Piling guide frame and construction method thereof

By designing the retractable cylinder module and guide ring, combined with the push assembly, the difficulty of positioning piles in the construction of offshore wind power guide frames is solved, and the stable placement of the guide frames and the precise driving of small piles are achieved, reducing costs and Improved efficiency.

CN118793053AInactive Publication Date: 2024-10-18SHANGHAI BESTWAY MARINE ENGINEERING DESIGN CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202310402810.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-14
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing offshore wind power guide frame construction method requires driving positioning piles first, which results in large equipment, heavy weight, high cost, difficulty in reuse, and low construction efficiency.

Method used

Design a piling guide frame, including a retractable cylinder module, a connecting frame and a pile leg. The guide ring and push assembly assist small piles in driving into the seabed, avoiding the use of positioning piles. The structure is simple and the piles can be adjusted flexibly. distance.

Benefits of technology

It achieves stable placement of the guide frame on the seabed and precise driving of small piles, reduces construction costs, improves construction efficiency, has a light structure, low cost, and adapts to different engineering requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793053A_ABST
    Figure CN118793053A_ABST
Patent Text Reader

Abstract

The invention provides a piling guide frame and a construction method thereof, the piling guide frame comprises a plurality of cylinder modules, connecting frames and pile legs, each cylinder module comprises a main cylinder and a guide ring body, and the guide ring body is connected to the periphery of the main cylinder; the pile legs are telescopically mounted in the main barrel body, and the barrel body modules are connected through connecting frames; the guide ring body is used for assisting the small pile to be driven into a seabed; a plurality of pushing assemblies are arranged on the guide ring body and used for adjusting the perpendicularity of the small pile. According to the piling guide frame and the construction method thereof, the shoe tips are arranged at the bottom ends of the pile legs, so that the piling guide frame can be inserted into a seabed by a certain depth, and the piling guide frame cannot move due to external loads in the piling process. According to the piling guide frame and the construction method thereof, the boot vamp is arranged above the boot tip, an effective force bearing surface can be formed, and therefore a single pile leg cannot sink into a seabed too deep, and leveling is more effective.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of offshore wind power engineering equipment, and in particular to a pile driving guide frame and a construction method thereof. Background Art

[0002] The guide frame foundation of offshore wind power requires driving several small piles into the seabed. The length of a single small pile is tens of meters. In order to coordinate with the subsequent conductor frame, the position of each small pile needs to be precisely controlled. The conventional method is to use a guide frame for auxiliary positioning during the piling process.

[0003] This traditional guide frame is similar to a single frame structure, which needs to be hoisted onto the seabed during construction. Due to the uneven seabed, several positioning piles need to be fixed on the seabed, and the guide frame and the positioning piles need to be connected together with steel wire ropes. After the small piles are driven in, the positioning piles are pulled out one by one, and the guide frame is hoisted to the next machine position.

[0004] That is, in the traditional sense, the installation of offshore wind power pipe frames requires driving small piles first, and driving small piles requires the use of guide frames, and in order to place the guide frames stably on the seabed, several positioning piles need to be fixed. As can be seen from the above, the above traditional guide frames have the following defects:

[0005] 1. The bottom of the guide frame must be firmly placed on the seabed, and the top platform must be higher than the sea surface for easy connection and operation. That is, its total height must be greater than the water depth. Therefore, the scale is large, with a height of about 50m to 60m, a total weight of hundreds of tons, inconvenient to use, and a high production cost.

[0006] 2. For different engineering projects, the sizes of the conductor frames are different, and the spacing between the small piles is also different. Different guide frames need to be made, which are difficult to reuse, further increasing the construction cost.

[0007] 3. The positioning piles used to additionally fix the guide frame are also large steel structures, with a single length of about 60m to 70m. They have to be inserted and pulled out one by one on the choppy sea surface, and then turned over and put back on the deck, which requires a lot of complex lifting and piling work, which seriously slows down the progress of the work.

