Power Engineering Pipeline Installation Equipment

Through the design of the support frame and the rail frame, combined with hydraulic cylinder and electric push rod, the precise docking and angle adjustment of multi-power engineering pipelines is achieved, and the precise connection problem of existing equipment when docking multi-section pipelines with pipelines to be installed is solved. , ensuring the firm connection and smooth installation of the pipes.

CN118789222BActive Publication Date: 2024-11-15SHANDONG NANSHAN ALUMINUM
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411289941.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-11-15
Estimated Expiration
2044-09-14

AI Technical Summary

Technical Problem

The existing power engineering pipeline installation equipment is not suitable for the docking between connected multi-section pipelines and the hoisted pipelines to be installed, making it difficult to achieve precision docking and firm connections at the pipeline connections.

Method used

Using a power engineering pipeline installation device including a support frame and a track frame, the clamping of the pipeline is achieved by combining the first pipe clamping assembly, the second pipe clamping assembly and the second pipe angle adjustment assembly. With angle adjustment, ensures the pipe inclination angle consistent, and achieves close docking and rotation of the pipe through the design of arc-shaped grippers and inner sliders, which facilitates flange bolt connection.

Benefits of technology

It realizes accurate butt and firm connection of multi-section pipelines, avoids the occurrence of inclination gaps in the pipeline, ensures the smooth progress of welding and flange bolt connections, and adapts to the harsh power engineering pipeline laying environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118789222B_ABST
    Figure CN118789222B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of electric power engineering pipeline clamping equipment, and specifically discloses an electric power engineering pipeline installation equipment. It is used to solve the problem that the existing pipeline docking auxiliary device is not suitable for docking between the connected multi-section pipelines and the suspended pipeline to be installed. It includes a support frame and a track frame, the support frame is slidably connected to the track frame, the support frame includes a support plate, the support plate is provided with a first position adjustment component and a second position adjustment component, the first position adjustment component is connected to the first pipeline clamping component, the second position adjustment component is connected to the second pipeline clamping component and the second pipeline angle adjustment component, the first pipeline clamping component, the second pipeline angle adjustment component and the second pipeline clamping component are arranged in parallel from left to right. The present invention not only solves the problem that the traditional suspended pipeline cannot be docked and installed due to shaking, but also facilitates the precise contact of the pipeline, ensuring the firmness of the welding and the smooth progress of the flange bolt connection operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of electric power engineering pipeline clamping equipment, and in particular relates to electric power engineering pipeline installation equipment. Background Art

[0002] Power engineering pipelines are generally laid underground. During the installation of power engineering pipelines, since the power engineering pipelines themselves are heavy and long pipelines are generally made up of multiple pipe sections, installation equipment is needed to assist in the butt installation of the two pipe sections. In order to ensure the tightness of the connection between the two sections of the power engineering pipelines, the height of the joints of the two connected pipe sections must be kept consistent.

[0003] Most of the existing power engineering pipelines are laid in the trench after trenching in the area where they are required to be laid. The pipelines are all stacked in the trench and then butt-jointed and installed together section by section. However, the multi-section pipelines that are first installed and butt-jointed are long and heavy, making them difficult to clamp. Only one end of the pipeline can be lifted for the butt-jointed installation of subsequent pipelines, which causes an inclination at one end of the pipeline. Most of the subsequently connected pipelines are hoisted by a crane, which will cause shaking. Moreover, the inclination at one end of the pipeline is difficult to accurately control, which makes it difficult to precisely butt the joints of the two sections of the pipeline, and the connection between the pipelines is poor in firmness or even impossible to connect.

[0004] Although there are currently pipeline docking auxiliary devices, the pipeline docking auxiliary devices are mostly used for docking between two sections of pipelines, and such pipeline docking auxiliary devices are generally installed on the pipeline or located below the pipeline. After the two sections of pipelines are docked, they need to be disassembled or the connected pipelines need to be moved from the top of the pipeline docking auxiliary device to the storage position. The operation is cumbersome and not suitable for docking between connected multi-section pipelines and hoisted pipelines to be installed. For example, the Chinese invention patent with publication number CN117862803A discloses a water conservancy project underground pipeline installation centering device, which uses a fixed long end positioning ring and a relatively moving short end positioning ring to respectively fix the welded pipelines, and uses the three-way adjustment device, the centering adjustment device and the height adjustment device to align the short pipe end to be welded with the long pipe. The water conservancy project underground pipeline installation centering device is only suitable for docking between two sections of pipelines, but not suitable for docking between connected multi-section pipelines and hoisted pipelines to be installed. Summary of the invention

[0005] The object of the present invention is to provide a power engineering pipeline installation device, which effectively solves the problem that the existing pipeline docking auxiliary device is not suitable for docking between connected multi-section pipelines and hoisted pipelines to be installed.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: an electric power engineering pipeline installation equipment, including a support frame and a track frame, the support frame is slidably connected to the track frame, the support frame includes a support plate and a support leg connected to the bottom end surface of the support plate, the support plate is provided with a square first limit frame and a second limit frame in parallel on the left and right, the first limit frame is provided with a first position adjustment component that can move forward and backward, the second limit frame is provided with a second position adjustment component that can move forward and backward, left and right, the first position adjustment component is connected to a first pipe clamping component, the second position adjustment component is connected to a second pipe clamping component and a second pipe angle adjustment component, the first pipe clamping component, the second pipe angle adjustment component and the second pipe clamping component are arranged in parallel from left to right.

