Intelligent mold production line cooperative control system and control method thereof

By collecting and analyzing multiple data information of the mold production line, a comprehensive analysis model is established to determine and issue startup abnormality warnings, achieving stable startup and real-time adjustment of the mold production line, solving efficiency and cost problems when restarting after shutdown, and improving efficiency. Production line stability and maintainability.

CN118778575APending Publication Date: 2024-10-15SHENZHEN JINCHEN PLASTIC PROD CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410905502.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

When the mold production line is restarted after shutdown, it often causes incorrect starts due to process asynchronousness, uncalibrated sensor parameters, dry lubricant and other issues, resulting in increased costs, wasted time and reduced production efficiency.

Method used

Collect multiple data information after equipment initialization and system software startup, including interactive data of the display screen and dynamic characteristic information of the mold, establish a comprehensive analysis model, generate an initialization effect evaluation value, and judge startup by comparing the evaluation value with the set threshold Effect, and issue warning and adjustment maintenance signals to achieve real-time monitoring and dynamic adjustment.

Benefits of technology

It improves the stability, efficiency and maintainability of the production line. Through real-time monitoring and adjustment maintenance, it reduces startup abnormalities, supports rapid decision-making and operation, and improves the adaptability and reliability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118778575A_ABST
    Figure CN118778575A_ABST
Patent Text Reader

Abstract

The invention discloses a cooperative control system for an intelligent mold production line and a control method thereof, and relates to the technical field of intelligent production lines, and the method comprises the following steps: when the mold production line is shut down and then restarted, collecting multiple data information after equipment initialization and system software starting of the mold production line, comprising interaction data of the display screen and dynamic characteristic information of the mold, and the interaction data of the display screen and the dynamic characteristic information of the mold are analyzed and processed. And relevant adjustment and maintenance work is arranged on the mold production line in time, and the maintenance condition of the mold production line is tracked and managed when the mold production line is found to have a problem in starting, so that the mold production line is ensured to start working timely and effectively, and the stability, efficiency and maintainability of the mold production line are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent production lines, and more specifically, to a collaborative control system for an intelligent mold production line and a control method thereof. Background Art

[0002] The mold intelligent production line collaborative control system is a highly integrated advanced technology platform. By integrating advanced automation, machine learning and real-time data analysis technologies, it realizes the collaborative operation and intelligent control of each link in the mold production line to improve production efficiency, reduce energy consumption and ensure product quality. Through the human-computer interaction interface, operators can intuitively monitor and adjust the entire production process.

[0003] Deficiencies in existing technologies: When a mold production line is operating in a factory, it is often necessary to shut down the entire line for reasons such as regularly scheduled maintenance and upkeep, emergency equipment failure repairs, or product replacement and model changes. When the line is restarted, many problems often arise, such as process asynchrony, uncalibrated sensor parameters, lubricant drying, and inadequate personnel training. These problems can lead to incorrect startup of the production line and the inability to detect or determine the severity of the problem in a timely manner. This leads to increased costs, wasted time, and reduced production efficiency.

[0004] In view of the above problems, the present invention proposes a solution. Summary of the Invention

[0005] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a mold intelligent production line collaborative control system and a control method thereof, which solves the problems raised in the above-mentioned background technology through an intelligent production line.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] A collaborative control method for a mold intelligent production line includes the following steps:

[0008] S10, when the mold production line is restarted after being shut down, a plurality of data and information after the equipment of the mold production line is initialized and the system software is started, including interactive data of the display screen and dynamic characteristic information of the mold, and the interactive data of the display screen and the dynamic characteristic information of the mold are collected and analyzed;

[0009] S20, establishing a comprehensive analysis model based on the interactive data of the display screen and the dynamic characteristic information of the mold after the mold production line is started, generating an initialization effect evaluation value, and evaluating the effect of the mold production line startup based on the initialization effect evaluation value;

[0010] S30, comparing and analyzing the initialization effect evaluation value generated after the mold production line is started with a preset initialization effect reference threshold, determining the startup effect of the mold production line after startup, and issuing a warning for any abnormal situation;

[0011] S40, when adjusting and repairing the mold production line due to abnormal startup effect, collect several initialization effect evaluation values ​​output in real time after the mold production line is started, perform comprehensive analysis, and judge the adjustment and repair situation.