[0008] As can be seen from the above, inventing a pile driving guide frame and a construction method thereof that can solve the above problems is a technical problem that technical personnel in this field need to solve urgently. Summary of the invention

[0009] In view of the shortcomings of the prior art mentioned above, the purpose of the present invention is to provide a piling guide frame and a construction method thereof, which is used to solve the technical problems of difficult operation, high cost and low construction efficiency caused by the prior art construction method of installing the conductor frame, which requires first setting fixed piles, then connecting the fixed piles and the guide frame together, and then driving a number of small piles through the guide frame, and then relying on the several small piles to set the conductor frame.

[0010] To achieve the above-mentioned purpose and other related purposes, the present invention provides a pile driving guide frame, including a plurality of cylinder modules, a connecting frame, and pile legs, wherein the cylinder modules include a main cylinder and a guide ring body, wherein the guide ring body is connected to the outer periphery of the main cylinder body; the pile legs are telescopically installed in the main cylinder body, and a plurality of the cylinder modules are connected by a connecting frame; the guide ring body is used to assist small piles in being driven into the seabed; and a plurality of jacking assemblies are arranged on the guide ring body, wherein the jacking assemblies are used to adjust the verticality of the small piles.

[0011] Preferably, the main cylinder includes an ear plate and a leveling cylinder, the ear plate is arranged on the inner top surface of the main cylinder, one end of the leveling cylinder is arranged on the ear plate, and the other end is fixedly connected to the top end of the pile leg; a plurality of connecting guide rods are arranged on the outer periphery of the main cylinder, a main cylinder flange is arranged at one end of the connecting guide rod away from the main cylinder, a connecting frame flange is arranged on the connecting frame, and the main cylinder and the connecting frame are connected via the main cylinder flange, the connecting frame flange, and a connecting piece arranged therebetween.

[0012] Preferably, the connecting frame includes an intermediate frame and a side frame, the number of the cylinder modules is four, two adjacent main cylinders are connected by a side frame, and two diagonal main cylinders are connected by an intermediate frame. An intermediate tube is vertically arranged at the intersection of the intermediate frames, and a lifting eye plate is arranged on the top of the intermediate tube.

[0013] Preferably, the middle frame and the side frame are both assemblies, and the lengths of the middle frame and the side frame can be adjusted by increasing or decreasing the number of assemblies in the middle frame and the side frame.

[0014] Preferably, a shoe surface is provided at the bottom end of the pile leg, and the shoe surface prevents the pile leg from sinking too deep into the seabed; a shoe tip is provided on the bottom surface of the shoe surface, and the shoe tip enables the pile leg to be inserted into the seabed.

[0015] Preferably, the guide ring body includes an upper guide ring and a lower guide ring, the upper guide ring is arranged at the upper end of the outer periphery of the main cylinder, and the lower guide ring is arranged at the lower end of the outer periphery of the main cylinder, and the centers of the upper guide ring and the lower guide ring are located on the same axis in the vertical direction.

[0016] Preferably, the upper guide ring is configured as an arm-type structure, the upper guide ring is hinged to the outer periphery of the main cylinder, and an opening and closing cylinder is also provided between the outer periphery of the upper guide ring and the outer periphery of the main cylinder, and the opening and closing cylinder is used to open and close the upper guide ring.

[0017] Preferably, the upper end surface of the upper guide ring is also provided with a bell mouth, and the bell mouth is used to guide the small pile.

[0018] Preferably, the pushing assembly includes a plurality of telescopic cylinders, which are evenly distributed on the outer circumferential surfaces of the upper guide ring and the lower guide ring along the circumferential direction. The telescopic cylinders penetrate the outer circumferential surfaces of the upper guide ring and the lower guide ring and are used to adjust the verticality of the small pile passing through the upper guide ring and the lower guide ring.

