Oil and gas pipeline TBM (Tunnel Boring Machine) tunnel anti-dislocation joint penetrating through active fault zone

By designing the anti-displacement joint structure of TBM rings, shock-absorbing layers, deformation joints and memory alloy plates in the oil and gas pipeline TBM tunnel, the problems of high construction risk and weak anti-displacement ability are solved, and the surrounding rock stability and stability are achieved. Improved seismic performance while ensuring waterproof effect.

CN118774841APending Publication Date: 2024-10-15CHINA PETROLEUM PIPELINE ENG CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310351825.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-04
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

When existing technology crosses active fault zones, the construction risk of TBM tunnels for oil and gas pipelines is high and the ability to resist dislocation is weak. Moreover, conventional methods are not suitable for oil and gas pipeline projects. The surrounding rocks are prone to instability and the structure has poor resistance to dislocation under strong earthquakes. insufficient.

Method used

An anti-displacement joint structure including TBM rings, shock-absorbing layers, deformation joints, memory alloy plates and Ω waterstops was designed. The shock-absorbing layer was filled between the TBM rings and surrounding rocks and set along the tunnel axis. Foam fiber concrete deformation joints, and memory alloy plates are set on the inside to improve seismic performance, while multi-layer waterproofing measures are used to prevent leakage.

Benefits of technology

It effectively reduces the risk of surrounding rock instability, improves the structure's ability to resist dislocation under strong earthquakes, avoids the need to dismantle the TBM ring segments during the construction process, and significantly enhances the structure's seismic performance and waterproofing effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774841A_ABST
    Figure CN118774841A_ABST
Patent Text Reader

Abstract

The invention provides an oil and gas pipeline TBM tunnel anti-dislocation connector penetrating through an active fault zone. The oil and gas pipeline TBM tunnel anti-dislocation connector comprises a TBM ring piece, a damping layer, a deformation joint, a memory alloy plate, an omega water stop belt and a fastener. A gap is formed between the TBM ring piece and the surrounding rock, and the gap is filled with the damping layer; the deformation joints are arranged at intervals in the extending direction of the tunnel axis, penetrate through the TBM ring piece and are filled with foam fiber concrete; the elastic memory alloy plate is arranged on the inner side of the tunnel; the omega-shaped water-stop belt is arranged on one side, far away from the deformation joint, of the memory alloy plate; the fastener sequentially penetrates through the omega-shaped water stop belt and the memory alloy plate so as to fix the omega-shaped water stop belt and the memory alloy plate to the TBM ring piece. The method has the technical effects that the design is reasonable, the risk that the surrounding rock loses support and is unstable is avoided from the source, and the anti-dislocation capability of the structure under a strong earthquake is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oil and gas transportation, and in particular relates to an anti-dislocation joint of a TBM tunnel of an oil and gas pipeline passing through an active fault zone. Background Art

[0002] Tunnels crossing active fault zones have always been a difficult problem in the field of engineering earthquake resistance, and regulations require that special research should be conducted on tunnel projects crossing active fault zones.

[0003] For domestic highway and railway TBM tunnels, the conventional approach to crossing active fault zones is to remove the TBM ring segments, expand the surrounding rock within the active fault zone defense range, and use the drilling and blasting method for construction. This approach to crossing active fault zones has the following shortcomings:

[0004] ①TBM construction disturbs the stability of the surrounding rock in the active fault zone, and the surrounding rock pressure within a range of approximately 3D outside the excavation section is borne by the TBM ring segment. After the ring segment is removed, if the later support is not timely, this part of the surrounding rock is easy to collapse and become unstable, and may even cause the tunnel to be buried. ②The drilling and blasting method is used for excavation expansion + reinforced concrete lining + deformation joints. The overall rigidity of the structure is relatively large, and the ability to resist displacement during an earthquake is relatively weak.

