Ventilation, heat dissipation and dust suppression method for tunnel TBM construction

Through the pre-evaluation and continuous optimization of the tunnel construction ventilation simulation model, the problem of ventilation, heat dissipation and dust suppression in tunnel TBM construction was solved, the performance improvement and adaptability of the ventilation system were improved, and the environmental safety and construction efficiency in the tunnel were ensured.

CN118761126AInactive Publication Date: 2024-10-11SINOHYDRO BUREAU 5 +2

Patent Information

Application Number
CN202410760247.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology lacks long-term effect evaluation and cannot promptly detect and correct ventilation, heat dissipation and dust suppression problems in tunnel TBM construction, resulting in evaluation results that are inconsistent with the actual situation and unable to effectively improve the performance and adaptability of the ventilation system.

Method used

By constructing a tunnel construction ventilation simulation model, the ventilation effect is pre-evaluated, a closed-loop process of 'simulation-implementation-evaluation-adjustment' is established, the actual ventilation effect is regularly monitored and compared with the simulation results, and the ventilation system parameters are continuously optimized until the evaluation indicators reach the target value.

Benefits of technology

It is possible to identify problems and make corrections before construction, improve the performance and adaptability of the ventilation system, ensure the safety and health of the environment in the tunnel, and improve construction efficiency and progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761126A_ABST
    Figure CN118761126A_ABST
Patent Text Reader

Abstract

The invention discloses a tunnel TBM (tunnel boring machine) construction ventilation, heat dissipation and dust suppression method, which comprises the following steps: constructing a tunnel construction ventilation simulation model through tunnel geometric parameters, engineering construction related parameters, geological parameters and ventilation parameters, performing index evaluation on the ventilation condition of tunnel construction according to the ventilation simulation model, and adjusting the parameters according to the evaluation result. Problems can be found and corrected before construction by simulating and pre-evaluating the ventilation effect, index evaluation is performed on the ventilation condition of tunnel construction according to the ventilation simulation model, and a continuously improved circulation mechanism is established by simulating and pre-evaluating the ventilation effect, periodically monitoring the actual ventilation effect and comparing simulation results. Simulation and actual evaluation are carried out again after each adjustment, a closed-loop process of simulation-implementation-evaluation-adjustment is formed, and the performance and adaptability of the ventilation system are continuously improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of ventilation engineering and simulation technology, and in particular to a ventilation, heat dissipation and dust suppression method for tunnel TBM construction. Background Art

[0002] According to the current construction environment analysis of Zhejiang Qujiang Pumped Storage Project, the strata of TBM tunnels are mainly Class II, III, and IV surrounding rocks, and the average uniaxial compressive strength can reach up to 110MPa. In the surrounding rock fracture zone, TBM jamming and support structure deformation and failure often occur due to large deformation of the surrounding rock, which increases the unfavorable factors in engineering construction. Under the condition of high rock strength and long-distance continuous excavation, the tunnel has high requirements for TBM rock breaking ability and advanced detection and treatment of unfavorable geological conditions; the turning radius of the drainage corridor tunnel is 30m, which requires extremely high turning and climbing capabilities of TBM equipment and supporting equipment and battery vehicles; under the condition of ultra-small diameter tunnels, as the depth of the tunnel continues to increase, the temperature and dust in the tunnel will continue to rise, which will affect the metabolic capacity of construction personnel and reduce the physical and mental health and work efficiency of construction personnel. The existing methods may lack long-term effect evaluation and cannot determine the impact on the environment during the construction period or after the construction is completed. There may be a gap between the theoretical model and the actual situation in the evaluation process. Theoretical models are usually based on assumptions and simplifications, while the actual situation may be affected by a variety of complex factors, resulting in the evaluation results not being consistent with the actual situation. Therefore, a ventilation, heat dissipation and dust suppression method for tunnel TBM construction is designed. Summary of the invention

[0003] The technical problem to be solved by the present invention is the lack of long-term effect evaluation, and problems cannot be discovered and corrected in time, resulting in the evaluation results being inconsistent with the actual situation. The purpose is to provide a ventilation, heat dissipation and dust suppression method for tunnel TBM construction. By constructing a tunnel construction ventilation simulation model and pre-evaluating the ventilation effect through simulation, problems can be discovered and corrected before construction. According to the ventilation simulation model, the ventilation conditions of the tunnel construction are evaluated by indicators, the ventilation effect is pre-evaluated through simulation, and the actual ventilation effect is regularly monitored and compared with the simulation results. A continuous improvement cycle mechanism is established, and simulation and actual evaluation are performed again after each adjustment to form a closed-loop process of "simulation-implementation-evaluation-adjustment", thereby continuously improving the performance and adaptability of the ventilation system.