[0012] In a preferred embodiment, in step S10, the interactive data of the display screen after the mold production line is started includes the production rhythm index and the electromechanical voltage difference index. The dynamic characteristic information of the mold after the mold production line is started includes the mold shape evaluation index. After obtaining, the production rhythm index, the electromechanical voltage difference index and the mold shape evaluation index are calibrated as 、 、 .

[0013] In a preferred embodiment, the logic for obtaining the production rhythm index is as follows:

[0014] Record the number of mold products completed in a fixed time period and divide it by the time period to obtain the production rate. For different types of molds, record the time required for the mold production line to complete a production cycle to obtain the cycle time. Record the normal production start time and the downtime end time, and subtract the downtime end time from the normal production start time to obtain the startup time. Combine the production rate, cycle time and startup time to calculate the production rhythm index. The following is the calculation formula for the production rhythm index. , where is the production rate, is the cycle time, is the start time;

[0015] The logic for obtaining the electromechanical voltage difference index is as follows:

[0016] Label each piece of equipment on the mold production line and combine them into one equipment set , is the total number of devices; obtain the voltage data of each device at different times within T time, and generate their own voltage data sets , is the device number, is the total number of voltage data for a single device; the electromechanical voltage difference index is calculated based on the voltage data set of each device in the mold production line. The specific formula is as follows: , where is the average voltage of device j, T is the total time of voltage data;

[0017] The logic for obtaining the mold morphology evaluation index is as follows:

[0018] The image sensor is used to capture the mold shape produced in the time period K, and each mold is numbered from 1 to generate a digital image. The vertical axis image standard value and the cross-section image standard value are set according to the produced mold. The vertical axis image value of the generated digital image is compared with the vertical axis image standard value to obtain the vertical axis image contrast value and calibrate it as , the following is the specific comparative analysis method: , where is the standard value of the vertical axis image, The vertical axis image value is compared with the cross-sectional image standard value to obtain the cross-sectional image contrast value and calibrate it as , the following is the specific comparative analysis method: , where is the standard value of the cross-section image, is the cross-sectional image value; the obtained cross-sectional image contrast value and the longitudinal axis image contrast value are calculated to generate a mold morphology evaluation index. The mold morphology evaluation index is calculated as follows: , where g is the number of molds.

[0019] In a preferred embodiment, in step S20, the mold morphology evaluation index after the mold production line is started and analyzed is obtained. , production rhythm index and electromechanical voltage difference index Establish a comprehensive analysis model based on the formula , where To initialize the effect evaluation value, 、 、 They are the preset proportional coefficients of the electromechanical voltage difference index, mold shape evaluation index, and production rhythm index, respectively, and 、 、 Both are greater than zero.

[0020] In a preferred embodiment, in step S30, the initialization effect evaluation value generated after the mold production line is started is compared and analyzed with a preset initialization effect reference threshold. The result of the comparison and analysis is as follows:

[0021] If the initialization effect evaluation value is less than the initialization effect reference threshold, a high-efficiency start signal is generated, and no warning is issued for the high-efficiency start signal;

[0022] If the initialization effect evaluation value is greater than or equal to the initialization effect reference threshold, a startup abnormality signal is generated and a warning is issued for the startup abnormality signal.

[0023] In a preferred embodiment, in step S40, when the mold production line startup effect is abnormal and adjustment and maintenance are performed, several initialization effect evaluation values ​​output in real time after the mold production line is started are collected to establish an evaluation set, and the evaluation set is calibrated as ,but , e represents the number of the initialization effect evaluation value in the evaluation set, , is a positive integer;

[0024] Calculate the standard deviation of the initialization effect evaluation value by the initialization effect evaluation value in the evaluation set and the average value of the initialization effect evaluation value , and initialize the standard deviation of the effect evaluation value and the average value of the initialization effect evaluation value The pre-set standard deviation reference threshold and the preset reference threshold for initialization effect evaluation value A comparative analysis was performed, and the results of the comparative analysis are as follows:

[0025] like ≥ , then an adjustment and maintenance failure signal is generated and transmitted to the mobile terminal, which prompts the user. When the adjustment and maintenance failure signal is generated, it indicates that the adjustment and maintenance has failed and further adjustment and maintenance is required;

[0026] like and ≥ When the adjustment and maintenance is insufficient, an adjustment and maintenance insufficient signal is generated and transmitted to the mobile terminal, and a prompt is given through the mobile terminal. When the adjustment and maintenance insufficient signal is generated, it indicates that the adjustment and maintenance is insufficient and further adjustment and maintenance is also required;

[0027] like and When the adjustment and maintenance success signal is generated, the signal is transmitted to the mobile terminal, and a prompt is given through the mobile terminal. When the adjustment and maintenance success signal is generated, it indicates that the adjustment and maintenance is successful.

