Pipe jacking construction method, pipe jacking and pipe jacking tunneling system

By using casings with different inner hole sizes to transmit the pushing force during pipe jacking construction, and using them as permanent supports after being locked, the problem of locked pipe jacking is solved and the continuity and stability of the construction are ensured.

CN118774845APending Publication Date: 2024-10-15CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410894448.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

During the pipe jacking construction process, the jacked pipe cannot continue to be jacked after it is locked, resulting in construction failure, especially when the stratum is rich in water and the stratum is broken or the stratum is convergent.

Method used

Use casings with different inner hole sizes to transmit the thrust force. Use the casing with the larger inner hole first to transmit the thrust force. After being locked, leave it in the formation as permanent support. Switch to the casing with the smaller inner hole. Pass the casing through it and continue pushing until the target distance is completed.

Benefits of technology

It ensures that the construction can proceed normally and avoids project failure caused by the locked casing during construction. The casing with a smaller inner hole is passed through the locked casing to continue jacking, achieving the continuity and stability of the construction. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774845A_ABST
    Figure CN118774845A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of tunneling, and particularly provides a jacking pipe construction method, a jacking pipe and a jacking pipe tunneling system. The pipe jacking construction method comprises the steps that in the construction process, when a first casing pipe for transmitting jacking force on the outermost layer is locked and cannot be jacked normally, a second casing pipe smaller than an inner hole of the first casing pipe is switched to be used for transmitting the jacking force, the second casing pipe is jacked and pushed to pass through the interior of the first casing pipe, so that a pipe jacking machine main machine is jacked to advance, and the jacking force is transmitted; and when the target distance is completed or the second sleeve is locked, a third sleeve smaller than an inner hole of the second sleeve is switched to be used for transmitting the jacking force, the third sleeve is pushed to pass through the interior of the second sleeve so as to push the main machine of the pipe jacking machine to advance, and the rest can be done in the same way until the target distance is completed, so that normal construction is guaranteed. The pipe jacking is used for realizing the pipe jacking construction method. The jacking pipe tunneling system comprises the jacking pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel excavation, and in particular relates to a pipe jacking construction method, a pipe jacking and a pipe jacking excavation system. Background Art

[0002] As a method of underground tunnel construction by concealed excavation, the pipe jacking method has the advantages of few pipe joints (the jacking pipe can be prefabricated as a whole), easy control of surface settlement, and good safety. It is suitable for excavation construction in various strata. The pipe jacking system mainly includes a main pipe jacking machine for excavating and breaking rocks, a jacking pipe that plays a role in supporting and transmitting force (thrusting force), and a jacking device. The main machine generally includes a cutter head, a shield, a main drive, etc., and the jacking device generally includes a jacking cylinder, a jacking iron, a back wall, etc. During construction, the jacking cylinder configured by the jacking device extends to push the first section of the jacking pipe and the main machine forward into the stratum (soil layer or rock layer). When the first section of the jacking pipe is completely pushed into the stratum, the second section of the jacking pipe is connected to the back of the first section of the jacking pipe and continues to push forward. According to this process, the jacking pipes are connected section by section until the tunnel is formed.

[0003] It is not difficult to understand from the analysis of the above process that during the construction process, the jacking pipe and the formation (tunnel wall) are in a sliding fit relationship. However, in actual construction, the jacking pipe may be locked and unable to continue to advance, resulting in the failure of the project construction. For example, when constructing in a water-rich and broken formation, in order to avoid a large amount of water gushing, grouting and sealing are required between the jacking pipe and the formation. However, from the perspective of the entire construction section, the water-rich and broken formation may be located in the middle of the construction section. After grouting and sealing, it is necessary to continue to advance, but the solidification of the slurry will cause the jacking pipe to be locked. For example, in a long-distance jacking tunneling project, as the formation converges, the jacking pipe may be locked by the formation. Summary of the invention

[0004] The purpose of the present invention is to provide a pipe jacking construction method to solve the technical problem in the prior art that the pipe jacking cannot be continued after being locked. The purpose of the present invention is also to provide a pipe jacking and a pipe jacking excavation system including the pipe jacking to solve the same technical problem.

[0005] To achieve the above purpose, the technical solution of the pipe jacking construction method provided by the present invention is:

[0006] A pipe jacking construction method, during the construction process, when the outermost first casing pipe for transmitting the jacking thrust is locked and cannot be pushed forward normally, a second casing pipe with a smaller inner hole than the first casing pipe is switched to transmit the jacking thrust, and the second casing pipe is pushed to pass through the inside of the first casing pipe to push the main machine of the pipe jacking machine forward until a target distance is completed or until the second casing pipe is locked, and a third casing pipe with a smaller inner hole than the second casing pipe is switched to transmit the jacking thrust, and the third casing pipe is pushed to pass through the inside of the second casing pipe to push the main machine of the pipe jacking machine forward, and so on, until the target distance is completed.

[0007] As a further improvement, two adjacent first casings in the front-to-back direction are connected and sealed, and the frontmost first casing is connected and sealed to the main body of the pipe jacking machine. When the first casing is locked and cannot be pushed forward normally, the connection between the frontmost first casing and the main body of the pipe jacking machine is first released, and then the second casing is switched to use.

[0008] As a further improvement, when excavating to a water-rich stratum, a drainage pipe is connected through the drainage hole on the casing that is directly in contact with the stratum at this time to drain the stratum water.

[0009] As a further improvement, after the formation water is drained away or during the drainage process, a grouting pipe is connected through the grouting hole to inject grout between the casing and the formation.