[0004] The present invention is achieved through the following technical solutions:

[0005] A method for ventilation, heat dissipation and dust suppression in tunnel TBM construction, comprising the following specific steps:

[0006] S1: Collect tunnel geometry parameters, engineering construction related parameters, geological parameters and ventilation parameters;

[0007] S2: Based on the parameters collected in S1, a tunnel construction ventilation simulation model is constructed;

[0008] S3: Evaluate the ventilation conditions of tunnel construction according to the ventilation simulation model and adjust the parameters according to the evaluation results;

[0009] S4: Perform a secondary simulation based on the adjusted parameters and repeat steps S2 and S3 until the indicator evaluation result reaches the target value.

[0010] The present invention constructs a tunnel construction ventilation simulation model and pre-evaluates the ventilation effect through simulation, so that problems can be discovered and corrected before construction. The ventilation conditions of the tunnel construction are evaluated according to the ventilation simulation model, and the ventilation effect is pre-evaluated through simulation. The actual ventilation effect is regularly monitored and compared with the simulation results to establish a continuous improvement cycle mechanism. After each adjustment, simulation and actual evaluation are performed again to form a closed-loop process of "simulation-implementation-evaluation-adjustment", thereby continuously improving the performance and adaptability of the ventilation system.

[0011] Furthermore, the specific steps of S2 include:

[0012] S21: establishing a three-dimensional geometric model of the tunnel according to tunnel geometric parameters, engineering construction related parameters, geological parameters and ventilation parameters;

[0013] S22: Set the ventilation inlet and outlet boundary conditions as well as the surface temperature and wind direction boundary conditions in the 3D geometric model;

[0014] S23: According to the set boundary conditions and initial conditions, a ventilation simulation model is obtained to simulate the fluid flow, heat transfer and mass transfer processes inside the tunnel.

[0015] Furthermore, the specific steps of S3 include:

[0016] S31: Determine the evaluation index of ventilation effect and the target value of each index;

[0017] S32: Compare the calculated evaluation index value with the target value to determine whether the evaluation index meets the target;

[0018] S33: Adjust ventilation parameters for evaluation indicators that do not meet the standards.

[0019] Furthermore, in S31, the evaluation indicators include air flow, pipeline pressure, temperature distribution and dust diffusion.

[0020] Furthermore, the calculation step of the air flow evaluation index includes:

[0021]

[0022] Among them, Q gd Make the duct air volume; D is the duct diameter; V is the wind speed.

[0023] Furthermore, the calculation step of the pipeline pressure evaluation index includes:

[0024]

[0025] Among them, P is the pressure loss of the pipeline; f is the friction coefficient; L is the length of the duct; ρ is the air density; K is the local resistance coefficient.

[0026] Furthermore, the calculation step of the temperature distribution evaluation index includes:

[0027]

[0028] Among them, Q1 is the heat flow generated by the heat source; Q2 is the heat flow carried away by ventilation heat; Q3 is the heat flow of convective heat transfer; Q4 is the heat flow of radiation heat transfer; E is the internal energy stored in unit volume; t is time.

[0029] Furthermore, the calculation steps of the dust diffusion assessment index include:

[0030]

[0031]

[0032] Where C is the particle concentration; is a vector operator; v is the air velocity field; D is the particle diffusion coefficient; S is the particle generation or deposition rate; (x, y, z) represents the three-dimensional space coordinates.

[0033] Furthermore, when the index evaluation result reaches the target value, it also includes regular monitoring of the ventilation effect during the tunnel construction process, and the monitoring of the ventilation effect includes ventilation efficiency, air change times and dust concentration reduction rate.

[0034] Furthermore, the specific monitoring steps of the ventilation efficiency, air change frequency and dust concentration reduction rate include:

[0035]

[0036] Among them, η is the ventilation efficiency; F1 is the actual air supply volume; F2 is the theoretical air supply volume;

[0037]

[0038] Where N is the number of ventilations; V sn is the internal volume of the tunnel;

[0039]

[0040] Among them, R is the dust concentration reduction rate; C1 is the particle concentration at the air outlet; C2 is the particle concentration at the air inlet.

