State evaluation method and device of power equipment, storage medium and electronic equipment

By performing feature extraction and neural network model evaluation on the operating data of power equipment, the problem of low accuracy of power equipment status assessment is solved and more efficient equipment status monitoring and maintenance is achieved.

CN118760863AInactive Publication Date: 2024-10-11GUANGDONG POWER GRID CORP ZHAOQING POWER SUPPLY BUREAU

Patent Information

Application Number
CN202411241237.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing technology, the status assessment of power equipment relies on human experience, resulting in low assessment accuracy and inability to ensure stability.

Method used

By obtaining the operating data of power equipment, key operating characteristics related to the health status of the equipment are extracted, and input into a neural network model trained by multiple equipment samples for evaluation, and a status assessment result is generated to reflect the health status of the equipment.

Benefits of technology

It improves the accuracy and stability of power equipment status assessment, achieves more scientific equipment status monitoring and preventive maintenance, and optimizes equipment operating efficiency and cost control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760863A_ABST
    Figure CN118760863A_ABST
Patent Text Reader

Abstract

The invention discloses a state evaluation method and device of power equipment, a storage medium and electronic equipment. The method comprises the steps that at least one piece of equipment operation data acquired from target power equipment is acquired, and the equipment operation data is used for reflecting the operation state of the target power equipment; key operation characteristics related to the equipment health state are extracted from at least one piece of equipment operation data, and the equipment health state is used for measuring the overall condition and performance of the equipment in the operation process; and inputting the key operation characteristics into a state evaluation model to obtain a state evaluation result output by the state evaluation model, the state evaluation model being a neural network model obtained by training a plurality of equipment samples and used for evaluating the equipment state, and the state evaluation result being used for indicating the equipment health state of the target power equipment. The technical problem that the state evaluation accuracy of the power equipment is low is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of computers, and in particular to a method, device, storage medium and electronic device for evaluating the status of power equipment. Background Art

[0002] In the scenario of power equipment status assessment, human experience is usually used to assess the status of the power equipment operation data. However, human experience is greatly affected by subjective factors and cannot guarantee the stability of the assessment, which leads to the problem of low accuracy of power equipment status assessment. Therefore, there is a problem of low accuracy of power equipment status assessment.

[0003] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0004] The embodiments of the present application provide a method, device, storage medium and electronic device for evaluating the status of an electric power device, so as to at least solve the technical problem of low accuracy in evaluating the status of the electric power device.

[0005] According to one aspect of an embodiment of the present application, a method for evaluating the state of an electric device is provided, comprising: acquiring at least one device operation data collected from a target electric device, wherein the device operation data is used to reflect the operation state of the target electric device;

[0006] Extracting key operating characteristics related to the health status of the device from the at least one device operating data, wherein the health status of the device is used to measure the overall condition and performance of the device during operation;

[0007] The above-mentioned key operating characteristics are input into the state assessment model to obtain the state assessment results output by the above-mentioned state assessment model, wherein the above-mentioned state assessment model is a neural network model trained using multiple equipment samples and used to evaluate the equipment state, and the above-mentioned state assessment results are used to indicate the equipment health status of the above-mentioned target power equipment.

[0008] According to another aspect of an embodiment of the present application, a state assessment device for an electric power equipment is also provided, including: a first acquisition unit, used to acquire at least one device operation data collected from a target electric power equipment, wherein the above-mentioned device operation data is used to reflect the operation state of the above-mentioned target electric power equipment; an extraction unit, used to extract key operation characteristics related to the equipment health state from the above-mentioned at least one device operation data, wherein the above-mentioned equipment health state is used to measure the overall condition and performance of the equipment during operation; a first assessment unit, used to input the above-mentioned key operation characteristics into a state assessment model to obtain a state assessment result output by the above-mentioned state assessment model, wherein the above-mentioned state assessment model is a neural network model obtained by training with multiple device samples and used to assess the equipment state, and the above-mentioned state assessment result is used to indicate the equipment health state of the above-mentioned target electric power equipment.

[0009] As an optional scheme, the second acquisition unit is used to obtain a state prediction result based on the state assessment result after inputting the above-mentioned key operating characteristics into the state assessment model and obtaining the state assessment result output by the above-mentioned state assessment model, wherein the above-mentioned state prediction result is used to indicate the equipment health status of the above-mentioned target power equipment at a future time.

[0010] As an optional scheme, the above-mentioned second acquisition unit includes: a first acquisition module, used to combine historical data and the above-mentioned state evaluation results to obtain the above-mentioned state estimation results, wherein the above-mentioned historical data includes at least one of the following: historical state evaluation results of the above-mentioned target power equipment, historical equipment operation data of the above-mentioned target power equipment.

[0011] As an optional scheme, the above-mentioned first acquisition unit includes: a second acquisition module, used to obtain N operating data collected by at least two types of sensors on the above-mentioned target power equipment, wherein N is a positive integer; a retention module, used to proportionally retain the operating data collected by each type of sensor according to the type of the above-mentioned sensor, to obtain M operating data, wherein M is a positive integer less than N; a third acquisition module, used to obtain the above-mentioned at least one device operating data based on the above-mentioned M operating data.

[0012] As an optional solution, the above-mentioned third acquisition module includes: an acquisition sub-module, used to obtain normal data corresponding to the above-mentioned various sensors, and average data of operation data collected by the above-mentioned various sensors; a comparison sub-module, used to use the above-mentioned normal data as a reference value, perform difference comparison on the above-mentioned average data, and obtain the above-mentioned at least one device operation data.

[0013] As an optional scheme, the above-mentioned device also includes: a third acquisition unit, which is used to obtain the operation characteristics related to the health status of the above-mentioned equipment and the actual equipment health status of the above-mentioned equipment from the historical evaluation data of each power equipment before inputting the above-mentioned key operation characteristics into the state assessment model to obtain the state assessment result output by the above-mentioned state assessment model; a combination unit, which is used to combine the above-mentioned operation characteristics and the above-mentioned equipment health status of the above-mentioned equipment into pairs of samples to obtain the above-mentioned multiple equipment samples before inputting the above-mentioned key operation characteristics into the state assessment model to obtain the state assessment result output by the above-mentioned state assessment model; a training unit, which is used to train the initial model using the above-mentioned multiple equipment samples to obtain a trained model before inputting the above-mentioned key operation characteristics into the state assessment model to obtain the state assessment result output by the above-mentioned state assessment model, and determine the above-mentioned trained model as the above-mentioned state assessment model.

