Building jacking device and construction method thereof

By using a combination device of inverted fixation, temporary support and pads during the building jacking process, the problem of the building jacking height exceeding the maximum stroke of the jacking jack is solved, achieving structural safety and quickly reaching the predetermined height with flexibility. and cost-effectiveness.

CN118774259APending Publication Date: 2024-10-15SHANGHAI CONSTRUCTION NO 7 (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411111193.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

In the process of building protection, there is a problem in how to quickly reach the building jacking height without compromising the safety of the structure, especially when the jacking height exceeds the maximum stroke of the jack.

Method used

A building jacking device is designed, which includes a jacking jack fixed upside down under the lifting beam, a temporary support set under the lifting beam, and a pad at the bottom of the jacking cylinder. It is fixed through inversion and synchronized stroke setting. Determine, install temporary supports and add pads to ensure that the building can quickly reach the predetermined height.

Benefits of technology

The device can quickly reach lifting heights higher than the maximum stroke of the jacking jack while ensuring the safety of the building structure, and is flexible and cost-effective due to the use of conventional materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774259A_ABST
    Figure CN118774259A_ABST
Patent Text Reader

Abstract

The invention provides a building jacking device. The building jacking device comprises a jacking jack inversely fixed to the lower portion of a jacking lifting beam. The temporary support is arranged below the upper tray beam connected with the jacking lifting beam; and the cushion block is arranged at the lower part of an oil cylinder of the jacking jack. The structure safety of a summary building in the building jacking process can be guaranteed, and it can be guaranteed that when the building jacking height is larger than the maximum stroke of the jacking jack, the set jacking height can be conveniently and rapidly reached. Materials adopted by the invention are conventional steel plates, steel box concrete, jacking jacks, fixed profile steel and opposite-pull screws.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a building jacking device and a construction method thereof. Background Art

[0002] As the pace of urban development is getting faster and faster, more and more old buildings need to be protected and repaired. Protective building translation is one of the main protection methods. Before the protection building is translated, it is necessary to reinforce and lift the protected building. How to quickly and conveniently reach the predetermined lifting height when the lifting height of the building is greater than the maximum stroke of the lifting jack, and ensure the structural safety of the building during the lifting process, is a problem that needs to be solved urgently. Summary of the invention

[0003] The purpose of the present invention is to provide a building jacking device and a construction method thereof.

[0004] In order to solve the above problems, the present invention provides a building jacking device, comprising:

[0005] A lifting jack fixed invertedly below the lifting beam;

[0006] A temporary support provided below the upper pallet beam connected to the jacking beam;

[0007] A pad disposed at the bottom of the oil cylinder of the lifting jack.

[0008] Furthermore, in the above-mentioned building jacking device, the pad is a steel plate.

[0009] Furthermore, in the above-mentioned building jacking device, the temporary support is a steel structure.

[0010] Furthermore, in the above-mentioned building jacking device, the temporary support is a steel box concrete pad.

[0011] Furthermore, in the above-mentioned building jacking device, the diameter of the steel box concrete pad is 450 cm, and the heights are 20 cm, 10 cm and 5 cm respectively.

[0012] Furthermore, in the above-mentioned building jacking device, the jacking beam is fixedly connected to the jacking jack through a steel fixing piece and a tension screw.

[0013] Furthermore, in the above-mentioned building jacking device, a steel fixing piece is provided on the top of the jacking lifting beam, and the jacking jack is connected to the steel fixing piece by a tension screw.

[0014] Furthermore, in the above-mentioned building jacking device, the temporary support is arranged on both sides of the jacking jack.

[0015] According to another aspect of the present invention, there is also provided a construction method of a building jacking device, using any of the above-mentioned building jacking devices, the method comprising:

[0016] Fix the lifting jack upside down under the lifting platform beam;

[0017] The primary stroke of the lifting jack is set to simultaneously lift the lifting platform beam, and the whole process is monitored in real time;

[0018] After the lifting jack reaches the preset stroke, a temporary support is installed under the upper pallet beam, and the jack cylinder retracts;

[0019] Add a block under the oil cylinder of the lifting jack;

[0020] The lifting jack repeats the lifting process until the lifting beam is lifted to a predetermined height.

[0021] Compared with the prior art, the advantages of the present invention are:

[0022] 1. The present invention can ensure the structural safety of the building during the building jacking process.

[0023] 2. The present invention can ensure that when the building lifting height is greater than the maximum stroke of the lifting jack, the predetermined lifting height can be reached conveniently and quickly.

[0024] 3. The materials used in the present invention are conventional steel plates, steel box concrete, lifting jacks, fixed steel and tension screws.

[0025] 4. The present invention can adjust the building lifting height and lifting speed according to the actual on-site conditions and monitoring conditions, and has extremely high flexibility. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 is a schematic diagram of a building jacking device according to an embodiment of the present invention;

[0027] Among them: 1-lifting chassis; 2-steel plate; 3-lifting jack; 4-tension screw; 5-steel fixings; 6-steel box pad; 7-lifting beam; 8-upper pallet beam. DETAILED DESCRIPTION

[0028] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0029] like Figure 1 As shown, the present invention provides a building jacking device, comprising:

[0030] A lifting jack 3 is inverted and fixed below the lifting beam 7;

[0031] A temporary support provided below the upper pallet beam 8 connected to the jacking beam 7;

[0032] A pad is arranged at the lower part of the oil cylinder of the lifting jack 3.

