, the performance of the conical valve under different working conditions can be understood, providing a scientific basis for the design optimization and performance improvement of the conical valve. The automated control and data acquisition system improves the test efficiency, and can quickly and accurately complete the test process and obtain the required data.

[0222] In one embodiment of the present invention, the third data acquisition module includes:

[0223] Test pressure acquisition module, used to extract test requirement information;

[0224] Acquire a first outlet test pressure, a second outlet test pressure, and a third outlet test pressure corresponding to the conical valve according to the test requirement information;

[0225] A range setting module, used for setting a first pressure boosting gradient range, a second pressure boosting gradient range and a third pressure boosting gradient range corresponding to the inlet pressure of the conical valve according to the first outlet test pressure, the second outlet test pressure and the third outlet test pressure;

[0226] a first test recording module, configured to set a first boost gradient according to the first boost gradient range, increase the inlet pressure of the conical valve according to the first boost gradient until the outlet pressure of the conical valve reaches a first outlet test pressure, and record a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure;

[0227] a second test recording module, configured to set a second boost gradient according to the second boost gradient range, increase the inlet pressure of the conical valve according to the second boost gradient until the outlet pressure of the conical valve reaches a second outlet test pressure, and record a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure;

[0228] a third test recording module, configured to set a third boost gradient according to the third boost gradient range, increase the inlet pressure of the conical valve according to the third boost gradient until the outlet pressure of the conical valve reaches a third outlet test pressure, and record a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the third outlet test pressure;

[0229] The third acquisition module is used to use the data parameters corresponding to the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure, the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure, and the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure as the third data information.

[0230] The working principle of the above technical solution is as follows: before starting the test, first extract the test requirement information, which usually includes the rated parameters of the cone valve, the expected test range, the outlet pressure point to be tested, etc. According to the test requirement information, determine the first outlet test pressure, the second outlet test pressure and the third outlet test pressure corresponding to the cone valve. These test pressure points represent the key points that need to be paid attention to during the test. According to each outlet test pressure point, set the first boost gradient range, the second boost gradient range and the third boost gradient range corresponding to the inlet pressure of the cone valve. These gradient ranges ensure that the pressure increase is gradual during the test, thereby avoiding sudden impact on the cone valve. Set the first boost gradient according to the first boost gradient range, and gradually increase the inlet pressure of the cone valve until the outlet pressure of the cone valve reaches the first outlet test pressure. In this process, record the vibration signal, cavitation image and inlet and outlet pressure values ​​of the cone valve when the outlet pressure reaches the test pressure point. Set the second boost gradient according to the second boost gradient range, and repeat the above process until the outlet pressure reaches the second outlet test pressure. The third boost gradient is set according to the third boost gradient range, and the above steps are continued until the outlet pressure reaches the third outlet test pressure. All data collected during the test (including vibration signals, cavitation images, and inlet and outlet pressure values) are sorted according to the corresponding outlet test pressure points, and the data are stored as the third data information.

[0231] The effect of the above technical solution is: by setting different pressure increase gradient ranges, the process of increasing the inlet pressure of the conical valve can be accurately controlled to ensure that the test process is carried out within the predetermined pressure range, thereby improving the accuracy and reliability of the test. By testing the performance of the conical valve at different outlet test pressure points, the performance of the conical valve under different working conditions can be comprehensively evaluated, providing an important basis for product design and optimization. During the test, a large amount of data such as vibration signals, cavitation images, and inlet and outlet pressure values ​​were collected. These data provide rich data support for the performance evaluation of the conical valve, which helps to discover potential problems and make improvements. By analyzing the third data information, the performance change trend of the conical valve under different pressures can be understood, providing a scientific basis for the design optimization and performance improvement of the conical valve. The automated control and data acquisition system improves the test efficiency, can quickly and accurately complete the test process and obtain the required data, and shortens the product development cycle.

