Separate layer fracturing and sand prevention integrated transformation method for loose sandstone reservoir

Through the integrated transformation method of layered fracturing and sand control in loose sandstone reservoirs, pipe strings are used to achieve perforation, fracturing and sand control, combined with fiber composite proppant, to solve the problems of sand production and insufficient production capacity in the development of loose sandstone reservoirs. It improves oil well production and operating efficiency and is suitable for various well types.

CN118774598APending Publication Date: 2024-10-15CHINA OILFIELD SERVICES LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410991811.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Unconsolidated sandstone reservoirs are prone to sand production during reservoir development. The existing fracturing sand control technology has problems such as reduced productivity, short sand control period, and low operating efficiency, making it difficult to meet the needs of efficient development.

Method used

The loose sandstone reservoir layered fracturing and sand control integrated transformation method is used to install special pipe strings for perforating, fracturing and sand control operations. Composite proppant carrying fibers is used to form a stable structure in the artificial fractures and improve the proppant It has excellent erosion resistance and stability, and can complete the perforating, fracturing and sand control processes in one trip through the pipe string.

Benefits of technology

It improves the stability and erosion resistance of proppant in fractures, extends the effective period of sand control, improves oil well production and operating efficiency, and is suitable for a variety of well types, including small-size casing and horizontal wells.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774598A_ABST
    Figure CN118774598A_ABST
Patent Text Reader

Abstract

The invention relates to a loose sandstone reservoir separate layer fracturing and sand prevention integrated transformation method which comprises the steps that firstly, a loose sandstone reservoir separate layer fracturing and sand prevention integrated pipe column is installed, and the pipe column comprises an oil pipe, a depth correction short section, a safety connector, an oil pipe, a centralizer, a spray gun, a check valve, a centralizer, a punching pipe and a guiding shoe which are sequentially connected from top to bottom; secondly, the pipe column is put down into a stratum, and perforation, fracturing and sand prevention construction are sequentially conducted on the stratum comprising a plurality of fracturing sections from bottom to top; and 3, after fracturing sand prevention operation of all the fracturing sections is completed, the pipe column is lifted up. According to the separate layer fracturing and sand prevention integrated transformation method for the loose sandstone reservoir, the purposes of separate layer fracturing yield increase and sand prevention of the loose sandstone reservoir can be achieved, and economic and efficient development of the loose sandstone reservoir is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of petroleum engineering, and in particular relates to a stratified fracturing and sand control integrated transformation method for loose sandstone reservoirs. Background Art

[0002] Loose sandstone reservoirs are usually shallowly buried, with weak cementation strength and mainly mud. The risk of sand production in the formation is high during production, and effective sand control measures must be taken. However, the mud content is high, and the production capacity decreases after sand control, making it difficult to meet production needs. At the same time, the migration of particles caused by excessive production pressure difference during oil production blocks the seepage channel in the near-wellbore area, and the formation fluid cannot flow into the wellbore, often resulting in poor production. Therefore, the use of integrated fracturing and sand control technology is one of the technical measures for the efficient development of loose sandstone reservoirs. At present, the fracturing and sand control technologies for loose sandstone reservoirs mainly include two methods: fracturing and filling sand control and screen pipe fracturing.

[0003] The key to fracturing and filling sand prevention is the end-sanding technology, and its operation process is divided into two stages: the first stage is the same as conventional fracturing, pumping in pre-fluid to create fractures, followed by mixed sand fluids of different densities, until end-sanding occurs and the fractures stop extending; in the second stage, continue to pump in mixed sand fluids with high sand ratios, the fractures expand, compact and fill, and form a channel with very high conductivity between the reservoir and the wellbore. Fracturing and filling changes the flow pattern of formation fluids near the wellbore through artificial fractures. The flow direction of formation fluids changes from radial flow to the wellbore to dual unidirectional flow in the direction perpendicular to the fracture and along the fracture direction, increasing the oil leakage area, reducing the flow rate in the fractures near the wellbore, and reducing the migration of formation sand, thereby achieving the purpose of sand prevention. The formation fluid flows into the wellbore through the fractures with high conductivity, greatly reducing the pressure drop in the near-wellbore zone, increasing the production capacity of the oil well, and extending the life of the oil well. This technology is suitable for casing cementing and perforating completion. Screens and filling service tools are placed in the casing for fracturing and filling operations. It is currently widely used for production casings of 7 inches and above. Small-sized casings (such as 5.5-inch casings) are rarely used, and the construction displacement is limited (the maximum displacement is about 3.0m 3 / min), and is not suitable for horizontal wells, branch wells, and multi-bottom wells.

