Prefabricated elevator shaft structure and construction method thereof

Through the prefabricated elevator shaft structure and construction method, the problems of long on-site construction time and great impact on residents' lives are solved, the stability of the elevator shaft and the convenience of construction are achieved, which is suitable for the installation of elevators in old residential buildings.

CN118774444APending Publication Date: 2024-10-15NANTONG HUARONG CONSTR GRP CO LTD

Patent Information

Application Number
CN202411096199.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing elevator construction method is carried out on site, which takes up a lot of time and causes a lot of interference to residents' lives. It is especially unsuitable for old residential buildings.

Method used

Prefabricated elevator shaft structures and construction methods are adopted, including prefabricated bases, square steel tube shafts, energy-saving glass and buckle-type scaffolding. Through foundation pit laying, positioning measurement, shaft construction, scaffolding construction, energy-saving glass packaging and capping steps, ensure that the shaft is consistent with The wall is fit and stable, reducing the impact on the site environment and residents.

Benefits of technology

It achieves the stability of the elevator shaft and the convenience of construction, reduces the interference to residents' lives, and improves the construction efficiency and overall stiffness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774444A_ABST
    Figure CN118774444A_ABST
Patent Text Reader

Abstract

The invention discloses a prefabricated elevator shaft structure and a construction method thereof, the prefabricated elevator shaft structure comprises a prefabricated base and a square steel tube hoistway erected on the prefabricated base, a top beam plate is packaged at the top of the square steel tube hoistway, and an air outlet is formed in the lower end of the top beam plate; one side of the square steel tube hoistway is connected with a wall body on the side surface of the building body and is fixed through a connecting clamping plate; the outer side of the square steel tube hoistway is packaged by energy-saving glass; an opening communicated with the square steel tube hoistway is formed between every two adjacent floors. The prefabricated base can be tightly connected with the foundation cushion layer, and the integrity of the foundation bottom plate and a shear wall of the elevator shaft foundation part is ensured; meanwhile, the square steel tube hoistway is attached to the wall, the stability degree of the hoistway can be increased, the scaffold is erected in the hoistway, the scaffold body is safe and convenient to operate, the site environment and residents are not affected, and the overall rigidity of the scaffold body is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of elevators, and specifically relates to a prefabricated elevator shaft structure and a construction method thereof. Background Art

[0002] Some old residential buildings not only have unreasonable structural layouts, but also have fallen into disrepair and many outdated functions. Especially for the elderly, it is very inconvenient to go up and down the stairs because there are no elevators. Many elderly people stop at the stairs due to their inconvenient legs and feet, and seldom go out throughout the year. Therefore, installing elevators in existing old residential buildings has become a highly anticipated wish.

[0003] Generally, the construction of elevator installation is carried out on site. The foundation is built on site, and then the steel structure shaft and external protection decoration are constructed upwards, and then the elevator host and car are installed, and finally outdoor restoration construction is carried out. Due to this conventional construction procedure, on-site construction work not only takes up a lot of time, but also has a lot of interference or impact on the lives of residents. Summary of the invention

[0004] The present application provides a prefabricated elevator shaft structure and a construction method thereof to solve the above-mentioned technical problems.

[0005] In order to solve the above technical problems, a technical solution adopted in the present application is: a prefabricated elevator shaft structure, comprising: a prefabricated base and a square steel tube shaft mounted on the prefabricated base, the top of the square steel tube shaft is encapsulated with a top beam plate, and an air outlet is provided at the lower end of the top beam plate; one side of the square steel tube shaft is connected to the wall on the side of the building and fixed by a connecting clamp; the outer side of the square steel tube shaft is encapsulated by energy-saving glass; wherein, openings connected to the square steel tube shaft are provided between adjacent floors.

[0006] Furthermore, the square steel pipe shaft includes four vertically arranged support pipes, and the support pipes are connected by horizontally arranged transverse pipes, wherein the transverse pipes are located above and below the opening.

[0007] Furthermore, steel columns are pre-buried around the upper end of the prefabricated base, and the steel columns are welded to the bottom of the support pipe.

[0008] Furthermore, a glass fixing frame is welded to the outer side of the supporting tube, and a plurality of energy-saving glasses are packaged between the glass fixing frames.

