Automatic execution system and method for process of cutting ethylene cracking furnace out of quench tower
The automatic execution system intelligently controls the process of cutting out the quench tower from the ethylene cracking furnace, which solves the problem of parameter fluctuations caused by manual operation, improves the cutting efficiency and safety, and ensures system stability.
Patent Information
- Application Number
- CN202310372675.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-10
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-04-10
AI Technical Summary
During the process of cutting out the quench tower of the ethylene cracking furnace, parameters such as the negative pressure and outlet temperature of the cracking furnace fluctuated greatly due to manual operations. There were problems such as low cutting efficiency, poor system stability and insufficient safety.
An automatic execution system for the process of cutting out the quenching tower of the ethylene cracking furnace is designed, including a status confirmation module before cutting out the quenching tower, an intelligent control module for cutting out the quenching tower process, and an execution module for cutting out the quenching tower. By confirming the initial parameters, intelligently Control and execute corresponding operations to ensure parameter stability during the process of cutting out the quench tower.
It effectively improves the system stability and safety during the process of cutting out the quench tower, improves the cutting efficiency, and reduces the risk of misoperation.
Smart Images

Figure CN118772913A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of petrochemical industry, and in particular to an automatic execution system and method for a process of cutting out a quench tower from an ethylene cracking furnace. Background Art
[0002] Ethylene is an important basic raw material for petrochemical industry and one of the petrochemical products with the largest demand and production volume. Its output, scale and technical level indicate the development level of a country's petrochemical industry. The tubular cracking furnace is used for hydrocarbon cracking and is the core device for producing ethylene. It determines the production capacity, stable operation and overall energy consumption of the entire ethylene device. When hydrocarbons undergo steam cracking reaction in the radiation section of the tubular cracking furnace, coke will accumulate on the inner wall of the furnace tube due to secondary reactions such as polymerization and condensation in the radiation section, forming coke. When the temperature of the outer wall of the furnace tube in the radiation section or the outlet temperature of the quench boiler reaches the production limit or the pressure difference before and after the Venturi tube reaches the production limit due to coking, it will seriously affect the production of ethylene, and cause problems such as reduced ethylene yield, increased energy consumption, shortened furnace tube life, and even affect production safety. Therefore, in the actual production process, the furnace must be cleaned regularly to ensure normal production. When cleaning or overhauling the furnace, the cracking gas pipeline and the cracking gas main of the cracking furnace must be completely cut off, that is, the cracking furnace needs to be cut out of the quenching tower to prevent the cracking gas from flowing back during furnace cleaning or overhaul and the air from entering the cracking gas main during cleaning, and even entering the quenching tower.
[0003] At present, the cutting process of most domestic ethylene cracking furnaces is still controlled manually, and manual cutting of the cracking furnace out of the quenching tower requires frequent operation by technical personnel, which is not only labor-intensive, inefficient, and has a high rate of error operations, but also completely relies on personal experience and the responsibility of the operator. In the process of cutting the furnace, it is also difficult to accurately control the key parameters of the cutting out, such as the negative pressure in the furnace of the cracking furnace and the outlet temperature of the cracking furnace, which can easily cause large fluctuations in the key parameters of the cutting out, thereby causing system instability and thus posing a major safety hazard.
[0004] Therefore, there is an urgent need for an automatic execution system and method for cutting out the quench tower process of an ethylene cracking furnace. Summary of the invention
[0005] The present invention aims to solve the problem that in the prior art, the process of cutting out a quench tower of an ethylene cracking furnace is operated manually based on experience, which easily leads to large fluctuations in parameters such as the negative pressure in the furnace of the cracking furnace and the outlet temperature of the cracking furnace during the process of cutting out the quench tower, and there are problems such as low cutting efficiency and poor system stability and safety. An automatic execution system and method for the process of cutting out a quench tower of an ethylene cracking furnace are provided.
[0006] In order to achieve the above-mentioned object, the present invention provides, in a first aspect, an automatic execution system for cutting out a quench tower from an ethylene cracking furnace, the system comprising:
[0007] A state confirmation module before cutting out the quench tower is used to confirm the initial parameters before the cracking furnace cuts out the quench tower, and when the initial parameters are within the initial range, it indicates that the quench tower can be cut out, and when the initial parameters are not within the initial range, an alarm is issued;
[0008] The intelligent control module for cutting out the quench tower process is used to control the key parameters for cutting out and issue control instructions during the stage of cutting out the quench tower, wherein the key parameters for cutting out include the cracking furnace outlet temperature, the furnace single-tube dilution steam flow rate, the cracking furnace furnace negative pressure, the fuel gas calorific value and the ultra-high pressure steam temperature;
[0009] The quench tower cut-out execution module is used to cut out the quench tower according to the control instructions of the quench tower cut-out process intelligent control module during the quench tower cut-out stage.
[0010] Preferably, when the initial parameter is not within the initial range, an alarm is issued, which specifically includes:
[0011] When the initial parameters are not within the initial range, an alarm is issued for one or more initial parameters that are not within the initial range.
[0012] Preferably, the initial parameters include furnace single tube dilution steam flow, cracking furnace outlet temperature, ultra-high pressure steam temperature, cracking furnace furnace negative pressure, furnace single tube dimethyl disulfide injection amount and fuel gas calorific value.
[0013] Preferably, the initial range of the furnace single-tube dilution steam flow rate is 3500-5500 kg / h, the initial range of the cracking furnace outlet temperature is 720-750°C, the initial range of the ultra-high pressure steam temperature is 480-525°C, the initial range of the cracking furnace negative pressure is -45--20 Pa, the initial range of the furnace single-tube dimethyl disulfide injection amount is 1-20 kg / h, and the initial range of the fuel gas calorific value is 7-9 MW.
[0014] Preferably, the cracking furnace includes at least one three-valve shut-off system, which includes a furnace cracking gas valve, a coke cleaning bypass valve and a furnace coke cleaning valve, wherein the furnace cracking gas valve and the coke cleaning bypass valve are linked by a mechanical mechanism, and when the furnace cracking gas valve is opened, the coke cleaning bypass valve is closed, and when the furnace cracking gas valve is closed, the coke cleaning bypass valve is opened.
