A road crack monitoring system

Through the design of the pavement crack monitoring system, the information acquisition and analysis module combined with load and strain data is used to solve the problem of accurate and low efficiency of pavement crack monitoring in the prior art, and more efficient and accurate crack detection is achieved.

CN118777063BActive Publication Date: 2024-11-19LUOYANG NORMAL UNIV +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411237480.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-11-19
Estimated Expiration
2044-09-05

AI Technical Summary

Technical Problem

The existing pavement crack monitoring technology has low accuracy and low efficiency, and is sensitive to lighting conditions and pavement color, resulting in inaccurate monitoring results.

Method used

A pavement crack monitoring system was designed, including information acquisition module, strain metering analysis module, load analysis module, crack metering management module, management optimization module and update module. By obtaining pavement load, material information and environmental information, strain and load are analyzed. Anomaly, risk warning and measurement are carried out, and parameters of the detection cycle are adjusted to improve monitoring accuracy.

Benefits of technology

It improves the measurement efficiency and accuracy of road cracks, reduces the adverse effects caused by material and environmental factors, and enhances the early warning accuracy and reliability of monitoring results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118777063B_ABST
    Figure CN118777063B_ABST
Patent Text Reader

Abstract

The present invention relates to a road crack monitoring system, and in particular to the field of crack monitoring technology. The system comprises an information acquisition module for acquiring road load, road material information and environmental information; a strain measurement analysis module for analyzing the abnormality of road strain and adjusting the analysis process of road strain abnormality according to the acquired road material information; a load analysis module for analyzing the abnormality of road pressure; a crack measurement management module for performing road crack risk warning and acquiring measurement results of the width and depth of road cracks; a management optimization module for optimizing the analysis process of road crack risk warning; and an update module for updating the analysis process of road crack risk warning for the next detection period according to the warning accuracy within the detection period. The present invention improves the measurement efficiency and accuracy of road cracks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of crack monitoring, and in particular to a pavement crack monitoring system. Background Art

[0002] At present, road crack monitoring usually adopts manual inspection or uses traditional image processing technology. However, manual inspection is inefficient, costly, and prone to omissions. Traditional image processing technology requires complex preprocessing and feature extraction steps, and is sensitive to factors such as lighting conditions and road surface color, resulting in inaccurate monitoring results.

[0003] Chinese Patent Publication No.: CN109696115B discloses a wireless monitoring system for internal cracks in cement pavement and a method for determining crack width and position. The system includes a plurality of cement-based wireless piezoelectric intelligent aggregates and wireless signal receivers; wherein the cement-based wireless piezoelectric intelligent aggregates are buried at the bottom of the cement surface layer, and the wireless signal receiver is placed on the road surface. The width of the cracks inside the pavement is determined by utilizing the change in the amplitude of the output signal before and after the pavement is loaded, and the specific location of the cracks is determined based on the system. The method of the present invention can reduce the cost of pavement monitoring, is reliable, simple and fast, and is suitable for large-scale promotion and application; and the crack size and position obtained are highly accurate; it can be seen that when monitoring cracks, this scheme only analyzes the parameters of the equipment itself, and there are problems of low accuracy and low efficiency in monitoring pavement cracks. Summary of the invention

[0004] To this end, the present invention provides a road surface crack monitoring system to overcome the problems of low accuracy and low efficiency in road surface crack monitoring in the prior art.

[0005] To achieve the above object, the present invention provides a road crack monitoring system, the system comprising:

[0006] An information acquisition module is used to obtain road load, road material information and environmental information;

[0007] A strain measurement analysis module is used to analyze the abnormality of pavement strain according to the pavement strain measurement information measured during the monitoring period, and to adjust the analysis process of pavement strain abnormality according to the acquired pavement material information;

[0008] A load analysis module is used to analyze the abnormality of road surface pressure based on the road surface load obtained during the monitoring period;

[0009] The crack measurement management module is used to issue a risk warning for pavement cracks based on the analysis results of pavement strain anomalies and pressure anomalies during the management period, and obtain the measurement results of the width and depth of pavement cracks. It is also used to adjust the maximum speed limit of each sample section in the next detection period based on the number of warnings for each sample section in the detection period;

[0010] A management optimization module is used to optimize the analysis process of pavement crack risk warning based on the average ambient temperature of the management period, and to optimize the analysis process of pavement crack risk warning based on the obtained precipitation of the management period;

[0011] The update module is used to update the analysis process of the pavement crack risk warning in the next detection cycle according to the warning accuracy within the detection cycle.

[0012] Furthermore, the strain measurement and analysis module is provided with a compression strain analysis unit, which is used to compare the pavement compression strain a0 measured during the monitoring period with the first preset strain a1, and analyze the abnormality of the pavement compression strain according to the comparison result, wherein:

[0013] When a0≤a1, the compression strain analysis unit determines that the compression strain of the road surface is normal;

[0014] When a0>a1, the compression strain analysis unit determines that the compression strain of the road surface is abnormal;

[0015] The strain measurement and analysis module is further provided with a tensile strain analysis unit, which is used to compare the road surface tensile strain b0 measured during the monitoring period with the second preset strain b1, and analyze the abnormality of the road surface tensile strain according to the comparison result, wherein:

[0016] When b0≤b1, the tensile strain analysis unit determines that the tensile strain of the road surface is normal;

[0017] When b0>b1, the tensile strain analysis unit determines that the tensile strain of the road surface is abnormal.

[0018] Furthermore, the strain measurement analysis module is further provided with a strain anomaly analysis unit, which is used to analyze the abnormality of the road surface strain according to the analysis results of the abnormality of the road surface compression strain and the abnormality of the tensile strain within the monitoring period, wherein:

[0019] When w1×A1+w2×A2≤A0, the strain anomaly analysis unit determines that the strain of the road surface in the current monitoring period is normal;

[0020] When w1×A1+w2×A2>A0, the strain anomaly analysis unit determines that the strain of the road surface in the current monitoring period is abnormal;

[0021] Among them, A1 is the abnormal time of pavement compressive strain within the monitoring period, A2 is the abnormal time of pavement tensile strain within the monitoring period; w1 is the compressive strain weight, w2 is the tensile strain weight; A0 is the first preset abnormal time.