[0232] In one embodiment of the present invention, the range setting module includes:

[0233] A first upper limit calculation module, used to calculate an upper limit value corresponding to a first boost gradient range;

[0234]

[0235] Among them, P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P cup Indicates the upper limit value of the pressure regulation gradient at which the outlet pressure of the cone valve increases;

[0236] A first lower limit calculation module, used to calculate a lower limit value corresponding to a first boost gradient range;

[0237]

[0238] Among them, P rdown01 represents the lower limit value corresponding to the first boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P rup01 Indicates the upper limit value corresponding to the first boost gradient range;

[0239] A second upper limit calculation module, used to calculate an upper limit value corresponding to a second boost gradient range;

[0240]

[0241] Among them, P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P c02 Indicates the second outlet test pressure; P rup01 Indicates the upper limit value corresponding to the first boost gradient range;

[0242] A second lower limit calculation module, used to calculate the lower limit value corresponding to the second boost gradient range;

[0243]

[0244] Among them, P rdown02 represents the lower limit value corresponding to the second boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve;

[0245] A third upper limit calculation module, used to calculate an upper limit value corresponding to a third boost gradient range;

[0246]

[0247] Among them, P rup03 represents the upper limit value corresponding to the third boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve;

[0248] A third lower limit calculation module, used to calculate the lower limit value corresponding to the third boost gradient range;

[0249]

[0250] Among them, P rdown03 represents the lower limit value corresponding to the third boost gradient range; Prup03 represents the upper limit value corresponding to the third boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully open.

[0251] The working principle of the above technical solution is: the upper limit value (P rup01 ) is calculated taking into account the test opening of the cone valve (ω c ), full opening (ω e ), target inlet pressure (P mr ), target outlet pressure (P mc ) and the first outlet test pressure (P c01 At the same time, the upper limit value (Pcup) of the pressure regulation gradient of the outlet pressure increase is also referred to ensure the rationality of the pressure increase. rdown01 ) is based on the upper limit value (P rup01 ) and the current test opening (ω c ) and other parameters to ensure the stability of pressure increase. rup02 ) is calculated by taking into account the same parameters as the first pressure gradient range, and also taking into account the second outlet test pressure (P c02 ) in order to set a suitable pressure increase gradient before reaching the second test point.

[0252] Lower limit (P rdown02 ) is based on the upper limit value (P rup02 ) and other related parameters. The upper limit value (P rup03 ) is calculated based on the upper limit of the first two boost gradient ranges (P rup01 and P rup02 ), and the test opening of the cone valve (ω c ) and other parameters to ensure that the pressure increase gradient before reaching the third test point is coordinated with the first two test stages. rdown03 ) and the upper limit value of the third boost gradient range (P rup03 ) and other relevant parameters. These calculated pressure increase gradient ranges are used to control the increase process of the cone valve inlet pressure, ensuring that the test process is carried out within the predetermined pressure range and that the appropriate pressure increase gradient can be set for different test stages.

[0253] The effect of the above technical solution is: by calculating the pressure increase gradient range based on the current opening of the cone valve, the target pressure, the test point and other parameters, the process of increasing the pressure at the inlet of the cone valve can be accurately controlled to ensure that the test process is carried out within the predetermined pressure range, thereby improving the accuracy and reliability of the test. Reasonable pressure increase gradient setting can prevent the cone valve from being subjected to sudden pressure shock during the test, thereby reducing the risk of equipment damage or personal injury during the test and improving the safety of the test. Testing within different pressure increase gradient ranges can collect more performance data of the cone valve under different pressures, providing rich data support for the performance evaluation of the cone valve, helping to discover potential problems and make improvements. By analyzing the test data, the performance change trend of the cone valve under different pressures can be understood, providing a scientific basis for the design optimization and performance improvement of the cone valve, and helping to improve the overall performance of the product. Through the automated control and data acquisition system, combined with the precisely set pressure increase gradient range, the test process can be completed quickly and accurately and the required data can be obtained, which improves the test efficiency and shortens the product development cycle.

[0254] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A method for testing the flow capacity of a cone valve, characterized in that: The cone valve flow capacity testing method comprises: Extracting test requirement information, and obtaining a test opening value corresponding to the cone valve according to the test requirement information; At the test initial moment corresponding to each opening value, target pressure adjustment is performed on the inlet pressure and the outlet pressure of the cone valve, and the test operation and data recording are started to obtain first data information; Increasing the outlet pressure of the conical valve until the cavitation bubbles in the cavity of the conical valve disappear, and acquiring second data information; increasing the inlet pressure of the conical valve and recording third data information when the inlet pressure of the conical valve is increased; The flow capacity of the cone valve is evaluated according to the first data information, the second data information and the third data information, and an evaluation result is obtained.

