By analyzing the energy consumption and power grid data of the sewage plant, dividing time intervals and optimizing the energy supply method, the problem of low energy utilization rate of the sewage plant was solved, and the stability of energy supply and cost reduction were achieved.
Patent Information
- Application Number
- CN202410836247.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-15
AI Technical Summary
The sewage treatment plant is overly dependent on a single power grid, resulting in low energy utilization. When the power supply is interrupted or unstable, alternative energy cannot be supplied in time, affecting the sewage treatment process.
By obtaining historical equipment energy consumption data of sewage treatment plants, photovoltaic power generation history data and power grid peak-valley price difference history data, we can conduct seasonal characteristics analysis and power price characteristics analysis, divide different time intervals, and select appropriate energy supply methods based on current needs and priorities. , combine the coordination of new energy power generation and traditional energy to optimize energy supply.
It simplifies the energy control process, reduces costs, improves the energy utilization rate of sewage treatment plants, and ensures stable energy supply under different load demands.
Smart Images

Figure CN118783545A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of automated energy control, and in particular to a method, device, equipment, medium and program product for energy control in a sewage treatment plant. Background Art
[0002] Sewage treatment plants generally use power grid as the main energy source. Under existing technical conditions, the construction and maintenance of multiple energy supply systems require high initial investment and complex technical support. The integration and management of multiple energy systems are complex. Even if multiple energy supplies are used, it is still impossible to effectively coordinate multiple energy sources.
[0003] For example, sewage treatment plants rely too much on a single power grid for power supply, which may affect the sewage treatment process when the power supply is interrupted or unstable, and other potential energy sources cannot be supplied in time, resulting in low energy utilization. Summary of the invention
[0004] In view of this, the present invention provides a sewage treatment plant energy control method, device, equipment, medium and program product to solve the problem of how to improve the energy utilization rate of the sewage treatment plant.
[0005] In a first aspect, the present invention provides a method for controlling energy in a sewage treatment plant, the method comprising:
[0006] Obtaining historical data on equipment energy consumption, photovoltaic power generation, and peak-valley price difference of the sewage treatment plant;
[0007] Perform seasonal characteristic analysis on the historical data of energy consumption of the equipment to determine cooling demand intervals and non-cooling demand intervals;
[0008] Performing photovoltaic power generation characteristic analysis on the photovoltaic power generation history data to determine a photovoltaic power generation time interval and a non-photovoltaic power generation time interval;
[0009] Analyze the electricity price characteristics of the peak-to-valley price difference historical data of the power grid to determine the peak power consumption time interval and the non-peak power consumption time interval;
[0010] According to the current time of the sewage treatment plant, the interval to which it belongs and the priority of the different load demands of the sewage treatment plant at the current time are determined, and the corresponding energy supply method is selected.
[0011] This embodiment obtains and analyzes historical data on equipment energy consumption, historical data on photovoltaic power generation, and historical data on peak-valley price differences of the power grid to identify the characteristics of energy demand and supply in different time periods, divides time intervals with different characteristics based on the analysis results, and selects the most appropriate energy supply method in different time intervals based on current demand and priority. The present invention essentially controls the energy supply method by combining new energy power generation with the division of time intervals, which is different from the control process of complex coordinated power generation between multiple energy sources such as wind energy and biomass energy in related technologies. The related technologies do not consider the steps of coordinating energy supply methods by combining different energy sources with the division of time intervals. The present invention not only simplifies the energy control process and reduces costs, but also improves the energy utilization rate of the entire sewage treatment plant.
[0012] In an optional implementation, the determining of the interval to which the sewage treatment plant belongs and the priority of different load demands of the sewage treatment plant at the current moment according to the current moment, and selecting the corresponding energy supply mode includes:
[0013] When the current time of the sewage treatment plant is in the cooling demand interval, the current time of the sewage treatment plant includes heat load demand, cooling load demand, and electricity load demand;
[0014] According to the priorities of different load demands of the sewage treatment plant at the current moment, the energy supply modes corresponding to the heat load demand, the cold load demand, and the electricity load demand are determined in turn, among which the priority of the heat load demand is higher than the priority of the cold load demand, and the priority of the cold load demand is higher than the priority of the electricity load demand.
[0015] This embodiment achieves optimal configuration of energy levels within the cooling demand range by comprehensively considering the priorities of heat load, cooling load and electric load. This is different from the prior art method of jointly regulating multiple load demands and supplying energy in parallel. Energy is supplied to load demands of different levels in sequence according to priority, which not only reduces costs but also improves energy utilization.
[0016] In an optional implementation, the determining of the interval to which the sewage treatment plant belongs and the priority of different load demands of the sewage treatment plant at the current moment according to the current moment, and selecting the corresponding energy supply mode includes:
[0017] When the sewage treatment plant is currently in a non-cooling demand interval, the sewage treatment plant currently includes heat load demand and electricity load demand;
[0018] According to the priorities of different load demands of the sewage treatment plant at the current moment, the energy supply modes corresponding to the heat load demand and the electricity load demand are determined in turn, wherein the priority of the heat load demand is higher than the priority of the electricity load demand.
[0019] In this embodiment, the cooling load demand is removed in the non-cooling demand interval, which not only simplifies the complexity of energy management and avoids energy waste, but also concentrates all energy supply resources on the demand of heat load and electric load, effectively improving energy utilization.
[0020] In an optional implementation, if the sewage treatment plant is currently in a cooling demand interval, determining the energy supply mode corresponding to the heat load demand includes:
[0021] Controlling the energy supply mode using biogas cogeneration and monitoring the real-time heat load data of the sewage treatment plant;
[0022] Determining whether the standard heat load requirement of the sewage treatment plant has been reached at the current moment according to the real-time heat load data;
[0023] If not, confirm whether the current time period is a peak power consumption time interval. If the current time period is a peak power consumption time interval, control to increase the energy supply mode of using a heat storage tank, and monitor the real-time heat load data of the sewage treatment plant; determine whether the standard heat load demand of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; when it is confirmed that the standard heat load demand is still not met, control to increase the energy supply mode of using an electric boiler;
[0024] If the current time period is a non-peak power consumption time interval, the energy supply mode of the electric boiler is directly controlled.
[0025] In the embodiment of the present invention, biogas cogeneration is preferentially adopted in the cooling demand interval, and the biogas generated by sewage treatment is used to consume cost-free renewable energy first. Secondly, the heat load data is monitored in real time to adjust the energy supply. During the peak power consumption period, the heat storage tank is used to supply the previously stored heat, resulting in lower cost consumption. Finally, when the heat load demand still cannot be met, energy is supplied by electric boilers to ensure that the overall heat load demand is fully met. By reasonably allocating different energy supply methods, biogas resources and electricity resources are utilized to the maximum extent at a low cost to reduce energy waste.