[0014] As an optional solution, the above-mentioned device also includes: a third acquisition unit, which is used to acquire multiple test samples from new historical evaluation data after the initial model is trained using the above-mentioned multiple device samples to obtain a trained model, and the trained model is determined as the above-mentioned state evaluation model; a second evaluation unit, which is used to perform performance evaluation on the above-mentioned state evaluation model using the above-mentioned multiple test samples after the initial model is trained using the above-mentioned multiple device samples to obtain a trained model, and the trained model is determined as the above-mentioned state evaluation model.

[0015] As an optional scheme, the above-mentioned device also includes at least one of the following: a first use unit, used to use a bar chart to display the equipment health status of the above-mentioned target power equipment after the above-mentioned key operating characteristics are input into the state assessment model and the state assessment results output by the above-mentioned state assessment model are obtained; a second use unit, used to use a line chart to display the change of the equipment health status of the above-mentioned target power equipment over time after the above-mentioned key operating characteristics are input into the state assessment model and the state assessment results output by the above-mentioned state assessment model are obtained; a third use unit, used to use a pie chart to display the distribution of the equipment health status of the above-mentioned target power equipment under different situations after the above-mentioned key operating characteristics are input into the state assessment model and the state assessment results output by the above-mentioned state assessment model are obtained.

[0016] According to another aspect of the embodiments of the present application, a computer program product or a computer program is provided, the computer program product or the computer program including computer instructions, the computer instructions being stored in a computer-readable storage medium. A processor of an electronic device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the electronic device performs the above state assessment method of the power device.

[0017] According to another aspect of an embodiment of the present application, an electronic device is also provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the method for evaluating the state of the power equipment through the computer program.

[0018] In an embodiment of the present application, at least one device operation data collected from a target power device is obtained, wherein the device operation data is used to reflect the operation status of the target power device; key operation characteristics related to the device health status are extracted from the at least one device operation data, wherein the device health status is used to measure the overall condition and performance of the device during operation; the key operation characteristics are input into a state assessment model to obtain a state assessment result output by the state assessment model, wherein the state assessment model is a neural network model trained using multiple device samples and used to assess the device status, and the state assessment result is used to indicate the device health status of the target power device.

[0019] By collecting the operating data of the target power equipment, these data can objectively and in real time reflect the operating status of the equipment. Then extract key operating features from these equipment operating data, which are directly related to the health status of the equipment. By extracting and analyzing these features, the operating status and performance of the equipment can be understood more accurately, providing a more accurate data basis for subsequent status evaluation. These key operating features are further input into the status evaluation model trained with multiple equipment samples. This model is a neural network model, which can automatically identify and judge the health status of the equipment by learning the data features and status of a large number of equipment samples. In this way, the purpose of improving the stability of the status evaluation of power equipment is achieved, thereby achieving the technical effect of improving the efficiency of the status evaluation of power equipment, and thus solving the technical problem of low accuracy of the status evaluation of power equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0021] Figure 1is a schematic diagram of an application environment of an optional method for evaluating the state of electric power equipment according to an embodiment of the present application;

[0022] Figure 2 is a schematic diagram of a process of an optional method for evaluating the state of electric power equipment according to an embodiment of the present application;

[0023] Figure 3 is a schematic diagram of an optional method for evaluating the state of electric power equipment according to an embodiment of the present application;

[0024] Figure 4 is a schematic diagram of another optional method for evaluating the state of electric power equipment according to an embodiment of the present application;

[0025] Figure 5 is a schematic diagram of an optional state assessment device for electric power equipment according to an embodiment of the present application;

[0026] Figure 6 It is a schematic diagram of the structure of an optional electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0027] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0028] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0029] According to one aspect of an embodiment of the present application, a method for evaluating the state of an electric device is provided. Optionally, as an optional implementation, the method for evaluating the state of an electric device may be applied to, but is not limited to, Figure 1In the environment shown, the environment may include, but is not limited to, a user device 102 and a server 112 . The user device 102 may include, but is not limited to, a display 104 , a processor 106 , and a memory 108 . The server 112 includes a database 114 and a processing engine 116 .

[0030] The specific process can be as follows:

[0031] Step S102, the user device 102 acquires at least one device operation data collected from the target power device;

[0032] Step S104, sending the device operation data to the server 112 via the network 110;

[0033] Steps S106-S108, the server 112 extracts key operating features related to the health status of the device from at least one device operating data through the processing engine 116, and further inputs the key operating features into the status assessment model to obtain a status assessment result output by the status assessment model;

[0034] Step S110 , sending the status evaluation result to the user device 102 via the network 110 , the user device 102 displays the status evaluation result on the display 104 via the processor 106 , and stores the status evaluation result in the memory 108 .

[0035] remove Figure 1 In addition to the examples shown, the terminal device may be a terminal device configured with a target client, which may include but is not limited to at least one of the following: a mobile phone (such as an Android phone, an iOS phone, etc.), a laptop, a tablet computer, a PDA, a MID (Mobile Internet Devices), a PAD, a desktop computer, a smart TV, etc. The target client may be a video client, an instant messaging client, a browser client, an education client, etc. The network may include but is not limited to: a wired network, a wireless network, wherein the wired network includes: a local area network, a metropolitan area network and a wide area network, and the wireless network includes: Bluetooth, WIFI and other networks that implement wireless communication. The server may be a single server, or a server cluster consisting of multiple servers, or a cloud server. The above is only an example, and no limitation is made to this in this embodiment.

[0036] Optionally, as an optional implementation, as Figure 2 As shown, the state assessment method of the power equipment can be executed by an electronic device, and the electronic device can be, for example, Figure 1 The user device or server shown in the figure comprises:

[0037] S202, acquiring at least one device operation data collected from a target electric device, wherein the device operation data is used to reflect the operation status of the target electric device;

[0038] It involves collecting various data generated by power equipment during operation. Equipment operation data refers to various parameters and information generated by power equipment during operation, such as voltage, current, temperature, power factor, etc. These data can reflect the operating status of the equipment in real time.

[0039] S204, extracting key operation characteristics related to the health status of the device from the at least one device operation data, wherein the health status of the device is used to measure the overall condition and performance of the device during operation;

[0040] Among the numerous equipment operation data collected, it is necessary to identify and extract key data features that can directly reflect or affect the health status of the equipment. Key operation features refer to data points that can significantly characterize equipment performance, efficiency or potential failures, such as abnormal temperature rise, voltage fluctuation, etc.

