Static load test counter-force device for pull rod type steel bar pile-loading foundation pile

By designing a tie-rod type steel bar pile-loaded foundation pile static load test reaction device, using existing engineering piles and on-site steel bars, the problem of insufficient number of anchor piles and small space was solved, cost reduction, construction simplification and test efficiency improvement were achieved, adapting to It has strong performance and is suitable for high-speed railway foundation pile detection.

CN118774183APending Publication Date: 2024-10-15CNNC SURVEY DESIGN & RES CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410874254.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing foundation pile static load test reaction force devices have problems such as high cost, complicated installation, and poor test accuracy. Especially in the detection of high-speed railway foundation piles, it is difficult to achieve effective reaction force distribution when the number of anchor piles is insufficient and the site is small. and load control.

Method used

A tie-rod type steel bar pile-loaded foundation pile static load test reaction device is designed, which uses existing engineering piles as anchor piles, forms a load-bearing area through jacks, main beams, auxiliary beams and pressure steel groups, and uses on-site steel bars as the load-bearing materials, simplifying the construction process and reducing material costs. The load size can be flexibly adjusted through the adjustment mechanism to adapt to different test needs.

Benefits of technology

It reduces the construction cost of additional anchor piles, reduces material costs, simplifies the construction process, improves test efficiency, has strong adaptability, can effectively solve the problems of insufficient number of anchor piles and small space, and improves the accuracy and efficiency of the test.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774183A_ABST
    Figure CN118774183A_ABST
Patent Text Reader

Abstract

The invention discloses a pull rod type reinforcing steel bar pile-loading foundation pile static load test counter-force device, and relates to the technical field of foundation pile compression resistance static load tests, the pull rod type reinforcing steel bar pile-loading foundation pile static load test counter-force device comprises a test pile, a jack, an anchor pile, a main beam and an auxiliary beam, the jack is installed on a steel bracket on the test pile, and the upper portion of the jack abuts against the lower surface of the main beam through the steel bracket; anchor bars are respectively hung at the left and right ends of the main beam; the bottoms of the anchor bars are fixedly connected with anchor piles; the main and auxiliary beams are perpendicularly arranged in the middle of the upper surface of the main beam, the balance structure is fixedly installed at the near end of the main and auxiliary beams, the auxiliary and auxiliary beams are installed at the far end of the main and auxiliary beams, a series of upper pressure steel sets are evenly fixed to the auxiliary and auxiliary beams, and a series of lower pressure steel sets are arranged at the corresponding positions of the upper surface of a sleeper on the ground. A front pull rod and a rear pull rod are symmetrically and fixedly installed at the front and rear ends of the upper pressure steel set correspondingly. Existing engineering piles can be fully utilized as anchor piles, local materials are used, on-site reinforcing steel bars are used for pile loading, the site excavation workload is small, the cost is saved, and the pile loading time is short.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of static load test of pile compression resistance, and in particular relates to a static load test reaction force device of a pull rod type steel bar pile. Background Art

[0002] In construction projects, it is necessary to conduct static load compression tests on samples of piles driven into the ground to verify the vertical compressive bearing capacity of a single pile, which provides an important reference for construction projects. In static load tests, the load acting on the piles is generally provided by the reaction device above the main beam. During the test, the jack works, its piston rises, and the upward force acts on the piles through the welded steel bars and the downward force acts on the supporting anchor piles through the main beam to form a step-by-step force balance. The ease of use of the reaction device directly affects the process and results of the test. The commonly used reaction devices include precast concrete block reaction devices, artificial sandbag reaction devices, anchor pile reaction devices, anchor rod reaction devices, etc.