[0010] As a further improvement, when the main machine of the pipe jacking machine starts, at least two casings with different inner hole sizes, including a first casing and a second casing, are connected to the tail of the main machine of the pipe jacking machine, and various casings are connected by at least one section to form a layered casing structure nested inside and outside, and the supporting equipment used by the main machine of the pipe jacking machine is placed in the innermost casing.

[0011] The beneficial effect is that the present invention is a pioneering invention. Specifically, in actual construction, if the casing is locked, the casing can be directly left in the stratum to form a permanent support, and the casing with a smaller inner hole is used to transmit the jacking force. During the jacking process, the casing with a smaller inner hole passes through the casing left in the stratum, so that the main machine of the jacking machine continues to move forward, ensuring that the construction can proceed normally.

[0012] To achieve the above purpose, the technical solution of pipe jacking provided by the present invention is:

[0013] A pipe jacking includes at least two casings with different inner hole sizes. The casing with a larger inner hole has a passing space inside for allowing the casing with a smaller inner hole to pass through it. One end of each casing is a pushing end for pushing a main machine of a pipe jacking machine, so that after the casing with a larger inner hole is locked, the casing with a smaller inner hole passes through the locked casing to push the main machine of the pipe jacking machine forward.

[0014] As a further improvement, the pushing end of the casing with the largest inner hole is provided with a connecting structure for connecting to the main body of the jacking machine or another casing adapted thereto and a sealing portion for sealing cooperation, and the other end is provided with a connecting structure for connecting to another casing adapted thereto and a sealing portion for sealing cooperation.

[0015] As a further improvement, the connection structure provided at the pushing end is a detachable connection structure.

[0016] As a further improvement, a sealing member is provided on the outer periphery of the sleeve having the largest inner hole.

[0017] As a further improvement, a sealing installation groove is provided on the outer periphery of the sleeve with the largest inner hole, and a sealing member is arranged in the sealing installation groove.

[0018] As a further improvement, the sleeve with the largest inner hole is composed of three sections of tube body spliced ​​together front and back, and the outer circumferential size of the tube body in the middle is smaller than the outer circumferential size of the front and rear sections of the tube body, so that the outer circumferential surface of the middle tube body forms the bottom surface of the sealing installation groove, and the end surfaces of the front and rear sections of the tube body facing the middle tube body form the side surfaces of the sealing installation groove.

[0019] As a further improvement, the two ends of the middle tube body are connected to the front and rear tube bodies through splicing rings respectively, and the inner circumference of the splicing ring is provided with a supporting structure for supporting a sleeve with a smaller inner hole passing through the sleeve.

[0020] As a further improvement, a plurality of reinforcing ribs spaced apart in the circumferential direction are connected between the two splicing rings, and the supporting structure is provided on the inner side of the reinforcing ribs.

[0021] As a further improvement, the sleeve with the largest inner hole is provided with a friction reducing hole for connecting the friction reducing agent injection pipe, and the sealing element is provided with at least two sealing elements spaced apart from each other, and the friction reducing hole is provided between two adjacent sealing elements.

[0022] As a further improvement, the sleeve with the largest inner hole is provided with a drainage hole for connecting a drainage pipe, and the drainage hole is arranged on a side of the sealing member away from the push end.

[0023] As a further improvement, the casing with the largest inner hole is provided with a grouting hole for connecting the grouting pipe, and the grouting hole is arranged on a side of the sealing member away from the jacking end.

[0024] As a further improvement, a supporting structure for supporting a sleeve with a smaller inner hole passing through the sleeve is provided on the inner periphery of the sleeve.

[0025] As a further improvement, each sleeve includes a cylindrical main body and a top ring connected to both ends of the main body, the inner circumference of the top ring is smaller than the inner circumference of the main body, and one end of the top ring forms a push end.

[0026] As a further improvement, the interior of the casing with the smallest inner hole has an equipment installation space for placing the supporting equipment required by the main machine of the pipe jacking machine.

[0027] As a further improvement, the length of the sleeve with the largest inner hole is not less than the lengths of the other sleeves.

[0028] The beneficial effect is that the present invention is a pioneering invention. Specifically, since each casing has a pushing part for pushing the main machine of the pipe jacking machine, in actual construction, the casing with a larger inner hole is first used to push the main machine of the pipe jacking machine forward. If the casing is locked, the casing can be directly left in the formation to form a permanent support, and then the casing with a smaller inner hole is used to transmit the pushing force to push the main machine of the pipe jacking machine forward. During the pushing process, the casing with a smaller inner hole passes through the casing left in the formation, thereby pushing the main machine of the pipe jacking machine to continue to move forward, ensuring that the construction can proceed normally.

[0029] To achieve the above purpose, the technical solution of the pipe jacking system provided by the present invention is:

[0030] A pipe jacking system includes a pipe jacking used in the excavation process, wherein the pipe jacking includes at least two casings with different inner hole sizes, wherein the casing with a larger inner hole has a passing space inside for allowing the casing with a smaller inner hole to pass through the inside thereof, and one end of each casing is a pushing end for pushing a main machine of a pipe jacking machine, so that after the casing with a larger inner hole is locked, the casing with a smaller inner hole passes through the locked casing to push the main machine of the pipe jacking machine forward.

[0031] As a further improvement, the pushing end of the casing with the largest inner hole is provided with a connecting structure for connecting to the main body of the jacking machine or another casing adapted thereto and a sealing portion for sealing cooperation, and the other end is provided with a connecting structure for connecting to another casing adapted thereto and a sealing portion for sealing cooperation.

[0032] As a further improvement, the connection structure provided at the pushing end is a detachable connection structure.

[0033] As a further improvement, a sealing member is provided on the outer periphery of the sleeve having the largest inner hole.

