Gas turbine mixed gas combustion adjusting method and system

By determining the design calorific value and low calorific value in the gas turbine, adjusting the fuel pipeline and mixed fuel ratio, and conducting load and calorific value tests, the problem of adjusting the combustion process caused by changes in fuel characteristics is solved, and the adaptability and stability of the gas turbine are achieved. , reducing costs and emissions.

CN118775072APending Publication Date: 2024-10-15XIAN THERMAL POWER RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411044051.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

It is difficult for gas turbines to effectively adjust the combustion process when fuel characteristics change, resulting in unstable operation and high emissions. The lack of flexible and adaptable adjustment methods increases technical complexity and dependence on manufacturer's proprietary technology.

Method used

By determining the design calorific value and low calorific value of the gas turbine, adjusting the fuel quantity and mixed fuel ratio in the fuel pipeline, conducting load swing tests and calorific value fluctuation tests, determining the operating parameters of each load point and the fuel quantity boundary of the fuel pipeline, ensuring that the gas turbine Adaptability and stable operation under different fuel characteristics.

Benefits of technology

It achieves the comprehensive adaptability and flexibility of gas turbines under different fuel characteristics, improves combustion efficiency and stability, reduces economic costs and environmental impact, reduces dependence on manufacturer's proprietary technology, simplifies maintenance processes and improves long-term operating benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775072A_ABST
    Figure CN118775072A_ABST
Patent Text Reader

Abstract

The invention discloses a gas turbine mixed gas combustion adjusting method and system, and the method comprises the steps: determining the upper and lower boundaries of the fuel quantity of each fuel pipeline at each load point according to the design heat value of a gas turbine; controlling the input quantity of the mixed fuel according to the upper and lower boundaries of the fuel quantity of each fuel pipeline, performing a load swing test of the gas turbine under the condition of a designed heat value, and determining operating parameters of each load point; carrying out a calorific value fluctuation test on the gas turbine to determine a low calorific value of the gas turbine in steady-state operation at the load point; adjusting the fuel distribution quantity of each fuel pipeline at each load point, and determining the upper and lower boundaries of the fuel quantity of each fuel pipeline at each load point; when the gas turbine runs under the low-heating-value working condition, the input quantity of fuel is controlled according to the upper and lower boundaries of the fuel quantity of a fuel pipeline, a load swing test is conducted on the gas turbine, and running parameters of all load points are determined; according to the method, the gas turbine can adapt to new fuel characteristics, and safe, stable and low-emission operation is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of gas turbine service maintenance, and in particular to a gas turbine mixed gas combustion adjustment method and system. Background Art

[0002] Before the gas turbine is put into operation, the fuel's composition and calorific value and other characteristics are predetermined, and these characteristics directly affect the combustion efficiency and performance of the gas turbine. However, due to the diversity and instability of fuel sources, different fuels from those used in the design need to be used in actual operation, so the gas turbine is required to adapt to fuels with different characteristics and maintain efficient and stable operation of the gas turbine. This requires adjusting the combustion process of the gas turbine so that the gas turbine has a certain degree of fuel adaptability.

[0003] Domestic gas turbine power generation companies have difficulty responding effectively to changes in fuel composition and calorific value due to the lack of proprietary combustion adjustment technology from manufacturers. When fuel properties change significantly, how to adjust the fuel pipeline flow to adapt to these changes becomes a technical problem. The combustion adjustment technology of gas turbines is in the hands of manufacturers and has high technical barriers. At the same time, due to the variability of fuel properties, it is necessary to develop an adjustment method that is both flexible and adaptable. In addition, the adjustment process must ensure that the safety and performance of the gas turbine are not affected, which increases the complexity of mixed gas combustion adjustment. Summary of the invention

[0004] In order to guide the service and maintenance personnel of power generation enterprises to have a clear understanding of combustion adjustment methods when the combustion characteristics of gas turbines such as fuel composition and fuel calorific value change over a large range, the present invention provides a gas turbine mixed combustion adjustment method to adjust the combustion process of the gas turbine so that the gas turbine can adapt well to the new fuel characteristics and operate safely, stably and with low emissions.