[0041] S206, inputting key operating characteristics into a state assessment model to obtain a state assessment result output by the state assessment model, wherein the state assessment model is a neural network model trained using multiple equipment samples and used to assess equipment status, and the state assessment result is used to indicate the equipment health status of the target power equipment.

[0042] The extracted key operating features are used as input to a pre-trained state assessment model, which outputs an assessment result about the health status of the equipment based on these feature data. The state assessment model is a model built based on machine learning or deep learning algorithms. It builds a prediction model by learning a large amount of historical equipment data and its corresponding health status to evaluate the equipment status of new input data.

[0043] To further illustrate, optionally assume that there is a transformer, and this embodiment collects data such as voltage, current, and oil temperature of this transformer during operation. From these data, it is found that the abnormal increase in oil temperature is a key operating feature, which may indicate a fault or overload inside the transformer. This embodiment inputs this feature and other related features into a neural network model that has been trained with multiple transformer sample data. After calculation, the model outputs a state assessment result, indicating that the transformer may have an internal fault and recommends further inspection.

[0044] Optionally, in this embodiment, the state assessment model can continuously learn and optimize, and improve the accuracy and reliability of the prediction by continuously incorporating new equipment operation data and corresponding health status information. In addition, with the development of Internet of Things (IoT) technology, the collection of equipment operation data has become more convenient and efficient, providing strong support for real-time equipment status monitoring and preventive maintenance.

[0045] By collecting the operating data of the target power equipment, these data can objectively and in real time reflect the operating status of the equipment. Then extract key operating features from these equipment operating data, which are directly related to the health status of the equipment. By extracting and analyzing these features, the operating status and performance of the equipment can be understood more accurately, providing a more accurate data basis for subsequent status evaluation. These key operating features are further input into the status evaluation model trained with multiple equipment samples. This model is a neural network model, which can automatically identify and judge the health status of the equipment by learning the data features and status of a large number of equipment samples. In this way, the purpose of improving the stability of the status evaluation of power equipment is achieved, thereby realizing the technical effect of improving the efficiency of the status evaluation of power equipment.

[0046] As an optional solution, after inputting the key operating characteristics into the condition assessment model and obtaining the condition assessment results output by the condition assessment model, the following are included:

[0047] According to the status evaluation result, a status prediction result is obtained, wherein the status prediction result is used to indicate the equipment health status of the target power equipment at a future time.

[0048] It should be noted that after the key operating characteristics are input into the state assessment model and the state assessment result is obtained, the further operation is to obtain a state prediction result based on this assessment result. The "state prediction result" here refers to the prediction of the possible health state of the equipment at a certain point in the future based on the health state assessment of the current equipment.

[0049] To further illustrate, taking a wind turbine as an example, suppose that the condition assessment model has been used to determine that the current gearbox oil temperature of a certain wind turbine is high and there is a certain amount of wear. Based on this information, it can be further estimated that if maintenance is not carried out in time, the gearbox wear may increase in the next few months, and the oil temperature will continue to rise, which will affect the overall performance and life of the wind turbine. This prediction of the future health status is the condition estimation result.

[0050] Condition prediction can not only be used to predict the health status of equipment, but also provide a basis for preventive maintenance planning of equipment. For example, if the prediction results show that the equipment may fail in the next few months, the maintenance team can arrange maintenance work in advance to avoid unexpected downtime events.

[0051] By obtaining the status prediction results, it is possible to achieve predictive management of the future health status of power equipment. This not only helps to discover and solve potential problems in advance and reduce the occurrence of sudden failures, but also optimizes maintenance plans and improves the overall operating efficiency and reliability of equipment. At the same time, this status prediction method also provides enterprises with more scientific decision-making support, which helps to improve their operational efficiency and cost control capabilities.

[0052] As an optional solution, based on the status assessment results, status prediction results are obtained, including:

[0053] The state estimation result is obtained by combining the historical data and the state assessment result, wherein the historical data includes at least one of the following: the historical state assessment result of the target power equipment, and the historical equipment operation data of the target power equipment.

[0054] Optionally, in this embodiment, the historical status evaluation result of the target electric power equipment refers to the results obtained from multiple status evaluations performed on the same electric power equipment in the past.

[0055] Optionally, in this embodiment, the historical equipment operation data of the target electric equipment refers to various data generated by the electric equipment during its past operation, such as voltage, current, temperature, etc.

[0056] It should be noted that in the process of obtaining the state estimation result based on the state assessment result, in addition to considering the current assessment result, historical data will also be combined for comprehensive analysis. The "historical data" here refers to the past information related to the target power equipment, including but not limited to the equipment's past state assessment results and equipment operation data.

[0057] To further illustrate, taking a generator set as an example, in order to predict its future health status, not only the current status assessment results (such as bearing vibration exceeding the standard) will be considered, but also the status assessment records of the past few months or years will be checked to see if similar problems have occurred and the development trend of the problems. At the same time, the past equipment operation data will also be checked, such as whether there are obvious changes in the load, oil temperature, speed and other data of the generator set before and after the bearing vibration exceeds the standard. Combining this information, the future health status of the generator set can be more accurately estimated.

[0058] By combining historical data with current status assessment results to obtain status prediction results, the accuracy and reliability of the prediction can be significantly improved. This method can not only help companies to promptly discover and solve potential equipment problems, but also provide strong data support for preventive maintenance and replacement of equipment. At the same time, through the analysis of historical data, companies can also optimize equipment operation and maintenance strategies, extend the service life of equipment, and improve overall operational efficiency.

[0059] As an optional solution, obtaining at least one device operation data collected from the target power device includes:

[0060] S1-1, obtaining N operating data collected by at least two types of sensors on the target power equipment, where N is a positive integer;

[0061] S1-2, according to the type of sensor, the operating data collected by each type of sensor is reserved in proportion to obtain M operating data, where M is a positive integer less than N;

[0062] S1-3, obtaining at least one device operation data according to the M operation data.

[0063] Optionally, in this embodiment, sensor: Here, the sensor refers to various devices installed on the power equipment for real-time monitoring and recording the operating status of the equipment, such as temperature sensors, pressure sensors, etc.

[0064] Optionally, in this embodiment, proportion retention refers to screening out part of the data from a large amount of raw data collected by various sensors according to a certain standard or rule, so as to reduce data redundancy and improve data processing efficiency.

[0065] It should be noted that this embodiment describes the process of obtaining target power equipment operation data. This process includes collecting raw data from multiple sensors, then screening and processing these data according to certain rules (such as retaining in proportion), and finally obtaining equipment operation data for subsequent analysis.