[0015] Preferably, in the stage of cutting out the quench tower, the key parameters for cutting out are controlled and control instructions are issued, specifically including:
[0016] Control the flow rate of the dilution steam in the furnace single tube to remain unchanged on the basis of its initial flow rate;
[0017] In the first stage, the negative pressure in the cracking furnace is controlled to decrease to a first negative pressure in the furnace at a first negative pressure rate based on the initial negative pressure;
[0018] In the second stage, when the negative pressure in the cracking furnace drops to the first negative pressure in the cracking furnace, the cracking gas valve in the cracking furnace is controlled to be fully closed at the first cracking valve rate; when the negative pressure in the cracking furnace rises to the second negative pressure in the cracking furnace based on the first negative pressure in the cracking furnace, the coke clearing valve in the cracking furnace is controlled to be fully opened at the first coke clearing valve rate to allow the dilution steam to enter the cracking furnace; at the same time, the calorific value of the fuel gas is controlled to rise to the first preset calorific value at the first preset calorific value rate based on its initial calorific value;
[0019] In the third stage, after controlling the negative pressure in the furnace of the cracking furnace to maintain the negative pressure in the second furnace for a first set time, the negative pressure in the furnace of the cracking furnace is controlled to increase to the initial negative pressure of the negative pressure in the furnace of the cracking furnace at a second negative pressure rate based on the second negative pressure in the furnace;
[0020] In the fourth stage, after the negative pressure in the cracking furnace rises to the initial negative pressure in the cracking furnace, the outlet temperature of the cracking furnace is controlled to be maintained for a second set time based on the initial temperature, and then the outlet temperature of the cracking furnace is controlled to rise to a first set temperature at a first heating rate based on the initial temperature, and maintained for a third set time based on the first set temperature; at the same time, after the temperature of the ultra-high pressure steam is controlled to be maintained for a fourth set time based on the initial temperature, the temperature of the ultra-high pressure steam is controlled to rise to a first set steam temperature at the first heating rate based on the initial temperature.
[0021] Preferably, the first furnace negative pressure is -180 to -130Pa, the second furnace negative pressure is -70 to -40Pa, the first negative pressure rate is 15 to 35Pa / min, the second negative pressure rate is 0.5 to 15Pa / min, the first cracking valve rate is 10 to 40% / min, the first decoking valve rate is 20 to 60% / min, the first preset calorific value rate is 0.2 to 2MW / min, the first preset calorific value is 10 to 15MW, the first setting time is 1 to 10min, the second setting time is 5 to 30min, the third setting time is 30 to 120min, the fourth setting time is 10 to 60min, the first setting temperature is 740-800℃, the first setting steam temperature is 500 to 525℃, and the first heating rate is 0.2 to 10℃ / min.
[0022] Preferably, the cracking furnace comprises at least one furnace.
[0023] Preferably, the system further comprises an operation navigation function module for providing operation prompts in the quenching tower cut-out stage according to the control instructions of the quenching tower cut-out process intelligent control module.
[0024] Preferably, before the first stage, the operation navigation function module prompts to remove the high-high interlock of the negative pressure in the cracking furnace;
[0025] After the fourth stage, the operation navigation function module prompts to close the dimethyl disulfide root valve, stop the injection of dimethyl disulfide, and check the state of the cracking furnace.
[0026] Preferably, the system also includes a process key parameter monitoring and alarm module, which is used to monitor the process key parameters during the quench tower cut-out stage and to generate an alarm when the process key parameters exceed a preset range.
[0027] Preferably, the key process parameters include cracking furnace outlet temperature, furnace single tube dilution steam flow, fuel gas calorific value, fuel gas pressure, cracking furnace furnace pressure, Venturi rear pressure, VHS drum liquid level, ultra-high pressure steam temperature, ultra-high pressure steam pressure and cracking furnace cross section temperature.
[0028] Preferably, the monitoring of the key process parameters and the alarming when the key process parameters exceed a preset range specifically include:
[0029] When one or more of the key process parameters exceeds a first preset range, an alarm is issued;
[0030] When one or more of the process key parameters exceed the second preset range, the process key parameters exceeding the second preset range are adjusted to within the first preset range according to a preset ratio based on their current values, and an alarm is issued.
[0031] Preferably, the upper limit value of the second preset range is greater than the upper limit value of the first preset range, the lower limit value of the second preset range is less than the lower limit value of the first preset range, and the preset ratio is ±0.1% to 10%.
[0032] Preferably, the system also includes a cut-out process alarm optimization management module, which is used to automatically shield the cracking furnace operation instrument alarm after entering the cut-out quench tower stage, and make the cracking furnace operation instrument alarm activation prompt light turn red; after the cut-out quench tower stage is completed, the cracking furnace operation instrument alarm is automatically enabled, and the cracking furnace operation instrument alarm activation prompt light turns green.
[0033] Preferably, the types of cracking furnace operation instrument alarms include high oxygen content alarm of cross-section flue gas, bottom fuel heat load ratio alarm, side wall fuel heat load ratio alarm, cracking furnace liquid phase feed flow alarm, cracking furnace gas phase feed flow alarm, quench oil flow alarm, total feed amount alarm, furnace tube gas raw material flow alarm, furnace tube liquid raw material flow alarm, gas raw material pressure alarm, liquid raw material pressure alarm, quencher outlet temperature alarm, inlet burnt gas temperature adjustment alarm, cracking gas temperature alarm and Venturi pressure difference alarm.
[0034] Preferably, the system also includes a deep learning function module for learning the control advantages and disadvantages of each of the key parameters of the quench tower stage based on experience and big data, and deriving the optimal control values of the key parameters of the quench tower stage.
[0035] In order to achieve the above-mentioned object, the second aspect of the present invention provides a method for automatically executing the process of cutting out the quench tower of an ethylene cracking furnace, which is implemented using the system, and comprises:
[0036] A state confirmation module before cutting out the quench tower is used to confirm the initial parameters before the cracking furnace cuts out the quench tower, and when the initial parameters are within the initial range, it indicates that the quench tower can be cut out, and when the initial parameters are not within the initial range, an alarm is issued;
[0037] An intelligent control module for the process of cutting out the quench tower is used to control the key parameters of the cut-out and issue control instructions during the stage of cutting out the quench tower, wherein the key parameters of the cut-out include the cracking furnace outlet temperature, the furnace single-tube dilution steam flow rate, the cracking furnace negative pressure, the fuel gas calorific value and the ultra-high pressure steam temperature;
[0038] A quench tower cut-out execution module is adopted, and in the quench tower cut-out stage, the quench tower is cut out according to the control instruction of the quench tower cut-out process intelligent control module.
[0039] According to the above technical scheme, based on the system, in the actual application process, by confirming the status before cutting out the quenching tower, and then controlling the key parameters of cutting out the quenching tower during the cutting out of the quenching tower through the intelligent control module of the cutting out quenching tower process, and performing corresponding operations according to the control instructions through the cutting out quenching tower execution module, the stability of the system in the process of cutting out the quenching tower can be effectively improved, and it has the advantages of high cutting efficiency and high safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a flow chart of the automatic execution system of the process of cutting out the quench tower of the ethylene cracking furnace. DETAILED DESCRIPTION
[0041] The specific implementation of the embodiment of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present invention, and is not used to limit the embodiment of the present invention.