[0009] Furthermore, a shock-absorbing rubber strip is provided between the energy-saving glass and the glass fixing frame.

[0010] Another technical solution adopted in the present application is: a construction method of a prefabricated elevator shaft structure, comprising: Foundation pit laying: dig a foundation pit in front of the wall, lay a cushion layer at the bottom of the foundation pit, set a square tube shear wall in the foundation pit, and set the prefabricated base in the square tube shear wall; Positioning measurement: Determine the installation axis on the wall using a plumb line and theodolite; Shaft construction: hoist the prefabricated square steel tube shaft so that one side of the square steel tube shaft is aligned with the axis of the wall, and weld the bottom of the pillar of the square steel tube shaft to the column of the prefabricated base; Scaffolding construction: set up working scaffolding between floors, and set up disc-type scaffolding inside the square steel pipe shaft; Wall construction: Workers connect the square steel pipe shaft to the wall on the disc-type scaffolding, and open openings between adjacent floors to connect to the square steel pipe shaft; Energy-saving glass packaging: multiple sets of glass fixing frames are fixed on the outside of the four corner pillars of the square steel tube shaft, and the energy-saving glass is installed in the glass fixing frames; Capping: Use a crane to lift the top beam to the top of the square steel pipe shaft, connect it with preset clips, and then weld the connecting gap.

[0011] Furthermore, a plurality of groups of connecting clamps are provided on one side of the square steel pipe well close to the wall, and the connecting clamps are connected to the expansion bolts embedded in the wall.

[0012] The beneficial effects of the present application are as follows: the prefabricated base of the present application can be tightly joined with the foundation cushion layer to ensure the integrity of the shear wall of the foundation bottom plate and the foundation part of the elevator shaft; at the same time, the fitting arrangement of the square steel pipe shaft and the wall can increase the stability of the shaft, and the scaffolding is erected inside the shaft, the frame is safe, easy to operate, has no impact on the on-site environment and residents, and the overall rigidity of the frame is enhanced. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a cross-sectional structural schematic diagram of an embodiment of a prefabricated elevator shaft structure of the present application; Figure 2 This is a side view of the prefabricated elevator shaft structure of an embodiment of the present application. Figure 3 yes Figure 1 A structural schematic diagram of an embodiment of a prefabricated base; Figure 4 yes Figure 1 A schematic diagram of a top view of a shaft in an embodiment of the present invention; Figure 5 yes Figure 4 A schematic diagram of a top view of an embodiment of a connecting card plate; Figure 6 It is a flow chart of an embodiment of a construction method of a prefabricated elevator shaft structure of the present application. DETAILED DESCRIPTION

[0014] In order to make the objectives, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below in conjunction with specific embodiments.

[0015] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0016] See also Figure 1-2 , Figure 1 It is a cross-sectional structural schematic diagram of an embodiment of a prefabricated elevator shaft structure of the present application; Figure 2 It is a side view structural diagram of an embodiment of the prefabricated elevator shaft structure of the present application, which includes: a prefabricated base 1 and a square steel pipe shaft 2 erected on the prefabricated base 1, the top of the square steel pipe shaft 2 is encapsulated with a top beam 3, and the lower end of the top beam 3 is provided with an air outlet 31; one side of the square steel pipe shaft 2 is connected to the wall on the side of the building 5 and fixed by a connecting clamp 4; the outer side of the square steel pipe shaft 2 is encapsulated by energy-saving glass 6; wherein, an opening 51 connected to the square steel pipe shaft 2 is provided between adjacent floors. The shaft 2 in the above design is connected to the wall, so that the shaft 2 can be effectively stabilized, the structure is reasonable, and the impact on the use of the elevator after installation is small, so that the newly installed elevator forms a whole with the original structure.

[0017] The square steel pipe shaft 2 includes four vertically arranged support pipes 21, and the support pipes 21 are connected by horizontally arranged transverse pipes 22, wherein the transverse pipes 22 are located above and below the opening 51. The support pipes 21 in the above design are used to support the entire shaft 2, and the transverse pipes 22 are used to firmly connect the support pipes 21. The opening 51 is the connection port between the building 5 and the elevator, and the transverse pipes 22 are located above and below the opening 51, which can prevent the transverse pipes 22 from blocking the connection port, and facilitate the subsequent construction of the elevator entrance channel.