[0034] As a further improvement, a sealing installation groove is provided on the outer periphery of the sleeve with the largest inner hole, and a sealing member is arranged in the sealing installation groove.

[0035] As a further improvement, the sleeve with the largest inner hole is composed of three sections of tube body spliced ​​together front and back, and the outer circumferential size of the tube body in the middle is smaller than the outer circumferential size of the front and rear sections of the tube body, so that the outer circumferential surface of the middle tube body forms the bottom surface of the sealing installation groove, and the end surfaces of the front and rear sections of the tube body facing the middle tube body form the side surfaces of the sealing installation groove.

[0036] As a further improvement, the two ends of the middle tube body are connected to the front and rear tube bodies through splicing rings respectively, and the inner circumference of the splicing ring is provided with a supporting structure for supporting a sleeve with a smaller inner hole passing through the sleeve.

[0037] As a further improvement, a plurality of reinforcing ribs spaced apart in the circumferential direction are connected between the two splicing rings, and the supporting structure is provided on the inner side of the reinforcing ribs.

[0038] As a further improvement, the sleeve with the largest inner hole is provided with a friction reducing hole for connecting the friction reducing agent injection pipe, and the sealing element is provided with at least two sealing elements spaced apart from each other, and the friction reducing hole is provided between two adjacent sealing elements.

[0039] As a further improvement, the sleeve with the largest inner hole is provided with a drainage hole for connecting a drainage pipe, and the drainage hole is arranged on a side of the sealing member away from the push end.

[0040] As a further improvement, the casing with the largest inner hole is provided with a grouting hole for connecting the grouting pipe, and the grouting hole is arranged on a side of the sealing member away from the jacking end.

[0041] As a further improvement, a supporting structure for supporting a sleeve with a smaller inner hole passing through the sleeve is provided on the inner periphery of the sleeve.

[0042] As a further improvement, each sleeve includes a cylindrical main body and a top ring connected to both ends of the main body, the inner circumference of the top ring is smaller than the inner circumference of the main body, and one end of the top ring forms a push end.

[0043] As a further improvement, the interior of the casing with the smallest inner hole has an equipment installation space for placing the supporting equipment required by the main machine of the pipe jacking machine.

[0044] As a further improvement, the length of the sleeve with the largest inner hole is not less than the lengths of the other sleeves.

[0045] The beneficial effect is that the present invention belongs to an improved invention. Specifically, since each casing has a pushing part for pushing the main machine of the pipe jacking machine, in actual construction, the casing with a larger inner hole is first used to push the main machine of the pipe jacking machine forward. If the casing is locked, the casing can be directly left in the formation to form a permanent support, and then the casing with a smaller inner hole is used to transmit the pushing force to push the main machine of the pipe jacking machine forward. During the pushing process, the casing with a smaller inner hole passes through the casing left in the formation, thereby pushing the main machine of the pipe jacking machine to continue to move forward, ensuring that the construction can proceed normally. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a schematic diagram of an embodiment of the pipe jacking construction method of the present invention during horizontal excavation construction;

[0047] Figure 2 A schematic diagram of an embodiment of the pipe jacking construction method of the present invention during diagonally downward excavation construction;

[0048] Figure 3 It is a schematic diagram of an embodiment of the pipe jacking construction method of the present invention, in which the inner casing is switched to continue excavation during construction;

[0049] Figure 4 for Figure 1 A partial cross-sectional view of the middle top tube;

[0050] Figure 5 for Figure 3 A partial cross-sectional view of the top tube position;

[0051] Figure 6 for Figure 1 A partial cross-sectional view of the location of the starting supporting device.

[0052] Description of reference numerals:

[0053] 1. Main machine of pipe jacking machine; 2. Pipe jacking; 3. Pushing device; 4. Starting supporting device; 5. Grouting consolidation layer; 6. Grouting pipe; 7. Friction reducer injection pipe; 8. Starting guide rail; 101. Cutter head; 102. Front shield; 103. Articulated cylinder; 104. Tail shield; 105. Main drive; 106. Slag discharge device; 201. Outer casing; 202. Inner casing; 203. Seal; 204. Friction reducing hole; 205. Functional hole; 206. Top ring; 207. Splicing ring; 208. Reinforcement rib; 301. Top iron; 302. Pushing cylinder; 303. Back wall; 401. Tunnel gate seal. DETAILED DESCRIPTION

[0054] In the face of the technical problem that the jacking pipe cannot be pushed further after being locked by the stratum or the consolidated grouting layer during the jacking construction, the basic technical concept of the present invention is that during the construction, the casing with a larger inner hole is first used to transmit the jacking force, and the main machine of the jacking machine is pushed forward. When the casing is locked and cannot be pushed, the casing is left in the stratum to play a permanent support role. Then the casing with a smaller inner hole is switched to transmit the jacking force, and the jacking casing passes through the casing left in the stratum, and the main machine of the jacking machine is continuously pushed forward to dig forward, and so on, to ensure the normal progress of the construction.

[0055] The present invention is further described in detail below in conjunction with embodiments.

[0056] Specific embodiments of the pipe jacking construction method provided by the present invention:

[0057] The pipe jacking construction method provided in this embodiment is as follows during construction: Figure 1-Figure 3As shown, it is suitable for horizontal project excavation and inclined shaft project excavation. Specifically, during construction, the jacking excavation system used includes a main pipe jacking machine 1, a jacking pipe 2, a jacking device 3, a starting guide rail 8, etc. The main pipe jacking machine 1 is used to excavate the soil layer forward. More specifically, the main pipe jacking machine 1 includes a cutter head 101, a shield body, a main drive 105, a slag discharge device 106, etc. The shield body includes a front shield 102 and a rear shield 104. An articulated cylinder 103 is hinged between the front shield 102 and the rear shield 104. When the articulated cylinder 103 is configured, the articulated cylinder 103 can be actively controlled to actively adjust the excavation direction of the main pipe jacking machine 1. Of course, in other implementations, the shield body can also only include the front shield 102.

