Capacity configuration method and device for hybrid energy storage system participating in AGC frequency modulation

By using an optimization algorithm in AGC frequency modulation to optimize the capacity configuration of the hybrid energy storage system, the frequency modulation performance is improved, the problem of poor frequency modulation performance in the existing technology is solved, and a better AGC frequency modulation effect is achieved.

CN118783471APending Publication Date: 2024-10-15이너 몽골리아 일렉트릭 파워 그룹 컴퍼니 리미티드 이너 몽골리아 일렉트릭 파워 리서치 인스티튜트 브랜치 +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410874676.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing capacity optimization configuration method fails to effectively consider the regulation performance in AGC frequency modulation, resulting in poor frequency modulation performance.

Method used

An optimization algorithm is used to maximize the AGC regulation performance index as the optimization goal, and based on the state of charge constraints, determine the optimal capacity configuration scheme of the hybrid energy storage system, including the output and capacity of the thermal power unit, flywheel energy storage system and flow battery system configuration.

Benefits of technology

The performance of AGC frequency modulation has been improved, which can better meet the demand of AGC frequency modulation spot market and obtain better frequency modulation benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118783471A_ABST
    Figure CN118783471A_ABST
Patent Text Reader

Abstract

The invention discloses a capacity configuration method and device for a hybrid energy storage system participating in AGC frequency modulation, and relates to the field of power generation system capacity configuration, and the capacity configuration method comprises the steps: obtaining AGC instruction data issued by a power grid; on the basis of the AGC instruction data, an optimal capacity configuration scheme is determined by adopting an optimization algorithm with the maximum AGC regulation performance index as an optimization target and the condition that the state of charge of the hybrid energy storage system is within a set range as a constraint condition; wherein the AGC adjustment performance index is determined according to an adjustment rate index, an adjustment precision index and a response time index; the hybrid energy storage system comprises a thermal power generating unit, a flywheel energy storage system and a flow battery system. The optimal capacity configuration scheme comprises the output and the capacity of the corresponding hybrid energy storage system when the AGC regulation performance index is in a set maximum range. According to the invention, the capacity optimization configuration scheme of the hybrid energy storage system participating in AGC frequency modulation can be determined, and the frequency modulation performance is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of capacity configuration of power generation systems, and in particular to a capacity configuration method and device for a hybrid energy storage system participating in AGC frequency modulation. Background Art

[0002] As the scale of new energy power generation connected to the grid increases year by year, traditional power systems are increasingly challenged by frequency fluctuations. Research on frequency regulation and resource allocation on the power generation side is of great significance and development prospects. It is true that thermal power units have their own frequency regulation capabilities, but in the face of power grid frequency fluctuations with increasing amplitude and frequency year by year, relying solely on thermal power units to store heat energy can no longer guarantee safe and stable operation of the units. Flywheel energy storage systems have the characteristics of rapid response, long service life, and low loss. The introduction of flywheel energy storage systems to assist thermal power units in participating in primary frequency regulation can well make up for the shortcomings of thermal power units themselves.

[0003] With the construction of the electricity spot market, the establishment of a supporting ancillary service market, the decisive role of the market in optimizing resource allocation, and the mobilization of various market players to participate in frequency regulation ancillary services will be more conducive to the development and efficient use of green energy, while ensuring the safe, stable and economical operation of the power grid. Therefore, when studying the capacity configuration of hybrid energy storage systems participating in the automatic generation control (AGC) frequency regulation of the power grid, it should be in line with the AGC frequency regulation spot market. How to achieve the optimal capacity configuration of hybrid energy storage systems participating in AGC frequency regulation has become a problem that needs to be solved urgently.

[0004] Currently, existing capacity optimization configuration methods usually do not consider the benefits of AGC frequency regulation, resulting in poor frequency regulation performance. Summary of the invention

[0005] The purpose of the present invention is to provide a capacity configuration method and device for a hybrid energy storage system participating in AGC frequency modulation, so as to determine a capacity optimization configuration scheme for the hybrid energy storage system participating in AGC frequency modulation and improve the frequency modulation performance.