[0066] To further illustrate, it is optional to assume that there is a power transformer with temperature sensors, voltage sensors, and current sensors installed on it. These sensors collect a large amount of data every second. If all of this data is retained without processing, the amount of data will be huge and difficult to analyze efficiently. Therefore, according to the type of sensor, for example, a data point of the temperature sensor can be retained every 10 seconds, and a data point of the voltage and current sensors can be retained every 5 seconds. In this way, the amount of data can be greatly reduced while ensuring the representativeness of the data, which is convenient for subsequent analysis.

[0067] Through the embodiments provided in this application, the complexity of data processing and analysis can be effectively reduced while ensuring data quality. This method not only improves the efficiency of data processing, but also provides a more accurate and reliable data basis for subsequent equipment status evaluation, fault prediction, etc. At the same time, through reasonable data screening and processing, it can also help enterprises better understand the actual operation of equipment, discover potential problems in a timely manner, and thus optimize equipment maintenance and management strategies.

[0068] As an optional solution, obtaining at least one device operation data according to the M operation data includes:

[0069] S2-1, obtaining normal data corresponding to various sensors and average data of operation data collected by various sensors;

[0070] S2-2, using normal data as a reference value, performing a difference comparison on the average data to obtain at least one device operation data.

[0071] Optionally, in this embodiment, normal data refers to the data range or standard value collected by various sensors when the device is in normal operation. These data are usually obtained when the device is fault-free and has good performance, and are used as reference values.

[0072] Optionally, in this embodiment, average data refers to data obtained by averaging the M operating data obtained after proportional retention, which represents the average level of the equipment operating status in a certain period of time.

[0073] It should be noted that this embodiment is a process of further processing and extracting equipment operation data based on the M operation data previously retained in proportion. Specifically, the average value of the operation data collected by various sensors is first calculated, and compared with the normal data of the sensors, and the equipment operation data reflecting the actual operation status of the equipment is obtained through difference comparison.

[0074] To further illustrate, take the wind speed sensor of a wind turbine as an example. Assume that over a period of time, the wind speed sensor collects multiple wind speed data and retains a portion of the data in proportion. Next, calculate the average value of these retained data to obtain an average wind speed data. At the same time, it is known that under normal circumstances, the wind speed sensor of a wind turbine should fluctuate within a certain range (such as 5-25m / s). Compare the calculated average wind speed data with this normal range. By comparing the difference, it can be seen whether the actual wind speed deviates from the normal range, thereby judging whether the operating status of the wind turbine is normal.

[0075] Through the embodiments provided in this application, the actual operating status of the equipment can be more accurately reflected. The difference comparison with normal data can help to timely discover abnormal conditions of the equipment and provide strong support for preventive maintenance and troubleshooting of the equipment. At the same time, this method can also improve the efficiency and accuracy of data processing, reduce the interference of redundant data and noise, and make subsequent data analysis more accurate and efficient.

[0076] As an optional solution, before inputting the key operating characteristics into the state assessment model to obtain the state assessment result output by the state assessment model, the method further includes:

[0077] S3-1, obtaining the operation characteristics of each power device related to the health status of the device and the actual health status of each power device from the historical evaluation data of each power device;

[0078] S3-2, combining the operation characteristics and health status of each power device into pairs of samples to obtain multiple device samples;

[0079] S3-3, using multiple equipment samples, train the initial model to obtain a trained model, and determine the trained model as a state assessment model.

[0080] Optionally, in this embodiment, historical evaluation data refers to data accumulated from evaluations of various power equipment over a period of time in the past, including information such as equipment operating characteristics and equipment health status.

[0081] Optionally, in this embodiment, the equipment sample refers to a data unit that combines the operating characteristics of the power equipment and the corresponding equipment health status, which is used for model training.

[0082] Optionally, in this embodiment, the initial model refers to an untrained original model built based on a certain algorithm, which needs to be trained with sample data to improve its prediction accuracy.

[0083] It should be noted that before key operating features are input into the condition assessment model to obtain the condition assessment results, the model needs to be built and trained first. This process involves extracting the operating features related to the health status and the actual health status of the equipment from the historical data of multiple power equipment, and then combining these features and status into sample data. Next, the initial model is trained using these sample data, and finally a well-trained condition assessment model is obtained.

[0084] To further illustrate, it is optional to assume that there is a batch of historical evaluation data of transformers, which includes the operating characteristics of the transformers such as oil temperature and voltage fluctuations, as well as the actual health status information such as whether the transformers have failed or performance has degraded. These characteristics and states can be mapped one by one and combined into multiple transformer samples. Then, an initial neural network model is trained using these sample data, and the parameters of the model are continuously adjusted so that it can more accurately predict the health status of the transformer based on the input operating characteristics. Ultimately, this trained model is the desired state assessment model.

[0085] By extracting equipment operation characteristics and health status from historical data to construct equipment samples, and using these samples to train the initial model, a state assessment model that can accurately assess the health status of power equipment can be obtained. This model can quickly predict the health status of equipment based on real-time collected equipment operation data, thereby providing companies with timely equipment maintenance and management suggestions. This not only helps reduce equipment failure rates and improve operational efficiency, but also provides strong support for companies to save maintenance costs and extend equipment life.

[0086] As an optional solution, after the initial model is trained using multiple device samples to obtain a trained model, and the trained model is determined as the state assessment model, the method further includes:

[0087] S4-1, obtaining multiple test samples from new historical evaluation data;

[0088] S4-2, using multiple test samples, the performance of the state assessment model is evaluated.

[0089] Optionally, in this embodiment, new historical evaluation data refers to historical data obtained after model training, which does not participate in the model training process and can therefore be used to objectively evaluate the performance of the model.

[0090] Optionally, in this embodiment, the test sample is sample data extracted from new historical evaluation data and used to test model performance, including operating characteristics of the equipment and the corresponding health status.

[0091] It should be noted that after the initial model is trained using multiple equipment samples and the trained state assessment model is obtained, multiple test samples will be obtained from the new historical assessment data to verify the performance and accuracy of the model. Then, these test samples are used to evaluate the performance of the state assessment model to verify whether the model can accurately predict the health status of the equipment based on the input operating characteristics.

[0092] To further illustrate, the optional assumption is that a condition assessment model has been trained to predict the health status of a wind turbine. To test the accuracy of this model, a new set of test samples is extracted from the historical assessment data of the wind turbines that have been recently collected. These test samples contain the operating characteristics of the wind turbines, such as wind speed, wind direction, temperature, and the corresponding health status (such as normal operation, performance degradation, etc.). These test samples are input into the condition assessment model, and the model's predictions are compared with the actual health status to evaluate the model's performance.