[0028] A collaborative control system for a mold intelligent production line includes a startup module, an information collection module, a data analysis module, an effect evaluation module, an early warning module, and a feedback module, with connections between the modules.

[0029] Startup module, used to control the startup and initialization of the mold production line;

[0030] The information acquisition module acquires multiple data and information after the equipment initialization and system software startup of the mold production line, including interactive data of the display screen and dynamic characteristic information of the mold, and analyzes and processes the interactive data of the display screen and the dynamic characteristic information of the mold;

[0031] The data analysis module establishes a comprehensive analysis model based on the interactive data of the display screen and the dynamic characteristic information of the mold after the mold production line is started, generates an initialization effect evaluation value, and uses the initialization effect evaluation value to evaluate the effect of the mold production line startup;

[0032] The effect evaluation module compares and analyzes the initialization effect evaluation value generated after the mold production line is started with the pre-set initialization effect reference threshold to determine the startup effect of the mold production line after startup, and issues warnings for any abnormal situations through the early warning module;

[0033] The feedback module collects several initialization effect evaluation values ​​output in real time after the mold production line is started for comprehensive analysis when adjusting and repairing the abnormal startup effect of the mold production line to determine the adjustment and maintenance situation.

[0034] The technical effects and advantages of the mold intelligent production line collaborative control system and control method of the present invention are as follows:

[0035] 1. The present invention establishes a comprehensive analysis model to generate an initialization effect evaluation value by collecting multiple data and information after equipment initialization and system software startup, including interactive data from the display screen, dynamic characteristics of the mold, and the electromechanical voltage difference index and production rhythm index. The model also compares the evaluation value with the set threshold to monitor the startup effect of the mold production line in real time and issue abnormal warnings in a timely manner, including morphological consistency, production rate, electrical characteristics, and other aspects. This provides a comprehensive and practical means to improve the stability, efficiency, and maintainability of the production line.

[0036] 2. The present invention introduces a secondary follow-up mechanism. When the system detects abnormal startup effect of the mold production line, it collects multiple initialization effect evaluation values ​​output in real time for comprehensive analysis. By calculating the standard deviation and average value and comparing them with the pre-set reference threshold, the system generates different adjustment and maintenance signals, including adjustment and maintenance failure signal, adjustment and maintenance insufficient signal and adjustment and maintenance success signal. This flexible signal generation mechanism provides prompts through the mobile terminal, realizes real-time monitoring of dynamic adjustment and maintenance, provides detailed feedback to managers, supports quick decision-making and further operations, and improves the adaptability and reliability of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 This is a structural schematic diagram of a collaborative control method for a mold intelligent production line according to the present invention.

[0038] Figure 2 This is a schematic diagram of the structure of a collaborative control system for an intelligent mold production line of the present invention. DETAILED DESCRIPTION

[0039] The following will provide a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative efforts shall fall within the scope of protection of the present invention.

[0040] Example 1, Figure 1 The present invention provides a mold intelligent production line collaborative control system, which includes the following steps:

[0041] S10, collecting a plurality of data information after the equipment of the mold production line is initialized and the system software is started, including interactive data of the display screen and dynamic characteristic information of the mold, and analyzing and processing the interactive data of the display screen and the dynamic characteristic information of the mold;

[0042] The interactive data of the display screen after the mold production line is started includes the production rhythm index and the electromechanical voltage difference index. After obtaining, the production rhythm index and the electromechanical voltage difference index are calibrated as and .

[0043] After a mold production line is started up, various factors can lead to unsatisfactory startup results. Therefore, it's necessary to collect data on the production rhythm of the production line and analyze the results. The production rhythm index reflects the overall performance of the production line after startup. Changes in the index are directly related to the combined performance of factors such as production rate, cycle time, startup time, and downtime. A higher production rhythm index generally indicates a better startup result, meaning the line can run quickly, efficiently, and stably after startup. Conversely, a lower production rhythm index may indicate poor startup results, requiring attention and the implementation of adjustments and optimization measures.