[0041] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0042] By constructing a tunnel construction ventilation simulation model and pre-evaluating the ventilation effect through simulation, problems can be discovered and corrected before construction. The ventilation conditions of the tunnel construction can be evaluated based on the ventilation simulation model. The ventilation effect can be pre-evaluated through simulation. By regularly monitoring the actual ventilation effect and comparing the simulation results, a continuous improvement cycle mechanism can be established. After each adjustment, simulation and actual evaluation are carried out again to form a closed-loop process of "simulation-implementation-evaluation-adjustment" to continuously improve the performance and adaptability of the ventilation system. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:

[0044] Figure 1 Flowchart in an embodiment of the present invention. DETAILED DESCRIPTION

[0045] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0046] As a possible implementation, Figure 1 As shown, this embodiment provides a method for ventilation, heat dissipation and dust suppression in tunnel TBM construction, including the following specific steps:

[0047] S1: Collect the geometric parameters, construction-related parameters, geological conditions and ventilation parameters of the tunnel;

[0048] S2: Simulate ventilation conditions during tunnel construction based on the data collected in S1;

[0049] S3: Evaluate the ventilation conditions of tunnel construction according to the ventilation simulation model and adjust the parameters according to the evaluation results;

[0050] S4: Perform secondary simulation based on the adjusted parameters, and repeat steps S2 and S3 until the indicator evaluation result reaches the target value;

[0051] S5: If the improvement effect does not meet expectations, continue to adjust parameters and re-simulate until all evaluation indicators meet the requirements;

[0052] S6: Apply the simulated ventilation equipment parameters to the actual system, regularly monitor the ventilation effect during tunnel construction, continue to make adjustments and then execute S2 to achieve a closed-loop management process.

[0053] The specific steps of S2 are as follows:

[0054] S21: establishing a three-dimensional geometric model of the tunnel according to tunnel geometric parameters, engineering construction related parameters, geological parameters and ventilation parameters;

[0055] S22: Set the ventilation inlet and outlet boundary conditions as well as the surface temperature and wind direction boundary conditions in the 3D geometric model;

[0056] S23: According to the set boundary conditions and initial conditions, a ventilation simulation model is obtained to simulate the fluid flow, heat transfer and mass transfer processes inside the tunnel.

[0057] The specific steps of S3 are as follows:

[0058] S31: Determine the key indicators for evaluating ventilation effectiveness and the target value for each key indicator;

[0059] S32: Compare the calculated evaluation index value with the target value to determine whether the ventilation effect meets the standard;

[0060] S33: Adjust ventilation equipment parameters accordingly based on the problems and deficiencies found during the assessment.

[0061] In S31, key indicators include air flow, duct pressure, temperature distribution, and dust dispersion.

[0062] The expression of air flow evaluation index is as follows:

[0063]

[0064] Among them, Q gd Make the duct air volume; D is the duct diameter; V is the wind speed.

[0065] The expression of pipeline pressure evaluation index is as follows:

[0066]

[0067] Among them, P is the pressure loss of the pipeline; f is the friction coefficient; L is the length of the duct; ρ is the air density; K is the local resistance coefficient.

[0068] The expression of the temperature distribution evaluation index is as follows:

[0069]

[0070] Among them, Q1 is the heat flow generated by the heat source; Q2 is the heat flow carried away by ventilation heat; Q3 is the heat flow of convective heat transfer; Q4 is the heat flow of radiation heat transfer; E is the internal energy stored in unit volume; t is time.

[0071] The expression of dust diffusion evaluation index is as follows:

[0072]

[0073] Where C is the particle concentration; is a vector operator; v is the air velocity field; D is the particle diffusion coefficient; S is the particle generation or deposition rate; (x, y, z) represents the three-dimensional space coordinates.

[0074] In S6, the evaluation of ventilation effect is based on ventilation efficiency, air exchange rate and dust concentration reduction rate.

[0075] The expressions for ventilation efficiency, air change times and dust concentration reduction rate are as follows:

[0076]

[0077] Among them, η is the ventilation efficiency; F1 is the actual air supply volume; F2 is the theoretical air supply volume;

[0078]

[0079] Where N is the number of ventilations; V sn is the internal volume of the tunnel;

[0080]

[0081] Among them, R is the dust concentration reduction rate; C1 is the particle concentration at the air outlet; C2 is the particle concentration at the air inlet.

