Method and system for improving integration of research and development-production-forwarding chain of tower crane
By designing the packaging unit module in the PLM system, splitting and reorganizing EBOM into FBOM, and connecting it with the ERP system, the low efficiency of data transfer and production and shipping management problems of tower cranes were solved, and information integration and production plan optimization were achieved. Improved the efficiency of the R&D-production-shipping chain and the smoothness of the overall process.
Patent Information
- Application Number
- CN202410871288.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-15
AI Technical Summary
The existing BOM system has problems such as lengthy data storage, untimely changes, low circulation efficiency, and difficult process control. It cannot meet the needs of tower crane production process management, warehousing and shipping management, and working hours quota settlement.
Design the packaging unit module in the PLM system, split and reorganize EBOM to form FBOM, and connect it with the ERP system to realize the real architecture of the whole machine from the split and combined parts to the packaging unit, improve the efficiency of data flow, and pass The packaging unit format optimizes production and shipping processes.
It improves information circulation efficiency, production plan accuracy and shipping efficiency, reduces transportation costs, shortens delivery time, optimizes the overall process, and significantly improves the integration level of the tower crane's R&D-production-shipping chain.
Smart Images

Figure CN118780754A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of information-based manufacturing, and in particular relates to a method and a system for improving the integration of a tower crane research and development-production-shipping chain. Background Art
[0002] At present, equipment manufacturing and production management are important supports for the development of information technology in the manufacturing industry, especially PLM and ERP systems are indispensable management tools for the information technology process. Bill of materials (BOM) is a data integration of product attributes and relationships, and a "bridge" is built between the PLM-ERP system to achieve data transmission. In the BOM system, the design BOM (EBOM) is the source data, describing the overall design indicators and structural levels of the product; the manufacturing BOM (MBOM) is connected to the ERP system as the basic data for production planning, reflecting the manufacturing process and production process of parts. The data focuses on different aspects, and the BOM structure varies greatly.
[0003] In BOM management and maintenance, with the rapid development of my country's tower crane industry, product updates and customer customization needs continue to increase the pressure on enterprise data management and maintenance. At present, most companies adopt the information management model of converting EBOM into MBOM and then connecting MBOM to the ERP system. The relevant functional departments further screen MBOM to build purchase lists, outsourcing lists, etc. However, since data flow involves multiple departments such as design, production, warehousing, sales, and finance, there are often problems such as lengthy data storage, untimely changes, low flow efficiency, and difficult process control.
[0004] In production process management, the workshop production process only increases the output of a single department point, which easily leads to the accumulation of semi-finished products, resulting in an increase in the budget demand for raw materials and an increase in capital occupancy rate. In addition, the large accumulation and chaotic placement of semi-finished products increase the difficulty of warehouse inventory and the monitoring error rate, resulting in a waste of personnel, funds and space.
[0005] In the warehousing and shipping management, the tower structure and electrical parts include a large number of self-made parts, purchased parts and standard parts. There are many types of parts and various structural forms. There are problems such as unclear classification, disordered placement and random storage in the warehouse. In addition, in the actual vehicle distribution and shipment process, considering the shipping cost and vehicle loading safety, it is inevitable to disassemble large-volume components, and self-made parts such as bolts, nuts, pins, steel plates and splints are mixed. Pins, platforms, railings and other easily mixed parts are often mis-shipped or missed.
[0006] In the labor quota settlement, the completion of the whole machine loading was previously used as the labor quota settlement indicator for the assembly workshop. Affected by market supply and demand, order changes, backlog of semi-finished products, etc., the untimely shipment of the whole machine often caused the workers' labor quota settlement to stagnate. Therefore, a flexible and effective labor quota settlement model is urgently needed.
[0007] Through the above analysis, the problems and defects of the existing technology are as follows: the existing BOM system has problems such as lengthy data storage, untimely changes, low circulation efficiency and difficult process control, and cannot meet the needs of production process management, warehousing and shipment management and labor time quota settlement. Summary of the invention
[0008] In view of the problems existing in the prior art, the present invention provides a method and system for improving the integration of the research and development-production-shipping chain of tower cranes.