[0005] At present, for oil and gas pipeline TBM tunnel projects, the project often adopts the method of bypassing to avoid crossing active fault zones. However, the conventional method of crossing active fault zones for domestic highway and railway industry TBM tunnels is not applicable to oil and gas pipeline TBM tunnel projects. Summary of the invention

[0006] The present invention aims to solve at least one of the technical problems existing in the prior art and provide a new technical solution for the anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone.

[0007] According to one aspect of the present invention, there is provided an anti-dislocation joint for a TBM tunnel of an oil and gas pipeline crossing an active fault zone, comprising:

[0008] A TBM ring segment and a shock-absorbing layer, wherein a gap is formed between the TBM ring segment and the surrounding rock, and the shock-absorbing layer fills the gap;

[0009] Deformation joints, which are arranged at intervals along the extension direction of the tunnel axis and penetrate the TBM ring segments, and are filled with foam fiber concrete;

[0010] A memory alloy plate, the elastic memory alloy plate is arranged on the inner side of the tunnel, and the memory alloy plate closes the deformation seam;

[0011] An Ω waterstop and a fastener, wherein the Ω waterstop is arranged on a side of the memory alloy plate away from the deformation joint, and the Ω waterstop corresponds to the position of the deformation joint; the fastener passes through the Ω waterstop and the memory alloy plate in sequence to fix the Ω waterstop and the memory alloy plate to the TBM ring piece.

[0012] Optionally, within the fortification range of the active fault zone, the shock-absorbing layer is composed of shock-absorbing material;

[0013] In normal sections of TBM excavation, the shock absorbing layer consists of pea gravel.

[0014] Optionally, the shock-absorbing material is foam fiber concrete.

[0015] Optionally, the lower area of ​​the shock-absorbing layer corresponding to the central angle of 90 degrees of the TBM ring piece is filled with pea gravel.

[0016] Optionally, the distance between two adjacent deformation joints is 12m.

[0017] Optionally, the width of the deformation joint is 20 cm; the thickness of the shock-absorbing layer is 20 cm.

[0018] Optionally, a blocking unit is provided in the shock-absorbing layer, the blocking unit corresponds to the position of the deformation joint and is used to block the deformation joint; the blocking unit is formed by mesh anchor sprayed C40 plain concrete.

[0019] Optionally, the anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone also includes:

[0020] A first waterproof layer, provided between the blocking unit and the deformation joint;

[0021] A second waterproof layer is provided between the TBM ring piece and the memory alloy plate, and the fastener passes through the second waterproof layer.

[0022] Optionally, the first waterproof layer comprises a non-woven fabric layer and an acrylate spray waterproof coating, and the acrylate spray waterproof coating covers the surface of the non-woven fabric layer;

[0023] The second waterproof layer is a rubber sheet.

[0024] Optionally, the maximum recoverable strain of the memory alloy plate is 6% to 8%, and the ultimate strain is 14% to 18%.

[0025] A technical effect of the present invention is:

[0026] In the embodiment of the present application, the structural design of the anti-dislocation joint of the oil and gas pipeline TBM tunnel crossing the active fault zone is reasonable, which effectively solves the problems of high construction risk and weak anti-dislocation ability faced by the existing oil and gas pipeline TBM tunnel when crossing the active fault zone. The TBM ring segments do not need to be removed during the construction process, which fundamentally avoids the risk of surrounding rock losing support and becoming unstable. At the same time, it also greatly improves the structure's anti-dislocation ability under strong earthquakes. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of a shock-absorbing layer of an anti-dislocation joint of a TBM tunnel of an oil and gas pipeline crossing an active fault zone provided by an embodiment of the present invention;

[0028] Figure 2 It is a schematic diagram of an anti-dislocation joint of a TBM tunnel of an oil and gas pipeline crossing an active fault zone provided by an embodiment of the present invention;

[0029] Figure 3 It is a schematic diagram of the connection between the Ω-shaped water stop strip, the memory alloy plate and the TBM ring piece of the anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone provided by the embodiment of the present invention;

[0030] Figure 4 It is a schematic diagram of an Ω-shaped waterstop of an anti-dislocation joint of a TBM tunnel of an oil and gas pipeline crossing an active fault zone provided by an embodiment of the present invention.