[0003] However, the production and transportation costs of precast concrete block reaction devices are high, and there are certain requirements for the test site; the position and number of anchor piles in the anchor pile reaction device affect the distribution and size of the reaction force, resulting in asymmetric reaction force. The load size is not easy to control during installation, and overshoot is prone to occur, affecting the accuracy of the test; the load gravity of the artificial sandbag reaction device must be no less than 1.2 times the estimated ultimate load of the test pile, and the amount of loading material is large; the fixation and stability of the anchor rod in the anchor pile beam reaction device affects the transmission and distribution of the reaction force. The load centering is difficult to control during installation, and the disturbance of the soil between the piles will also affect the test piles.

[0004] The present invention proposes a tension rod type steel bar pile static load test reaction device, which can be used when the number of anchor piles is insufficient. It is mainly used for static load test of high-speed railway piles. The piles of high-speed railway are distributed along the line. The pier piles are mostly 8 or 10 piles distributed in two rows (such as Figure 6 As shown), the foundation pit depth is mostly 6-8m; if prefabricated concrete block reaction device is used, the site is small and it is not suitable; if anchor piles are used, the number of anchor piles is insufficient. Summary of the invention

[0005] In view of the defects and problems existing in the prior art, the present invention provides a tension rod type steel bar pile static load test reaction force device.

[0006] The solution adopted by the present invention to solve the technical problem is: a pull-rod type steel bar pile static load test reaction device, including a test pile, a jack, an anchor pile, a main beam, an adjustment mechanism and a sub-beam, the jack is installed on a steel bracket on the test pile, the upper part of the jack is supported on the lower surface of the main beam through the steel bracket, the left and right ends of the main beam are respectively hung with anchor bars, and the bottom of the anchor bars is welded and fixed to the anchor pile outside the test pile; the sub-beam includes a main sub-beam and an auxiliary sub-beam, the main sub-beam is vertically arranged in the middle of the upper surface of the main beam, and a balancing structure is placed on the proximal top surface of the main sub-beam, and the balancing structure It is connected to the upper surface of the anchor pile near the test pile through anchor bars; the auxiliary sub-beam is installed on the far end top surface of the main sub-beam, and the auxiliary sub-beam is arranged parallel to the balance structure; a series of upper pressure steel groups are evenly fixed on the auxiliary sub-beam, and a series of lower pressure steel groups are arranged at corresponding positions on the upper surface of the sleepers on the ground; the front and rear ends of the upper pressure steel groups are symmetrically fixed with front tie rods and rear tie rods respectively; each tie rod extends vertically downward and is fixedly connected to the lower pressure steel group respectively, so that the auxiliary sub-beam, each front tie rod, each rear tie rod and the lower pressure steel group together enclose a loading area; bundles of steel bars are placed in the loading area.

[0007] Furthermore, the main and auxiliary beams are arranged in a cross shape with the main beam, and a balancing structure is fixed on the proximal ends of the main and auxiliary beams. The balancing structure includes an auxiliary beam and a saddle symmetrically placed on the upper part of the auxiliary beam. The saddle is vertically fixed above the proximal ends of the main and auxiliary beams, and anchor bars are symmetrically hung on the saddle. The anchor bars extend vertically downward and are fixedly connected to the anchor piles at the bottom.

[0008] Furthermore, the upper pressure steel group is composed of two upper I-beams with the same structure, the two upper I-beams are welded together up and down by steel bars with a diameter of 22 mm, and an installation gap is left between the two upper I-beams, and an upper pad with a side length of 250 mm and a thickness of 25 mm is fixed at the installation gap on the upper surface of the two upper I-beams, and the upper pad is provided with a through hole, and the front and rear pull rods pass through the installation gap upward, and continue to extend upward out of the through hole of the upper pad and weld the pull rods to the through hole and fix them.

[0009] Furthermore, the lower pressure steel group is composed of two lower I-beams with the same structure. The two lower I-beams are welded together up and down by steel bars with a diameter of 22 mm, and an installation gap is also left between the two lower I-beams. A lower pad is welded and fixed in the installation gap between the two lower I-beams. The upper surface of the lower pad is welded and fixed to the inner top surfaces of the two lower I-beams, and the lower pad is also provided with a through hole. After the front and rear pull rods pass downward through the installation gap, they continue to extend downward out of the through holes of the lower pad, and the pull rods are welded and fixed to the through holes.