[0058] Considering that there may be water-rich strata during actual excavation, in order to avoid a large amount of water gushing, a seal is provided between the front shield 102 and the rear shield so that a closed pressure-maintaining space is formed inside the shield. At the same time, the slag discharge device 106 is configured as a slurry discharge device capable of pumping out slurry, specifically including a slurry discharge pipe and a slurry discharge pump. In addition, the top pipe excavation system also includes an initial supporting device 4, such as Figure 6 As shown, the starting supporting device 4 includes a tunnel door seal 401, which plays the role of sealing and maintaining pressure with the shield of the pipe jacking machine main body 1 at the time of starting. Of course, in other embodiments, if the actual excavation stratum is a hard rock stratum with less water content, for the pipe jacking machine main body 1, the corresponding sealing and pressure maintaining components can be omitted.

[0059] The structure of the pushing device 3 is as follows: Figure 1 and Figure 2 As shown, it includes a jacking cylinder 302, a rear wall 303, and a top iron 301. The jacking cylinder 302 is configured with multiple, and the specific number is not specifically limited. The rear wall 303 is used to be close to the pit wall of the starting foundation pit to form a reaction force support foundation. One end of the jacking cylinder 302 is connected to the rear wall 303, and the other end is connected to the top iron 301. The jacking cylinder 302 extends out, and the top iron 301 can push the top pipe 2 forward, thereby providing a jacking force for the main body 1 of the jacking machine to move forward. The top iron 301 can be an annular structure or a top plate connected to the end of the jacking cylinder 302. The front end of the top iron 301 is used to push the top pipe 2.

[0060] The starting guide rail 8 is arranged in the starting foundation pit. During construction, the main body 1 of the jacking machine and the jacking pipe 2 are arranged on the starting guide rail 8 and can slide along the starting guide rail 8. This can provide guidance for the movement of the main body 1 of the jacking machine and the jacking pipe 2 to ensure the excavation accuracy.

[0061] It should be noted that the specific structure and arrangement method of the jacking device 3, the starting guide rail 8 and the main body 1 of the pipe jacking machine can be consistent with the existing technology and will not be repeated here.

[0062] The jacking pipe 2 used in this embodiment includes more than two sizes of casings, and the size refers to the inner hole size. The space inside the casing with a larger inner hole is sufficient for the casing with a smaller inner hole to pass through it, and no matter which specification of the casing, one end (front end) of the casing has a pushing part for pushing the main body 1 of the jacking machine. It should be noted here that during the construction process, more than one section of the jacking pipe 2 is used, so in fact, the frontmost casing directly pushes the main body 1 of the jacking machine, and the front end of the rear casing indirectly pushes the main body 1 of the jacking machine by pushing the casing at its front end.

[0063] Therefore, during construction, each casing is used as a casing to transmit the jacking force to push the main machine 1 of the pipe jacking machine forward. During construction, if the casing with a larger inner hole is locked, there is no need to release the locked state of the casing, and the locked casing is directly left in the formation to form a permanent support. In the next stage, the casing with a smaller inner hole can be used as a force transmission pipe to transmit the jacking force to push the main machine 1 of the pipe jacking machine forward. In this process, the casing with a smaller inner hole can pass through the locked casing in the previous stage.

[0064] Specifically, Figure 1-Figure 5 As shown, taking the jacking pipe 2 including two sizes of casings as an example, the jacking pipe 2 includes an inner casing 202 and an outer casing 201, and the inner hole of the inner casing 202 is smaller than the inner hole of the outer casing 201, so that the inner casing 202 can be nested in the outer casing 201 and can slide forward along the outer casing 201. It should be noted here that since the cross-section of the tunnel excavated by the jacking machine main unit 1 is generally circular, and the structure of the jacking pipe 2 is generally cylindrical, the movement between the inner casing 202 and the outer casing 201 can be understood as axial movement, and the inner holes of the inner casing 202 and the outer casing 201 can be understood as the aperture size. However, in other embodiments, the jacking pipe 2 can also be a special-shaped jacking pipe, in which case the inner holes of the inner casing 202 and the outer casing 201 can be understood as the circumference size of the inner hole.

[0065] During construction, the jacking device 3 can first push the outer casing 201, and transmit the jacking force through the outer casing 201 to push the main machine 1 of the jacking machine forward, and the outer casing 201 is directly in contact with the formation. As the construction progresses, when the outer casing 201 in direct contact with the formation is locked and cannot be pushed forward normally due to formation convergence and other reasons, the outer casing 201 is directly left in the formation, and then the inner casing 202 can be switched to enable the jacking of the inner casing 202, and the inner casing 202 passes through the inner casing 201, and the main machine 1 of the jacking machine continues to be pushed forward through the inner casing 202 until the target distance is completed.

[0066] A vertically extending partition is provided at the rear of the tail shield 104, and both the inner casing 202 and the outer casing 201 can push the partition to push the main pipe jacking machine 1 forward. In addition, for the pushing device 3, the size of the push iron 301 can be flexibly set according to the size of the inner casing 202 and the outer casing 201 to ensure that the pushing force of the pushing cylinder 302 can be transmitted to the inner casing 202 and the outer casing 201.