[0042] The first aspect of the present invention provides an automatic execution system for cutting out a quench tower from an ethylene cracking furnace, such as Figure 1 As shown, the automatic execution system of the ethylene cracking furnace cutting out the quench tower process includes:
[0043] A state confirmation module before cutting out the quench tower is used to confirm the initial parameters before the cracking furnace cuts out the quench tower, and when the initial parameters are within the initial range, it indicates that the quench tower can be cut out, and when the initial parameters are not within the initial range, an alarm is issued;
[0044] The intelligent control module for cutting out the quench tower process is used to control the key parameters for cutting out and issue control instructions during the stage of cutting out the quench tower, wherein the key parameters for cutting out include the cracking furnace outlet temperature, the furnace single-tube dilution steam flow rate, the cracking furnace furnace negative pressure, the fuel gas calorific value and the ultra-high pressure steam temperature;
[0045] The quench tower cut-out execution module is used to cut out the quench tower according to the control instructions of the quench tower cut-out process intelligent control module during the quench tower cut-out stage.
[0046] In the present invention, the quench tower cut-out execution module is used to cut out the quench tower according to the control instructions of the quench tower cut-out process intelligent control module during the quench tower cut-out stage. Specifically, it controls multiple key cut-out parameters to reach set values during the quench tower cut-out stage according to the control instructions, thereby realizing the quench tower cut-out.
[0047] According to the above technical scheme, based on the system, in the actual application process, by confirming the status before cutting out the quenching tower, and then controlling the key parameters of cutting out the quenching tower during the cutting out of the quenching tower through the intelligent control module of the cutting out quenching tower process, and performing corresponding operations according to the control instructions through the cutting out quenching tower execution module, the stability of the system in the process of cutting out the quenching tower can be effectively improved, and it has the advantages of high cutting efficiency and high safety.
[0048] The automatic execution system of the ethylene cracking furnace cutting out the quench tower process of the present invention, in a preferred embodiment, when the initial parameter is not within the initial range, an alarm is issued, specifically comprising:
[0049] When the initial parameters are not within the initial range, an alarm is issued for one or more initial parameters that are not within the initial range.
[0050] In a specific embodiment, the initial parameters include furnace single tube dilution steam flow, cracking furnace outlet temperature, ultra-high pressure steam temperature, cracking furnace furnace negative pressure, furnace single tube dimethyl disulfide injection amount and fuel gas calorific value. In a more specific embodiment, the initial range of the furnace single tube dilution steam flow is 3500-5500 kg / h, preferably 3800-4500 kg / h, the initial range of the cracking furnace outlet temperature is 720-750°C, preferably 720-735°C, the initial range of the ultra-high pressure steam temperature is 480-525°C, preferably 480-500°C, the initial range of the cracking furnace negative pressure is -45--20Pa, preferably -35--25Pa, the initial range of the furnace single tube dimethyl disulfide injection amount is 1-20kg / h, preferably 3-6kg / h, and the initial range of the fuel gas calorific value is 7-9MW. Thus, it is ensured that all preparations are ready before the cracking furnace is cut out of the quench tower, especially that the key initial parameters are within the initial range, thereby ensuring the safety of the process of cutting out the quench tower and the efficiency of the subsequent cutting out. Among them, ensuring that the ultra-high pressure steam temperature is within the set range before cutting out can effectively prevent a large amount of dilution steam from entering the cracking furnace during the cutting out process, causing negative pressure in the cracking furnace and excessive ultra-high pressure steam temperature, thereby triggering a chain trip.
[0051] The automatic execution system of the ethylene cracking furnace cutting out the quench tower process of the present invention, in a specific embodiment, the cracking furnace includes at least one set of three-valve cut-off system, the three-valve cut-off system includes a furnace cracking gas valve, a coke-clearing bypass valve and a furnace coke-clearing valve, wherein the furnace cracking gas valve and the coke-clearing bypass valve are linked by a mechanical mechanism, when the furnace cracking gas valve is opened, the coke-clearing bypass valve is closed, and when the furnace cracking gas valve is closed, the coke-clearing bypass valve is opened. In a more specific embodiment, in the stage of cutting out the quench tower, the key parameters of the cut-out are controlled and control instructions are issued, specifically including:
[0052] Control the flow rate of the dilution steam in the furnace single tube to remain unchanged on the basis of its initial flow rate;
[0053] In the first stage, the negative pressure in the cracking furnace is controlled to decrease to a first negative pressure in the furnace at a first negative pressure rate based on the initial negative pressure;
[0054] In the second stage, when the negative pressure in the cracking furnace drops to the first negative pressure in the cracking furnace, the cracking gas valve in the cracking furnace is controlled to be fully closed at the first cracking valve rate; when the negative pressure in the cracking furnace rises to the second negative pressure in the cracking furnace based on the first negative pressure in the cracking furnace, the coke clearing valve in the cracking furnace is controlled to be fully opened at the first coke clearing valve rate to allow the dilution steam to enter the cracking furnace; at the same time, the calorific value of the fuel gas is controlled to rise to the first preset calorific value at the first preset calorific value rate based on its initial calorific value;
[0055] In the third stage, after controlling the negative pressure in the furnace of the cracking furnace to maintain the negative pressure in the second furnace for a first set time, the negative pressure in the furnace of the cracking furnace is controlled to increase to the initial negative pressure of the negative pressure in the furnace of the cracking furnace at a second negative pressure rate based on the second negative pressure in the furnace;
[0056] In the fourth stage, after the negative pressure in the cracking furnace rises to the initial negative pressure in the cracking furnace, the outlet temperature of the cracking furnace is controlled to be maintained for a second set time based on the initial temperature, and then the outlet temperature of the cracking furnace is controlled to rise to a first set temperature at a first heating rate based on the initial temperature, and maintained for a third set time based on the first set temperature; at the same time, after the temperature of the ultra-high pressure steam is controlled to be maintained for a fourth set time based on the initial temperature, the temperature of the ultra-high pressure steam is controlled to rise to a first set steam temperature at the first heating rate based on the initial temperature.
[0057] In a more specific embodiment, the first furnace negative pressure is -180 to -130 Pa, preferably -160 to -140 Pa, the second furnace negative pressure is -70 to -40 Pa, preferably -60 to -45 Pa, the first negative pressure rate is 15 to 35 Pa / min, preferably 22 to 28 Pa / min, the second negative pressure rate is 0.5 to 15 Pa / min, preferably 3 to 8 Pa / min, the first cracking valve rate is 10 to 40% / min, preferably 20 to 30% / min, the first decoking valve rate is 20 to 60% / min, preferably 35 to 45% / min, The first preset calorific value rate is 0.2-2MW / min, preferably 0.3-0.8MW / min, the first preset calorific value is 10-15MW, the first setting time is 1-10min, the second setting time is 5-30min, the third setting time is 30-120min, the fourth setting time is 10-60min, the first setting temperature is 740-800℃, preferably 750-780℃, the first setting steam temperature is 500-525℃, preferably 505-515℃, and the first heating rate is 0.2-10℃ / min, preferably 0.5-3℃ / min.
