River ecological slope structure and construction method
By using tight steel wire mesh and prefabricated slope protection on the slope, combined with an internal partition network and a sealed drainage system, the problems of insufficient support and water sinking at the bottom of the existing slope protection are solved, and a more stable slope structure and Longer service life.
Patent Information
- Application Number
- CN202411127261.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-08-16
AI Technical Summary
The existing concrete ecological slope protection has poor bottom support after paving geotextile on the slope, which can easily lead to collapse, and the lack of a sealing structure causes water to sink, further accelerating the damage of the slope protection.
Steel wire mesh is used to pave tightly through anchor rods, combined with prefabricated slope protection and internal partition networks, and seals and drainage parts are provided, including permeable concrete slabs and liquid storage tanks. One-way diaphragms and water diversion pipes are used to introduce water to in the liquid storage tank to prevent water from sinking.
Improves the stability and support effect of the slope, prevents water from sinking, and extends the service life of the slope protection.
Smart Images

Figure CN118793014A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of river ecological restoration, and in particular relates to a river ecological slope structure and a construction method. Background Art
[0002] Concrete ecological slope protection is a slope protection technology that integrates the basic knowledge of engineering mechanics, soil science, ecology and botany to support slopes or slopes, forming a comprehensive slope protection system composed of plants or engineering and plants. After the excavation of the slope, by planting plants and utilizing the interaction between plants and rocks and soil (root anchoring effect) to protect and reinforce the surface of the slope, it can not only meet the requirements for the stability of the slope surface, but also restore the damaged natural ecological environment. It is an effective means of slope protection and consolidation.
[0003] Most existing concrete ecological slope protection is to directly pave the ecological slope protection after paving the geotextile on the slope, which easily leads to poor bottom support effect of the ecological slope protection. After the slope soil drops slightly, there is a drop, which causes the ecological slope protection to collapse, thus causing the slope to be damaged. Secondly, most ecological slope protection is a mortise and tenon installation structure, and the splicing structure of the ecological slope protection is mostly a drainage position, and there is a lack of sealing structure to prevent water from eroding and infiltrating downwards, which will cause the soil below the infiltration position to continue to sink, further accelerating the damage of the slope protection. Summary of the invention
[0004] In order to solve the above technical problems, the inventors have obtained the technical solution of the present invention through practice and summary. The present invention adopts the following technical solution:
[0005] A river ecological slope structure, comprising:
[0006] The wire mesh is paved on the slope surface through anchor rods, and the wire mesh is in a taut state. A pressing sheet for fixing the wire mesh is provided at the end of the anchor rod, and a mounting piece is installed on the wire mesh;
[0007] Prefabricated slope protection body, a connection part is arranged on the back of the prefabricated slope protection body, the connection part and the mounting part are adapted, an inner partition network is arranged inside the prefabricated slope protection body, a geotextile with grass seeds is arranged inside the inner partition network, and planting soil is paved on the geotextile with grass seeds, and extension plates extending outward are arranged on the left and right sides of the prefabricated slope protection body, a sealing part is arranged on the side of one of the extension plates, water diversion pipes are pre-buried in both sides of the prefabricated slope protection body, a one-way diaphragm is arranged in the water diversion pipe, and both ends of the water diversion pipe are used to connect the area above the extension plate and the inner partition network;
[0008] The drainage piece includes a permeable concrete plate arranged above the extension plate and a liquid storage tank located in the inner partition network. A retention structure is arranged on the permeable concrete. The water diversion pipe is used to introduce the moisture of the permeable concrete plate into the liquid storage tank.
[0009] Preferably, the sealing member comprises a mounting body, the mounting body is fixed on the extension plate, a rolling rubber tube and an arc-shaped sealing body are arranged on the mounting body, a roller is arranged inside the rolling rubber tube, the rolling rubber tube can be adjusted relative to the mounting body via the roller, the distance between the two ends of the arc-shaped sealing body and the steel wire mesh is greater than the distance between the middle part and the steel wire mesh, and the arc-shaped sealing body is deflected downward in a natural state;
[0010] When the prefabricated slope protection is installed vertically on the slope, the outer side of the rolling rubber tube will first contact the installed extension plate. The rolling rubber tube will move upward relative to the installation body through the action of the roller, and the arc-shaped sealing body will extend outward to the side wall of the extension plate.