[0067] It should be noted here that Figure 1-Figure 5 Only one method of using two-layer casing for tunneling is given, but it is not difficult to understand that in actual construction, for a tunnel project with a longer distance, the inner casing 202 may also be locked during subsequent tunneling. Therefore, for the jacking pipe, the casing sizes used may be three or more. For example, taking three sizes of casing as an example, one size can be added. Figure 1 In other words, a casing that can be set inside the inner casing 202 is added. In the previous stage, the outer casing 201 is first used as a force transmission tube. When the outer casing 201 is locked, the inner casing 202 is activated. During the jacking process, the inner casing 202 can pass through the outer casing 201. Then the inner casing 202 becomes the casing that directly contacts the formation. When the inner casing 202 is locked, in the next stage, the casing inside the inner casing 202 is activated. During the jacking process, the casing inside the inner casing 202 passes through the inner casing 202. It is not difficult to understand that if the three sizes of casing are still not enough to complete the construction of the whole process, a fourth or even more sizes of casing can be added by analogy.

[0068] In general, during the construction process, if the casing that is in contact with the formation and transmits the jacking force is locked and cannot be pushed forward, the locked casing will be left in the formation. In the next stage, a casing with a smaller inner hole than the casing left in the formation in the previous stage will be used as a force transmission tube for transmitting the jacking force. The jacking force transmission tube passes through the inside of the casing left in the formation in the previous stage to push the main body of the pipe jacking machine to continue to push forward.

[0069] As mentioned above, water-rich formations may be encountered during actual construction. In order to prevent formation water from flowing into the interior through the jacking pipe 2, during actual construction, the outermost casing that transmits the jacking force should be used first. In other words, it should be in the casing with the largest inner hole, that is, the outer casing 201 that is in direct contact with the formation used from the starting section to the water-rich section. The two adjacent outer casings 201 in the front-to-back direction are connected and sealed, and the frontmost outer casing 201 is connected and sealed to the main body 1 of the jacking machine. For the casing with the largest inner hole, during actual construction, the frontmost casing jacking end should be provided with a connection structure connected to the main body of the jacking machine, and the other end opposite to the jacking end should be provided with a connection structure connected to another casing, and the jacking end of the casing should be provided with a connection structure connected to another casing adapted thereto, and the other end opposite to the jacking end should be provided with a connection structure connected to another casing. Of course, a sealing portion should also be provided at each end. Specifically, such as Figure 4 As shown, a sealing ring groove may be provided at the end of the outer sleeve 201, and a sealing ring may be placed in the sealing ring groove.

[0070] In this way, in the entire construction area, for example, there is a section of water-rich strata in the AB section, the frontmost outer casing 201 and the main body 1 of the pipe jacking machine are sealed, and the two adjacent outer casings 201 in the front and rear directions are also sealed, so that the formation water can be prevented from pouring into the interior. Of course, if there are two intervals of water-rich strata in the entire construction area, for example, in the AB section, a sealing structure and a connecting structure can also be set at the end of the inner casing 202 to achieve sealing between the inner casing 202 and the main body of the pipe jacking machine 2, and between two adjacent inner casings 202.

[0071] However, it should be noted that since the outer casing 201 is connected to the main machine 1 of the pipe jacking machine, when the outer casing 201 is locked, before the inner casing 202 is activated, the connection between the outer casing 201 and the main machine 1 of the pipe jacking machine should be released first. Preferably, the connection structure provided at the front end of the outer casing 201, that is, the pushing end, is preferably a detachable connection structure, for example Figure 4 In other embodiments, the detachable connection structure may also adopt a socket joint commonly used in pipe segment connection. It should be added here that the connection structure between the outer sleeve 201 and the main body 1 of the pipe jacking machine is not necessarily a detachable connection structure. For example, the outer sleeve 201 may actually use a steel pipe, and the steel pipe may be welded to the tail shield 104 of the main body 1 of the pipe jacking machine, and the connection structure is equivalent to a welded structure. During actual construction, if the connection between the outer sleeve 201 and the tail shield 104 is to be released, the outer sleeve 201 can be cut off from the tail shield 104, for example, by flame cutting.

[0072] It should also be noted that if there is no water-rich stratum in the entire construction area and the casing is locked only due to stratum convergence, then in practice, in other implementations, the casings and the frontmost casing and the main machine of the pipe jacking machine may not be connected and do not require sealing.

[0073] Furthermore, as a preferred solution, when excavating in a water-rich stratum, in order to prevent the formation water from flowing back and forth, the casing with the largest inner hole, that is, Figure 1-Figure 5 The outer periphery of the outer casing 201 is provided with a seal 203, and the seal 203 can prevent the formation water from flowing back and forth. Figure 4 and Figure 5 As shown, the seal 203 is preferably a seal steel brush with better wear resistance. Of course, in other embodiments, the seal 203 can also be a seal ring made of wear-resistant rubber.

[0074] In order to prevent the seal 203 from being worn out due to friction resistance when the outer sleeve 201 moves forward, no matter which type of seal 203 is used, a friction reduction hole 204 can be provided in the sleeve equipped with the seal 203. Figure 4 As shown, the friction reducing agent injection pipe 7 can be connected to the friction reducing hole 204, and the friction reducing agent, such as grease or friction reducing slurry, can be injected between the casing and the formation through the friction reducing hole 204.

[0075] Furthermore, the sealing member 203 is provided with two rows spaced apart from each other, and the friction reducing hole 204 is provided between two adjacent rows of sealing members 203. Figure 5 As shown, under the action of two sealing members 203, the injected friction reducing agent can form an annular liquid water retaining ring, which not only has a better friction reducing effect, but also can play a better water retaining effect, achieving the effect of 1+1>2. Of course, more than three sealing members 203 can be set at intervals in front and back, and friction reducing holes 204 can be set between two adjacent sealing members 203.

