Automatic telescopic escape device for tunnel inverted arch

By designing an automatic telescopic escape device at the tunnel invert construction site and using steel cables and movable boat mechanisms to quickly move people within the pipeline, the problem of low personnel movement rates during tunnel collapse was solved and construction efficiency and safety were improved.

CN118774941AInactive Publication Date: 2024-10-15CHINA FIRST HIGHWAY ENGINEERING CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410852008.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During tunnel construction, the crawling movement rate of personnel in the escape pipe is low, making it impossible to quickly transfer the injured. Moreover, the collapse of the front tunnel face is more instantaneous and dangerous, affecting construction efficiency and safety.

Method used

Design a tunnel inverted arch automatic telescopic escape device, including a trestle, a box girder body, polyethylene pipes and an emergency shelter. By installing a console, steel cables and drums in the box girder body, the signal acquisition module and signal processing are used The module monitors the risk of tunnel collapse, controls the rotation of the winch to retract the steel cable, and quickly moves people in the pipeline through the movable boat mechanism.

Benefits of technology

It increases the movement rate of personnel in the escape pipe, ensures the rapid transfer of the injured, reduces the danger caused by collapse during construction, and improves the efficiency and safety of tunnel construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774941A_ABST
    Figure CN118774941A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic telescopic escape device for a tunnel inverted arch, relates to the technical field of automatic escape of tunnel inverted arches, and is used for solving the problems that when a tunnel collapses, the crawling activity speed of personnel in an escape pipeline is low, and meanwhile, wounded personnel cannot be quickly transferred. According to the movable boat mechanism, the steel cables are laid on the basis of improvement of an original tunnel escape pipeline, a trestle foundation box girder body and an inclined square channel, directional movement of the steel cables in the pipeline is achieved in cooperation with placement of a winding drum in a tunnel face emergency refuge house and rotation of a winch in the box girder body, and then the whole movable boat mechanism is fixed to the steel cables, so that the movable boat mechanism is fixed to the steel cables. The cushion cover on the base plate is manually controlled to fluctuate, so that a worker prostrates on the top of the cushion cover and the distance between the worker and the inner wall of a pipeline is adjusted, then the worker in the prostrating state can rotate the Z-shaped rod, the friction sleeve with the anti-skid cushion block makes contact with the bottom of the steel cable, and therefore the whole prostrating worker and the base plate are driven to rapidly move in the pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of automatic escape of tunnel inverts, in particular to an automatic telescopic escape device of a tunnel invert. Background Art

[0002] The tunnel construction process and connection time have become the key points of tunnel construction control. The pitch between the invert and the face of the II and I long tunnels has become a major difficulty affecting the construction. The newly excavated section at the tunnel invert construction site needs to be entered through the invert trestle to carry out the invert construction. The stability of the tunnel wall of the new section is poor. The vibration generated by the equipment during the construction process can easily cause the phenomenon of soil and rock falling and landslides.

[0003] In the text with the publication number CN216240777U, it is mentioned that an emergency shelter is set up at the front end of the invert face. The pipeline connected to the tail of the emergency shelter is widened with the box girder body on one side of the trestle as an escape pipeline across the invert section. However, due to the advancement of tunnel construction, the laying of the relative invert and the movement of the trestle, the entire front escape pipeline needs to be disassembled and assembled, resulting in a decrease in the efficiency of the entire tunnel construction. Therefore, a telescopic escape mechanism is designed while the entire trestle escape pipeline is preserved to ensure the efficient progress of the tunnel project while enabling the rapid deployment of the escape structure. However, considering the instantaneous and dangerous collapse of the front end face and the accelerated transfer of the front personnel, the personnel crawling method has a low movement rate in the escape pipeline and is not friendly to the injured. Therefore, we propose an automatic telescopic escape device for the tunnel invert. Summary of the invention