[0026] In an optional implementation, if the sewage treatment plant is currently in a non-cold demand interval, determining the energy supply mode corresponding to the heat load demand includes:
[0027] Controlling the energy supply mode using sewage source heat pumps and monitoring the real-time heat load data of the sewage treatment plant;
[0028] Determining whether the standard heat load requirement of the sewage treatment plant has been reached at the current moment according to the real-time heat load data;
[0029] If not, the energy supply mode of biogas cogeneration is controlled to be adopted, and it is judged whether the standard heat load requirement of the sewage treatment plant has been reached at the current moment according to the real-time heat load data;
[0030] When it is confirmed that the standard heat load demand is still not met, it is determined whether the current time period is a peak power consumption time interval. If the current time period is a peak power consumption time interval, the energy supply method of using a heat storage tank is controlled to be increased, and the real-time heat load data of the sewage treatment plant is monitored; according to the real-time heat load data, it is determined whether the standard heat load demand of the sewage treatment plant has been reached at the current moment; when it is confirmed that the standard heat load demand is still not met, the energy supply method of using an electric boiler is controlled to be increased;
[0031] If the current time period is a non-peak power consumption time interval, the energy supply mode of the electric boiler is directly controlled.
[0032] In the embodiment of the present invention, in the non-cooling demand interval, the sewage source heat pump is preferentially used as the energy supply mode, and the biogas cogeneration is used to consume the biogas generated by sewage treatment, firstly consuming the cost-free renewable energy, and then adjusting the energy supply by real-time monitoring of the heat load data, using the heat storage tank during the peak power consumption period, and using the previously stored heat for supply, resulting in lower cost consumption, and finally when the heat load demand still cannot be met, the electric boiler is used to supply energy to ensure that the overall heat load demand is fully met, and by reasonably allocating different energy supply modes, the sewage source heat pump, biogas resources and electricity resources are maximized at a low cost to reduce energy waste.
[0033] In an optional implementation, if the sewage treatment plant is currently in a cooling demand interval, determining the energy supply mode corresponding to the cooling load demand includes:
[0034] Controlling the energy supply mode using sewage source heat pumps and monitoring the real-time cooling load data of the sewage treatment plant;
[0035] Determining whether the standard cooling load requirement of the sewage treatment plant has been reached at the current moment according to the real-time cooling load data;
[0036] If not, the control increases the energy supply mode of using electric refrigeration units.
[0037] The embodiment of the present invention is based on the characteristics of low cost and good energy-saving effect of the sewage source heat pump. When the cooling load demand is realized in the cooling demand interval, the sewage source heat pump is used first. Only when the sewage source heat pump cannot meet all the cooling load demands, the electric refrigeration unit will be enabled to supplement the insufficient cooling load. The advantages of the sewage source heat pump can be fully utilized to achieve the optimal energy-saving effect at a low cost.
[0038] In an optional implementation, if the sewage treatment plant is currently in a non-photovoltaic power generation time interval, determining the energy supply mode corresponding to the electric load demand includes:
[0039] Determine whether the biogas has been exhausted;
[0040] When it is confirmed that the biogas is not exhausted, the energy supply mode of biogas cogeneration is controlled; and the real-time electric load data of the sewage treatment plant is monitored;
[0041] Determining whether the standard power load requirement of the sewage treatment plant has been reached at the current moment according to the real-time power load data;
[0042] If the standard electricity load demand is still not met, confirm whether the current time period is a peak electricity consumption time interval. If the current time period is a peak electricity consumption time interval, control the energy supply method of using electric vehicle virtual energy storage. If the current time period is a non-peak electricity consumption time interval, control the execution of the power grid purchase operation.
[0043] The embodiment of the present invention ensures the priority use of renewable energy, namely biogas, and reduces dependence on traditional power grids. During peak electricity consumption, the use of electric vehicle virtual energy storage can reduce the sewage treatment plant's instantaneous load demand on the power grid, thereby alleviating the pressure on the power grid. By using the power grid to purchase electricity during non-peak time periods, the cost of electricity expenditure can be effectively reduced. In this embodiment, the electric vehicle is not only a means of transportation, but also a mobile energy storage unit similar to a power bank, providing stable power support for the sewage treatment plant.
[0044] In an optional implementation, if the current time of the sewage treatment plant belongs to the photovoltaic power generation time interval, then determining the energy supply mode corresponding to the electric load demand includes:
[0045] Controlling the energy supply mode using photovoltaic power generation and monitoring the real-time electrical load data of the sewage treatment plant;
[0046] Determining whether the standard power load requirement of the sewage treatment plant has been reached at the current moment according to the real-time power load data;
[0047] If the standard electricity load requirement is not met, it is determined whether the biogas has been exhausted;
[0048] When it is confirmed that the biogas is not exhausted, the energy supply mode of biogas cogeneration is controlled; and the real-time electric load data of the sewage treatment plant is monitored;
[0049] Determining whether the standard power load requirement of the sewage treatment plant has been reached at the current moment according to the real-time power load data;
[0050] If the standard electricity load demand is still not met, confirm whether the current time period is a peak electricity consumption time interval. If the current time period is a peak electricity consumption time interval, control the energy supply method of using electric vehicle virtual energy storage. If the current time period is a non-peak electricity consumption time interval, control the execution of the power purchase operation from the power grid; wherein, if the standard electricity load demand is met at the current moment, control the execution of the power storage strategy.
[0051] The embodiment of the present invention ensures the priority use of renewable energy, namely biogas, and reduces dependence on traditional power grids. During peak electricity consumption, the use of electric vehicle virtual energy storage can reduce the sewage treatment plant's instantaneous load demand on the power grid, thereby alleviating the pressure on the power grid. By using the power grid to purchase electricity during non-peak time periods, the cost of electricity expenditure can be effectively reduced. In this embodiment, the electric vehicle is not only a means of transportation, but also a mobile energy storage unit similar to a power bank, providing stable power support for the sewage treatment plant.
[0052] In an optional implementation, when the energy supply mode using virtual energy storage of electric vehicles is controlled, the lower discharge limit of the electric vehicle is set to the SOC value expected by the owner of the electric vehicle.
[0053] In order to ensure that electric vehicles can still meet the normal vehicle use needs of car owners when participating in virtual energy storage, the embodiment of the present invention sets the lower discharge limit of the electric vehicle to the SOC value expected by the electric vehicle owner. Virtual energy storage can help the power grid balance the load, and use the batteries of electric vehicles to discharge during peak power demand periods and charge during low demand periods, which can not only meet the needs of car owners, but also further improve the overall energy utilization efficiency of the sewage treatment plant.
[0054] In a second aspect, the present invention provides an energy control device for a sewage treatment plant, the device comprising:
[0055] A data acquisition module, used to acquire historical data on energy consumption of equipment in the sewage treatment plant, historical data on photovoltaic power generation, and historical data on peak-valley price differences of the power grid;
[0056] A seasonal characteristic analysis module, used to perform seasonal characteristic analysis on the historical data of energy consumption of the equipment to determine a cooling demand interval and a non-cooling demand interval;
[0057] A photovoltaic power generation characteristic analysis module, used to perform photovoltaic power generation characteristic analysis on the photovoltaic power generation historical data, and determine a photovoltaic power generation time interval and a non-photovoltaic power generation time interval;
[0058] An electricity price characteristic analysis module is used to analyze the electricity price characteristics of the peak-to-valley price difference historical data of the power grid, and determine the peak power consumption time interval and the non-peak power consumption time interval;
[0059] The automatic control module is used to determine the interval to which the sewage treatment plant belongs and the priority of different load demands of the sewage treatment plant at the current moment, and select the corresponding energy supply mode.
[0060] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor are communicatively connected to each other, computer instructions are stored in the memory, and the processor executes the sewage treatment plant energy control method of the first aspect or any corresponding embodiment thereof by executing the computer instructions.