[0058] In the embodiment of the present invention, the outlet temperature of the cracking furnace, the flow rate of the single-tube dilution steam in the furnace, the negative pressure in the furnace of the cracking furnace, the calorific value of the fuel gas and the temperature of the ultra-high pressure steam are controlled in stages, and the temperature changes linearly in the entire stage of cutting out the quench tower, which effectively solves the problem that the parameters such as the outlet temperature of the cracking furnace and the negative pressure in the furnace of the cracking furnace are greatly fluctuated by cutting out the quench tower manually based on experience, thereby causing unplanned shutdown of the ethylene unit. At the same time, compared with cutting out the quench tower manually based on experience, the efficiency of cutting out the quench tower and the safety of the system during the process of cutting out the quench tower are greatly improved. Among them, the dilution steam entering the furnace is finally passed into the atmosphere from the top of the furnace.
[0059] In a preferred embodiment of the automatic execution system for cutting out the quench tower process of the ethylene cracking furnace of the present invention, the cracking furnace comprises at least one furnace.
[0060] In an embodiment of the present invention, when the cracking furnace is not a single furnace, specifically, for example, when the cracking furnace has two furnaces, refer to the second stage and perform the same operation on the other furnace. Further, for example, when the cracking furnace has more than two furnaces, perform the same operation on the other furnaces until all the furnaces have been operated and then perform the third stage.
[0061] The automatic execution system for the ethylene cracking furnace cutting out the quench tower process of the present invention, in a preferred embodiment, also includes an operation navigation function module for providing operation prompts at the cutting out quench tower stage according to the control instructions of the intelligent control module for the cutting out quench tower process.
[0062] In a specific implementation, before the first stage, the operation navigation function module prompts to remove the high-high interlock of the negative pressure in the cracking furnace;
[0063] After the fourth stage, the operation navigation function module prompts to close the dimethyl disulfide root valve, stop the injection of dimethyl disulfide, and check the state of the cracking furnace.
[0064] In an embodiment of the present invention, the operation navigation function module further provides operation prompts according to the control instructions of the intelligent control module for cutting out the quench tower during the cracking furnace cutting out of the quench tower, which can further effectively improve the system safety and cutting out efficiency during the cutting out process.
[0065] The automatic execution system of the ethylene cracking furnace cutting out the quench tower process of the present invention, in a preferred embodiment, the system also includes a process key parameter monitoring and alarm module, which is used to monitor the process key parameters during the quench tower cutting out stage and to alarm when the process key parameters exceed a preset range.
[0066] In a specific embodiment, the key process parameters include cracking furnace outlet temperature, furnace single tube dilution steam flow, fuel gas calorific value, fuel gas pressure, cracking furnace furnace pressure, Venturi tube back pressure, VHS drum liquid level, ultra-high pressure steam temperature, ultra-high pressure steam pressure and cracking furnace cross section temperature.
[0067] In another specific implementation, the monitoring of the key process parameters and the alarming when the key process parameters exceed a preset range specifically include:
[0068] When one or more of the key process parameters exceeds a first preset range, an alarm is issued;
[0069] When one or more of the process key parameters exceed the second preset range, the process key parameters exceeding the second preset range are adjusted to within the first preset range according to the preset ratio based on their current values, and an alarm is issued. The upper limit value of the second preset range is greater than the upper limit value of the first preset range, the lower limit value of the second preset range is less than the lower limit value of the first preset range, and the preset ratio is ±0.1% to 10%.
[0070] In an embodiment of the present invention, taking the ultra-high pressure steam temperature in the process key parameter as an example, the first preset range is 480-500°C, and the second preset range is 470-510°C. When the process key parameter monitoring and alarm module detects that the ultra-high pressure steam temperature is 475°C, an alarm is issued; when the process key parameter monitoring and alarm module further detects that the ultra-high pressure steam temperature is 460°C, the ultra-high pressure steam temperature is expanded to within the first preset range at a ratio of 0.1% to 10% on the basis of 460°C, and an alarm is issued, thereby improving the safety of the system during the entire cut-out process.
[0071] Furthermore, the process key parameter monitoring and alarm module can set the alarm display status according to the priority, and the alarm sound and light signals should be easy to distinguish. For example, when the ultra-high pressure steam temperature exceeds the first preset range, a first-level alarm is used, and when the ultra-high pressure steam temperature exceeds the second preset range, a second-level alarm is performed. Specifically, the first-level alarm uses black text on a yellow background, flashing, and low-frequency sound, and the second-level alarm uses black text on an orange background, flashing, and medium-frequency sound. The boundary values of the first preset range and the second preset range should not overlap with the instrument range of the alarm device of the process key parameter monitoring and alarm module, and should be set within 10% to 90% of the maximum range of the instrument.
[0072] The automatic execution system of the ethylene cracking furnace cutting out the quench tower process of the present invention, in a preferred embodiment, the system also includes a cutting out process alarm optimization management module, which is used to automatically shield the cracking furnace operation instrument alarm after entering the cutting out quench tower stage, and make the cracking furnace operation instrument alarm activation prompt light turn red; after the cutting out quench tower stage is completed, the cracking furnace operation instrument alarm is automatically activated, and the cracking furnace operation instrument alarm activation prompt light turns green.
[0073] In a specific embodiment, the types of cracking furnace operation instrument alarms include high oxygen content alarm of cross-section flue gas, bottom fuel heat load ratio alarm, side wall fuel heat load ratio alarm, cracking furnace liquid phase feed flow alarm, cracking furnace gas phase feed flow alarm, quench oil flow alarm, total feed amount alarm, furnace tube gas raw material flow alarm, furnace tube liquid raw material flow alarm, gas raw material pressure alarm, liquid raw material pressure alarm, quench cooler outlet temperature alarm, inlet burnt gas temperature adjustment alarm, cracking gas temperature alarm and Venturi pressure difference alarm.
[0074] In the embodiment of the present invention, through the cut-out process alarm optimization management module, it is convenient for operators to know whether the alarm is normally enabled during actual use, avoiding interference from invalid alarms and affecting the efficiency of the cracking furnace cutting out the quench tower.
[0075] In a preferred embodiment, the automatic execution system of the ethylene cracking furnace cutting out the quench tower process of the present invention further includes a deep learning function module for learning the control advantages and disadvantages of each of the key cutting out parameters in the cutting out quench tower stage based on experience and big data, and deriving the optimal control values of the key cutting out parameters in the cutting out quench tower stage, thereby ensuring the stability of the cutting out process and improving the efficiency to the greatest extent.
[0076] The second aspect of the present invention provides a method for automatically executing the process of cutting out the quench tower of an ethylene cracking furnace, the method is implemented using the system, and the method comprises:
[0077] A state confirmation module before cutting out the quench tower is used to confirm the initial parameters before the cracking furnace cuts out the quench tower, and when the initial parameters are within the initial range, it indicates that the quench tower can be cut out, and when the initial parameters are not within the initial range, an alarm is issued;
[0078] An intelligent control module for the process of cutting out the quench tower is used to control the key parameters of the cut-out and issue control instructions during the stage of cutting out the quench tower, wherein the key parameters of the cut-out include the cracking furnace outlet temperature, the furnace single-tube dilution steam flow rate, the cracking furnace negative pressure, the fuel gas calorific value and the ultra-high pressure steam temperature;
[0079] A quench tower cut-out execution module is adopted, and in the quench tower cut-out stage, the quench tower is cut out according to the control instruction of the quench tower cut-out process intelligent control module.