[0004] In the prior art, the target layer of the screen completion is perforated in the screen fracturing to establish a channel for the fracturing proppant to enter the formation. The artificial fractures formed by fracturing penetrate the contaminated zone and open up the oil flow channel. In the later stage of fracturing, the consolidation proppant is pumped in. The consolidation proppant is consolidated under the formation temperature and pressure, which can block the perforation holes of the screen, repair the original screen, and prevent the formation sand from entering the wellbore, thereby achieving the triple goals of unblocking, increasing production and preventing sand. This technology has been applied to about 20 wells in the Bohai Oilfield, and the production increase effect is about 2-4 times, but due to the use of consolidation proppant for sand control, its effective period of sand control is relatively short. At the same time, this technology requires a separate perforating string to perforate the screen, and layered fracturing requires sand filling or bridge plugs, and the operation time efficiency is relatively low.

[0005] Based on the above technical analysis, there is an urgent need for an integrated and efficient development technology for fracturing and sand control suitable for loose sandstone reservoirs. Summary of the invention

[0006] In order to solve all or part of the above problems, the purpose of the present invention is to provide an integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs, so as to achieve the purpose of stratified fracturing and sand control of loose sandstone reservoirs, and achieve economical and efficient development of loose sandstone reservoirs.

[0007] The present application provides a method for integrated transformation of loose sandstone reservoir by stratified fracturing and sand control, the method comprising the following steps:

[0008] Step 1: Install the integrated pipe string for stratified fracturing and sand control of loose sandstone reservoir, wherein the pipe string includes, from top to bottom, the following connected in sequence: oil pipe, depth calibration nipple, safety joint, oil pipe, centralizer, spray gun, check valve, centralizer, perforated pipe and guide shoe;

[0009] Step 2: lower the pipe string into the formation, and perform perforation, fracturing, and sand control operations on the formation including several fracturing sections from bottom to top;

[0010] Step 3: After completing the fracturing and sand control operations in all fracturing sections, lift the tubing string.

[0011] In some embodiments, step one further includes: adjusting the number of nozzles, nozzle diameter, and spraying medium of the sandblasting perforation of the perforated tube to achieve the perforation operation.

[0012] In some embodiments, step one further includes: adjusting the construction displacement and injection time of the sandblasting perforation of the perforated pipe to achieve the perforation operation.

[0013] In some embodiments, step 2 further includes: mixing a fiber material with a certain flexibility into a sand-carrying fluid and injecting the fluid into the formation to form a composite support structure in the artificial fracture.

[0014] In some embodiments, the composite support structure includes a proppant and fibers, wherein the proppant is a matrix and the fibers are a reinforcing phase.

[0015] In some embodiments, the composite support structure is a spatial reticular structure.

[0016] In some embodiments, step 2 further comprises:

[0017] Step 4: lowering the loose sandstone reservoir stratified fracturing and sand control integrated pipe string to the first fracturing layer section;

[0018] Step 5, opening the casing annulus, pumping liquid and injection medium into the pipe string through the surface pumping equipment, and performing sandblasting perforation on the first fracturing layer section;

[0019] Step 6, pumping liquid into the pipe column through the surface pumping equipment to circulate the injection medium to the surface;

[0020] Step 7: Slowly close the annulus and judge whether the perforation is successful by the change of ground pressure;

[0021] Step 8, pumping the pre-fluid into the pipe string through the surface pumping equipment;

[0022] Step nine, pumping sand-carrying fluid into the pipe column through ground pumping equipment, and performing construction according to the designed pumping procedure. In the later stage of pumping the sand-carrying fluid, a certain amount of fiber and proppant are added to the sand-carrying fluid and pumped into the bottom layer;

[0023] Step 10, pumping displacement fluid into the pipe string through surface pumping equipment;

[0024] Step 11, stop the pump and measure the pressure drop according to the designed time;

[0025] Step 12: Perform circulating well pressure according to the ground pressure.