[0082] In this embodiment, firstly, the geometric parameters of the tunnel, the parameters related to the engineering construction, the geological conditions and the parameters affecting ventilation are collected; based on the collected data, the ventilation conditions during the tunnel construction are simulated; by simulating the ventilation effects under different working conditions, the design parameters of the ventilation system, such as the fan power, the air duct layout, the air outlet position and other parameters can be accurately adjusted and optimized to ensure effective ventilation under various complex construction conditions. In addition, the simulation results can also provide a scientific basis for the operation scheduling, troubleshooting, maintenance and other management work of the on-site ventilation equipment, and improve the operation efficiency and reliability of the ventilation system. The specific steps are as follows: Use 3D modeling software to establish a 3D geometric model of the tunnel, including the length, width, height, curvature, etc. of the tunnel; ensure that the simulation results are consistent with the actual situation, and improve the credibility and accuracy of the simulation; according to the actual situation, set the inlet and outlet boundary conditions of the ventilation system, including inlet wind speed, temperature, humidity, etc. At the same time, according to the geographical conditions and meteorological data of the construction site, boundary conditions such as surface temperature and wind direction are set. Simulating boundary conditions is crucial to the accuracy of the simulation results, and they will directly affect the authenticity of the simulation results; set the parameters of the numerical simulation; according to the set boundary conditions and initial conditions, simulate the fluid flow, heat transfer and mass transfer processes inside the tunnel. Through simulation analysis, we can understand the operation of the ventilation system under different working conditions, discover possible problems, and guide subsequent optimization and improvement measures.

[0083] Then, multiple evaluations are performed on the simulated ventilation conditions, and the parameters of the ventilation equipment are adjusted according to the evaluation results; the specific steps are as follows:

[0084] Determine the key indicators for evaluating ventilation effects and the target value of each key indicator; the key indicators include air flow, duct pressure, temperature distribution, and dust diffusion. The expression of the air flow evaluation indicator is as follows:

[0085]

[0086] Among them, Q gd D is the duct air volume; D is the duct diameter; V is the wind speed. Calculate the duct air volume. A larger air volume usually means a better ventilation effect. Observe the direction and speed distribution of air flow to ensure that the air can flow effectively to the area that needs ventilation and avoid the formation of dead corners and vortices.

[0087] The expression of pipeline pressure evaluation index is as follows:

[0088]

[0089] Where P is the pressure loss of the pipe; f is the friction coefficient; L is the length of the duct; ρ is the air density; K is the local resistance coefficient. Calculate the pressure loss of the pipe. Smaller pressure loss means less resistance in the ventilation system and better ventilation effect; observe the pressure distribution in the pipe to ensure that the ventilation system can generate enough wind pressure to ensure the ventilation effect;

[0090] The expression of the temperature distribution evaluation index is as follows:

[0091]

[0092] Among them, Q1 is the heat flow generated by the heat source; Q2 is the heat flow carried away by ventilation heat; Q3 is the heat flow of convective heat transfer; Q4 is the heat flow of radiation heat transfer; E is the internal energy stored in unit volume; t is time.

[0093] Calculate the change in stored internal energy per unit volume to evaluate the temperature distribution. Observe the temperature distribution in the tunnel to ensure that the ventilation system can effectively remove the heat generated inside the tunnel and maintain a relatively stable temperature. Understanding and controlling the temperature distribution in the tunnel can prevent problems such as heat stroke and fatigue caused by high-temperature working environments, while ensuring that electromechanical equipment operates at an appropriate temperature to avoid overheating and causing failures or fires.

[0094] The expression of dust diffusion evaluation index is as follows:

[0095]

[0096] Where C is the particle concentration; is a vector operator used to represent spatial variables; v is the airflow velocity field, which is a vector function that represents the velocity of air at each point in space; D is the particle diffusion coefficient, which is a scalar that represents the random diffusion capacity of particles in the fluid due to molecular thermal motion;

[0097] S is the particle generation or sedimentation rate, which is a scalar function that represents the rate of particle generation (such as caused by a chemical reaction or fragmentation process) or the sedimentation rate (due to the separation of particles from the air due to gravity) per unit volume. Positive values ​​represent generation, and negative values ​​represent sedimentation or consumption. (x, y, z) represents the three-dimensional space coordinates.