[0080] In the present invention, by confirming the state before cutting out the quenching tower, and then controlling the key parameters of cutting out the quenching tower in the stage of cutting out the quenching tower through the intelligent control module of the quenching tower cutting process, and executing the corresponding operation according to the control instruction through the quenching tower cutting execution module, the stability of the system in the process of cutting out the quenching tower can be effectively improved, and it has the advantages of high cutting efficiency and high safety.
[0081] The automatic execution system of the ethylene cracking furnace cutting out the quenching tower process of the present invention, in a specific embodiment, the system is composed of a human-computer interaction interface and a program control system, so that online control is realized by a combination of DCS configuration based on the field distributed control system and upper computer server programming. At the same time, in order to realize the automatic execution of the ethylene cracking furnace cutting out the quenching tower process, an independent server needs to be deployed in the industrial control network, and the ethylene cracking furnace cutting out the quenching tower process execution program exchanges data through the OPC DA interface of the OPC server of Emerson DCS to obtain the value or state of the relevant parameters. In order to ensure the safe operation of the DCS system, an industrial-grade firewall is added between the system server and the communication interface, and by configuring the corresponding rule strategy, the deep isolation protection of the DCS control system is realized, the virus transmission path is cut off, and the normal, safe and stable operation of the device DCS production control system is ensured. The industrial firewall has built-in private communication protocols of various mainstream automation product manufacturers, which can realize non-disturbance access with various mainstream automation products such as Honeywell DCS, Yokogawa DCS, Emerson DCS and other systems, as well as OPC SERVER, IP21 / PHD / PI and other servers or databases.
[0082] Among them, the interface design of the human-computer interaction interface includes function buttons such as parameter "setting", cracking furnace status "confirmation", program "run", run "pause", run "continue", run "stop", parameter "alarm" to realize the human-computer interaction function. Specifically, during use, click the "parameter setting" button to view the default values of each control parameter of the process, and manually set the control threshold of key parameters of the program and the upper and lower limit preset values of key parameters according to actual production needs; click the "cracking furnace status confirmation" button to complete the status confirmation work before cutting out the quench tower, and the interface jumps to the operation interface of cutting out the quench tower. Otherwise, the program for cutting out the quenching tower cannot be run; click the "Program Run" button to start the program for cutting out the quenching tower; click "Pause" to stop the next step of the program, and the control values of each parameter of the program for cutting out the quenching tower will remain at the current value. Click "Continue" and the program will continue according to the current execution steps; click "Stop" manually to stop the cracking furnace from automatically cutting out the quenching tower program and switch to manual operation; click "Alarm Button" to switch the human-computer interaction interface to the alarm interface, where you can view the system alarm status in detail and choose whether to enable the alarm shielding function during the process of cutting out the quenching tower as needed.
[0083] Furthermore, the functions of the human-machine interface also include system operation status display, system operation buttons, key parameter trend charts and system alarm prompt information. Among them, the human-machine interface is designed with function buttons such as "Run", "Stop", "Pause", "Continue", and "Parameter Setting". During the system operation, the user can execute the above function buttons at any time according to the actual operation of the ethylene device.
[0084] The present invention will be described in detail below through examples, but the protection scope of the present invention is not limited thereto.
[0085] Example 1
[0086] Based on an ethylene cracking furnace with a production capacity of 140,000 tons / year, the present invention is used as follows Figure 1 The automatic execution system of the ethylene cracking furnace cutting out the quenching tower process is implemented as shown, specifically, the system includes:
[0087] A state confirmation module before cutting out the quench tower is used to confirm the initial parameters before the cracking furnace cuts out the quench tower, and when the initial parameters are within the initial range, it indicates that the quench tower can be cut out, and when the initial parameters are not within the initial range, an alarm is issued;
[0088] The intelligent control module for cutting out the quench tower process is used to control the key parameters for cutting out and issue control instructions during the stage of cutting out the quench tower, wherein the key parameters for cutting out include the cracking furnace outlet temperature, the furnace single-tube dilution steam flow rate, the cracking furnace furnace negative pressure, the fuel gas calorific value and the ultra-high pressure steam temperature;
[0089] The quench tower cut-out execution module is used to cut out the quench tower according to the control instructions of the quench tower cut-out process intelligent control module during the quench tower cut-out stage.
[0090] Specifically, when the initial parameter is not within the initial range, an alarm is issued, which specifically includes:
[0091] When the initial parameters are not within the initial range, an alarm is issued for one or more of the initial parameters that are not within the initial range; the initial parameters include furnace single-tube dilution steam flow, cracking furnace outlet temperature, ultra-high pressure steam temperature, cracking furnace furnace negative pressure, furnace single-tube dimethyl disulfide injection amount and fuel gas calorific value; the furnace single-tube dilution steam flow is 4500kg / h, the cracking furnace outlet temperature is 720℃, the ultra-high pressure steam temperature is 480℃, the cracking furnace negative pressure is -30Pa, the furnace single-tube dimethyl disulfide injection amount is 5kg / h, and the fuel gas calorific value is 8MW.
[0092] The cracking furnace comprises at least one three-valve cut-off system, which comprises a furnace cracking gas valve, a coke-cleaning bypass valve and a furnace coke-cleaning valve, wherein the furnace cracking gas valve and the coke-cleaning bypass valve are linked by a mechanical mechanism, and when the furnace cracking gas valve is opened, the coke-cleaning bypass valve is closed, and when the furnace cracking gas valve is closed, the coke-cleaning bypass valve is opened;
[0093] In the stage of cutting out the quench tower, the key parameters of the cutting out are controlled and control instructions are issued, which specifically include:
[0094] Control the flow rate of the dilution steam in the furnace single tube to remain unchanged on the basis of its initial flow rate;
[0095] In the first stage, the negative pressure in the cracking furnace is controlled to decrease to a first negative pressure in the furnace at a first negative pressure rate based on the initial negative pressure;
[0096] In the second stage, when the negative pressure in the cracking furnace drops to the first negative pressure in the cracking furnace, the cracking gas valve in the cracking furnace is controlled to be fully closed at the first cracking valve rate; when the negative pressure in the cracking furnace rises to the second negative pressure in the cracking furnace based on the first negative pressure in the cracking furnace, the coke clearing valve in the cracking furnace is controlled to be fully opened at the first coke clearing valve rate to allow the dilution steam to enter the cracking furnace; at the same time, the calorific value of the fuel gas is controlled to rise to the first preset calorific value at the first preset calorific value rate based on its initial calorific value;
[0097] In the third stage, after controlling the negative pressure in the furnace of the cracking furnace to maintain the negative pressure in the second furnace for a first set time, the negative pressure in the furnace of the cracking furnace is controlled to increase to the initial negative pressure of the negative pressure in the furnace of the cracking furnace at a second negative pressure rate based on the second negative pressure in the furnace;
[0098] In the fourth stage, after the negative pressure in the cracking furnace rises to the initial negative pressure in the cracking furnace, the outlet temperature of the cracking furnace is controlled to be maintained for a second set time based on the initial temperature, and then the outlet temperature of the cracking furnace is controlled to be increased to a first set temperature at a first heating rate based on the initial temperature, and maintained for a third set time based on the first set temperature; at the same time, after the temperature of the ultra-high pressure steam is controlled to be maintained for a fourth set time based on the initial temperature, the temperature of the ultra-high pressure steam is controlled to be increased to a first set steam temperature at the first heating rate based on the initial temperature;
[0099] The first furnace negative pressure is -150Pa, the second furnace negative pressure is -50Pa, the first negative pressure rate is 25Pa / min, the second negative pressure rate is 4Pa / min, the first cracking valve rate is 25% / min, the first decoking valve rate is 40% / min, the first preset calorific value rate is 0.5MW / min, the first preset calorific value is 12MW, the first setting time is 2min, the second setting time is 10min, the third setting time is 60min, the fourth setting time is 20min, the first setting temperature is 760℃, the first setting steam temperature is 510℃, and the first heating rate is 1℃ / min.