[0031] In the figure: 1. shock-absorbing layer; 2. deformation joint; 3. memory alloy plate; 4. Ω-shaped waterstop; 5. TBM ring; 6. reinforcement unit; 7. surrounding rock; 8. plugging unit; 9. first waterproof layer; 10. second waterproof layer; 11. fastener; 12. pressure plate; 13. embedded nut; 14. washer. DETAILED DESCRIPTION

[0032] Various exemplary embodiments of the present application will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangement of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present application.

[0033] The embodiments of the present application will be described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and should not be construed as limitations on the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0034] The term "first" or "second" in the specification and claims of this application may include one or more of the features explicitly or implicitly. In the description of this application, unless otherwise specified, "plurality" means two or more. In addition, "and / or" in the specification and claims means at least one of the connected objects, and the character " / " generally means that the objects connected before and after are in an "or" relationship.

[0035] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0036] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0037] like Figures 1 to 4 As shown, an embodiment of the present application provides an anti-displacement joint for a TBM tunnel of an oil and gas pipeline that crosses an active fault zone. The TBM ring segment 5 does not need to be removed. It can fundamentally avoid the risk of the surrounding rock 7 losing support and becoming unstable, reduce construction risks, and greatly improve the structure's anti-displacement ability under strong earthquakes.

[0038] Specifically, the anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone includes:

[0039] TBM ring segment 5 and shock-absorbing layer 1, a gap is formed between the TBM ring segment 5 and the surrounding rock 7, and the shock-absorbing layer 1 fills the gap; wherein, the material of the TBM ring segment 5 is concrete, which can better support the surrounding rock 7 surface of the tunnel excavation.

[0040] Deformation joints 2, which are arranged at intervals along the extension direction of the tunnel axis and penetrate the TBM ring piece 5, and are filled with foam fiber concrete;

[0041] A memory alloy plate 3, the memory alloy plate 3 having elasticity is arranged on the inner side of the tunnel, and the memory alloy plate 3 closes the deformation joint 2;

[0042] The Ω waterstop and fastener 11, the Ω waterstop is arranged on the side of the memory alloy plate 3 away from the deformation joint 2, and the Ω waterstop corresponds to the position of the deformation joint 2; the fastener 11 passes through the Ω waterstop and the memory alloy plate 3 in sequence to fix the Ω waterstop and the memory alloy plate 3 to the TBM ring piece 5.

[0043] In the embodiment of the present application, the structural design of the anti-dislocation joint of the oil and gas pipeline TBM tunnel crossing the active fault zone is reasonable, which effectively solves the problems of high construction risk and weak anti-dislocation ability faced by the existing oil and gas pipeline TBM tunnel when crossing the active fault zone. The TBM ring segment 5 can be removed during the construction process, which fundamentally avoids the risk of surrounding rock 7 losing support and becoming unstable. At the same time, it also greatly improves the structure's anti-dislocation ability under strong earthquakes.

[0044] Optionally, within the fortification range of the active fault zone, the shock-absorbing layer 1 is composed of shock-absorbing material;

[0045] In the normal section of TBM excavation, the shock absorbing layer 1 is composed of pea gravel.

[0046] In the above embodiment, within the active fault zone defense range, the gap between the surface of the excavated surrounding rock 7 and the outer surface of the TBM ring segment 5 is filled with a shock-absorbing material, such as foam fiber concrete, which not only simplifies the construction steps, but also greatly improves the seismic resistance of the structure. In the ordinary section of TBM excavation, the shock-absorbing layer 1 is composed of pea gravel, which significantly improves the overall strength of the structure.

[0047] Optionally, the shock-absorbing material is foam fiber concrete, which can significantly improve the shock-absorbing effect of the shock-absorbing layer 1, thereby better improving the anti-seismic capacity of the structure.