[0009] The present invention is implemented as follows: a method for improving the integration of the tower crane R&D-production-shipping chain comprises:
[0010] Step 1: In the product lifecycle management (PLM) system, according to the product structure level, product characteristics and road transportation requirements, the packaging unit module is designed and assembled into the assembly unit bill of materials (FBOM). The FBOM is formed by splitting and reorganizing the engineering bill of materials (EBOM), and the process department designs the corresponding process documents according to the FBOM. The FBOM is built based on the EBOM and is used to connect to the enterprise resource planning (ERP) system, and it can exist independently higher than the EBOM. The FBOM allows the entire product structure level and final form to be presented in the form of a packaging unit without making any changes to the EBOM;
[0011] Step 2: The production department initiates the ERP data push process according to the production plan. After the relevant departments confirm that the FBOM data is correct and has been archived in the PLM system, the Technology Development Department pushes the required packaging unit (FBOM) of the whole machine or component into the ERP system according to the product push plan described in the process;
[0012] Step 3: Based on the production plan, the production department relies on the ERP system to convert the packaged unit of the whole machine or component (FBOM) that needs to be put into production into the production order (MO) required by the production department, and releases the production order (MO). Subsequently, the relevant departments produce and purchase related self-made parts and supporting parts according to the production order;
[0013] Step 4: The assembly workshop assembles and packages the self-made parts and supporting parts into packaging units according to the specific types and quantities of each packaging unit module in the production order (MO), and refers to the specific drawings and process requirements of the packaging unit in the FBOM in the PLM, and then completes the finished products and puts them into storage;
[0014] Step 5: The property management department selects and summarizes the packaging units of the corresponding model batches in the inventory according to the delivery plan, prepares a shipping bill of materials (SBOM), and organizes personnel to ship out the relevant packaging unit modules according to the shipping bill of materials (SBOM), and loads and ships them according to the loading design.
[0015] The method for constructing the FBOM architecture includes:
[0016] The step 1 outputs the parts details of the EBOM drawing in the PLM system, creates new first-level components and general drawings after splitting, reorganizing or directly quoting them according to the packaging unit design concept, and then uploads them to PLM to regenerate the FBOM structure tree, realizing the real architecture of the whole machine from the split and combined parts to the packaging unit.
[0017] The step 2 pushes the basic data of FBOM from the PLM system into the ERP system.
[0018] Step 3 converts the master production plan into packaging unit requirements, and the production department organizes related production and procurement, including:
[0019] Run the planner workbench to balance the production packaging unit plan, inventory and in-transit order data, and then release the self-made parts production plan orders in batches according to the actual production progress. At the same time, filter and release the supporting parts and auxiliary material procurement plans for the production batches according to the production plan of the month.
[0020] In the fourth step, the assembly workshop packs / boxes the self-made parts and supporting parts of each packing unit according to the production order. During this process, the whole machine is divided into several packing units for completion and storage.
[0021] In step 5, during the loading and shipment according to the loading design, the packaging units within the coverage area are loaded in sequence according to the SBOM requirements of the current shipping batch, and the material codes and configuration quantities of the packaging units are checked at the same time.
[0022] Another object of the present invention is to provide a system for improving the integration of the tower crane R&D-production-shipping chain, the system for improving the integration of the tower crane R&D-production-shipping chain comprising:
[0023] The packaging unit is used to split and package the workpieces according to the product structure and the rationality of packaging and loading;
[0024] Vehicle loading design unit, used to design vehicle assembly plans based on vehicle transportation capacity and transportation safety;
[0025] The FBOM data building unit is used to output the drawing parts details of the EBOM components in the PLM system, split, reorganize or directly reference the packaging unit design to create a new first-level component and general drawing, and then upload it to PLM to regenerate the FBOM structure tree;
[0026] The production planning and management unit is used to run the planner's workbench. After balancing the production packaging unit plan, inventory and in-transit order data, the production plan orders for self-made parts are released in batches according to the actual production progress. At the same time, the supporting parts and auxiliary material procurement plans for the production batches are screened and released according to the production plan of the month.