2. The method for testing the flow capacity of a cone valve according to claim 1, characterized in that: At the test initial moment corresponding to each opening value, the inlet pressure and the outlet pressure of the cone valve are adjusted to target pressure, and the test operation and data recording are started to obtain first data information, including: Extract the test opening value of the cone valve corresponding to the current test; Obtaining a target inlet pressure value and a target outlet pressure value of the conical valve according to a test opening value of the conical valve; The inlet pressure of the conical valve is adjusted to a target inlet pressure value; wherein the target inlet pressure value is obtained by the following formula: P mr =P min -α·(P max -P min ) Among them, P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max represents the maximum working pressure corresponding to the rated working pressure range of the cone valve; α represents the first adjustment coefficient; and the first adjustment coefficient is obtained by the following formula: Among them, ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve; The outlet pressure of the conical valve is adjusted to a target outlet pressure value; wherein the target outlet pressure value is obtained by the following formula: P mc =(1+β)·P min Among them, P mc Indicates the target outlet pressure value; P min represents the minimum working pressure corresponding to the rated working pressure range of the cone valve; β represents the second adjustment coefficient; and the second adjustment coefficient is obtained by the following formula: Among them, P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve; P mr Indicates the target inlet pressure value; When the test operation is stable, collect the vibration signal and cavitation image under the working condition when the test operation is stable, and record the current inlet and outlet pressure and flow data of the cone valve; The vibration signal, the cavitation image, and the inlet and outlet pressure and flow data of the cone valve are used as the first data information.

3. The method for testing the flow capacity of a cone valve according to claim 1, characterized in that: The outlet pressure of the conical valve is increased until the cavitation bubbles in the cavity of the conical valve disappear, and second data information is obtained, including: Extracting the target inlet pressure value and the target outlet pressure; Extract the test opening value of the cone valve corresponding to the current test; According to the test opening value of the conical valve combined with the target inlet pressure value and the target outlet pressure, the upper limit value and the lower limit value of the pressure regulation gradient corresponding to a single pressure regulation in the process of increasing the outlet pressure of the conical valve are obtained; wherein the upper limit value and the lower limit value of the pressure regulation gradient of the increase in the outlet pressure of the conical valve are obtained by the following formula: Among them, P cup Indicates the upper limit of the pressure adjustment gradient of the cone valve outlet pressure increase; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; α indicates the first adjustment coefficient; β indicates the second adjustment coefficient; Among them, P cdown Indicates the lower limit of the pressure adjustment gradient; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P cup Indicates the upper limit of the pressure adjustment gradient; The pressure regulating gradient is set according to the upper and lower limits of the pressure gradient of the increased outlet pressure of the cone valve; The outlet pressure of the conical valve is increased and adjusted according to the pressure adjustment gradient until the cavitation bubbles in the cavity of the conical valve disappear; The vibration signal and cavitation image when the cavitation bubbles disappear in the cavity and the inlet and outlet pressure and flow data of the cone valve are collected as the second data information.

4. The method for testing the flow capacity of a cone valve according to claim 1, characterized in that: Increasing the inlet pressure of the conical valve and recording third data information when the inlet pressure of the conical valve is increased, including: Extract test requirement information; Acquire a first outlet test pressure, a second outlet test pressure, and a third outlet test pressure corresponding to the conical valve according to the test requirement information; According to the first outlet test pressure, the second outlet test pressure and the third outlet test pressure, a first pressure boosting gradient range, a second pressure boosting gradient range and a third pressure boosting gradient range corresponding to the inlet pressure of the conical valve are set; setting a first boosting gradient according to the first boosting gradient range, increasing the inlet pressure of the conical valve according to the first boosting gradient until the outlet pressure of the conical valve reaches a first outlet test pressure, and recording a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure; setting a second pressurization gradient according to the second pressurization gradient range, increasing the inlet pressure of the conical valve according to the second pressurization gradient until the outlet pressure of the conical valve reaches a second outlet test pressure, and recording a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure; setting a third boost gradient according to the third boost gradient range, increasing the inlet pressure of the conical valve according to the third boost gradient until the outlet pressure of the conical valve reaches a third outlet test pressure, and recording a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the third outlet test pressure; The data parameters corresponding to the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure, the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure, and the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure are taken as the third data information.