[0022] Furthermore, the strain measurement analysis module is provided with a first adjustment unit, which is used to compare the elastic modulus e0 of the obtained pavement material with the preset modulus e1, and to adjust the analysis process of the pavement strain anomaly according to the comparison result, wherein:

[0023] When e0≤e1, the first adjustment unit determines that the elastic modulus of the pavement material is abnormal, and adjusts the analysis process of the pavement strain abnormality once, and sets the adjusted first preset abnormal time as A0', and sets A0'=A0×[1-0.36×sin(e1-e0)×(π / 2) / (e1+e0)];

[0024] When e0>e1, the first adjustment unit determines that the elastic modulus of the pavement material is normal and does not make any adjustment.

[0025] Furthermore, the strain measurement analysis module is further provided with a second adjustment unit, which is used to compare the thickness h0 of the acquired pavement material with the preset thickness h1, and to make a secondary adjustment to the analysis process of the pavement strain anomaly according to the comparison result, wherein:

[0026] When h0≤h1, the second adjustment unit determines that the thickness of the pavement material is abnormal, and performs a secondary adjustment on the analysis process of the pavement strain abnormality, and sets the adjusted preset modulus e1 to e1', setting e1'=e1×[1+0.45×(h1-h0) / (h1+h0)];

[0027] When h0>h1, the second adjustment unit determines that the thickness of the road surface is normal and does not perform any adjustment.

[0028] Furthermore, the load analysis module is provided with a load analysis unit, which is used to compare the road load z0 obtained during the monitoring period with the preset load z1, and analyze the abnormality of the road load according to the comparison result, wherein:

[0029] When z0≤z1, the load analysis unit determines that the road load is normal;

[0030] When z0>z1, the load analysis unit determines that the road load is abnormal;

[0031] The load analysis module is further provided with a pressure anomaly analysis unit, which is used to analyze the abnormality of the road surface pressure according to the analysis result of the abnormality of the road surface load within the monitoring period, wherein:

[0032] When B1≤B0, the pressure abnormality analysis unit determines that the road surface pressure in the current monitoring period is normal;

[0033] When B1>B0, the pressure anomaly analysis unit determines that the road surface pressure in the current monitoring period is abnormal;

[0034] Wherein, B1 is the time when the road load is abnormal within the monitoring period, and B0 is the second preset abnormal time.

[0035] Furthermore, the crack metering management module is provided with a crack metering unit, which analyzes the abnormality of the pavement environment according to the analysis results of the pavement strain abnormality and the pressure abnormality within the management period, and issues a pavement crack risk warning according to the analysis results, wherein:

[0036] When r1×i1 / i0+r2×i2 / i0≤d, the crack metering unit determines that the pavement environment in the current management period is normal and does not issue a pavement crack risk warning to the user;

[0037] When r1×i1 / i0+r2×i2 / i0>d, the crack metering unit determines that the pavement environment in the current management period is abnormal, and issues a pavement crack risk warning to the user;

[0038] Wherein, i1 is the number of monitoring cycles of abnormal road strain within the management period, i2 is the number of monitoring cycles of abnormal road pressure within the management period, i0 is the number of monitoring cycles within the management period; r1 is the preset first weight, r2 is the preset second weight, r1+r2=1 and r1>r2; d is the preset abnormality rate;

[0039] When providing a pavement crack risk warning to the user, the crack metering unit obtains the measurement results of the length m1 and the width m2 of the pavement crack, and analyzes the effectiveness of the pavement crack risk warning based on the measurement results, wherein:

[0040] When m1<n1 or m2<n2, the crack metering unit determines that the pavement crack risk warning is invalid;

[0041] When m1≥n1 or m2≥n2, the crack metering unit determines that the pavement crack risk warning is effective;

[0042] Wherein, n1 is the preset length threshold, and n2 is the preset width threshold;

[0043] The crack metering management module is further provided with a management unit, which is used to compare the warning quantity f0 of each sample road section in the detection period with the preset quantity f1, and adjust the maximum speed limit V of each sample road section in the next detection period according to the comparison result, wherein:

[0044] When f0≤f1, the management unit determines that the number of warnings for the sample road section in the current detection period is normal and does not make any adjustments;

[0045] When f0>f1, the management unit determines that the number of warnings for the sample road section in the current detection cycle is abnormal, and adjusts the maximum speed limit of each sample road section in the next detection cycle, and sets the adjusted maximum speed limit to V', setting V'=V×[1-0.25×e 3(f0-f1) / (f0+f1)-3 ];

[0046] Where V' is V×[1-0.25×e 3(f0-f1) / (f0+f1)-3 ] is rounded down, and when V'≤v0, V' takes the value of v0, where v0 is the minimum speed limit of the sample section.

[0047] Furthermore, the management optimization module is provided with a first optimization unit, which is used to compare the average ambient temperature k of the acquired management period with the preset temperature k0, and optimize the analysis process of the pavement crack risk warning according to the comparison result, wherein:

[0048] When k≤k0, the first optimization unit determines that the ambient temperature of the current management period is normal and does not perform optimization;

[0049] When k>k0, the first optimization unit determines that the ambient temperature of the current management period is abnormal, and optimizes the analysis process of the pavement crack risk warning, and sets the optimized preset abnormality rate to d', setting d'=d×{1-arctan[(k-k0) / (k0+k)×(π / 4)]}.

[0050] Furthermore, the management optimization module is further provided with a second optimization unit, which is used to compare the precipitation j0 within the management period with the preset precipitation j1, and perform secondary optimization on the analysis process of the pavement crack risk warning according to the comparison result, wherein:

[0051] When j0≤j1, the second optimization unit determines that the precipitation in the current management period is normal and does not perform optimization;

[0052] When j0>j1, the second optimization unit determines that the precipitation in the current management period is abnormal, and performs secondary optimization on the analysis process of pavement crack risk warning, and sets the optimized preset temperature to k0', setting k0'=k0×{1-In[1+(j0-j1) / (j1+j0)] / In2}.