[0048] Alternatively, see Figure 1 The lower area of ​​the shock-absorbing layer 1 corresponding to the central angle of 90 degrees between the TBM ring segment 5 is filled with pea gravel. The part filled with pea gravel constitutes the reinforcement unit 6 of the shock-absorbing layer 1, which can better improve the supporting strength of the shock-absorbing layer 1 to the TBM ring segment 5.

[0049] In the above embodiment, when the shock-absorbing layer 1 is entirely made of foam fiber concrete, the supporting capacity for the TBM ring segment 5 is relatively weak. Therefore, the portion of the shock-absorbing layer 1 used to support the TBM ring segment 5 can be filled with bean gravel. For example, the lower area of ​​the shock-absorbing layer 1 corresponding to the 90-degree central angle between the shock-absorbing layer 1 and the TBM ring segment 5 is filled with bean gravel, thereby better improving the supporting capacity of the shock-absorbing layer 1 for the TBM ring segment 5 and enhancing the stability of the structure during the construction period.

[0050] Optionally, the distance between two adjacent deformation joints 2 is 12 m.

[0051] In the above embodiment, a foam fiber concrete deformation joint 2 is set every 12m along the axial direction of the TBM tunnel within the defense range of the active fault zone when the TBM tunnel passes through. Since the rigidity of the deformation joint 2 is much smaller than the rigidity of the TBM segment, the deformation concentration effect can be generated, and the seismic action at the non-flexible joint can be avoided.

[0052] Optionally, the width of the deformation joint 2 is 20 cm, and the thickness of the shock-absorbing layer 1 is 20 cm. This can better improve the seismic performance of the TBM tunnel passing through the active fault zone.

[0053] Optionally, a blocking unit 8 is provided in the shock-absorbing layer 1 , and the blocking unit 8 corresponds to the position of the deformation joint 2 and is used to block the deformation joint 2 ; the blocking unit 8 is formed by mesh anchor sprayed C40 plain concrete.

[0054] In the above embodiment, in order to prevent the shock-absorbing layer 1 of the fiber foam concrete at the 12m interval from seeping into the interior of the TBM tunnel through the deformation joint 2 before solidification, a plugging unit 8 is provided at each 12m interval to better block the deformation joint 2, and effectively prevent the shock-absorbing layer 1 from seeping into the interior of the TBM tunnel through the deformation joint 2 before solidification. The plugging unit 8 is formed by mesh anchor spraying C40 plain concrete, and the construction method is relatively simple, and the deformation joint 2 can be better sealed.

[0055] Alternatively, see Figure 2 and Figure 3 The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone also includes:

[0056] The first waterproof layer 9 is provided between the blocking unit 8 and the deformation joint 2

[0057] First waterproof layer 9;

[0058] The second waterproof layer 10 is provided between the TBM ring piece 5 and the memory alloy plate 3 , and the fastener 11 passes through the second waterproof layer 10 .

[0059] In the above embodiment, the first waterproof layer 9 can effectively prevent the groundwater in the surrounding rock 7 of the TBM tunnel from seeping into the interior of the TBM tunnel through the deformation joint 2. The second waterproof layer 10 can further effectively prevent the groundwater in the surrounding rock 7 of the TBM tunnel from seeping into the interior of the TBM tunnel through the deformation joint 2. The first waterproof layer 9 and the second waterproof layer 10 significantly improve the waterproof effect of the anti-dislocation joint of the TBM tunnel.

[0060] In a specific embodiment, see Figure 3 The second waterproof layer 10 is arranged between the TBM ring piece 5 and the memory alloy plate 3, the Ω water stop strip is arranged on the side of the memory alloy plate 3 away from the second waterproof layer 10, the pressure plate 12 is arranged on the side of the Ω water stop strip away from the memory alloy plate 3, the gasket is arranged on the side of the pressure plate 12 away from the memory alloy plate 3, and the fastener 11 passes through the gasket, the pressure plate 12, the Ω water stop strip, the memory alloy plate 3, the second waterproof layer 10 and is connected with the embedded nut 13 embedded in the TBM ring piece 5 in sequence. On the one hand, it is conducive to the construction of the Ω water stop strip, the memory alloy plate 3, the second waterproof layer 10, etc.; on the other hand, it helps to improve the waterproof effect of the connection between the fastener 11 and the TBM ring piece 5.