[0019] To achieve the above purpose or other purposes, the present invention also discloses a construction method of a pile driving guide frame, using the above pile driving guide frame, the steps are as follows:

[0020] S1: Connect the shell module, the connecting frame and the pile legs into a whole and place them on the deck of the crane ship; the thrust assembly is in the initial state;

[0021] S2: After arriving at the designated sea area, the crane on the crane ship hoists the pile driving guide frame to the designated position on the seabed;

[0022] S3: adjusting the telescopic length of the pile legs in the main cylinder so that the pile driving guide frame is in a horizontal state;

[0023] S4: The crane on the crane ship lifts the small pile, and the small pile passes through the guide ring from top to bottom, and the verticality of the small pile in the guide ring is controlled by the jacking assembly to make the small pile reach a specified vertical state;

[0024] S5: Continue to lower the small pile until it is inserted into the seabed. The crane is separated from the small pile, and the pile hammer is used to hammer the top of the small pile until the small pile reaches the specified height.

[0025] S6: Repeat the operations of S4 and S5 to complete the piling operation of all small piles;

[0026] S7: After all the small piles are driven, the crane lifts the pile driving guide frame back to the deck and transports it to the next construction site via a crane ship to repeat the operation steps S2-S6.

[0027] As described above, the piling guide frame and the construction method thereof of the present invention have the following beneficial effects:

[0028] 1. The piling guide frame and the construction method thereof of the present invention are provided with a boot tip at the bottom end of the pile leg, which enables the piling guide frame to be inserted into the seabed to a certain depth, so that the piling guide frame will not move due to external loads during the piling process.

[0029] 2. The pile driving guide frame and the construction method thereof disclosed in the present invention have a shoe surface arranged above the shoe tip, which can form an effective load-bearing surface, so that a single pile leg will not sink too deep into the seabed, and leveling is more effective.

[0030] 3. The pile driving guide frame and the construction method thereof involved in the present invention have pile legs with self-leveling function, do not need the assistance and connection of positioning piles, are easy to operate, have simple structure, light weight and low cost.

[0031] 4. The piling guide frame and construction method thereof involved in the present invention connects several cylinder modules through a connecting frame. The connecting frame is a combination part. The operator can change the pile spacing according to the specifications of the conductor frame, so as to quickly adapt to different engineering requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a front view of the pile driving guide frame of the present invention;

[0033] Figure 2 A top view of the pile driving guide frame of the present invention;

[0034] Figure 3 It is a schematic diagram of the structure between the main cylinder and the pile legs in the pile driving guide frame of the present invention.

[0035] Description of reference numerals:

[0036] 1. Cylinder module; 101. Main cylinder; 1010. Leveling cylinder; 102. Guide ring body; 1020. Upper guide ring; 1021. Lower guide ring; 103. Bell mouth; 104. Push assembly; 105. Opening and closing cylinder; 2. Connecting frame; 201. Middle frame; 202. Side frame; 203. Lifting eye plate; 204. Middle pipe; 3. Pile leg; 301. Boot tip; 302. Boot surface. DETAILED DESCRIPTION

[0037] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.

[0038] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportional relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.

[0039] like Figure 1-Figure 3 As shown, the present invention provides a pile driving guide frame, including a plurality of cylinder modules 1, a connecting frame 2, and pile legs 3. The cylinder module 1 includes a main cylinder 101 and a guide ring body 102, and the guide ring body 102 is connected to the outer periphery of the main cylinder 101; the pile legs 3 are telescopically installed in the main cylinder 101, and the plurality of cylinder modules 1 are connected by the connecting frame 2; the guide ring body 102 is used to assist small piles to be driven into the seabed; a plurality of jacking assemblies 104 are arranged on the guide ring body 102, and the jacking assemblies 104 are used to adjust the verticality of the small piles.

[0040] The pile driving guide frame involved in the present invention connects several cylinder modules 1 through a connecting frame 2, and the pile legs 3 are telescopically installed in the main cylinder 101, so that the pile driving guide frame can be placed horizontally on the seabed, and there is no need to drive positioning piles into the seabed in advance for assistance. It is easy to operate and has a simple structure. A guide ring body 102 is arranged on the outer periphery of the main cylinder 101, and the guide ring body 102 is used to assist the small piles to be driven into the seabed, and a number of jacking assemblies 104 are arranged on the guide ring body 102. The jacking assemblies 104 can be used to adjust the verticality of the small piles, which can ensure that the small piles are in a vertical state in the seabed and ensure the quality of the subsequent installation of the conductor frame. The connecting frame 2 can be adjusted in length according to the size specifications of the conductor frame, so that the position where the small piles are driven into the seabed is suitable for conductor frames of different sizes.