[0026] In some embodiments, step 2 further comprises: lifting to other fractured layer sections, and repeating steps 4 to 12.

[0027] In some embodiments, step 2 further includes: completing the perforation, fracturing, and sand control operations of other fracturing layers in the order of lifting.

[0028] In some embodiments, step seven further includes: if the pressure continues to rise and does not drop, repeating steps five and six; if the pressure first rises and then drops, executing step eight.

[0029] It can be seen from the above technical scheme that, compared with the prior art, the integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs in the embodiment of the present invention can, on the one hand, realize the perforation, fracturing, sand control and stratified fracturing processes in one trip through the pipe string, greatly improving the operation time efficiency; on the other hand, it effectively improves the stability and erosion resistance of the proppant in the crack, avoids the formation sand and proppant from flowing into the wellbore, and prolongs the effective period of sand control. At the same time, it can increase the production pressure difference and improve the oil well production. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 A schematic flow chart of the method steps of the integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs according to an embodiment of the present invention;

[0031] Figure 2 It is a schematic flow chart of further method steps of step 2 of the integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs according to an embodiment of the present invention;

[0032] Figure 3It is a schematic diagram of the structure of an integrated pipe string for stratified fracturing and sand control in a loose sandstone reservoir according to an embodiment of the present invention;

[0033] Figure 4 Schematic diagram of the structure of the composite support structure according to an embodiment of the present invention. DETAILED DESCRIPTION

[0034] In order to better understand the purpose, structure and function of the present invention, the following is a further detailed description of a loose sandstone reservoir stratified fracturing and sand control integrated transformation method of the present invention in conjunction with the accompanying drawings.

[0035] Figure 1 The schematic diagram of the steps of the method 100 of the integrated transformation method of the loose sandstone reservoir layered fracturing and sand control according to the embodiment of the present invention is shown. Figure 1 As shown, the steps of the method 100 include:

[0036] Step 1 S1, installing the loose sandstone reservoir layered fracturing sand control integrated pipe string 200. Please refer to Figure 3 As shown, the pipe string 200 includes, from top to bottom, the following connected in sequence: oil pipe 201, depth calibration nipple 202, safety joint 209, oil pipe 203, centralizer 204, spray gun 205, check valve 210, centralizer 206, perforated pipe 207 and guide shoe 208;

[0037] Step 2 S2, lowering the pipe string 200 into the formation, and performing perforation, fracturing, and sand control operations on the formation including several fracturing sections from bottom to top;

[0038] Step three S3, after completing the fracturing and sand control operations in all fracturing stages, lift the pipe string 200.

[0039] The loose sandstone reservoir stratified fracturing sand control integrated pipe string 200 in the present application is installed on the ground. Among them: a plurality of sandblasting perforation nozzles are formed on the perforated pipe 207 for spraying corresponding media; the spray gun 205 is used to provide corresponding spraying power to the medium in the pipe string 200; the centralizer 204 and the centralizer 206 are used for position correction when the pipe string 200 is lowered, so as to improve the lowering accuracy and reduce its deviation.

[0040] Compared with the prior art, the integrated reconstruction method 100 of the loose sandstone reservoir by stratified fracturing and sand control according to the embodiment of the present invention: through the pipe string 200, the perforation, fracturing, sand control and stratified fracturing processes can be completed in one trip, greatly improving the operation time efficiency.

[0041] In some embodiments, step 1 S1 may further include: adjusting the number of nozzles, nozzle diameter, and spraying medium of the sandblasting perforation of the perforating tube 207 to achieve the perforation operation.

[0042] In some embodiments, step 1 S1 may further include: adjusting the construction displacement and injection time of the sandblasting perforation of the perforating tube 207 to achieve the perforation operation.

[0043] In the present application, the perforating operation can be achieved by optimizing the number of nozzles, nozzle diameter, and spraying medium of the sandblasting perforating, optimizing the construction displacement and spraying time of the sandblasting perforating.

