Method for supporting construction formwork of retaining wall between piles
The up and down sliding construction of the retaining wall formwork is realized through the guide rail system, which solves the problems of inconvenient operation of the formwork and low construction efficiency in the existing technology, and improves the construction efficiency and operation convenience.
Patent Information
- Application Number
- CN202411189711.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-09-11
AI Technical Summary
The existing retaining wall formwork is inconvenient to operate during the construction process, has low construction efficiency, and requires frequent dismantling and installation.
Using a guide rail system, the formwork slides from top to bottom, and is fixed on the piles using the side rails and middle rails of the guide rails. The length of the formwork is equal to the length of the retaining wall, and the height is less than 1/3 of the pile height. The first fixed position is at the top row of retaining walls. , the fixed position of each time is determined according to the distance of the lower retaining wall, and the formwork slides along the guide rail to the next position for construction.
It reduces the frequency of formwork removal and installation, improves construction efficiency, and makes formwork operation more convenient.
Smart Images

Figure CN118774170A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of retaining wall construction, and in particular to a method for supporting a formwork for retaining wall construction between piles. Background Art
[0002] Retaining walls are usually set between two piles to retain soil or water. Due to the large distance between the piles, the soil between the piles (such as sand, pebbles, gravel, etc.) is more easily eroded in the presence of water. Therefore, a solution is designed to cast a concrete retaining wall between the piles. However, since this part can only be supported on one side, and since the concrete is a wall poured from top to bottom, the formwork system is also supported from top to bottom.
[0003] During the construction process of retaining wall formwork in the prior art, the formwork is usually removed after the construction of the upper row of retaining walls is completed, and then the formwork is installed at the construction position of the lower row of retaining walls, and this process is repeated until the construction of all retaining walls is completed.
[0004] During the construction process, the formwork needs to be frequently removed and installed. Therefore, the retaining wall formwork in the prior art has technical problems of inconvenient operation and low construction efficiency during the construction process. Summary of the invention
[0005] The invention provides a method for supporting a retaining wall construction formwork between piles, which solves the technical problems of inconvenient operation and low construction efficiency of retaining wall formwork in the prior art during construction.
[0006] Some implementation plans adopted to solve the above technical problems include: A method for supporting formwork for construction of a retaining wall between piles, comprising the following steps: Determine the distance between piles, determine the length of the retaining wall according to the distance between piles, and determine the length of the template according to the length of the retaining wall, wherein the length of the template is equal to the length of the retaining wall; Determine the height of the pile, and determine the height of the retaining wall according to the height of the pile, wherein the height of the retaining wall is less than 1 / 3 of the height of the pile, and determine the height of the template according to the height of the retaining wall; Determining a fixed position of the guide rail on the pile, wherein the installation position of the guide rail on the pile is determined according to the length of the template; Determine the first fixed position of the template, install the template on the guide rail on the pile, and determine the first fixed position of the template according to the position of the uppermost row of retaining walls; Determine the secondary fixed position of the template. After the construction of the upper retaining wall is completed, determine the secondary fixed position of the template according to the distance between the lower retaining wall and the upper retaining wall, and complete the construction of all retaining walls in sequence, wherein the template slides from the primary fixed position to the secondary fixed position, and slides to all the secondary fixed positions in sequence.
[0007] Preferably, the secondary fixed position of the template is determined after the construction of the upper retaining wall is completed, and the secondary fixed position of the template is determined according to the distance between the lower retaining wall and the upper retaining wall. After the construction of the upper retaining wall is completed, the actual position of the upper retaining wall is measured first, and then the secondary fixed position of the template is determined according to the measured actual position of the upper retaining wall and the distance between the upper retaining wall and the lower retaining wall, wherein the lower retaining wall is the retaining wall to be constructed.
[0008] Preferably, the template slides from the primary fixed position to the secondary fixed position. After the retaining wall formed at the primary fixed position is solidified, the template is released to slide downward along the guide rail to the secondary fixed position, and then the template is fixed to the secondary fixed position.
[0009] Preferably, the device slides to all the secondary fixed positions in sequence, and then slides to the next secondary fixed position after the retaining wall currently under construction is solidified.
[0010] Preferably, the guide rail comprises a side rail and a middle rail, there are two side rails, all the middle rails are located between the two side rails, and the templates are respectively provided with sliding grooves cooperating with the guide rails.
[0011] Preferably, the guide rail comprises a mounting portion mounted on the pile and a positioning portion for positioning the template, wherein the template is located between the retaining wall and the positioning portion.
[0012] Preferably, the cross-section of the side rail is L-shaped.
[0013] Preferably, the cross-sectional shape of the middle rail is T-shaped.
[0014] Preferably, the guide rail is fixed to the pile by means of pegs.
