Inclined shaft structure of pumped storage power station and inclined shaft steel pipe installation construction method

By setting up multiple horizontal construction holes in the inclined shaft structure of the pumped storage power station and using pipe laying cranes and winches to cooperate, the traditional construction problems of difficulty, low efficiency and high cost have been solved, and the construction of inclined shaft steel pipes has been realized. Quick, safe installation and ease of maintenance.

CN118774093AActive Publication Date: 2024-10-15CHINA GEZHOUBA (GRP) FIRST ENG CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410930470.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-15
Estimated Expiration
2044-07-11

AI Technical Summary

Technical Problem

The construction of the inclined shaft structure of traditional pumped storage power stations is difficult, low-efficiency, high-cost, and inconvenient for later maintenance. In particular, there is a lack of efficient, safe, and economical construction solutions during the installation of water diversion steel pipes.

Method used

The design is to set up multiple horizontal construction holes at equal intervals on one side of the inclined shaft. The pipe-laying crane and the winch are used to work together, and the joint operation platform is used to achieve precise docking and rapid installation of the water diversion steel pipes, reducing reliance on large machinery and simplifying the construction process.

Benefits of technology

It significantly increases the construction speed, reduces the investment cost of manpower, materials and mechanical equipment, provides a safe and convenient working environment, and simplifies post-maintenance and management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774093A_ABST
    Figure CN118774093A_ABST
Patent Text Reader

Abstract

The invention discloses a pumped storage power station inclined shaft structure and a steel pipe installation construction method thereof, and aims to solve the problems of low inclined shaft construction efficiency, high cost, poor safety and the like in the prior art. The inclined shaft structure comprises an inclined shaft body, an inclined shaft extension section, construction holes, an elevator shaft, a water diversion steel pipe and other assemblies, a plurality of horizontal construction holes are formed in one side of the inclined shaft and connected to the elevator shaft, and material transportation and personnel entering and exiting in the construction period are facilitated. The steel pipe installation construction method comprises the steps of pipe placing of the pipe placing crane, winch assistance, joint operation platform positioning installation and the like, and accurate butt joint and stable installation of the water diversion steel pipes are ensured. Through the optimized inclined shaft structure design and construction process, the construction efficiency is remarkably improved, the cost is reduced, the construction safety is enhanced, and the method is suitable for inclined shaft construction of the pumped storage power station and has important engineering application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction of pumped storage power stations, in particular to an inclined shaft structure of a pumped storage power station and an inclined shaft steel pipe installation construction method. Background Art

[0002] As an important part of the power system, pumped storage power stations can not only store and release electric energy, but also have multiple functions such as peak-to-valley shifting, emergency standby, and black start, which play an irreplaceable role in improving the flexibility and reliability of power grid operation. In the construction of pumped storage power stations, the inclined shaft structure is the key channel connecting the upper reservoir and the lower reservoir, and its design and construction technology directly affect the operating efficiency and safety of the entire power station.

[0003] The traditional inclined shaft structure and its construction method have the following problems: 1. Difficulty in construction: Inclined shafts usually need to be excavated in mountains or underground. The geological conditions are complex and the construction environment is harsh. In particular, the verticality control of the inclined shaft, the stability treatment of the rock wall, and the waterproof and anti-seepage measures all place extremely high demands on the construction technology.

[0004] 2. Low construction efficiency: Traditional inclined shaft construction often adopts the method of excavation and support in sections, which has complicated procedures, long construction period, and is greatly affected by weather, geological and other factors, making it difficult to ensure the construction progress.

[0005] 3. High cost: Due to the difficulty and low efficiency of construction, the cost of manpower, materials and mechanical equipment is high, and the safety risks during the construction process also increase additional costs.

[0006] 4. Inconvenience in later maintenance: The installation and maintenance of internal facilities of the inclined shaft, such as water diversion pipes, are limited by factors such as narrow space and tortuous passages, which brings great inconvenience to the later inspection and maintenance work.

[0007] Combined with existing technologies, the design and construction of inclined shaft structures of most pumped storage power stations still rely on traditional excavation technology and installation methods, lacking efficient, safe and economical construction solutions. Especially in the installation process of water diversion steel pipes, how to ensure the precise docking, stable installation and rapid construction of steel pipes is a technical problem that needs to be solved urgently. Summary of the invention

[0008] The technical problem to be solved by the present invention is to provide an inclined shaft structure of a pumped storage power station and an inclined shaft steel pipe installation construction method, aiming to overcome the shortcomings of the existing technology, improve construction efficiency, reduce construction costs, ensure construction safety, and facilitate subsequent maintenance and management.