[0093] By using the test samples in the new historical evaluation data to evaluate the performance of the condition assessment model, we can objectively understand the prediction accuracy and generalization ability of the model. This helps to find possible problems and deficiencies in the model, so as to carry out targeted optimization and improvement. At the same time, the results of the performance evaluation can also provide a reference for corporate decision-making, such as whether to apply the model to the actual power equipment condition assessment.

[0094] As an optional solution, after inputting the key operating characteristics into the state assessment model and obtaining the state assessment result output by the state assessment model, the method further includes at least one of the following:

[0095] S5-1, using a bar graph to display the equipment health status of the target power equipment;

[0096] S5-2, using a line graph to show the change of the equipment health status of the target power equipment over time;

[0097] S5-3, use a pie chart to show the distribution of the equipment health status of the target power equipment under different conditions.

[0098] Optionally, in this embodiment, a bar chart is a statistical chart with the length of a rectangle as a variable, which is used to compare the quantitative relationship between various items or reflect the internal structure of a certain item. Assume that the state assessment model outputs the health status score of the target power equipment every day in the past week. These scores can be displayed using a bar chart, where the height of each bar represents the health status score of the corresponding date.

[0099] Optionally, in this embodiment, a line graph: a graph that represents the trend of data changes by connecting lines between data points, suitable for displaying time series data. If you want to observe the trend of changes in the health status of the target power equipment over time, you can use a line graph. For example, you can draw a line graph containing the weekly health status scores in the past few months, and analyze the changes in the health status of the equipment through the trend of the line.

[0100] Optionally, in this embodiment, a pie chart: a chart in which the total area of ​​a circle represents 100% and the area of ​​each sector in the circle represents the proportion of each part. If you want to understand the distribution of target power equipment in different health states, you can use a pie chart. For example, you can divide the equipment status into four levels: "excellent", "good", "average" and "poor", and use a pie chart to show the proportion of each level.

[0101] It should be noted that after the key operating characteristics are input into the status assessment model and the status assessment results of the model are obtained, in order to more intuitively display and understand these assessment results, this embodiment also provides a variety of visualization methods, including the use of bar charts, line charts and pie charts to display the health status of the target power equipment.

[0102] Through the embodiments provided by this application, users can more intuitively understand the health status of target power equipment and its changing trends. This not only helps users to promptly discover potential problems with equipment and take corresponding maintenance measures, but also provides users with richer data analysis and decision support. At the same time, visual display can also enhance users' perception and understanding of data and improve the efficiency of data use.

[0103] As an optional solution, for ease of understanding, the above-mentioned power equipment status assessment method is applied to the equipment health status diagnosis system. The equipment health status diagnosis system is an intelligent diagnosis system that integrates collection, analysis, intelligent diagnosis and comprehensive performance evaluation. It uses real-time monitoring devices such as temperature, vibration, voltage, power, current, and pressure to monitor the operating status of power equipment in real time. The relevant data is transmitted to the monitoring system, and the equipment health status is monitored in real time and off-line alarms are issued through various forms such as charts, real-time curves, and fault alarms. The health status of the equipment is displayed and warned in various forms. It has been widely used in the diagnosis and monitoring of the health status of power equipment. The existing intelligent diagnosis system for the health status of power equipment has the following problems:

[0104] 1. Insufficient ability to predict equipment health status. The real-time monitoring system mainly monitors and displays the equipment operating status in real time, and can query the data of the equipment's previous operating status. However, the diagnosis process does not fully apply previous operating data, big data algorithm models and other technologies to predict the equipment's health status, and lacks accurate prediction capabilities.

[0105] 2. Insufficient diagnostic accuracy. The equipment health status monitoring indicator system is not perfect, and the detailed indicator content is not monitored in detail. It is impossible to locate and monitor the detailed indicators with potential hidden dangers, and it is impossible to accurately predict the future equipment health status.

[0106] 3. Narrow application scenarios. The application scope of equipment monitoring results is limited to functions such as real-time viewing of the system and export of monitoring results, which provide reference for equipment management decisions. The relevant data cannot be applied to intelligent equipment such as on-site mobile operation terminals and automatic inspection robots at any time.

[0107] 4. Weak decision-making support capabilities. They only monitored the actual operation of the equipment, recorded and displayed the actual indicator data, did not analyze the impact of this state on the health of the equipment, did not give treatment suggestions, and had weak decision-making support capabilities.

[0108] The problems still existing in the related technology are:

[0109] 1. Relying on real-time collected power equipment operation data, however, in actual applications, due to equipment aging, sensor failure or data transmission problems, data quality may be low or missing. These problems will directly affect the accuracy and reliability of the evaluation model.

[0110] 2. With the increase in the number of devices in the power system and the diversification of data types, the complexity of data processing and analysis is also increasing. Although the patent mentions the application of technologies such as data mining and machine learning, it is still a challenge to efficiently process and analyze massive amounts of data and extract information that is useful for equipment health status assessment.

[0111] 3. The health status of power equipment will change with the change of operating time and environmental conditions, so the evaluation model needs to be constantly updated and maintained to adapt to these changes. However, how to effectively update the model, maintain its accuracy and real-time performance, and ensure the stability and reliability of the model is one of the problems that the equipment health status diagnosis system needs to solve.

[0112] To further illustrate, the optional Figure 3 As shown, the specific steps are as follows:

[0113] S302, data collection:

[0114] Data collection to ensure data quality and integrity; establish a strict data collection and verification mechanism to ensure the accuracy and reliability of sensor data; use data cleaning and preprocessing technology to remove noise and fill missing values ​​in the collected data to improve data quality; introduce data quality monitoring and alarm systems to monitor data quality in real time and promptly detect and handle data anomalies.

[0115] Specific as Figure 4 As shown in Figure 1, various sensors are first grouped according to the power equipment to be monitored, and the monitoring data set obtained by each group is , Contains data monitored by all sensors in this group , , , ..., assuming that the data monitored by each sensor contains Values , according to the monitoring characteristics of the sensor, select the numerical ratio to be removed from the monitoring data ,Right now The value is retained The effective average value of each sensor is calculated based on the effective values ​​in the data monitored by each sensor. , , , ……;

[0116] The equipment is rated for normal operation. , , , ...is the reference value, which is the effective average of each sensor , , , ...to compare the differences:

[0117] For example With the corresponding The difference is = , set the variable operation control threshold according to the equipment's operating life ,when Less than The device is operating normally. Greater than The equipment is not operating normally, triggering an alarm and adjusting the control threshold. Sum and Difference Carry out real-time monitoring and calculate the difference between the two. The more dramatic the change per unit time, the greater the fluctuation in the equipment operation, which triggers attention and requires the operator to pay attention to the equipment;

[0118] Other sensors are similar to the above operation process, monitoring the difference and control threshold , and the difference between the two Changes in situation.