[0004] The purpose of the present invention is to provide a tunnel invert automatic telescopic escape device to solve the problem raised in the above background technology that when a tunnel collapses, the crawling speed of personnel in the escape pipe is low and the rapid transfer of injured persons cannot be performed.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an automatic telescopic escape device for a tunnel invert, comprising a trestle, a box beam, a polyethylene pipe and an emergency shelter, wherein the box beam on one side of the trestle is widened as a passage across the invert section, an emergency shelter is installed at the tunnel mining face, and a polyethylene pipe is installed on one side of the emergency shelter, an oblique channel is fixed to one side of the box beam by bolts, and one side of the oblique channel is connected to the polyethylene pipe;

[0006] A control console is installed in the box girder body, and a steel cable is connected to one side of the control console. A reinforced outer shell is installed in the emergency shelter, and a reel is movably connected in the reinforced outer shell. One end of the steel cable passes through the oblique channel and the polyethylene pipe respectively and is wound around the reel. Movable boat mechanisms are evenly placed in the emergency shelter.

[0007] Furthermore, a fixing frame is fixed to the inner wall of the bottom of the oblique channel by spot welding, and a guide wheel is movably connected to one side of the fixing frame through a bearing, and the steel cable is in contact with the guide wheel.

[0008] Furthermore, the control console includes a winch, a signal acquisition module, a signal processing module and a correction module. The signal acquisition module is used to collect data on the foundation surface of the trestle and obtain signals from the alarm on the face of the tunnel, wherein the foundation surface data of the trestle includes vibration amplitude difference data and noise extreme difference data. The correction module is used to manually participate in the rotation control of the winch and the drum. The signal processing module performs decision-making processing operations after receiving the foundation surface data of the trestle, as follows:

[0009] Step 1: Set the monitoring period of the trestle and obtain the vibration amplitude difference data Fc and the noise extreme difference data Jc of the trestle surface within the monitoring period;

[0010] Step 2: Obtain the tunnel collapse risk coefficient Y according to the formula, and compare it with the tunnel collapse risk coefficient threshold y stored in the signal processing module;

[0011] When the alarm on the face sounds, it is directly determined that the tunnel has collapsed;

[0012] When the face alarm does not sound, but Y ≥ y, it is determined that the tunnel has collapsed;

[0013] When the face alarm does not sound, but Y<y, it is determined that the tunnel has not collapsed;

[0014] After determining that the tunnel has collapsed, the signal processing module controls the rotation of the winch to reel in the steel cable on the drum. If the tunnel has not collapsed, the winch will not rotate.

[0015] Furthermore, the movable boat mechanism includes a chassis, a cushion cover and a jacket. The bottom of the chassis is symmetrically and movably connected to movable wheels via bearings, the top of the chassis is slidably connected to the cushion cover, the top of the cushion cover is fixed with rubber filling by adhesion, and the bottom of the chassis is fixed with a jacket by bolts.

[0016] Furthermore, a slider is slidably connected to the inner wall of the bottom of the chassis, and a swivel arm is rotatably connected to the top of the slider, one end of the swivel arm is movably connected to the bottom of the cushion cover, the upper sleeve of the slider is threadedly connected to a threaded rod, and one end of the threaded rod is fixedly connected to transmission tooth 2, one side of the chassis is movably connected to an L-shaped rod, one end of the L-shaped rod passes through the chassis and is fixedly connected to transmission tooth 1, the transmission tooth 1 is meshingly connected to transmission tooth 2, and a telescopic plate sleeve is installed on the opposite surface of the chassis and the cushion cover.

[0017] Furthermore, a movable plate is slidably connected to the inner wall of the top of the jacket, a friction sleeve is symmetrically rotatably connected to one side of the movable plate, an anti-slip pad is fixed to the inner wall of the friction sleeve by adhesion, and a Z-shaped rod is movably connected to the outer wall of one side of the jacket, one end of the Z-shaped rod passes through the jacket and abuts against the protrusion on the movable plate.

[0018] The method of using the tunnel invert automatic telescopic escape device is as follows:

[0019] Tunnel escape equipment installation: fix the drum with the winding steel cable and the reinforced shell protecting the drum in the emergency shelter. The steel cable extending from the drum is fixed to the winch in the control console along the polyethylene pipe, guide wheel and inclined channel. The movable boat mechanism is placed in the emergency shelter according to the number of construction workers on the tunnel face.