[0007] The first position adjustment component is provided with a first hydraulic cylinder, the second position adjustment component is provided with a second hydraulic cylinder and a third hydraulic cylinder, the first pipe clamping component includes a first lifting platform and a first arc-shaped grabbing clamp located below the first lifting platform, the output end of the first hydraulic cylinder is connected to the top end surface of the first lifting platform, the second pipe clamping component includes a hanging plate, a third lifting platform and a second arc-shaped grabbing clamp located below the third lifting platform, the bottom end surface of the hanging plate is connected to the top end surface of the third lifting platform by a steel cable, the output end of the third hydraulic cylinder is connected to the top end surface of the hanging plate, the second pipe angle adjustment component includes a second lifting platform and a first baffle and a second baffle located below the second lifting platform, and the output end of the second hydraulic cylinder is connected to the top end surface of the second lifting platform.

[0008] The clamping directions of the first arc-shaped grasping clamp, the second arc-shaped grasping clamp, the first baffle plate and the second baffle plate are the same and are perpendicular to the axis of the pipe to be connected. The first arc-shaped grasping clamp and the second arc-shaped grasping clamp are both composed of two oppositely arranged arc-shaped plates. An inner slide plate is slidably connected to the inner side wall of the arc-shaped plate of the second arc-shaped grasping clamp. The curvature of the inner slide plate is the same as that of the corresponding arc-shaped plate. Threaded blind holes are provided at the upper and lower ends of the inner slide plate, and a through hole is provided at a position corresponding to the threaded blind hole on the corresponding arc-shaped plate. A fastening nut is embedded in the through hole, and the fastening nut and the threaded blind hole are threadedly connected.

[0009] The opening of the first baffle and the opening of the second baffle are arranged opposite to each other, and when the first baffle and the second baffle are connected, they form a "mouth" shape. A hydraulic cylinder is provided on each frame of the first baffle and the second baffle, and the output end of the hydraulic cylinder is connected to a push block for adjusting the angle of the pipeline end.

[0010] Furthermore, the first position adjustment component includes a first movable platform, a guide rod and a first electric push rod, the first movable platform is passed through the guide rod, the two ends of the guide rod are respectively connected to the front side wall and the rear side wall of the first limit frame, the first electric push rod is arranged on the front side wall of the first limit frame, and the output end of the first electric push rod is connected to the front side wall of the first movable platform.

[0011] The second position adjustment component includes a square moving frame, a second moving platform, a third electric push rod and two second electric push rods, the second electric push rod is arranged on the right side wall of the second limit frame, the output end of the second electric push rod is connected to the right side wall of the moving frame, the two second electric push rods are symmetrically arranged relative to the axis of the moving frame, the third electric push rod is arranged on the front side wall of the moving frame, the second moving platform is located in the moving frame and the output end of the third electric push rod is connected to the front side wall of the second moving platform.

[0012] The front side wall and the rear side wall of the movable frame are respectively slidably connected to the front side wall and the rear side wall of the second limiting frame, the left side wall and the right side wall of the second movable platform are respectively slidably connected to the left side wall and the right side wall of the movable frame, the top of the first movable platform is fixedly connected to the first hydraulic cylinder by bolts, and the top of the second movable platform is fixedly connected to the second hydraulic cylinder and the third hydraulic cylinder by bolts.

[0013] Furthermore, a motor is fixedly connected to the center of the front side wall or the rear side wall of the first lifting platform, the second lifting platform and the third lifting platform, the output end of the motor is fixedly connected to the first ball screw, the free end key of the first ball screw is connected to the second ball screw, and the thread rotation directions of the first ball screw and the second ball screw are opposite.

[0014] The nut seats on the first ball screw and the second ball screw in the first lifting platform and the third lifting platform are fixedly connected to an arc plate through nuts, and the nut seats on the first ball screw and the second ball screw in the second lifting platform are fixedly connected to the first baffle plate and the second baffle plate respectively through nuts.

[0015] Furthermore, the support plate is rectangular, and a first spirit level is provided at the outer end of the front side wall of the support plate. There are four support legs, and the four support legs are respectively provided at four angles of the support plate. A rotatably connected walking wheel is embedded in the bottom of the support leg, and a support plate horizontal adjustment component is provided on the outer wall of the support leg. The support plate horizontal adjustment component includes a first fixed plate, and the top end surface of the first fixed plate is perpendicular to the outer wall surface of the support leg. A fourth hydraulic cylinder is provided on the top of the first fixed plate, and the output end of the fourth hydraulic cylinder is fixedly connected to the first grounding plate.

[0016] Furthermore, the track frame includes two parallel tracks and reinforcing ribs for connecting the two tracks, a guide groove is provided on the top of the track, a guide wheel bracket is provided on the outer wall of the support leg, a plurality of guide wheels are rotatably connected to the guide wheel bracket, and the guide wheels are connected to the inner wall of the guide groove. When working, the walking wheel is placed in the guide groove, and the guide wheel is in contact with the inner wall of the guide groove. The movement of the support frame on the track frame is realized by the rotation of the guide wheel and the walking wheel.

[0017] Furthermore, a track frame horizontal adjustment component is provided on the outer wall of the track, and the track frame horizontal adjustment component includes a second fixed plate, the top surface of the second fixed plate is perpendicular to the outer wall of the track, a fifth hydraulic cylinder is provided on the top of the second fixed plate, and the output end of the fifth hydraulic cylinder is fixedly connected to a second grounding plate, and a second spirit level is provided at the central position of the outer wall of the track.