[0006] To achieve the above object, the present invention provides the following solutions:

[0007] A capacity configuration method for a hybrid energy storage system participating in AGC frequency modulation, comprising:

[0008] Obtain AGC command data issued by the power grid;

[0009] Based on the AGC command data, an optimization algorithm is used to maximize the AGC regulation performance index as the optimization goal, and the charge state of the hybrid energy storage system is within a set range as a constraint condition to determine the optimal capacity configuration plan;

[0010] Among them, the AGC regulation performance index is determined according to the regulation rate index, the regulation accuracy index and the response time index; the hybrid energy storage system includes: a thermal power unit, a flywheel energy storage system and a flow battery system; the optimal capacity configuration scheme includes: the output and capacity of the hybrid energy storage system corresponding to when the AGC regulation performance index is within the set maximum range.

[0011] Optionally, the regulation rate index represents the degree to which the actual regulation rate of the thermal power unit is compared with the standard regulation rate that should be achieved;

[0012] The regulation accuracy represents the degree to which the actual regulation deviation of the thermal power unit is compared with the allowable regulation deviation;

[0013] The response time represents the degree to which the actual response time of the thermal power unit is compared with the standard response time;

[0014] The AGC regulation performance index represents the regulation performance of the thermal power unit during regulation.

[0015] Optionally, based on the AGC instruction data, an optimization algorithm is used to maximize the AGC regulation performance index as the optimization target, and the state of charge of the hybrid energy storage system is within a set range as a constraint condition to determine the optimal capacity configuration plan, specifically including:

[0016] Determine the capacity configuration plan under the current number of iterations;

[0017] Under the capacity configuration scheme under the current number of iterations, the frequency modulation instruction allocation strategy is used to allocate the AGC instruction data to obtain the thermal-storage frequency modulation instruction under the current number of iterations; the thermal-storage frequency modulation instruction includes: thermal power frequency modulation instruction, flywheel energy storage frequency modulation instruction and flow battery frequency modulation instruction;

[0018] Determine the fire-storage frequency modulation output at the current iteration number according to the fire-storage frequency modulation instruction at the current iteration number; the fire-storage frequency modulation output includes: thermal power unit output, flywheel energy storage output and flow battery output;

[0019] Taking the state of charge of the hybrid energy storage system within the set range as a constraint condition, the AGC regulation performance index under the current iteration number is calculated according to the thermal-storage frequency regulation output under the current iteration number;

[0020] Determine whether the AGC adjustment performance index under the current iteration number is within the set maximum range;

[0021] If so, the capacity configuration scheme under the current number of iterations is determined as the optimal capacity configuration scheme; otherwise, the capacity configuration scheme under the current number of iterations is updated and the next iteration is performed.

[0022] Optionally, the calculation formula of the AGC adjustment performance index is:

[0023]

[0024] in, It represents the AGC regulation performance index of thermal power unit i during the jth regulation; It represents the regulation rate index of thermal power unit i during the jth regulation; It represents the regulation accuracy index of thermal power unit i during the jth regulation; It represents the response time index of thermal power unit i during the j-th adjustment.

[0025] Optionally, the calculation formula of the adjustment rate index is:

[0026]

[0027] Among them, v i,j represents the actual regulation rate of thermal power unit i during the jth regulation; v N,i It represents the standard regulation rate that thermal power unit i should achieve.

[0028] Optionally, the calculation formula of the adjustment accuracy index is:

[0029]

[0030] Among them, ΔP i,j It represents the actual adjustment deviation of thermal power unit i during the j-th adjustment.

[0031] Optionally, the calculation formula of the response time indicator is:

[0032]

[0033] Among them, t i,j It represents the actual response time of thermal power unit i during the jth adjustment.

[0034] Optionally, the constraint condition includes: the charge states of the flywheel energy storage system and the liquid flow battery system are both in [0.2, 0.8].

[0035] The present invention also provides a capacity configuration device for a hybrid energy storage system participating in AGC frequency modulation, comprising:

[0036] Data acquisition module, used to obtain AGC command data issued by the power grid;

[0037] A capacity configuration scheme optimization module is used to determine the optimal capacity configuration scheme based on the AGC instruction data, using an optimization algorithm to maximize the AGC regulation performance index as the optimization target, and taking the charge state of the hybrid energy storage system being within a set range as a constraint condition;

[0038] Among them, the AGC regulation performance index is determined according to the regulation rate index, the regulation accuracy index and the response time index; the hybrid energy storage system includes: a thermal power unit, a flywheel energy storage system and a flow battery system; the optimal capacity configuration scheme includes: the output and capacity of the hybrid energy storage system corresponding to when the AGC regulation performance index is within the set maximum range.