[0061] Optionally, the first waterproof layer 9 includes a non-woven fabric layer and an acrylate spray waterproof coating, and the acrylate spray waterproof coating covers the surface of the non-woven fabric layer of 400g / m2, which can better improve the waterproof effect of the first waterproof layer 9 and facilitate construction; the second waterproof layer 10 is a rubber sheet, which is conducive to construction and has a better waterproof effect.

[0062] Optionally, attend Figure 4 The maximum recoverable strain of the memory alloy plate 3 is 6% to 8%, and the ultimate strain is 14% to 18%.

[0063] In the above embodiment, the memory alloy plate 3 is arranged inside the tunnel and can be connected to the TBM ring piece 5 by reinforcing bolts, which is conducive to transferring the deformation of the distal joint to the flexible flexible joint (that is, the anti-dislocation joint of the present application). The memory alloy plate 3 has superelastic properties, the maximum recoverable strain is 6% to 8%, and the limit strain is 14% to 18%, which can well improve the seismic performance of the structure. At the same time, within the recoverable strain, the memory alloy plate 3 forms a hysteresis curve to dissipate the energy generated by the earthquake, and the seismic effect is good.

[0064] According to two aspects of the present invention, a construction method for a TBM tunnel anti-dislocation joint of an oil and gas pipeline crossing an active fault zone is provided, comprising the following implementation steps:

[0065] Step 1: Install two half-ring segments at the front pipe ring of the deformation joint so that the contact surface of the pipe ring formed by the two half-ring segments is a vertical surface;

[0066] Step 2: A jack and an adjustable I-beam that can meet the thrust of the TBM are fixedly placed in the middle of the deformation joint and correspond to the support shoe of the thrust cylinder to provide a 20cm vertical contact surface of the deformation joint for the subsequent pipe ring;

[0067] Step 3: Install a stress strain gauge on the front pipe ring to monitor the pressure of the pipe ring;

[0068] Step 4: Before excavating the subsequent pipe ring, fix the contact surface between the jack and the adjustable I-beam and the thrust cylinder, and assemble the two half-ring segments and the subsequent pipe ring after excavating to the predetermined cylinder stroke; use effective brackets and arc devices to fix the jack and the adjustable I-beam so that their positions correspond to the support shoes of the thrust cylinder and the forces are in a straight line.

[0069] Step 5: Install stress strain gauges on subsequent pipe rings to monitor the pressure of the pipe rings;

[0070] Step 6: Use I-beams and pipe ring bolts to make no less than six tensioning devices;

[0071] Step 7: Continue to excavate, and after the deformation joint is separated from the shield tail, anchor rod hanging mesh spraying concrete is applied, and before spraying, pressure relief drainage pipes with gate valves are installed on the deformation joint and the front and rear pipe rings;

[0072] Step 8: During the excavation process, fill the lower pipe segment with pea-grain stone and appropriate amount of foam concrete to stabilize the pipe ring;

[0073] Step 9: After the expansion joint spraying material has finally set, foam concrete can be added in due course;

[0074] Step 10: After the foam concrete behind the pipe ring reaches final setting, release the pressure and take out the jack, adjust the I-beam to release the stress, and apply waterproofing and secondary lining to the expansion joint in due time.

[0075] Optionally, a set of molds for half-ring segments can be customized, and the produced half-ring segments meet the requirements of segment grabbing, installation connection and waterproofing.

[0076] Optionally, an effective bracket and arc device are used to fix the jack and the adjustable I-beam so that the position corresponds to the support shoe of the thrust cylinder and the force is in a straight line.

[0077] Optionally, stress strain gauges for timely monitoring are installed, and data are retrieved in a timely manner to monitor the pressure of the pipe ring in real time.