[0100] In the actual application process, before the quenching tower is cut out, the state confirmation module before cutting out the quenching tower confirms the initial parameters. When the initial parameters are within the initial range, it indicates that the quenching tower can be cut out. Then the intelligent control module of the quenching tower process is cut out to control the furnace single-tube dilution steam flow rate to remain unchanged on the basis of 4500kg / h. In the first stage, the negative pressure of the cracking furnace is controlled to drop to -150Pa at a rate of 25Pa / min on the basis of -30Pa; in the second stage, when the negative pressure of the cracking furnace drops to -150Pa, the furnace cracking gas valve is controlled to be fully closed at a rate of 25% / min. When the negative pressure of the cracking furnace rises to -50Pa on the basis of -150Pa, the furnace coke cleaning valve is controlled to be fully opened at a rate of 40% / min to allow the dilution steam to enter the furnace of the cracking furnace. At the same time, the control The calorific value of the fuel gas is increased from 8MW to 12MW at a rate of 0.5MW / min; in the third stage, the negative pressure of the cracking furnace is controlled to be maintained at -50Pa for 2min, and then the negative pressure of the cracking furnace is controlled to be increased to -30Pa at a rate of 4Pa / min on the basis of -50Pa; in the fourth stage, when the negative pressure of the cracking furnace rises to -30Pa, the outlet temperature of the cracking furnace is controlled to be maintained at 720℃ for 10min, and then the outlet temperature of the cracking furnace is controlled to be increased to 760℃ at a rate of 1℃ / min on the basis of 720℃, and maintained at 760℃ for 60min; at the same time, the temperature of the ultra-high pressure steam is controlled to be maintained at 480℃ for 20min, and then the temperature of the ultra-high pressure steam is controlled to be increased to 520℃ at a rate of 1℃ / min on the basis of 480℃, and the rapid cooling is completed.
[0101] After testing, it is found that the automatic execution system for the ethylene cracking furnace cutting out the quench tower process of the present invention is used. In actual application, the state before cutting out the quench tower is confirmed by the state confirmation module before cutting out the quench tower, which can be used to ensure that the cracking furnace can normally cut out the quench tower and ensure the accuracy of subsequent cutting out. The intelligent control module for the cutting out quench tower process controls the cutting out key parameters, which can avoid drastic fluctuations of the cutting out key parameters during the cutting out process, causing system instability. The system has the advantages of high cutting out efficiency, small fluctuations of the cutting out key parameters, high stability and high safety.
[0102] Example 2
[0103] Refer to Example 1, except that the cracking furnace includes at least two furnaces.
[0104] After testing, it is found that the automatic execution system for the ethylene cracking furnace cutting out the quench tower process of the present invention is used. In actual application, the state before cutting out the quench tower is confirmed by the state confirmation module before cutting out the quench tower, which can be used to ensure that the cracking furnace can normally cut out the quench tower and ensure the accuracy of subsequent cutting out. The intelligent control module for the cutting out quench tower process controls the cutting out key parameters, which can avoid drastic fluctuations of the cutting out key parameters during the cutting out process, causing system instability. The system has the advantages of high cutting out efficiency, small fluctuations of the cutting out key parameters, high stability and high safety.
[0105] Example 3
[0106] Refer to Example 2, except that the first cracking valve rate is 20% / min, the first decoking valve rate is 35% / min, the first preset calorific value rate is 0.4MW / min, and the first preset calorific value is 10MW.
[0107] After testing, it is found that the automatic execution system for the ethylene cracking furnace cutting out the quench tower process of the present invention is used. In actual application, the state before cutting out the quench tower is confirmed by the state confirmation module before cutting out the quench tower, which can be used to ensure that the cracking furnace can normally cut out the quench tower and ensure the accuracy of subsequent cutting out. The intelligent control module for the cutting out quench tower process controls the cutting out key parameters, which can avoid drastic fluctuations of the cutting out key parameters during the cutting out process, causing system instability. The system has the advantages of high cutting out efficiency, small fluctuations of the cutting out key parameters, high stability and high safety.
[0108] Example 4
[0109] Refer to Example 2, except that the first cracking valve rate is 30% / min, the first decoking valve rate is 35% / min, the first preset calorific value rate is 0.6MW / min, and the first preset calorific value is 13MW.
[0110] After testing, it is found that the automatic execution system for the ethylene cracking furnace cutting out the quench tower process of the present invention is used. In actual application, the state before cutting out the quench tower is confirmed by the state confirmation module before cutting out the quench tower, which can be used to ensure that the cracking furnace can normally cut out the quench tower and ensure the accuracy of subsequent cutting out. The intelligent control module for the cutting out quench tower process controls the cutting out key parameters, which can avoid drastic fluctuations of the cutting out key parameters during the cutting out process, causing system instability. The system has the advantages of high cutting out efficiency, small fluctuations of the cutting out key parameters, high stability and high safety.
[0111] Example 5
[0112] Refer to Example 2 for implementation, except that the first cracking valve rate is 30% / min, the first decoking valve rate is 45% / min, the first preset calorific value rate is 0.6MW / min, and the first preset calorific value is 15MW.
[0113] After testing, it is found that the automatic execution system for the ethylene cracking furnace cutting out the quench tower process of the present invention is used. In actual application, the state before cutting out the quench tower is confirmed by the state confirmation module before cutting out the quench tower, which can be used to ensure that the cracking furnace can normally cut out the quench tower and ensure the accuracy of subsequent cutting out. The intelligent control module for the cutting out quench tower process controls the cutting out key parameters, which can avoid drastic fluctuations of the cutting out key parameters during the cutting out process, causing system instability. The system has the advantages of high cutting out efficiency, small fluctuations of the cutting out key parameters, high stability and high safety.