[0039] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:

[0040] The embodiment of the present invention takes into account the calculation of the AGC regulation performance index when the hybrid energy storage system participates in the AGC frequency modulation, determines the AGC regulation performance index according to the regulation rate index, the regulation accuracy index and the response time index, and takes the maximum of the index as the optimization target. Under the constraint that the charge state of the hybrid energy storage system is within the set range, the optimal capacity configuration scheme is determined. The optimal capacity configuration scheme determined by this method can well meet the AGC frequency modulation spot market demand, obtain better frequency modulation benefits, and improve frequency modulation performance. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0042] Figure 1 A schematic flow chart of a capacity configuration method for a hybrid energy storage system participating in AGC frequency modulation provided in Example 1 of the present invention;

[0043] Figure 2 A schematic diagram of a specific implementation process of the capacity configuration method for the hybrid energy storage system participating in AGC frequency modulation provided in Example 1 of the present invention in practical application;

[0044] Figure 3 A frequency modulation simulation model diagram provided in Example 1 of the present invention;

[0045] Figure 4 This is a diagram of the internal structure of a computer device. DETAILED DESCRIPTION

[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] The purpose of the present invention is to provide a capacity configuration method and device for a hybrid energy storage system participating in AGC frequency modulation, aiming to determine a capacity optimization configuration scheme for the hybrid energy storage system participating in AGC frequency modulation and improve frequency modulation performance.

[0048] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0049] Example 1

[0050] like Figure 1 As shown, the capacity configuration method of the hybrid energy storage system participating in AGC frequency modulation in this embodiment includes:

[0051] Step 101: Obtain AGC instruction data issued by the power grid.

[0052] Step 102: Based on the AGC command data, an optimization algorithm is used to determine the optimal capacity configuration scheme with the maximum AGC regulation performance index as the optimization target and the charge state of the hybrid energy storage system being within a set range as a constraint condition.

[0053] Among them, the AGC regulation performance index is determined based on the regulation rate index, regulation accuracy index and response time index; the regulation rate index characterizes the degree to which the actual regulation rate of the thermal power unit is compared with the standard regulation rate that should be achieved; the regulation accuracy characterizes the degree to which the actual regulation deviation of the thermal power unit is compared with the allowable deviation of the regulation; the response time characterizes the degree to which the actual response time of the thermal power unit is compared with the standard response time; the AGC regulation performance index characterizes the degree of regulation performance during the regulation process of the thermal power unit.

[0054] The hybrid energy storage system includes: a flywheel energy storage system and a liquid flow battery system; the optimal capacity configuration scheme includes: the output and capacity of the hybrid energy storage system corresponding to when the AGC regulation performance index is within the set maximum range.

[0055] The hybrid energy storage system combined with the power generation system of the above embodiment realizes the capacity configuration of AGC frequency regulation, and considers the above AGC regulation performance index to improve the frequency regulation performance.

[0056] In another exemplary embodiment, the above step 102 specifically includes:

[0057] (1) Determine the capacity configuration plan under the current number of iterations.

[0058] (2) Under the capacity configuration scheme at the current number of iterations, the frequency modulation instruction allocation strategy is used to allocate the frequency modulation instruction to the AGC instruction data, and the fire-storage frequency modulation instruction at the current number of iterations is obtained, and the fire-storage frequency modulation output at the current number of iterations is determined according to the fire-storage frequency modulation instruction at the current number of iterations. The fire-storage frequency modulation instruction includes: thermal power frequency modulation instruction, flywheel energy storage frequency modulation instruction and liquid flow battery frequency modulation instruction; the fire-storage frequency modulation output includes: thermal power unit output, flywheel energy storage output and liquid flow battery output.

[0059] Specifically, the power grid sends the AGC frequency modulation instruction P AGC When it arrives at the power plant, the power plant sends frequency modulation commands to the thermal power unit, flywheel energy storage system, and liquid flow battery system according to the set frequency modulation command allocation strategy. After the thermal-storage combined frequency modulation system outputs, the output of the thermal power unit, flywheel energy storage system, and liquid flow battery system is aggregated and transmitted to the power grid. Among them: P AGC = thermal power frequency regulation command + flywheel energy storage frequency regulation command + liquid flow battery frequency regulation command; thermal-storage frequency regulation output = thermal power unit output + flywheel energy storage output + liquid flow battery output.