[0011] Preferably, the mounting body comprises a mounting plate, four steel sheets are arranged on the side of the mounting plate, the steel sheets are used to press the wire mesh, a through hole is arranged in the middle of the mounting plate, and a connecting sleeve is installed in the through hole;
[0012] A retaining ring, an adjusting ring and a pressing ring are arranged inside the connecting sleeve. The adjusting ring is located below the retaining ring and is connected to the connecting sleeve through a thread. The pressing ring is located above the retaining ring and is connected to the connecting sleeve through a thread.
[0013] Two symmetrically distributed limit blocks are installed between the retaining ring and the adjusting ring, grooves are arranged on opposite sides of the limit blocks, and the grooves are arranged along the circumferential direction of the connecting sleeve. Axial guide grooves are arranged on opposite sides of the two grooves, and a radial blind hole is arranged on the side of the axial guide groove close to the adjusting ring. A spring and a slider are installed in the connecting sleeve, and the two ends of the spring are respectively abutted on the slider and the retaining ring, and the top of the slider is fitted on the lower surface of the pressing ring;
[0014] A countersunk hole is provided at one end where the slider and the pressure ring abut against each other, and a connecting block is installed in the countersunk hole. The end where the slider and the spring abut against each other is connected to an extended center rod, and the extended center rod is a hollow structure. An elastic telescopic rod is provided at the end of the extended center rod away from the slider, and a traction rope is provided inside the extended center rod. One end of the traction rope is fixed on the movable rod of the elastic telescopic rod, and the other end passes through the slider and is connected to the connecting block.
[0015] Preferably, the connecting block is a structure with large ends and a small middle, an ear block is provided at the end side located in the countersunk hole, and a guide groove is provided on the side wall of the countersunk hole, and the guide groove is spirally distributed along the axial direction of the side wall of the countersunk hole.
[0016] Preferably, the connecting portion comprises an installation box embedded in the back of the prefabricated slope protection body, an elastic locking pin is arranged in the installation box, and the elastic locking pin and the end of the sliding block exposed outside the connecting block are used to limit the connecting block.
[0017] Preferably, the inner diameter of the pressing ring is larger than the middle size of the connecting block and smaller than the end size located in the counterbore.
[0018] Preferably, the interception structure is a plurality of triangular plates which are arranged continuously and upwardly, and the triangular plates are arranged perpendicular to the prefabricated slope protection body.
[0019] A river ecological slope construction method, the construction steps are as follows:
[0020] S1: Measurement and setting out
[0021] Lay out the excavation line according to the construction drawings, nail wooden wedges at both ends every 10 meters, use a measuring rope to fix and straighten the middle, use a shovel to shovel lime along the edge of the measuring rope and spread the lime line while knocking;
[0022] S2: Earthwork Excavation
[0023] The method of using large earth-moving machinery such as excavators, loaders, and heavy trucks to work together; the earth excavation is carried out in sections and zones;
[0024] The excavation sequence and method must be consistent with the design requirements and follow the principle of "supporting before trenching, excavating in layers, and strictly prohibiting over-excavation"; the excavation sequence shall be carried out in sections and zones according to the construction drawings of the excavation operation; the excavation depth varies from 2 to 5 meters, and is excavated in 2 to 3 layers;
[0025] When multiple excavators and multiple working surfaces are used for construction in different areas, the width of each working surface should be greater than 20m;
[0026] During the excavation process, surveyors use RTK to measure the excavation depth at any time to avoid over-excavation. After excavation to the specified depth, 100-150mm is reserved for manual trimming;
[0027] S3: Acceptance
[0028] After the manual repair is completed, self-inspection will be carried out. If the self-inspection is qualified, the construction unit will report it to the supervision unit to organize relevant acceptance work;
[0029] S4: Concrete corner protection construction
[0030] Pour the concrete corner guard concrete and vibrate it while pouring to ensure that the concrete corner guard is vibrated and compacted;