[0053] Furthermore, the updating module compares the warning accuracy y0 within the detection period with the preset accuracy y1, and updates the analysis process of the road crack risk warning for the next detection period according to the comparison result, wherein:

[0054] When y0≤y1, the update module determines that the warning accuracy of the current detection cycle is abnormal, and updates the analysis process of the pavement crack risk warning for the next detection cycle, and sets the updated preset abnormality rate to d0, setting d0=d×[1+0.75×(y1-y0) / (y1+y0)];

[0055] When y0>y1, the updating module determines that the warning accuracy of the current detection cycle is normal and does not perform updating.

[0056] Compared with the prior art, the beneficial effect of the present invention lies in that the compression strain analysis unit improves the accuracy of the pavement compression strain abnormality analysis by setting the first preset strain, thereby improving the accuracy of the analysis results of the pavement strain abnormality, thereby improving the accuracy of the pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; the tensile strain analysis unit improves the accuracy of the pavement tensile strain abnormality analysis by setting the second preset strain, thereby improving the accuracy of the analysis results of the pavement strain abnormality, thereby improving the accuracy of the pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; the strain abnormality analysis unit improves the accuracy of the pavement strain abnormality analysis results by setting the first preset abnormal time Accuracy, thereby improving the accuracy of pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; the first adjustment unit improves the accuracy of the analysis result of pavement strain abnormality by setting a preset modulus, thereby reducing the adverse effect of the first preset abnormal time value due to the low elastic modulus of the pavement material, thereby improving the accuracy of pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; the second adjustment unit improves the accuracy of the analysis result of pavement strain abnormality by setting a preset thickness, thereby reducing the adverse effect of the first preset abnormal time value due to abnormal pavement thickness, thereby improving the accuracy of pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; the load analysis unit The element improves the accuracy of pavement load abnormality analysis by setting a preset load, thereby improving the accuracy of pavement pressure abnormality analysis, thereby improving the accuracy of pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; the pressure abnormality analysis unit improves the accuracy of pavement pressure abnormality analysis by setting a second preset abnormal time, thereby improving the accuracy of pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; the crack metering unit improves the accuracy of pavement crack risk warning by setting a preset abnormal rate, thereby improving the accuracy of warning accuracy analysis, and thereby improving the measurement efficiency and accuracy of pavement cracks; the management unit improves the accuracy of each sample section in the next detection cycle by setting a preset number The accuracy of the maximum speed limit analysis is improved, thereby improving the measurement efficiency and accuracy of pavement cracks; the first optimization unit improves the accuracy of the pavement crack risk warning analysis by setting a preset temperature, so as to reduce the adverse effects of excessively high ambient temperature on the pavement environment abnormality analysis, and ultimately improves the measurement efficiency and accuracy of pavement cracks; the second optimization unit improves the accuracy of the pavement crack risk warning analysis by setting a preset precipitation, so as to reduce the adverse effects of excessively high precipitation on the pavement environment abnormality analysis, and ultimately improves the measurement efficiency and accuracy of pavement cracks; the update module improves the accuracy of the analysis of the pavement crack risk warning in the next detection period by setting a preset accuracy, thereby improving the measurement efficiency and accuracy of pavement cracks. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1 Schematic diagram of the structure of the pavement crack monitoring system of this embodiment;

[0058] Figure 2 Schematic diagram of the structure of the strain measurement analysis module of this embodiment;

[0059] Figure 3 is a schematic diagram of the structure of the load analysis module of this embodiment;

[0060] Figure 4 This is a schematic diagram of the structure of the crack measurement management module of this embodiment;

[0061] Figure 5 This is a schematic diagram of the structure of the management optimization module of this embodiment. DETAILED DESCRIPTION

[0062] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0063] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0064] It should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0065] See also Figure 1 As shown, it is a structural schematic diagram of a road crack monitoring system in this embodiment, the system includes:

[0066] An information acquisition module is used to acquire road load, road material information and environmental information; the road load is the pressure applied by the vehicle to the road surface, the material information includes the elastic modulus and thickness of the material, and the environmental information includes the ambient temperature and ambient humidity; in this embodiment, no specific limitation is made on the acquisition method of the road load, road material information and environmental information, and those skilled in the art can freely set it, as long as the acquisition method of the road load, road material information and environmental information is satisfied, wherein the road load can be acquired by installing a pressure sensor under the road surface and calculating the road load according to the measurement area of ​​the pressure sensor, and the calculation formula is road load = measurement data of the pressure sensor × measurement area; road material information can be acquired through interaction, and environmental information can be acquired through a meteorological website;

[0067] A strain measurement and analysis module is used to analyze the abnormality of the pavement strain according to the pavement strain measurement information measured during the monitoring period, and to adjust the analysis process of the pavement strain abnormality according to the acquired pavement material information, wherein the strain measurement information includes tensile strain and compressive strain, and the strain measurement and analysis module is connected to the information acquisition module; in this embodiment, no specific limitation is made to the setting of the monitoring period, and those skilled in the art can freely set it, as long as the setting requirements of the monitoring period are met, wherein the monitoring period can be set to 12h, 24h, 48h, etc.; in this embodiment, no specific limitation is made to the measurement method of the strain measurement information, and those skilled in the art can freely set it, as long as the measurement requirements of the strain measurement information are met, wherein the pavement strain measurement information can be measured by installing a strain gauge inside the pavement, and the measurement data can be acquired;

[0068] A load analysis module, used to analyze the abnormality of the road surface pressure according to the road surface load obtained during the monitoring period, and the load analysis module is connected to the information acquisition module;