[0060] (3) Taking the charge state of the hybrid energy storage system in the set range as a constraint condition, the AGC regulation performance index at the current iteration number is calculated according to the thermal-storage frequency regulation output at the current iteration number. The constraint conditions include: the charge state of the flywheel energy storage system and the liquid flow battery system are both in [0.2, 0.8] or [0.1-0.9].

[0061] (4) Determine whether the AGC adjustment performance index under the current iteration number is within the set maximum range. If so, determine the capacity configuration scheme under the current iteration number as the optimal capacity configuration scheme; otherwise, update the capacity configuration scheme under the current iteration number and proceed to the next iteration.

[0062] In another exemplary embodiment, the calculation formula of the AGC adjustment performance index is:

[0063]

[0064] in, It represents the AGC regulation performance index of thermal power unit i during the jth regulation; It represents the regulation rate index of thermal power unit i during the jth regulation; It represents the regulation accuracy index of thermal power unit i during the jth regulation; It represents the response time index of thermal power unit i during the j-th adjustment.

[0065] The calculation formula of the adjustment rate index is:

[0066]

[0067] Among them, v i,j It indicates the actual regulation rate of thermal power unit i during the jth regulation, in megawatts per minute; v N,i It indicates the standard regulation rate that thermal power unit i should reach, in megawatts per minute. For thermal power units, it is 1%-2% of the rated active power of the unit.

[0068] The calculation formula of the adjustment accuracy index is:

[0069]

[0070] Among them, ΔP i,j It indicates the actual adjustment deviation of thermal power unit i during the jth adjustment, in megawatts; the allowable adjustment deviation is 1% of the rated active power of the unit. If the calculated value of is less than 0.1, it is taken as 0.1.

[0071]

[0072] Among them, P Ei,j is the output (MW) at the end of the response process, P Si,j is the output (MW) when it starts to operate, T Ei,j is the ending time (minutes), T Si,j is the starting time (minutes).

[0073] The calculation formula of the response time indicator is:

[0074]

[0075] Among them, t i,j It represents the actual response time of thermal power unit i during the jth adjustment. If the calculated value of is less than 0.1, it is taken as 0.1.

[0076] The capacity configuration method for the hybrid energy storage system participating in AGC frequency regulation mentioned above takes into account the calculation of the AGC regulation performance index of the hybrid energy storage participating in AGC power grid frequency regulation. The capacity configuration method with the optimal frequency regulation performance as the goal can well meet the AGC frequency regulation spot market demand and obtain better frequency regulation benefits.

[0077] Combine the following Figure 2 and Figure 3 , a more specific implementation process of the capacity configuration method of the above-mentioned hybrid energy storage system participating in AGC frequency modulation in practical application is introduced.

[0078] See also Figure 2 ,The specific implementation process of the capacity configuration method is as follows:

[0079] 1) Collect the AGC command data P sent by the thermal power plant to the power grid AGC , based on the characteristics of instruction distribution, formulate the initial capacity configuration and calculate the investment cost.

[0080] Specifically, the AGC command data received by the target thermal power plant from the power grid is collected, and the command distribution statistics are performed on the data. The specific statistical content is: the distribution pattern of the AGC command size and duration within the statistical data segment and the calculation of the frequency regulation mileage. At the same time, the size and duration of the AGC command that appears most frequently in the statistical frequency regulation commands are used as the output and capacity indicators of the initial capacity configuration.

[0081] Among them, the frequency regulation mileage is the total frequency regulation mileage in a certain period of time, which is the sum of the adjustment mileage of the thermal power units in response to the AGC control command in this period. The frequency regulation mileage of the thermal power units in response to the AGC control command each time refers to the absolute value of the difference between the actual output value at the end of responding to the AGC control command and the output value at the time of responding to the command. The calculation formula is as follows:

[0082]

[0083] Where: D j It is the frequency regulation mileage of the thermal power unit for the jth time, unit: MW.

[0084] 2) Build a frequency regulation simulation model of a flywheel-flow battery hybrid energy storage system combined with a thermal power unit.