[0005] The present invention is achieved through the following technical solutions:

[0006] A method for adjusting mixed gas combustion of a gas turbine comprises the following steps:

[0007] Step 1: According to the design calorific value of the gas turbine, the fuel distribution amount of each fuel pipeline is adjusted at each load point to determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point;

[0008] Step 2: Control the input amount of the mixed fuel according to the upper and lower limits of the fuel amount of each fuel pipeline, conduct a load swing test of the gas turbine under the design calorific value condition, determine the operating parameters of each load point, and make the monitoring data of the gas turbine at each load point in a normal state;

[0009] Step 3, conducting a calorific value fluctuation test on the gas turbine to determine the lower calorific value of the gas turbine when operating in a steady state at the load point;

[0010] Step 4: Adjust the fuel distribution amount of each fuel pipeline at each load point to make the gas turbine operate at a low calorific value condition, and determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point;

[0011] Step 5: When the gas turbine is operating under low calorific value conditions, the fuel input amount is controlled according to the upper and lower boundaries of the fuel amount in the fuel pipeline obtained in step 4, and a load swing test is performed on the gas turbine to determine the operating parameters of each load point so that the monitoring data of the gas turbine at each load point is in a normal state.

[0012] Preferably, the method for determining the upper and lower boundaries of the fuel quantity of each fuel pipeline at the load point in step 1 is as follows:

[0013] The fuel distribution amount of each fuel pipeline is gradually increased or decreased according to a certain step distance to obtain the monitoring data of the gas turbine until the monitoring data becomes abnormal, and the last fuel distribution amount of each fuel pipeline is used as the boundary value of the fuel amount of each fuel pipeline.

[0014] Preferably, the monitoring data includes gas turbine operation data, combustion pressure pulsation data and pollutant emission data.

[0015] Preferably, the method of the load swing test in step 2 is as follows:

[0016] The upper and lower boundaries of the fuel amount in the fuel pipeline are input into the control system of the gas turbine, and a load swing test is carried out on the gas turbine under the design calorific value conditions. The load of the gas turbine swings back and forth from full load to minimum load, and the ratio of the mixed fuel is adjusted at each load point according to the upper and lower boundaries of the fuel amount in the fuel pipeline, and the monitoring data of the gas turbine is obtained. When the monitoring data is abnormal, the operating parameters of the load corresponding to the abnormal monitoring data are adjusted until the operating parameters are normal, thereby determining the operating parameters of the gas turbine at the load point.

[0017] Preferably, the method for adjusting the ratio of the mixed fuel is as follows:

[0018] At each load point, the fuel amount of each fuel pipeline is operated at a boundary value, monitoring data corresponding to the boundary value is obtained, and the operating parameters of the load point are determined according to the monitoring data.

[0019] Preferably, the method for determining the lower heating value of the gas turbine in step 3 is as follows:

[0020] At the load point, the calorific value of the mixed fuel is changed by adjusting the fuel composition and fuel quantity, and the calorific value is gradually reduced. The monitoring data of the gas turbine under the current operating state is obtained. When the monitoring data is abnormal, the calorific value adjusted at that time is used as the low calorific value of the load point.

[0021] Preferably, the monitoring data in the lower calorific value determination process is emission data of the gas turbine.

[0022] Preferably, the fuel pipeline includes a natural gas pipeline and a hydrogen pipeline.

[0023] A gas turbine mixed gas combustion adjustment system, comprising:

[0024] The first fuel boundary module is used to adjust the fuel distribution amount of each fuel pipeline at each load point according to the design calorific value of the gas turbine, and determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point;

[0025] The first load swing module is used to control the input amount of the mixed fuel according to the upper and lower limits of the fuel amount of each fuel pipeline, perform a load swing test of the gas turbine under the design calorific value condition, determine the operating parameters of each load point, and make the monitoring data of the gas turbine at each load point in a normal state;

[0026] The calorific value module is used to conduct calorific value fluctuation tests on gas turbines and determine the lower calorific value of the gas turbine when operating at a steady state at the load point;

[0027] The second fuel boundary module is used to adjust the fuel distribution amount of each fuel pipeline at each load point, so that the gas turbine operates at a low calorific value condition, and determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point;

[0028] The second load swing module is used to control the fuel input amount according to the upper and lower limits of the fuel amount in the fuel pipeline obtained in step 4 when the gas turbine is operating under low calorific value conditions, conduct a load swing test on the gas turbine, determine the operating parameters of each load point, and ensure that the monitoring data of the gas turbine at each load point is in a normal state.