[0069] The crack metering management module is used to issue a risk warning of pavement cracks based on the analysis results of pavement strain anomalies and pressure anomalies within the management period, and obtain the measurement results of the width and depth of pavement cracks, and is also used to adjust the maximum speed limit of each sample section in the next detection period according to the number of warnings for each sample section within the detection period; the crack metering management module is connected to the strain metering analysis module and the load analysis module; in this embodiment, no specific limitation is made on the method for obtaining the maximum speed limit and the minimum speed limit of each current sample section, and those skilled in the art can set it freely, as long as the requirements for obtaining the maximum speed limit and the minimum speed limit of each current sample section are met, wherein the maximum speed limit and the minimum speed limit of each current sample section can be obtained through interaction; in this embodiment, no specific limitation is made on the method for obtaining the maximum speed limit and the minimum speed limit of each current sample section, and those skilled in the art can set it freely, and the requirements for obtaining the maximum speed limit and the minimum speed limit of each current sample section are met, wherein the maximum speed limit and the minimum speed limit of each current sample section can be obtained through interaction; The setting of the management period is specifically limited, and those skilled in the art can set it freely, and only need to meet the setting requirements of the management period, wherein the setting of the management period should be greater than the setting of the monitoring period, and the management period can be set to 30 days, 60 days, 90 days, etc.; the sample section described in this embodiment is the monitored section, and the setting of the monitored section is not specifically limited in this embodiment, and those skilled in the art can set it freely, and only need to meet the setting requirements of the monitored section; the setting of the detection period is not specifically limited in this embodiment, and those skilled in the art can set it freely, and only need to meet the setting requirements of the detection period, wherein the setting of the detection period should be greater than the setting of the management period, and the detection period can be set to 360 days, 540 days, 720 days, etc.;

[0070] A management optimization module is used to optimize the analysis process of the pavement crack risk warning according to the average ambient temperature of the management period, and is also used to optimize the analysis process of the pavement crack risk warning according to the obtained precipitation of the management period. The management optimization module is connected to the crack measurement management module;

[0071] An update module is used to update the analysis process of the pavement crack risk warning for the next detection period according to the warning accuracy within the detection period. The update module is connected to the crack measurement management module. In this embodiment, the warning accuracy is the ratio of the number of invalid pavement crack risk warnings to the total number of pavement crack risk warnings within the detection period.

[0072] See also Figure 2 As shown, it is a schematic diagram of the structure of the strain measurement and analysis module of this embodiment, and the strain measurement and analysis module includes:

[0073] A compression strain analysis unit for analyzing the abnormality of the pavement compression strain according to the pavement compression strain measured during the monitoring period;

[0074] A tensile strain analysis unit for analyzing the abnormality of the tensile strain of the pavement according to the tensile strain of the pavement measured during the monitoring period;

[0075] A strain anomaly analysis unit, used to analyze the abnormality of road surface strain according to the analysis results of road surface compression strain abnormality and tensile strain abnormality within the monitoring period, and the strain anomaly analysis unit is connected to the tensile strain analysis unit and the compression strain analysis unit;

[0076] A first adjustment unit, used for performing an adjustment according to the obtained analysis process of the elastic modulus of the pavement material and the pavement strain anomaly, the first adjustment unit being connected to the strain analysis unit;

[0077] The second adjustment unit is used to perform secondary adjustment on the analysis process of pavement strain anomaly according to the acquired thickness of the pavement material, and the second adjustment unit is connected to the first adjustment unit.

[0078] See also Figure 3 As shown, it is a schematic diagram of the structure of the load analysis module of this embodiment, and the load analysis module includes:

[0079] A load analysis unit for analyzing the abnormality of the road load based on the road load obtained during the monitoring period;

[0080] The pressure anomaly analysis unit is used to analyze the abnormality of the road surface pressure according to the analysis result of the road surface load abnormality within the monitoring period, and the pressure anomaly analysis unit is connected to the load analysis unit.

[0081] See also Figure 4 As shown, it is a schematic diagram of the structure of the crack metering management module of this embodiment, and the crack metering management module includes:

[0082] The crack measurement unit is used to provide early warning of pavement crack risks based on the analysis results of pavement strain anomaly and pressure anomaly within the management period, and obtain the measurement results of the width and depth of pavement cracks;

[0083] The management unit is used to adjust the maximum speed limit of each sample road section in the next detection cycle according to the number of warnings of each sample road section in the detection cycle. The management unit is connected to the crack metering unit.

[0084] See also Figure 5 As shown, it is a schematic diagram of the structure of the management optimization module of this embodiment, and the management optimization module includes:

[0085] The first optimization unit is used to optimize the analysis process of the pavement crack risk warning according to the average ambient temperature of the management period;

[0086] The second optimization unit is used to perform secondary optimization on the analysis process of the pavement crack risk warning according to the obtained precipitation in the management period, and the second optimization unit is connected to the first optimization unit.

[0087] Specifically, the ground crack monitoring system described in this embodiment is applied to pavement crack monitoring in high-humidity areas. It analyzes the pavement strain abnormality and load abnormality, and provides early warning and crack measurement based on the analysis results. The analysis process is adjusted based on environmental factors and the characteristics of the material itself, thereby improving the measurement efficiency and accuracy of pavement cracks.

[0088] Specifically, the strain measurement analysis module improves the accuracy of the analysis of pavement compression strain abnormality by setting a first preset strain, improves the accuracy of the analysis of pavement tensile strain abnormality by setting a second preset strain, improves the accuracy of the analysis of pavement strain abnormality by setting a first preset abnormal time, and improves the accuracy of the analysis of pavement strain abnormality by setting a preset modulus, thereby reducing the adverse effect of the first preset abnormal time value due to the low elastic modulus of the pavement material, and improves the accuracy of the analysis of pavement strain abnormality by setting a preset thickness, thereby reducing the adverse effect of the first preset abnormal time value due to abnormal pavement thickness, thereby improving the accuracy of pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; the load analysis module improves the accuracy of the analysis of pavement load abnormality by setting a preset load, and improves the accuracy of the analysis of pavement pressure abnormality by setting a second preset abnormal time, thereby improving the pavement The accuracy of crack risk warning is improved, and the measurement efficiency and accuracy of pavement cracks are ultimately improved; the crack measurement management module improves the accuracy of pavement crack risk warning by setting a preset abnormality rate, thereby improving the accuracy of warning accuracy analysis, and then improving the measurement efficiency and accuracy of pavement cracks, and improves the accuracy of maximum speed limit analysis of each sample section in the next detection cycle by setting a preset number, thereby improving the measurement efficiency and accuracy of pavement cracks; the management optimization module improves the accuracy of pavement crack risk warning analysis by setting a preset temperature, so as to reduce the adverse effects of excessively high ambient temperature on pavement environment abnormality analysis, and improves the accuracy of pavement crack risk warning analysis by setting a preset precipitation, so as to reduce the adverse effects of excessively high precipitation on pavement environment abnormality analysis; the update module improves the accuracy of the analysis of pavement crack risk warning in the next detection cycle by setting a preset accuracy, thereby improving the measurement efficiency and accuracy of pavement cracks.