[0061] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the sewage treatment plant energy control method of the first aspect or any corresponding embodiment thereof.
[0062] In a fifth aspect, the present invention provides a computer program product, comprising computer instructions for causing a computer to execute the sewage treatment plant energy control method of the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0064] Figure 1 is a flow chart of a method for controlling energy in a sewage treatment plant according to an embodiment of the present invention;
[0065] Figure 2 is a flow chart of energy supply to a sewage treatment plant according to an embodiment of the present invention;
[0066] Figure 3 is another wastewater treatment plant energy supply flow chart according to an embodiment of the present invention;
[0067] Figure 4 is a structural block diagram of a sewage treatment plant energy control device according to an embodiment of the present invention;
[0068] Figure 5 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0069] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0070] As an important part of urban infrastructure, the normal operation of sewage treatment plants is crucial to environmental protection. At present, most sewage treatment plants mainly rely on power grid power supply as their main energy source, or use multiple energy systems with complex integration and management. In actual operation, integrating different types of energy systems (such as solar energy, wind energy, biomass energy, etc.) into sewage treatment plants requires a total efficient energy management system to coordinate the relationship between various energy sources. However, no suitable solution has been found in this field in related technologies. Therefore, although some sewage treatment plants have tried to adopt multiple energy supply methods, they have not been able to effectively improve energy self-sufficiency and utilization efficiency, because the current multiple energy supply solutions cannot provide sufficient alternative energy support when dealing with power supply interruptions or instability. For example, although solar energy and wind energy are potential alternative energy sources for electricity, they are greatly affected by weather and environmental factors, and it is difficult to ensure a continuous and stable energy supply.
[0071] Sewage treatment plants are overly dependent on power supply from the power grid. When the power supply is interrupted or unstable, the sewage treatment process may be seriously affected, resulting in low energy self-sufficiency and inability to achieve reasonable energy utilization.
[0072] This embodiment is applied to the energy control process of a sewage treatment plant or a large-scale energy self-sufficiency project. In different time intervals, the most appropriate energy supply method is selected according to current needs and priorities, which simplifies the energy control process, reduces costs, and improves the energy utilization rate of the entire sewage treatment plant.
[0073] According to an embodiment of the present invention, an embodiment of a sewage treatment plant energy control method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0074] In this embodiment, a sewage treatment plant energy control method is provided, which can be used in the above-mentioned computer. Figure 1 is a flow chart of a method for controlling energy in a sewage treatment plant according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:
[0075] Step S101, obtaining historical data on equipment energy consumption, photovoltaic power generation, and peak-valley price difference of the sewage treatment plant.
[0076] It should be noted that the equipment energy consumption historical data refers to the data on the changes in equipment energy consumption over time within a historical period of time (for example, at least one year covering all seasons). Photovoltaic power generation historical data refers to the power data generated by photovoltaic (solar) power generation systems within a historical period of time (for example, at least one year covering all seasons). The power grid peak-valley price difference historical data refers to the historical electricity price change data of the power grid in different time periods, including the price difference between peak and trough periods.
[0077] It is understandable that through the collection of a large amount of historical data, it is possible to analyze the energy demand, energy supply situation and electricity cost fluctuations in different time periods, providing a data basis for the flexible adaptation of subsequent energy supply strategies.
[0078] Step S102, performing seasonal characteristic analysis on the historical data of equipment energy consumption to determine a cooling demand interval and a non-cooling demand interval.
[0079] It should be noted that seasonal characteristic analysis refers to analyzing the changing trend of equipment energy consumption in different seasons based on the historical data of equipment energy consumption. The cooling demand interval refers to the time period with higher temperature (such as spring and summer) when there is more cooling demand for sewage treatment plant equipment energy. The non-cooling demand interval refers to the time period with lower temperature (such as autumn and winter) when there is less cooling demand for sewage treatment plants. Among them, seasonal characteristic analysis can adopt time series analysis, threshold analysis algorithm, etc.
[0080] Specifically, the equipment energy consumption data is taken as a time series, and the seasonal trend is extracted through decomposition technology. The temperature change trend in different seasons is analyzed, and the high and low temperature periods are identified through the temperature change trend in different seasons. It is distinguished whether there is a demand for cooling, so as to reasonably allocate the energy supply of cooling equipment, avoid energy waste and reduce energy costs.
[0081] Step S103 , analyzing photovoltaic power generation characteristics of photovoltaic power generation history data to determine photovoltaic power generation time intervals and non-photovoltaic power generation time intervals.
[0082] It should be noted that photovoltaic power generation characteristic analysis refers to the analysis of the distribution of solar power generation during the day (for example, high during the day and low at night). Photovoltaic power generation time interval refers to the time period when solar power generation is high (for example, around noon). Non-photovoltaic power generation time interval refers to the time period when solar power generation is low or no power generation (for example, at night). Among them, photovoltaic power generation characteristic analysis can use statistical analysis or machine learning algorithms.
[0083] Specifically, the historical photovoltaic power generation data includes the power generation per hour or per minute. A time series graph of the power generation is drawn, the average power generation per hour is calculated, the power generation trend of each hour is determined, and a reasonable threshold is set according to the power generation data to distinguish between high power generation and low power generation periods. The time period when the power generation is greater than the set threshold is the photovoltaic power generation time interval, and the time period when the power generation is lower than the set threshold is the non-photovoltaic power generation time interval. According to the time law of solar power generation, more photovoltaic power is used as much as possible during the peak period of solar power generation to reduce dependence on grid power and ensure diverse energy supply.
[0084] Step S104, analyzing the electricity price characteristics of the historical data of the peak-to-valley price difference of the power grid to determine the peak power consumption time interval and the non-peak power consumption time interval.
[0085] It should be noted that the peak-valley price difference analysis of the power grid refers to analyzing the changes in power grid electricity prices in different time periods to identify the peak and valley periods of electricity prices. The peak time interval of electricity consumption refers to the time period with high electricity demand and high electricity prices. The non-peak time interval of electricity consumption refers to the time period with low electricity demand and low electricity prices. Among them, the peak-valley price difference analysis of the power grid can adopt the regression analysis algorithm.
[0086] Specifically, based on historical electricity price data, features that affect electricity prices are generated. In this embodiment, different time points within a day are selected as features, and a linear regression or nonlinear regression model is used to fit the relationship between electricity prices and time point features. Based on the prediction results of the regression model, peak electricity price periods (i.e., peak electricity consumption time intervals) and valley periods (i.e., non-peak electricity consumption time intervals) are identified. By consuming more electricity during the valley period of electricity prices and reducing electricity use during peak periods, electricity costs can be reduced.
[0087] Step S105, determining the interval to which the sewage treatment plant belongs and the priorities of different load demands of the sewage treatment plant at the current moment according to the current moment, and selecting a corresponding energy supply method.
[0088] It should be noted that the energy supply mode can be determined according to the interval to which the sewage treatment plant belongs (such as the cooling demand interval, non-photovoltaic power generation time interval, non-peak power consumption time interval, etc.) and the priority of different load demands of the sewage treatment plant at the current moment (such as cooling load demand, heat load demand) to adaptively allocate the sewage treatment plant energy according to time, thereby ensuring the utilization rate of energy resources. Among them, the energy supply mode refers to the energy supply mode of different energy supply equipment in the sewage treatment plant. The sewage treatment plant contains a variety of energy supply equipment for providing, managing and regulating energy.