[0041] Furthermore, in this embodiment, the central axis of the main cylinder 101 is parallel to the central axis of the guide ring 102; the main cylinder 101 is preferably a perfect circular cylinder. The cylinder module 1 is made of steel.

[0042] Preferably, Figure 3As shown, the main cylinder 101 includes an ear plate and a leveling cylinder 1010, the ear plate is arranged on the inner top surface of the main cylinder 101, the top of the leveling cylinder 1010 is fixed on the ear plate by bolts, and the bottom end of the leveling cylinder 1010 is fixedly connected with the top of the pile leg 3 by bolts; a plurality of connecting guide rods are arranged on the outer periphery of the main cylinder 101, a main cylinder flange is arranged at one end of the connecting guide rod away from the main cylinder 101, a connecting frame flange is arranged on the connecting frame 2, and the main cylinder 101 and the connecting frame 2 are connected by the main cylinder flange, the connecting frame flange, and the connecting piece arranged therebetween. Further, in this embodiment, the connecting piece between the main cylinder flange and the connecting frame flange is fastened and connected by bolts and nuts (the connecting guide rod, the main cylinder flange, and the connecting frame flange are not drawn), which is convenient for disassembly and assembly.

[0043] Preferably, Figure 1 , Figure 2 As shown, the connecting frame 2 includes an intermediate frame 201 and a side frame 202. The number of the barrel modules 1 is four. Two adjacent main barrels 101 are connected by the side frame 202, and two diagonal main barrels 101 are connected by the intermediate frame 201. An intermediate pipe 204 is vertically arranged at the intersection of the intermediate frame 201, and a lifting eye plate 203 is arranged on the top of the intermediate pipe 204. Further, when the number of the barrel modules 1 is four, as shown in FIG. Figure 3 As shown, four main cylinders 101 form a rectangle, and there are four side frames 202, which connect two adjacent main cylinders 101; there are two intermediate frames 201, which connect two main cylinders 101 at opposite corners. In this embodiment, the connecting frame 2 has a large rigidity and can withstand the vertical and horizontal loads on a single cylinder module 1 during the piling process to ensure that the overall frame does not deform.

[0044] In another embodiment, the number of the cylinder modules 1 is three, and the three cylinder modules 1 are distributed in a triangle. The number of the side frames 202 is three, and the three side frames 202 connect two adjacent main cylinders 101; the number of the intermediate frames 201 is three, and the intermediate frames 201 are the midlines of each side of the triangle, and the intermediate tube 204 is arranged at the intersection of the three midlines.

[0045] In the above-described embodiment, the middle pipe 204 extends vertically upward, and the height of the middle pipe 204 extends above the sea surface.

[0046] Preferably, the middle frame 201 and the side frame 202 are both assemblies, and the number of assemblies in the middle frame 201 and the side frame 202 can be increased or decreased to adjust the length of the middle frame 201 and the side frame 202, so that the positions between the guide ring bodies 102 on several cylinder modules 1 just correspond to the positions where small piles need to be driven in, that is, the corresponding small piles are driven in according to the size specifications of the conductor frame.

[0047] Preferably, Figure 3 As shown, a shoe surface 302 is provided at the bottom end of the pile leg 3, and the shoe surface 302 prevents the pile leg 3 from sinking too deep into the seabed; a shoe tip 301 is provided on the bottom surface of the shoe surface 302, and the shoe tip 301 enables the pile leg 3 to be inserted into the seabed.