[0015] Preferably, the guide rail is also provided with a positioning pin for positioning the template, and both the guide rail and the template are provided with a positioning hole that cooperates with the positioning pin.
[0016] Compared with the prior art, the present invention has the following advantages: The present invention sets a guide rail. During the construction of the retaining wall, the construction is carried out from top to bottom, that is, after the retaining wall at the top is solidified, the retaining wall below is constructed, that is, concrete is poured. After the upper retaining wall is solidified, the template is slid downward to the construction position of the lower retaining wall, and then the lower retaining wall is constructed. This construction method does not require frequent installation and removal of the template, greatly improves the construction efficiency, and the template is easy to operate. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] For the purpose of explanation, several embodiments of the present invention technology are described in the following drawings. The following drawings are incorporated into this text and constitute a part of the specific embodiment. In some cases, well-known structures and components are shown in block diagram form to avoid obscuring the concept of the present invention subject technology.
[0018] Figure 1 It is a flow chart of the present invention.
[0019] Figure 2 Schematic diagram of the application scenario of retaining wall.
[0020] Figure 3 This is a schematic diagram of the retaining wall construction.
[0021] Figure 4 Schematic diagram of the middle track in the guide rail.
[0022] Figure 5 Schematic diagram of the side track in the guide rail.
[0023] Figure 6 Schematic diagram of the pile.
[0024] As shown in the figure: 1. Piles, 2. Retaining wall, 3. Guide rails, 4. Formwork, 5. Pile nails. DETAILED DESCRIPTION
[0025] The specific embodiments shown below are intended to be descriptions of various configurations of the subject technology of the present invention, and are not intended to represent the only configuration that the subject technology of the present invention can be put into practice. The specific embodiments include specific details intended to provide a thorough understanding of the subject technology of the present invention. However, it will be clear and obvious to those skilled in the art that the subject technology of the present invention is not limited to the specific details shown herein, and can be put into practice without these specific details.
[0026] It can be understood that, in this document, relational terms such as “first” and “second” are intended to distinguish one entity or operation from another entity or operation, and are not intended to express or imply any actual relationship or order between these entities or operations.
[0027] The terms "comprises," "comprising," or any other variation thereof are intended to encompass non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus. In the absence of further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article, or apparatus that includes the element.
[0028] Reference Figures 1 to 6 As shown, a method for supporting formwork for construction of a retaining wall between piles comprises the following steps: Determine the distance between piles, determine the length of the retaining wall 2 according to the distance between piles, and determine the length of the template 4 according to the length of the retaining wall 2, wherein the length of the template 4 is equal to the length of the retaining wall 2; Determine the height of the pile 1, and determine the height of the retaining wall 2 according to the height of the pile 1, wherein the height of the retaining wall 2 is less than 1 / 3 of the height of the pile 1, and determine the height of the template 4 according to the height of the retaining wall 2; Determine the fixed position of the guide rail 3 on the pile 1, wherein the installation position of the guide rail 3 on the pile 1 is determined according to the length of the template 4; Determine the first fixed position of the template 4, install the template 4 on the guide rail 3 on the pile 1, and determine the first fixed position of the template 4 according to the position of the uppermost row of the retaining wall 2; Determine the secondary fixed position of the template 4. After the construction of the upper retaining wall 2 is completed, determine the secondary fixed position of the template 4 according to the distance between the lower retaining wall 2 and the upper retaining wall 2, and complete the construction of all retaining walls 2 in sequence, wherein the template 4 slides from the primary fixed position to the secondary fixed position, and slides to all the secondary fixed positions in sequence.
[0029] In some embodiments, the secondary fixed position of the template 4 is determined after the construction of the upper retaining wall 2 is completed, and the secondary fixed position of the template 4 is determined according to the distance between the lower retaining wall 2 and the upper retaining wall 2. After the construction of the upper retaining wall 2 is completed, the actual position of the upper retaining wall 2 is measured first, and then the secondary fixed position of the template 4 is determined according to the measured actual position of the upper retaining wall 2 and the distance between the upper retaining wall 2 and the lower retaining wall 2. The lower retaining wall 2 is the retaining wall 2 to be constructed.
[0030] Reference Figures 1 to 6 As shown, in some embodiments, the template 4 slides from the primary fixed position to the secondary fixed position. After the retaining wall 2 formed at the primary fixed position is solidified, the template 4 is released to slide downward along the guide rail 3 to the secondary fixed position, and then the template 4 is fixed to the secondary fixed position.
[0031] The device slides to all the secondary fixed positions in sequence, and then slides to the next secondary fixed position after the retaining wall 2 currently under construction is solidified.
[0032] In some embodiments, the guide rail 3 includes a side rail and a middle rail, there are two side rails, all the middle rails are located between the two side rails, and the templates 4 are respectively provided with sliding grooves that cooperate with the guide rails 3.