[0098] represents the partial derivative of the particle concentration C with respect to time t, describing the rate of change of the particle concentration with time;

[0099] The vector product v·C represents the product of the velocity field and the particle concentration. The divergence operation represents the divergence or convergence of this product vector field at a certain point, that is, the flux density flowing into or out of the point;

[0100] is the diffusion term, where yes The second derivative of is, the Laplace operator, gives the sum of the second partial derivatives of the scalar function C in space, describing the curvature or smoothness of the concentration variation in space.

[0101] By solving this equation, we can get the specific distribution of particle concentration in the tunnel, providing key data support for the design and optimization of ventilation and heat dissipation dust suppression methods. Effectively suppressing dust diffusion can improve visibility, ensure clear sight, facilitate accurate operation of TBMs and other construction activities, and reduce mechanical wear and electrical equipment failures caused by dust accumulation, thereby maintaining construction progress.

[0102] The calculated evaluation index value is then compared with the target value to determine whether the ventilation effect meets the standard. The ventilation equipment parameters are adjusted accordingly based on the problems and deficiencies found in the evaluation.

[0103] In some possible implementations, the adjusted parameter settings are simulated again, the simulation evaluation steps are repeated, and the effect of the improvement measures is evaluated again; if the improvement effect does not meet expectations, the parameters are adjusted and re-simulated until the evaluation indicators meet the requirements; finally, the simulated ventilation equipment parameters are applied to the actual system, the ventilation effect during the tunnel construction process is regularly monitored, and the adjustment and simulation process are continued to realize a closed-loop management process. The evaluation of ventilation effect is based on ventilation efficiency, air change frequency, and dust concentration reduction rate; the expressions are as follows:

[0104]

[0105] Among them, η is the ventilation efficiency; F1 is the actual air supply volume; F2 is the theoretical air supply volume; this indicator represents the ratio between the actual air supply volume and the designed or expected theoretical air supply volume, and is used to evaluate the actual working performance of the ventilation equipment. When the actual air supply volume is close to or equal to the theoretical air supply volume, the ventilation efficiency is high, indicating that the equipment operates well and the energy utilization efficiency is high. On the contrary, if the actual air supply volume is much lower than the theoretical air supply volume, there may be problems such as equipment failure, air duct obstruction, improper air volume adjustment, etc., and the ventilation system needs to be checked and optimized.

[0106]

[0107] Where N is the number of ventilations; V snThe ventilation rate is the internal volume of the tunnel; the ventilation rate indicates the number of times the entire air in the tunnel is replaced by fresh air per unit time, reflecting the air renewal rate. A higher ventilation rate means that the air is renewed more quickly, which helps to reduce the concentration of harmful gases and dust and improve the working environment. According to the working environment requirements and relevant standards, an appropriate ventilation rate target should be set and achieved by adjusting the air volume.

[0108]

[0109] Among them, R is the dust concentration reduction rate; C1 is the particle concentration at the air outlet; C2 is the particle concentration at the air inlet. The dust concentration reduction rate indicates the effect of the ventilation system on dust purification in the incoming air. The larger the value, the higher the dust removal efficiency of the ventilation system. According to the dust control requirements of the working environment, a reasonable dust concentration reduction rate target should be set, and the purification efficiency should be improved by optimizing the ventilation system design, adding filtering equipment, etc.

[0110] Through these three indicators, we can conclude that: if the ventilation efficiency is low, it may be necessary to check the performance of the ventilation equipment, the condition of the air duct, the air volume adjustment device, etc. to ensure the normal operation of the equipment and accurate air volume adjustment; if the ventilation frequency is insufficient, it may be necessary to increase the air volume or adjust the ventilation strategy to ensure that the air renewal speed meets the requirements; if the dust concentration reduction rate is not high, it may be necessary to improve the filtration equipment, optimize the air outlet layout, add dust removal facilities, etc. to improve the dust purification effect.

[0111] After the evaluation of the ventilation effect, continue to make adjustments and execute the simulation process to realize the closed-loop management process. Closed-loop management emphasizes repeated evaluation of ventilation effects and parameter adjustments, which can continuously discover and solve potential problems. Once the ventilation effect is found to be abnormal or approaching the safety threshold, it can promptly issue an early warning signal, activate the emergency plan, and quickly adjust the ventilation strategy to effectively prevent major risk events such as ventilation system failures, fires, and explosions, ensure the smooth progress of the project, continuously optimize the operating status and efficiency of the ventilation equipment, gradually improve the overall ventilation effect, and ensure that the air quality in the tunnel is always maintained within a safe and appropriate range.