[0020] For collapse problems in tunnels, the front-end alarm will send an alarm signal to the control console, which will be processed by the signal processing module in the control console to control the rotation of the entire winch and pull the steel cable on the entire drum toward the trestle side. At this time, the workers who enter the emergency shelter will insert the movable boat mechanism into the polyethylene pipe. After the friction sleeve in the jacket is aligned with the steel cable, the workers will swing the Z-rod on the jacket, and the Z-rod will push the friction sleeve against the steel cable. The movable steel cable will drive the movable wheel on the entire chassis to move in the polyethylene pipe, and finally send the workers into the box girder body and then come to the safe area behind the tunnel through the turnover box.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] 1. In the present invention, the steel cable is laid by improving the original tunnel escape pipeline and the box beam body and the oblique channel of the trestle foundation, and the placement of the drum in the emergency shelter of the tunnel face and the rotation of the winch in the box beam body are coordinated to realize the directional movement of the steel cable in the pipeline, and then the entire movable boat mechanism is fixed on the steel cable, and the cushion cover on the chassis is manually controlled to rise and fall so that the worker can lie prone on the top of the cushion cover and adjust the distance between the worker and the inner wall of the pipeline. Then, the worker in the prone state can rotate the Z-shaped rod to realize the contact between the friction sleeve with the anti-slip pad and the bottom of the steel cable, thereby driving the entire prone worker and the chassis as a whole to move in the pipeline. Compared with the creeping movement of the pipeline, the moving speed is improved, and it is more conducive to the transfer of the injured in the tunnel collapse;

[0023] 2. In the present invention, a signal acquisition module, a signal processing module and a correction module are arranged in the control console to detect the front-end tunnel construction. When a tunnel collapse occurs, the entire winch is controlled to rotate immediately to realize the movement of the steel cable in the pipeline, and then the movable boat mechanism is used to quickly transfer the people in the emergency shelter to avoid secondary injuries to the people. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1It is a schematic diagram of the overall structure of the automatic telescopic escape device of the tunnel invert of the present invention;

[0025] Figure 2 It is a simplified structural schematic diagram of the main cross section of the automatic telescopic escape device of the tunnel invert of the present invention;

[0026] Figure 3 It is a schematic diagram of the contact structure between the movable boat mechanism and the oblique channel of the present invention;

[0027] Figure 4 It is a schematic diagram of the overall structure of the movable boat mechanism of the present invention;

[0028] Figure 5 It is a schematic diagram of the front cross-sectional structure of the movable boat mechanism of the present invention;

[0029] Figure 6 It is a schematic diagram of connecting the transmission tooth 1 on the L-shaped rod and the transmission tooth 2 on the threaded rod of the present invention;

[0030] Figure 7 It is a schematic diagram of the connection structure between the friction sleeve and the guide wheel on the fixed frame of the present invention.

[0031] In the figure: 1. trestle; 2. box girder body; 3. turnover box; 4. oblique passage; 5. polyethylene pipe; 6. emergency shelter; 7. reinforced shell; 8. reel; 9. control console; 10. steel cable; 11. guide wheel; 12. movable boat mechanism; 121. chassis; 122. cushion cover; 123. rubber filling; 124. jacket; 125. movable wheel; 13. L-shaped rod; 14. transmission gear 1; 15. threaded rod; 16. transmission gear 2; 17. slider; 18. rotating arm; 19. telescopic plate sleeve; 20. Z-shaped rod; 21. movable plate; 22. friction sleeve; 23. fixing frame; 24. anti-skid pad. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] See also Figure 1-7 , the present invention provides a technical solution:

[0034] Embodiment 1: Usually, the distance between the inverted arch of the surrounding rock section of grade Ⅰ, Ⅱ and Ⅲ should not be greater than 90m, while the distance between the closed inverted arch of the surrounding rock section of grade Ⅳ, Ⅴ and Ⅵ should not be greater than 35m from the face. Under normal circumstances, laying and erecting the escape pipeline in the inverted arch section of the tunnel will affect the normal construction at the inverted arch. For this reason, the box girder body 2 on the trestle 1 is widened as a passage across the inverted arch section, and the upper turnaround box 3 is connected at the same time to the safe area behind the tunnel. The front of the entire box girder body 2 is connected with an oblique channel 4, and the oblique channel 4 is overall square outside and round inside, and is thickened and supported. One end of the oblique channel 4 is connected with a polyethylene pipe 5, and the polyethylene pipe 5 here is made of ultra-high molecular polyethylene, which has the characteristics of wear resistance, corrosion resistance, no scaling, impact resistance and low temperature resistance, is suitable for the front working environment of the tunnel, and is conducive to the escape of the staff. An emergency shelter 6 is installed at the front end of the entire polyethylene pipe 5, and "X"-shaped cross steels are arranged on both sides of the house;

[0035] In order to increase the transfer rate of personnel in the emergency shelter 6 after the entire tunnel collapses, the entire escape passage activity line is first installed, such as Figure 2 As shown, a drum 8 is installed in the entire emergency shelter 6 to prevent the drum 8 from being damaged and affecting the normal release of the steel cable 10. A reinforcing shell 7 is installed on the outer side of the drum 8. One end of the steel cable 10 passes through the polyethylene pipe 5 and reaches the surface of the fixing frame 23 on the bottom inner wall of the oblique channel 4. Figure 7 As shown, the entire fixed frame 23 has a guide wheel 11 movably connected to one side, and the steel cable 10 passes through the oblique channel 4 and enters the box beam body 2, and is finally wound on the winch in the control console 9;

[0036] When it is necessary to transfer personnel in the emergency shelter 6, the same storage movable boat mechanism 12 is used to realize the auxiliary movement of personnel in the pipeline. First, the chassis 121 is placed flat in the polyethylene pipe 5, and the movable wheels 125 at the bottom of the chassis 121 are placed obliquely against the pipe wall. The worker wears a safety helmet and lies prone on the cushion cover 122. In order to improve the movement comfort of the entire movable boat mechanism 12, a rubber filling 123 is bonded and fixed on the top of the cushion cover 122;

[0037] According to the difference in the size of the workers, the height of the combination of the workers and the cushion cover 122 relative to the inside of the pipeline is then adjusted, such as Figure 4 and Figure 5As shown, an L-shaped rod 13 is movably connected to one side of the chassis 121, and the L-shaped rod 13 is fixedly connected to a transmission tooth 14 in the chassis 121. The transmission tooth 14 is driven to rotate by the axial rotation of the L-shaped rod 13. A slider 17 is slidably connected to the inner wall of the bottom of the chassis 121, and a threaded rod 15 is threadedly connected to the slider 17, wherein one end of the threaded rod 15 is fixed to a transmission tooth 2 16 and meshes with the transmission tooth 14, so that after the L-shaped rod 13 rotates, the entire slider 17 is driven to move left and right. A rotating arm 18 is rotatably connected to the top of the slider 17, and one end of the rotating arm 18 is movably connected to the top inner wall of the cushion cover 122. When the angle between the rotating arm 18 and the chassis 121 increases, the combined thickness of the cushion cover 122 and the chassis 121 increases, and vice versa. At the same time, the entire cushion cover 122 is assisted in its movement, and a telescopic plate sleeve 19 is also installed between it and the chassis 121 to offset part of the acting force.

[0038] Before the worker lies prone on the cushion cover 122, he needs to pay attention to whether the friction sleeve 22 in the entire jacket 124 is in contact with the steel cable 10. When the worker lies prone, he swings the Z-shaped rod 20 on the jacket 124 downward with his right hand. The Z-shaped rod 20 located on one side of the jacket 124 moves upward, and at the same time pulls the friction sleeve 22 on both sides of the entire movable plate 21 to contact the steel cable 10. The inner wall of the friction sleeve 22 is fixed with an anti-skid pad 24. After contacting the steel cable 10, it will be dragged by the moving steel cable 10, so that the prone person on the top of the cushion cover 122 in the pipeline is dragged while the steel cable 10 is reeled up. At the same time, the moving speed of the entire chassis 121 in the pipeline is controlled. It only needs to swing the Z-shaped rod 20 up and down to shorten the contact time between the friction sleeve 22 and the steel cable 10, and the moving speed of the entire chassis 121 in the pipeline is reduced.