[0044] If there is a fault during the startup of the production line, the performance of the production rhythm index may be affected. The following is an explanation of the performance of the production rhythm index combined with the startup fault situation:

[0045] Reduced production rate: Startup failure may cause equipment to operate abnormally or production process to be blocked, reducing production rate;

[0046] Extended cycle time: Startup failures may result in extended startup times and increased production cycle time;

[0047] Impact of the Production Cadence Index: Extended cycle time will lead to a decrease in the Production Cadence Index, as the Production Cadence Index is a comprehensive consideration of production rate and cycle time;

[0048] Increased downtime: Startup failures may require more downtime to repair;

[0049] Impact of production rhythm index: Increased downtime will significantly reduce the production rhythm index, because downtime is a negative item in the production rhythm index;

[0050] Reduced actual capacity utilization: Startup failures result in production lines not being able to fully utilize their capacity;

[0051] Decreased equipment utilization rate: Startup failure may cause equipment to operate abnormally and reduce utilization rate;

[0052] Increased rework: Startup failures may result in lower quality products, increasing the need for rework;

[0053] Therefore, by monitoring the production rhythm index after the mold production line is started, the operation status of the mold production line can be obtained in a timely manner to judge the startup effect.

[0054] The logic for obtaining the production rhythm index is as follows:

[0055] Record the number of mold products completed in a certain period of time and divide it by the period to obtain the production rate. For different types of molds, record the time required for the mold production line to complete a production cycle to obtain the cycle time. Record the normal production start time and the shutdown end time, and subtract the shutdown end time from the normal production start time to obtain the startup time. Combine the production rate, cycle time and startup time to calculate the production rhythm index. The following is the calculation formula for the production rhythm index. , where is the production rate, is the cycle time, is the start time;

[0056] It should be noted that the production rate is the number of products produced per hour or minute; the cycle time is the time required for the production line to complete one production cycle; the startup time is the time required for the production line to return to normal production from a shutdown state; the production rhythm index is an index used to comprehensively evaluate the production efficiency and operational stability of the production line;

[0057] From the calculation expression of the production rhythm index, it can be seen that the larger the production rhythm index performance value after the production line is started, the better the effect of the mold production line startup is, and vice versa.

[0058] After the mold production line is started, the startup effect may be unsatisfactory due to various reasons. The production effect can be analyzed by collecting the equipment voltage of the production line. The electromechanical voltage difference index is the electrical characteristic of the startup effect after the mold production line is restarted. The electromechanical voltage difference index has the following effects and influences on the startup effect after the mold production line is started:

[0059] Electrical Fluctuation Assessment: The electromechanical voltage difference index, as an indicator of comprehensive electrical characteristics, can assess the degree of electrical fluctuation after the mold production line is restarted. A higher electromechanical voltage difference index value indicates that the voltage fluctuates greatly during the startup phase, which helps detect problems such as unstable power supply or abnormal electrical components.

[0060] Quantification of starting effect: The electromechanical voltage difference index provides a quantitative way to characterize starting effect by considering multiple aspects of electrical characteristics rather than just a single voltage value. This makes the analysis of starting effect more comprehensive and objective;

[0061] Abnormality Detection: A high voltage difference index may indicate abnormal conditions during the startup phase, such as power supply mutations or voltage waveform distortion. Therefore, the voltage difference index can be used to detect potential electrical problems in advance, facilitating timely adjustments and maintenance.

[0062] Engineering optimization guidance: Based on the value of the electromechanical voltage difference index, engineers can adjust the parameters of the electrical system and optimize the startup strategy to reduce charge fluctuations and improve startup effects, which helps improve the stability and efficiency of the production line;

[0063] Therefore, by monitoring the electromechanical voltage difference index after the mold production line is started, the operation status of the mold production line can be obtained in time to judge the startup effect.