[0027] The warehousing and shipping management unit is used by the assembly workshop to pack / box the self-made parts and supporting parts according to the parts list of each packaging unit, and put them into storage as several packaging units of the whole machine. The property management department will ship them according to the delivery plan.
[0028] In combination with the above technical solutions and the technical problems solved, the advantages and positive effects of the technical solutions to be protected by the present invention are as follows:
[0029] First, based on the management system and the structural characteristics of tower cranes, the present invention proposes to structurally split, reorganize or directly quote the EBOM, and connect the shipping BOM (FBOM) to the PLM-ERP system, so that it can improve the data flow efficiency while solving related problems in the production, warehousing and shipping processes, and promote the integrated development of the tower crane R&D-production-shipping chain. The present invention has been successfully applied to the enterprise series of tower types, significantly improving data flow and product control, and enhancing the competitiveness of the enterprise.
[0030] Second, the method for improving the integration of the tower crane R&D-production-shipping chain provided by the implementation case of the present invention significantly improves the integration level of the entire process of tower cranes from R&D to production and then to shipment by integrating PLM (product lifecycle management) and ERP (enterprise resource planning) systems. The following are the existing technical problems solved by this method and the significant technical progress achieved:
[0031] Existing technical problems solved:
[0032] 1) Poor information flow: In the traditional R&D, production and shipping processes, information flow in each link is not smooth, resulting in inefficient information transmission between the R&D department and the production and shipping departments, and even information distortion.
[0033] 2) Inaccurate production planning: Due to the lack of accurate material demand information and production plans, there is a shortage or surplus of materials in the production process, which affects production efficiency and cost control.
[0034] 3) Low shipping efficiency: Due to the lack or inaccurate packaging and loading design, the shipping efficiency is low, and even causes increased transportation costs and delayed delivery time.
[0035] Significant technological advances achieved:
[0036] 1) Information integration: By connecting the EBOM (engineering bill of materials) structure tree in the PLM system to the ERP system, the integration of R&D, production and shipping information is achieved, ensuring the accuracy and consistency of information and improving the efficiency of information flow.
[0037] 2) Production plan optimization: Convert the master production plan into packaging unit requirements, so that the production department can organize production and procurement more accurately, avoid material shortages or surpluses, and improve production efficiency and cost control capabilities.
[0038] 3) Improved shipping efficiency: The assembly workshop packs and stores self-made parts and supporting parts according to the specific requirements of different packaging units, manages the warehouse, and loads and ships them according to the loading design, which improves shipping efficiency, reduces transportation costs, and shortens delivery time.
[0039] 4) Overall process optimization: This method not only improves the efficiency of each link of R&D, production and shipment, but also optimizes the overall process in an integrated way, making the R&D-production-shipping chain of tower cranes smoother and more efficient.
[0040] In summary, the method for improving the integration of the tower crane R&D-production-shipping chain provided by the implementation case of the present invention solves the problems existing in the prior art through information integration, production plan optimization and improved shipping efficiency, and achieves significant technological progress.
[0041] As auxiliary evidence of the inventiveness of the claims of the present invention, it is also reflected in the following important aspects:
[0042] The expected benefits and commercial value of the technical solution of the present invention after transformation are:
[0043] By designing the packaging unit module, the cycle from product research and development to production, manufacturing and shipment is accelerated, which makes it easier for production planners to accurately and efficiently select production according to the production plan, and for the assembly workshop to report and settle accounts at any time according to the completion status of each process of the packaging unit (if the work is reported according to the completion of the whole machine, the reporting cycle is long, which affects the enthusiasm of operators). It also makes it easier for the property management department to organize and store the incoming parts and select the parts to be shipped out of the warehouse as needed.