[0018] Furthermore, track frame docking plates are welded to both ends of the outer side wall of the track, and docking holes are provided on the track frame docking plates.

[0019] Furthermore, two slide grooves are arranged on the inner side wall of the arc-shaped plate of the second arc-shaped gripping clamp, and sliding blocks are arranged on the outer side wall of the inner sliding plate at positions corresponding to the slide grooves, and the sliding blocks are adapted to the slide grooves.

[0020] Furthermore, the lengths of the upper frame and the lower frame of the first baffle are the same, the lengths of the upper frame and the lower frame of the second baffle are the same, the length of the upper frame of the first baffle is greater than the length of the upper frame of the second baffle, and the hydraulic cylinder is arranged on the upper frame, the lower frame and the side frame of the first baffle and on the side frame of the second baffle.

[0021] Furthermore, there are two of each of the first hydraulic cylinder, the second hydraulic cylinder and the third hydraulic cylinder, the two first hydraulic cylinders are arranged front and back side by side on the top of the first moving platform, the two second hydraulic cylinders are arranged front and back side by side on the left side of the top of the second moving platform, and the two third hydraulic cylinders are arranged front and back side by side on the right side of the top of the second moving platform.

[0022] Compared with the prior art, the beneficial technical effects of the present invention are as follows: (1) The present invention realizes that one end of the installed multi-section pipe is clamped and lifted through the mutual cooperation of the first pipe clamping assembly, the second pipe clamping assembly and the second pipe angle adjustment assembly, and after the pipe to be installed is suspended, the inclination angle of one end is adjusted by using the lever principle and the assistance of the second pipe angle adjustment assembly, ensuring that the inclination angles of the two pipe sections are the same, so that the two pipe sections are subsequently tightly butted together, which not only solves the problem that the traditional hoisting pipe shakes and cannot be butted together for installation, but also ensures that the pipes are in precise contact, avoids the generation of inclination gaps, and ensures the firmness of welding and the smooth progress of flange bolt connection operations.

[0023] (2) The present invention facilitates selection according to the butt-jointing installation method of the power engineering pipeline by connecting the arc plate of the second arc-shaped gripping clamp with the corresponding inner slide plate. It not only realizes the close butt-jointing of the two sections of the pipeline during welding and ensures the firmness of the welding, but also enables the rotation of the section of the pipeline to be installed during the flange bolt connection, thereby ensuring that the flange bolt holes on the two sections of the pipeline are connected, which is convenient for subsequent installation and fixation.

[0024] (3) The present invention facilitates the support frame to provide a moving route in muddy and bumpy places and on roads where the running wheels are inconvenient to rotate, through the mutual cooperation between the track frame and the track frame horizontal adjustment assembly. This not only ensures the smooth movement of the support frame and facilitates the support frame to quickly move to the next pipeline installation connection, but also helps to adapt to the relatively harsh power engineering pipeline laying environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a structural schematic diagram of the power engineering pipeline installation equipment of the present invention.

[0026] Figure 2 It is a structural schematic diagram of the support frame of the present invention.

[0027] Figure 3 It is a structural schematic diagram of the first position adjustment component of the present invention.

[0028] Figure 4 It is a structural schematic diagram of the second position adjustment component of the present invention.

[0029] Figure 5 It is a structural schematic diagram of the support plate of the present invention.

[0030] Figure 6 It is a structural schematic diagram of the inner slide plate of the present invention.

[0031] Figure 7 It is an exploded view of the first lifting platform of the present invention.

[0032] Figure 8 It is a structural schematic diagram of the track frame of the present invention.

[0033] Fig. 9 yes Figure 2 Enlarged view of point A in the middle.

[0034] List of reference numerals: support frame-1; track frame-2; support plate-3; support leg-4; walking wheel-5; guide wheel bracket-6; guide wheel-7; track-8; reinforcing rib-9; guide groove-10; first limit frame-11; second limit frame-12; first moving platform-13; guide rod-14; first electric push rod-15; moving frame-16; second moving platform-17; third electric push rod-18; second electric push rod-19; first pipe clamping assembly-20; second pipe clamping assembly-21; second pipe angle adjustment assembly-22; first hydraulic cylinder-23; second hydraulic cylinder-24; third hydraulic cylinder-25; first lifting platform-26; first arc shaped grab clamp-27; hanging plate-28; third lifting platform-29; second arc-shaped grab clamp-30; steel cable-31; second lifting platform-32; first baffle-33; second baffle-34; hydraulic cylinder-35; push block-36; motor-37; first ball screw-38; second ball screw-39; inner slide plate-40; slide groove-41; slide block-42; threaded blind hole-43; fastening nut-44; first level-45; first fixed plate-46; fourth hydraulic cylinder-47; first grounding plate-48; second level-49; second fixed plate-50; fifth hydraulic cylinder-51; second grounding plate-52; track frame docking plate-53; docking hole-54. DETAILED DESCRIPTION

[0035] Embodiment 1: A power engineering pipeline installation device, such as Figure 1 As shown, it includes a support frame 1 and a track frame 2. The support frame 1 is slidably connected to the track frame 2. The support frame 1 includes a rectangular support plate 3 and four support legs 4 respectively connected to the bottom end faces of the four angles of the support plate 3. The bottom of the support leg 4 is embedded with a rotatably connected running wheel 5. The outer wall of the support leg 4 is provided with a guide wheel bracket 6, and the guide wheel bracket 6 is rotatably connected with a plurality of guide wheels 7. The track frame 2 includes two parallel tracks 8 and a reinforcing rib 9 for connecting the two tracks 8. The top of each track 8 is provided with a guide groove 10, and the guide wheel 7 is connected to the inner wall of the guide groove 10. When working, the running wheel 5 is placed in the guide groove 10, and the guide wheel 7 is in contact with the inner wall of the guide groove 10. The movement of the support frame 1 on the track frame 2 is realized by the rotation of the guide wheel 7 and the running wheel 5.