[0010] Furthermore, the pull rod is composed of two sections of threaded steel fixed together by high-strength bolts, and the front pull rod and the rear pull rod have the same structure.

[0011] Compared with the prior art, the present invention has the following beneficial effects: The pull rod type steel bar loaded pile static load test reaction device provided by the present invention utilizes existing engineering piles as anchor piles, thus reducing the construction cost of additional anchor piles, and uses on-site steel bars as loading materials, thus reducing material costs; local materials are used, thus reducing the need for large-scale excavation of the site and simplifying the construction process; the loading time is short, thus accelerating the progress of the test and improving the efficiency of the project; the load borne on the main beam can be flexibly adjusted through the adjustment mechanism to meet different test requirements; a clear loading area is formed through the design of auxiliary beams, various pull rods and pressure steel groups, which is convenient for placing and fixing bundles of steel bars required for the test; it is allowed to adapt to different test pile sizes and test requirements, and has good versatility and adaptability; the present invention effectively solves the problem that the number of engineering piles as anchor piles is insufficient and the foundation pit area is small, making it unsuitable to use a precast concrete block reaction device. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention; Figure 2 It is a front view structural schematic diagram of the auxiliary sub-beam of the present invention; Figure 3 It is a front view structural schematic diagram of the saddle of the present invention; Figure 4 This is a schematic diagram of the installation structure of the stacking area of ​​the present invention; Figure 5 It is a schematic diagram of the internal structure of the pressure steel group and the pull rod of the present invention; Figure 6 Schematic diagram of pile piers; Figure (a) is a schematic diagram of an 8-pile pier, and Figure (b) is a schematic diagram of a 10-pile pier.

[0013] In the figure: 1-test pile, 2-anchor pile, 3-jack, 4-main beam, 5-main and auxiliary beam, 6-saddle, 7-auxiliary and auxiliary beam, 8-upper pressure steel group, 9-rear tie rod, 10-bundled steel bars, 11-sleepers, 12-anchor bars, 13-steel bracket, 20-loading area, 21-upper I-beam, 22-high-strength bolts, 23-upper pad, 24-threaded steel, 25-lower pressure steel group, 26-front tie rod, 27-lower I-beam, 28-lower pad. DETAILED DESCRIPTION

[0014] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0015] Example 1: Figure 1-5As shown, this embodiment provides a pull-rod type steel bar pile static load test reaction device, which can make full use of existing engineering piles as anchor piles, use local materials, use on-site steel bars as load, reduce the workload of site excavation, save costs, and shorten the loading time. The device includes a test pile 1, a jack 3, an anchor pile 2, a main beam 4 and a secondary beam, etc., wherein the anchor pile piers are evenly distributed on the outside of the test piles, and are distributed in a row, such as Figure 6 The actual engineering site shown includes 8-pile piers and 10-pile piers. Figure 1 As shown, a steel bracket 13 is fixed on the upper surface of the test pile 1, and a jack 3 is fixedly installed on the top surface of the steel bracket. The upper part of the jack is supported on the middle part of the lower surface of the main beam 4 through the steel bracket. A series of anchor bars 12 are symmetrically hung on the left and right sides of the main beam. The anchor bars are symmetrically hung on the left and right ends of the main beam and extend downward. The bottom of the anchor bars is welded and fixed to the anchor pile 2 on the ground.