[0044] (1) Design perspective: Each packaging unit is a shipping unit. The designed EBOM is converted into an FBOM in the form of a packaging unit. During the conversion process, the EBOM can be fed back according to the actual production situation, so that the EBOM hierarchical structure can serve production more reasonably and better. By standardizing the hierarchical framework of data, the manufacturing management of standardized products can be achieved. The FBOM in the form of a packaging unit does not restrict the EBOM. The EBOM exists as the most basic data. The relationship is inseparable and can exist and be used independently.
[0045] The historical model converts the design EBOM into the manufacturing MBOM, and then converts the manufacturing MBOM into a paper version for packaging and shipping. When the EBOM changes, it is difficult to synchronize data among departments, errors and omissions often occur, service costs are high, and brand image is affected.
[0046] (2) Manufacturing perspective: Based on the production plan, the production department can directly select the required packaging unit modules under the packaging unit FBOM structure tree of the corresponding product through the ERP system. There is no need to select the parts to be put into production in the complex design EBOM or manufacturing MBOM, which reduces errors and omissions and makes it easier for different planners to understand the production status at a glance.
[0047] (3) Assembly perspective: The assembly workshop assembles and packs each packing unit according to the MBOM packing unit details and puts it into storage. The process of each packing unit is independent and completed according to the order materials of each packing unit to prevent wrong assembly and missing parts. At the same time, each completed process can be reported and settled, without having to wait until all processes are completed and put into storage before reporting and settling, which is convenient for the assembly workshop to adjust and balance the monthly working hours of the workshop.
[0048] (4) From the perspective of property management: the property management department manages the storage and shipment of parts and summarizes the inventory status of each part. The comparison between the storage of packaged units and the storage of loose parts greatly reduces the work of the property management department in preparing various parts documents. It only needs to check and manage according to the details of the product packaging unit, and select the corresponding packaging unit for shipment according to the shipping plan. The inventory status of the packaging unit is dynamically registered to provide feedback to the production department for production and replenishment.
[0049] (5) After-sales perspective: It is convenient for after-sales personnel to track the goods sold according to the corresponding batches. It is also convenient for the sale of historical versions of spare parts and accessories and for data retrieval.
[0050] Summary: This FBOM in the form of packaging units simplifies the production process and changes the original production management form. Rather than FBOM, it is more accurate to say that it is a production mode management in the form of BOM based on the PLM system and ERP system. This production mode has completely transformed the original manual maintenance into an online mode, truly achieving a FBOM that can be used by multiple departments, with only differences in the choice of data usage. At the same time, it also achieves synchronization of the same batch of data, eliminating the situation where the lower-level user data is out of sync due to design changes. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 It is a flow chart of a method for improving the integration of the tower crane R&D-production-shipping chain provided by an implementation case of the present invention.
[0052] Figure 2 It is a historical production model diagram of an enterprise provided by an implementation case of the present invention.
[0053] Figure 3 It is the latest production mode diagram at the current stage provided by the implementation case of the present invention.
[0054] Figure 4 It is a data display on the PLM platform provided by the implementation case of the present invention, which can be expanded to the lower-level diagram.