[0036] like Figure 2 and Figure 5 As shown, a square first limit frame 11 and a second limit frame 12 are arranged side by side on the support plate 3. A first position adjustment component that can move forward and backward is arranged in the first limit frame 11, such as Figure 3As shown, the first position adjustment assembly includes a first moving platform 13, a guide rod 14 and a first electric push rod 15. The first moving platform 13 is inserted into the guide rod 14. The two ends of the guide rod 14 are respectively connected to the front side wall and the rear side wall of the first limit frame 11. The first electric push rod 15 is fixedly connected to the front side wall of the first limit frame 11 by bolts, and the output end of the first electric push rod 15 is connected to the front side wall of the first moving platform 13. The first moving platform 13 is driven by the first electric push rod 15 to move horizontally in the first limit frame 11. The stability of the horizontal and horizontal (front and back) movement of the first moving platform 13 can be ensured by the guidance of the guide rod 14.

[0037] A second position adjustment component that can move forward, backward, left, and right is provided in the second limit frame 12. Figure 4 As shown, the second position adjustment assembly includes a square moving frame 16, a second moving platform 17, a third electric push rod 18 and two second electric push rods 19. The second electric push rod 19 is fixedly connected to the right side wall of the second limiting frame 12 by bolts, and the output end of the second electric push rod 19 is connected to the right side wall of the moving frame 16. The two second electric push rods 19 are symmetrically arranged relative to the axis of the moving frame 16. The third electric push rod 18 is fixedly connected to the front side wall of the moving frame 16 by bolts, the second moving platform 17 is located in the moving frame 16, and the output end of the third electric push rod 18 is connected to the front side wall of the second moving platform 17. The front side wall and the rear side wall of the moving frame 16 are slidably connected to the front side wall and the rear side wall of the second limiting frame 12, respectively, and the left side wall and the right side wall of the second moving platform 17 are slidably connected to the left side wall and the right side wall of the moving frame 16, respectively. The second electric push rod 19 drives the moving frame 16 to move horizontally and longitudinally (left and right) in the second limiting frame 12 , and the third electric push rod 18 drives the second moving platform 17 to move horizontally and transversely (front and back) in the moving frame 16 .

[0038] The first position adjustment component is connected to the first pipe clamping component 20, the second position adjustment component is connected to the second pipe clamping component 21 and the second pipe angle adjustment component 22, and the first pipe clamping component 20, the second pipe angle adjustment component 22 and the second pipe clamping component 21 are arranged in parallel from left to right.

[0039] In some preferred embodiments, the top of the first movable platform 13 is fixedly connected by bolts with two first hydraulic cylinders 23 arranged side by side front to back, the left side of the top of the second movable platform 17 is fixedly connected by bolts with two second hydraulic cylinders 24 arranged side by side front to back, and the right side of the top of the second movable platform 17 is fixedly connected by bolts with two third hydraulic cylinders 25 arranged side by side front to back.

[0040] The first pipe clamping assembly 20 includes a first lifting platform 26 and a first arc-shaped gripper 27 located below the first lifting platform 26, and the output end of the first hydraulic cylinder 23 is connected to the top surface of the first lifting platform 26. The second pipe clamping assembly 21 includes a hanging plate 28, a third lifting platform 29, and a second arc-shaped gripper 30 located below the third lifting platform 29, the output end of the third hydraulic cylinder 25 is connected to the top surface of the hanging plate 28, and the bottom surface of the hanging plate 28 is connected to the top surface of the third lifting platform 29 through a steel cable 31. The second pipe angle adjustment assembly 22 includes a second lifting platform 32 and a first baffle 33 and a second baffle 34 located below the second lifting platform 32, and the output end of the second hydraulic cylinder 24 is connected to the top surface of the second lifting platform 32.

[0041] The clamping directions of the first arc-shaped grabbing clamp 27, the second arc-shaped grabbing clamp 30, the first baffle plate 33 and the second baffle plate 34 are the same and the clamping direction is perpendicular to the axis of the pipe to be connected. The first arc-shaped grabbing clamp 27 and the second arc-shaped grabbing clamp 30 are both composed of two arc-shaped plates arranged opposite to each other. The opening of the first baffle plate 33 and the opening of the second baffle plate 34 are arranged opposite to each other, and when the first baffle plate 33 and the second baffle plate 34 are connected, they are in the shape of a "mouth". In some preferred embodiments, the lengths of the upper and lower frames of the first baffle plate 33 are the same, the lengths of the upper and lower frames of the second baffle plate 34 are the same, and the length of the upper frame of the first baffle plate 33 is greater than the length of the upper frame of the second baffle plate 34.

[0042] A hydraulic cylinder 35 is provided on each frame of the first baffle 33 and the second baffle 34, and a push block 36 for adjusting the angle of the pipe end is connected to the output end of the hydraulic cylinder 35. In this embodiment, the hydraulic cylinder 35 is provided on the upper frame, the lower frame and the side frame of the first baffle 33 and the side frame of the second baffle 34.