[0089] This embodiment obtains and analyzes historical data on equipment energy consumption, historical data on photovoltaic power generation, and historical data on peak-valley price differences of the power grid to identify the characteristics of energy demand and supply in different time periods, divides time intervals with different characteristics based on the analysis results, and selects the most appropriate energy supply method in different time intervals based on current demand and priority. The present invention essentially controls the energy supply method by combining new energy power generation with the division of time intervals, which is different from the control process of complex coordinated power generation between multiple energy sources such as wind energy and biomass energy in related technologies. The related technologies do not consider the steps of coordinating energy supply methods by combining different energy sources with the division of time intervals. The present invention not only simplifies the energy control process and reduces costs, but also improves the energy utilization rate of the entire sewage treatment plant.
[0090] In an optional implementation manner, step S105 of a sewage treatment plant energy control method provided in this embodiment specifically includes:
[0091] Step A1, when the sewage treatment plant is currently in a cooling demand interval, the sewage treatment plant currently includes heat load demand, cooling load demand, and electricity load demand;
[0092] Step A2, according to the priorities of different load demands of the sewage treatment plant at the current moment, determine the energy supply modes corresponding to the heat load demand, the cold load demand, and the electric load demand respectively, among which the priority of the heat load demand is higher than the priority of the cold load demand, and the priority of the cold load demand is higher than the priority of the electric load demand.
[0093] Regarding the priority allocation principle in this embodiment, it can be understood that the heat load demand is closely related to the heating process required in the sewage treatment process. The thermal process has a direct impact on the effluent water quality and treatment effect. Therefore, it is necessary to ensure that the heat load demand is the priority demand. The cold load demand is mainly used for the cooling of equipment and the temperature control of some treatment processes. That is to say, the cold load demand is a demand that may only exist after the thermal process. Therefore, although the cold load demand is important, it is second to the heat load demand. The electric load demand covers the power supply of various equipment in the sewage treatment plant, but compared with the heat load and the cold load, the electric load has less direct impact on the treatment process. Under the premise of ensuring the heat load and the cold load demand, through the reasonable regulation of the electric load demand, the efficient use of energy can be achieved. At the same time, since the electric load demand is not met first, the cost can be reduced.
[0094] This embodiment achieves optimal configuration of energy levels within the cooling demand range by comprehensively considering the priorities of heat load, cooling load and electric load. This is different from the prior art method of jointly regulating multiple load demands and supplying energy in parallel. Energy is supplied to load demands of different levels in sequence according to priority, which not only reduces costs but also improves energy utilization.
[0095] In an optional implementation manner, step S105 of a sewage treatment plant energy control method provided in this embodiment specifically includes:
[0096] Step B1, when the sewage treatment plant is currently in a non-cooling demand interval, the sewage treatment plant currently includes heat load demand and electricity load demand;
[0097] Step B2, according to the priorities of different load demands of the sewage treatment plant at the current moment, determine the energy supply modes corresponding to the heat load demand and the electricity load demand respectively, wherein the priority of the heat load demand is higher than the priority of the electricity load demand.
[0098] The priority allocation principle in this embodiment can refer to the contents of step A1 to step A2, but the difference is that during the operation of the sewage treatment plant, there will be different time intervals and different cooling requirements. For example, in summer or in certain high temperature environments, the cooling load demand will increase significantly, while in winter or when the temperature is low, the cooling load demand may be greatly reduced or non-existent. Therefore, in this embodiment, the cooling load demand is excluded in the non-cooling demand interval, and the energy supply equipment resources of the original cooling load demand are reasonably utilized.
[0099] In this embodiment, the cooling load demand is removed in the non-cooling demand interval, which not only simplifies the complexity of energy management and avoids energy waste, but also concentrates all energy supply resources on the demand of heat load and electric load, effectively improving energy utilization.
[0100] In an optional implementation, if the sewage treatment plant is currently in a cooling demand interval, determining the energy supply mode corresponding to the heat load demand includes:
[0101] C1, controls the energy supply mode using biogas cogeneration and monitors the real-time heat load data of the sewage treatment plant;
[0102] C2, judging whether the standard heat load requirement of the sewage treatment plant has been reached at the current moment according to the real-time heat load data;
[0103] C3, if not, confirm whether the current time period is the peak time period for electricity consumption. If the current time period is the peak time period for electricity consumption, control to increase the energy supply mode of using heat storage tanks and monitor the real-time heat load data of the sewage treatment plant; judge whether the standard heat load demand of the sewage treatment plant has been met at the current moment according to the real-time heat load data; when it is confirmed that the standard heat load demand is still not met, control to increase the energy supply mode of using electric boilers;
[0104] C4: If the current time period is not the peak time period for electricity consumption, the energy supply mode of the electric boiler is directly controlled.
[0105] It should be noted that biogas cogeneration is a device that produces electricity and heat energy at the same time. The biogas generated during sewage treatment is used as fuel and burned in the generator to generate electricity. The heat energy generated is recovered through the heat exchanger for heating or cooling. The heat storage tank is a device used to store thermal energy. By storing excess heat in the tank, it can be released when needed to maintain the thermal load balance of the system. The heat storage tank usually uses water or other heat transfer media to store and release heat through heat exchange. Electric boilers use electricity to heat water or other heat transfer media to generate hot water or steam for heating or other industrial purposes. Electric boilers are suitable for use when heat needs to be replenished quickly.
[0106] It is understandable that the embodiment of the present invention first adopts biogas cogeneration, because the biogas generated in the sewage treatment process is used as fuel, so the renewable energy generated in the sewage treatment process can be maximized. During the peak electricity consumption period, the electricity price is high, and the heat storage tank is used first to reduce the electricity bill. When the above measures still cannot meet the demand, the electric boiler is used to cover the unmet heat load demand and ensure that the overall heat load demand is fully met.
[0107] In the embodiment of the present invention, biogas cogeneration is preferentially adopted in the cooling demand interval, and the biogas generated by sewage treatment is used to consume cost-free renewable energy first. Secondly, the heat load data is monitored in real time to adjust the energy supply. During the peak power consumption period, the heat storage tank is used to supply the previously stored heat, resulting in lower cost consumption. Finally, when the heat load demand still cannot be met, energy is supplied by electric boilers to ensure that the overall heat load demand is fully met. By reasonably allocating different energy supply methods, biogas resources and electricity resources are utilized to the maximum extent at a low cost to reduce energy waste.
[0108] In an optional implementation, if the sewage treatment plant is currently in a non-cold demand interval, determining the energy supply mode corresponding to the heat load demand includes:
[0109] D1, controls the energy supply mode using sewage source heat pump and monitors the real-time heat load data of the sewage treatment plant;
[0110] D2, judging whether the standard heat load requirement of the sewage treatment plant has been reached at the current moment according to the real-time heat load data;
[0111] D3, if not, then control the energy supply mode of biogas cogeneration, and judge whether the standard heat load demand of the sewage treatment plant has been reached at the current moment according to the real-time heat load data;
[0112] D4, when it is confirmed that the standard heat load demand is still not met, it is determined whether the current time period is the peak power consumption time interval. If the current time period is the peak power consumption time interval, the energy supply method of the heat storage tank is increased, and the real-time heat load data of the sewage treatment plant is monitored; according to the real-time heat load data, it is determined whether the standard heat load demand of the sewage treatment plant has been reached at the current moment; when it is confirmed that the standard heat load demand is still not met, the energy supply method of the electric boiler is increased;
[0113] D5: If the current time period is not the peak time period for electricity consumption, the energy supply mode of using electric boilers is directly controlled.