[0031] S5: Laying wire mesh
[0032] Making the positioning body: welding a fixed connecting sleeve in the through hole of the positioning plate, installing two limit blocks in the connecting sleeve through the adjusting ring, and making the top of the limit block close to the lower surface of the retaining ring; placing a spring on the upper surface of the retaining ring, installing an extended center rod on the lower surface of the slider, and inserting a traction rope inside the extended center rod, one end of the traction rope is connected to the movable rod of the elastic telescopic rod, and the other end passes through the slider and the body to be connected and fixed, after the externally pulled connecting block retracts the movable rod inward to the maximum stroke through the traction rope, the slider is placed inside the connecting sleeve until the movable rod enters the axial guide groove, releasing the connecting block, and limiting the upper surface of the slider through the pressing ring;
[0033] Fix the mounting plate with steel sheets at the designed position on the wire mesh, lay the wire mesh on the slope, and tighten it on the slope through anchor rods and pressing sheets;
[0034] S6: Installation of prefabricated slope protection
[0035] The prefabricated slope protection body is laid along the side of the concrete corner protection, and the prefabricated slope protection body is installed in the direction perpendicular to the slope. The installation box at the bottom of the prefabricated slope protection body is aligned with the connecting block and vertically pressed. The connecting block abuts against the box wall and is axially restricted by the elastic locking pin. The connecting block drives the slider and extends the center rod axially close to the adjustment ring until the elastic telescopic rod bearing is inserted into the radial blind hole;
[0036] Install the slope protection from bottom to top until it is completely installed. During installation, it is necessary to ensure that the interception structure is distributed in the left and right directions;
[0037] When constructing the top prefabricated slope protection, the geotextile is laid at the bottom and extended to the bottom of the pressure beam, and the wire mesh is turned over to the bottom of the pressure beam by at least 50cm;
[0038] S7: Formwork casting top pressure beam
[0039] S8: Construction of top beam
[0040] Pour the top beam concrete and vibrate it to make it dense;
[0041] S9: Filling with planting soil
[0042] After the pressure beam is completed, fill the inner partition network with planting soil and sprinkle water for maintenance.
[0043] Compared with the prior art, the present invention has the following beneficial effects:
[0044] The present invention anchors a taut wire mesh on the slope through anchor rods, and then uses the mounting parts on the wire mesh and the connecting parts on the prefabricated slope protection body to adapt and install the wire mesh, thereby achieving effective and supported paving of the prefabricated slope protection body. The disassembly and assembly of the slope structure are all perpendicular to the wire mesh, which is convenient for disassembly and assembly. Secondly, permeable concrete is arranged on the extension plate, and the permeable concrete is introduced into the liquid storage tank through the water diversion pipe and the internal one-way diaphragm in the drainage direction, and the plants for planting inside are introduced into the internal partition network through the liquid storage tank. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0046] Figure 2 A bottom view of the prefabricated slope protection body of the present invention;
[0047] Figure 3 This is the side section of the prefabricated slope protection;
[0048] Figure 4 It is the position relationship diagram of the prefabricated slope protection and installation parts;
[0049] Figure 5 for Figure 4 Position relationship diagram of the installation box and the installation parts;
[0050] Figure 6 for Figure 5 The end structure diagram of the middle extended center rod;
[0051] Figure 7 for Figure 6 Distribution diagram of guide grooves in the countersunk hole;
[0052] Figure 8 A top view of the connection block. DETAILED DESCRIPTION
[0053] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0054] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0055] Embodiment 1, as Figures 1 to 3As shown, a river ecological slope structure includes:
[0056] The wire mesh 10 is installed on the slope surface through the anchor rod 20, and the wire mesh 10 is in a taut state. The end of the anchor rod 20 is provided with a pressing sheet for fixing the wire mesh 10, and the wire mesh 10 is installed with a mounting part 30; the wire mesh 10 is tautly installed on the slope through the anchor rod 20.