[0043] like Figure 7As shown, the center of the front side wall of the first lifting platform 26, the second lifting platform 32 and the third lifting platform 29 are all fixedly connected with a motor 37 by bolts, the output end of the motor 37 is fixedly connected with the first ball screw 38, the free end of the first ball screw 38 is keyed to the second ball screw 39, and the first ball screw 38 and the second ball screw 39 have opposite thread rotation directions. The nut seats on the first ball screw 38 and the second ball screw 39 in the first lifting platform 26 and the third lifting platform 29 are fixedly connected to an arc plate by nuts, and the nut seats on the first ball screw 38 and the second ball screw 39 in the second lifting platform 32 are respectively fixedly connected to the first baffle 33 and the second baffle 34 by nuts. During operation, taking the first arc-shaped gripper 27 as an example, when the first lifting platform 26 is adjusted to the top of the pipeline, the output end of the control motor 37 drives the first ball screw 38 to rotate, and the second ball screw 39 also rotates synchronously. Since the threads of the first ball screw 38 and the second ball screw 39 are in opposite directions, the arc plate on the first ball screw 38 and the arc plate on the second ball screw 39 move toward each other synchronously, and the two arc plates simultaneously apply pressure to the pipe to clamp it. Similarly, the second arc-shaped gripper 30 can clamp the pipe to be connected, and the first baffle 33 and the second baffle 34 can be combined to achieve the suspension and inclination adjustment of the pipe to be connected.

[0044] like Figure 4 and Figure 6As shown, an inner slide plate 40 is slidably connected to the inner side wall of the arc plate of the second arc-shaped grabbing clamp 30, and the curvature of the inner slide plate 40 is the same as the curvature of the arc plate where it is located. In this embodiment, two slide grooves 41 with a T-shaped cross section are provided on the inner side wall of the arc plate of the second arc-shaped grabbing clamp 30, and a slider 42 adapted to the slide groove 41 is provided at a position corresponding to the slide groove 41 on the outer side wall of the inner slide plate 40. The upper and lower ends of the inner slide plate 40 are both threadedly connected and fixed to the arc plate where it is located. In this embodiment, a threaded blind hole 43 is provided on the outer wall of one side of the inner slide plate 40 at a position close to one side of the arc plate of the second arc-shaped grabbing clamp 30, and a through hole is provided on the arc plate of the second arc-shaped grabbing clamp 30 at a position corresponding to the corresponding threaded blind hole 43, and a fastening nut 44 is embedded in the through hole, and the fastening nut 44 and the threaded blind hole 43 are threadedly connected. During operation, the connection method is selected according to the installation and docking of the power engineering pipeline. When the power engineering pipeline is installed by welding, one end of the two sections of the pipeline after adjusting the inclination angle to the same is directly contacted and squeezed, which can ensure the tight docking of the two sections of the pipeline at the welding point, thereby ensuring the quality of welding and the firmness after docking; when the power engineering pipeline is installed by flange bolts, one end of the two sections of the pipeline is brought close to each other. When one end of the two sections of the pipeline is about to touch, the bolts are passed through the bolt holes on the flange to achieve installation and fixation. When there is a deviation in the bolt holes on the flanges so that the bolts cannot pass through the two flanges, the fastening screws on the arc plate of the second arc-shaped grabbing clamp 30 are unscrewed. The nut 44 is rotated to unscrew the fastening nut 44 from the threaded blind hole 43 of the inner slide plate 40, and the fastening nut 44 is pulled out from the through hole. At this time, there is no fastening between the inner slide plate 40 and the arc plate of the second arc-shaped grab clamp 30, and the inner slide plate 40 can slide on the inner side wall of the arc plate of the second arc-shaped grab clamp 30. The staff rotates the power engineering pipeline, and the power engineering pipeline drives the inner slide plate 40 to slide on the arc plate of the second arc-shaped grab clamp 30. The power engineering pipeline can be rotated, and the flange at one end of the power engineering pipeline rotates synchronously, and then it can be adjusted to make the bolt holes on the two flanges dock, which is convenient for subsequent installation and fixation.

[0045] During operation, most of the existing power engineering pipelines are laid in the trench after trenches are dug in the area where they are required to be laid. All the pipelines are stacked in the trench and then butt-jointed and installed together section by section. However, the multi-section pipelines that are first installed and butt-jointed are long and heavy, making them difficult to clamp. Only one end of the pipeline can be lifted for the subsequent butt-jointed installation of the pipeline, which causes an inclination at one end of the pipeline. Most of the subsequently connected pipelines are hoisted by a crane, which causes shaking during the hoisting. Moreover, the inclination at one end of the pipeline is difficult to accurately control, which makes it difficult to precisely butt the joints of the two sections of the pipeline, and the connection between the pipelines is poor in firmness or even impossible to connect.

[0046] The specific working method of this embodiment to solve the above problem is as follows: first, the power engineering pipeline installation equipment described in this embodiment is placed in the groove excavated at the power engineering pipeline laying site, and the support frame 1 is moved in the groove by rotating the guide wheel 7 and the walking wheel 5. The first position adjustment component and the second position adjustment component are adjusted so that the first pipeline clamping component 20 and the second pipeline angle adjustment component 22 and the second pipeline clamping component 21 are respectively located at one end of the two sections of the pipeline. The specific adjustment operation is as follows: (1) Control the first electric push rod 15 to drive the first moving platform 13 to move horizontally in the first limit frame 11. The stability of the horizontal horizontal (forward and backward) movement of the first moving platform 13 can be guaranteed by the guidance of the guide rod 14. The first hydraulic cylinder 23 on the first moving platform 13 moves synchronously, thereby causing the first lifting platform 26 at the output end of the first hydraulic cylinder 23 to move horizontally and horizontally, and the position can be adjusted according to the position of one end of a section of the pipeline.