[0064] The logic for obtaining the electromechanical voltage difference index is as follows:

[0065] Label each device on the production line and combine them into one device set , is the total number of devices; obtain the voltage data of each device at different times within T time, and generate their own voltage data sets , is the device number, is the total number of voltage data for a single device; the electromechanical voltage difference index is calculated based on the voltage data set of each device in the mold production line. The specific formula is as follows: , where is the average voltage of device j, T is the total time of voltage data;

[0066] From the calculation expression of the electromechanical voltage difference index, it can be seen that the larger the electromechanical voltage difference index performance value after the production line is started, the greater the fluctuation in the electrical characteristics, and the worse the effect of the mold production line startup. The smaller the electromechanical voltage difference index performance value after the production line is started, the relatively stable electrical characteristics, the smaller the voltage fluctuation, and the smoother the overall trend change, the better the effect of the mold production line startup.

[0067] The dynamic characteristic information of the mold after the mold production line is started includes the mold shape evaluation index. After obtaining it, the mold shape evaluation index is calibrated as ;

[0068] After the mold production line is started, there may be parameter calibration errors, or changes in external conditions may cause the parameters to be readjusted but not adjusted. This may result in the mold production line running normally but the produced molds not meeting the standards. It is necessary to collect mold morphology data to analyze the production effect. The role and impact of the mold morphology evaluation index in analyzing the startup effect after the mold production line is restarted is explained as follows:

[0069] Shape consistency assessment: The mold shape assessment index can be used to assess whether the mold shape remains consistent after restart. A lower mold shape assessment index value may indicate that the mold shape changes less during startup, which is conducive to maintaining product consistency;

[0070] Production line stability: The mold shape evaluation index reflects the overall stability of the mold shape. Stable mold shape may help improve the stability of the production line and reduce manufacturing problems caused by shape changes;

[0071] Shape trend analysis: The mold shape evaluation index can be used to analyze the trend changes of mold shape and understand the evolution of shape during the startup phase, which helps to detect potential production problems early;

[0072] Abnormality detection: A high mold shape assessment index value may indicate a significant abnormal change in mold shape during the restart phase. This can be used to promptly detect problems with the mold or production line and take corrective measures;

[0073] The logic for obtaining the mold morphology evaluation index is as follows:

[0074] The image sensor is used to capture the mold shape produced in the time period K, and each mold is numbered from 1 to generate a digital image. The vertical axis image standard value and the cross-section image standard value are set according to the produced mold. The vertical axis image value of the generated digital image is compared with the vertical axis image standard value to obtain the vertical axis image contrast value and calibrate it as , the following is the specific comparative analysis method: , where is the standard value of the vertical axis image, The vertical axis image value is compared with the cross-sectional image standard value to obtain the cross-sectional image contrast value and calibrate it as , the following is the specific comparative analysis method: , where is the standard value of the cross-section image, is the cross-sectional image value; the obtained cross-sectional image contrast value and the longitudinal axis image contrast value are calculated to generate a mold morphology evaluation index. The mold morphology evaluation index is calculated as follows: , where g is the number of molds;

[0075] From the calculation expression of the mold morphology evaluation index, it can be seen that the larger the mold morphology evaluation index performance value after the production line is started, the worse the effect of the mold production line startup is, and the smaller the electromechanical voltage difference index performance value after the production line is started, the better the effect of the mold production line startup is.

[0076] S20, establishing a comprehensive analysis model based on the interactive data of the display screen and the dynamic characteristic information of the mold after the mold production line is started, generating an initialization effect evaluation value, and evaluating the effect of the mold production line startup based on the initialization effect evaluation value;

[0077] The mold morphology evaluation index after the mold production line is started and analyzed , production rhythm index and electromechanical voltage difference index Establish a comprehensive analysis model based on the formula , where To initialize the effect evaluation value, 、 、 They are the preset proportional coefficients of the electromechanical voltage difference index, mold shape evaluation index, and production rhythm index, respectively, and 、 、 are all greater than zero;

[0078] From the calculation expression of the mold shape evaluation index, it can be seen that after the production line is started, the larger the mold shape evaluation index performance value, the larger the electromechanical voltage difference index, and the smaller the production rhythm index, the worse the effect of the mold production line startup is, and vice versa, the better the effect of the mold production line startup is.