[0048] Preferably, Figure 1 As shown, the guide ring body 102 includes an upper guide ring 1020 and a lower guide ring 1021. The upper guide ring 1020 is arranged at the upper end of the outer periphery of the main cylinder body 101, and the lower guide ring 1021 is arranged at the lower end of the outer periphery of the main cylinder body 101. The centers of the upper guide ring 1020 and the lower guide ring 1021 are located on the same axis in the vertical direction. The upper guide ring 1020 and the lower guide ring 1021 are short cylindrical bodies, and the inner diameters of the upper guide ring 1020 and the lower guide ring 1021 are slightly larger than the outer diameters of the small piles.

[0049] Further, in the present embodiment, the upper guide ring 1020 is configured as an arm-holding structure, the upper guide ring 1020 is hinged to the outer periphery of the main cylinder 101, and an opening and closing oil cylinder 105 is further provided between the outer periphery of the upper guide ring 1020 and the outer periphery of the main cylinder 101, and the opening and closing oil cylinder 105 is used to open and close the upper guide ring 1020. Specifically, the upper guide ring 1020 is divided into two semicircular rings, one end of the two semicircular rings is respectively hinged to the outer periphery of the main cylinder 101, and an opening and closing oil cylinder 105 is provided between the outer periphery of the two semicircular rings and the outer periphery of the main cylinder 101, when the opening and closing oil cylinder 105 is extended, the two semicircular rings are closed, and when the opening and closing oil cylinder 105 is shortened, the two semicircular rings are opened. The purpose of setting the upper guide ring 1020 as an arm-type structure is that when the pile hammer drives the small pile into the seabed, the upper guide ring 1020 may affect the stroke of the pile hammer, so the upper guide ring 1020 is set to an arm-type structure to enable the pile hammer to pass. In addition, the upper guide ring 1020 can also be set to a non-openable type, in which case the pile hammer can drive the small pile into the seabed by adding an extension hammer.

[0050] Further, such as Figure 1 As shown, in order to ensure that the upper guide ring 1020 can guide the small pile when it is driven into the seabed, a bell mouth 103 is also provided on the upper end surface of the upper guide ring 1020.

[0051] Preferably, Figure 1 , Figure 2As shown, the push assembly 104 includes a plurality of telescopic cylinders, which are uniformly distributed on the outer circumference of the upper guide ring 1020 and the lower guide ring 1021 along the circumferential direction. The telescopic cylinders penetrate the outer circumference of the upper guide ring 1020 and the lower guide ring 1021, and are used to adjust the verticality of the small pile through the upper guide ring 1020 and the lower guide ring 1021. Further, in this embodiment, the piston end of the telescopic cylinder penetrates the ring wall of the upper guide ring 1020 and the lower guide ring 1021, and when the telescopic cylinder is extended, the end of the piston end extends into the inner side of the inner wall of the upper guide ring 1020 and the lower guide ring 1021, so as to adjust the verticality of the small pile. When the telescopic cylinder is shortened, the end of the piston end retracts into the telescopic cylinder, and will not block the small pile from passing through the upper guide ring 1020 and the lower guide ring 1021. Further, in order to reduce the friction between the piston end of the telescopic cylinder and the outer circumferential surface of the small pile, a roller or other components can also be provided at the end of the piston end of the telescopic cylinder to reduce the friction.

[0052] Further, in this embodiment, the hydraulic oil used in the telescopic cylinder, the opening and closing cylinder 105, and the leveling cylinder 1010, and the container storing the hydraulic oil can be arranged on the connecting frame 2. In this embodiment, a level gauge can also be arranged on the connecting frame 2 to detect whether the pile driving guide frame is in a horizontal state on the seabed.

[0053] To achieve the above purpose or other purposes, the present invention further discloses a construction method of a pile driving guide frame, using the above pile driving guide frame, the number of the cylinder modules 1 in the above pile driving guide frame is three or four, and the embodiment in which the number of the cylinder modules 1 is four is now described, and the steps are as follows:

[0054] A1: Four cylinder modules 1, several middle frames 201, several side frames 202, and pile legs 3 are connected into a whole. The four cylinder modules 1 form a quadrilateral. Two adjacent cylinder modules 1 are connected by the middle frame 201, and two diagonal cylinder modules 1 are connected by the side frame 202. The middle pipe 204 is vertically arranged at the intersection of the two side frames 202; the pile legs 3 are installed inside the main cylinder 101 through the leveling cylinder 1010. The operator places the assembled pile driving guide frame on the deck of the crane ship, and makes the leveling cylinder 1010 and the push assembly 104 in the initial state (that is, the piston ends of the leveling cylinder 1010 and the push assembly 104 are in the contracted state).