[0018] See also Figure 3 , Figure 3 yes Figure 1 The structural diagram of the embodiment of the prefabricated base in FIG. Steel columns 11 are pre-buried around the upper end of the prefabricated base 1, and the steel columns 11 are welded to the bottom of the support pipe 21. The steel columns 11 in the above design can better support the entire square steel pipe shaft 2, thereby ensuring the stability of the foundation of the shaft 2.

[0019] See also Figure 4-5 , Figure 4 yes Figure 1 A schematic diagram of a top view of a hoistway in an embodiment of the present invention. A glass fixing frame 61 is welded to the outside of the support tube 21, and a plurality of energy-saving glasses 6 are encapsulated between the glass fixing frames 61. The energy-saving glass 6 in the above design can wrap the outside of the hoistway 2, thereby increasing the overall lighting of the elevator and having a better sightseeing effect.

[0020] A shock-absorbing rubber strip is provided between the energy-saving glass 6 and the glass fixing frame 61. The shock-absorbing rubber strip in the above design can alleviate the vibration between the energy-saving glass 6 and the fixing frame, thereby ensuring the safety of the energy-saving glass 6.

[0021] See also Figure 6 , Figure 6 1 is a flow chart of an embodiment of a construction method of a prefabricated elevator shaft structure of the present application. The construction method comprises the following steps: Step S1. Foundation pit laying: dig a foundation pit in front of the wall, lay a cushion layer at the bottom of the foundation pit, set a square tube shear wall in the foundation pit, and set the prefabricated base in the square tube shear wall.

[0022] Specifically, a foundation pit 7 is excavated at a predetermined position in front of the selected wall of the building body 5, and pipes and debris in the foundation pit 7 are removed. Then, a cushion layer is poured at the bottom of the foundation pit 7, and a foundation slab and a square tube shear wall are installed, and a prefabricated base 1 is hoisted into the shear wall.

[0023] Step S2. Positioning measurement: Determine the installation axis on the wall using a plumb line and a theodolite.

[0024] Specifically, the installation position of the shaft 2 is determined by accurately positioning the theodolite and the seven-line infrared plumb line, and the installation axis is drawn on the wall.

[0025] Step S3. Shaft construction: hoist the prefabricated square steel pipe shaft so that one side of the square steel pipe shaft is aligned with the axis of the wall, and weld the bottom of the supporting pipe 21 of the square steel pipe shaft 2 to the column of the prefabricated base 1.

[0026] Specifically, square steel pipes are welded into prefabricated square steel pipe shafts, and the square steel pipe shafts are hoisted along the axis to the steel columns in the prefabricated base 1 set, and the hoisting position of the shaft is adjusted so that one side of the square steel pipe shaft is aligned with the axis of the wall, and then the support pipe 21 of the square steel pipe shaft 2 is welded to the steel column 11.

[0027] Step S4. Scaffolding construction: constructing working scaffolding between floors, and constructing disc-type scaffolding inside the square steel pipe shaft.

[0028] Specifically, a disc-type scaffolding is set up inside the square steel pipe shaft 2 so that the scaffolding can be attached to the square steel pipe shaft 2, which can effectively reduce interference with nearby residents and facilitate construction inside the shaft 2.

[0029] Step S5. Wall construction: Workers connect the square steel pipe shaft and the wall on the disc-type scaffolding, and open an opening between adjacent floors that is connected to the square steel pipe shaft.

[0030] Specifically, workers construct the wall on the scaffolding, and multiple sets of connecting clamps 4 are welded to the side of the square steel pipe shaft 2 close to the wall. The steel pipes of the shaft 2 are fixed to the expansion bolts embedded in the wall through the connecting clamps 4, and then an opening 51 connected to the square steel pipe shaft 2 is opened between the floors.

[0031] Step S6. Energy-saving glass packaging: a plurality of glass fixing frames are fixedly connected to the outer sides of the four-corner support tubes of the square steel tube shaft, and the energy-saving glass is installed in the glass fixing frames.