[0057] Prefabricated slope protection body 40, the back of the prefabricated slope protection body 40 is provided with a connection part 41, the connection part 41 and the mounting part 30 are adapted, the prefabricated slope protection body 40 is provided with an inner partition network 42, the inner partition network 42 is provided with a grass seed geotextile 43, the grass seed geotextile 43 is paved with planting soil, and the grass seeds germinate and grow into vegetation in the planting soil. The left and right sides of the prefabricated slope protection body 40 are provided with extension plates 44 extending outward, and a sealing member 50 is provided on the side of one of the extension plates 44. Water diversion pipes 45 are pre-buried in both sides of the prefabricated slope protection body 40, and a one-way diaphragm 46 is provided in the water diversion pipe 45. The two ends of the water diversion pipe 45 are used to connect the area above the extension plate 44 and the inner partition network 42.
[0058] The drainage member 47 includes a permeable concrete plate 48 disposed above the extension plate 44 and a liquid storage tank 49 located in the inner partition network 42. The permeable concrete is provided with an interception structure. The water diversion pipe 45 is used to introduce the moisture of the permeable concrete plate 48 into the liquid storage tank 49. The liquid storage tank 49 is connected with capillaries, which are evenly distributed above the grass seed geotextile 43 and are used to plant grass. The water diversion pipe 45 diverts the water intercepted by the interception structure into the liquid storage tank 49.
[0059] Since the prefabricated slope protection body 40 and the steel wire mesh 10 are installed vertically, the sealing member 50 can automatically seal the joint. The sealing member 50 includes a mounting body 51, which is fixed on the extension plate 44. The mounting body 51 is provided with a rolling rubber tube 52 and an arc-shaped sealing body 53. The rolling rubber tube 52 is provided with a roller inside. The rolling rubber tube 52 can be adjusted relative to the mounting body 51 through the roller. The distances between the two ends of the arc-shaped sealing body 53 and the steel wire mesh are greater than the distance between the middle part and the steel wire mesh. The arc-shaped sealing body 53 is deflected downward in a natural state.
[0060] When the prefabricated slope protection body 40 is vertically installed on the slope surface, the outer side of the rolling rubber tube 52 will first contact the installed extension plate 44. Through the action of the roller, the rolling rubber tube 52 will move upward relative to the installation body 51, and the arc-shaped sealing body 53 will extend outward to the side wall of the extension plate 44.
[0061] During installation, the rolling rubber tube 52 can contact the side of the prefabricated slope protection body 40, and due to the friction resistance, the roller acts to roll the rubber tube 52 upward to the top, and then acts on the middle of the arc-shaped sealing body 53, so that the free end is extended outward and contacts the installed prefabricated slope protection body 40. When the mounting member 30 and the connecting part 41 are adapted and installed, the free end of the arc-shaped sealing body 53 fits tightly on the side wall of the prefabricated slope protection body 40, and the distance between the two ends of the arc-shaped sealing body 53 and the wire mesh is still greater than the distance between the middle part and the wire mesh.
[0062] Embodiment 2, based on the above embodiment, the following improvements are made: Figures 4 to 8 As shown, the mounting body 51 includes a mounting plate 511, and four steel sheets 512 are arranged on the upper side of the mounting plate 511. The steel sheets 512 are used to press the steel wire mesh 10. The pressing here means to wrap and then press and fix. A through hole is arranged in the middle of the mounting plate 511, and a connecting sleeve 513 is installed in the through hole.
[0063] A retaining ring 514, an adjusting ring 515 and a pressing ring 516 are arranged inside the connecting sleeve 513. The adjusting ring 515 is located below the retaining ring 514 and is connected to the connecting sleeve 513 through threads. The pressing ring 516 is located above the retaining ring 514 and is connected to the connecting sleeve 513 through threads.
[0064] Two symmetrically distributed limit blocks 517 are installed between the retaining ring 514 and the adjusting ring 515. The limit blocks 517 are provided with grooves on opposite sides thereof. The grooves are arranged along the circumferential direction of the connecting sleeve 513. Axial guide grooves 518 are provided on opposite sides of the two grooves. A radial blind hole 519 is provided on the side of the axial guide grooves 518 close to the adjusting ring 515. A spring 520 and a slider 521 are installed in the connecting sleeve 513. The two ends of the spring 520 are respectively abutted against the slider 521 and the retaining ring 514. The top of the slider 521 is fitted to the lower surface of the pressing ring 516.