[0085] A single-region frequency regulation model was built, and flywheel energy storage systems were configured for the thermal power units in the two regions. The specific frequency regulation simulation model is shown in the figure below. Figure 3 The thermal power unit adopts a 350MW unit, and the data obtained in step 1) is used as the disturbance input value.

[0086] Figure 3 In the figure, the state of charge SOC of the flywheel energy storage system and the liquid flow battery system ranges from 0 to 1, which represents the ratio of the energy stored by the flywheel energy storage system and the liquid flow battery system under the current situation to their maximum stored energy. When the flywheel energy storage system and the liquid flow battery system respond to assist in frequency regulation and output, if they continue to output at rated power without restriction, the SOC of the flywheel energy storage system and the liquid flow battery system will soon be saturated or exhausted, resulting in poor frequency regulation effect. Based on a series of comparative analyses, this embodiment chooses to set the SOC lower limit of the flywheel energy storage system and the liquid flow battery system to 0.2 and the upper limit to 0.8.

[0087] A frequency regulation simulation model of a flywheel energy storage system and a liquid flow battery system combined with a thermal power unit is built on the MATLAB\SIMULINK platform. The frequency regulation simulation model includes: a thermal power unit, a flywheel energy storage system, a liquid flow battery system and a disturbance input module.

[0088] Still see Figure 3 The disturbance input module is used to input the AGC command data P issued by the power grid. AGC After the AGC command data is input, the corresponding frequency modulation commands are allocated to the thermal power units, flywheel energy storage system and liquid flow battery system according to the set frequency modulation command allocation strategy, and the output of the thermal power units, flywheel energy storage system and liquid flow battery system is updated. The continuous output of the thermal power units, flywheel energy storage system and liquid flow battery system forms a corresponding output curve.

[0089] Figure 3 In the figure, the input of the speed regulator is the thermal power frequency regulation instruction; the output of the speed regulator is the high-pressure regulating valve opening instruction. The input of the steam turbine is the high-pressure regulating valve opening instruction; the output of the steam turbine is the steam turbine output, which is the output of the thermal power unit. The flywheel energy storage system: inputs the flywheel energy storage frequency regulation instruction, converts mechanical energy and electrical energy through the flywheel rotor, and outputs the flywheel energy storage output. The liquid flow battery energy storage system: inputs the liquid flow battery frequency regulation instruction, and the liquid flow battery energy storage system converts the liquid flow battery chemical energy and electrical energy, and outputs the liquid flow battery output.

[0090] 3) Under the proposed initial capacity configuration, the collected historical AGC command data of the thermal power plant is input into the frequency regulation simulation model to obtain the thermal-storage frequency regulation output under the capacity configuration.

[0091] 4) According to the fire-storage frequency regulation output, calculate the AGC regulation performance index K under this capacity configuration p .

[0092] Based on the AGC regulation performance index K in North China p As an example, the calculation method is:

[0093] ① Adjustment rate index (K 1 ).

[0094] In the stage of increasing output, the grinding point is crossed, so the influence of grinding must be eliminated when calculating its adjustment rate; in the range of decreasing output, the grinding stop point is not crossed, so the influence of grinding stop does not need to be considered when calculating. Combining these two situations, the adjustment rate index K is obtained. 1 The calculation formula of is not repeated here.

[0095] ②Adjustment accuracy index (K 2 ).

[0096] Regulation accuracy refers to the difference between the actual output and the set point output after the unit response is stable. The calculation process of the regulation accuracy assessment index is described as follows: In the stable operation stage of the i-th unit, the absolute value of the difference between the actual output and the set point instruction is integrated, and then the integral value is divided by the integration time, which is the regulation deviation of this period. The regulation deviation ΔP i,j The calculation formula of is not repeated here.

[0097] Based on the adjustment deviation ΔP i,j The adjustment accuracy K can be calculated 2 , the calculation formula will not be repeated here.

[0098] ③Response time index (K 3 ).

[0099] Response time refers to the time it takes for the unit output to reliably step out of the regulation dead zone consistent with the regulation direction based on the original output point after the EMS system issues a command. That is: and Based on the above formula, the calculation formula of the response time indicator can be obtained, which will not be repeated here.

[0100] Where, T 0 and T 1 are the start and end time of the jth response of thermal power unit i to the AGC discharge command, T 5 and T 6 are the start and end time of the jth response of thermal power unit i to the AGC charging command, is the response time of thermal power unit i to the jth AGC discharge command, It is the response time of thermal power unit i to the jth AGC charging command. The AGC response time of thermal power unit should be less than 1 minute, and the AGC response time of hydropower unit should be less than 20 seconds.