5. The method for testing the flow capacity of a cone valve according to claim 4, characterized in that: The first boost gradient range, the second boost gradient range and the third boost gradient range are obtained by the following formula: Among them, P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P cup Indicates the upper limit value of the pressure regulation gradient at which the outlet pressure of the cone valve increases; Among them, P rdown01 represents the lower limit value corresponding to the first boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P rup01 Indicates the upper limit value corresponding to the first boost gradient range; Among them, P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P c02 Indicates the second outlet test pressure; P rup01 Indicates the upper limit value corresponding to the first boost gradient range; Among them, P rdown02 represents the lower limit value corresponding to the second boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve; Among them, P rup03 represents the upper limit value corresponding to the third boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve; Among them, P rdown03 represents the lower limit value corresponding to the third boost gradient range; P rup03 represents the upper limit value corresponding to the third boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully open.

6. A cone valve flow capacity test system, characterized in that: The cone valve flow capacity testing system comprises: An opening value extraction module is used to extract test requirement information and obtain a test opening value corresponding to the cone valve according to the test requirement information; A first data acquisition module is used to adjust the inlet pressure and the outlet pressure of the cone valve to a target pressure at the test initial moment corresponding to each opening value, and start the test operation and data recording to obtain first data information; A second data acquisition module is used to increase the outlet pressure of the conical valve until the cavitation bubbles in the cavity of the conical valve disappear, and acquire second data information; A third data acquisition module, used for increasing the inlet pressure of the conical valve and recording third data information when the inlet pressure of the conical valve is increased; The capacity evaluation module is used to evaluate the flow capacity of the cone valve according to the first data information, the second data information and the third data information, and obtain an evaluation result.

7. The conical valve flow capacity testing system according to claim 6, characterized in that: The first data acquisition module includes: A test opening value extraction module is used to extract the test opening value of the cone valve corresponding to the current test; A pressure value acquisition module, used for acquiring a target inlet pressure value and a target outlet pressure value of the conical valve according to a test opening value of the conical valve; The inlet pressure adjustment calculation module is used to adjust the inlet pressure of the conical valve to a target inlet pressure value; wherein the target inlet pressure value is obtained by the following formula: P mr =P min -α·(P max -P min ) Among them, P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max represents the maximum working pressure corresponding to the rated working pressure range of the cone valve; α represents the first adjustment coefficient; and the first adjustment coefficient is obtained by the following formula: Among them, ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve; The outlet pressure adjustment calculation module is used to adjust the outlet pressure of the conical valve to a target outlet pressure value; wherein the target outlet pressure value is obtained by the following formula: P mc =(1+β)·P min Among them, P mc Indicates the target outlet pressure value; P min represents the minimum working pressure corresponding to the rated working pressure range of the cone valve; β represents the second adjustment coefficient; and the second adjustment coefficient is obtained by the following formula: Among them, P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; P max Indicates the maximum working pressure corresponding to the rated working pressure range of the cone valve; P mr Indicates the target inlet pressure value; The data recording module is used to collect the vibration signal and cavitation image under the working condition when the test is running stably, and record the current inlet and outlet pressure and flow data of the cone valve; The vibration signal, the cavitation image, and the inlet and outlet pressure and flow data of the cone valve are used as the first data information.

8. The cone valve flow capacity testing system according to claim 6, characterized in that: The second data acquisition module includes: A pressure extraction module, used to extract the target inlet pressure value and the target outlet pressure; A test opening value extraction module is used to extract the test opening value of the cone valve corresponding to the current test; A limit value adjustment calculation module is used to obtain the upper limit value and lower limit value of the pressure adjustment gradient corresponding to a single pressure adjustment in the process of increasing the outlet pressure of the conical valve according to the test opening value of the conical valve combined with the target inlet pressure value and the target outlet pressure; wherein the upper limit value and lower limit value of the pressure adjustment gradient of the increase in the outlet pressure of the conical valve are obtained by the following formula: Among them, P cup Indicates the upper limit of the pressure adjustment gradient of the cone valve outlet pressure increase; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P min Indicates the minimum working pressure corresponding to the rated working pressure range of the cone valve; α indicates the first adjustment coefficient; β indicates the second adjustment coefficient; Among them, P cdown Indicates the lower limit of the pressure adjustment gradient; P mc Indicates the target outlet pressure value; P mr Indicates the target inlet pressure value; P cup Indicates the upper limit of the pressure adjustment gradient; A gradient setting module, used to set a pressure regulating gradient according to an upper limit value and a lower limit value of a pressure gradient of an outlet pressure increase of the conical valve; An increase regulation module, used for increasing and regulating the outlet pressure of the conical valve according to the pressure regulation gradient until the cavitation bubbles in the cavity of the conical valve disappear; The second acquisition module is used to collect the vibration signal and cavitation image when the cavitation bubbles disappear in the cavity and the inlet and outlet pressure and flow data of the cone valve as the second data information.