[0065] A countersunk hole is provided at one end where the slider 521 and the pressure ring 516 abut, and a connecting block 522 is installed in the countersunk hole. The end where the slider 521 and the spring 520 abut is connected to an extended center rod 523. The extended center rod 523 is a hollow structure. An elastic telescopic rod 524 is provided at the end of the extended center rod 523 away from the slider 521. A traction rope 525 is provided inside the extended center rod 523. One end of the traction rope 525 is fixed on the movable rod of the elastic telescopic rod 524, and the other end passes through the slider 521 and is connected to the connecting block 522.
[0066] The connecting block 522 is a structure with large ends and a small middle. An ear block 527 is provided at the end side portion located in the countersunk hole. A guide groove 526 is provided on the side wall of the countersunk hole. The guide groove 526 is spirally distributed along the axial direction of the side wall of the countersunk hole. In a natural state, the ear block 527 is located at the bottom of the guide groove 526. When the prefabricated slope protection body 40 is removed, the ear block 527 will guide the connecting block 522 to rotate along the guide groove 526 and separate from the elastic locking pin 402, thereby realizing the separation of the prefabricated slope protection body 40 and the connecting portion 41.
[0067] The connecting portion 41 includes a mounting box embedded in the back of the prefabricated slope protection body 40 , in which an elastic locking pin 402 is arranged. The elastic locking pin 402 and the end of the sliding block 521 exposed outside the connecting block 522 are used to restrict the connecting block 522 .
[0068] The inner diameter of the pressing ring 516 is larger than the middle size of the connecting block 522 and smaller than the size of the end portion located inside the countersunk hole, and a notch is provided at the end portion of the connecting block 522 outside the countersunk hole for separation from the elastic locking pin 402.
[0069] During installation, the connection block 522 is aligned with the installation box, and the prefabricated slope protection body 40 is installed in the direction perpendicular to the wire mesh 10. After the connection block 522 is abutted against the inner top of the installation box through the elastic locking pin 402, the connection block 522 is axially fixed by the elastic locking pin 402. The connection block 522, the slider 521 and the prefabricated slope protection body 40 move together, and the elastic telescopic rod 524 at the end of the extended center rod 523 will enter the radial blind hole 519 along the axial guide groove 518. The elastic telescopic rod 524 and the radial blind hole 519 are adapted to achieve locking and fixing. When dismantling, it is only necessary to pull the prefabricated slope protection body 40 outward, move the connection block 522 outward and rotate on the ear plate 527 and the guide groove 526 at the same time, and the elastic locking pin 402 and the connection block 522 rotate relative to each other. When they rotate a certain angle, the two separate, thereby realizing the separation of the prefabricated slope protection body 40.
[0070] Embodiment 3, based on the above embodiment, the following improvement is made: the interception structure is a plurality of triangular plates which are arranged continuously and upwardly, and the triangular plates are arranged vertically to the prefabricated slope protection body 40.
[0071] A river ecological slope construction method, the construction steps are as follows:
[0072] S1: Measurement and setting out
[0073] Lay out the excavation line according to the construction drawings, nail wooden wedges at both ends every 10 meters, use a measuring rope to fix and straighten the middle, use a shovel to shovel lime along the edge of the measuring rope and spread the lime line while knocking;
[0074] S2: Earthwork Excavation
[0075] The method of using large earth-moving machinery such as excavators, loaders, and heavy trucks to work together; the earth excavation is carried out in sections and zones;
[0076] The excavation sequence and method must be consistent with the design requirements and follow the principle of "supporting before trenching, excavating in layers, and strictly prohibiting over-excavation"; the excavation sequence shall be carried out in sections and zones according to the construction drawings of the excavation operation; the excavation depth varies from 2 to 5 meters, and is excavated in 2 to 3 layers;
[0077] When multiple excavators and multiple working surfaces are used for construction in different areas, the width of each working surface should be greater than 20m;
[0078] During the excavation process, surveyors use RTK to measure the excavation depth at any time to avoid over-excavation. After excavation to the specified depth, 100-150mm is reserved for manual trimming;
[0079] S3: Acceptance
[0080] After the manual repair is completed, self-inspection will be carried out. If the self-inspection is qualified, the construction unit will report it to the supervision unit to organize relevant acceptance work;