[0119] S304, feature extraction and selection:

[0120] Based on the preprocessed data, feature extraction and selection are performed to extract key features related to the health status of power equipment to provide input for subsequent model training; to ensure the reliability of data processing, distributed computing frameworks and big data processing technologies are used to improve the efficiency and speed of data processing and analysis; efficient feature extraction and selection methods are used to reduce redundant features and improve the generalization ability of the model; advanced technologies such as deep learning are combined to build more complex evaluation models to handle more diverse and complex data types.

[0121] Specifically, the difference will be monitored , control threshold , Difference As the main monitoring data of the model and the key feature for assessing the health status of the equipment, it is stored to form a database to monitor the equipment that has been in operation. For the newly invested equipment, the relevant monitoring data can be extracted from the database within the model to perform data comparison, providing a basis for model optimization.

[0122] S306, model construction and training: Use statistical analysis, correlation analysis, machine learning and other big data mining methods to build a power equipment health status assessment model. By learning a large amount of historical data, the model is trained to identify the laws of equipment health status.

[0123] Regularly evaluate and tune the model to ensure its accuracy and real-time performance. Introduce online learning technology to enable the model to learn new data in real time and adjust model parameters adaptively. Establish a standardized process for model update and maintenance to ensure the stability and reliability of the model.

[0124] Specifically, according to the monitoring difference of the equipment , control threshold , Difference , adjust the control threshold , try to keep the equipment in the optimal operating state and control the threshold Difference with monitoring Maintain a stable difference , to obtain the optimal control value of the equipment, reduce the frequency of alarms and concerns, and improve the operating health value of the equipment.

[0125] S308. Health status assessment and prediction: Use the trained model to assess the health status of the power equipment and predict the future health status of the equipment based on historical data and real-time data.

[0126] S310, Result output and visualization: Output the evaluation results in an easy-to-understand manner, such as reports, charts, etc., to provide decision support for equipment maintenance personnel.

[0127] In addition, in this embodiment, a strict data collection and verification mechanism can be established; data cleaning and preprocessing technology can be used; a data quality monitoring and alarm system can be introduced; and the integrity and reliability of the data can be effectively guaranteed.

[0128] Through the embodiments provided in the present application, the data collection part of the model is performed in the model, and a more efficient data processing method is introduced to solve the problem of poor data quality existing in the related technology.

[0129] Control threshold Adopt the dynamic setting of the curve related to the equipment's operating life to keep the monitoring data of the equipment in each stage matching the control threshold, avoid excessive alarms and concerns, and make the data processing more realistic.

[0130] It is understandable that in the specific implementation of this application, related data such as user information is involved. When the above embodiments of this application are applied to specific products or technologies, user permission or consent is required, and the collection, use and processing of relevant data need to comply with relevant laws, regulations and standards of relevant countries and regions.

[0131] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0132] According to another aspect of the embodiments of the present application, there is also provided a device for evaluating the state of an electric device for implementing the above-mentioned method for evaluating the state of an electric device. Figure 5 As shown, the device comprises:

[0133] A first acquisition unit 502 is used to acquire at least one device operation data collected from a target power device, wherein the device operation data is used to reflect the operation status of the target power device;

[0134] An extraction unit 504 is used to extract key operation characteristics related to the health status of the device from the at least one device operation data, wherein the health status of the device is used to measure the overall condition and performance of the device during operation;

[0135] The first evaluation unit 506 is used to input key operating characteristics into a state evaluation model to obtain a state evaluation result output by the state evaluation model, wherein the state evaluation model is a neural network model trained using multiple equipment samples and used to evaluate equipment status, and the state evaluation result is used to indicate the equipment health status of the target power equipment.

[0136] For a specific embodiment, reference may be made to the example shown in the above-mentioned method for assessing the state of electric power equipment, which will not be described in detail in this example.

[0137] As an optional scheme, the second acquisition unit is used to obtain a state prediction result based on the state assessment result after inputting the key operating characteristics into the state assessment model and obtaining the state assessment result output by the state assessment model, wherein the state prediction result is used to indicate the equipment health status of the target power equipment at a future time.

[0138] For a specific embodiment, reference may be made to the example shown in the above-mentioned method for assessing the state of electric power equipment, which will not be described in detail in this example.

[0139] As an optional solution, the second acquisition unit includes:

[0140] The first acquisition module is used to obtain the state estimation result by combining the historical data and the state evaluation result, wherein the historical data includes at least one of the following: the historical state evaluation result of the target power equipment, and the historical equipment operation data of the target power equipment.

[0141] For a specific embodiment, reference may be made to the example shown in the above-mentioned method for assessing the state of electric power equipment, which will not be described in detail in this example.

[0142] As an optional solution, the first acquisition unit 502 includes:

[0143] A second acquisition module is used to acquire N operating data collected by at least two types of sensors on the target power equipment, where N is a positive integer;

[0144] A retention module is used to retain the operating data collected by various sensors in proportion according to the type of the sensor, to obtain M operating data, where M is a positive integer less than N;

[0145] The third acquisition module is used to acquire at least one device operation data according to the M operation data.

[0146] For a specific embodiment, reference may be made to the example shown in the above-mentioned method for assessing the state of electric power equipment, which will not be described in detail in this example.

[0147] As an optional solution, the third acquisition module includes:

[0148] The acquisition submodule is used to obtain the normal data corresponding to each type of sensor and the average data of the operating data collected by each type of sensor;

[0149] The comparison submodule is used to perform a difference comparison on the average data with the normal data as a reference value to obtain at least one device operation data.

[0150] For a specific embodiment, reference may be made to the example shown in the above-mentioned method for assessing the state of electric power equipment, which will not be described in detail in this example.

[0151] As an optional solution, the device also includes:

[0152] A third acquisition unit is used to acquire the operation characteristics related to the health status of each power device and the actual health status of each power device from the historical evaluation data of each power device before inputting the key operation characteristics into the state evaluation model to obtain the state evaluation result output by the state evaluation model;

[0153] A combining unit, used for combining the operating characteristics and the health status of each power device into pairs of samples to obtain a plurality of device samples before inputting the key operating characteristics into the state assessment model to obtain the state assessment result output by the state assessment model;

[0154] The training unit is used to train the initial model using multiple equipment samples to obtain a trained model before inputting key operating characteristics into the state assessment model to obtain the state assessment result output by the state assessment model, and determine the trained model as the state assessment model.

