Irregular concrete modeling method and readable storage medium

By splitting and integrating irregular concrete models, the problem of inaccurate control of internal temperature changes in large-thickness irregular concrete rafts is solved, and detailed temperature analysis data is provided to support effective temperature measurement point layout and maintenance.

CN118761121AActive Publication Date: 2024-10-11CHINA MCC5 GROUP CORP LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410643905.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2024-10-11
Estimated Expiration
2044-05-23

AI Technical Summary

Technical Problem

The existing technology cannot effectively obtain the temperature changes inside the large-thickness irregular concrete raft, resulting in inaccurate temperature measurement point layout and maintenance data.

Method used

By splitting horizontal layers, irregular concrete models are established and integrated to conduct layered viewing and temperature calculation analysis to provide detailed internal temperature change data.

Benefits of technology

It achieves accurate control of the internal temperature changes of large-thickness irregular concrete rafts and supports the layout of on-site temperature measurement points and concrete curing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761121A_ABST
    Figure CN118761121A_ABST
Patent Text Reader

Abstract

The invention discloses an irregular concrete modeling method and a readable storage medium, and the method comprises the steps: S1, splitting horizontal layer sections, dividing the elevation of each layer of an irregular concrete raft foundation according to the actual project condition, dividing the horizontal layer sections according to the elevation, and guaranteeing that the horizontal sections of the single horizontal layer sections are consistent; s2, establishing a horizontal layer section model, establishing a cross section of a certain horizontal layer section, expanding the cross section to a horizontal layer section with a corresponding thickness, completing the establishment of a corresponding horizontal layer section structure model, and repeating the operation of the step S2 to complete the establishment of all horizontal layer section models; s3, integrating the models, namely integrating the models of all the horizontal layer sections into a complete model according to an elevation sequence, so as to carry out subsequent calculation and analysis; and S4, layered checking is conducted, temperature calculation analysis is conducted on the complete model obtained in the step S3, after calculation is completed, any horizontal layer section is selected for checking according to needs, and the analysis result of the interior of the irregular concrete is known.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of concrete construction, and in particular relates to an irregular concrete modeling method and a readable storage medium. Background Art

[0002] In actual projects, the foundations of high-rise and super-high-rise buildings are all large-volume concrete rafts. Due to the diversity of building functions, there will be a certain number of drop-off areas such as elevator shafts and sump pits in the large-volume concrete rafts, resulting in an irregular overall shape of the raft and a large thickness in some areas. The "Massive Concrete Construction Standards", "Construction Calculation Manual" and conventional modeling and analysis methods cannot clearly obtain the internal calculation data of irregular and thick concrete, and are not very helpful for actual on-site construction.

[0003] In order to better understand the temperature changes inside large-volume concrete with large irregular thickness, so as to facilitate the subsequent reasonable and effective layout and maintenance of temperature measuring points, the present invention proposes a method for establishing a large-volume concrete model with large irregular thickness, which provides a model basis for understanding the temperature changes at various locations inside a large-volume concrete raft slab with large irregular thickness. Summary of the invention

[0004] The purpose of the present invention is to make up for the insufficiency of data in existing specifications and manuals and the roughness of conventional modeling methods, and to propose an irregular concrete modeling method and a readable storage medium, which solves the problem of inaccurate temperature control of large-volume concrete with large thickness and irregular shape.

[0005] On the one hand, the purpose of the present invention is achieved by the following technical solutions:

[0006] An irregular concrete modeling method, the irregular concrete modeling method comprising the following steps:

[0007] S1: Split the horizontal layers. According to the actual project situation, divide the elevations of each layer of the irregular concrete raft foundation, and divide the horizontal layers according to the elevations to ensure that the horizontal cross-section of a single horizontal layer remains consistent;

[0008] S2: Establish a horizontal layer segment model, establish a cross section of a certain horizontal layer segment, and expand it to the corresponding thickness horizontal layer segment to complete the establishment of the corresponding horizontal layer segment structure model. Repeat step S2 to complete the establishment of the model of all horizontal layer segments;

[0009] S3: Integrate the model, integrating the models of each horizontal layer into a complete model according to the elevation order for subsequent calculation and analysis;

[0010] S4: Layered viewing, performing temperature calculation and analysis on the complete model obtained in step S3, and after the calculation is completed, selecting any horizontal layer segment for viewing according to needs to understand the analysis results inside the irregular concrete.