[0033] In some embodiments, the guide rail 3 includes a mounting portion mounted on the pile 1 and a positioning portion for positioning the template 4, wherein the template 4 is located between the retaining wall 2 and the positioning portion.
[0034] The cross-sectional shape of the side rail is L-shaped.
[0035] The cross-section of the middle rail is T-shaped.
[0036] In some embodiments, the guide rail 3 is fixed to the pile 1 via pegs 5 .
[0037] The guide rail 3 is also provided with a positioning pin for positioning the template 4, and both the guide rail 3 and the template 4 are provided with a positioning hole that cooperates with the positioning pin.
[0038] A specific application example: Reference Figures 1 to 6 As shown, the retaining wall 2 is usually set between two piles 1, and the construction sequence is usually from top to bottom, that is, the retaining wall 2 at the higher position is solidified before the retaining wall 2 at the lower position is constructed. This creates conditions for the slide rail formwork method, which is to install "┰"-shaped slide rails on both sides of each pile 1, and then install steel formwork 4 between the slide rails. After one piece is constructed, the steel formwork 4 continues to move down to construct the next piece, and so on, until all the concrete is completed.
[0039] Specifically: Determine the distance between piles, determine the length of the retaining wall 2 according to the distance between piles, and determine the length of the template 4 according to the length of the retaining wall 2, wherein the length of the template 4 is equal to the length of the retaining wall 2; according to the construction requirements, measure the distance between the two piles 1, and design the length of the retaining wall 2 according to the distance between the two piles 1, that is, the length of the retaining wall 2 located between the two piles 1, and then design the length of the template 4 according to the length of the retaining wall 2. Reinforcing ribs may be provided on the template 4 to prevent deformation of the template 4, and the reinforcing ribs may be provided in a grid shape on the outside of the template 4.
[0040] Determine the height of the pile 1, and determine the height of the retaining wall 2 according to the height of the pile 1, wherein the height of the retaining wall 2 is less than 1 / 3 of the height of the pile 1, and determine the height of the template 4 according to the height of the retaining wall 2. Measure the height of the pile 1, that is, the total height of the retaining wall 2. The retaining wall 2 consists of several components, and its total height is the sum of the heights of all retaining walls 2. Then, determine the height of each retaining wall 2 according to geological conditions. After the height of each retaining wall 2 is determined, the height of the template 4 can be determined according to the height of each retaining wall 2. After the length and height of the template 4 are determined, the overall size of the template 4 is obtained. The thickness of the template 4 can be freely determined according to actual needs, as long as the strength meets the requirements.
[0041] The fixing position of the guide rail 3 on the pile 1 is determined, wherein the installation position of the guide rail 3 on the pile 1 is determined according to the length of the template 4; the guide rail 3 is fixed to the pile 1 by means of the pile nails 5. The side rails and the middle rails are both fixed to the pile 1 by means of the pile nails 5. The pile nails 5 may be expansion screws or the like.
[0042] The first fixed position of the template 4 is determined, and the template 4 is installed on the guide rail 3 on the pile 1. The first fixed position of the template 4 is determined according to the position of the uppermost row of the retaining wall 2; the first fixed position is the position of the retaining wall 2 at the highest point, which is determined according to the construction requirements and the height of the pile 1. The template 4 can be positioned at an appropriate position on the guide rail 3 by using a positioning pin. After the template 4 is fixed, concrete is poured, and the uppermost row of retaining walls 2 is obtained after the concrete solidifies.
[0043] Determine the secondary fixed position of the template 4. After the construction of the upper retaining wall 2 is completed, determine the secondary fixed position of the template 4 according to the distance between the lower retaining wall 2 and the upper retaining wall 2, and complete the construction of all retaining walls 2 in sequence, wherein the template 4 slides from the primary fixed position to the secondary fixed position, and slides to all the secondary fixed positions in sequence. After the uppermost retaining wall 2 solidifies, release the positioning pins of the positioning template 4, and then slide the template 4 downward. According to the design position of the lower retaining wall 2 and the actual position of the upper retaining wall 2, the construction position of the lower retaining wall 2 can be determined. After the template 4 slides to the construction position of the lower retaining board, the position of the template 4 is fixed by the positioning pins, and concrete is poured in the lower retaining wall 2. Complete the construction of all retaining walls 2 in sequence according to the above steps.
[0044] According to the above introduction, the template 4 in the present invention does not need to be removed or installed, and only needs to be slid along the guide rail 3, so that the template 4 is very convenient to operate and the construction efficiency is improved.
[0045] The above describes the subject technical solution and corresponding details of the present invention. It can be understood that the above description is only some implementation plans of the subject technical solution of the present invention, and some details may be omitted during the specific implementation.