[0114] It should be noted that the sewage source heat pump is a device that heats or cools by extracting heat energy from sewage. Its working principle is similar to that of a traditional heat pump system, but it uses sewage as a heat source. The sewage source heat pump extracts heat energy from sewage through a heat exchanger, and then raises the temperature through a compressor to meet heating needs.
[0115] In this embodiment, the sewage source heat pump uses the temperature characteristics of sewage to provide heating or cooling in different seasons through the principle of heat exchange. That is, in autumn and winter, the sewage temperature is higher than the ambient temperature, indicating that the sewage has stored a high amount of thermal energy. The sewage source heat pump extracts heat from the sewage through a heat exchanger to meet part or all of the heat load requirements. In spring and summer, the sewage temperature is lower than the ambient temperature, and the sewage can be used as a cold source to achieve a cooling effect.
[0116] It is understandable that the sewage source heat pump does not need to supply the cooling load demand in the non-cooling demand interval. Therefore, it is preferred to use sewage source heat pumps that are easier to operate and provide more stable heat load demands. Sewage source heat pumps can operate efficiently under lower temperature difference conditions.
[0117] In addition, the energy supply methods of biogas cogeneration, heat storage tanks, and electric boilers can refer to the descriptions of C1 to C4 and will not be repeated here.
[0118] In the embodiment of the present invention, in the non-cooling demand interval, the sewage source heat pump is preferentially used as the energy supply mode, and the biogas cogeneration is used to consume the biogas generated by sewage treatment, firstly consuming the cost-free renewable energy, and then adjusting the energy supply by real-time monitoring of the heat load data, using the heat storage tank during the peak power consumption period, and using the previously stored heat for supply, resulting in lower cost consumption, and finally when the heat load demand still cannot be met, the electric boiler is used to supply energy to ensure that the overall heat load demand is fully met, and by reasonably allocating different energy supply modes, the sewage source heat pump, biogas resources and electricity resources are maximized at a low cost to reduce energy waste.
[0119] In an optional implementation, if the sewage treatment plant is currently in a cooling demand interval, determining the energy supply mode corresponding to the cooling load demand includes:
[0120] E1, controls the energy supply mode using sewage source heat pump and monitors the real-time cooling load data of the sewage treatment plant;
[0121] E2, judging whether the standard cooling load demand of the sewage treatment plant has been reached at the current moment according to the real-time cooling load data;
[0122] E3, if not, the control increases the energy supply mode of using electric refrigeration units.
[0123] It is understandable that sewage source heat pumps can be used not only as a heat source for heating, but also as a cold source for cooling. The principle is to transfer the low-temperature heat energy in sewage to the refrigerant, which absorbs heat through the evaporator and becomes gaseous, then is compressed and heated by the compressor, releases heat through the condenser, and finally cools down through the expansion valve to become liquid and re-enters the evaporator cycle. It can be seen that in the cooling demand range, the priority use of sewage source heat pumps can be more efficient and energy-saving.
[0124] The electric refrigeration unit relies on electricity to drive the refrigerant cycle. The refrigerant absorbs heat from the environment in the evaporator, becomes gaseous, and is heated by the compressor. It then releases heat in the condenser and finally cools down through the expansion valve to become liquid and repeats the cycle. Therefore, when the monitored cooling load data cannot meet the standard cooling load requirements of the sewage treatment plant, the electric refrigeration unit is used to increase the cold source to ensure that all cooling needs can be effectively met.
[0125] The embodiment of the present invention is based on the characteristics of low cost and good energy-saving effect of the sewage source heat pump. When the cooling load demand is realized in the cooling demand interval, the sewage source heat pump is used first. Only when the sewage source heat pump cannot meet all the cooling load demands, the electric refrigeration unit will be enabled to supplement the insufficient cooling load. The advantages of the sewage source heat pump can be fully utilized to achieve the optimal energy-saving effect at a low cost.
[0126] In an optional implementation, if the sewage treatment plant is currently in a non-photovoltaic power generation time interval, determining the energy supply mode corresponding to the electric load demand includes:
[0127] F1, determine whether the biogas has been exhausted;
[0128] F2, when it is confirmed that the biogas is not exhausted, the energy supply mode of biogas cogeneration is controlled; and the real-time power load data of the sewage treatment plant is monitored;
[0129] F3, judging whether the standard power load demand of the sewage treatment plant has been reached at the current moment according to the real-time power load data;
[0130] F4, if the standard electricity load demand is still not reached, confirm whether the current time period is the peak time period. If the current time period is the peak time period, control the energy supply method of electric vehicle virtual energy storage. If the current time period is not the peak time period, control the execution of power purchase from the power grid.
[0131] The electric vehicle virtual energy storage in the embodiment of the present invention refers to using the battery of the electric vehicle as a distributed energy storage device, connecting the power grid through a bidirectional charging pile, and realizing the bidirectional flow of electricity. It can be understood that the electric vehicle uses the power grid to charge when the power grid load is low, and feeds back the power grid when the power grid load is high. Because the electric vehicle itself carries a battery, it can flexibly charge and discharge characteristics, so it is used as a mobile energy storage device.
[0132] It is worth noting that this embodiment does not directly use electric vehicle virtual energy storage but first determines whether the biogas has been exhausted, because regardless of whether photovoltaic power generation is used, the priority of thermal load demand is always higher than the priority of electrical load demand. There is a situation where the thermal load demand has been met, but when it uses biogas cogeneration, there is still some biogas fuel remaining. Therefore, it is prioritized to determine whether the biogas has been exhausted. When the biogas is not exhausted, the energy supply method of biogas cogeneration is adopted to avoid using expensive grid electricity during peak electricity consumption, and instead use electric vehicle energy storage equipment to maximize energy utilization.
[0133] Specifically, two-way charging piles are installed in sewage treatment plants and parking lots, and electric vehicles and power grids are connected through V2G technology to ensure two-way power flow. The battery status of electric vehicles, grid load and power demand of sewage treatment plants are monitored in real time, and the timing of charging and discharging is determined through a preset scheduling algorithm. Based on factors such as electricity prices, load demand, and vehicle usage, the scheduling algorithm is optimized through self-feedback to ensure the best utilization of energy storage.
[0134] The embodiment of the present invention ensures the priority use of renewable energy, namely biogas, and reduces dependence on traditional power grids. During peak electricity consumption, the use of electric vehicle virtual energy storage can reduce the sewage treatment plant's instantaneous load demand on the power grid, thereby alleviating the pressure on the power grid. By using the power grid to purchase electricity during non-peak time periods, the cost of electricity expenditure can be effectively reduced. In this embodiment, the electric vehicle is not only a means of transportation, but also a mobile energy storage unit similar to a power bank, providing stable power support for the sewage treatment plant.