[0101] In summary, the AGC regulation performance index can be determined each time the AGC is actuated.

[0102] 5) Use the particle swarm optimization algorithm to adjust the AGC performance index K p As the objective function, the SOC of the flywheel energy storage system and the flow battery system are used as constraints to obtain the optimal capacity configuration solution.

[0103] Specifically, the particle swarm optimization algorithm is used to optimize the capacity configuration scheme, and the objective function is set as: AGC adjustment performance index K p ; Set the constraints as: SOC range of flywheel energy storage system and flow battery system [0.1-0.9]. Use particle swarm optimization algorithm to adjust the performance index K with AGC pTaking the maximum as the optimization target, the optimal capacity configuration scheme of the hybrid energy storage auxiliary power generation system participating in the AGC frequency regulation spot market is determined. The final configuration scheme includes the capacity and output of the flywheel energy storage system and the flow battery system.

[0104] All the above embodiments, based on the constructed frequency modulation simulation model of the hybrid energy storage system auxiliary power system participating in AGC frequency modulation, fully consider the AGC regulation performance index K of the spot market p and auxiliary frequency modulation benefits, and simulated through actual frequency modulation data, using AGC to adjust the performance index K p and auxiliary frequency regulation benefit as the objective function, a particle swarm optimization algorithm is constructed to obtain the optimal capacity configuration scheme to improve the frequency regulation performance.

[0105] Example 2

[0106] A capacity configuration device for a hybrid energy storage system participating in AGC frequency modulation, comprising:

[0107] The data acquisition module is used to obtain the AGC command data issued by the power grid.

[0108] The capacity configuration scheme optimization module is used to determine the optimal capacity configuration scheme based on the AGC instruction data, using an optimization algorithm to maximize the AGC regulation performance index as the optimization target, and taking the charge state of the hybrid energy storage system within a set range as a constraint condition.

[0109] Among them, the AGC regulation performance index is determined according to the regulation rate index, the regulation accuracy index and the response time index; the hybrid energy storage system includes: a thermal power unit, a flywheel energy storage system and a flow battery system; the optimal capacity configuration scheme includes: the output and capacity of the hybrid energy storage system corresponding to when the AGC regulation performance index is within the set maximum range.

[0110] Example 3

[0111] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the capacity configuration method for a hybrid energy storage system participating in AGC frequency modulation in Example 1.

[0112] Example 4

[0113] A computer program product includes a computer program, which, when executed by a processor, implements the capacity configuration method for a hybrid energy storage system participating in AGC frequency modulation in Example 1.

[0114] Example 5

[0115] A computer device whose internal structure diagram can be shown as Figure 4As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store pending transactions. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the capacity configuration method of the hybrid energy storage system participating in AGC frequency modulation in Example 1 is implemented.

[0116] It should be noted that the object information (including but not limited to object device information, object personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in the present invention are all information and data authorized by the object or fully authorized by all parties.

[0117] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided by the present invention can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided by the present invention may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited thereto. The processor involved in each embodiment provided by the present invention may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, etc., but are not limited thereto.

[0118] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0119] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A capacity configuration method for a hybrid energy storage system participating in AGC frequency modulation. It is characterized in that include: Obtain AGC command data issued by the power grid; Based on the AGC command data, an optimization algorithm is used to maximize the AGC regulation performance index as the optimization goal, and the charge state of the hybrid energy storage system is within a set range as a constraint condition to determine the optimal capacity configuration plan; Among them, the AGC regulation performance index is determined according to the regulation rate index, the regulation accuracy index and the response time index; the hybrid energy storage system includes: a thermal power unit, a flywheel energy storage system and a flow battery system; the optimal capacity configuration scheme includes: the output and capacity of the hybrid energy storage system corresponding to when the AGC regulation performance index is within the set maximum range.

2. The capacity configuration method of the hybrid energy storage system participating in AGC frequency modulation according to claim 1, It is characterized in that The regulation rate index represents the degree to which the actual regulation rate of the thermal power unit is compared with the standard regulation rate that should be achieved; The regulation accuracy represents the degree to which the actual regulation deviation of the thermal power unit is compared with the allowable regulation deviation; The response time represents the degree to which the actual response time of the thermal power unit is compared with the standard response time; The AGC regulation performance index represents the regulation performance of the thermal power unit during regulation.