[0089] Specifically, the compression strain analysis unit compares the road surface compression strain a0 measured during the monitoring period with the first preset strain a1, and analyzes the abnormality of the road surface compression strain according to the comparison result, wherein:

[0090] When a0≤a1, the compression strain analysis unit determines that the compression strain of the road surface is normal;

[0091] When a0>a1, the compressive strain analysis unit determines that the compressive strain of the road surface is abnormal.

[0092] Specifically, the compression strain analysis unit improves the accuracy of the pavement compression strain abnormality analysis by setting the first preset strain, thereby improving the accuracy of the pavement strain abnormality analysis results, thereby improving the accuracy of the pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; in this embodiment, there is no specific limitation on the setting of the preset first strain, and technical personnel in this field can set it freely, as long as the setting requirements of the preset first strain are met. Among them, when the pavement is cement concrete, the optimal value of the preset first strain is 300 microstrain.

[0093] Specifically, the tensile strain analysis unit compares the road surface tensile strain b0 measured during the monitoring period with the second preset strain b1, and analyzes the abnormality of the road surface tensile strain according to the comparison result, wherein:

[0094] When b0≤b1, the tensile strain analysis unit determines that the tensile strain of the road surface is normal;

[0095] When b0>b1, the tensile strain analysis unit determines that the tensile strain of the road surface is abnormal.

[0096] Specifically, the tensile strain analysis unit improves the accuracy of the pavement tensile strain abnormality analysis by setting the second preset strain, thereby improving the accuracy of the pavement strain abnormality analysis results, thereby improving the accuracy of the pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; in this embodiment, there is no specific limitation on the setting of the preset second strain, and technical personnel in this field can set it freely, as long as the setting requirements of the preset second strain are met. Among them, when the pavement is cement concrete, the optimal value of the preset second strain is 100 microstrain.

[0097] Specifically, the strain anomaly analysis unit analyzes the anomaly of the road surface strain according to the analysis results of the anomaly of the road surface compression strain and the anomaly of the tensile strain during the monitoring period, wherein:

[0098] When w1×A1+w2×A2≤A0, the strain anomaly analysis unit determines that the strain of the road surface in the current monitoring period is normal;

[0099] When w1×A1+w2×A2>A0, the strain anomaly analysis unit determines that the strain of the road surface in the current monitoring period is abnormal;

[0100] Among them, A1 is the abnormal time of pavement compressive strain within the monitoring period, A2 is the abnormal time of pavement tensile strain within the monitoring period; w1 is the compressive strain weight, w2 is the tensile strain weight, w1+w2=1 and w1<w2; A0 is the first preset abnormal time.

[0101] Specifically, the strain anomaly analysis unit improves the accuracy of the analysis results of the pavement strain anomaly by setting the first preset abnormal time, thereby improving the accuracy of the pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; in this embodiment, there is no specific limitation on the setting of the first preset abnormal time, the compression strain weight and the tensile strain weight, and technical personnel in this field can set them freely, as long as the setting requirements of the first preset abnormal time, the compression strain weight and the tensile strain weight are met. Among them, when the monitoring period is 24h, the optimal value of the first preset abnormal time is 6h, the optimal value of w1 is 0.35, and the optimal value of w2 is 0.65.

[0102] Specifically, the first adjustment unit compares the elastic modulus e0 of the obtained pavement material with the preset modulus e1, and adjusts the pavement strain anomaly analysis process once according to the comparison result, wherein:

[0103] When e0≤e1, the first adjustment unit determines that the elastic modulus of the pavement material is abnormal, and adjusts the analysis process of the pavement strain abnormality once, and sets the adjusted first preset abnormal time as A0', and sets A0'=A0×[1-0.36×sin(e1-e0)×(π / 2) / (e1+e0)];

[0104] When e0>e1, the first adjustment unit determines that the elastic modulus of the pavement material is normal and does not make any adjustment.

[0105] Specifically, the first adjustment unit improves the accuracy of the analysis results of the pavement strain abnormality by setting a preset modulus, thereby reducing the adverse effect of the first preset abnormal time value due to the low elastic modulus of the pavement material, thereby improving the accuracy of the pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; in this embodiment, there is no specific limitation on the setting of the preset modulus, and technical personnel in this field can set it freely, as long as the setting requirements of the preset modulus are met. Among them, when the pavement is cement concrete, the optimal value of the preset modulus is 30GPa.

[0106] Specifically, the second adjustment unit compares the obtained thickness h0 of the pavement material with the preset thickness h1, and performs secondary adjustment on the pavement strain anomaly analysis process according to the comparison result, wherein:

[0107] When h0≤h1, the second adjustment unit determines that the thickness of the pavement material is abnormal, and performs a secondary adjustment on the analysis process of the pavement strain abnormality, and sets the adjusted preset modulus e1 to e1', setting e1'=e1×[1+0.45×(h1-h0) / (h1+h0)];

[0108] When h0>h1, the second adjustment unit determines that the thickness of the road surface is normal and does not perform any adjustment.

[0109] Specifically, the second adjustment unit improves the accuracy of the analysis results of the pavement strain abnormality by setting a preset thickness, thereby reducing the adverse impact of the pavement thickness abnormality on the value of the first preset abnormal time, thereby improving the accuracy of the pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks; in this embodiment, there is no specific limitation on the setting of the preset thickness, and technical personnel in this field can set it freely, as long as the setting requirements of the preset thickness are met. Among them, when the pavement is a rural road, the optimal value of the preset thickness is 130mm.

[0110] Specifically, the load analysis unit compares the road load z0 obtained during the monitoring period with the preset load z1, and analyzes the abnormality of the road load according to the comparison result, wherein:

[0111] When z0≤z1, the load analysis unit determines that the road load is normal;

[0112] When z0>z1, the load analysis unit determines that the road load is abnormal.