[0009] In order to solve the above technical problems, the technical solution adopted by the present invention is: a pumped storage power station inclined shaft structure, including an inclined shaft, the bottom of the inclined shaft is connected to the lower flat section, the upper part of the inclined shaft is connected to the upper flat section, and the upper end of the inclined shaft is provided with an inclined shaft extension section extending upward to the outside of the ground; A plurality of horizontal construction holes are equidistantly arranged on one side of the inclined shaft, and the same end of the plurality of construction holes is connected to the elevator shaft.

[0010] In a preferred solution, the lower end of the elevator shaft extends to the lower flat section and is connected to a dismantling hole provided at one end of the lower flat section.

[0011] In a preferred solution, a water diversion steel pipe is provided in the inclined shaft, and the water diversion steel pipe is composed of multiple pipe sections, and two adjacent pipe sections are connected by steel pipe joints, and the steel pipe joints and the construction hole are located at the same horizontal height.

[0012] In a preferred solution, a pipe laying crane is provided on the ground above the inclined shaft, and the pipe laying crane is used for pipe laying construction of the pipe section to be laid.

[0013] In a preferred solution, a joint operating platform is provided on one end of the construction hole close to the inclined shaft, and an upper steel pipe pulling rope and a lower steel pipe pulling rope are provided on the joint operating platform for pulling the ends of the water diversion steel pipes at the upper and lower ends of the steel pipe joint.

[0014] In a preferred solution, a winch and a pipe section lower end fixing mechanism are arranged on the ground where the pipe-laying crane is located, and a pulling rope for the pipe section upper end is arranged on the winch; One end of the pulling rope at the upper end of the pipe section is connected to the hook of the pipe-laying crane, and a pulling rope sleeved on the lower end of the pipe section to be suspended is provided on the fixing mechanism at the lower end of the pipe section.

[0015] In a preferred embodiment, the joint working platform is anchored at the opening of the construction hole by an anchor rod. A method for installing and constructing a steel pipe in an inclined shaft of a pumped storage power station comprises the following steps: 1) The pipe crane enters the site and lifts the water diversion steel pipe; 2) A winch and a fixing mechanism for the lower end of the pipe segment are arranged on the ground, and the crane hook is pulled by the pulling rope at the upper end of the pipe segment on the winch, and the lower part of the pipe segment to be hoisted is fixed by the fixing mechanism at the lower end of the pipe segment; 3) The pipe-laying crane gradually lowers the pipe, so that the lower end of the water diversion steel pipe moves downward to near the upper end of the inclined shaft extension section. During the process, the winch gradually reels in, so that the pipe section to be lowered is tilted to the same inclination as the inclined shaft; 4) The pipe-laying crane and the winch continue to cooperate to allow the water diversion steel pipe to enter the inclined shaft until the lower end of the pipe section to be laid moves to the construction hole entrance. The upper steel pipe on the joint operation platform is used to pull the rope loop to receive the lower end of the pipe section to be laid. The pipe-laying crane continues to lay the pipe section to be laid until the midpoint of the pipe section to be laid is below the construction hole entrance. The pipe-laying crane hook is removed and the pipe section is slowly lowered to the next construction hole entrance by its own gravity. 5) Repeat the above steps to complete the hanging and placing of multiple sections of water diversion steel pipes in place; 6) After hoisting into place, secure the upper end of the pipe section below the steel pipe joint through the lower steel pipe pulling rope on the joint working platform at the entrance of the construction hole, and ensure that the upper steel pipe pulling rope and the lower steel pipe pulling rope are tensioned to align the steel pipe joints, and carry out the connection and installation of the steel pipe joints through the joint working platform.

[0016] In a preferred solution, the machine hole is dismantled through the lower end of the inclined shaft extension section, the TBM equipment originating from the upper end of the inclined shaft extension section is recovered, and transported out through the elevator shaft.

[0017] In a preferred solution, the construction hole located at the top is flush with the upper flat section connected to the upper reservoir to carry out the installation construction of the elbow part of the water diversion steel pipe.

[0018] The invention provides a pumped storage power station inclined shaft structure and an inclined shaft steel pipe installation construction method, which has the following beneficial effects by adopting the above structure and method: (1) By setting up multiple horizontal construction holes at equal intervals on one side of the inclined shaft, not only a safe and convenient working platform is provided for construction workers, but also the installation process of the water diversion steel pipe is greatly simplified. The joint working platform is used to accurately connect the steel pipe joints, which effectively avoids the installation difficulties caused by space limitations in traditional methods and significantly improves the construction speed. (2) It reduces the reliance on large-scale construction machinery and shortens the construction period, thereby effectively reducing the overall investment cost of manpower, materials and mechanical equipment; (3) Through the coordinated operation of the pipe-laying crane and the winch, the water diversion steel pipe can be smoothly laid, reducing the impact on the surrounding environment. This advantage is more obvious in mountainous areas with complex geological conditions, solving the problem of collision and obstruction between the pipe section and the well wall during the inclined well pipe laying operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0020] Figure 2 It is a schematic diagram of the construction hole opening structure of the present invention.

