Method for measuring easy-to-collapse area of irregular-end pipe gallery foundation pit

The finite element software ABAQUS is used to establish a three-dimensional model and use the maximum settlement ratio formula to solve the problem of measuring the collapse-prone area of ​​the foundation pit of the irregular end pipe gallery, achieving safe and reliable measurement and cost reduction.

CN118776519AInactive Publication Date: 2024-10-15GUANGZHOU PANYU POLYTECHNIC
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410871124.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the construction of urban comprehensive pipe corridors, it is difficult to accurately measure the collapse-prone areas of the foundation pits of irregular end pipe corridors, which poses greater safety risks and higher construction costs.

Method used

The finite element software ABAQUS is used to establish a three-dimensional model of the pipe gallery foundation pit. The surface settlement is statistically calculated through the maximum settlement ratio formula. The distribution curve and measurement formula of the maximum settlement ratio are obtained by fitting to determine the prone area to collapse.

Benefits of technology

It achieves accurate measurement of areas prone to collapse in foundation pits with irregular ends, ensuring construction safety and reducing construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118776519A_ABST
    Figure CN118776519A_ABST
Patent Text Reader

Abstract

The invention discloses a method for measuring an easy-to-collapse area of a pipe gallery foundation pit with an irregular end. The method comprises the following steps: establishing a three-dimensional model of the pipe gallery foundation pit by adopting finite element software ABAQUS; in the three-dimensional model of the pipe gallery foundation pit, starting from the end of the foundation pit, taking a numerical simulation monitoring point every other distance d; carrying out statistical calculation on ground surface settlement by adopting a maximum settlement ratio delta delta v formula: # imgabs0 #; fitting according to a statistical calculation result to obtain a distribution rule curve of the maximum settlement ratio; obtaining a maximum settlement ratio measurement formula in an asymmetric end form according to the distribution curve of the maximum settlement ratio; according to the distribution rule curve of the maximum settlement ratio and a measurement formula, obtaining an easy-to-collapse area; according to the method for measuring the easy-to-collapse area of the irregular-end pipe gallery foundation pit, the easy-to-collapse area of the irregular-end pipe gallery foundation pit can be accurately measured, the method is safer and more reliable, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit measurement, and in particular to a method for measuring a collapse-prone area of ​​a foundation pit of a pipe gallery with an irregular end. Background Art

[0002] The development and utilization of underground space is an inevitable choice for urban development. Taking the construction of urban integrated pipe corridors as an example, it can not only improve the level of basic urban governance, but also improve the quality of life of urban residents. However, the notable characteristics of the pipe corridor foundation pit are that the excavation surface is very small and the depth is large, especially when construction is carried out in soft soil areas, the foundation pit is very easy to deform. At the same time, due to the limitations of urban space, the excavation of irregular end-type pipe corridor foundation pits has gradually increased. The positive angle form and arm length formed by the excavation of such end foundation pits are different from those of regular end foundation pits. Therefore, the areas prone to collapse in the excavation of such end foundation pits cannot be accurately measured, and there are great safety hazards. Summary of the invention

[0003] The purpose of the present invention is to provide a method for measuring the easily collapsed area of ​​the irregular end tunnel foundation pit, which can accurately measure the easily collapsed area of ​​the irregular end tunnel foundation pit, is safer and more reliable, and reduces construction costs.

[0004] To achieve this object, the present invention adopts the following technical solutions: A method for measuring the prone-to-collapse area of ​​an irregular-end tunnel foundation pit is provided, comprising the following steps: The finite element software ABAQUS is used to establish the three-dimensional model of the tunnel foundation pit; In the three-dimensional model of the tunnel foundation pit, starting from the end of the foundation pit, a numerical simulation monitoring point is taken at every interval d; Maximum sedimentation ratio Δ δv formula: , to perform statistical calculation of surface subsidence, where: δ vm,d is the maximum surface settlement at the cross section at a horizontal distance d from the pit corner, δ vm,70 It is the maximum surface settlement at the section 70m horizontally away from the pit corner; The distribution curve of the maximum sedimentation ratio is fitted based on the results of statistical calculations; According to the distribution curve of the maximum settlement ratio, the maximum settlement ratio measurement formula of the asymmetric end form is obtained; As a preferred solution for measuring the prone-to-collapse area of ​​an irregular-end corridor foundation pit, in the step of establishing a three-dimensional model of the corridor foundation pit using the finite element software ABAQUS, the modeling parameters include: the size of the foundation pit, the physical and mechanical parameters of the soil layer, and the physical and mechanical parameters of the retaining structure.