[0114] Example 6
[0115] The implementation is carried out with reference to Example 2, except that the system further includes an operation navigation function module for providing operation prompts in the quenching tower cut-out stage according to the control instructions of the intelligent control module of the quenching tower cut-out process; before the first stage, the operation navigation function module prompts to remove the high-high interlock of the negative pressure in the cracking furnace; after the fourth stage, the operation navigation function module prompts to close the root valve of dimethyl disulfide, stop the injection of dimethyl disulfide, and check the status of the cracking furnace.
[0116] According to the test, compared with the embodiment 2, the cutting efficiency and the safety and cutting efficiency during the cutting process can be further improved.
[0117] Example 7
[0118] The implementation is carried out with reference to Example 6, except that the system further includes a process key parameter monitoring and alarm module, which is used to monitor the process key parameters during the stage of cutting out the quench tower, and to alarm when the process key parameters exceed the preset range; the process key parameters include the cracking furnace outlet temperature, the furnace single tube dilution steam flow rate, the fuel gas calorific value, the fuel gas pressure, the cracking furnace pressure, the Venturi tube rear pressure, the VHS drum liquid level, the ultra-high pressure steam temperature, the ultra-high pressure steam pressure and the cracking furnace cross section temperature.
[0119] According to testing, the safety during the cutting process can be further improved compared with Example 6.
[0120] Example 8
[0121] The method is implemented with reference to Example 7, except that the key process parameters are monitored, and an alarm is issued when the key process parameters exceed a preset range, specifically including:
[0122] When one or more of the key process parameters exceeds a first preset range, an alarm is issued;
[0123] When one or more of the key process parameters exceed the second preset range, the key process parameters exceeding the second preset range will be adjusted to within the first preset range according to a preset ratio based on their current values, and an alarm will be issued; the upper limit value of the second preset range is greater than the upper limit value of the first preset range, and the lower limit value of the second preset range is less than the lower limit value of the first preset range, and the preset ratio is ±0.1% to 10%.
[0124] According to testing, the safety during the cutting process can be further improved compared with Example 7.
[0125] Example 9
[0126] The implementation is carried out with reference to Example 8, but the difference therefrom is that the system further includes a cut-out process alarm optimization management module, which is used for automatically shielding the cracking furnace operation instrument alarm after entering the cut-out quench tower stage, and turning the cracking furnace operation instrument alarm activation prompt light red; after the cut-out quench tower stage is completed, the cracking furnace operation instrument alarm is automatically enabled, and the cracking furnace operation instrument alarm activation prompt light turns green; the types of the cracking furnace operation instrument alarm include a high oxygen content alarm of the cross-section flue gas, a bottom fuel heat load ratio alarm, a side wall fuel heat load ratio alarm, a cracking furnace liquid phase feed flow alarm, a cracking furnace gas phase feed flow alarm, a quench oil flow alarm, a total feed amount alarm, a furnace tube gas raw material flow alarm, a furnace tube liquid raw material flow alarm, a gas raw material pressure alarm, a liquid raw material pressure alarm, a quencher outlet temperature alarm, an inlet burnt gas temperature adjustment alarm, a cracking gas temperature alarm and a Venturi pressure difference alarm.
[0127] According to the test, the cutting efficiency can be further improved compared with the embodiment 8.
[0128] Example 10
[0129] The system is implemented with reference to Example 9, but differs therefrom in that the system also includes a deep learning function module for learning the control advantages and disadvantages of the key parameters of the quenching tower stage based on experience and big data, and deriving the optimal control values of the key parameters of the quenching tower stage.
[0130] According to testing, the cutting efficiency, stability and safety during the cutting process can be further improved compared with Example 9.
[0131] The automatic execution system and method of the ethylene cracking furnace cutting out the quench tower process provided by the present invention can effectively improve the stability of the system in the process of cutting out the quench tower by confirming the state before cutting out the quench tower, and then controlling the cutting out key parameters in the stage of cutting out the quench tower through the intelligent control module of the cutting out quench tower process, and executing the corresponding operation according to the control instruction through the cutting out quench tower execution module, so as to have the advantages of high cutting out efficiency and high safety.
[0132] The preferred embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited thereto. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations. However, these simple modifications and combinations should also be regarded as the contents disclosed by the present invention and belong to the protection scope of the present invention.
Claims
1. An automatic execution system for cutting out the quench tower process of an ethylene cracking furnace, characterized in that: The system includes: A state confirmation module before cutting out the quench tower is used to confirm the initial parameters before the cracking furnace cuts out the quench tower, and when the initial parameters are within the initial range, it indicates that the quench tower can be cut out, and when the initial parameters are not within the initial range, an alarm is issued; The intelligent control module for cutting out the quench tower process is used to control the key parameters for cutting out and issue control instructions during the stage of cutting out the quench tower, wherein the key parameters for cutting out include the cracking furnace outlet temperature, the furnace single-tube dilution steam flow rate, the cracking furnace furnace negative pressure, the fuel gas calorific value and the ultra-high pressure steam temperature; The quench tower cut-out execution module is used to cut out the quench tower according to the control instructions of the quench tower cut-out process intelligent control module during the quench tower cut-out stage.
2. The system according to claim 1, characterized in that When the initial parameter is not within the initial range, an alarm is issued, specifically including: When the initial parameters are not within the initial range, an alarm is issued for one or more initial parameters that are not within the initial range.
3. The system according to claim 1 or 2, characterized in that: The initial parameters include furnace single tube dilution steam flow, cracking furnace outlet temperature, ultra-high pressure steam temperature, cracking furnace furnace negative pressure, furnace single tube dimethyl disulfide injection amount and fuel gas calorific value.
4. The system according to claim 3, characterized in that The initial range of the furnace single-tube dilution steam flow rate is 3500-5500 kg / h, the initial range of the cracking furnace outlet temperature is 720-750°C, the initial range of the ultra-high pressure steam temperature is 480-525°C, the initial range of the cracking furnace furnace negative pressure is -45--20 Pa, the initial range of the furnace single-tube dimethyl disulfide injection amount is 1-20 kg / h, and the initial range of the fuel gas calorific value is 7-9 MW.
5. The system according to claim 1 or 4, characterized in that: The cracking furnace includes at least one three-valve cut-off system, which includes a furnace cracking gas valve, a coke cleaning bypass valve and a furnace coke cleaning valve, wherein the furnace cracking gas valve and the coke cleaning bypass valve are linked by a mechanical mechanism. When the furnace cracking gas valve is opened, the coke cleaning bypass valve is closed, and when the furnace cracking gas valve is closed, the coke cleaning bypass valve is opened.