[0033] In an embodiment of the building jacking device of the present invention, the cushion block is a steel plate 2.

[0034] Here, the lifting jack can be of larger model and larger stroke.

[0035] In one embodiment of the building jacking device of the present invention, the temporary support is a steel structure.

[0036] In one embodiment of the building jacking device of the present invention, the temporary support is a steel box concrete pad 6.

[0037] In one embodiment of the building jacking device of the present invention, the diameter of the steel box concrete pad 6 is 450 cm, and the heights are 20 cm, 10 cm and 5 cm respectively.

[0038] Here, the diameter of the steel box concrete pad is 450cm, and the height is 20cm, 10cm or 5cm. During jacking, the gap less than 5cm is filled with steel plates of various thicknesses until the gap below the jacking beam 7 is filled tightly.

[0039] In one embodiment of the building jacking device of the present invention, the jacking beam 7 is fixedly connected to the jacking jack 3 through a steel fixing piece 5 and a tension screw rod 4.

[0040] In one embodiment of the building jacking device of the present invention, a steel fixing piece 5 is provided on the top of the jacking lifting beam 7 , and the jacking jack 3 is connected to the steel fixing piece 5 via a tension screw 4 .

[0041] In one embodiment of the building jacking device of the present invention, the temporary supports are arranged on both sides of the jacking jack 3 .

[0042] Reference Figure 1 As shown, the construction method of the short-stroke building jacking device as described above includes the following steps:

[0043] Step 1) Fix the lifting jack upside down under the lifting platform beam;

[0044] Step 2) setting a stroke of the lifting jack, synchronously lifting the lifting platform beam, and performing real-time monitoring of the whole process;

[0045] Step 3) After the lifting jack reaches the preset stroke, a temporary support 6 is installed below the upper pallet beam 8, and the jack cylinder is retracted;

[0046] Step 4) Add a pad under the oil cylinder of the lifting jack;

[0047] Step 5) The lifting jack repeats the lifting process until the lifting beam is lifted to a predetermined height.

[0048] The advantages of the present invention are:

[0049] 1. The present invention can ensure the structural safety of the building during the building jacking process.

[0050] 2. The present invention can ensure that when the building lifting height is greater than the maximum stroke of the lifting jack, the predetermined lifting height can be reached conveniently and quickly.

[0051] 3. The materials used in the present invention are conventional steel plates, steel box concrete, lifting jacks, fixed steel and tension screws.

[0052] 4. The present invention can adjust the building lifting height and lifting speed according to the actual on-site conditions and monitoring conditions, and has extremely high flexibility.

[0053] For detailed contents of the system embodiments of the present invention, please refer to the corresponding parts of the method embodiments, which will not be described in detail here.

[0054] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0055] Obviously, those skilled in the art can make various changes and modifications to the invention without departing from the spirit and scope of the invention. Thus, if these modifications and variations of the invention fall within the scope of the claims of the invention and their equivalents, the invention is also intended to include these modifications and variations.

Claims

1. A building lifting device, characterized in that: include: A lifting jack fixed invertedly below the lifting beam; A temporary support provided below the upper pallet beam connected to the jacking beam; A pad disposed at the bottom of the oil cylinder of the lifting jack.

2. The building lifting device according to claim 1, characterized in that: The cushion block is a steel plate.

3. The building lifting device according to claim 1, characterized in that: The temporary support is a steel structure.

4. The building lifting device according to claim 3, characterized in that: The temporary support is a steel box concrete pad.

5. The building lifting device according to claim 4, characterized in that: The diameter of the steel box concrete pad is 450 cm.

6. The building lifting device according to claim 5, characterized in that: The heights of the steel box concrete pads are 20 cm, 10 cm and 5 cm respectively.

7. The building lifting device according to claim 1, characterized in that: The lifting beam is fixedly connected to the lifting jack through a steel fixing piece and a tension screw rod.

8. The building lifting device according to claim 7, characterized in that: A steel fixing piece is arranged on the top of the lifting beam, and the lifting jack is connected to the steel fixing piece through a tension screw rod.

9. The building lifting device according to claim 1, characterized in that: The temporary supports are arranged on both sides of the lifting jack.

10. A construction method of a building jacking device, characterized in that: Using the building jacking device according to any one of claims 1 to 8, the method comprises: Fix the lifting jack upside down under the lifting platform beam; The primary stroke of the lifting jack is set to simultaneously lift the lifting platform beam, and the whole process is monitored in real time; After the lifting jack reaches the preset stroke, a temporary support is installed under the upper pallet beam, and the jack cylinder retracts; Add a block under the oil cylinder of the lifting jack; The lifting jack repeats the lifting process until the lifting beam is lifted to a predetermined height.