[0081] S4: Concrete corner protection construction
[0082] Pour the concrete corner guard concrete and vibrate it while pouring to ensure that the concrete corner guard is vibrated and compacted;
[0083] S5: Wire Mesh 10
[0084] Make the positioning body: weld and fix the connecting sleeve 513 in the through hole of the positioning plate, install two limit blocks 517 in the connecting sleeve 513 through the adjustment ring 515, and make the top of the limit block 517 close to the lower surface of the retaining ring 514; place a spring 520 on the upper surface of the retaining ring 514, install an extended center rod 523 on the lower surface of the slider 521, and insert a traction rope 525 into the extended center rod 523. One end of the traction rope 525 is connected to the movable rod of the elastic telescopic rod 524, and the other end passes through the slider 521 and is connected and fixed to the body. After the connecting block 522 is pulled outward and the movable rod is retracted to the maximum stroke through the traction rope 525, the slider 521 is placed in the connecting sleeve 513 until the movable rod enters the axial guide groove 518, the connecting block 522 is released, and the upper surface of the slider 521 is limited by the pressing ring 516;
[0085] The mounting plate 511 is fixed at the designed position on the wire mesh 10 by a steel sheet 512, the wire mesh 10 is laid on the slope, and is laid on the slope by tensioning it through a pressing sheet through an anchor rod 20;
[0086] S6: Installation of prefabricated slope protection 40
[0087] The prefabricated slope protection body 40 is laid along the side of the concrete corner protection, and the prefabricated slope protection body 40 is installed in the direction perpendicular to the slope. The installation box at the bottom of the prefabricated slope protection body 40 is aligned with the connecting block 522 and vertically pressed. The connecting block 522 is abutted against the box wall and axially restricted by the elastic locking pin 402. The connecting block 522 drives the slider 521 and the extended center rod 523 to axially approach the adjustment ring 515 until the elastic telescopic rod 524 is inserted into the radial blind hole 519.
[0088] Install the slope protection from bottom to top until it is completely installed. During installation, it is necessary to ensure that the interception structure is distributed in the left and right directions;
[0089] When constructing the top prefabricated slope protection 40, the geotextile is laid at the bottom and extended to the bottom of the pressure beam, and the wire mesh 10 is turned over to the bottom of the pressure beam by at least 50 cm;
[0090] S7: Formwork casting top pressure beam
[0091] S8: Construction of top beam
[0092] Pour the top beam concrete and vibrate it to make it dense;
[0093] S9: Filling with planting soil
[0094] After the pressure beam is completed, the inner partition network 42 is filled with planting soil and watered for maintenance.
[0095] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. The replacement may be a replacement of a part of the structure, device, method step, or a complete technical solution. Any equivalent replacement or change according to the technical solution and the inventive concept of the present invention shall be covered within the protection scope of the present invention.
Claims
1. A river ecological slope structure, characterized in that: include: A wire mesh (10), wherein the wire mesh (10) is paved on the slope surface through an anchor rod (20), and the wire mesh (10) is in a taut state, a pressing sheet for fixing the wire mesh (10) is provided at the end of the anchor rod (20), and a mounting member (30) is installed on the wire mesh (10); A prefabricated slope protection body (40), wherein a connection portion (41) is provided on the back of the prefabricated slope protection body (40), the connection portion (41) and the mounting member (30) are adapted to each other, an inner partition network (42) is provided inside the prefabricated slope protection body (40), a grass seed geotextile (43) is provided inside the inner partition network (42), and planting soil is paved on the grass seed geotextile (43), and extension plates (44) extending outward are provided on the left and right sides of the prefabricated slope protection body (40), a sealing member (50) is provided on the side of one of the extension plates (44), and water diversion pipes (45) are pre-buried in both sides of the prefabricated slope protection body (40), a one-way diaphragm (46) is provided inside the water diversion pipe (45), and both ends of the water diversion pipe (45) are used to connect the area above the extension plate (44) and the inner partition network (42); The drainage member (47) comprises a permeable concrete plate (48) arranged above the extension plate (44) and a liquid storage tank (49) located in the inner partition network (42); a retention structure is arranged on the permeable concrete; and a water diversion pipe (45) is used to introduce moisture from the permeable concrete plate (48) into the liquid storage tank (49).