[0016] like Figure 1 and Figure 2 As shown, a trapezoidal boss structure is formed on the upper surface of the main beam 4, and a sub-beam is vertically arranged at the center of the top surface of the structure. The sub-beam is stably suspended at the center of the top of the main beam through lifting equipment, etc. The sub-beam includes a main sub-beam 5 and an auxiliary sub-beam 7. The main sub-beam 5 and the main beam 4 are arranged in a cross shape, and a balancing structure is placed on the proximal end of the main sub-beam 5. In this embodiment, the balancing structure is an auxiliary beam and a saddle 6 symmetrically placed on the upper part of the auxiliary beam. The auxiliary beam is placed at one end of the main sub-beam 5 close to the anchor pile, and its direction is consistent with the center line of the anchor pile. A saddle is placed on the upper part of each side, and the center of the saddle is centered on the center of the lower anchor pile. Anchor bars are symmetrically suspended on the saddle, and the anchor bars extend vertically downward and are welded and fixed to the anchor pile at the bottom, and the length and size of the auxiliary beam are the same as the auxiliary sub-beam 7.

[0017] The auxiliary sub-beam 7 is installed at the far end of the main sub-beam symmetrical to the saddle 6 structure. Figure 1-4 As shown, a series of upper pressure steel groups 8 are vertically welded to the upper surface of the auxiliary sub-beam, and a series of lower pressure steel groups 25 are provided on the upper surface of the sleepers 11 on the ground at positions corresponding to the upper pressure steel groups; front and rear ends of the upper pressure steel groups are symmetrically fixedly installed with front tie rods 26 and rear tie rods 9, and each tie rod extends vertically downward and is fixedly connected to the lower pressure steel groups 25 respectively.

[0018] like Figure 4 and Figure 5 As shown, the upper pressure steel group is composed of two upper I-beams 21 with the same structure. The two upper I-beams are welded together up and down by steel bars with a diameter of 22 mm, and an installation gap is left between the two upper I-beams. An upper pad 23 with a side length of 250 mm and a thickness of 25 mm is fixed at the installation gap on the upper surface of the two upper I-beams. The upper pad is provided with a through hole, and the front and rear pull rods pass through the installation gap upward, and continue to extend upward out of the through hole of the upper pad and weld the pull rod to the through hole and fix it.

[0019] Further, on the upper surface of the sleeper 11, at the vertical projection position of the upper pressure steel group 8, a lower pressure steel group 25 is provided, and the lower pressure steel group can have the same structure as the upper pressure steel group, or can be as follows: Figure 5 The structure shown in the figure is specifically composed of two lower I-beams 21 with the same structure. The two lower I-beams are welded together up and down by steel bars with a diameter of 22 mm, and an installation gap is also left between the two lower I-beams. A lower pad 28 is welded and fixed in the installation gap between the two lower I-beams. The upper surface of the lower pad is welded and fixed to the inner top surface of the two lower I-beams, and the lower pad is also provided with a through hole. The front and rear pull rods pass downward through the installation gap and continue to extend downward out of the through hole of the lower pad, and the pull rods are welded and fixed to the through hole, and bolts are respectively mounted on the pull rods outside the upper and lower pads, and the fastening between each upper and lower pull rod and the corresponding I-beam is further strengthened by screwing the bolts.

[0020] In this embodiment, the upper I-beam and the lower I-beam have the same structure, both of which are 220mm×112mm×9.5mm, 2.4m long I-beams, and the upper and lower surfaces of the two are welded together by a steel bar with a diameter of 22mm. The front and rear tie rods are respectively composed of two sections of threaded steel bars 24 with a length of 3m and a diameter of 32m fixed together by high-strength bolts, the high-strength bolts have a diameter of 70mm and a height of 200mm, and the front tie rod and the rear tie rod have the same structure, both of which are welded and fixed to the upper I-beam on the top and welded and fixed to the lower I-beam on the bottom, so that the auxiliary sub-beam 7, each front tie rod, each rear tie rod and the lower pressure steel group 25 together enclose a loading area 20, and bundles of steel bars 10 are placed in the loading area 20.