[0079] S30, comparing and analyzing the initialization effect evaluation value generated after the mold production line is started with a preset initialization effect reference threshold, determining the startup effect of the mold production line after startup, and issuing a warning for any abnormal situation;

[0080] The initialization effect evaluation value generated after the mold production line is started is compared and analyzed with the pre-set initialization effect reference threshold. The results of the comparison and analysis are as follows: if the initialization effect evaluation value is less than the initialization effect reference threshold, a high-efficiency startup signal is generated. When a high-efficiency startup signal is generated after the mold production line is started, it indicates that the initialization of the mold production line is successful and the startup effect is good, and no warning is issued for the high-efficiency startup signal; if the initialization effect evaluation value is greater than or equal to the initialization effect reference threshold, a startup abnormality signal is generated. When a startup abnormality signal is generated after the mold production line is started, it indicates that there is a problem with the initialization of the mold production line, a warning is issued for the startup abnormality signal, the relevant staff is notified of the situation, and relevant maintenance and processing work is arranged for the mold production line in a timely manner, and the mold production line is maintained and managed.

[0081] This embodiment establishes a comprehensive analysis model to generate an initialization effect evaluation value by collecting multiple data information after equipment initialization and system software startup, including interactive data of the display screen, dynamic characteristic information of the mold, and electromechanical voltage difference index and production rhythm index. It also monitors the startup effect of the mold production line in real time by comparing the evaluation value with the set threshold, and issues abnormal warnings in time, including multiple aspects such as morphological consistency, production rate and electrical characteristics, providing a comprehensive and practical means to improve the stability, efficiency and maintainability of the production line.

[0082] Example 2: After the problem of starting the mold production line is discovered in the above example, a second follow-up is still required to ensure a perfect solution to the incident.

[0083] S40, when adjusting and repairing the mold production line due to abnormal startup effect, collect several initialization effect evaluation values ​​output in real time after the mold production line is started, perform comprehensive analysis, and judge the adjustment and repair situation.

[0084] When adjusting and repairing the abnormal startup effect of the mold production line, several initialization effect evaluation values ​​output in real time after the mold production line is started are collected to establish an evaluation set, and the evaluation set is calibrated as ,but , e represents the number of the initialization effect evaluation value in the evaluation set, , is a positive integer;

[0085] Calculate the standard deviation of the initialization effect evaluation value by the initialization effect evaluation value in the evaluation set and the average value of the initialization effect evaluation value , and initialize the standard deviation of the effect evaluation value and the average value of the initialization effect evaluation value The pre-set standard deviation reference threshold and the preset reference threshold for initialization effect evaluation value A comparative analysis was performed, and the results of the comparative analysis are as follows:

[0086] like ≥ , then an adjustment and maintenance failure signal is generated and transmitted to the mobile terminal, which prompts the user. When the adjustment and maintenance failure signal is generated, it indicates that the adjustment and maintenance has failed and further adjustment and maintenance is required;

[0087] like and ≥ When the adjustment and maintenance is insufficient, an adjustment and maintenance insufficient signal is generated and transmitted to the mobile terminal, and a prompt is given through the mobile terminal. When the adjustment and maintenance insufficient signal is generated, it indicates that the adjustment and maintenance is insufficient and further adjustment and maintenance is also required;

[0088] like and When the adjustment and maintenance success signal is generated, the signal is transmitted to the mobile terminal, and a prompt is given through the mobile terminal. When the adjustment and maintenance success signal is generated, it indicates that the adjustment and maintenance is successful and can work normally.

[0089] This embodiment introduces a secondary follow-up mechanism. Upon detecting abnormal startup performance of a mold production line, the system collects multiple real-time initialization performance evaluation values ​​for comprehensive analysis. By calculating the standard deviation and average value and comparing them with pre-set reference thresholds, the system generates different adjustment and maintenance signals, including those indicating adjustment and maintenance failure, insufficient adjustment and maintenance, and successful adjustment and maintenance. This flexible signal generation mechanism, delivered through mobile devices, enables real-time monitoring of dynamic adjustments and maintenance, providing managers with detailed feedback, enabling rapid decision-making and further action, and improving the system's adaptability and reliability.

[0090] Real-time Example 3: A collaborative control system for a mold intelligent production line includes a startup module, an information acquisition module, a data analysis module, an effect evaluation module, an early warning module, and a feedback module, with connections between the modules.