[0055] Figure 5 It is a data display on the ERP platform provided by the implementation case of the present invention, which can be expanded to the lower-level diagram. DETAILED DESCRIPTION
[0056] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with implementation cases. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0057] like Figure 1 As shown, a method for improving the integration of the tower crane R&D-production-shipping chain provided by an implementation case of the present invention includes:
[0058] S101: In the product lifecycle management (PLM) system, according to the product structure level, product characteristics and road transportation requirements, the packaging unit module is designed and assembled into the assembly unit bill of materials (FBOM), where the FBOM is formed by splitting and reorganizing the engineering bill of materials (EBOM), and the process department designs the corresponding process documents based on the FBOM. The FBOM is built based on the EBOM and is used to connect to the enterprise resource planning (ERP) system, and it can exist independently higher than the EBOM. The FBOM allows the entire product structure level and final form to be presented in the form of a packaging unit without making any changes to the EBOM;
[0059] S102: The production department initiates the ERP data push process according to the production plan. After the relevant departments confirm that the FBOM data is correct and has been archived in the PLM system, the Technology Development Department pushes the required packaging unit (FBOM) of the whole machine or component into the ERP system according to the product push plan described in the process;
[0060] S103: Based on the production plan, the production department relies on the ERP system to convert the packaged unit of the whole machine or component (FBOM) that needs to be put into production into the production order (MO) required by the production department, and releases the production order (MO). Subsequently, the relevant departments produce and purchase related self-made parts and supporting parts according to the production order;
[0061] S104: The assembly workshop assembles and packages the self-made parts and supporting parts into packaging units according to the specific types and quantities of each packaging unit module in the production order (MO), and refers to the specific drawings and process requirements of the packaging unit in the FBOM in the PLM, and then completes the finished products and puts them into storage;
[0062] S105: The property management department selects and summarizes the packaging units of the corresponding model batches in the inventory according to the delivery plan, prepares a shipping bill of materials (SBOM), and organizes personnel to ship out the relevant packaging unit modules according to the shipping bill of materials (SBOM), and loads and ships them according to the loading design.
[0063] The method for constructing the FBOM architecture includes:
[0064] The step 1 outputs the parts details of the EBOM drawing in the PLM system, creates new first-level components and general drawings after splitting, reorganizing or directly quoting them according to the packaging unit design concept, and then uploads them to PLM to regenerate the FBOM structure tree, realizing the real architecture of the whole machine from the split and combined parts to the packaging unit.
[0065] The step 2 pushes the basic data of FBOM from the PLM system into the ERP system.
[0066] Step 3 converts the master production plan into packaging unit requirements, and the production department organizes related production and procurement, including:
[0067] Run the planner workbench to balance the production packaging unit plan, inventory and in-transit order data, and then release the self-made parts production plan orders in batches according to the actual production progress. At the same time, filter and release the supporting parts and auxiliary material procurement plans for the production batches according to the production plan of the month.
[0068] In the fourth step, the assembly workshop packs / boxes the self-made parts and supporting parts of each packing unit according to the production order. During this process, the whole machine is divided into several packing units for completion and storage.
[0069] In step 5, during the loading and shipment according to the loading design, the packaging units within the coverage area are loaded in sequence according to the SBOM requirements of the current shipping batch, and the material codes and configuration quantities of the packaging units are checked at the same time.
[0070] Figure 2 It is a historical production model diagram of an enterprise provided by an implementation case of the present invention.
[0071] Figure 3 It is the latest production mode diagram at the current stage provided by the implementation case of the present invention.
[0072] Figure 4 It is a data display on the PLM platform provided by the implementation case of the present invention, which can be expanded to the lower-level diagram.
[0073] Figure 5 It is a data display on the ERP platform provided by the implementation case of the present invention, which can be expanded to the lower-level diagram.
[0074] The following are two specific application examples for improving the integrated method of tower crane R&D-production-shipping chain:
[0075] Embodiment 1:
[0076] The embodiments of the present invention have achieved some positive effects during the research and development or use process, and indeed have great advantages over the prior art. The following content is described in conjunction with the data, charts, etc. of the test process of this unit.
[0077] 1. Packing unit and vehicle loading design
[0078] Reasonable packaging unit and loading scheme design not only needs to consider the rationality of product structure splitting, but also needs to take into account vehicle transportation capacity and transportation safety, taking the Q0711 standard section as an example.
[0079] Through the "wall-building" simulation, the tower body A, tower body B, tower body C, and tower body D are stacked in sequence to construct a "stable and compact" packaging unit 32 (tower body). At the same time, the 17.5-meter flatbed truck is loaded with 4, 5, 5, 5, and 5 sections from beginning to end, a total of 24 packaging units 32 (tower body sections), 6 packaging units 33 (standard section packaging parts), 20 platforms and other accessories. Loading plan (such as Figure 3 ), the vehicle weight is 30t, which increases the vehicle saturation and reduces costs while complying with the vehicle road transport safety management regulations.