[0113] Specifically, the load analysis unit improves the accuracy of pavement load abnormality analysis by setting a preset load, thereby improving the accuracy of pavement pressure abnormality analysis, thereby improving the accuracy of pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks. In this embodiment, there is no specific limitation on the setting of the preset load, and technical personnel in this field can set it freely as long as the setting requirements of the preset load are met. Among them, when the pavement is a rural road, the optimal value of the preset modulus is 8t.

[0114] Specifically, the pressure anomaly analysis unit analyzes the abnormality of the road surface pressure according to the analysis result of the abnormality of the road surface load within the monitoring period, wherein:

[0115] When B1≤B0, the pressure abnormality analysis unit determines that the road surface pressure in the current monitoring period is normal;

[0116] When B1>B0, the pressure anomaly analysis unit determines that the road surface pressure in the current monitoring period is abnormal;

[0117] Wherein, B1 is the time when the road load is abnormal within the monitoring period, and B0 is the second preset abnormal time.

[0118] Specifically, the pressure anomaly analysis unit improves the accuracy of pavement pressure abnormality analysis by setting a second preset abnormal time, thereby improving the accuracy of pavement crack risk warning, and ultimately improving the measurement efficiency and accuracy of pavement cracks. In this embodiment, there is no specific limitation on the value of the second preset abnormal time, and technical personnel in this field can set it freely, as long as the setting requirements of the second preset abnormal time are met. Among them, when the monitoring period is 24h, the optimal value of B0 is 4h.

[0119] Specifically, the crack metering unit analyzes the abnormality of the pavement environment according to the analysis results of the pavement strain abnormality and the pressure abnormality within the management period, and issues a pavement crack risk warning according to the analysis results, wherein:

[0120] When r1×i1 / i0+r2×i2 / i0≤d, the crack metering unit determines that the pavement environment in the current management period is normal and does not issue a pavement crack risk warning to the user;

[0121] When r1×i1 / i0+r2×i2 / i0>d, the crack metering unit determines that the pavement environment in the current management period is abnormal, and issues a pavement crack risk warning to the user;

[0122] Wherein, i1 is the number of monitoring cycles of abnormal road strain within the management period, i2 is the number of monitoring cycles of abnormal road pressure within the management period, i0 is the number of monitoring cycles within the management period; r1 is the preset first weight, r2 is the preset second weight, r1+r2=1 and r1>r2; d is the preset abnormality rate;

[0123] When providing a pavement crack risk warning to the user, the crack metering unit obtains the measurement results of the length m1 and the width m2 of the pavement crack, and analyzes the effectiveness of the pavement crack risk warning based on the measurement results, wherein:

[0124] When m1<n1 or m2<n2, the crack metering unit determines that the pavement crack risk warning is invalid;

[0125] When m1≥n1 or m2≥n2, the crack metering unit determines that the pavement crack risk warning is effective;

[0126] Among them, n1 is the preset length threshold, and n2 is the preset width threshold.

[0127] Specifically, the crack metering unit improves the accuracy of the pavement crack risk warning by setting a preset abnormality rate, thereby improving the accuracy of the warning precision analysis, and further improving the measurement efficiency and accuracy of pavement cracks; in this embodiment, the preset abnormality rate, the preset first weight and the preset second weight are not specifically limited, and those skilled in the art can set them freely, and only need to meet the setting requirements of the preset abnormality rate, the preset first weight and the preset second weight, among which the optimal value of d is 0.36, the optimal value of r1 is 0.7, and the optimal value of r2 is 0.3; it is worth noting that the warning method in this embodiment is to send a pavement crack risk warning and warning location information to the user. In this implementation, the method for obtaining the warning location information is not specifically limited, and those skilled in the art can set it freely, and only need to meet the warning location information. The acquisition requirements are sufficient, wherein the warning location information can be obtained by installing a GPS device on the roadside and recording and integrating it through a data acquisition device or software; in this embodiment, the setting of the preset length threshold and the preset width threshold is not specifically limited, and those skilled in the art can set them freely, and it is only necessary to meet the setting requirements of the preset length threshold and the preset width threshold, wherein the optimal value of the preset length threshold is 3mm, and the optimal value of the preset width threshold is 0.1mm; in this embodiment, the method for obtaining the measurement results of pavement cracks is not specifically limited, and those skilled in the art can set them freely, and it is only necessary to meet the acquisition requirements of the measurement results of pavement cracks, wherein the laser rangefinder can be installed on a mobile device, and the measurement is performed at the designated location according to the location information given during the warning, and the measurement results are obtained.

[0128] Specifically, the management unit compares the warning quantity f0 of each sample road section in the detection cycle with the preset quantity f1, and adjusts the maximum speed limit V of each sample road section in the next detection cycle according to the comparison result, wherein:

[0129] When f0≤f1, the management unit determines that the number of warnings for the sample road section in the current detection period is normal and does not make any adjustments;

[0130] When f0>f1, the management unit determines that the number of warnings for the sample road section in the current detection cycle is abnormal, and adjusts the maximum speed limit of each sample road section in the next detection cycle, and sets the adjusted maximum speed limit to V', setting V'=V×[1-0.25×e 3(f0-f1) / (f0+f1)-3 ];

[0131] Where V' is V×[1-0.25×e 3(f0-f1) / (f0+f1)-3 ] is rounded down, and when V'≤v0, V' takes the value of v0, where v0 is the minimum speed limit of the sample road section;

[0132] The management unit outputs the analysis result of the maximum speed limit of each sample road section to the user.

[0133] Specifically, the management unit sets a preset number to improve the accuracy of the maximum speed limit analysis of each sample section in the next detection cycle, thereby improving the measurement efficiency and accuracy of pavement cracks. In this embodiment, the value of the preset number is not specifically limited, and technicians in this field can set it freely as long as the setting requirements of the preset number are met. Among them, when the length of the sample section is 10km, the optimal value of the preset number is 20.