[0044] Please refer to Figure 4 In some embodiments, step 2 S2 may further include: mixing a fiber material with a certain flexibility into a sand-carrying fluid and injecting the mixture into the formation to form a composite support structure 300 in the artificial fracture.

[0045] Please continue to refer to Figure 4 In some embodiments, the composite support structure 300 may include a proppant 301 and fibers 302, wherein the proppant 301 is a matrix and the fibers 302 are a reinforcement phase.

[0046] Please continue to refer to Figure 4 In some embodiments, the composite support structure 300 may be a spatial mesh structure.

[0047] In the present application, a fiber material with a certain flexibility is mixed in a sand-carrying fluid and injected into the formation to form a composite support structure 300 in an artificial fracture. Among them, the proppant 301 is a matrix and the fiber 302 is a reinforcing phase. Through this arrangement, each fiber 302 contacts with a number of proppant 301 particles to form a spatial network structure that can enhance the cohesive force of the proppant 301, thereby stabilizing the proppant in its original position. The fluid can freely pass through the spatial network structure to achieve the purpose of preventing the proppant 301 and the formation sand from flowing into the wellbore. In the present application, the fiber 302 component in the proppant 301 can enhance the resistance of the proppant 301 sand arch to move and deform. In addition, the fiber 302 can act with multiple proppant 301 at the same time to entangle them together, thereby increasing the ability of the proppant 301 to resist scour.

[0048] Compared with the prior art, the integrated sand control reform method 100 for stratified fracturing of loose sandstone reservoirs according to the embodiment of the present invention effectively improves the stability and scour resistance of the proppant 301 in the cracks, prevents the formation sand and the proppant 301 from flowing into the wellbore, and prolongs the effective period of sand control. At the same time, the production pressure difference can be increased to improve the oil well production.

[0049] Please refer to Figure 2 In some embodiments, step 2 S2 may further include:

[0050] Step 4 S21, lowering the loose sandstone reservoir stratified fracturing and sand control integrated pipe string 200 to the first fracturing layer section;

[0051] Step 5 S22, opening the oil casing annulus, pumping liquid and injection medium into the pipe string 200 through the surface pumping equipment, and performing sandblasting perforation on the first fracturing layer section;

[0052] Step six S23, pumping liquid into the pipe column 200 through the surface pumping equipment to circulate the injection medium to the surface;

[0053] Step 7 S24, slowly closing the annulus and judging whether the perforation is successful by the change of the surface pressure;

[0054] Step eight S25, pumping pre-fluid into the pipe string 200 by surface pumping equipment;

[0055] Step nine S26, pumping sand-carrying fluid into the pipe column 200 through the surface pumping equipment, and performing the construction according to the designed pumping procedure. In the later stage of pumping the sand-carrying fluid, a certain amount of fiber 302 and proppant 301 are added to the sand-carrying fluid and pumped into the bottom layer;

[0056] Step 10 S27, pumping displacement fluid into the pipe string through surface pumping equipment;

[0057] Step 11 S28, stop the pump and measure the pressure drop according to the designed time;

[0058] Step twelve S29, performing circulating well killing according to the ground pressure.

[0059] In some embodiments, step two S2 may further include: lifting to other fractured layer sections, and repeating steps four S21 to twelve S29.

[0060] In some embodiments, step 2 S2 may further include: completing the perforation, fracturing, and sand control operations of other fracturing layers in the order of lifting.

[0061] In some embodiments, step seven S24 may further include: if the pressure keeps rising and does not drop, repeating step five S22 and step six S23; if the pressure first rises and then drops, executing step eight S25.

[0062] Through the above steps, in this application, the pipe string 200 is used to first perform perforation, fracturing, and sand control on the first fracturing section, and then the pipe string 200 is lifted to the second fracturing section, and the second fracturing section is sandblasted, perforated, fracturing, and sand controlled. Then, the pipe string 200 is lifted to the third fracturing section, and the third fracturing section is sandblasted, perforated, fracturing, and sand controlled. And so on, until the fracturing and sand control operations of all fracturing sections are completed. In this way, the integrated transformation method 100 for stratified fracturing and sand control of loose sandstone reservoirs according to an embodiment of the present invention completes the fracturing and sand control of all fracturing sections by lifting the pipe string 200 and repeating the above steps, which can achieve the purpose of efficiently and economically developing loose sandstone reservoirs.