[0091] Startup module, used to control the startup and initialization of the mold production line;

[0092] The information acquisition module acquires multiple data and information after the equipment initialization and system software startup of the mold production line, including interactive data of the display screen and dynamic characteristic information of the mold, and analyzes and processes the interactive data of the display screen and the dynamic characteristic information of the mold;

[0093] The data analysis module establishes a comprehensive analysis model based on the interactive data of the display screen and the dynamic characteristic information of the mold after the mold production line is started, generates an initialization effect evaluation value, and uses the initialization effect evaluation value to evaluate the effect of the mold production line startup;

[0094] The effect evaluation module compares and analyzes the initialization effect evaluation value generated after the mold production line is started with the pre-set initialization effect reference threshold to determine the startup effect of the mold production line after startup, and issues warnings for any abnormal situations through the early warning module;

[0095] The feedback module collects several initialization effect evaluation values ​​output in real time after the mold production line is started for comprehensive analysis when adjusting and repairing the abnormal startup effect of the mold production line to determine the adjustment and maintenance situation.

[0096] The above formulas are all dimensionless and numerical calculations. The formulas are obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The preset parameters in the formulas are set by technicians in this field according to actual conditions.

[0097] The above embodiments may be implemented in whole or in part through software, hardware, firmware, or any other combination thereof. When implemented using software, the above embodiments may be implemented in whole or in part in the form of a computer program product.

[0098] Those skilled in the art will appreciate that the modules and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0099] In addition, each functional module in each embodiment of the present application may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module.

[0100] The above description is merely a specific embodiment of the present application, but the scope of protection of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in this application should be included in the scope of protection of this application. Therefore, the scope of protection of this application should be based on the scope of protection of the claims.

[0101] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A mold intelligent production line collaborative control method, characterized in that: The steps include: S10, when the mold production line is restarted after being stopped, a plurality of data information after the equipment of the mold production line is initialized and the system software is started, including the interactive data of the display screen and the dynamic characteristic information of the mold, and the interactive data of the display screen and the dynamic characteristic information of the mold are analyzed and processed; S20, establishing a comprehensive analysis model based on the interactive data of the display screen and the dynamic characteristic information of the mold after the mold production line is started, generating an initialization effect evaluation value, and evaluating the effect of the mold production line startup through the initialization effect evaluation value; S30, comparing and analyzing the initialization effect evaluation value generated after the mold production line is started with the preset initialization effect reference threshold, judging the startup effect of the mold production line after startup, and issuing a warning for any abnormal situation; S40, when the startup effect of the mold production line is abnormal and an adjustment and maintenance is performed, a plurality of initialization effect evaluation values ​​output in real time after the mold production line is started are collected for comprehensive analysis to determine the adjustment and maintenance situation.

2. The mold intelligent production line collaborative control method according to claim 1 is characterized in that: In step S10, the interactive data of the display screen after the mold production line is started includes the production rhythm index and the electromechanical voltage difference index. The dynamic characteristic information of the mold after the mold production line is started includes the mold shape evaluation index. After acquisition, the production rhythm index, the electromechanical voltage difference index and the mold shape evaluation index are calibrated as , , .

3. The mold intelligent production line collaborative control method according to claim 2 is characterized in that: The logic for obtaining the production rhythm index is as follows: Record the number of mold products completed in a fixed time period and divide it by the time period to obtain the production rate; for different types of molds, record the time required for the mold production line to complete a production cycle to obtain the cycle time; record the normal production start time and the shutdown end time, and subtract the shutdown end time from the normal production start time to obtain the startup time; combine the production rate, cycle time and startup time to calculate the production rhythm index. The following is the calculation formula for the production rhythm index , where is the production rate, is the cycle time, is the start time; The logic of obtaining the electromechanical voltage difference index is as follows: Label each piece of equipment on the mold production line and combine them into one equipment set , is the total number of devices; obtain the voltage data of each device at different times within T time, and generate their own voltage data sets , is the device number, is the total number of voltage data of a single device; the machine voltage difference index is calculated based on the voltage data set of each device in the mold production line. The specific formula is as follows: , where is the average voltage of device j, T is the total time of voltage data; The logic for obtaining the mold shape evaluation index is as follows: The image sensor is used to capture the mold shape produced in the time period K, and each mold is labeled from 1 to generate a digital image. The longitudinal axis image standard value and the cross-sectional image standard value are set according to the produced mold. The longitudinal axis image value of the generated digital image is compared with the longitudinal axis image standard value to obtain the longitudinal axis image contrast value and calibrate it as , the following is the specific comparative analysis method: , where is the standard value of the vertical axis image, is the longitudinal axis image value; the cross-sectional image value of the generated digital image is compared with the cross-sectional image standard value to obtain the cross-sectional image contrast value and calibrated as , the following is the specific comparative analysis method: , where is the standard value of the cross-section image, is the cross-sectional image value; the obtained cross-sectional image contrast value and the longitudinal axis image contrast value are calculated to generate a mold morphology evaluation index, and the mold morphology evaluation index is calculated as follows: , where g is the number of molds.