[0011] According to a preferred embodiment, step S1 includes: clarifying the external structure elevation of the irregular large-volume concrete raft slab and the elevation of the internal elevator shaft sump or pit-in-pit structure according to the drawings, dividing the horizontal layers layer by layer according to the elevation sequence, and ensuring that the horizontal cross-section of a single horizontal layer segment remains consistent.

[0012] According to a preferred embodiment, step S1 further includes: when the thickness of a certain horizontal layer segment exceeds a high threshold, dividing the corresponding horizontal layer segment into multiple segments.

[0013] According to a preferred embodiment, step S2 includes: modeling layer by layer according to the divided horizontal layers;

[0014] For each layer, the cross-sectional shape is first drawn at the starting elevation of the horizontal layer segment, and then extended to the final elevation, thus establishing the structural model of the horizontal layer segment.

[0015] According to a preferred embodiment, step S3 further includes: in the process of integrating the models of each horizontal layer segment into a complete model, checking whether there are duplications and omissions, and after the checking is correct, the model can be used for subsequent calculation and analysis.

[0016] According to a preferred embodiment, step S4 further includes: providing data support for the layout of on-site temperature measurement points and concrete curing through the analysis results inside the irregular concrete.

[0017] On the other hand, the present invention also discloses:

[0018] A computer-readable storage medium stores a computer program, which implements the irregular concrete modeling method when executed by a processor.

[0019] The aforementioned main scheme of the present invention and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection by the present invention. After understanding the scheme of the present invention, those skilled in the art can understand that there are multiple combinations based on the prior art and common knowledge, all of which are technical schemes to be protected by the present invention, and they are not exhaustively listed here.

[0020] Beneficial effects of the present invention:

[0021] The irregular concrete modeling method of the present invention solves the problem of inaccurate temperature control of large-volume concrete with large thickness and irregular shape. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1is a flow chart of the irregular concrete modeling method of the present invention;

[0023] Figure 2 It is a schematic diagram of the viewing effect of the irregular concrete model of different horizontal layers of the present invention. DETAILED DESCRIPTION

[0024] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0025] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0026] Example 1

[0027] refer to Figure 1 As shown, the figure shows an irregular concrete modeling method, which includes the following steps.

[0028] Step S1: Split the horizontal layer segments. According to the actual project situation, divide the elevations of each layer of the irregular concrete raft foundation, and divide the horizontal layer segments according to the elevations to ensure that the horizontal cross-section of a single horizontal layer segment remains consistent.

[0029] Preferably, step S1 includes: clarifying the external structure elevation of the irregular large-volume concrete raft slab and the elevation of the internal elevator shaft sump or pit-in-pit structure according to the drawings, dividing the horizontal layers layer by layer according to the elevation sequence, and ensuring that the horizontal cross-section of a single horizontal layer remains consistent.

[0030] Furthermore, step S1 further includes: when the thickness of a certain horizontal layer segment exceeds a high threshold, dividing the corresponding horizontal layer segment into multiple segments.

[0031] Step S2: Establish a horizontal layer segment model, establish a cross section of a horizontal layer segment, and expand it to the corresponding thickness horizontal layer segment to complete the establishment of the corresponding horizontal layer segment structure model, and repeat step S2 to complete the establishment of the model of all horizontal layer segments.

[0032] Preferably, step S2 includes: modeling layer by layer according to the divided horizontal layers; first drawing the cross-sectional shape of each layer at the starting elevation position of the horizontal layer segment, and extending it to the final elevation position, that is, establishing a structural model of the horizontal layer segment.