9. The conical valve flow capacity testing system according to claim 6, characterized in that: The third data acquisition module includes: Test pressure acquisition module, used to extract test requirement information; Acquire a first outlet test pressure, a second outlet test pressure, and a third outlet test pressure corresponding to the conical valve according to the test requirement information; A range setting module, used for setting a first pressure boosting gradient range, a second pressure boosting gradient range and a third pressure boosting gradient range corresponding to the inlet pressure of the conical valve according to the first outlet test pressure, the second outlet test pressure and the third outlet test pressure; a first test recording module, configured to set a first boost gradient according to the first boost gradient range, increase the inlet pressure of the conical valve according to the first boost gradient until the outlet pressure of the conical valve reaches a first outlet test pressure, and record a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure; a second test recording module, configured to set a second boost gradient according to the second boost gradient range, increase the inlet pressure of the conical valve according to the second boost gradient until the outlet pressure of the conical valve reaches a second outlet test pressure, and record a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure; a third test recording module, configured to set a third boost gradient according to the third boost gradient range, increase the inlet pressure of the conical valve according to the third boost gradient until the outlet pressure of the conical valve reaches a third outlet test pressure, and record a vibration signal and a cavitation image as well as inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the third outlet test pressure; The third acquisition module is used to use the data parameters corresponding to the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the first outlet test pressure, the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure, and the vibration signal and cavitation image as well as the inlet and outlet pressure values ​​when the outlet pressure of the conical valve reaches the second outlet test pressure as the third data information.

10. The cone valve flow capacity testing system according to claim 9, characterized in that: The range setting module includes: A first upper limit calculation module, used to calculate an upper limit value corresponding to a first boost gradient range; Among them, P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P cup Indicates the upper limit value of the pressure regulation gradient at which the outlet pressure of the cone valve increases; A first lower limit calculation module, used to calculate a lower limit value corresponding to a first boost gradient range; Among them, P rdown01 represents the lower limit value corresponding to the first boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P rup01 Indicates the upper limit value corresponding to the first boost gradient range; A second upper limit calculation module, used to calculate an upper limit value corresponding to a second boost gradient range; Among them, P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully opened; P mr Indicates the target inlet pressure value; P mc Indicates the target outlet pressure value; P c01 Indicates the first outlet test pressure; P c02 Indicates the second outlet test pressure; P rup01 Indicates the upper limit value corresponding to the first boost gradient range; A second lower limit calculation module, used to calculate the lower limit value corresponding to the second boost gradient range; Among them, P rdown02 represents the lower limit value corresponding to the second boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve; A third upper limit calculation module, used to calculate an upper limit value corresponding to a third boost gradient range; Among them, P rup03 represents the upper limit value corresponding to the third boost gradient range; P rup01 represents the upper limit value corresponding to the first boost gradient range; P rup02 represents the upper limit value corresponding to the second boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the fully opened cone valve; A third lower limit calculation module, used to calculate the lower limit value corresponding to the third boost gradient range; Among them, P rdown03 represents the lower limit value corresponding to the third boost gradient range; P rup03 represents the upper limit value corresponding to the third boost gradient range; ω c Indicates the test opening value of the cone valve corresponding to the current test; ω e Indicates the opening value corresponding to the cone valve fully open.

Citation Information

Patent Citations

  • Comprehensive test bench and comprehensive test method for safety valve

    CN115931342A

  • Method and device for detecting and correcting opening degree of valve

    CN116222483A

  • System and method for testing partial stroke of valve

    CN116878860A

  • Cone valve remote control method and cone valve remote control system

    CN117628245A

  • Intelligent overflow test device of automatic shut-off valve

    WO2022257199A1