[0021] In the figure: inclined shaft 1, lower flat section 2, upper flat section 3, inclined shaft extension section 4, machine dismantling hole 5, elevator shaft 6, construction hole 7, water diversion steel pipe 8, steel pipe joint 9, pipe lowering crane 10, pipe section to be lowered 11, winch 12, pulling rope at the upper end of the pipe section 13, fixing mechanism at the lower end of the pipe section 14, joint working platform 15, anchor rod 16, upper steel pipe pulling rope 17, lower steel pipe pulling rope 18. DETAILED DESCRIPTION

[0022] Embodiment 1: like Figure 1-2 In the invention, a pumped storage power station inclined shaft structure comprises an inclined shaft 1, the bottom of the inclined shaft 1 is connected to a lower flat section 2, the upper part of the inclined shaft 1 is connected to an upper flat section 3, and an inclined shaft extension section 4 is provided at the upper end of the inclined shaft 1 and extends upward to the outside of the ground; A plurality of horizontal construction holes 7 are equidistantly arranged on one side of the inclined shaft 1 , and the same end of the plurality of construction holes 7 is connected to the elevator shaft 6 .

[0023] In a preferred solution, the lower end of the elevator shaft 6 extends to the lower flat section 2 and communicates with a disassembly hole 5 provided at one end of the lower flat section 2 .

[0024] In a preferred solution, a water diversion steel pipe 8 is provided in the inclined shaft 1. The water diversion steel pipe 8 is composed of multiple pipe sections. Two adjacent pipe sections are connected by steel pipe joints 9. The steel pipe joints 9 and the construction hole 7 are located at the same horizontal height.

[0025] In a preferred solution, a pipe-laying crane 10 is provided on the ground above the inclined shaft 1, and the pipe-laying crane 10 is used for pipe-laying construction of the pipe section 11 to be suspended.

[0026] In the preferred embodiment, a joint operation platform 15 is provided on one end of the construction hole 7 close to the inclined shaft 1, and an upper steel pipe pulling rope 17 and a lower steel pipe pulling rope 18 are provided on the joint operation platform 15 for pulling the ends of the water diversion steel pipe 8 at the upper and lower ends of the steel pipe joint 9.

[0027] In a preferred solution, a winch 12 and a pipe section lower end fixing mechanism 14 are arranged on the ground where the pipe-laying crane 10 is located, and a pulling rope 13 for the pipe section upper end is arranged on the winch 12; One end of the pulling rope 13 at the upper end of the pipe segment is connected to the hook of the pipe-laying crane 10, and the fixing mechanism 14 at the lower end of the pipe segment is provided with a pulling rope sleeved on the lower end of the pipe segment 11 to be suspended.

[0028] In a preferred solution, the joint working platform 15 is anchored at the hole opening of the construction hole 7 by means of an anchor rod 16 .

[0029] In the above scheme, the inclined shaft structure is designed as follows: Main body of the inclined shaft: The inclined shaft is designed as a key channel connecting the upper reservoir and the lower reservoir. The upper part of the inclined shaft is connected to the upper flat section, and the bottom is connected to the lower flat section. An inclined shaft extension section extending to the ground is provided at the upper end of the inclined shaft to ensure ventilation and lighting during construction.

[0030] Construction holes and elevator shafts: Multiple horizontal construction holes are set equidistantly on one side of the inclined shaft. The same end of the construction holes is connected to the elevator shaft. The lower end of the elevator shaft extends to the dismantling hole on the lower flat section, providing convenience for material transportation and personnel entry and exit during construction.

[0031] Configuration of water diversion steel pipe: The water diversion steel pipe is installed in the inclined shaft and consists of multiple pipe sections. Adjacent pipe sections are connected by steel pipe joints to ensure the continuity and sealing of the water diversion system.