[0080] 2. FBOM data construction
[0081] In the PLM system, the drawing parts and components of the EBOM components (or assemblies) are output, and after being split, reorganized or directly referenced according to the packaging unit design, a new first-level component (packaging unit) is created, and then uploaded to PLM to regenerate the FBOM structure tree, realizing the real architecture of the whole machine from structural components to packaging units. For example, Q0711 is split into Q0711FB01, Q0711FB02...Q0711FB04, 4 packaging units, as shown in Table 1.
[0082] Table 1 Q0711 Standard Section SBOM List
[0083]
[0084] After the FBOM is produced, push the FBOM from the PLM system into the ERP system.
[0085] 3. Production planning and management
[0086] The production management personnel run the planner workbench to balance the data such as the production packaging unit plan (MPS), inventory (STOCK) and orders in transit (OPEN MO), and then release the production plan orders (MO) for self-made parts in batches according to the actual production progress. At the same time, they screen and release the supporting parts and auxiliary material procurement plans for the production batches according to the production plan of the month, so as to effectively control the single-point output of finished products (packaging units) and promote the production management of complete products.
[0087] 4. Warehousing and shipping management
[0088] The assembly workshop packs / boxes the self-made parts and supporting parts according to the parts list of each packing unit. In this process, the whole machine is completed and put into storage as several packing units, which solves the workers' working hours settlement and realizes financial cost accounting. In addition, the real-time storage quantity of the packing unit can timely and effectively reflect the product inventory status, providing accurate information for production decisions.
[0089] In addition, the layout of storage cargo spaces is further optimized. After the transport truck enters the storage channel, the crane loads the packaging units within the coverage area in sequence according to the SBOM requirements of the current shipping batch, reducing driving distance and picking time. The property management shipping personnel effectively solve the problems of unclear classification of warehouse parts, disordered placement, picking errors and omissions in the traditional shipping process by checking the material coding and configuration quantity of the packaging units, which significantly improves the loading and shipping efficiency.
[0090] Embodiment 2:
[0091] A large construction company needed to customize a high-performance tower crane with a variety of non-standard options and required rapid production and on-time shipment.
[0092] 1. Step 1: Designers design specific packaging unit modules in the PLM system according to customer needs and product structure characteristics, and form FBOMs. These FBOMs take into account the needs of various links such as production, procurement, and shipment.
[0093] 2. Step 2: The ERP system generates an MO production order based on the FBOM and guides the production department to carry out production and procurement.
[0094] 3. Step 3: The assembly workshop assembles and packs the units according to the requirements of MO and FBOM. The packed units are directly put into the warehouse and wait for shipment.
[0095] 4. Step 4: The property management department will set up the SBOM according to the delivery plan, select the packaging unit directly from the inventory for delivery, and quickly load it for delivery. Since the packaging unit has been designed according to the delivery requirements, the entire delivery process is very smooth.
[0096] By implementing this method, the company is able to respond quickly to customer needs and achieve rapid production and accurate shipment. At the same time, since the consistency and accuracy of data are guaranteed, production efficiency and shipment accuracy are improved, errors and omissions are reduced, service costs are reduced, customer satisfaction is improved, and the brand image is enhanced.
[0097] The method for improving the integration of the tower crane R&D-production-shipping chain provided by the implementation case of the present invention realizes the optimization of the whole process from R&D to production and then to shipment by integrating the packaging unit and loading design into the PLM (product lifecycle management) and ERP (enterprise resource planning) systems. First, an EBOM (engineering bill of materials) structure tree is constructed in the PLM system. Designers split, reorganize or directly quote the parts, packaging units and loading design requirements in the EBOM structure tree, generate an FBOM architecture, and connect it to the ERP system to ensure the consistency and traceability of material information during production and shipment.