[0021] The present invention provides a tension rod type steel bar pile static load test reaction device, the weight of the bundled steel bars acts on the lower I-beam of the lower pressure steel group, and the weight of the steel bars can be transferred to the auxiliary beam through the tension rods connected to the upper and lower I-beams, and other anchor piles provide pull-out resistance, thereby forming a reaction device together. In this embodiment, six groups of pressure steel groups are respectively provided, and two tension rods are connected to each pressure steel group, correspondingly, twelve tension rods are provided in total. After actual field testing, the pull-out resistance of a single tension rod is 321kN, and the pull-out resistance that 12 tension rods can bear is 3852kN. The specific calculation process is as follows: Calculation of steel bar weight: For example, the design bearing capacity limit of a single test pile is 5000kN, and the reaction force provided is 1.2×5000=6000kN.

[0022] According to the principle of symmetry, the weight of the steel bar should be equal to the reaction force provided by two anchor piles. Anchor piles, 6000÷(2+4)=1000kN. Each anchor pile needs to provide a reaction force of 1000kN.

[0023] The weight of the steel bars required is 2×1000=2000kN=200t.

[0024] In the engineering piles of the present invention, four foundation piles can be used as anchor piles, such as Figure 1 As shown. The jack 3 is centered on the test pile and placed on the circular steel bracket on the test pile. A square steel bracket is installed on the jack 3 to place the main beam 4. The direction of the main beam 4 is consistent with the center line of the anchor pile. The main and auxiliary beams 5 are placed crosswise with the main beam on the upper part of the main beam 4. The center of the main and auxiliary beams 5 is centered on the test pile. After the main and auxiliary beams 5 are placed, they are welded and fixed up and down with steel bars and engineering pile steel bars near the test pile and the main and auxiliary beams 5. The auxiliary beam is placed at one end of the main and auxiliary beams 5 close to the anchor pile, and its direction is consistent with the center line of the anchor pile. A saddle is placed on the upper part of each side, and the center of the saddle is centered on the center of the lower anchor pile. The auxiliary and auxiliary beams 7 are symmetrically placed at the other end of the main and auxiliary beams 5. The two ends of the main beam 4 are welded and fixed with steel bars and anchor pile steel bars, the saddle is welded and fixed with steel bars and anchor pile steel bars, and the auxiliary and auxiliary beams 7 are fixed with tie rod type loading steel bars.

[0025] During the test, an area occupied by the tie-rod type steel bar load is excavated on one side of the test pile, sleepers and lower pressure steel group are placed, bottom tie rods are inserted at corresponding positions, and protected with steel pipes. Then bundles of steel bars are hoisted according to the load tonnage, and the jacks, main beams, secondary beams, saddles, upper I-beams and tie rods are steadily installed in sequence according to the above structure through hoisting equipment. Anchor bars are hung on the main beam and saddle respectively, and their bottoms are welded and fixed to the anchor piles. Testing instruments and equipment are installed near the jacks for pressure testing.

[0026] After all the devices are installed, the static load test is started, and the vertical compressive bearing capacity test value of the single pile is tested by the slow maintenance load method. The maximum load of the test is determined according to the design requirements. The loading is carried out in nine levels, and the graded load is 1 / 10 of the maximum load, of which the first level is twice the graded load. Unloading is carried out in five levels, and the unloading amount of each level is twice the graded load during loading. The static load tester applies graded loads to the main beam by controlling the jack to press upward according to the set parameters, and automatically records the displacement and load value of the test pile; when the graded load reaches the stability standard after application, the lower load application test is automatically carried out until the set maximum load; after reaching the maximum load and meeting the stability standard, the static load tester automatically performs the unloading test according to the set parameters. After the test, the collected data is analyzed to evaluate the bearing capacity and deformation characteristics of the test pile. In addition, if the reaction force of the entire device is not enough, the steel bars can be piled in the loading area of ​​the device, and the anchor pile plus counterweight can be used to solve it.

[0027] The pull rod type steel bar loaded pile static load test reaction device provided by the present invention reduces the construction cost of additional anchor piles by utilizing existing engineering piles as anchor piles, and uses on-site steel bars as loads, further reducing material costs, allowing quick installation and disassembly, facilitating site recovery after the test, and allowing it to adapt to different test pile sizes and test requirements, and has good versatility and adaptability.