[0055] A2: After arriving at the predetermined sea area, the crane on the crane ship is hung on the lifting eye plate 203 on the top of the intermediate pipe 204, and the pile driving guide frame is lifted to the designated position on the seabed. After the pile driving guide frame is lowered to the seabed, the shoe tip 301 is inserted into the seabed, and the shoe surface 302 prevents the pile leg 3 from sinking too deep into the seabed;

[0056] A3: When the pile driving guide frame contacts the seabed in step A2, the two diagonal pile legs 3 are first extended. At this time, most of the deadweight of the pile driving guide frame will be borne by the seabed below the shoe surfaces 302 of the two pile legs 3, and the seabed below the shoe surfaces 302 of the two pile legs 3 will be further compacted. Then retract the two pile legs 3 and extend the remaining two pile legs 3, and similarly complete the compaction of the seabed below the shoe surfaces 302 of the two pile legs 3. Then uniformly adjust the lengths of the four pile legs 3 to make the pile driving guide frame in a horizontal state (i.e., the level on the connecting frame 2 is in a horizontal position);

[0057] A4: The crane on the crane ship lifts the small pile, and the small pile passes through the upper guide ring 1020 and the lower guide ring 1021 from top to bottom, and the verticality of the small pile in the guide ring body 102 is controlled by the jacking assembly 104 on the outer circumference of the upper guide ring 1020 and the lower guide ring 1021, so that the small pile reaches a specified vertical state;

[0058] A5: Use a crane to lower the pile so that the bottom of the pile is inserted into the seabed, and then detach the crane from the pile; connect the pile hammer to the crane and hammer the top of the pile until the pile reaches the specified depth;

[0059] A6: Repeat steps A4-A5 to hoist the remaining three small piles into the corresponding upper guide ring 1020 and lower guide ring 1021, and hammer them into the seabed to a specified depth;

[0060] A7: The pile driving guide frame is hoisted back onto the deck by a crane, transported to the next construction area by a crane ship, and the operation steps A2-A6 are repeated until all the small piles in the construction area are driven into the seabed.

[0061] Preferably, in step A1, the middle frame 201 and the side frame 202 are both assemblies, and the lengths of the middle frame 201 and the side frame 202 are adjusted according to the spacing between the small piles to accommodate small piles with different spacings.

[0062] Preferably, the purpose of setting step A3 is to first compact the seabed under the two diagonal pile legs 3, and then compact the seabed under the remaining two pile legs 3; when two of the pile legs 3 contact the seabed, the seabed under the two pile legs 3 has a potential high bearing capacity, which is close to 1 times the margin. Then the seabed under the remaining two pile legs 3 also has a bearing capacity close to 1 times the margin (that is, when the four pile legs 3 contact the seabed evenly, the bearing capacity of the seabed under each pile leg 3 is 1 / 4 of its own weight; when the two pile legs 3 first contact the seabed and compact, the bearing capacity of the seabed under these two pile legs 3 is 1 / 2 of their own weight; the corresponding bearing capacity of the seabed under the other two pile legs 3 is also 1 / 2 of their own weight, so that the bearing capacity under the four pile legs 3 is 1 / 2 of their own weight, leaving a bearing margin of 1 times). In this way, during the piling process, the piling guide frame is not prone to sinking, which overcomes the problem of the friction and vibration between the small pile and the upper guide ring 1020 and the lower guide ring 1021 causing the sinking to cause the horizontality of the piling guide frame to change, and reliably ensures the continuity and construction efficiency of the construction process.

[0063] Preferably, in step A4, in order to facilitate the small pile to be quickly inserted into the upper guide ring 1020, the bell mouth 103 on the top surface of the upper guide ring 1020 plays a guiding role in the lowering process of the small pile.