[0098] In the second step, the ERP system generates a master production plan based on the sales order and converts it into specific packaging unit requirements. The production department arranges the production and procurement of various components of the tower crane based on these requirements. In this way, the production plan can accurately reflect market demand and achieve efficient resource allocation and scheduling in the production process, avoiding material mismatch and resource waste, and improving production efficiency.
[0099] The third step is warehousing management and shipment. The assembly workshop department classifies, assembles, packs and boxes the self-made and purchased parts according to the specific requirements of the packaging unit, and then puts them into storage. The warehouse management system will update the inventory information in real time to ensure the accuracy and timeliness of the inventory information. The property management department will form an SBOM according to the shipping plan, and the tower crane packaging units that have been packed into the warehouse will be shipped out and loaded reasonably, and then shipped to various construction sites. This process ensures the efficient operation of logistics and reduces shipping delays.
[0100] Through the method of the present invention, the research and development-production-shipping chain of tower cranes has been fully optimized and integrated. The information flow, logistics and capital flow of each link have achieved a high degree of coordination, improved the overall operation efficiency, and reduced the production and transportation costs. At the same time, the integrated management of the system has also enhanced the control ability of the production process, improved customer satisfaction and market competitiveness.
[0101] At present, our company has a total of 4,000 series of tower crane products entering the market. Nearly 600 STC160A tower cranes have been put into production. The FBOM production mode has been adopted since the trial production was completed and mass production began. It has been very mature now. After the trial production of the product was completed, the problems existing in the trial production were rectified. On this basis, the packaging unit modules (crane arm packaging unit, balance arm packaging unit, counterweight packaging unit, trolley packaging unit, hook packaging unit, slewing tower body packaging unit, slewing assembly packaging unit, lifting mechanism packaging unit, variable amplitude mechanism packaging unit, jacking system packaging unit, electrical system packaging unit, frame jacking support foot foundation section packaging unit, standard section packaging unit, and other unconventional packaging units) were designed according to the product structure characteristics and vehicle allocation conditions, and each packaging unit module was assembled into the STC160A tower crane FBOM and entered into the PLM system, and this FBOM was pushed from the PLM system into the ERP system. The production department selects the STC160A tower crane FBOM in the ERP system according to the production plan, selects the packaging unit modules to be put into production under the FBOM, forms the production order required by the production system for production, and organizes relevant departments to produce and purchase related self-made parts and supporting parts. The assembly workshop assembles, packages, and stores the packaging unit modules involved in the STC160A production order, and reports and settles the work in a timely manner after each process is completed. The property management department classifies and stores the STC160A packaging unit modules that have been put into storage, and uses SBOM to dispatch vehicles for shipment according to the delivery plan.
[0102] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical field within the technical scope disclosed by the present invention and within the spirit and principle of the present invention should be covered by the protection scope of the present invention.
Claims
1. A method for improving the integration of the tower crane R&D-production-shipping chain, characterized in that: include: Step 1: In the product lifecycle management PLM system, according to the product structure level, product characteristics and road transportation requirements, the packaging unit module is designed and assembled into the assembly unit bill of materials FBOM. Among them, FBOM is split and reorganized from the engineering bill of materials EBOM and is used to connect to the enterprise resource planning ERP system; FBOM is based on EBOM and can exist independently higher than EBOM, so that the final form of the structural level of the entire product is presented in the form of packaging units, and no changes are made to EBOM; Step 2: The production department initiates the ERP data push process according to the production plan. After the relevant departments confirm that the FBOM data is correct and has been archived in the PLM system, the Technology Development Department pushes the required packaging unit (FBOM) of the whole machine or component into the ERP system according to the product push plan described in the process; Step 3: Relying on the ERP system, the master production plan is converted into the production order MO required by the production department. The production department organizes the production and purchases related self-made parts and supporting parts; Step 4: The assembly workshop assembles and packs the self-made parts and supporting parts into packing units according to the specific quantity of each packing unit module in the production order MO, and refers to the specific drawings, process requirements, and subordinate drawings of the packing unit in the FBOM in the PLM. After that, the finished products of the packing unit are put into storage; Step 5: The property management department selects the corresponding batch of shipping material list SBOM according to the shipping plan. The property management department issues the goods according to the packaging unit module and loads and ships them according to the loading design. All packaging units listed in the SBOM are loaded and shipped.