[0155] For a specific embodiment, reference may be made to the example shown in the above-mentioned method for assessing the state of electric power equipment, which will not be described in detail in this example.

[0156] As an optional solution, the device also includes:

[0157] A third acquisition unit is used to train the initial model using multiple device samples to obtain a trained model, and after determining the trained model as a state evaluation model, acquire multiple test samples from new historical evaluation data;

[0158] The second evaluation unit is used to train the initial model using multiple device samples to obtain a trained model, and after determining the trained model as a state evaluation model, use multiple test samples to perform performance evaluation on the state evaluation model.

[0159] For a specific embodiment, reference may be made to the example shown in the above-mentioned method for assessing the state of electric power equipment, which will not be described in detail in this example.

[0160] As an optional solution, the device further includes at least one of the following:

[0161] A first using unit is used to display the equipment health status of the target power equipment using a bar graph after inputting the key operation characteristics into the state assessment model and obtaining the state assessment result output by the state assessment model;

[0162] A second using unit is used to display the change of the equipment health status of the target power equipment over time using a line graph after inputting the key operation characteristics into the state assessment model and obtaining the state assessment result output by the state assessment model;

[0163] The third using unit is used to use a pie chart to display the distribution of the equipment health status of the target power equipment under different conditions after inputting the key operating characteristics into the state assessment model to obtain the state assessment result output by the state assessment model.

[0164] For a specific embodiment, reference may be made to the example shown in the above-mentioned method for assessing the state of electric power equipment, which will not be described in detail in this example.

[0165] According to another aspect of the embodiment of the present application, an electronic device for implementing the above-mentioned power equipment status assessment method is also provided. The electronic device can be but is not limited to Figure 1 The user device 102 or the server 112 shown in FIG. 1 is used as an example to illustrate the electronic device as the user device 102. Figure 6 As shown, the electronic device includes a memory 602 and a processor 604. The memory 602 stores a computer program, and the processor 604 is configured to execute the steps in any of the above method embodiments through the computer program.

[0166] Optionally, in this embodiment, the electronic device may be located in at least one network device among a plurality of network devices of a computer network.

[0167] Optionally, in this embodiment, the processor may be configured to perform the following steps through a computer program:

[0168] S1, obtaining at least one device operation data collected from a target power device, wherein the device operation data is used to reflect the operation status of the target power device;

[0169] S2, extracting key operation characteristics related to the health status of the device from the operation data of at least one device, wherein the health status of the device is used to measure the overall condition and performance of the device during operation;

[0170] S3, inputting key operating characteristics into the state assessment model to obtain the state assessment results output by the state assessment model, wherein the state assessment model is a neural network model trained using multiple equipment samples and used to assess the equipment state, and the state assessment results are used to indicate the equipment health status of the target power equipment.

[0171] Alternatively, a person skilled in the art may understand that: Figure 6 The structure shown is for illustration only. Figure 6 The structure of the electronic device is not limited. Figure 6 More or fewer components (such as network interfaces, etc.) as shown in, or with Figure 6 Different configurations are shown.

[0172] Among them, the memory 602 can be used to store software programs and modules, such as the program instructions / modules corresponding to the state assessment method and device of the power equipment in the embodiment of the present application. The processor 604 executes various functional applications and data processing by running the software programs and modules stored in the memory 602, that is, realizing the above-mentioned state assessment method of the power equipment. The memory 602 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some instances, the memory 602 may further include a memory remotely located relative to the processor 604, and these remote memories may be connected to the electronic device via a network. Examples of the above-mentioned networks include, but are not limited to, the Internet, corporate intranets, local area networks, mobile communication networks, and combinations thereof. Among them, the memory 602 may be specifically, but not limited to, used to store information such as equipment operation data, key operation characteristics, and state assessment results. As an example, if Figure 6 As shown, the memory 602 may include but is not limited to the first acquisition unit 502, extraction unit 504 and first evaluation unit 506 in the power equipment status evaluation device. In addition, it may also include but is not limited to other module units in the power equipment status evaluation device, which will not be repeated in this example.

[0173] Optionally, the transmission device 606 is used to receive or send data via a network. Specific examples of the network may include a wired network and a wireless network. In one example, the transmission device 606 includes a network adapter (Network Interface Controller, NIC), which can be connected to other network devices and routers via a network cable so as to communicate with the Internet or a local area network. In one example, the transmission device 606 is a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0174] In addition, the electronic device further includes: a display 608 for displaying information such as the operating data, key operating characteristics and status evaluation results of the device; and a connection bus 610 for connecting various module components in the electronic device.

[0175] In other embodiments, the user device or server may be a node in a distributed system, wherein the distributed system may be a blockchain system, and the blockchain system may be a distributed system formed by connecting the multiple nodes through network communication. Among them, a peer-to-peer network may be formed between the nodes, and any form of computing device, such as a server, user device, or other electronic device, may become a node in the blockchain system by joining the peer-to-peer network.

[0176] According to one aspect of the present application, a computer program product is provided, the computer program product comprising a computer program / instruction, the computer program / instruction comprising a program code for executing the method shown in the flow chart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication part, and / or installed from a removable medium. When the computer program is executed by a central processing unit, various functions provided by the embodiments of the present application are executed.

[0177] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.

[0178] It should be noted that the computer system of the electronic device is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0179] The computer system includes a central processing unit (CPU), which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) or the program loaded from the storage part to the random access memory (RAM). In the random access memory, various programs and data required for system operation are also stored. The central processing unit, the read-only memory and the random access memory are connected to each other through a bus. The input / output interface (I / O interface) is also connected to the bus.

[0180] The following components are connected to the input / output interface: an input part including a keyboard, a mouse, etc.; an output part including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker; a storage part including a hard disk, etc.; and a communication part including a network interface card such as a local area network card, a modem, etc. The communication part performs communication processing via a network such as the Internet. A drive is also connected to the input / output interface as needed. Removable media, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., are installed on the drive as needed so that the computer program read therefrom is installed into the storage part as needed.

[0181] In particular, according to an embodiment of the present application, the process described in each method flow chart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer readable medium, and the computer program contains a program code for executing the method shown in the flow chart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication part, and / or installed from a removable medium. When the computer program is executed by a central processing unit, various functions defined in the system of the present application are executed.