[0039] like Figure 3 As shown, since there is an angle at the connection between the entire oblique channel 4 and the polyethylene pipe 5, in order to stabilize the trajectory of the entire steel cable 10 close to the ground, a fixing frame 23 is fixed to the inner wall of the bottom of the oblique channel 4 by spot welding, and a guide wheel 11 is movably connected to one side of the fixing frame 23. Since the friction sleeve 22 always fits with the steel cable 10, the distance between the entire chassis 121 and the pipe wall increases when passing through the guide wheel 11. In order to prevent the entire friction sleeve 22 from separating from the steel cable 10, the hand-held end of the Z-shaped rod 20 is passively moved upward at this time, and the entire movable plate 21 is extended as a whole;

[0040] At the same time, when the movable plate 21 is in contact with the fixed frame 23, a set of friction sleeves 22 are installed on the movable plate 21, and the two friction sleeves 22 can rotate independently. Figure 7 As shown, the two will not collide. At the same time, after the friction sleeve 22 passes the fixing frame 23, one end of the Z-shaped rod 20 needs to be pressed down quickly manually to ensure that the friction sleeve 22 fits the bottom of the steel cable 10 and that there is enough friction to drag the entire chassis 121 into the box beam body 2.

[0041] Embodiment 2: Considering that the entire steel cable 10 can react quickly when a tunnel collapses, the control console 9 is provided with a signal acquisition module, a signal processing module and a correction module in addition to the winch, wherein the signal acquisition module is used for acquiring the data of the foundation surface of the trestle 1 and the signal of the face alarm, wherein the foundation surface data of the trestle 1 includes vibration amplitude difference data and noise extreme difference data, and the vibration amplitude difference data is the difference between the maximum vibration amplitude and the minimum vibration amplitude of the surface of the trestle 1 per unit time. Since vehicles pass through the entire trestle 1, the vibrations generated are mostly continuous, and compared with tunnel collapse, the instantaneous vibration obtains a larger vibration amplitude difference data, thereby avoiding the data error problem caused by the activities of vehicles on the trestle 1;

[0042] Similarly, the noise extreme value data can also be understood as the difference between the maximum noise decibel value and the minimum noise decibel value per unit time. Then the entire trestle 1 foundation surface data is sent to the signal processing module for decision-making processing operations:

[0043] Step 1: Set the monitoring period of the trestle 1, and obtain the vibration amplitude difference data Fc and the noise extreme difference data Jc on the surface of the trestle 1 within the monitoring period;

[0044] Step 2: According to the formula Processing is performed to obtain a tunnel collapse risk coefficient Y, where a1 and a2 are correction factors, and a1+a2=5.232, a2>a1>0, and the coefficient is compared with the tunnel collapse risk coefficient threshold y stored in the signal processing module;

[0045] When the alarm on the face sounds, it is directly determined that the tunnel has collapsed;

[0046] When the face alarm does not sound, but Y ≥ y, it is determined that the tunnel has collapsed;

[0047] When the face alarm does not sound, but Y<y, it is determined that the tunnel has not collapsed;

[0048] After determining that the tunnel has collapsed, the signal processing module controls the rotation of the winch to wind up the steel cable 10 on the drum 8. If the tunnel has not collapsed, the winch does not rotate.

[0049] Considering that a collapse in front of the tunnel will immediately send an alarm signal to the rear of the tunnel, the signal processing module will start the winch to reel in the entire steel cable 10 regardless of the authenticity of the alarm signal in front of the tunnel. However, if the alarm in front does not sound but the Y value obtained by the signal processing module is higher than the threshold, it will be determined that a collapse has occurred in front, which serves as an early warning. However, considering that the steel cable 10 on the drum 8 needs to meet the needs of personnel activities in the pipeline, the rotation of the winch caused by the false alarm of the signal processing module will shorten the steel cable 10 retained on the entire drum 8.