[0032] Embodiment 2: The inclined shaft steel pipe installation construction method of the inclined shaft structure of the pumped storage power station based on Example 1 comprises the following steps: 1) The pipe crane 10 enters the site and lifts the water diversion steel pipe 8; 2) A hoist 12 and a pipe segment lower end fixing mechanism 14 are arranged on the ground, and the hook of the crane 10 is pulled by the pipe segment upper end pulling rope 13 on the hoist 12, and the lower part of the pipe segment 11 to be hoisted is fixed by the pipe segment lower end fixing mechanism 14; 3) The pipe-laying crane 10 gradually lays the pipe, so that the lower end of the water diversion steel pipe 8 moves downward to near the upper end of the inclined shaft extension section 4. During this process, the winch 12 gradually reels in, so that the pipe section 11 to be laid is tilted to the same inclination as the inclined shaft 1; 4) The pipe-laying crane 10 and the winch 12 continue to cooperate to allow the water diversion steel pipe 8 to enter the inclined shaft 1 until the lower end of the pipe section 11 to be laid moves to the opening of the construction tunnel 7. The upper steel pipe pulling rope 17 on the joint operation platform 15 is used to receive the lower end of the pipe section 11 to be laid. The pipe-laying crane 10 continues to lay the pipe section 11 to be laid until the midpoint of the pipe section 11 to be laid is below the opening of the construction tunnel 7. The hook of the pipe-laying crane 10 is removed and the pipe section 11 is slowly lowered to the opening of the next construction tunnel 7 by its own gravity. 5) Repeat the above steps to complete the hanging and placing of multiple sections of water diversion steel pipes 8 in place; 6) After being hoisted into place, the lower steel pipe pulling rope 18 on the joint working platform 15 at the entrance of the construction hole 7 is used to secure the upper end of the pipe section below the steel pipe joint 9, and the upper steel pipe pulling rope 17 and the lower steel pipe pulling rope 18 are ensured to be tensioned so that the steel pipe joints 9 are aligned, and the connection and installation of the steel pipe joints 9 are carried out through the joint working platform 15.

[0033] In a preferred solution, the machine hole 5 is dismantled through the lower end of the inclined shaft extension section 4, the TBM equipment starting from the upper end of the inclined shaft extension section 4 is recovered, and transported out through the elevator shaft 6.

[0034] In a preferred solution, the construction hole 7 located at the top is flush with the upper flat section 3 connected to the upper reservoir, so as to carry out the installation construction of the elbow part of the water diversion steel pipe 8.

[0035] In the above scheme: Preliminary preparation: Set up a pipe-laying crane on the ground above the inclined shaft to hang and lower the water diversion steel pipe; configure a winch and a fixing mechanism at the lower end of the pipe section to ensure stable laying of the steel pipe.

[0036] Pipe laying operation: Use the pipe laying crane to gradually lay the pipe so that the lower end of the water diversion steel pipe is close to the upper end of the inclined shaft extension section. Use the winch to gradually reel it in so that the pipe section to be laid is tilted to match the slope of the inclined shaft, ensuring that the steel pipe enters the inclined shaft smoothly.

[0037] Precise positioning and installation: When the lower end of the suspended pipe section reaches the entrance of the construction hole, fix the lower end of the pipe section by pulling the upper steel pipe rope on the joint working platform, continue to lower the pipe until the midpoint of the pipe section is below the entrance of the construction hole, then remove the crane hook, and use the deadweight of the pipe section to slowly lower it to the entrance of the next construction hole to connect and install the steel pipe joint.

[0038] The above scheme effectively improved construction efficiency and accelerated project progress.

[0039] And by relying on the setting of construction holes and elevator shafts, the dependence on large-scale machinery and equipment is reduced, and the construction costs are effectively controlled.

[0040] In addition, the design of the construction hole and joint working platform provides a safe working environment and reduces construction risks.

Claims

1. A pumped storage power station inclined shaft structure, characterized in that: It comprises an inclined shaft (1), wherein the bottom of the inclined shaft (1) is connected to a lower flat section (2), the upper part of the inclined shaft (1) is connected to an upper flat section (3), and an inclined shaft extension section (4) is provided at the upper end of the inclined shaft (1) and extends upward to the outside of the ground; A plurality of horizontal construction holes (7) are equidistantly arranged on one side of the inclined shaft (1), and the same end of the plurality of construction holes (7) is connected to the elevator shaft (6).

2. The inclined shaft structure of a pumped storage power station according to claim 1, characterized in that: The lower end of the elevator shaft (6) extends to the lower flat section (2) and is connected to a disassembly hole (5) provided at one end of the lower flat section (2).

3. The inclined shaft structure of a pumped storage power station according to claim 1, characterized in that: A water diversion steel pipe (8) is provided in the inclined shaft (1). The water diversion steel pipe (8) is composed of a plurality of pipe sections. Two adjacent pipe sections are connected by steel pipe joints (9). The steel pipe joints (9) are located at the same horizontal height as the construction hole (7).