[0063] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by those skilled in the art to which the present invention belongs.

[0064] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0065] In addition, the terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. In the description of the present invention, the meaning of "plurality" is more than two, unless otherwise clearly and specifically defined.

[0066] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention. In particular, as long as there is no structural conflict, the various technical features mentioned in each embodiment can be combined in any way. The present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.

Claims

1. A method for integrated transformation of loose sandstone reservoir by stratified fracturing and sand control, characterized in that: The steps of the method include: Step 1: Install the integrated pipe string for stratified fracturing and sand control of loose sandstone reservoir, wherein the pipe string includes, from top to bottom, the following connected in sequence: oil pipe, depth calibration nipple, safety joint, oil pipe, centralizer, spray gun, check valve, centralizer, perforated pipe and guide shoe; Step 2: lowering the pipe string into the formation, and performing perforation, fracturing, and sand control operations on the formation including several fracturing sections from bottom to top; Step three, after completing the fracturing and sand control operations of all fracturing stages, lift up the pipe string.

2. The integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs according to claim 1 is characterized in that: The step 1 further comprises: The perforating operation is achieved by adjusting the number of nozzles, nozzle diameter and spraying medium of the sandblasting perforation of the perforating tube.

3. The integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs according to claim 2 is characterized in that: The step 1 further comprises: The perforating operation is achieved by adjusting the construction displacement and injection time of the sandblasting perforation of the perforated pipe.

4. The integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs according to claim 1, characterized in that: The step 2 further comprises: A fiber material with a certain degree of flexibility is mixed in a sand-carrying fluid and injected into the formation to form a composite support structure in the artificial fracture.

5. The integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs according to claim 4 is characterized in that: The composite support structure comprises a proppant and fibers, wherein the proppant is a matrix and the fibers are a reinforcement phase.

6. The integrated reconstruction method for stratified fracturing and sand control of loose sandstone reservoirs according to claim 5 is characterized in that: The composite support structure is a spatial reticular structure.

7. The integrated reconstruction method for stratified fracturing and sand control of loose sandstone reservoirs according to claim 5 or 6, characterized in that: The step 2 further comprises: Step 4: lowering the loose sandstone reservoir stratified fracturing and sand control integrated pipe string to the first fracturing layer section; Step 5, opening the oil casing annulus, pumping liquid and injection medium into the pipe string through ground pumping equipment, and performing sandblasting perforation on the first fracturing layer section; Step six, pumping liquid into the pipe column through ground pumping equipment to circulate the injection medium to the ground; Step 7: Slowly close the annulus and judge whether the perforation is successful by the change of ground pressure; Step eight, pumping the pre-fluid into the pipe string through the surface pumping equipment; Step nine, pumping sand-carrying fluid into the pipe column through ground pumping equipment, performing construction according to the designed pumping procedure, adding a certain amount of the fiber and the proppant into the sand-carrying fluid at the later stage of pumping the sand-carrying fluid, and pumping it into the bottom layer; Step ten, pumping displacement fluid into the pipe string through surface pumping equipment; Step 11, stop the pump and measure the pressure drop according to the designed time; Step 12: Perform circulating well pressure according to the ground pressure.

8. The integrated reconstruction method for stratified fracturing and sand control of loose sandstone reservoirs according to claim 7, characterized in that: The step 2 further comprises: Lift up to other fracturing layers and repeat steps 4 to 12.

9. The integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs according to claim 8, characterized in that: The step 2 further comprises: Complete the perforation, fracturing and sand control construction of other fracturing layers in the order of lifting.

10. The integrated transformation method for stratified fracturing and sand control of loose sandstone reservoirs according to claim 7, characterized in that: The step seven further includes: if the pressure keeps rising and does not drop, repeating the steps five and six; if the pressure first rises and then drops, executing the step eight.