2. A river ecological slope structure according to claim 1, characterized in that: The sealing member (50) comprises a mounting body (51), the mounting body (51) being fixed on the extension plate (44), the mounting body (51) being provided with a rolling rubber tube (52) and an arc-shaped sealing body (53), the rolling rubber tube (52) being provided with a roller inside, the rolling rubber tube (52) being positionally adjustable relative to the mounting body (51) via the roller, the distances between the two ends of the arc-shaped sealing body (53) and the steel wire mesh being greater than the distance between the middle part and the steel wire mesh, and the arc-shaped sealing body (53) being deflected downward in a natural state; When the prefabricated slope protection body (40) is vertically installed on the slope surface, the outer side of the rolling rubber tube (52) will first contact the installed extension plate (44), and the rolling rubber tube (52) will move upward relative to the installation body (51) through the action of the roller, and the arc-shaped sealing body (53) will be extended to the side wall of the extension plate (44).
3. A river ecological slope structure according to claim 2, characterized in that: The mounting member (30) comprises a mounting plate (511), four steel sheets (512) are arranged on the upper side of the mounting plate (511), the steel sheets (512) are used to press the steel wire mesh (10), a through hole is arranged in the middle of the mounting plate (511), and a connecting sleeve (513) is installed in the through hole; A retaining ring (514), an adjusting ring (515) and a pressing ring (516) are arranged inside the connecting sleeve (513); the adjusting ring (515) is located below the retaining ring (514) and is connected to the connecting sleeve (513) through a thread; and the pressing ring (516) is located above the retaining ring (514) and is connected to the connecting sleeve (513) through a thread. Two symmetrically distributed limit blocks (517) are installed between the retaining ring (514) and the adjusting ring (515), and grooves are arranged on opposite sides of the limit blocks (517), and the grooves are arranged along the circumferential direction of the connecting sleeve (513). Axial guide grooves (518) are arranged on opposite sides of the two grooves, and a radial blind hole (519) is arranged on the side of the axial guide groove (518) close to the adjusting ring (515). A spring (520) and a slider (521) are installed in the connecting sleeve (513), and the two ends of the spring (520) are respectively abutted against the slider (521) and the retaining ring (514), and the top of the slider (521) is in contact with the lower surface of the pressing ring (516); A countersunk hole is provided at one end where the slider (521) and the pressure ring (516) abut against each other, and a connecting block (522) is installed in the countersunk hole. An end where the slider (521) and the spring (520) abut against each other is connected to an extension center rod (523). The extension center rod (523) is a hollow structure. An elastic telescopic rod (524) is provided at one end of the extension center rod (523) away from the slider (521). A traction rope (525) is provided inside the extension center rod (523). One end of the traction rope (525) is fixed to the movable rod of the elastic telescopic rod (524), and the other end passes through the slider (521) and is connected to the connecting block (522).
4. A river ecological slope structure according to claim 3, characterized in that: The connecting block (522) is a structure with large ends and a small middle. An ear block (527) is provided at the end side located in the countersunk hole. A guide groove (526) is provided on the side wall of the countersunk hole. The guide groove (526) is distributed in a spiral shape along the axial direction of the side wall of the countersunk hole.
5. A river ecological slope structure according to claim 4, characterized in that: The connecting portion (41) comprises an installation box embedded in the back of the prefabricated slope protection body (40), wherein an elastic locking pin (402) is arranged in the installation box, and the end of the sliding block (521) exposed outside the elastic locking pin (402) and the connecting block (522) is used to restrict the connecting block (522).
6. A river ecological slope structure according to claim 5, characterized in that: The inner diameter of the pressing ring (516) is larger than the middle size of the connecting block (522) and smaller than the size of the end portion located inside the counterbore, and a notch is provided at the end of the connecting block (522) outside the counterbore for separation from the elastic locking pin (402).
7. A river ecological slope structure according to claim 6, characterized in that: The interception structure is a plurality of triangular plates which are arranged continuously and upwardly, and the triangular plates are arranged vertically to the prefabricated slope protection body (40).