[0076] In addition, whether or not the friction reducing hole 204 is provided, as another solution to reduce the friction between the seal 203 and the formation, as Figure 4 and Figure 5 As shown, the outer circumference of the sleeve provided with the seal 203, that is, the outer sleeve 201, has a seal installation groove, and the seal 203 is installed in the seal installation groove, which can avoid excessive compression of the seal 203 during construction and reduce the friction of the seal 203. Of course, the groove depth of the seal installation groove should not be too large, and it should be ensured that after the seal 203 is installed, a part of it still protrudes from the seal installation groove so as to be compressed during use to ensure the sealing effect.

[0077] As a way to facilitate the processing of sealing installation grooves, such as Figure 4 and Figure 5As shown, the outer sleeve 201 is actually formed by splicing three sections of tube bodies, which are spliced ​​in sequence front to back (which can be welded or bolted), and the outer circumferential size of the middle tube body is smaller than the outer circumferential sizes of the front and rear sections of the tube body, so that the outer circumferential surface of the middle tube body forms the bottom surface of the sealing installation groove, and the end surfaces of the front and rear sections of the tube body facing the middle tube body form the side surfaces of the sealing installation groove.

[0078] Of course, in other implementations, the outer sleeve 201 may be an integral structure, and a sealing installation groove may be machined on the outer periphery of the outer sleeve 201 by means of machining.

[0079] In order to improve the strength of the outer sleeve 201, the two ends of the middle tube body are connected to the front and rear sections of the tube body through a splicing ring 207. At the same time, the inner circumference of the splicing ring 207 is provided with a support structure for supporting a smaller sleeve passing through the outer sleeve 201, that is, the inner sleeve 202. During actual construction, the support structure can play a role in positioning and supporting the inner sleeve 202, which is convenient for connecting the inner sleeve 202 during construction, and can also provide a guiding role for the movement of the inner sleeve 202. Specifically, the inner circumference size of the splicing ring 207 can be adapted to the outer circumference size of the inner sleeve 202, so that the inner circumference of the splicing ring forms the above-mentioned support structure. Of course, in other embodiments, an independent support structure, such as a support guide wheel, can also be set on the inner circumference of the splicing ring.

[0080] Furthermore, a plurality of circumferentially spaced reinforcing ribs are connected between the two splicing rings, and the provision of the reinforcing ribs can also play a role in strengthening the strength of the outer sleeve 201. At the same time, the inner side of the reinforcing ribs, i.e. Figure 4 A supporting structure for supporting the inner sleeve 202 is also provided on the lower side of the housing, so that the supporting effect on the inner sleeve 202 can also be strengthened.

[0081] It should also be noted that, with the support structure configured, it is convenient for workers to connect the inner sleeve 202 and also convenient for guiding and moving the inner sleeve 202. In other embodiments, regardless of whether the outer sleeve is composed of three sections of pipe body, a support structure can be provided inside the outer sleeve to support the inner sleeve.

[0082] In order to facilitate grouting between the casing and the formation and draining the water between the casing and the formation when excavating in water-rich formations, Figure 4 and Figure 5 As shown, at least the casing with the largest inner hole, i.e., the outer casing 201, should be provided with a drainage hole. During the construction process, a drainage pipe can be connected through the drainage hole on the outer casing 201 to pump out the formation water. Of course, at least a grouting hole should also be provided in the casing with the largest inner hole, i.e., the outer casing 201. During the construction process, a grouting pipe 6 can be connected through the grouting hole to grout outwards.

[0083] Specifically, in this embodiment, the drainage hole and the grouting hole are the same hole, namely, the functional hole 205, and in the case of being provided with a seal 203, the functional hole 205 should be arranged behind the seal 203, and a plurality of functional holes 205 should be arranged at intervals. In actual construction, the drainage pipe can be connected through the functional hole 205 to pump out the formation water. After the formation water is pumped out, the grouting pipe 6 can be connected to the functional hole 205 to grout outward, and after the slurry is solidified, a grouting consolidation layer 5 is formed, and finally the outer casing 201 and the formation are consolidated into one to form a permanent support. At the same time, since the functional hole 205 is arranged behind the seal 203, the seal 203 can also prevent the slurry from flowing forward to the shield body, and prevent the slurry from solidifying and causing the main machine 1 of the pipe jacking machine to lock. That is to say, at this time, a slurry containing a quick-setting agent can be selected to quickly consolidate the support. It should be supplemented that for strata with a large water content, grouting can be performed while draining water during construction.

[0084] In other embodiments, the drainage hole connected to the drainage pipe can also be set on the shield body. Of course, it is necessary to select a slurry that solidifies slowly (compared to the quick-setting slurry) to avoid the shield body being locked due to the rapid solidification of the slurry. After the main body 1 of the pipe jacking machine passes, the slurry solidifies to form a grouting consolidation layer. In other embodiments, the drainage hole connected to the drainage pipe and the grouting hole connected to the grouting pipe can also be set separately, but this requires drilling more holes, and the operation is relatively complicated.

[0085] It should be noted that, regardless of whether the seal 203 is provided in other embodiments, the outer sleeve 201 can be provided with drainage holes and grouting holes, which can also facilitate drainage and grouting during actual construction. In addition, in order to improve the efficiency of the connection, no matter which pipeline is connected, the quick-connect connector in the prior art can be used.

[0086] It should also be added that, during actual construction, it is not necessary to set grouting holes and drainage holes in all outer casings. Grouting holes and drainage holes can be set in part of the outer casing close to the front end of the main body 1 of the pipe jacking machine, for example, drainage holes and grouting holes can be set in the first section of the outer casing at the front end or the first and second sections of the outer casing.