[0029] A gas turbine, wherein a control system of the gas turbine is provided with a program for executing the gas turbine mixed gas combustion adjustment method.

[0030] Compared with the prior art, the present invention has the following beneficial technical effects:

[0031] The present invention provides a method for adjusting the mixed combustion of a gas turbine. First, the design calorific value and the lower calorific value of the gas turbine in steady-state operation are determined. Then, the upper and lower boundaries of the fuel quantity in the fuel pipeline under the design calorific value and the lower calorific value are determined respectively. Then, a load swing experiment is used to determine the operating parameters of each load point, so that the monitoring data of the gas turbine at each load point is in a normal state, thereby realizing the parameter adjustment of the mixed combustion scheme of the gas turbine, and ensuring the comprehensive adaptability, flexibility and accuracy of the gas turbine under different fuel characteristics. It not only improves the combustion efficiency and equipment stability, but also enhances the operational safety, reduces the economic cost and environmental impact. In addition, the method reduces the reliance on the manufacturer's proprietary technology, provides data-driven decision support, simplifies the maintenance process, and effectively responds to emergencies, thereby improving the long-term operating benefits and technological advancement of the gas turbine. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 The present invention is a flow chart of the method for adjusting the mixed gas combustion of a gas turbine. DETAILED DESCRIPTION

[0033] The present invention will be further described in detail below in conjunction with the accompanying drawings, which are intended to explain the present invention rather than to limit it.

[0034] A method for adjusting mixed gas combustion of a gas turbine comprises the following steps:

[0035] Step 1: Develop a combustion adjustment test plan.

[0036] The gas turbine combustion adjustment test plan is generally formulated before the gas turbine combustion adjustment test. The combustion adjustment test plan includes the test purpose, unit overview, matters and requirements to be prepared, test plan, risk identification and prevention measures, etc.

[0037] Step 2: Determine the unit load and gas consumption according to the adjustment test plan developed in step 1.

[0038] The unit load and gas consumption on the test date are determined according to the test plan in step 1. The unit load and gas consumption are then coordinated with the power grid and gas grid respectively to meet the power consumption and gas consumption during the test.

[0039] Step 3: Arrange a fuel temperature control logic module and a fuel switching module in the gas turbine unit.

[0040] Before the mixed gas combustion is adjusted, a fuel temperature control logic module and a fuel switching module are preset in the control system of the unit to be adjusted for combustion.

[0041] The fuel control logic module includes a temperature setting unit, an alarm unit and a fuel control unit.

[0042] The output temperature alarm signal is used to set the combustion temperature; the alarm unit is used to output the temperature alarm signal according to the combustion temperature, including low fuel temperature alarm and high fuel temperature alarm; the fuel control unit includes low fuel temperature runback and high fuel temperature runback, which adjust the operating state of the gas turbine to restore the combustion temperature to normal.

[0043] The fuel switching module is used to switch the fuel type of the gas turbine, for example, switching the stored natural gas to a mixed fuel according to the combustion requirements.

[0044] Step 4: within the design calorific value range of the gas turbine, adjust the fuel distribution amount of each fuel pipeline at each load point to obtain the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point.

[0045] The combustion adjustment within the design calorific value range refers to maintaining the unit load at the predetermined load at the test time point, confirming that the combustion monitoring equipment functions normally and the fuel temperature remains unchanged. Then the fuel is switched and the new fuel temperature is modified.