4. The mold intelligent production line collaborative control method according to claim 3 is characterized in that: In step S20, the mold morphology evaluation index after the mold production line is started and analyzed is , production rhythm index And the electromechanical voltage difference index Establish a comprehensive analysis model based on the formula , where is the initialization effect evaluation value, , , They are the preset proportional coefficients of the electromechanical voltage difference index, the mold shape evaluation index, and the production rhythm index, respectively, and , , Both are greater than zero.

5. The mold intelligent production line collaborative control method according to claim 4 is characterized in that: In step S30, the initialization effect evaluation value generated after the mold production line is started is compared and analyzed with the preset initialization effect reference threshold value. The result of the comparison and analysis is as follows: If the initialization effect evaluation value is less than the initialization effect reference threshold, a high-efficiency start signal is generated, and no warning is issued for the high-efficiency start signal; If the initialization effect evaluation value is greater than or equal to the initialization effect reference threshold, a startup abnormality signal is generated and a warning is issued for the startup abnormality signal.

6. A mold intelligent production line collaborative control method according to claim 5, characterized in that: In step S40, when the startup effect of the mold production line is abnormal and an adjustment and maintenance is performed, several initialization effect evaluation values ​​output in real time after the mold production line is started are collected to establish an evaluation set, and the evaluation set is calibrated as ,but , e represents the number of the initialization effect evaluation value in the evaluation set, , is a positive integer; Calculate the standard deviation of the initialization effect evaluation value by the initialization effect evaluation value in the evaluation set And the average of the initialization effect evaluation values , and initialize the effect evaluation value standard deviation And the average of the initialization effect evaluation values The standard deviation reference thresholds are set and the preset reference threshold of the initialization effect evaluation value A comparative analysis was performed, and the results of the comparative analysis are as follows: like ≥ , then an adjustment and maintenance failure signal is generated, and the signal is transmitted to the mobile terminal, and a prompt is given through the mobile terminal. When the adjustment and maintenance failure signal is generated, it indicates that the adjustment and maintenance has failed and further adjustment and maintenance is required; like and ≥ When the adjustment and maintenance is insufficient, an adjustment and maintenance insufficient signal is generated and transmitted to the mobile terminal, and a prompt is given through the mobile terminal. When the adjustment and maintenance insufficient signal is generated, it indicates that the adjustment and maintenance is insufficient and further adjustment and maintenance is also required; like and When the adjustment and maintenance success signal is generated, the signal is transmitted to the mobile terminal, and a prompt is given through the mobile terminal. When the adjustment and maintenance success signal is generated, it indicates that the adjustment and maintenance is successful.

7. A mold intelligent production line collaborative control system, used to implement a mold intelligent production line collaborative control method as described in any one of claims 1 to 6, characterized in that: It includes a startup module, an information collection module, a data analysis module, an effect evaluation module, an early warning module and a feedback module, and there are connections between the modules; Startup module, used to control the startup and initialization of the mold production line; The information acquisition module obtains a number of data information after the equipment of the mold production line is initialized and the system software is started, including the interactive data of the display screen and the dynamic characteristic information of the mold, and analyzes and processes the interactive data of the display screen and the dynamic characteristic information of the mold; The data analysis module establishes a comprehensive analysis model based on the interactive data of the display screen and the dynamic characteristic information of the mold after the mold production line is started, generates an initialization effect evaluation value, and evaluates the effect of the mold production line startup through the initialization effect evaluation value; The effect evaluation module compares and analyzes the initialization effect evaluation value generated after the mold production line is started with the preset initialization effect reference threshold, determines the startup effect of the mold production line after startup, and issues a warning for any abnormal situation through the early warning module; The feedback module collects several initialization effect evaluation values ​​output in real time after the mold production line is started for comprehensive analysis to determine the adjustment and maintenance situation when the startup effect of the mold production line is abnormal and needs to be adjusted and repaired.

Citation Information

Cited By

  • LCD display screen production tracking collaborative management method and system

    CN121069938A