[0064] Preferably, in step A5, when the pile hammer is hammering the top of the small pile, in order to enable the pile hammer to pass through the upper guide ring 1020, the operator can control the opening and closing cylinder 105 to work, and open the upper guide ring 1020 through the opening and closing cylinder 105, so that the pile hammer can drive the small pile into the predetermined depth of the seabed. In other embodiments, an extension pile can also be set under the pile hammer, and the small pile can be driven into the predetermined depth of the seabed through the extension pile.

[0065] When there are three barrel modules 1, the operation steps of the embodiment of three barrel modules 1 differ from those of the embodiment of four barrel modules 1 only in that step A3 in the embodiment of three barrel modules 1 can be omitted, and the other steps are the same and will not be repeated here.

[0066] The piling guide frame and the construction method thereof according to the present invention have the following beneficial effects:

[0067] 1. The present invention can change the length of the connecting frame 2, and then change the spacing between the cylinder modules 1, so as to adapt to different small pile spacings. The bottom of the pile leg 3 is provided with a shoe tip 301 and a shoe surface 302, which can not only prevent the pile leg 3 from moving due to external loads during the piling process, but also prevent the single pile leg 3 from sinking too deep into the seabed, and can compensate for the settlement of the seabed while making the leveling more rapid and effective.

[0068] 2. The pile driving guide frame and the construction method thereof involved in the present invention have a pile leg 3 with a self-leveling function, do not need the assistance and connection of positioning piles, are easy to operate, and the pile driving guide frame can be completely submerged in water. The overall design is not affected by changes in water depth, has a simple structure, is light in weight, and has a low cost.

[0069] 3. The present invention adjusts the horizontality of the pile driving guide frame through the retractable pile legs 3 and can compensate for the seabed settlement, effectively ensuring the accuracy of the pile driving process. The whole process does not require the assistance of positioning piles, which simplifies the operation process. By changing the length of the connecting frame 2 to adapt to different pile spacings, it can also be switched according to different numbers of small piles, making it more flexible to use.

[0070] 4. The present invention solves the technical problems of difficult operation, high cost and low construction efficiency caused by the prior art construction method that requires first setting up fixed piles, then connecting the fixed piles and the guide frame together, and then driving a number of small piles through the guide frame, and then setting up the guide frame by relying on a number of small piles.

[0071] Therefore, the present invention effectively overcomes various shortcomings in the prior art and has high industrial utilization value.

[0072] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A pile driving guide frame, Features: The invention comprises a plurality of cylinder modules (1), a connecting frame (2), and pile legs (3), wherein the cylinder module (1) comprises a main cylinder (101) and a guide ring (102), wherein the guide ring (102) is connected to the outer periphery of the main cylinder (101); the pile legs (3) are telescopically installed in the main cylinder (101), and the plurality of cylinder modules (1) are connected via the connecting frame (2); the guide ring (102) is used to assist small piles in being driven into the sea; and a plurality of jacking assemblies (104) are arranged on the guide ring (102), wherein the jacking assemblies (104) are used to adjust the verticality of the small piles.

2. The piling guide frame according to claim 1, Features: The main cylinder (101) comprises an ear plate and a leveling cylinder (1010), wherein the ear plate is arranged on the inner top surface of the main cylinder (101), one end of the leveling cylinder (1010) is arranged on the ear plate, and the other end is fixedly connected to the top end of the pile leg (3); a plurality of connecting guide rods are arranged on the outer periphery of the main cylinder (101), a main cylinder flange is arranged at one end of the connecting guide rod away from the main cylinder (101), a connecting frame flange is arranged on the connecting frame (2), and the main cylinder (101) and the connecting frame (2) are connected via the main cylinder flange, the connecting frame flange, and a connecting piece arranged therebetween.