[0047] (2) The third electric push rod 18 is controlled to drive the second movable platform 17 to move horizontally in the movable frame 16 through its output end, and the second hydraulic cylinder 24 and the third hydraulic cylinder 25 on the second movable platform 17 move synchronously, thereby making the second lifting platform 32 at the output end of the second hydraulic cylinder 24 and the hanging plate 28 at the output end of the third hydraulic cylinder 25 move horizontally, and the position can be adjusted according to the position of one end of the other pipe section.

[0048] (3) The output end of the first hydraulic cylinder 23 is controlled to drive the first lifting platform 26 to move downward. The first lifting platform 26 is lowered to the top of the first pipe and the two arc plates of the first arc-shaped grabbing clamp 27 are located on the outside of the first pipe. The two arc plates of the first arc-shaped grabbing clamp 27 move toward each other to clamp the first pipe. After the first lifting platform 26 moves upward, one end of the first pipe is lifted. Similarly, the third lifting platform 29 under the hanging plate 28 is lowered to the top of the second (to be installed) pipe. The second arc-shaped grabbing clamp 30 clamps the second pipe. After the third lifting platform 29 moves upward, the second pipe is lifted. Through the connection of the steel cable 31, the two ends of the second pipe are in a shaking state. At this time, the first baffle 33 and the second baffle 34 are controlled to surround the outside of one end of the second pipe, and the output end of the hydraulic cylinder 35 is controlled to drive the corresponding push block 36 to move. When the push block 36 contacts the second pipe, it pushes one end of the second pipe to move. By pushing the second pipe by the push block 36 in four directions of up, down, left and right, the inclination of the second pipe can be adjusted, so as to ensure that the inclination of the two sections of the pipe is the same, and to ensure the tightness of the subsequent docking, the firmness of the welding and the flange bolt connection. When the power engineering pipeline is flange bolted or welded, the output end of the second electric push rod 19 is controlled to drive the moving frame 16 to move horizontally and longitudinally in the second limit frame 12. During the movement, the moving frame 16 makes the clamped second pipe move synchronously, thereby docking the two sections of the pipe together.

[0049] In order to make the power engineering pipeline installation equipment described in this embodiment suitable for the pit ground in the excavation trench, firstly, a first level 45 is provided on the outer side end of the front side wall of the support plate 3, and a support plate level adjustment component is provided on the outer side wall of the support leg 4. Fig. 9 As shown, the support plate horizontal adjustment assembly includes a first fixing plate 46, the top surface of the first fixing plate 46 is perpendicular to the outer wall surface of the supporting leg 4, and a fourth hydraulic cylinder 47 is provided on the top of the first fixing plate 46. The output end of the fourth hydraulic cylinder 47 is fixedly connected to the first grounding plate 48, and the plane where the first grounding plate 48 is located is perpendicular to the plane where the first fixing plate 46 is located. During operation, the output end of the fourth hydraulic cylinder 47 is controlled to drive the first grounding plate 48 to move downward, and the first grounding plate 48 lifts the supporting leg 4 after contacting the ground. By lifting the four supporting legs 4 to different heights, the horizontal leveling of the support plate 3 can be achieved, and then the level of the entire power engineering pipeline installation equipment can be adjusted. By observing whether the first level meter 45 is horizontal, the support plate horizontal adjustment assembly is controlled. By leveling the power engineering pipeline installation equipment, the second arc-shaped gripper 30 can be ensured to be located on one side of the power engineering pipeline, and the stability of the clamping can be ensured during clamping, and the power engineering pipeline installation equipment has stability during operation, and can adapt to different use environments, avoiding the problem of unstable placement of the power engineering pipeline installation equipment caused by potholes in the environment.

[0050] Secondly, if Figure 8 As shown, a second level 49 is provided at the central position of the outer wall of the track 8, and a track frame horizontal adjustment assembly is provided on the outer wall of the track 8. The track frame horizontal adjustment assembly includes a second fixed plate 50, the top surface of the second fixed plate 50 is perpendicular to the outer wall of the track 8, and a fifth hydraulic cylinder 51 is provided on the top of the second fixed plate 50. The output end of the fifth hydraulic cylinder 51 is fixedly connected to the second grounding plate 52, and the plane where the second grounding plate 52 is located is perpendicular to the plane where the second fixed plate 50 is located. When working, the output end of the fifth hydraulic cylinder 51 is controlled to drive the second grounding plate 52 to move up and down. After the second grounding plate 52 contacts the ground, the track frame 2 is lifted up. The fifth hydraulic cylinder 51 is controlled by observing whether the second level 49 is horizontal, and the track frame 2 is controlled and adjusted to be horizontal. By leveling the track frame 2, not only can the adjacent track frames 2 be smoothly docked and installed, but also the horizontal and stable movement of the support frame 1 on the track frame 2 can be ensured, so that the support frame 1 moves from one track frame 2 to another track frame 2, thereby enabling the power engineering pipeline installation equipment to adapt to the movement of the potholes in the excavation groove.

[0051] In order to facilitate the connection between multiple track frames 2, track frame docking plates 53 are welded at both ends of the outer wall of each track 8, and docking holes 54 are opened on the track frame docking plates 53. During operation, the connection between two track frames 2 is achieved through the track frame docking plates 53. Laying the track frame 2 in the excavation groove of the power engineering pipeline can make the support frame 1 quickly move to the next pipeline connection, and also avoid the problem that the walking wheels 5 on the support frame 1 are difficult to move due to the mud in the excavation groove.