[0135] In an optional implementation, if the current time of the sewage treatment plant belongs to the photovoltaic power generation time interval, then determining the energy supply mode corresponding to the electric load demand includes:
[0136] G1, controls the energy supply mode using photovoltaic power generation and monitors the real-time electrical load data of the sewage treatment plant;
[0137] G2, based on the real-time power load data, determines whether the standard power load demand of the sewage treatment plant has been reached at the current moment;
[0138] G3, if the standard electricity load requirement is not met, it is determined whether the biogas has been exhausted;
[0139] G4, when it is confirmed that the biogas is not exhausted, the energy supply mode of biogas cogeneration is controlled; and the real-time power load data of the sewage treatment plant is monitored;
[0140] G5, judging whether the standard power load demand of the sewage treatment plant has been reached at the current moment according to the real-time power load data;
[0141] G6, if the standard electricity load demand is still not reached, confirm whether the current time period is the peak electricity consumption time interval. If the current time period is the peak electricity consumption time interval, control the energy supply method of electric vehicle virtual energy storage. If the current time period is not the peak electricity consumption time interval, control the execution of the power grid purchase operation; among them, if the standard electricity load demand is reached at the current moment, control the execution of the power storage strategy.
[0142] In this embodiment, photovoltaic power generation is the first choice to maximize the use of solar energy resources, followed by biogas cogeneration, using renewable energy within the plant to reduce external dependence. During peak hours of electricity consumption, electric vehicle virtual energy storage is given priority to reduce costs. When all self-owned resources and energy storage resources cannot meet demand, electricity is purchased from the power grid to ensure stable power supply.
[0143] It is understandable that the power storage strategy in step G6 is mainly to store the surplus power of photovoltaic power generation. When photovoltaic power generation is in excess (i.e., the standard power load demand is reached at the current moment, and the power supply is greater than the power load demand), the excess power will be stored. When the power load demand is greater than the supply, that is, when photovoltaic power generation is impossible at night or on cloudy days, the stored power can be used to make up for the power gap.
[0144] In addition, for the explanation of biogas cogeneration, electric vehicle virtual energy storage, and grid electricity purchase strategy, please refer to the description of step F1 to step F4, which will not be repeated here.
[0145] In the embodiment of the present invention, photovoltaic power generation is used first during the photovoltaic power generation time interval to reduce energy costs, and renewable energy is used secondly to reduce dependence on traditional power grids. During peak power consumption periods, the use of electric vehicle virtual energy storage can reduce the instantaneous load demand of the sewage treatment plant on the power grid, thereby alleviating the pressure on the power grid. By using the power grid to purchase electricity during non-peak time periods, the cost of electricity expenditure can be effectively reduced. Through the power storage strategy, electric energy is stored when there is excess photovoltaic power generation to reduce energy waste, and the stored electric energy is used when necessary to reduce costs.
[0146] In an optional implementation, when the energy supply mode using virtual energy storage of electric vehicles is controlled, the lower discharge limit of the electric vehicle is set to the SOC value expected by the owner of the electric vehicle.
[0147] It should be noted that SOC refers to the percentage of remaining battery power. By setting the lower discharge limit to the SOC value expected by the owner, the main function of the electric vehicle in this embodiment is still to provide transportation services. If the virtual energy storage causes the electric vehicle to be too low in power, it may cause inconvenience or even safety hazards to the owner. Setting the expected SOC value can increase the owner's acceptance of the virtual energy storage of the electric vehicle.
[0148] In order to ensure that electric vehicles can still meet the normal vehicle use needs of car owners when participating in virtual energy storage, the embodiment of the present invention sets the lower discharge limit of the electric vehicle to the SOC value expected by the electric vehicle owner. Virtual energy storage can help the power grid balance the load, and use the batteries of electric vehicles to discharge during peak power demand periods and charge during low demand periods, which can not only meet the needs of car owners, but also further improve the overall energy utilization efficiency of the sewage treatment plant.
[0149] Exemplarily, since sewage has the characteristic of being warm in winter and cool in summer, the selected typical days are divided into T1 (spring, summer) and T2 (autumn, winter). When T∈T1 (spring, summer), the sewage treatment plant has a cooling demand. According to the characteristic of low water temperature of sewage in spring and summer, the cooling demand is met by using sewage source heat pump. When T∈T2 (autumn, winter), the sewage treatment plant does not have a cooling demand. According to the characteristic of high water temperature of sewage in autumn and winter, the heating demand is met by using sewage source heat pump. T1 is defined as the cooling demand interval, and T2 is defined as the non-cooling demand interval. According to the characteristics of photovoltaic power generation, the typical day is divided into two time periods: A1=(06:00-18:00). A2 = (00:00-06:00, 18:00-24:00), when A∈A1, it is the time period of photovoltaic power generation, photovoltaic power generation can be used to meet electricity demand, when A∈A2, it is not the time period of photovoltaic power generation, photovoltaic power generation cannot be used to meet electricity demand, where A1 is the photovoltaic power generation time interval, A2 is the non-photovoltaic power generation time interval, according to the peak-valley price difference of the power grid, when B∈(peak time), due to the relatively high electricity price, the heat storage tank is allowed to release heat to meet the heat gap, but the electric vehicle virtual energy storage discharge is not allowed to meet the electricity demand; when B∈(valley time), due to the relatively low electricity price, the heat storage tank is not required to release heat, and the electric vehicle virtual energy storage discharge is allowed. The peak time represents the peak time interval of electricity consumption, and the valley time represents the non-peak time interval of electricity consumption.
[0150] The energy supply flow chart of the sewage treatment plant according to the embodiment of the present invention can be referred to Figure 2 , Figure 2 The energy control mode of the sewage treatment plant in spring and autumn represents the energy control mode of the sewage treatment plant, which is in the cooling demand range. When the cooling demand range is determined, it is determined in turn whether it is in the photovoltaic power generation range and the peak power consumption time range, thereby determining four control branches. The control process on each branch is executed according to a sewage treatment plant energy control method provided in an embodiment of the present application, which will not be repeated here.
[0151] Another sewage treatment plant energy supply flow chart according to the embodiment of the present invention can be referred to Figure 3 , Figure 3 The energy control mode of the sewage treatment plant in the autumn and winter seasons is represented, which is in the non-cooling demand interval. When the non-cooling demand interval is determined, it is determined in turn whether it is in the photovoltaic power generation interval and the peak power consumption time interval, thereby determining four control branches. The control process on each branch is executed according to a sewage treatment plant energy control method provided in an embodiment of the present application, which will not be repeated here.
[0152] In this embodiment, a sewage plant energy control device is also provided, which is used to implement the above embodiments and preferred implementations, and the descriptions that have been made will not be repeated. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0153] This embodiment provides a sewage treatment plant energy control device, such as Figure 4 As shown, including:
[0154] The data acquisition module 401 is used to acquire the historical data of equipment energy consumption, photovoltaic power generation, and peak-valley price difference of the sewage treatment plant;
[0155] Seasonal characteristic analysis module 402, used to perform seasonal characteristic analysis on historical data of equipment energy consumption, and determine cooling demand intervals and non-cooling demand intervals;
[0156] Photovoltaic power generation characteristic analysis module 403, used to perform photovoltaic power generation characteristic analysis on photovoltaic power generation historical data, and determine photovoltaic power generation time interval and non-photovoltaic power generation time interval;
[0157] The power price characteristic analysis module 404 is used to analyze the power price characteristics of the power grid peak-valley price difference historical data to determine the peak power consumption time interval and the non-peak power consumption time interval;
[0158] The automatic control module 405 is used to determine the interval to which the sewage treatment plant belongs and the priority of different load demands of the sewage treatment plant at the current moment according to the current moment of the sewage treatment plant, and select the corresponding energy supply mode.