3. The piling guide frame according to claim 2, Features: The connecting frame (2) comprises an intermediate frame (201) and a side frame (202); the number of the cylinder modules (1) is four; two adjacent main cylinders (101) are connected via the side frame (202); and two diagonal main cylinders (101) are connected via the intermediate frame (201); an intermediate tube (204) is vertically arranged at the intersection of the intermediate frames (201); and a lifting eye plate (203) is arranged at the top of the intermediate tube (204).

4. The piling guide frame according to claim 3, Features: The middle frame (201) and the side frame (202) are both assemblies, and the lengths of the middle frame (201) and the side frame (202) can be adjusted by increasing or decreasing the number of assemblies in the middle frame (201) and the side frame (202).

5. The piling guide frame according to claim 1, Features: The bottom end of the pile leg (3) is provided with a shoe surface (302), and the shoe surface (302) prevents the pile leg (3) from sinking too deep into the seabed; the bottom surface of the shoe surface (302) is provided with a shoe tip (301), and the shoe tip (301) enables the pile leg (3) to be inserted into the seabed.

6. The piling guide frame according to claim 1, Features: The guide ring body (102) comprises an upper guide ring (1020) and a lower guide ring (1021); the upper guide ring (1020) is arranged at the upper end of the outer circumference of the main cylinder (101); the lower guide ring (1021) is arranged at the lower end of the outer circumference of the main cylinder (101); and the centers of the upper guide ring (1020) and the lower guide ring (1021) are located on the same axis in the vertical direction.

7. The piling guide frame according to claim 6, Features: The upper guide ring (1020) is configured as an arm-hugging structure, the upper guide ring (1020) is hinged to the outer periphery of the main cylinder (101), and an opening and closing cylinder (105) is further provided between the outer periphery of the upper guide ring (1020) and the outer periphery of the main cylinder (101), and the opening and closing cylinder (105) is used to open and close the upper guide ring (1020).

8. The piling guide frame according to claim 7, Features: The upper end surface of the upper guide ring (1020) is also provided with a bell mouth (103), and the bell mouth (103) is used to guide the small pile.

9. The piling guide frame according to claim 6, Features: The pushing assembly (104) includes a plurality of telescopic cylinders, which are evenly distributed along the circumferential direction on the outer circumference of the upper guide ring (1020) and the lower guide ring (1021). The telescopic cylinders penetrate the outer circumference of the upper guide ring (1020) and the lower guide ring (1021) and are used to adjust the verticality of the small pile passing through the upper guide ring (1020) and the lower guide ring (1021).

10. A construction method of a pile driving guide frame, using the pile driving guide frame according to any one of claims 1 to 9, Features: Here are the steps: S1: The barrel module (1), the connecting frame (2), and the pile legs (3) are connected into a whole and placed on the deck of the crane ship; the thrust assembly (104) is in an initial state; S2: After arriving at the designated sea area, the crane on the crane ship hoists the pile driving guide frame to the designated position on the seabed; S3: adjusting the telescopic length of the pile legs (3) in the main cylinder (101) so that the pile driving guide frame is in a horizontal state; S4: The crane on the crane ship lifts the small pile, and the small pile passes through the guide ring body (102) from top to bottom, and the verticality of the small pile in the guide ring body (102) is controlled by the jacking assembly (104) so ​​that the small pile reaches a specified vertical state; S5: Continue to lower the small pile until it is inserted into the seabed. The crane is separated from the small pile, and the pile hammer is used to hammer the top of the small pile until the small pile reaches the specified height. S6: Repeat the operations of S4 and S5 to complete the piling operation of all small piles; S7: After all the small piles are driven, the crane lifts the pile driving guide frame back to the deck and transports it to the next construction site via a crane ship to repeat the operation steps S2-S6.

Citation Information

Patent Citations

  • Rear-piling jacket construction method, rear-piling jacket construction assembly and rear-piling jacket

    CN107268669A

  • Post-pile method skirt pile type guide tube frame and steel tube pile temporary locking device and method

    CN110552366A

  • Pile-holding guiding pipe rack and construction method thereof

    CN111501756A

  • Offshore wind power guide frame device capable of automatically leveling

    CN216339648U

  • Piling barge

    US20110129301A1