[0052] The working principle of the present invention is as follows: first, according to the ground conditions in the excavation groove, choose whether to directly use the support frame 1 or lay the track frame 2. (1) When the ground is muddy and has many potholes, lay the track frame 2 in the excavation groove. The track frame 2 is laid in the excavation groove, and the connection between the two track frames 2 is realized through the track frame docking plate 53. The output end of the fifth hydraulic cylinder 51 is controlled to drive the second grounding plate 52 to move up and down. After the second grounding plate 52 contacts the ground, the track frame 2 is lifted up. By observing whether the second level 49 is horizontal, the fifth hydraulic cylinder 51 is controlled to adjust the track frame 2 to be horizontal. Place the walking wheel 5 in the guide groove 10, and push the support frame 1 to achieve movement. (2) When it is not necessary to lay the track frame 2, place the support frame 1 in the excavation groove, and realize the movement of the support frame 1 in the excavation groove by rotating the walking wheel 5. When it moves to the pipe connection, the output end of the first hydraulic cylinder 23 is controlled to drive the first lifting platform 26 to move downward, the first lifting platform 26 is lowered to the top of the first pipe and the two arc plates of the first arc-shaped gripping clamp 27 are located outside the first pipe. The two arc plates of the first arc-shaped gripping clamp 27 move toward each other to clamp the first pipe. The first lifting platform 26 moves upward to lift one end of the first pipe. Similarly, the third lifting platform 29 below the hanging plate 28 is lowered to the top of the second (to be installed) pipe, the second arc-shaped gripping clamp 30 clamps the second pipe, and the third lifting platform 29 moves upward to lift the second pipe. Through the connection of the steel cable 31, the two ends of the second pipe are in a shaking state. At this time, the first baffle 33 and the second baffle 34 are controlled to surround the outside of one end of the second pipe, and the output end of the hydraulic cylinder 35 is controlled to drive the corresponding push block 36 to move. After the push block 36 contacts the second pipe, it pushes one end of the second pipe to move. By pushing the second pipe in four directions of up, down, left and right, the inclination of the second pipe can be adjusted, thereby ensuring that the inclination of the two pipes is the same. (3) When the power engineering pipeline is installed by flange bolts, the inner slide plate 40 drives the second pipeline to rotate, and the flange at one end of the second pipeline rotates synchronously, and then the bolt holes on the two flanges can be adjusted to butt, which is convenient for subsequent installation and fixation.

[0053] The present invention realizes that one end of the installed multi-section pipe is clamped and lifted through the mutual cooperation of the first pipe clamping component 20, the second pipe clamping component 21 and the second pipe angle adjustment component 22, and after the pipe to be installed is suspended, the inclination angle of one end is adjusted by using the lever principle and the assistance of the second pipe angle adjustment component 22, ensuring that the inclination angles of the two pipe sections are the same, so that the two pipe sections are subsequently tightly butted together, which not only solves the problem that the traditional hoisting pipes shake and cannot be butted together for installation, but also ensures precise contact of the pipes, avoids the generation of inclination gaps, and ensures the firmness of welding and the smooth progress of flange bolt connection operations.

[0054] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.

Claims

1. A power engineering pipeline installation device, comprising a support frame, characterized in that: It further includes an orbital frame, the support frame is slidably connected to the orbital frame, the support frame includes a support plate and support legs connected to the bottom end surface of the support plate, a square first limit frame and a second limit frame are arranged side by side left and right on the support plate, a first position adjustment component capable of moving back and forth is arranged in the first limit frame, a second position adjustment component capable of moving back and forth, left and right is arranged in the second limit frame, a first pipe clamping component is connected to the first position adjustment component, a second pipe clamping component and a second pipe angle adjustment component are connected to the second position adjustment component, and the first pipe clamping component, the second pipe angle adjustment component and the second pipe clamping component are arranged side by side in sequence from left to right; A first hydraulic cylinder is arranged on the first position adjustment component, a second hydraulic cylinder and a third hydraulic cylinder are arranged on the second position adjustment component, the first pipe clamping component includes a first lifting platform and a first arc-shaped gripper located below the first lifting platform, the output end of the first hydraulic cylinder is connected to the top end surface of the first lifting platform, the second pipe clamping component includes a hanging plate, a third lifting platform and a second arc-shaped gripper located below the third lifting platform, the bottom end surface of the hanging plate is connected to the top end surface of the third lifting platform through a steel cable, the output end of the third hydraulic cylinder is connected to the top end surface of the hanging plate, the second pipe angle adjustment component includes a second lifting platform and a first baffle and a second baffle located below the second lifting platform, the output end of the second hydraulic cylinder is connected to the top end surface of the second lifting platform; The clamping directions of the first arc-shaped gripper, the second arc-shaped gripper, the first baffle and the second baffle are the same and the clamping direction is perpendicular to the axis of the pipe to be connected. The first arc-shaped gripper and the second arc-shaped gripper are each composed of two oppositely arranged arc-shaped plates. An inner sliding plate is slidably connected to the inner side wall of the arc-shaped plate of the second arc-shaped gripper, the radian of the inner sliding plate is the same as that of the corresponding arc-shaped plate, and the upper and lower ends of the inner sliding plate are threadedly connected to the corresponding arc-shaped plates; The openings of the first baffle and the second baffle are arranged oppositely. When the first baffle and the second baffle are butted, they form a "mouth" shape. Hydraulic cylinders are arranged on each side frame of the first baffle and the second baffle, and the output end of the hydraulic cylinder is connected to a push block for adjusting the angle of the pipe end.