[0078] Optionally, effective pressure relief and drainage pipes are arranged in the front pipe ring, the subsequent pipe ring and the deformation joint to ensure the quality of the shotcrete.

[0079] Optionally, an effective embedded part device is installed by using the connecting bolts of the front pipe ring and the subsequent pipe ring to provide a placement position and connection welding conditions for the jack, the adjustable I-beam and the tensioning device.

[0080] Optionally, the pressure and amount of the blown-in pea-grain rock and the injection pressure and amount of the foam concrete are strictly controlled to avoid floating of the pipe ring.

[0081] Optionally, before advancing the subsequent pipe ring, the connection and positioning of the thrust cylinder, the jack and the adjustable I-beam are reinforced to prevent slipping during the jacking process.

[0082] Optionally, the thickness and quality of shotcrete can be strictly controlled to ensure that it blocks water and builds pressure, thus providing a closed chamber for the subsequent filling of foam concrete.

[0083] Optionally, the data of the stress strain gauge and the strength of the drilled sampled foam concrete are retrieved in a timely manner, and it is necessary to ensure that the data is zero and the foam concrete reaches the design strength before removing the jack and adjusting the stress of the adjustable I-beam.

[0084] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present invention, but the present invention is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and essence of the present invention, and these modifications and improvements are also considered to be within the scope of protection of the present invention.

Claims

1. A TBM tunnel anti-dislocation joint for an oil and gas pipeline crossing an active fault zone, characterized in that: include: A TBM ring segment and a shock-absorbing layer, wherein a gap is formed between the TBM ring segment and the surrounding rock, and the shock-absorbing layer fills the gap; Deformation joints, which are arranged at intervals along the extension direction of the tunnel axis and penetrate the TBM ring segments, and are filled with foam fiber concrete; A memory alloy plate, the elastic memory alloy plate is arranged on the inner side of the tunnel, and the memory alloy plate closes the deformation seam; An Ω waterstop and a fastener, wherein the Ω waterstop is arranged on a side of the memory alloy plate away from the deformation joint, and the Ω waterstop corresponds to the position of the deformation joint; the fastener passes through the Ω waterstop and the memory alloy plate in sequence to fix the Ω waterstop and the memory alloy plate to the TBM ring piece.

2. The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone according to claim 1 is characterized in that: Within the fortification range of the active fault zone, the shock-absorbing layer is composed of shock-absorbing materials; In normal sections of TBM excavation, the shock absorbing layer consists of pea gravel.

3. The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone according to claim 2 is characterized in that: The shock-absorbing material is foam fiber concrete.

4. The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone according to claim 3 is characterized in that: The lower area of ​​the shock-absorbing layer corresponding to the central angle of 90 degrees of the TBM ring segment is filled with pea gravel.

5. The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone according to claim 1 is characterized in that: The distance between two adjacent deformation joints is 12m.

6. The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone according to claim 1 is characterized in that: The width of the deformation joint is 20 cm; the thickness of the shock-absorbing layer is 20 cm.

7. The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone according to claim 1 is characterized in that: A plugging unit is provided in the shock-absorbing layer, and the plugging unit corresponds to the position of the deformation joint and is used to plug the deformation joint; the plugging unit is formed by mesh anchor sprayed C40 plain concrete.

8. The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone according to claim 7 is characterized in that: Also includes: A first waterproof layer, provided between the blocking unit and the deformation joint; A second waterproof layer is provided between the TBM ring piece and the memory alloy plate, and the fastener passes through the second waterproof layer.

9. The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone according to claim 8 is characterized in that: The first waterproof layer comprises a non-woven fabric layer and an acrylate spray waterproof coating, and the acrylate spray waterproof coating covers the surface of the non-woven fabric layer; The second waterproof layer is a rubber sheet.

10. The anti-dislocation joint of the TBM tunnel of the oil and gas pipeline crossing the active fault zone according to claim 1, characterized in that: The maximum recoverable strain of the memory alloy plate is 6% to 8%, and the ultimate strain is 14% to 18%.