[0046] Specifically, under the design calorific value condition, the distribution amount of each fuel pipeline at each test load point is fine-tuned in turn to explore the upper and lower boundaries of the fuel amount of each fuel pipeline at each test load point. The upper and lower boundaries of the fuel amount are mainly determined based on the monitoring operation data of the combustion monitoring equipment, combustion pressure pulsation, and pollutant emissions.

[0047] It should be noted that in the actual combustion adjustment process, the adjustment order of the test load points may be affected by the power grid and gas volume. When adjusting the design calorific value combustion, the calorific value of each test load point remains basically stable.

[0048] Step 5: Within the adjustment range of the design calorific value of the gas turbine, control the fuel input according to the upper and lower limits of the fuel quantity in the fuel pipeline, conduct a load swing test on the gas turbine, and adjust the operating parameters of each load point so that the monitoring data of the gas turbine at each load point is in a normal state.

[0049] The method of load swing test is as follows:

[0050] The upper and lower boundaries of the fuel amount in the fuel pipeline are input into the control system of the gas turbine, and a load swing test is carried out within the design calorific value adjustment range of the gas turbine. The load of the gas turbine swings back and forth from full load to minimum load, and the input amount of the mixed fuel is adjusted at each load point according to the upper and lower boundaries of the fuel amount in the fuel pipeline. The monitoring data of the gas turbine is obtained. When the monitoring data is abnormal, the operating parameters of the load corresponding to the abnormal monitoring data are adjusted until the operating parameters are normal.

[0051] The monitoring data includes temperature data of the gas turbine, burner pressure pulsation data and pollutant emission data.

[0052] Step 6: Conduct a calorific value fluctuation test on the gas turbine to determine the low calorific value range of the gas turbine in steady-state operation at the load point.

[0053] The calorific value fluctuation test is to explore the lower limit of the fuel calorific value when the gas turbine is in steady state operation under various load point conditions after the fuel composition and fuel calorific value are changed. During the calorific value fluctuation test, when the calorific value reaches the calorific value condition to be adjusted, the fuel flow rate of each fuel pipeline is changed to observe whether the unit is operating safely, stably and with low emissions.

[0054] Step 7: Within the low calorific value range of the gas turbine, adjust the fuel distribution amount of each fuel pipeline at each load point to obtain the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point.

[0055] The low calorific value combustion adjustment test is to fine-tune the distribution amount of each fuel pipeline at each test load point in turn under the calorific value lower limit condition determined in step 6, and explore the upper and lower boundaries of the fuel amount of each fuel pipeline at each test load point. The upper and lower boundaries of the fuel amount are mainly determined based on the monitoring operation data of the combustion monitoring equipment, the combustion pressure pulsation, and the pollutant emission conditions.

[0056] It should be noted that in the actual combustion adjustment process, the adjustment order of the test load points may be affected by the power grid and gas volume. When adjusting the low calorific value combustion, the calorific value of each test load point remains basically stable.

[0057] Step 8: Within the low calorific value adjustment range of the gas turbine, control the fuel input according to the upper and lower limits of the fuel quantity in the fuel pipeline, conduct a load swing test on the gas turbine, and adjust the operating parameters of each load point so that the monitoring data of the gas turbine at each load point is in a normal state.

[0058] The low calorific value load swing refers to the swing from full load to the lowest load point of the combustion adjustment after the combustion adjustment is completed and the parameter setting is changed in step 7. During the swing, pay close attention to whether the unit operation data, the pressure pulsation of each burner, and the pollutant emission data are abnormal; if there is an abnormality, the load at the abnormal point needs to be readjusted, and the load swing is resumed after the parameter change until it returns to normal.

[0059] Step 9: When the unit is in shutdown state, modify the ignition and warm-up parameter settings to the corresponding parameters of the current mixed fuel to complete the adjustment of the combustion parameters of the gas turbine mixed fuel.

[0060] Example 1

[0061] The following uses a certain type of gas turbine mixed gas combustion adjustment as an example to illustrate a specific embodiment of the present invention in detail with reference to the accompanying drawings.