[0112] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for ventilation, heat dissipation and dust suppression in tunnel TBM construction, characterized in that: The specific steps include: S1: Collect tunnel geometry parameters, engineering construction related parameters, geological parameters and ventilation parameters; S2: Based on the parameters collected in S1, a tunnel construction ventilation simulation model is constructed; S3: Evaluate the ventilation conditions of tunnel construction according to the ventilation simulation model and adjust the parameters according to the evaluation results; S4: Perform a secondary simulation based on the adjusted parameters and repeat steps S2 and S3 until the indicator evaluation result reaches the target value.

2. The method for ventilation, heat dissipation and dust suppression in tunnel TBM construction according to claim 1, characterized in that: The specific steps of S2 include: S21: establishing a three-dimensional geometric model of the tunnel according to tunnel geometric parameters, engineering construction related parameters, geological parameters and ventilation parameters; S22: Set the ventilation inlet and outlet boundary conditions as well as the surface temperature and wind direction boundary conditions in the 3D geometric model; S23: According to the set boundary conditions and initial conditions, a ventilation simulation model is obtained to simulate the fluid flow, heat transfer and mass transfer processes inside the tunnel.

3. The method for ventilation, heat dissipation and dust suppression in tunnel TBM construction according to claim 1, characterized in that: The specific steps of S3 include: S31: Determine the evaluation index of ventilation effect and the target value of each index; S32: Compare the calculated evaluation index value with the target value to determine whether the evaluation index meets the target; S33: Adjust ventilation parameters for evaluation indicators that do not meet the standards.

4. The method for ventilation, heat dissipation and dust suppression in tunnel TBM construction according to claim 3 is characterized in that: In S31, the evaluation indicators include air flow, pipeline pressure, temperature distribution and dust diffusion.

5. The method for ventilation, heat dissipation and dust suppression in tunnel TBM construction according to claim 4 is characterized in that: The calculation steps of the air flow evaluation index include: Among them, Q gd Make the duct air volume; D is the duct diameter; V is the wind speed.

6. The method for ventilation, heat dissipation and dust suppression in tunnel TBM construction according to claim 5, characterized in that: The calculation steps of the pipeline pressure evaluation index include: Among them, P is the pressure loss of the pipeline; f is the friction coefficient; L is the length of the duct; ρ is the air density; K is the local resistance coefficient.

7. The method for ventilation, heat dissipation and dust suppression in tunnel TBM construction according to claim 6, characterized in that: The calculation steps of the temperature distribution evaluation index include: Among them, Q1 is the heat flow generated by the heat source; Q2 is the heat flow carried away by ventilation heat; Q3 is the heat flow of convective heat transfer; Q4 is the heat flow of radiation heat transfer; E is the internal energy stored in unit volume; t is time.

8. The method for ventilation, heat dissipation and dust suppression in tunnel TBM construction according to claim 7, characterized in that: The calculation steps of the dust diffusion assessment index include: Where C is the particle concentration; is a vector operator; v is the air velocity field; D is the particle diffusion coefficient; S is the particle generation or deposition rate; (x, y, z) represents the three-dimensional space coordinates.

9. The method for ventilation, heat dissipation and dust suppression in tunnel TBM construction according to claim 8, characterized in that: When the indicator evaluation result reaches the target value, it also includes regular monitoring of the ventilation effect during the tunnel construction process, and the monitoring of the ventilation effect includes ventilation efficiency, air change times and dust concentration reduction rate.

10. The method for ventilation, heat dissipation and dust suppression in tunnel TBM construction according to claim 9, characterized in that: The specific monitoring steps of the ventilation efficiency, air change frequency and dust concentration reduction rate include: Among them, η is the ventilation efficiency; F1 is the actual air supply volume; F2 is the theoretical air supply volume; Where N is the number of ventilations; V sn is the internal volume of the tunnel; Among them, R is the dust concentration reduction rate; C1 is the particle concentration at the air outlet; C2 is the particle concentration at the air inlet.

Citation Information

Patent Citations

  • High-geothermal intelligent ventilation design method and system for VI-grade surrounding rock tunnel

    CN117763665A

  • Comprehensive optimization system and method for ventilation calculation of high-altitude tunnel

    CN118070569A

Cited By

  • Intelligent ventilation method and device of pumped storage power station and readable storage medium

    CN120850560A