[0028] The above description is only a preferred embodiment of the present invention and does not limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A static load test reaction device for tension rod type steel bar piles. Features: The invention comprises a test pile (1), a jack (3), an anchor pile (2), a main beam (4) and a sub-beam, wherein the jack is mounted on a steel bracket 13 on the test pile, the upper part of the jack is supported on the lower surface of the main beam (4) through the steel bracket, the left and right ends of the main beam are respectively hung with anchor bars (12), the bottom of the anchor bars is welded to the anchor pile (2) outside the test pile; the sub-beam comprises a main sub-beam (5) and an auxiliary sub-beam (7), the main sub-beam (5) is vertically mounted in the middle of the upper surface of the main beam, and the proximal top surface of the main sub-beam is provided with a balancing structure, which is connected to the upper surface of the anchor pile near the test pile through the anchor bars; The auxiliary sub-beam (7) is symmetrically mounted on the top of the far end of the main sub-beam, and the auxiliary sub-beam is arranged in parallel with the balance structure; A series of upper pressure steel groups (8) are evenly fixed on the auxiliary sub-beam, and a series of lower pressure steel groups (25) are provided at corresponding positions on the upper surface of the sleepers (11) on the ground; front and rear ends of the upper pressure steel groups are symmetrically fixedly installed with front tie rods and rear tie rods; each tie rod extends vertically downward and is fixedly connected to the lower pressure steel group (25), so that the auxiliary sub-beam (7), each front tie rod, each rear tie rod and the lower pressure steel group (25) together form a loading area (20); bundles of steel bars are placed in the loading area.

2. According to claim 1, the static load test reaction device of the tension rod type steel bar pile load foundation, Features: The main and auxiliary beams (5) are arranged in a cross shape with the main beam (4), and a balancing structure is placed on the proximal ends of the main and auxiliary beams. The balancing structure comprises an auxiliary beam and a saddle (6) symmetrically placed on the upper part of the auxiliary beam. The saddle (6) is vertically fixed above the proximal ends of the main and auxiliary beams. Anchor bars are symmetrically hung on the saddles. The anchor bars extend vertically downward and are welded and fixed to anchor piles at the bottom.

3. The static load test reaction device for the tension rod type steel bar pile according to claim 1, Features: The upper pressure steel group is composed of two upper I-beams (21) of the same structure, the two upper I-beams are welded together up and down by steel bars with a diameter of 22 mm, and an installation gap is left between the two upper I-beams. An upper pad (23) with a side length of 250 mm and a thickness of 25 mm is fixed at the installation gap on the upper surfaces of the two upper I-beams. The upper pad is provided with a through hole, and the front and rear pull rods pass through the installation gap upward and continue to extend upward out of the through hole of the upper pad and are welded and fixed to the through hole.

4. The static load test reaction device for the tension rod type steel bar pile according to claim 1, Features: The lower pressure steel group is composed of two lower I-beams (21) of the same structure. The two lower I-beams are welded together up and down by steel bars with a diameter of 22 mm, and an installation gap is also left between the two lower I-beams. A lower pad (28) is welded and fixed in the installation gap between the two lower I-beams. The upper surface of the lower pad is welded and fixed to the inner top surfaces of the two lower I-beams, and a through hole is also opened on the lower pad. After the front and rear pull rods pass downward through the installation gap, they continue to extend downward out of the through hole of the lower pad, and the pull rods are welded and fixed to the through hole.

5. The static load test reaction device for the tension rod type steel bar pile according to claim 1, Features: The pull rod is composed of two sections of threaded steel (24) fixed together by high-strength bolts, and the front pull rod and the rear pull rod have the same structure.

Citation Information

Cited By

  • Loading device for static load test of steel structure frame body

    CN119000051A

  • Self-adaptive adjustable foundation pile static load test counterforce device and construction method

    CN121897032A