[0062] The working process of the mixed gas combustion adjustment of a gas turbine in this embodiment is as follows:

[0063] Step 1: To meet the demand for LNG and sea gas consumption, realize the unit burning LNG + sea gas (referred to as mixed gas) with a fixed calorific value, and improve the adaptability of gas turbines to different fuels, it is necessary to carry out mixed gas fuel adjustment tests for gas-steam combined cycle units. Before the combustion adjustment test, the service maintenance personnel of the power generation enterprise cooperate with the combustion adjustment engineers of the gas turbine manufacturer to formulate a combustion adjustment test plan, clarify the test purpose, unit overview, matters and requirements that need to be prepared, test plan, risk identification and prevention measures, etc.

[0064] Step 2: Determine the unit load and gas consumption on the planned test date according to the test plan in the combustion adjustment test plan in step 1, and coordinate with the power grid and gas grid in advance to ensure the smooth implementation of the combustion adjustment test.

[0065] Step 3: Since the gas turbine fuel is designed according to LNG fuel, it is planned to start combustion adjustment after the gas turbine fuel is switched from LNG to mixed gas fuel. Before the mixed gas combustion adjustment, the combustion adjustment engineer of the gas turbine manufacturer adds control logic modules such as mixed gas fuel temperature low alarm, fuel temperature low runback, fuel temperature setting, fuel temperature high alarm, fuel temperature high runback, and LNG fuel and mixed gas switching module to the unit to be adjusted for combustion.

[0066] Step 4: Maintain the gas turbine load at 150MW during the test time, connect the combustion monitoring system, confirm that the combustion monitoring equipment functions normally, and maintain the LNG fuel temperature at 220℃. Then switch LNG to mixed gas. When the fuel switch is completed, change the fuel temperature of 220℃ to the mixed gas fuel temperature of 105℃; at the same time, change the fuel temperature low alarm limit and low RunBack value; at this time, the fuel calorific value is 32.6MJ / Nm 3 . Fine-tune the distribution of each fuel pipeline at 100% load point, 90% load point, 75% load point, and 50% load point in turn to explore the upper and lower boundaries of the fuel amount in each fuel pipeline at each test load point. During the combustion adjustment period, the upper and lower boundaries of the fuel amount are mainly determined based on the monitoring operation data of the combustion monitoring equipment, combustion pressure pulsation, and pollutant emissions. 3 During combustion adjustment, the calorific value of each test load point remains basically stable.

[0067] Step 5, after the combustion adjustment of each load point in step 4 is completed, the parameters of each load point are set and changed according to the combustion adjustment result, and then the load point is swung back and forth from 100% full load to 50%. During the swing period, the unit operation data, the pressure pulsation of each burner, and the pollutant emission data are closely monitored to ensure that there are no abnormalities;

[0068] Step 6: After the fuel is switched from LNG to mixed gas fuel, the fuel composition and fuel calorific value change greatly. Under the 165MW load condition of the gas turbine, the fuel flow rate of each fuel pipeline is changed in turn to explore the lower limit of the fuel calorific value change. After the calorific value fluctuation test, it is confirmed that the fuel calorific value can be reduced to 30.8MJ / Nm 3 .

[0069] Step 7: 30.8MJ / Nm determined in step 6 3 Under the condition of the lower limit of calorific value, the distribution amount of each fuel pipeline at 100% load point, 90% load point, 75% load point, and 50% load point was fine-tuned in turn to explore the upper and lower boundaries of the fuel amount of each fuel pipeline at each test load point. During the combustion adjustment period, the upper and lower boundaries of the fuel amount are mainly determined based on the monitoring operation data of the combustion monitoring equipment, combustion pressure pulsation, and pollutant emissions. 3 During combustion adjustment, the calorific value of each test load point remains basically stable.

[0070] Step 8, after the combustion adjustment of each load point is completed in step 7, the parameters of each load point are set and changed according to the combustion adjustment result, and then the load point is swung back and forth from 100% full load to 50%. During the swing period, the unit operation data, the pressure pulsation of each burner, and the pollutant emission data are closely monitored to ensure that they are normal;

[0071] Step 9: After shutdown, modify the ignition and warm-up parameters to the corresponding parameters of the current mixed fuel.