4. The inclined shaft structure of a pumped storage power station according to claim 1, characterized in that: A pipe laying crane (10) is provided on the ground above the inclined shaft (1), and the pipe laying crane (10) is used for pipe laying construction of the pipe section (11) to be laid.

5. The inclined shaft structure of a pumped storage power station according to claim 1, characterized in that: A joint operation platform (15) is provided on one end of the construction hole (7) close to the inclined shaft (1), and an upper steel pipe pulling rope (17) and a lower steel pipe pulling rope (18) are provided on the joint operation platform (15) for pulling the ends of the water diversion steel pipe (8) at the upper and lower ends of the steel pipe joint (9).

6. The inclined shaft structure of a pumped storage power station according to claim 4, characterized in that: A winch (12) and a pipe section lower end fixing mechanism (14) are arranged on the ground where the pipe-laying crane (10) is located, and a pulling rope (13) for the pipe section upper end is arranged on the winch (12); One end of the pulling rope (13) at the upper end of the pipe segment is connected to the hook of the pipe-laying crane (10), and the fixing mechanism (14) at the lower end of the pipe segment is provided with a pulling rope sleeved on the lower end of the pipe segment (11) to be suspended.

7. The inclined shaft structure of a pumped storage power station according to claim 5, characterized in that: The joint operation platform (15) is anchored at the hole opening of the construction hole (7) via an anchor rod (16).

8. A method for installing steel pipes in the inclined shaft of a pumped storage power station, characterized in that The following steps are involved: 1) The pipe-laying crane (10) enters the site and lifts the water diversion steel pipe (8); 2) arranging a winch (12) and a pipe segment lower end fixing mechanism (14) on the ground, pulling a crane (10) hook through a pipe segment upper end pulling rope (13) on the winch (12), and fixing the lower part of the pipe segment (11) to be hoisted through the pipe segment lower end fixing mechanism (14); 3) The pipe-laying crane (10) gradually lowers the pipe so that the lower end of the water diversion steel pipe (8) moves downward to near the upper end of the inclined shaft extension section (4). During this process, the winch (12) gradually reels in so that the pipe section (11) to be lowered is tilted to the same inclination as the inclined shaft (1); 4) The pipe-laying crane (10) and the winch (12) continue to cooperate to allow the water-conducting steel pipe (8) to enter the inclined shaft (1) until the lower end of the pipe section (11) to be suspended moves to the opening of the construction hole (7), and the upper steel pipe pulling rope (17) on the joint operation platform (15) is sleeved around the lower end of the pipe section (11) to be suspended. The pipe section (11) to be suspended is continued to be suspended by the pipe-laying crane (10) until the midpoint of the pipe section (11) to be suspended is located below the opening of the construction hole (7), and then the lifting hook of the pipe-laying crane (10) is removed and the pipe section (11) is slowly lowered to the opening of the next construction hole (7) by its own weight; 5) Repeat the above steps to sequentially complete the hanging and placing of multiple sections of water diversion steel pipes (8); 6) After being hoisted into place, the lower steel pipe pulling rope (18) on the joint working platform (15) at the opening of the construction hole (7) is used to tighten the upper end of the pipe section below the steel pipe joint (9), and the upper steel pipe pulling rope (17) and the lower steel pipe pulling rope (18) are ensured to be tensioned, so that the steel pipe joints (9) are aligned with each other, and the connection and installation of the steel pipe joints (9) are carried out through the joint working platform (15).

9. A method for installing and constructing steel pipes in an inclined shaft of a pumped storage power station according to claim 8, characterized in that: The TBM equipment initiated from the upper end of the inclined shaft extension section (4) is recovered through the dismantling hole (5) at the lower end of the inclined shaft extension section (4) and transported out through the elevator shaft (6).

10. A method for installing and constructing steel pipes in an inclined shaft of a pumped storage power station according to claim 8, characterized in that: The construction hole (7) located at the top is flush with the upper flat section (3) connected to the upper reservoir, so as to carry out the installation construction of the elbow part of the water diversion steel pipe (8).

Citation Information

Patent Citations

  • Structure adopting hydropower station pressure pipeline construction adit as maintenance access and construction method

    CN110685256A

  • Water diversion system of pumped storage power station and construction method of water diversion system

    CN116201084A

  • Single-side deflecting horizontal directional drilling pipeline construction method

    CN116255504A

  • TBM-based water diversion inclined shaft arrangement structure of pumped storage power station and construction method

    CN117552390A

  • Diversion well hydraulic power plant

    RU2431015C1