[0087] As another preferred solution, Figure 1-Figure 5As shown, when the main body 1 of the pipe jacking machine starts, at least one section of the pipe jacking machine 2 is connected to the tail of the main body 1 of the pipe jacking machine, that is, the tail shield 104, that is, at least one section of the outer casing 201 and the inner casing 202 are connected to the tail of the main body 1 of the pipe jacking machine, so as to form a layered casing structure nested inside and outside. At the same time, some supporting equipment required by the main body 1 of the pipe jacking machine, such as the pump station configured by the slag discharge device 106, is placed in the inner casing 202 (when there are three specifications of casing, the supporting equipment is placed in the smallest casing), that is, the inner casing 202 has an equipment installation space for placing the supporting equipment required by the main body 1 of the pipe jacking machine. In this way, during construction, once the outer casing 201 is stuck and cannot be pushed, when it is necessary to switch to push the inner casing 202, the inner casing 202 can be directly connected to the inner casing 202, without the need to disassemble and reassemble the supporting equipment, thereby improving the construction efficiency. Of course, at this time, the inner casing 202 does not need to be connected to too many sections to avoid causing the jacking pipe to be too heavy when pushing the outer casing 201, increasing the load, especially when digging obliquely downward, the weight of the jacking pipe acts on the front jacking machine main body 1, which may cause the jacking machine main body 1 to be overloaded. Therefore, the number of sections of the inner casing 202 is sufficient to make the sum of the lengths of the innermost casings in the layered casing structure match the size of the supporting equipment to be placed. For example, if the length of the supporting equipment is 3m and the length of a single section of the inner casing 202 is 1m, then 3 sections of the inner casing 202 need to be spliced.

[0088] It should be added that if the inner casing 202 is already connected to the main machine 1 of the pipe jacking machine at the time of initialization, and the supporting equipment is also placed inside the inner casing 202, then the above-mentioned splicing ring 207 and reinforcing ribs 208 can also play a role in supporting the supporting equipment.

[0089] It should be noted that, in order to facilitate the connection of the friction reducing agent injection pipe 7, if the inner casing 202 has been connected to the main machine 1 of the pipe jacking machine at the time of initiation, a mounting hole corresponding to the friction reducing hole 204 can be preset in the inner casing 202, such as Figure 4 As shown, the friction reducing agent injection pipe 7 and the friction reducing hole 204 can be directly connected through the mounting hole. Of course, in other embodiments, if the inner sleeve 202 is activated after the outer sleeve 201 is locked or the inner sleeve 202 is shorter in the front-to-back direction (the inner sleeve 202 does not affect the connection of the friction reducing agent injection pipe 7), then the inner sleeve 202 does not necessarily have to be provided with a mounting hole.

[0090] During the construction process, if Figure 2 and Figure 3 In the inclined shaft project shown, if the weight of the jacking pipe 2 is heavy, it will also cause the main body 1 of the jacking machine to bear too much weight. Therefore, the jacking pipe 2 is preferably a steel pipe with a thinner wall thickness to avoid the jacking pipe 2 being too heavy. It is not difficult to understand that if the wall thickness of the jacking pipe 2 is thin, it is not conducive to connecting the jacking pipes 2 before and after, and it is not conducive to connecting the jacking pipe 2 with the main body 1 of the jacking machine. In view of this problem, in this embodiment, for the jacking pipe 2, if Figure 4As shown, the inner casing 202 and the outer casing 201 include a cylindrical main body, and top rings 206 are connected to both ends of the main body. Specifically, the top ring 206 can be welded to the main body, or connected to the main body by fasteners. The inner circumference size of the top ring 206 is smaller than the inner circumference size of the main body. One end of the top ring is the jacking end. During construction, the frontmost casing (inner casing 202 and outer casing 201) is connected to the main body 1 of the jacking machine through the top ring 206, and in the front-to-back direction, two adjacent casings of matching (equal) sizes are connected to each other through the top ring 206.

[0091] Since the inner hole of the top ring 206 is smaller than the inner hole of the main body, the casing can have a larger contact area when connected to the main body 1 of the pipe jacking machine and when two adjacent casings are connected without increasing the weight of the casing too much. At the same time, it is no longer necessary to set bolt hand holes or other forms of operation holes on the main body, which is convenient for staff to operate. Of course, for horizontal excavation projects, thicker wall casings (larger contact area) can be selected, and each casing can also be equipped with no top ring 206.

[0092] In addition, if the inner casing 202 is already connected to the main machine 1 of the pipe jacking machine at the start, in order to ensure that the outer casing 201 is pushed by the pushing device 3 at the start, then for the jacking pipe 2, the outer casing 201 with the largest inner hole has the longest length, that is, the length of the outer casing 201 is not less than the length of the inner casing 202. Figure 4 and Figure 5 As shown, the inner sleeve 202 is shorter, which can prevent the pushing device from directly pushing the inner sleeve 202 during the start.

[0093] Specific embodiments of the jacking pipe in the present invention:

[0094] The specific embodiment of the jacking pipe is the jacking pipe in the embodiment of the jacking pipe construction method mentioned above, which will not be described in detail here.

[0095] Specific embodiments of the pipe jacking system of the present invention:

[0096] The specific embodiment of the pipe jacking excavation system is the pipe jacking excavation system in the specific embodiment of the above-mentioned pipe jacking construction method, which will not be described in detail here.

[0097] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions recorded in the aforementioned embodiments without creative work, or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A pipe jacking construction method, Its characteristic is that During the construction process, when the outermost first casing that transmits the jacking force is locked and cannot be pushed forward normally, the second casing with a smaller inner hole than the first casing is switched to transmit the jacking force, and the second casing is pushed through the inside of the first casing to push the main machine of the pipe jacking machine forward until the target distance is completed or until the second casing is locked, and the third casing with a smaller inner hole than the second casing is switched to transmit the jacking force, and the third casing is pushed through the inside of the second casing to push the main machine of the pipe jacking machine forward, and so on, until the target distance is completed.