[0134] Specifically, the first optimization unit compares the average ambient temperature k of the acquired management period with the preset temperature k0, and optimizes the analysis process of the pavement crack risk warning according to the comparison result, wherein:

[0135] When k≤k0, the first optimization unit determines that the ambient temperature of the current management period is normal and does not perform optimization;

[0136] When k>k0, the first optimization unit determines that the ambient temperature of the current management period is abnormal, and optimizes the analysis process of the pavement crack risk warning, and sets the optimized preset abnormality rate to d', setting d'=d×{1-arctan[(k-k0) / (k0+k)×(π / 4)]}.

[0137] Specifically, the first optimization unit improves the accuracy of pavement crack risk warning analysis by setting a preset temperature, so as to reduce the adverse effects of excessively high ambient temperature on pavement environmental abnormality analysis, and ultimately improves the measurement efficiency and accuracy of pavement cracks. In this embodiment, there is no specific limitation on the setting of the preset temperature, and technical personnel in this field can set it freely, as long as the setting requirements of the preset temperature are met. Among them, when the pavement is cement concrete, the optimal value of the preset temperature is 30°C.

[0138] Specifically, the second optimization unit compares the precipitation j0 within the management period with the preset precipitation j1, and performs secondary optimization on the analysis process of the pavement crack risk warning according to the comparison result, wherein:

[0139] When j0≤j1, the second optimization unit determines that the precipitation in the current management period is normal and does not perform optimization;

[0140] When j0>j1, the second optimization unit determines that the precipitation in the current management period is abnormal, and performs secondary optimization on the analysis process of pavement crack risk warning, and sets the optimized preset temperature to k0', setting k0'=k0×{1-In[1+(j0-j1) / (j1+j0)] / In2}.

[0141] Specifically, the second optimization unit improves the accuracy of pavement crack risk warning analysis by setting a preset precipitation amount, so as to reduce the adverse effects of excessive precipitation on pavement environmental abnormality analysis, and ultimately improves the measurement efficiency and accuracy of pavement cracks. In this embodiment, there is no specific limitation on the setting of the preset precipitation amount, and technical personnel in this field can set it freely, as long as the setting requirements of the preset precipitation are met. Among them, when the management period is 30 days, the optimal value of the preset precipitation amount is 300mm.

[0142] Specifically, the updating module compares the warning accuracy y0 within the detection cycle with the preset accuracy y1, and updates the analysis process of the road crack risk warning for the next detection cycle according to the comparison result, wherein:

[0143] When y0≤y1, the update module determines that the warning accuracy of the current detection cycle is abnormal, and updates the analysis process of the pavement crack risk warning for the next detection cycle, and sets the updated preset abnormality rate to d0, setting d0=d×[1+0.75×(y1-y0) / (y1+y0)];

[0144] When y0>y1, the updating module determines that the warning accuracy of the current detection cycle is normal and does not perform updating.

[0145] Specifically, the update module improves the accuracy of the analysis of the pavement crack risk warning in the next detection cycle by setting a preset accuracy, thereby improving the measurement efficiency and accuracy of pavement cracks. In this embodiment, the setting of the preset accuracy is not specifically limited, and those skilled in the art can set it freely as long as the setting requirements of the preset accuracy are met. Among them, the best value of the preset accuracy is 0.9.

[0146] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims

1. A road crack monitoring system, characterized in that: include, An information acquisition module is used to obtain road load, road material information and environmental information; A strain measurement analysis module is used to analyze the abnormality of pavement strain according to the pavement strain measurement information measured during the monitoring period, and to adjust the analysis process of pavement strain abnormality according to the acquired pavement material information; A load analysis module is used to analyze the abnormality of road surface pressure based on the road surface load obtained during the monitoring period; The crack measurement management module is used to issue a risk warning for pavement cracks based on the analysis results of pavement strain anomalies and pressure anomalies during the management period, and obtain the measurement results of the width and depth of pavement cracks. It is also used to adjust the maximum speed limit of each sample section in the next detection period based on the number of warnings for each sample section in the detection period; A management optimization module is used to optimize the analysis process of pavement crack risk warning based on the average ambient temperature of the management period, and to optimize the analysis process of pavement crack risk warning based on the obtained precipitation of the management period; An update module is used to update the analysis process of the pavement crack risk warning for the next detection period according to the warning accuracy within the detection period; The strain measurement and analysis module is provided with a compression strain analysis unit, which is used to compare the road surface compression strain a0 measured during the monitoring period with the first preset strain a1, and analyze the abnormality of the road surface compression strain according to the comparison result, wherein: When a0≤a1, the compression strain analysis unit determines that the compression strain of the road surface is normal; When a0>a1, the compression strain analysis unit determines that the compression strain of the road surface is abnormal; The strain measurement and analysis module is further provided with a tensile strain analysis unit, which is used to compare the road surface tensile strain b0 measured during the monitoring period with the second preset strain b1, and analyze the abnormality of the road surface tensile strain according to the comparison result, wherein: When b0≤b1, the tensile strain analysis unit determines that the tensile strain of the road surface is normal; When b0>b1, the tensile strain analysis unit determines that the tensile strain of the road surface is abnormal; The strain measurement analysis module is further provided with a strain anomaly analysis unit, which is used to analyze the abnormality of the road surface strain according to the analysis results of the abnormality of the road surface compression strain and the abnormality of the tensile strain within the monitoring period, wherein: When w1×A1+w2×A2≤A0, the strain anomaly analysis unit determines that the strain of the road surface in the current monitoring period is normal; When w1×A1+w2×A2>A0, the strain anomaly analysis unit determines that the strain of the road surface in the current monitoring period is abnormal; Wherein, A1 is the abnormal time of pavement compressive strain within the monitoring period, A2 is the abnormal time of pavement tensile strain within the monitoring period; w1 is the compressive strain weight, w2 is the tensile strain weight; A0 is the first preset abnormal time; The strain measurement analysis module is provided with a first adjustment unit, which is used to compare the elastic modulus e0 of the obtained pavement material with the preset modulus e1, and to adjust the analysis process of the pavement strain anomaly according to the comparison result, wherein: When e0≤e1, the first adjustment unit determines that the elastic modulus of the pavement material is abnormal, and adjusts the analysis process of the pavement strain abnormality once, and sets the adjusted first preset abnormal time as A0', and sets A0'=A0×[1-0.36×sin(e1-e0)×(π / 2) / (e1+e0)]; When e0>e1, the first adjustment unit determines that the elastic modulus of the pavement material is normal and does not make any adjustment; The strain measurement analysis module is also provided with a second adjustment unit, which is used to compare the thickness h0 of the acquired pavement material with the preset thickness h1, and to make a secondary adjustment to the analysis process of the pavement strain anomaly according to the comparison result, wherein: When h0≤h1, the second adjustment unit determines that the thickness of the pavement material is abnormal, and performs a secondary adjustment on the analysis process of the pavement strain abnormality, and sets the adjusted preset modulus e1 to e1', setting e1'=e1×[1+0.45×(h1-h0) / (h1+h0)]; When h0>h1, the second adjustment unit determines that the thickness of the road surface is normal and does not perform any adjustment.