[0050] For this purpose, the entire control console 9 is also provided with a correction module, which detects the winding status of the steel cable 10 on the winch at a fixed point and time, and controls the rotation of the motor on one side of the drum 8 to retract the winding of the steel cable 10 caused by misjudgment on the winch. At the same time, the entire correction module can also be manually intervened to actively control the winding of the steel cable 10 by the winch.

[0051] The working process and principle of the present invention are as follows:

[0052] The drum 8 with the winding steel cable 10 and the reinforced shell 7 protecting the drum 8 are fixed in the emergency shelter 6. The steel cable 10 extending from the drum 8 is fixed to the winch in the control console 9 along the polyethylene pipe 5, the guide wheel 11 and the oblique channel 4. The movable boat mechanism 12 is placed in the emergency shelter 6 according to the number of construction workers at the tunnel face.

[0053] For the collapse problem in the tunnel, the front-end alarm will send the alarm signal to the control console 9, which will be processed by the signal processing module in the control console 9 to control the rotation of the entire winch and pull the steel cable 10 on the entire drum 8 to move toward the side of the pier 1. At this time, the workers who have entered the emergency shelter 6 will insert the movable boat mechanism 12 into the polyethylene pipe 5, and after the friction sleeve 22 in the jacket 124 is aligned with the steel cable 10, the workers will swing the Z-shaped rod 20 on the jacket 124, and the Z-shaped rod 20 will push the friction sleeve 22 against the steel cable 10. The movable steel cable 10 will drive the movable wheel 125 on the entire chassis 121 to move in the polyethylene pipe 5, and finally send the workers into the box beam body 2, and then come to the safe area behind the tunnel through the turnover box 3.

[0054] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.

[0055] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0056] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A tunnel inverted arch automatic telescopic escape device, comprising a trestle (1), a box beam body (2), a polyethylene pipe (5) and an emergency shelter (6), wherein the box beam body (2) on one side of the trestle (1) is widened as a passage across the inverted arch section, an emergency shelter (6) is installed at the tunnel mining face, and a polyethylene pipe (5) is installed on one side of the emergency shelter (6), characterized in that: An oblique channel (4) is fixed to one side of the box beam body (2) by means of bolts, and one side of the oblique channel (4) is in communication with a polyethylene pipe (5); A control console (9) is installed in the box beam body (2), and a steel cable (10) is connected to one side of the control console (9). A reinforced outer shell (7) is installed in the emergency shelter (6), and a reel (8) is movably connected in the reinforced outer shell (7). One end of the steel cable (10) passes through the oblique channel (4) and the polyethylene pipe (5) respectively and is wound around the reel (8). Movable boat mechanisms (12) are evenly placed in the emergency shelter (6).

2. The tunnel invert automatic telescopic escape device according to claim 1, characterized in that: A fixing frame (23) is fixed to the inner wall of the bottom of the oblique channel (4) by spot welding, and a guide wheel (11) is movably connected to one side of the fixing frame (23) by a bearing, and the steel cable (10) is in contact with the guide wheel (11).

3. The tunnel invert automatic telescopic escape device according to claim 2, characterized in that: The control console (9) comprises a winch, a signal acquisition module, a signal processing module and a correction module. The signal acquisition module is used for collecting data of the foundation surface of the trestle (1) and obtaining signals of a tunnel face alarm, wherein the data of the foundation surface of the trestle (1) comprises vibration amplitude difference data and noise extreme difference data. The correction module is used for manually participating in the rotation control of the winch and the drum (8). The signal processing module performs decision-making processing operations after receiving the data of the foundation surface of the trestle (1), which are specifically as follows: Step 1: setting a monitoring period of the trestle (1), and obtaining vibration amplitude difference data Fc and noise extreme difference data Jc on the surface of the trestle (1) within the monitoring period; Step 2: Obtain the tunnel collapse risk coefficient Y according to the formula, and compare it with the tunnel collapse risk coefficient threshold y stored in the signal processing module; When the alarm on the face sounds, it is directly determined that the tunnel has collapsed; When the face alarm does not sound, but Y ≥ y, it is determined that the tunnel has collapsed; When the face alarm does not sound, but Y<y, it is determined that the tunnel has not collapsed; After determining that the tunnel has collapsed, the signal processing module controls the rotation of the winch to wind up the steel cable (10) on the drum (8); if the tunnel has not collapsed, the winch does not rotate.