[0159] In some optional implementations, the automatic control module 405 includes:
[0160] The first demand analysis unit is used for when the sewage treatment plant is currently in a cooling demand interval, the sewage treatment plant currently includes heat load demand, cooling load demand, and electricity load demand;
[0161] The first load energy supply sub-unit is used to determine the energy supply modes corresponding to the heat load demand, the cooling load demand, and the electric load demand in turn according to the priorities of different load demands of the sewage treatment plant at the current moment, among which the priority of the heat load demand is higher than that of the cooling load demand, and the priority of the cooling load demand is higher than that of the electric load demand.
[0162] In some optional implementations, the automatic control module 405 includes:
[0163] The first demand analysis unit is used for when the sewage treatment plant is currently in a non-cold demand interval, the sewage treatment plant currently includes heat load demand and electricity load demand;
[0164] The second load energy supply subunit is used to determine the energy supply modes corresponding to the heat load demand and the electricity load demand in turn according to the priorities of different load demands of the sewage treatment plant at the current moment, wherein the priority of the heat load demand is higher than the priority of the electricity load demand.
[0165] In some optional embodiments, if the current moment of the sewage treatment plant belongs to the cooling demand interval, then, when determining the energy supply method corresponding to the heat load demand, the automatic control module 405 is used to control the energy supply method of biogas cogeneration and monitor the real-time heat load data of the sewage treatment plant; judge whether the standard heat load demand of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; if not, confirm whether the current time period is the peak power consumption time interval; if the current time period is the peak power consumption time interval, control to increase the energy supply method of using a heat storage tank, and monitor the real-time heat load data of the sewage treatment plant; judge whether the standard heat load demand of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; when it is confirmed that the standard heat load demand is still not met, control to increase the energy supply method of using an electric boiler; if the current time period is a non-peak power consumption time interval, directly control the energy supply method of using an electric boiler.
[0166] In some optional implementations, if the current moment of the sewage treatment plant belongs to the non-cold demand interval, the automatic control module 405 is used to control the energy supply method of the sewage source heat pump when determining the energy supply method corresponding to the heat load demand, and monitor the real-time heat load data of the sewage treatment plant; judge whether the standard heat load demand of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; if not, control the energy supply method of biogas cogeneration, and judge whether the standard heat load demand of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; when it is confirmed that the standard heat load demand is still not met, judge whether the current time period is the peak power consumption time interval, if the current time period is the peak power consumption time interval, control to increase the energy supply method of using the heat storage tank, and monitor the real-time heat load data of the sewage treatment plant; judge whether the standard heat load demand of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; when it is confirmed that the standard heat load demand is still not met, control to increase the energy supply method of using the electric boiler; if the current time period is the non-peak power consumption time interval, directly control the energy supply method of using the electric boiler.
[0167] In some optional embodiments, if the current moment of the sewage treatment plant belongs to the cooling demand interval, the automatic control module 405 is used to control the energy supply method of the sewage source heat pump when determining the energy supply method corresponding to the cooling load demand, and monitor the real-time cooling load data of the sewage treatment plant; determine whether the standard cooling load demand of the sewage treatment plant has been reached at the current moment according to the real-time cooling load data; if not, control to increase the energy supply method of the electric refrigeration unit.
[0168] In some optional embodiments, if the current moment of the sewage treatment plant belongs to a non-photovoltaic power generation time interval, the automatic control module 405 is used to determine whether the biogas has been exhausted when determining the energy supply method corresponding to the cooling load demand; when it is confirmed that the biogas has not been exhausted, the energy supply method of biogas cogeneration is controlled to be adopted; and the real-time electric load data of the sewage treatment plant is monitored; according to the real-time electric load data, it is determined whether the standard electric load demand of the sewage treatment plant has been reached at the current moment; if the standard electric load demand has not been reached, it is confirmed whether the current time period is a peak power consumption time interval; if the current time period is a peak power consumption time interval, the energy supply method of electric vehicle virtual energy storage is controlled to be adopted; if the current time period is a non-peak power consumption time interval, the operation of purchasing electricity from the power grid is controlled to be executed.
[0169] In some optional embodiments, if the current moment of the sewage treatment plant belongs to a non-photovoltaic power generation time interval, the automatic control module 405 is used to determine whether the biogas has been exhausted when determining the energy supply method corresponding to the electric load demand; when it is confirmed that the biogas has not been exhausted, the energy supply method of biogas cogeneration is controlled to be adopted; and the real-time electric load data of the sewage treatment plant is monitored; according to the real-time electric load data, it is determined whether the standard electric load demand of the sewage treatment plant has been reached at the current moment; if the standard electric load demand has not been reached, it is confirmed whether the current time period is a peak power consumption time interval; if the current time period is a peak power consumption time interval, the energy supply method of electric vehicle virtual energy storage is controlled to be adopted; if the current time period is a non-peak power consumption time interval, the operation of purchasing electricity from the power grid is controlled to be executed.
[0170] In some optional embodiments, if the current moment of the sewage treatment plant belongs to the photovoltaic power generation time interval, the automatic control module 405 is used to control the energy supply method of photovoltaic power generation when determining the energy supply method corresponding to the electric load demand, and monitor the real-time electric load data of the sewage treatment plant; judge whether the standard electric load demand of the sewage treatment plant has been reached at the current moment according to the real-time electric load data; if the standard electric load demand has not been reached, judge whether the biogas has been exhausted; when it is confirmed that the biogas has not been exhausted, control the energy supply method of biogas cogeneration; and monitor the real-time electric load data of the sewage treatment plant; judge whether the standard electric load demand of the sewage treatment plant has been reached at the current moment according to the real-time electric load data; if the standard electric load demand has not been reached, confirm whether the current time period is the peak power consumption time interval, if the current time period is the peak power consumption time interval, control the energy supply method of electric vehicle virtual energy storage, if the current time period is a non-peak power consumption time interval, control the execution of the power grid purchase operation; wherein, if the standard electric load demand is reached at the current moment, control the execution of the power storage strategy.
[0171] In some optional implementations, when the energy supply mode using virtual energy storage of electric vehicles is controlled, the lower discharge limit of the electric vehicle is set to the SOC value expected by the owner of the electric vehicle.
[0172] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0173] The sewage treatment plant energy control device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0174] The embodiment of the present invention also provides a computer device having the above Figure 4 The wastewater plant energy control device shown.
[0175] See also Figure 5 , Figure 5 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 5As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 5 A processor 10 is taken as an example.
[0176] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0177] The memory 20 stores instructions executable by at least one processor 10, so that at least one processor 10 executes the method shown in the above embodiment.
[0178] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0179] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0180] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0181] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0182] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.
[0183] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the claims.
Claims
1. A sewage treatment plant energy control method, characterized in that: The method comprises: Obtaining historical data on equipment energy consumption, photovoltaic power generation, and peak-valley price difference of the sewage treatment plant; Perform seasonal characteristic analysis on the historical data of energy consumption of the equipment to determine cooling demand intervals and non-cooling demand intervals; Performing photovoltaic power generation characteristic analysis on the photovoltaic power generation history data to determine a photovoltaic power generation time interval and a non-photovoltaic power generation time interval; Analyze the electricity price characteristics of the peak-to-valley price difference historical data of the power grid to determine the peak power consumption time interval and the non-peak power consumption time interval; According to the current time of the sewage treatment plant, the interval to which it belongs and the priority of the different load demands of the sewage treatment plant at the current time are determined, and the corresponding energy supply method is selected.