3. The capacity configuration method of the hybrid energy storage system participating in AGC frequency modulation according to claim 1, It is characterized in that Based on the AGC command data, an optimization algorithm is used to maximize the AGC regulation performance index as the optimization target, and the charge state of the hybrid energy storage system is within the set range as a constraint condition to determine the optimal capacity configuration plan, specifically including: Determine the capacity configuration plan under the current number of iterations; Under the capacity configuration scheme under the current number of iterations, the frequency modulation instruction allocation strategy is used to allocate the AGC instruction data to obtain the thermal-storage frequency modulation instruction under the current number of iterations; the thermal-storage frequency modulation instruction includes: thermal power frequency modulation instruction, flywheel energy storage frequency modulation instruction and flow battery frequency modulation instruction; Determine the fire-storage frequency modulation output at the current iteration number according to the fire-storage frequency modulation instruction at the current iteration number; the fire-storage frequency modulation output includes: thermal power unit output, flywheel energy storage output and flow battery output; Taking the state of charge of the hybrid energy storage system within the set range as a constraint condition, the AGC regulation performance index under the current iteration number is calculated according to the thermal-storage frequency regulation output under the current iteration number; Determine whether the AGC adjustment performance index under the current iteration number is within the set maximum range; If so, the capacity configuration scheme under the current number of iterations is determined as the optimal capacity configuration scheme; otherwise, the capacity configuration scheme under the current number of iterations is updated and the next iteration is performed.

4. The capacity configuration method of the hybrid energy storage system participating in AGC frequency modulation according to claim 1, It is characterized in that The calculation formula of the AGC adjustment performance index is: in, It represents the AGC regulation performance index of thermal power unit i during the jth regulation; It represents the regulation rate index of thermal power unit i during the jth regulation; It represents the regulation accuracy index of thermal power unit i during the jth regulation; It represents the response time index of thermal power unit i during the j-th adjustment.

5. The capacity configuration method of the hybrid energy storage system participating in AGC frequency modulation according to claim 4, It is characterized in that The calculation formula of the adjustment rate index is: Among them, v i,j represents the actual regulation rate of thermal power unit i during the jth regulation; v N,i It represents the standard regulation rate that thermal power unit i should achieve.

6. The capacity configuration method of the hybrid energy storage system participating in AGC frequency modulation according to claim 4, It is characterized in that The calculation formula of the adjustment accuracy index is: Among them, ΔP i,j It represents the actual adjustment deviation of thermal power unit i during the j-th adjustment.

7. The capacity configuration method for the hybrid energy storage system participating in AGC frequency modulation according to claim 4, It is characterized in that The calculation formula of the response time indicator is: Among them, t i,j It represents the actual response time of thermal power unit i during the j-th adjustment.

8. The capacity configuration method of the hybrid energy storage system participating in AGC frequency modulation according to claim 1, It is characterized in that The constraint conditions include: the charge states of the flywheel energy storage system and the flow battery system are both in [0.2, 0.8].

9. A capacity configuration device for a hybrid energy storage system participating in AGC frequency modulation, It is characterized in that include: Data acquisition module, used to obtain AGC command data issued by the power grid; A capacity configuration scheme optimization module is used to determine the optimal capacity configuration scheme based on the AGC instruction data, using an optimization algorithm to maximize the AGC regulation performance index as the optimization target, and taking the charge state of the hybrid energy storage system being within a set range as a constraint condition; Among them, the AGC regulation performance index is determined according to the regulation rate index, the regulation accuracy index and the response time index; the hybrid energy storage system includes: a thermal power unit, a flywheel energy storage system and a flow battery system; the optimal capacity configuration scheme includes: the output and capacity of the hybrid energy storage system corresponding to when the AGC regulation performance index is within the set maximum range.

Citation Information

Patent Citations

  • Charge state range optimizing method and device for flywheel energy storage participating in power grid frequency modulation

    CN116073414A

  • Method and system for optimizing frequency modulation capacity of hybrid energy storage auxiliary unit

    CN116780587A

  • Fire storage joint optimization control method, system and equipment considering carbon emission

    CN116826857A