4. The tunnel invert automatic telescopic escape device according to claim 3, characterized in that: The movable boat mechanism (12) comprises a chassis (121), a cushion cover (122) and a jacket (124); the bottom of the chassis (121) is symmetrically and movably connected to a movable wheel (125) via a bearing; the top of the chassis (121) is slidably connected to the cushion cover (122); the top of the cushion cover (122) is fixed with a rubber filler (123) via adhesion; and the bottom of the chassis (121) is fixed with a jacket (124) via bolts.

5. The tunnel invert automatic telescopic escape device according to claim 4, characterized in that: The bottom inner wall of the chassis (121) is slidably connected to a slider (17), the top of the slider (17) is rotatably connected to a rotating arm (18), one end of the rotating arm (18) is movably connected to the bottom of the cushion cover (122), the upper sleeve of the slider (17) is threadedly connected to a threaded rod (15), and one end of the threaded rod (15) is fixedly connected to a second transmission tooth (16), one side of the chassis (121) is movably connected to an L-shaped rod (13), one end of the L-shaped rod (13) passes through the chassis (121) and is fixedly connected to a first transmission tooth (14), the first transmission tooth (14) is meshedly connected to the second transmission tooth (16), and a telescopic plate sleeve (19) is installed on the opposite surface of the chassis (121) and the cushion cover (122).

6. The tunnel invert automatic telescopic escape device according to claim 5, characterized in that: The inner wall at the top of the jacket (124) is slidably connected to a movable plate (21), one side of the movable plate (21) is symmetrically rotatably connected to a friction sleeve (22), the inner wall of the friction sleeve (22) is fixed with an anti-slip pad (24) by adhesion, and the outer wall of one side of the jacket (124) is movably connected to a Z-shaped rod (20), one end of the Z-shaped rod (20) passes through the jacket (124) and abuts against a protrusion on the movable plate (21).

7. The tunnel invert automatic telescopic escape device according to claim 6, characterized in that: The method of using the tunnel invert automatic telescopic escape device is as follows: Tunnel escape equipment is installed, a drum (8) with a reeling steel cable (10) and a reinforced shell (7) protecting the drum (8) are fixed in an emergency shelter (6), the steel cable (10) extending from the drum (8) is fixed to a winch in a control console (9) along a polyethylene pipe (5), a guide wheel (11) and an oblique channel (4), and a movable boat mechanism (12) is placed in the emergency shelter (6) according to the number of construction workers on the tunnel face; In case of collapse in the tunnel, the front alarm will send an alarm signal to the control console (9), which is processed by the signal processing module in the control console (9) to control the rotation of the entire winch, pull the steel cable (10) on the entire drum (8) to move toward the trestle (1) side, and then the worker who enters the emergency shelter (6) inserts the movable boat mechanism (12) into the polyethylene pipe (5). After the friction sleeve (22) in the jacket (124) is aligned with the steel cable (10), the worker swings the Z-shaped rod (20) on the jacket (124), and the Z-shaped rod (20) pushes the friction sleeve (22) to press against the steel cable (10). The movable steel cable (10) drives the movable wheel (125) on the entire chassis (121) to move in the polyethylene pipe (5), and finally sends the worker into the box beam body (2), and then comes to the safe area behind the tunnel through the turnover box (3).

Citation Information

Cited By

  • Safety guarantee cabin of tunnel construction control center

    CN119801542A