[0072] Example 2

[0073] A gas turbine mixed gas combustion adjustment system, comprising:

[0074] The first fuel boundary module is used to adjust the fuel distribution amount of each fuel pipeline at each load point according to the design calorific value of the gas turbine, and determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point;

[0075] The first load swing module is used to control the input amount of the mixed fuel according to the upper and lower limits of the fuel amount of each fuel pipeline, perform a load swing test of the gas turbine under the design calorific value condition, determine the operating parameters of each load point, and make the monitoring data of the gas turbine at each load point in a normal state;

[0076] The calorific value module is used to conduct calorific value fluctuation tests on gas turbines and determine the lower calorific value of the gas turbine when operating at a steady state at the load point;

[0077] The second fuel boundary module is used to adjust the fuel distribution amount of each fuel pipeline at each load point, so that the gas turbine operates at a low calorific value condition, and determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point;

[0078] The second load swing module is used to control the fuel input amount according to the upper and lower limits of the fuel amount in the fuel pipeline obtained in step 4 when the gas turbine is operating under low calorific value conditions, conduct a load swing test on the gas turbine, determine the operating parameters of each load point, and ensure that the monitoring data of the gas turbine at each load point is in a normal state.

[0079] Example 3

[0080] A gas turbine, wherein a control system of the gas turbine is provided with a program for executing the gas turbine mixed gas combustion adjustment method.

[0081] The present invention provides a gas turbine mixed combustion adjustment method. When the combustion characteristics such as the fuel composition and fuel calorific value of the gas turbine change widely, the method systematically explains the focus points before, during and after the combustion adjustment, so as to guide the service and maintenance personnel of the gas turbine power generation enterprise to have a clear understanding of the mixed combustion adjustment method. The proposed mixed combustion adjustment method can provide guarantee for the safe, stable and low-emission operation of the gas turbine generator set, and can also provide technical support for the production and service maintenance team of the power plant to master the mixed combustion adjustment method.

[0082] The division of modules in the embodiments of the present invention is schematic and is only a logical function division. There may be other division methods in actual implementation. In addition, each functional module in each embodiment of the present invention may be integrated into one processor, or may exist physically separately, or two or more modules may be integrated into one module. The above-mentioned integrated modules may be implemented in the form of hardware or in the form of software functional modules.

[0083] In another embodiment of the present invention, a computer device is provided, the computer device comprising a processor and a memory, the memory being used to store a computer program, the computer program comprising program instructions, and the processor being used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or may be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc., which are the computing core and control core of the terminal, which are suitable for implementing one or more instructions, and are specifically suitable for loading and executing one or more instructions in the computer storage medium to implement the corresponding method flow or corresponding function; the processor described in the embodiment of the present invention can be used for the operation of the gas turbine mixed gas combustion adjustment method.

[0084] In another embodiment of the present invention, the present invention further provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It is understandable that the computer-readable storage medium here can include both built-in storage media in the computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the corresponding steps of the gas turbine mixed combustion adjustment method described in the above embodiment.

[0085] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0086] The above contents are only for explaining the technical idea of ​​the present invention and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.

Claims

1. A method for adjusting mixed gas combustion in a gas turbine, characterized in that: The following steps are involved: Step 1: According to the design calorific value of the gas turbine, the fuel distribution amount of each fuel pipeline is adjusted at each load point to determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point; Step 2: Control the input amount of the mixed fuel according to the upper and lower limits of the fuel amount of each fuel pipeline, conduct a load swing test of the gas turbine under the design calorific value condition, determine the operating parameters of each load point, and make the monitoring data of the gas turbine at each load point in a normal state; Step 3, conducting a calorific value fluctuation test on the gas turbine to determine the lower calorific value of the gas turbine when operating in a steady state at the load point; Step 4: Adjust the fuel distribution amount of each fuel pipeline at each load point to make the gas turbine operate at a low calorific value condition, and determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point; Step 5: When the gas turbine is operating under low calorific value conditions, the fuel input amount is controlled according to the upper and lower boundaries of the fuel amount in the fuel pipeline obtained in step 4, and a load swing test is performed on the gas turbine to determine the operating parameters of each load point so that the monitoring data of the gas turbine at each load point is in a normal state.