[0005] As a preferred solution for the method of measuring the prone-to-collapse area of ​​the irregular-end tunnel foundation pit, the interval distance d of the numerical simulation monitoring points is: 1m≤d≤3m.

[0006] As a preferred solution for the method of measuring the prone-to-collapse area of ​​the irregular-end tunnel foundation pit, the interval distance d of the numerical simulation monitoring points is 2m.

[0007] Beneficial effects of the present invention: The method for measuring the prone-to-collapse area of ​​the irregular-end tunnel foundation pit proposed in the present invention establishes a three-dimensional model of the tunnel foundation pit through the finite element software ABAQUS, adopts the maximum settlement ratio formula to perform statistical calculations on the surface settlement, and obtains the distribution law curve of the maximum settlement ratio and the maximum settlement ratio measurement formula based on the results of the statistical calculation. The prone-to-collapse area of ​​the irregular-end tunnel foundation pit can be accurately measured, and the staff can reinforce the prone-to-collapse area based on the measurement results, thereby ensuring the safety of the foundation pit construction and greatly reducing the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0009] Figure 1 This is a flow chart of a method for measuring the prone-to-collapse area of ​​an irregular-end tunnel foundation pit according to an embodiment of the present invention. Figure 2 It is a schematic structural diagram of a foundation pit end head in the form of a 120° asymmetric end head according to an embodiment of the present invention; Figure 3 It is a schematic diagram of the structure of a foundation pit end head in the form of a 150° asymmetric end head according to an embodiment of the present invention; Figure 4 This is a maximum settlement ratio distribution curve diagram of a foundation pit with a 120° asymmetric end form according to an embodiment of the present invention; Figure 5 This is a maximum settlement ratio distribution curve diagram of a foundation pit with a 150° asymmetric end form according to an embodiment of the present invention; DETAILED DESCRIPTION The embodiments of the present disclosure are described in detail below with reference to the accompanying drawings.

[0010] The following describes the embodiments of the present disclosure through specific examples, and those skilled in the art can easily understand other advantages and effects of the present disclosure from the contents disclosed in this specification. Obviously, the described embodiments are only a part of the embodiments of the present disclosure, rather than all of the embodiments. The present disclosure can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present disclosure. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present disclosure.

[0011] Reference Figure 1 An embodiment of the present invention provides a method for measuring the prone-to-collapse area of ​​an irregular-end tunnel foundation pit, which is characterized by comprising the following steps: S1: Use finite element software ABAQUS to establish a three-dimensional model of the tunnel foundation pit; S2: In the three-dimensional model of the tunnel foundation pit, starting from the end of the foundation pit, a numerical simulation monitoring point is taken at every interval d; S3: Use the maximum sedimentation ratio Δ δv formula: , to perform statistical calculation of surface subsidence, where: δ vm,d is the maximum surface settlement at the cross section at a horizontal distance d from the pit corner, δ vm,70 It is the maximum surface settlement at the section 70m horizontally away from the pit corner; S4: fitting the distribution curve of the maximum sedimentation ratio according to the result of statistical calculation; S5: According to the distribution curve of the maximum settlement ratio, the maximum settlement ratio measurement formula of the asymmetric end form is obtained; S6: Obtain the prone-to-collapse area based on the distribution law curve of the maximum settlement ratio and the measurement formula.

[0012] Specifically, take the following pipeline gallery deep foundation pit project as an example: The deep foundation pit of the pipe gallery is 97m long, the standard section width is 7.2m, the end area is 9.3m long and 9.9m wide, and the average excavation depth is H e is 7m.

[0013] The stratum where the foundation pit is located is a typical soft soil stratum in the Pearl River Delta. From top to bottom, the stratum is silty soil (20-35m), sandy clay soil (15-20m) and fully weathered granite (10-20m). The physical and mechanical parameters of the rock and soil layers are shown in Table 1.

[0014] Table 1 Physical and mechanical parameters of typical soft soil layers The foundation pit retaining structure is in the form of cast-in-place piles + steel supports, with an average pile length of 30m. Two steel supports are set vertically in the foundation pit direction with a spacing of 4m. The physical and mechanical parameters of the foundation pit retaining structure are shown in Table 2.