2. The method for improving the integration of the tower crane development-production-shipping chain as claimed in claim 1, characterized in that: Each packaging unit is a shipping unit, and the designed EBOM is converted into an FBOM in the form of a packaging unit. During the conversion process, the EBOM can be fed back according to the actual production situation, so that the EBOM hierarchical structure can serve the production more reasonably. By standardizing the hierarchical framework of data, standardized product manufacturing management can be achieved. The FBOM in the form of a packaging unit does not restrict the EBOM. EBOM exists as the most basic data.
3. The method for improving the integration of the tower crane development-production-shipping chain as claimed in claim 1, characterized in that: The historical model converts the design EBOM into the manufacturing MBOM, and then converts the manufacturing MBOM into a paper version for packaging and shipping. When the EBOM changes, it is difficult to synchronize data among departments, errors and omissions often occur, service costs are high, and the brand image is affected.
4. The method for improving the integration of the tower crane development-production-shipping chain as claimed in claim 1, characterized in that: The step 1 is to split, reorganize or directly reference the components of the EBOM structure tree to form a FBOM architecture to connect to the ERP system; The method for constructing the FBOM architecture includes: In the PLM system, the drawing parts details of EBOM are output, and after being split, reorganized or directly referenced according to the packaging unit design, new first-level components and general drawings are created. Then, the FBOM structure tree is uploaded to PLM to regenerate the FBOM structure tree, realizing the real architecture of the whole machine from structural components to packaging units.
5. The method for improving the integration of the tower crane development-production-shipping chain as claimed in claim 1, characterized in that: The step three converts the master production plan into packaging unit demand, and the production department organizes related production and procurement, specifically including: running the planner workbench, balancing the production packaging unit plan, inventory and in-transit order data, and releasing the self-made parts production plan orders in batches according to the actual production progress, and at the same time screening and releasing the supporting parts and auxiliary materials procurement plans for the production batches according to the production plan of the month.
6. The method for improving the integration of the tower crane development-production-shipping chain as claimed in claim 1, characterized in that: In step 4, the assembly workshop assembles, packs and boxes the self-made parts and supporting parts according to the specific requirements of different packaging units for storage. During this process, the whole machine is divided into several packaging units for completion and storage.
7. The method for improving the integration of the tower crane development-production-shipping chain as claimed in claim 1, characterized in that: In step 5, during the loading and shipment according to the loading design, the packaging units within the coverage area are loaded in sequence according to the SBOM requirements of the current shipping batch, and the material codes and configuration quantities of the packaging units are checked at the same time.
8. A method and system for implementing the method and system for improving the integration of the tower crane R&D-production-shipping chain as described in any one of claims 1 to 7, characterized in that: The system for improving the integration of the tower crane development-production-shipping chain includes: The packing unit disassembles and reorganizes the complete machine parts according to the rationality of packing and loading the product structure; Vehicle loading design unit, used to design vehicle assembly plans based on vehicle transportation capacity and transportation safety; The FBOM data building unit is used to output the detailed drawings of EBOM parts in the PLM system, split, reorganize or directly reference them according to the packaging unit design to create new first-level components, and then upload them to PLM to regenerate the FBOM structure tree; The production planning and management unit is used to run the planner workbench, balance the production packaging unit plan, inventory and in-transit order data, and release the self-made parts production plan orders in batches according to the actual production progress. At the same time, the supporting parts and auxiliary materials procurement plans for the production batches are screened and released according to the production plan of the month; The warehousing and shipping management unit is used by the assembly workshop to assemble, pack / box the self-made parts and supporting parts according to the parts list of each packaging unit, divide the whole machine into several packaging units for completion and storage, and the property management department carries out outbound shipment according to the shipping plan and the shipping list.