2. The pavement crack monitoring system according to claim 1, characterized in that: The load analysis module includes a load analysis unit, which is used to compare the road load z0 obtained during the monitoring period with the preset load z1, and analyze the abnormality of the road load according to the comparison result, wherein: When z0≤z1, the load analysis unit determines that the road load is normal; When z0>z1, the load analysis unit determines that the road load is abnormal; The load analysis module is further provided with a pressure anomaly analysis unit, which is used to analyze the abnormality of the road surface pressure according to the analysis result of the abnormality of the road surface load within the monitoring period, wherein: When B1≤B0, the pressure abnormality analysis unit determines that the road surface pressure in the current monitoring period is normal; When B1>B0, the pressure anomaly analysis unit determines that the road surface pressure in the current monitoring period is abnormal; Wherein, B1 is the time when the road load is abnormal within the monitoring period, and B0 is the second preset abnormal time.

3. The pavement crack monitoring system according to claim 2, characterized in that: The crack metering management module is provided with a crack metering unit, which analyzes the abnormality of the pavement environment according to the analysis results of the pavement strain abnormality and the pressure abnormality within the management period, and issues a pavement crack risk warning according to the analysis results, wherein: When r1×i1 / i0+r2×i2 / i0≤d, the crack metering unit determines that the pavement environment in the current management period is normal and does not issue a pavement crack risk warning to the user; When r1×i1 / i0+r2×i2 / i0>d, the crack metering unit determines that the pavement environment in the current management period is abnormal, and issues a pavement crack risk warning to the user; Wherein, i1 is the number of monitoring cycles of abnormal road strain within the management period, i2 is the number of monitoring cycles of abnormal road pressure within the management period, i0 is the number of monitoring cycles within the management period; r1 is the preset first weight, r2 is the preset second weight, r1+r2=1 and r1>r2; d is the preset abnormality rate; When providing a pavement crack risk warning to the user, the crack metering unit obtains the measurement results of the length m1 and the width m2 of the pavement crack, and analyzes the effectiveness of the pavement crack risk warning based on the measurement results, wherein: When m1<n1 or m2<n2, the crack metering unit determines that the pavement crack risk warning is invalid; When m1≥n1 or m2≥n2, the crack metering unit determines that the pavement crack risk warning is effective; Wherein, n1 is the preset length threshold, and n2 is the preset width threshold; The crack metering management module is further provided with a management unit, which is used to compare the warning quantity f0 of each sample road section in the detection period with the preset quantity f1, and adjust the maximum speed limit V of each sample road section in the next detection period according to the comparison result, wherein: When f0≤f1, the management unit determines that the number of warnings for the sample road section in the current detection period is normal and does not make any adjustments; When f0>f1, the management unit determines that the number of warnings for the sample road section in the current detection cycle is abnormal, and adjusts the maximum speed limit of each sample road section in the next detection cycle, and sets the adjusted maximum speed limit to V', setting V'=V×[1-0.25×e 3(f0-f1) / (f0+f1)-3 ]; Where V' is V×[1-0.25×e 3(f0-f1) / (f0+f1)-3 ] is rounded down, and when V'≤v0, V' takes the value of v0, where v0 is the minimum speed limit of the sample section.

4. The pavement crack monitoring system according to claim 3, characterized in that: The management optimization module includes a first optimization unit, which is used to compare the average ambient temperature k of the acquired management period with the preset temperature k0, and optimize the analysis process of the pavement crack risk warning according to the comparison result, wherein: When k≤k0, the first optimization unit determines that the ambient temperature of the current management period is normal and does not perform optimization; When k>k0, the first optimization unit determines that the ambient temperature of the current management period is abnormal, and optimizes the analysis process of the pavement crack risk warning, and sets the optimized preset abnormality rate to d', setting d'=d×{1-arctan[(k-k0) / (k0+k)×(π / 4)]}.

5. The pavement crack monitoring system according to claim 4, characterized in that: Including, the management optimization module is further provided with a second optimization unit, the second optimization unit is used to compare the precipitation j0 within the management period with the preset precipitation j1, and perform secondary optimization on the analysis process of the pavement crack risk warning according to the comparison result, wherein: When j0≤j1, the second optimization unit determines that the precipitation in the current management period is normal and does not perform optimization; When j0>j1, the second optimization unit determines that the precipitation in the current management period is abnormal, and performs secondary optimization on the analysis process of pavement crack risk warning, and sets the optimized preset temperature to k0', setting k0'=k0×{1-In[1+(j0-j1) / (j1+j0)] / In2}.

6. The pavement crack monitoring system according to claim 5, characterized in that: The updating module compares the warning accuracy y0 within the detection period with the preset accuracy y1, and updates the analysis process of the road crack risk warning for the next detection period according to the comparison result, wherein: When y0≤y1, the update module determines that the warning accuracy of the current detection cycle is abnormal, and updates the analysis process of the pavement crack risk warning for the next detection cycle, and sets the updated preset abnormality rate to d0, setting d0=d×[1+0.75×(y1-y0) / (y1+y0)]; When y0>y1, the updating module determines that the warning accuracy of the current detection cycle is normal and does not perform updating.

Citation Information

Cited By

  • Airfield pavement crack monitoring and maintenance method based on unmanned aerial vehicle and image recognition

    CN121047186A