2. The method according to claim 1, characterized in that The method of determining the interval to which the sewage treatment plant belongs and the priority of different load demands of the sewage treatment plant at the current moment according to the current moment of the sewage treatment plant, and selecting the corresponding energy supply mode includes: When the sewage treatment plant is currently in a cooling demand interval, the sewage treatment plant currently includes heat load demand, cooling load demand, and electricity load demand; According to the priorities of different load demands of the sewage treatment plant at the current moment, the energy supply modes corresponding to the heat load demand, the cold load demand, and the electricity load demand are determined in turn, among which the priority of the heat load demand is higher than the priority of the cold load demand, and the priority of the cold load demand is higher than the priority of the electricity load demand.
3. The method according to claim 1, characterized in that The method of determining the interval to which the sewage treatment plant belongs and the priority of different load demands of the sewage treatment plant at the current moment according to the current moment of the sewage treatment plant, and selecting the corresponding energy supply mode includes: When the sewage treatment plant is currently in a non-cold demand period, the sewage treatment plant currently includes heat load demand and electricity load demand; According to the priorities of different load demands of the sewage treatment plant at the current moment, the energy supply modes corresponding to the heat load demand and the electricity load demand are determined in turn, wherein the priority of the heat load demand is higher than the priority of the electricity load demand.
4. The method according to claim 2, characterized in that: If the sewage treatment plant is currently in the cooling demand range, the energy supply method corresponding to the heat load demand is determined, including: Controlling the energy supply mode using biogas cogeneration and monitoring the real-time heat load data of the sewage treatment plant; Determining whether the standard heat load requirement of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; If not, confirm whether the current time period is a peak power consumption time interval. If the current time period is a peak power consumption time interval, control to increase the energy supply mode of using a heat storage tank, and monitor the real-time heat load data of the sewage treatment plant; determine whether the standard heat load demand of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; when it is confirmed that the standard heat load demand is still not met, control to increase the energy supply mode of using an electric boiler; If the current time period is a non-peak power consumption time interval, the energy supply mode of the electric boiler is directly controlled.
5. The method according to claim 3, characterized in that: If the sewage treatment plant is currently in a non-cold demand period, the energy supply method corresponding to the heat load demand is determined, including: Controlling the energy supply mode using sewage source heat pumps and monitoring the real-time heat load data of the sewage treatment plant; Determining whether the standard heat load requirement of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; If not, the energy supply mode of biogas cogeneration is controlled to be adopted, and it is judged whether the standard heat load requirement of the sewage treatment plant has been reached at the current moment according to the real-time heat load data; When it is confirmed that the standard heat load demand is still not met, it is determined whether the current time period is a peak power consumption time interval. If the current time period is a peak power consumption time interval, the energy supply method of using a heat storage tank is controlled to be increased, and the real-time heat load data of the sewage treatment plant is monitored; according to the real-time heat load data, it is determined whether the standard heat load demand of the sewage treatment plant has been reached at the current moment; when it is confirmed that the standard heat load demand is still not met, the energy supply method of using an electric boiler is controlled to be increased; If the current time period is a non-peak power consumption time interval, the energy supply mode of the electric boiler is directly controlled.
6. The method according to claim 2, characterized in that If the sewage treatment plant is currently in the cooling demand interval, the energy supply method corresponding to the cooling load demand is determined, including: Controlling the energy supply mode using sewage source heat pumps and monitoring the real-time cooling load data of the sewage treatment plant; Determining whether the standard cooling load requirement of the sewage treatment plant has been reached at the current moment according to the real-time cooling load data; If not, the control increases the energy supply mode of using electric refrigeration units.
7. The method according to claim 2 or 3, characterized in that: If the sewage treatment plant is currently in a non-photovoltaic power generation time interval, the energy supply method corresponding to the electrical load demand is determined, including: Determine whether the biogas has been exhausted; When it is confirmed that the biogas is not exhausted, the energy supply mode of biogas cogeneration is controlled; and the real-time electric load data of the sewage treatment plant is monitored; Determining whether the standard power load requirement of the sewage treatment plant has been reached at the current moment according to the real-time power load data; If the standard electricity load demand is still not met, confirm whether the current time period is a peak electricity consumption time interval. If the current time period is a peak electricity consumption time interval, control the energy supply method of using electric vehicle virtual energy storage. If the current time period is a non-peak electricity consumption time interval, control the execution of the power grid purchase operation.
8. The method according to claim 7, characterized in that If the sewage treatment plant is currently in the photovoltaic power generation time interval, the energy supply method corresponding to the electrical load demand is determined, including: Controlling the energy supply mode using photovoltaic power generation and monitoring the real-time electrical load data of the sewage treatment plant; Determining whether the standard power load requirement of the sewage treatment plant has been reached at the current moment according to the real-time power load data; If the standard electricity load requirement is not met, it is determined whether the biogas has been exhausted; When it is confirmed that the biogas is not exhausted, the energy supply mode of biogas cogeneration is controlled; and the real-time electric load data of the sewage treatment plant is monitored; Determining whether the standard power load requirement of the sewage treatment plant has been reached at the current moment according to the real-time power load data; If the standard electricity load demand is still not met, confirm whether the current time period is a peak electricity consumption time interval. If the current time period is a peak electricity consumption time interval, control the energy supply method of using electric vehicle virtual energy storage. If the current time period is a non-peak electricity consumption time interval, control the execution of the power purchase operation from the power grid; wherein, if the standard electricity load demand is met at the current moment, control the execution of the power storage strategy.
9. The method according to claim 8, characterized in that When the energy supply mode using the virtual energy storage of electric vehicles is controlled, the lower discharge limit of the electric vehicle is set to the SOC value expected by the owner of the electric vehicle.
10. A sewage treatment plant energy control device, characterized in that: The device comprises: A data acquisition module, used to acquire historical data on energy consumption of equipment in the sewage treatment plant, historical data on photovoltaic power generation, and historical data on peak-valley price differences of the power grid; A seasonal characteristic analysis module, used to perform seasonal characteristic analysis on the historical data of energy consumption of the equipment to determine a cooling demand interval and a non-cooling demand interval; A photovoltaic power generation characteristic analysis module, used to perform photovoltaic power generation characteristic analysis on the photovoltaic power generation historical data, and determine a photovoltaic power generation time interval and a non-photovoltaic power generation time interval; An electricity price characteristic analysis module is used to analyze the electricity price characteristics of the peak-to-valley price difference historical data of the power grid, and determine the peak power consumption time interval and the non-peak power consumption time interval; The automatic control module is used to determine the interval to which the sewage treatment plant belongs and the priority of different load demands of the sewage treatment plant at the current moment, and select the corresponding energy supply mode.
11. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the sewage treatment plant energy control method according to any one of claims 1 to 9 by executing the computer instructions.
12. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the sewage treatment plant energy control method according to any one of claims 1 to 9.
13. A computer program product, characterized in that It comprises computer instructions, and the computer instructions are used to make a computer execute the sewage treatment plant energy control method according to any one of claims 1-9.
Citation Information
Cited By
Energy management method and device, equipment, storage medium and program product
CN122026463A