2. The pipe jacking construction method according to claim 1, Its characteristics are: The two adjacent first casings in the front-to-back direction are connected and sealed together, and the frontmost first casing is connected and sealed together with the main body of the pipe jacking machine. When the first casing is locked and cannot be pushed forward normally, the connection between the frontmost first casing and the main body of the pipe jacking machine is first released, and then the second casing is switched to use.

3. The pipe jacking construction method according to claim 2, Its characteristics are: When excavating to a water-rich stratum, a drainage pipe is connected through the drainage hole on the casing that is directly in contact with the stratum at this time to drain the stratum water.

4. The pipe jacking construction method according to claim 3, Its characteristics are: After the formation water is drained away or during the drainage process, the grouting pipe is connected through the grouting hole to inject grout between the casing and the formation.

5. The pipe jacking construction method according to any one of claims 1 to 4, Its characteristics are: When the main machine of the pipe jacking machine starts, at least two kinds of casings with different inner hole sizes, including a first casing and a second casing, are connected to the tail of the main machine of the pipe jacking machine, and various casings are connected by at least one section to form a layered casing structure nested inside and outside, and the supporting equipment used by the main machine of the pipe jacking machine is placed in the innermost casing.

6. A pipe jacking, Its characteristics are: It comprises at least two casings with different inner hole sizes, wherein the casing with a larger inner hole has a passing space inside for allowing the casing with a smaller inner hole to pass through, and one end of each casing is a pushing end for pushing the main machine of the pipe jacking machine, so that after the casing with a larger inner hole is locked, the casing with a smaller inner hole passes through the locked casing to push the main machine of the pipe jacking machine forward.

7. The jacking pipe according to claim 6, Its characteristics are: The pushing end of the casing with the largest inner hole is provided with a connecting structure for connecting to the main body of the jacking machine or another casing adapted thereto and a sealing part for sealing cooperation, and the other end is provided with a connecting structure for connecting to another casing adapted thereto and a sealing part for sealing cooperation.

8. The jacking pipe according to claim 7, Its characteristics are: The connection structure provided at the push end is a detachable connection structure.

9. The jacking pipe according to claim 7 or 8, Its characteristics are: A sealing member is provided on the outer periphery of the casing with the largest inner hole.

10. The jacking pipe according to claim 9, Its characteristics are: A sealing installation groove is arranged on the outer periphery of the sleeve with the largest inner hole, and a sealing member is arranged in the sealing installation groove.

11. The jacking pipe according to claim 10, Its characteristics are: The sleeve with the largest inner hole is formed by splicing three sections of pipe body front and back, and the outer circumferential size of the pipe body in the middle is smaller than the outer circumferential sizes of the front and rear sections of the pipe body, so that the outer circumferential surface of the middle pipe body forms the bottom surface of the sealing installation groove, and the end surfaces of the front and rear sections of the pipe body facing the middle pipe body form the groove side surfaces of the sealing installation groove.

12. The jacking pipe according to claim 11, Its characteristics are: The two ends of the middle tube body are connected to the front and rear tube bodies through splicing rings respectively, and the inner circumference of the splicing ring is provided with a supporting structure for supporting a sleeve with a smaller inner hole passing through the sleeve.

13. The jacking pipe according to claim 12, Its characteristics are: A plurality of reinforcing ribs arranged at intervals in the circumferential direction are connected between the two splicing rings, and the supporting structure is arranged on the inner side of the reinforcing ribs.

14. The jacking pipe according to claim 9, Its characteristics are: The sleeve with the largest inner hole is provided with a friction reducing hole for connecting the friction reducing agent injection pipe, and the sealing element is provided with at least two sealing elements arranged in a front-to-back interval, and the friction reducing hole is arranged between two adjacent sealing elements.

15. The jacking pipe according to claim 9, Its characteristics are: The sleeve with the largest inner hole is provided with a drainage hole for connecting a drainage pipe, and the drainage hole is arranged on a side of the sealing member away from the push end.

16. The jacking pipe according to claim 9, Its characteristics are: The casing with the largest inner hole is provided with a grouting hole for connecting a grouting pipe, and the grouting hole is arranged on a side of the sealing component away from the jacking end.

17. The jacking pipe according to any one of claims 6 to 8, Its characteristics are: The inner circumference of the sleeve is provided with a support structure for supporting a sleeve with a smaller inner hole passing through the sleeve.

18. The jacking pipe according to any one of claims 6 to 8, Its characteristics are: Each sleeve comprises a cylindrical main body and a top ring connected to both ends of the main body, the inner circumference of the top ring is smaller than the inner circumference of the main body, and one end of the top ring forms a push end.

19. The jacking pipe according to any one of claims 6 to 8, Its characteristics are: The inside of the casing with the smallest inner hole is provided with equipment installation space for placing the supporting equipment required by the main machine of the pipe jacking machine.

20. The jacking pipe according to any one of claims 6 to 8, Its characteristics are: The length of the casing with the largest inner hole shall not be less than the lengths of other casings.

21. A pipe jacking system, comprising a pipe jacking system for use in a tunneling process, Its characteristics are: The jacking pipe is the jacking pipe described in any one of claims 6-20.

Citation Information

Patent Citations

  • Long distance propelling construction method

    JP1996189293A

  • Pipe jacking method and excavating device thereof

    JP1997296683A

  • Double stepped pipe jacking method

    JP2005320822A

  • Two-stage pipe-jacking construction method and connector

    JP2005330667A