2. The power engineering pipeline installation equipment according to claim 1, characterized in that: The first position adjustment component includes a first moving platform, a guide rod and a first electric push rod. The first moving platform is sleeved on the guide rod, the two ends of the guide rod are respectively connected to the front side wall and the rear side wall of the first limit frame, the first electric push rod is arranged on the front side wall of the first limit frame, and the output end of the first electric push rod is connected to the front side wall of the first moving platform; The second position adjustment assembly includes a square moving frame, a second moving platform, a third electric push rod and two second electric push rods, the second electric push rod is arranged on the right side wall of the second limit frame, the output end of the second electric push rod is connected to the right side wall of the moving frame, the two second electric push rods are symmetrically arranged relative to the axis of the moving frame, the third electric push rod is arranged on the front side wall of the moving frame, the second moving platform is located in the moving frame and the output end of the third electric push rod is connected to the front side wall of the second moving platform; The front side wall and the rear side wall of the movable frame are respectively slidably connected to the front side wall and the rear side wall of the second limiting frame, the left side wall and the right side wall of the second movable platform are respectively slidably connected to the left side wall and the right side wall of the movable frame, the top of the first movable platform is fixedly connected to the first hydraulic cylinder by bolts, and the top of the second movable platform is fixedly connected to the second hydraulic cylinder and the third hydraulic cylinder by bolts.

3. The power engineering pipeline installation equipment according to claim 2, characterized in that: A motor is fixedly connected to the center of the front side wall or the rear side wall of the first lifting platform, the second lifting platform and the third lifting platform, the output end of the motor is fixedly connected to the first ball screw, the free end of the first ball screw is keyed to the second ball screw, and the first ball screw and the second ball screw have opposite thread rotation directions; The nut seats on the first ball screw and the second ball screw in the first lifting platform and the third lifting platform are fixedly connected to an arc plate through nuts, and the nut seats on the first ball screw and the second ball screw in the second lifting platform are fixedly connected to the first baffle plate and the second baffle plate respectively through nuts.

4. The power engineering pipeline installation equipment according to claim 3, characterized in that: The support plate is rectangular, and a first spirit level is provided at the outer end of the front side wall of the support plate. There are four support legs, and the four support legs are respectively provided at four angles of the support plate. A rotatably connected walking wheel is embedded in the bottom of the support leg, and a support plate horizontal adjustment component is provided on the outer wall of the support leg. The support plate horizontal adjustment component includes a first fixed plate, and the top end surface of the first fixed plate is perpendicular to the outer wall surface of the support leg. A fourth hydraulic cylinder is provided on the top of the first fixed plate, and the output end of the fourth hydraulic cylinder is fixedly connected to the first grounding plate.

5. The power engineering pipeline installation equipment according to claim 4, characterized in that: The track frame includes two parallel tracks and reinforcing ribs for connecting the two tracks. A guide groove is provided on the top of the track. A guide wheel bracket is provided on the outer wall of the support leg. A plurality of guide wheels are rotatably connected to the guide wheel bracket. The guide wheels are connected to the inner wall of the guide groove. When working, the walking wheel is placed in the guide groove, and the guide wheel is in contact with the inner wall of the guide groove. The movement of the support frame on the track frame is realized by the rotation of the guide wheel and the walking wheel.

6. The power engineering pipeline installation equipment according to claim 5, characterized in that: A track frame horizontal adjustment component is provided on the outer wall of the track, and the track frame horizontal adjustment component includes a second fixed plate, the top end surface of the second fixed plate is perpendicular to the outer wall surface of the track, a fifth hydraulic cylinder is provided on the top of the second fixed plate, and the output end of the fifth hydraulic cylinder is fixedly connected to a second grounding plate, and a second level is provided at the central position of the outer wall of the track.

7. The power engineering pipeline installation equipment according to claim 6, characterized in that: Both ends of the outer side wall of the track are welded with track frame docking plates, and docking holes are opened on the track frame docking plates.

8. The power engineering pipeline installation equipment according to claim 7, characterized in that: Two slide grooves are arranged on the inner side wall of the arc-shaped plate of the second arc-shaped grabbing clamp, and sliding blocks are arranged at positions corresponding to the slide grooves on the outer side wall of the inner sliding plate, and the sliding blocks are adapted to the slide grooves.

9. The power engineering pipeline installation equipment according to claim 8, characterized in that: The upper frame and the lower frame of the first baffle are of the same length, the upper frame and the lower frame of the second baffle are of the same length, the length of the upper frame of the first baffle is greater than the length of the upper frame of the second baffle, and the hydraulic cylinder is arranged on the upper frame, the lower frame and the side frame of the first baffle and on the side frame of the second baffle.

10. The power engineering pipeline installation equipment according to claim 9, characterized in that: There are two of each of the first hydraulic cylinder, the second hydraulic cylinder and the third hydraulic cylinder. The two first hydraulic cylinders are arranged front and back side by side on the top of the first moving platform, the two second hydraulic cylinders are arranged front and back side by side on the left side of the top of the second moving platform, and the two third hydraulic cylinders are arranged front and back side by side on the right side of the top of the second moving platform.

Citation Information

Cited By

  • Electric power engineering pipeline installation equipment

    CN224359646U