[0015] Table 2 Physical and mechanical parameters of enclosure structure According to the above-mentioned deep foundation pit parameters of the pipeline gallery, a three-dimensional model of the pipeline gallery foundation pit is established using the commonly used engineering simulation software in this field: finite element software ABAQUS; In the three-dimensional model of the tunnel foundation pit, starting from the end of the foundation pit, a numerical simulation monitoring point is taken at a distance of 2m; Maximum sedimentation ratio Δ δv formula: , to perform statistical calculation of surface subsidence, where: δ vm,d is the maximum surface settlement at the cross section at a horizontal distance d from the pit corner, δ vm,70 It is the maximum surface settlement at the section 70m horizontally away from the pit corner; The distribution curve of the maximum sedimentation ratio is fitted based on the results of statistical calculations; like Figure 2 , taking the 120º asymmetric end form foundation pit end as an example: The maximum settlement ratio distribution curve of the 120° asymmetric end foundation pit is shown in Figure 4 ; The fitting formula of the maximum settlement ratio distribution curve of the 120º asymmetric end foundation pit is: Depend on Figure 4 It can be seen that the pit angle effect of the 120° asymmetric end form foundation pit has an influence range of 0 to 58 m, that is, 0 to 8.3 H e , 25 to 53 m from the pit corner, i.e. 3.57 H e ~7.57 H e The area is prone to collapse; among them, H e is the foundation pit depth.

[0016] like Figure 3 , taking the 150º asymmetric end form foundation pit end as an example: The maximum settlement ratio distribution curve of the 150° asymmetric end foundation pit is shown in Figure 5; The fitting formula of the maximum settlement ratio distribution curve of the 150º asymmetric end foundation pit is: Depend on Figure 5 It can be seen that the pit angle effect of the 150° asymmetric end form foundation pit has an influence range of 0 to 40 m, that is, 0 to 5.7 H e , 15 to 36 m from the pit corner, i.e. 2.14 H e ~5.14 H e The area is prone to collapse; among them, H e is the foundation pit depth.

[0017] Therefore, the prone-to-collapse area is obtained according to the distribution law curve of the maximum settlement ratio and the measurement formula; the surface settlement influence range and prone-to-collapse area of ​​foundation pits with different end forms are shown in Table 3.

[0018] Table 3 Surface settlement influence range and prone-to-collapse area of ​​foundation pits with different end forms Based on the measurement results, staff can reinforce areas prone to collapse, thereby ensuring the safety of foundation pit construction and greatly reducing construction costs.

[0019] In the description of the present invention, it is necessary to understand that the terms "middle", "length", "up", "down", "front", "back", "vertical", "horizontal", "inside", "outside", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0020] In the present invention, unless otherwise clearly specified and limited, the first feature "on" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. "Multiple" means at least two, such as two, three, etc., unless otherwise clearly and specifically limited.

[0021] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0022] The above is only for explaining the implementation mode of the present invention and is not intended to limit the present invention. For those skilled in the art, any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention without creative work should be included in the protection scope of the present invention.

Claims

1. A method for measuring the prone-to-collapse area of ​​an irregular-end pipe gallery foundation pit, characterized in that: The following steps are involved: The finite element software ABAQUS is used to establish the three-dimensional model of the tunnel foundation pit; In the three-dimensional model of the tunnel foundation pit, starting from the end of the foundation pit, a numerical simulation monitoring point is taken at every interval d; Maximum sedimentation ratio Δ δv formula: , to perform statistical calculation of surface subsidence, where: δ vm,d is the maximum surface settlement at the cross section at a horizontal distance d from the pit corner, δ vm,70 It is the maximum surface settlement at the section 70m horizontally away from the pit corner; The distribution curve of the maximum sedimentation ratio is fitted based on the results of statistical calculations; According to the distribution curve of the maximum settlement ratio, the maximum settlement ratio measurement formula of the asymmetric end form is obtained; The collapse-prone area is obtained based on the distribution law curve of the maximum settlement ratio and the measurement formula.

2. The method for measuring the prone-to-collapse area of ​​the irregular-end pipe gallery foundation pit according to claim 1 is characterized in that: In the step of establishing the three-dimensional model of the tunnel foundation pit using the finite element software ABAQUS, the modeling parameters include: the size of the foundation pit, the physical and mechanical parameters of the soil layer, and the physical and mechanical parameters of the retaining structure.

3. The method for measuring the prone-to-collapse area of ​​the irregular-end tunnel foundation pit according to claim 1 is characterized in that: The interval distance d of the numerical simulation monitoring points is: 1m≤d≤3m.

4. The method for measuring the prone-to-collapse area of ​​the irregular-end tunnel foundation pit according to claim 1 is characterized in that: The interval distance d of the numerical simulation monitoring points is 2m.

Citation Information

Patent Citations

  • Pipe gallery double-wing-plate controlled abutment pressing implementation method

    CN111809657A

  • Long-strip-shaped underground structure segment length determination method considering stratigraphic space variability

    CN114547753A

  • Active guiding type ground fracture disaster reduction method based on separating wall

    CN115495826A