[0182] According to one aspect of the present application, a computer-readable storage medium is provided, and a processor of a computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device executes the methods provided in the above-mentioned various optional implementations.

[0183] Optionally, in this embodiment, the computer-readable storage medium may be configured to store a computer program for performing the following steps:

[0184] S1, obtaining at least one device operation data collected from a target power device, wherein the device operation data is used to reflect the operation status of the target power device;

[0185] S2, extracting key operation characteristics related to the health status of the device from the operation data of at least one device, wherein the health status of the device is used to measure the overall condition and performance of the device during operation;

[0186] S3, inputting key operating characteristics into the state assessment model to obtain the state assessment results output by the state assessment model, wherein the state assessment model is a neural network model trained using multiple equipment samples and used to assess the equipment state, and the state assessment results are used to indicate the equipment health status of the target power equipment.

[0187] Optionally, in the embodiments of the present application, the term "module" or "unit" refers to a computer program or a part of a computer program that has a predetermined function and works together with other related parts to achieve a predetermined goal, and can be implemented in whole or in part by using software, hardware (such as processing circuits or memories), or a combination thereof. Similarly, a processor (or multiple processors or memories) can be used to implement one or more modules or units. In addition, each module or unit can be part of an overall module or unit that includes the function of the module or unit.

[0188] Optionally, in this embodiment, a person of ordinary skill in the art may understand that all or part of the steps in the various methods of the above embodiments may be completed by instructing hardware related to the electronic device through a program, and the program may be stored in a computer-readable storage medium, and the storage medium may include: a flash drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.

[0189] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.

[0190] If the integrated units in the above embodiments are implemented in the form of software functional units and sold or used as independent products, they can be stored in the above computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the relevant technology, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for enabling one or more computer devices (which can be personal computers, servers or network devices, etc.) to execute all or part of the steps of the methods of each embodiment of the present application.

[0191] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.

[0192] In the several embodiments provided in the present application, it should be understood that the disclosed user equipment can be implemented in other ways. Among them, the device embodiments described above are only schematic, for example, the division of units is only a logical function division, and there may be other division methods in actual implementation, for example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0193] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0194] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0195] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A method for evaluating the status of an electric power device, characterized in that: include: Acquire at least one device operation data collected from a target electric device, wherein the device operation data is used to reflect the operation status of the target electric device; Extracting key operating characteristics related to the health status of the device from the at least one device operating data, wherein the health status of the device is used to measure the overall condition and performance of the device during operation; The key operating characteristics are input into a state assessment model to obtain a state assessment result output by the state assessment model, wherein the state assessment model is a neural network model trained using multiple equipment samples and used to assess equipment status, and the state assessment result is used to indicate the equipment health status of the target power equipment.

2. The method according to claim 1, characterized in that After inputting the key operating characteristics into the state assessment model to obtain the state assessment result output by the state assessment model, the method further comprises: According to the status evaluation result, a status prediction result is obtained, wherein the status prediction result is used to indicate the equipment health status of the target power equipment at a future time.

3. The method according to claim 2, characterized in that The obtaining of a state prediction result according to the state evaluation result includes: The state estimation result is obtained by combining historical data and the state assessment result, wherein the historical data includes at least one of the following: historical state assessment results of the target power equipment, and historical equipment operation data of the target power equipment.

4. The method according to claim 1, characterized in that The acquiring of at least one device operation data collected from the target power device includes: Acquire N operating data collected by at least two types of sensors on the target power equipment, where N is a positive integer; According to the type of the sensor, the operating data collected by each type of sensor is reserved in proportion to obtain M operating data, where M is a positive integer less than N; The at least one device operation data is acquired according to the M operation data.

5. The method according to claim 4, characterized in that The acquiring the at least one device operation data according to the M operation data includes: Acquire normal data corresponding to the various sensors and average data of the operating data collected by the various sensors; Taking the normal data as a reference value, performing a difference comparison on the average data to obtain the at least one device operation data.

6. The method according to claim 1, characterized in that Before inputting the key operating characteristics into a state assessment model to obtain a state assessment result output by the state assessment model, the method further includes: Obtaining, from historical evaluation data of each power device, operating characteristics of each power device related to the device health status and the actual device health status of each power device; Combining the operation characteristics and the health status of each power device into pairs of samples to obtain the plurality of device samples; The initial model is trained using the multiple device samples to obtain a trained model, and the trained model is determined as the state assessment model.

7. The method according to claim 6, characterized in that After the initial model is trained by using the multiple device samples to obtain a trained model, and the trained model is determined as the state assessment model, the method further includes: Obtain multiple test samples from new historical evaluation data; The performance of the state assessment model is evaluated using the multiple test samples.

8. The method according to any one of claims 1 to 7, characterized in that After inputting the key operating characteristics into the state assessment model to obtain the state assessment result output by the state assessment model, the method further includes at least one of the following: Using a bar graph to display the equipment health status of the target power equipment; Using a line graph to show the change of the equipment health status of the target power equipment over time; A pie chart is used to show the distribution of the equipment health status of the target power equipment under different conditions.

9. A device for evaluating the state of an electric power device, characterized in that: include: A first acquisition unit, configured to acquire at least one device operation data collected from a target power device, wherein the device operation data is used to reflect the operation status of the target power device; an extraction unit, configured to extract key operation characteristics related to a health status of a device from the at least one device operation data, wherein the health status of the device is used to measure the overall condition and performance of the device during operation; The first evaluation unit is used to input the key operating characteristics into a state evaluation model to obtain a state evaluation result output by the state evaluation model, wherein the state evaluation model is a neural network model trained using multiple equipment samples and used to evaluate equipment status, and the state evaluation result is used to indicate the equipment health status of the target power equipment.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein the program executes the method according to any one of claims 1 to 8 when executed by an electronic device.

11. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instructions are executed by a processor, the steps of the method described in any one of claims 1 to 8 are implemented.

12. An electronic device comprising a memory and a processor, characterized in that: A computer program is stored in the memory, and the processor is configured to execute the method according to any one of claims 1 to 8 through the computer program.

Citation Information

Patent Citations

  • Electric power secondary equipment state evaluation method and device and storage medium

    CN115375133A

  • Power grid power transmission equipment risk assessment method and system, terminal and medium

    CN117726161A

Cited By

  • Method, device and equipment for evaluating health state of battery and storage medium

    CN119044785A

  • Network equipment evaluation method, electronic equipment and storage medium

    CN121309407A