6. The system according to claim 5, characterized in that In the stage of cutting out the quench tower, the key parameters of the cutting out are controlled and control instructions are issued, which specifically include: Control the flow rate of the dilution steam in the furnace single tube to remain unchanged on the basis of its initial flow rate; In the first stage, the negative pressure in the cracking furnace is controlled to decrease to a first negative pressure in the furnace at a first negative pressure rate based on the initial negative pressure; In the second stage, when the negative pressure in the cracking furnace drops to the first negative pressure in the cracking furnace, the cracking gas valve in the cracking furnace is controlled to be fully closed at the first cracking valve rate; when the negative pressure in the cracking furnace rises to the second negative pressure in the cracking furnace based on the first negative pressure in the cracking furnace, the coke clearing valve in the cracking furnace is controlled to be fully opened at the first coke clearing valve rate to allow the dilution steam to enter the cracking furnace; at the same time, the calorific value of the fuel gas is controlled to rise to the first preset calorific value at the first preset calorific value rate based on its initial calorific value; In the third stage, after controlling the negative pressure in the furnace of the cracking furnace to maintain the negative pressure in the second furnace for a first set time, the negative pressure in the furnace of the cracking furnace is controlled to increase to the initial negative pressure of the negative pressure in the furnace of the cracking furnace at a second negative pressure rate based on the second negative pressure in the furnace; In the fourth stage, after the negative pressure in the cracking furnace rises to the initial negative pressure in the cracking furnace, the outlet temperature of the cracking furnace is controlled to be maintained for a second set time based on the initial temperature, and then the outlet temperature of the cracking furnace is controlled to rise to a first set temperature at a first heating rate based on the initial temperature, and maintained for a third set time based on the first set temperature; at the same time, after the temperature of the ultra-high pressure steam is controlled to be maintained for a fourth set time based on the initial temperature, the temperature of the ultra-high pressure steam is controlled to rise to a first set steam temperature at the first heating rate based on the initial temperature.
7. The system according to claim 6, characterized in that The first furnace negative pressure is -180 to -130Pa, the second furnace negative pressure is -70 to -40Pa, the first negative pressure rate is 15 to 35Pa / min, the second negative pressure rate is 0.5 to 15Pa / min, the first cracking valve rate is 10 to 40% / min, the first coke cleaning valve rate is 20 to 60% / min, the first preset calorific value rate is 0.2 to 2MW / min, the first preset calorific value is 10 to 15MW, the first setting time is 1 to 10min, the second setting time is 5 to 30min, the third setting time is 30 to 120min, the fourth setting time is 10 to 60min, the first setting temperature is 740-800℃, the first setting steam temperature is 500 to 525℃, and the first heating rate is 0.2 to 10℃ / min.
8. The system according to claim 6, characterized in that The cracking furnace comprises at least one furnace.
9. The system according to claim 6, characterized in that The system also includes an operation navigation function module, which is used to provide operation prompts in the quench tower cut-out stage according to the control instructions of the quench tower cut-out process intelligent control module.
10. The system according to claim 9, characterized in that Before the first stage, the operation navigation function module prompts to remove the high-high interlock of the negative pressure in the cracking furnace; After the fourth stage, the operation navigation function module prompts to close the dimethyl disulfide root valve, stop the injection of dimethyl disulfide, and check the state of the cracking furnace.
11. The system according to claim 1, characterized in that The system also includes a process key parameter monitoring and alarm module, which is used to monitor the process key parameters during the quench tower cut-out stage and to generate an alarm when the process key parameters exceed a preset range.
12. The system according to claim 11, characterized in that The key process parameters include cracking furnace outlet temperature, furnace single tube dilution steam flow, fuel gas calorific value, fuel gas pressure, cracking furnace pressure, Venturi rear pressure, VHS drum liquid level, ultra-high pressure steam temperature, ultra-high pressure steam pressure and cracking furnace cross section temperature.
13. The system according to claim 11, characterized in that The monitoring of the key process parameters and the alarming when the key process parameters exceed the preset range specifically include: When one or more of the key process parameters exceeds a first preset range, an alarm is issued; When one or more of the process key parameters exceed the second preset range, the process key parameters exceeding the second preset range are adjusted to within the first preset range according to a preset ratio based on their current values, and an alarm is issued.
14. The system according to claim 13, characterized in that The upper limit value of the second preset range is greater than the upper limit value of the first preset range, the lower limit value of the second preset range is less than the lower limit value of the first preset range, and the preset ratio is ±0.1% to 10%.
15. The system according to claim 1, characterized in that The system also includes a cut-out process alarm optimization management module, which is used to automatically shield the cracking furnace operation instrument alarm after entering the cut-out quench tower stage, and make the cracking furnace operation instrument alarm activation prompt light turn red; After the quench tower cut-out stage is completed, the cracking furnace operation instrument alarm is automatically enabled, and the cracking furnace operation instrument alarm enable prompt light turns green.
16. The system according to claim 15, characterized in that The types of cracking furnace operation instrument alarms include high oxygen content alarm of cross-section flue gas, bottom fuel heat load ratio alarm, side wall fuel heat load ratio alarm, cracking furnace liquid phase feed flow alarm, cracking furnace gas phase feed flow alarm, quench oil flow alarm, total feed amount alarm, furnace tube gas raw material flow alarm, furnace tube liquid raw material flow alarm, gas raw material pressure alarm, liquid raw material pressure alarm, quencher outlet temperature alarm, inlet burnt gas temperature adjustment alarm, cracking gas temperature alarm and Venturi pressure difference alarm.
17. The system according to claim 6, characterized in that The system also includes a deep learning function module for learning the control advantages and disadvantages of each key parameter of the quench tower cut-out stage based on experience and big data, and deriving the optimal control values of the key parameters of the quench tower cut-out stage.
18. A method for automatically executing the process of cutting out the quench tower of an ethylene cracking furnace, characterized in that: The method is implemented using the system described in any one of claims 1 to 17, and the method comprises: A state confirmation module before cutting out the quench tower is used to confirm the initial parameters before the cracking furnace cuts out the quench tower, and when the initial parameters are within the initial range, it indicates that the quench tower can be cut out, and when the initial parameters are not within the initial range, an alarm is issued; An intelligent control module for the process of cutting out the quench tower is used to control the key parameters of the cut-out and issue control instructions during the stage of cutting out the quench tower, wherein the key parameters of the cut-out include the cracking furnace outlet temperature, the furnace single-tube dilution steam flow rate, the cracking furnace negative pressure, the fuel gas calorific value and the ultra-high pressure steam temperature; A quench tower cut-out execution module is adopted, and in the quench tower cut-out stage, the quench tower is cut out according to the control instruction of the quench tower cut-out process intelligent control module.
Citation Information
Patent Citations
Method for automatically controlling switching of large valve of ethylene cracking furnace
CN111019692A
Method of thermal cracking of hydrocarbons
GB1270074A
Partial Trip System for Ethylene Furnace with Ground Flare
US20200048561A1