[0046] In addition, in some embodiments of the above invention, multiple embodiments may be implemented in combination, and various combinations are not listed one by one due to space limitations. Those skilled in the art can freely combine and implement the above embodiments as needed in specific implementation to obtain a better application experience.
[0047] When implementing the subject technical solution of the present invention, those skilled in the art can obtain other detailed configurations or drawings based on the subject technical solution of the present invention and the drawings. Obviously, these details still fall within the scope covered by the subject technical solution of the present invention without departing from the subject technical solution of the present invention.
Claims
1. A method for supporting formwork for retaining wall construction between piles, characterized in that: The method comprises the following steps: determining the distance between piles, determining the length of the retaining wall (2) according to the distance between piles, determining the length of the template (4) according to the length of the retaining wall (2), wherein the length of the template (4) is equal to the length of the retaining wall (2); determining the height of the pile (1), determining the height of the retaining wall (2) according to the height of the pile (1), wherein the height of the retaining wall (2) is less than 1 / 3 of the height of the pile (1), and determining the height of the template (4) according to the height of the retaining wall (2); determining the fixed position of the guide rail (3) on the pile (1), wherein the position of the guide rail (3) on the pile is determined according to the length of the template (4). (1); determining a primary fixing position of the template (4), installing the template (4) on the guide rail (3) on the pile (1), and determining the primary fixing position of the template (4) according to the position of the uppermost row of the retaining walls (2); determining a secondary fixing position of the template (4), after the construction of the upper row of retaining walls (2) is completed, determining the secondary fixing position of the template (4) according to the distance between the lower row of retaining walls (2) and the upper row of retaining walls (2), and completing the construction of all retaining walls (2) in sequence, wherein the template (4) slides from the primary fixing position to the secondary fixing position, and slides to all the secondary fixing positions in sequence.
2. The method for supporting formwork for retaining wall construction between piles according to claim 1, characterized in that: The secondary fixed position of the template (4) is determined, after the construction of the upper retaining wall (2) is completed, based on the distance between the lower retaining wall (2) and the upper retaining wall (2), the secondary fixed position of the template (4) is determined. After the construction of the upper retaining wall (2) is completed, the actual position of the upper retaining wall (2) is first measured, and then the secondary fixed position of the template (4) is determined based on the measured actual position of the upper retaining wall (2) and the distance between the upper retaining wall (2) and the lower retaining wall (2), wherein the lower retaining wall (2) is the retaining wall (2) to be constructed.
3. The method for supporting formwork for retaining wall construction between piles according to claim 1, characterized in that: The template (4) slides from the primary fixed position to the secondary fixed position. After the retaining wall (2) formed at the primary fixed position is solidified, the template (4) is loosened to allow the template (4) to slide downward along the guide rail (3) to the secondary fixed position, and then the template (4) is fixed to the secondary fixed position.
4. The method for supporting formwork for retaining wall construction between piles according to claim 1, characterized in that: The device slides to all the secondary fixed positions in sequence, and then slides to the next secondary fixed position after the retaining wall (2) that has been completed and solidifies.
5. The method for supporting formwork for retaining wall construction between piles according to claim 1, characterized in that: The guide rail (3) comprises a side rail and a middle rail, there are two side rails, all the middle rails are located between the two side rails, and the templates (4) are respectively provided with sliding grooves that cooperate with the guide rails (3).
6. The method for supporting formwork for retaining wall construction between piles according to claim 5, characterized in that: The guide rail (3) comprises a mounting portion mounted on the pile (1) and a positioning portion for positioning the template (4), wherein the template (4) is located between the retaining wall (2) and the positioning portion.
7. The method for supporting formwork for retaining wall construction between piles according to claim 6, characterized in that: The cross-sectional shape of the side rail is L-shaped.
8. The method for supporting formwork for retaining wall construction between piles according to claim 6, characterized in that: The cross-section of the middle rail is T-shaped.
9. The method for supporting formwork for retaining wall construction between piles according to claim 1, characterized in that: The guide rail (3) is fixed to the pile (1) via pile nails (5).
10. The method for supporting formwork for retaining wall construction between piles according to claim 1, characterized in that: The guide rail (3) is also provided with a positioning pin for positioning the template (4), and both the guide rail (3) and the template (4) are provided with a positioning hole that cooperates with the positioning pin.
Citation Information
Patent Citations
Casting method for concrete wall and special mould thereof
CN102383599A
Reinforcing structure of existing retaining wall and construction method of reinforcing structure
CN111636472A
Portable retaining wall construction formwork
CN208748682U
Construction of retaining wall by drain side-ditch
JP1985059233A
Step-fitting device for concrete form
JP1994285838A