2. A gas turbine mixed gas combustion adjustment method according to claim 1, characterized in that: The method for determining the upper and lower boundaries of the fuel quantity of each fuel pipeline at the load point in step 1 is as follows: The fuel distribution amount of each fuel pipeline is gradually increased or decreased according to a certain step distance to obtain the monitoring data of the gas turbine until the monitoring data becomes abnormal, and the last fuel distribution amount of each fuel pipeline is used as the boundary value of the fuel amount of each fuel pipeline.

3. A gas turbine mixed gas combustion adjustment method according to claim 2, characterized in that: The monitoring data includes gas turbine operation data, combustion pressure pulsation data and pollutant emission data.

4. A method for adjusting mixed gas combustion in a gas turbine according to claim 1, characterized in that: The method of the load swing test in step 2 is as follows: The upper and lower boundaries of the fuel amount in the fuel pipeline are input into the control system of the gas turbine, and a load swing test is carried out on the gas turbine under the design calorific value conditions. The load of the gas turbine swings back and forth from full load to minimum load, and the ratio of the mixed fuel is adjusted at each load point according to the upper and lower boundaries of the fuel amount in the fuel pipeline, and the monitoring data of the gas turbine is obtained. When the monitoring data is abnormal, the operating parameters of the load corresponding to the abnormal monitoring data are adjusted until the operating parameters are normal, thereby determining the operating parameters of the gas turbine at the load point.

5. A gas turbine mixed gas combustion adjustment method according to claim 4, characterized in that: The method for adjusting the ratio of the mixed fuel is as follows: At each load point, the fuel amount of each fuel pipeline is operated at a boundary value, monitoring data corresponding to the boundary value is obtained, and the operating parameters of the load point are determined according to the monitoring data.

6. A method for adjusting mixed gas combustion in a gas turbine according to claim 1, characterized in that: The method for determining the lower heating value of the gas turbine in step 3 is as follows: At the load point, the calorific value of the mixed fuel is changed by adjusting the fuel composition and fuel quantity, and the calorific value is gradually reduced. The monitoring data of the gas turbine under the current operating state is obtained. When the monitoring data is abnormal, the calorific value adjusted at that time is used as the low calorific value of the load point.

7. A gas turbine mixed gas combustion adjustment method according to claim 6, characterized in that: The monitoring data in the lower heating value determination process is the emission data of the gas turbine.

8. A method for adjusting mixed gas combustion in a gas turbine according to claim 1, characterized in that: The fuel pipeline includes a natural gas pipeline and a hydrogen pipeline.

9. A system for executing a gas turbine mixed gas combustion adjustment method according to any one of claims 1 to 8, characterized in that: include: The first fuel boundary module is used to adjust the fuel distribution amount of each fuel pipeline at each load point according to the design calorific value of the gas turbine, and determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point; The first load swing module is used to control the input amount of the mixed fuel according to the upper and lower limits of the fuel amount of each fuel pipeline, perform a load swing test of the gas turbine under the design calorific value condition, determine the operating parameters of each load point, and make the monitoring data of the gas turbine at each load point in a normal state; The calorific value module is used to conduct calorific value fluctuation tests on gas turbines and determine the lower calorific value of the gas turbine when operating at a steady state at the load point; The second fuel boundary module is used to adjust the fuel distribution amount of each fuel pipeline at each load point, so that the gas turbine operates at a low calorific value condition, and determine the upper and lower boundaries of the fuel amount of each fuel pipeline at each load point; The second load swing module is used to control the fuel input amount according to the upper and lower limits of the fuel amount in the fuel pipeline obtained in step 4 when the gas turbine is operating under low calorific value conditions, conduct a load swing test on the gas turbine, determine the operating parameters of each load point, and ensure that the monitoring data of the gas turbine at each load point is in a normal state.

10. A gas turbine, characterized in that: The control system of the gas turbine is provided with a program for executing the gas turbine mixed gas combustion adjustment method according to any one of claims 1 to 8.