[0032] Specifically, a plurality of glass fixing frames 61 are welded from top to bottom along the supporting tube 21 , and then the energy-saving glass 6 is installed on the glass fixing frames 61 , and a shock-absorbing rubber strip is arranged between the energy-saving glass 6 and the fixing frames.

[0033] Step S7. Capping: Use a crane to lift the top beam to the top of the square steel pipe shaft, connect it with a preset clip, and then weld the connection gap.

[0034] The prefabricated base 1 of the present application can be tightly connected with the foundation cushion layer to ensure the integrity of the shear wall of the foundation bottom plate and the foundation part of the elevator shaft 2; at the same time, the square steel pipe shaft 2 is fitted with the wall to increase the stability of the shaft 2, and the scaffolding is erected inside the shaft 2. The frame is safe and easy to operate, and has no impact on the on-site environment and residents, and the overall rigidity of the frame is enhanced.

[0035] The above descriptions are merely embodiments of the present application and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A prefabricated elevator shaft structure, characterized in that: include: A prefabricated base and a square steel tube shaft erected on the prefabricated base, wherein the top of the square steel tube shaft is encapsulated with a top beam plate, and an air outlet is provided at the lower end of the top beam plate; one side of the square steel tube shaft is connected to the wall of the side of the building and fixed by a connecting clamp; the outer side of the square steel tube shaft is encapsulated by energy-saving glass; wherein, openings connected to the square steel tube shaft are provided between adjacent floors.

2. A prefabricated elevator shaft structure according to claim 1, characterized in that: The square steel pipe shaft comprises four vertically arranged support pipes, and the support pipes are connected by horizontally arranged transverse pipes, wherein the transverse pipes are located above and below the opening.

3. A prefabricated elevator shaft structure according to claim 2, characterized in that: Steel columns are pre-buried around the upper end of the prefabricated base, and the steel columns are welded to the bottom of the support pipe.

4. The prefabricated elevator shaft structure according to claim 1, characterized in that: A glass fixing frame is welded on the outside of the support tube, and a plurality of energy-saving glasses are packaged between the glass fixing frames.

5. The prefabricated elevator shaft structure according to claim 4, characterized in that: A shock-absorbing rubber strip is provided between the energy-saving glass and the glass fixing frame.

6. A construction method for a prefabricated elevator shaft structure, characterized in that: The following steps are involved: Foundation pit laying: dig a foundation pit in front of the wall, lay a cushion layer at the bottom of the foundation pit, set a square tube shear wall in the foundation pit, and set the prefabricated base in the square tube shear wall; Positioning measurement: Determine the installation axis on the wall using a plumb line and theodolite; Shaft construction: hoist the prefabricated square steel tube shaft so that one side of the square steel tube shaft is aligned with the axis of the wall, and weld the bottom of the pillar of the square steel tube shaft to the column of the prefabricated base; Scaffolding construction: constructing working scaffolding between floors, and constructing disc-type scaffolding inside the square steel pipe shaft; Wall construction: workers connect the square steel pipe shaft to the wall on a disc-type scaffolding, and open an opening between adjacent floors that is connected to the square steel pipe shaft; Energy-saving glass packaging: multiple sets of glass fixing frames are fixedly connected to the outer sides of the four corner pillars of the square steel tube shaft, and the energy-saving glass is installed in the glass fixing frames; Capping: Use a crane to lift the top beam to the top of the square steel pipe shaft, connect it with preset clips, and then weld the connecting gap.

7. The method according to claim 6, characterized in that A plurality of groups of connection clamps are arranged on one side of the square steel pipe well close to the wall, and the connection clamps are connected with expansion bolts embedded in the wall.

Citation Information

Patent Citations

  • Modularized elevator shaft monomer and elevator shaft thereof

    CN107117517A

  • Assembling and disassembling method for prefabricated module of assembled concrete added elevator shaft

    CN115162742A

  • Wall-attached elevator hoistway

    CN201250038Y

  • Elevator shaft of frame type steel structure

    CN212427954U

  • Elevator shaft constructing method for base isolated building

    JP2010030735A

Cited By

  • A prefabricated elevator shaft structure and construction method thereof

    CN119021442B