8. A river ecological slope construction method, characterized in that: The slope structure according to claim 7 is constructed in the following steps: S1: Measurement and setting out Lay out the excavation line according to the construction drawings, nail wooden wedges at both ends every 10 meters, use a measuring rope to fix and straighten the middle, use a shovel to shovel lime along the edge of the measuring rope and spread the lime line while knocking; S2: Earthwork Excavation The method of using large earth-moving machinery such as excavators, loaders, and heavy trucks to work together; the earthwork excavation is carried out in sections and zones; The excavation sequence and method must be consistent with the design requirements and follow the principle of "supporting before trenching, excavating in layers, and strictly prohibiting over-excavation"; the excavation sequence shall be carried out in sections and zones according to the construction drawings of the excavation operation; the excavation depth of the earthwork varies from 2 to 5 meters, and it shall be excavated in 2 to 3 layers; When multiple excavators and multiple working surfaces are used for construction in different areas, the width of each working surface should be greater than 20m; During the excavation process, surveyors use RTK to measure the excavation depth at any time to avoid over-excavation. After excavation to the specified depth, 100-150mm is reserved for manual trimming; S3: Acceptance After the manual repair is completed, self-inspection will be carried out. If the self-inspection is qualified, the construction unit will report it to the supervision unit to organize relevant acceptance work; S4: Concrete corner protection construction Pour the concrete corner guard concrete and vibrate it while pouring to ensure that the concrete corner guard is vibrated and compacted; S5: Wire Mesh Installation (10) Manufacturing the positioning body: welding and fixing the connecting sleeve (513) in the through hole of the positioning plate, installing two limit blocks (517) in the connecting sleeve (513) through the adjusting ring (515), and making the top of the limit block (517) close to the lower surface of the retaining ring (514); placing a spring (520) on the upper surface of the retaining ring (514), installing an extended center rod (523) on the lower surface of the slider (521), and inserting a traction rope (525) inside the extended center rod (523), One end of the traction rope (525) is connected to the movable rod of the elastic telescopic rod (524), and the other end passes through the slider (521) and is connected and fixed to the body. After the connecting block (522) is pulled outwardly to retract the movable rod to the maximum stroke through the traction rope (525), the slider (521) is placed inside the connecting sleeve (513) until the movable rod enters the axial guide groove (518), the connecting block (522) is released, and the upper surface of the slider (521) is limited by the pressing ring (516); The mounting plate (511) is fixed at the designed position on the steel mesh (10) by means of a steel sheet (512), the steel mesh (10) is laid on the slope, and is laid on the slope by means of an anchor rod (20) and a pressing sheet to tighten the mesh; S6: Installation of prefabricated slope protection (40) The prefabricated slope protection body (40) is laid along the side of the concrete corner protection, and the prefabricated slope protection body (40) is installed in a direction perpendicular to the slope. The installation box at the bottom of the prefabricated slope protection body (40) is aligned with the connecting block (522) and vertically pressed. The connecting block (522) is abutted against the box wall and axially restricted by the elastic locking pin (402). The connecting block (522) drives the slider (521) and the extended center rod (523) to axially approach the adjustment ring (515) until the elastic telescopic rod (524) is inserted into the radial blind hole (519). Install the slope protection from bottom to top until it is completely installed. During installation, it is necessary to ensure that the interception structure is distributed in the left and right directions; When constructing the top prefabricated slope protection body (40), a geotextile is laid at the bottom to extend to the bottom of the pressure beam, and at the same time, the wire mesh (10) is turned over to at least 50 cm from the bottom of the pressure beam; S7: Formwork casting top pressure beam S8: Construction of top beam Pour the top beam concrete and vibrate it to make it dense; S9: Filling with planting soil After the pressure beam is completed, the inner partition network (42) is filled with planting soil and watered for maintenance.
Citation Information
Patent Citations
Ecological slope protection structure capable of being rapidly installed and ecological slope protection method thereof
CN113700009A
Water conservancy project river ecological slope protection construction method
CN113981896A
Side slope protection net structure
CN214738148U
Quick mounting and connecting structure for side slope protective net
CN219219049U
Slope protecting method
JP2005009306A