[0033] Step S3: Integrate the model, and integrate the models of each horizontal layer into a complete model according to the elevation order for subsequent calculation and analysis.

[0034] Preferably, step S3 further includes: in the process of integrating the models of each horizontal layer segment into a complete model, checking whether there are duplications and omissions, and after checking, using this model for subsequent calculation and analysis.

[0035] Step S4: Layered viewing, temperature calculation and analysis are performed on the complete model obtained in step S3, and after the calculation is completed, any horizontal layer segment is selected for viewing according to needs to understand the analysis results inside the irregular concrete.

[0036] Preferably, step S4 also includes: providing data support for the layout of on-site temperature measurement points and concrete curing through the analysis results inside the irregular concrete, referring to Figure 2 shown.

[0037] Example 2

[0038] On the basis of Example 1, this embodiment further discloses: a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements the irregular concrete modeling method disclosed in the aforementioned Example 1.

[0039] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0040] In addition, the present invention should be pointed out that, in the present invention, unless the specific structure, connection relationship, positional relationship, power source relationship, etc. are specifically written out, the structure, connection relationship, positional relationship, power source relationship, etc. involved in the present invention are all known by those skilled in the art on the basis of the prior art without creative work.

[0041] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0042] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0043] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for modeling irregular concrete. It is characterized in that The irregular concrete modeling method comprises the following steps: S1: Split the horizontal layers. According to the actual project situation, divide the elevations of each layer of the irregular concrete raft foundation, and divide the horizontal layers according to the elevations to ensure that the horizontal cross-section of a single horizontal layer remains consistent; S2: Establish a horizontal layer segment model, establish a cross section of a certain horizontal layer segment, and expand it to the corresponding thickness horizontal layer segment to complete the establishment of the corresponding horizontal layer segment structure model. Repeat step S2 to complete the establishment of the model of all horizontal layer segments; S3: Integrate the model, integrating the models of each horizontal layer into a complete model according to the elevation order for subsequent calculation and analysis; S4: Layered viewing, performing temperature calculation and analysis on the complete model obtained in step S3, and after the calculation is completed, selecting any horizontal layer segment for viewing according to needs to understand the analysis results inside the irregular concrete.

2. The irregular concrete modeling method according to claim 1, It is characterized in that Step S1 includes: clarifying the external structure elevation of the irregular large-volume concrete raft slab and the elevation of the internal elevator shaft sump or pit-in-pit structure according to the drawings, dividing the horizontal layers layer by layer according to the elevation sequence, and ensuring that the horizontal cross-section of a single horizontal layer remains consistent.

3. The irregular concrete modeling method according to claim 1, It is characterized in that Step S1 also includes: when the thickness of a certain horizontal layer segment exceeds a high threshold, dividing the corresponding horizontal layer segment into multiple segments.

4. The irregular concrete modeling method according to claim 1, It is characterized in that Step S2 includes: modeling layer by layer according to the divided horizontal layers; For each layer, the cross-sectional shape is first drawn at the starting elevation of the horizontal layer segment, and then extended to the final elevation, thus establishing the structural model of the horizontal layer segment.

5. The irregular concrete modeling method according to claim 1, It is characterized in that Step S3 also includes: in the process of integrating the models of each horizontal layer segment into a complete model, checking whether there are duplications and omissions, and after checking, using this model for subsequent calculation and analysis.

6. The irregular concrete modeling method according to claim 1, It is characterized in that Step S4 also includes: providing data support for the layout of on-site temperature measurement points and concrete curing through the analysis results inside the irregular concrete.

7. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • Method for controlling errors of dome concrete pouring

    CN114635567A

  • Fabricated building concrete pouring control system and method

    CN115613814A

  • Thermal-force coupling numerical simulation method for steel frame structure

    CN116644565A

  • Construction method of complex curved surface cast-in-place texture concrete

    CN116876649A

  • Component temperature field prediction method and device based on measured data and storage medium

    CN117669387A