Supporting latticed column in deep foundation pit and construction method

Through precise positioning and adjustment of stereotyped lattice column brackets, rapid concrete pouring and temporary support technology, the problems of azimuth deviation and conflict during the construction of steel lattice columns in deep foundation pits have been solved, achieving high-precision positioning and improving construction efficiency, ensuring Ensure construction safety and stress stability.

CN118793065APending Publication Date: 2024-10-18CHINA CONSTR HENGCHUANG (BEIJING) TECH DEV CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411049169.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

During the construction of supporting lattice columns in deep foundation pits, rotational orientation deviation of steel lattice columns often occurs, and verticality is difficult to ensure. Moreover, temporary lattice columns easily conflict with underground structures, affecting construction safety and stress resistance.

Method used

The standardized lattice column bracket precise positioning and adjustment technology is adopted, and the steel lattice columns are suspended through the straightening platform and the ground through the limit slot, and the verticality is fine-tuned using adjustable screws and threaded rods; an integrated concrete pouring platform is used and a foldable integrated installation protection system to quickly complete concrete pouring and cast-in-place pile construction; in case of conflict, temporary supports are set up to remove steel lattice columns that affect the column position.

Benefits of technology

The verticality and positioning accuracy of the steel lattice columns are improved, ensuring the safety and efficiency of construction, avoiding conflicts with underground structures, and ensuring the stability of the support system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793065A_ABST
    Figure CN118793065A_ABST
Patent Text Reader

Abstract

The invention relates to a supporting latticed column in a deep foundation pit and a construction method. The construction method comprises the following steps that after drilling, a straightening frame platform is fixed to the ground; hoisting and placing the steel latticed column; concrete pouring is conducted through concrete pouring holes of the concrete pouring platform, and a cast-in-place pile is formed; and basement structure construction is conducted. The invention has the following beneficial effects: the finalized latticed column bracket accurate positioning and adjusting technology is adopted, the bracket is detachable, simple and easy to straighten, the bracket straightening frame platform is fixed with the ground in a manner of planting expansion bolts after punching, and the latticed column is hung and placed through the limiting groove formed in the center of the straightening frame platform; the symmetrical adjustable screw rods mounted on the straightening frame platform are used for equidistant measurement for preliminary positioning, and finally the threaded rod is used for fine adjustment and fixation, so that the straightening precision is improved, and the perpendicularity and positioning are ensured to meet the design requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of lattice column construction, and in particular relates to a supporting lattice column in a deep foundation pit and a construction method. Background Art

[0002] With the development of cities, geological environmental conditions are becoming increasingly complex, foundation pits are becoming ultra-deep, and more and more high-rise buildings are being designed and expanding underground, which means that the control of deformation is extremely demanding. Deep foundation pit support is an important construction project in the field of building construction. In the support system, column piles are vertical load-bearing components, which are mainly cast by cast-in-place piles and steel lattice columns.

[0003] The deeper the foundation pit, the more difficult it is to construct the columns. It is common for steel lattice columns to have rotational deviations and difficult to ensure verticality, which directly affects the connection between the lattice columns and the supporting beams. In severe cases, it will affect the force and safety of the support system. The temporary lattice column layout is based on the principle of avoiding the vertical force-bearing components of the main structure, but there is often a conflict between the temporary lattice columns and the underground structure due to construction errors, basement layout adjustments, etc. In summary, it is very important to develop a safe, reliable, and convenient construction method for supporting lattice columns in deep foundation pits to solve the problems of lattice columns being prone to displacement, verticality deviation, and conflict. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a supporting lattice column in a deep foundation pit and a construction method.

[0005] The deep foundation pit supporting lattice column comprises a straightening frame platform, a steel lattice column, a concrete pouring platform and a supporting beam;

[0006] The support straightening frame platform is fixed to the ground, a concrete pouring platform is set above the support straightening frame platform, a limit groove is set at the center of the straightening frame platform, the steel lattice column is hoisted into the foundation pit from the limit groove, a threaded rod is set between the steel lattice column and the straightening frame platform, and a concrete pouring hole is set at the center of the concrete pouring platform for pouring the steel lattice column to form a cast-in-place pile;

[0007] When the steel lattice columns of the foundation pit collide with the supporting beams of the basement structure, temporary supports are set on both sides of the steel lattice columns to be removed.

[0008] Preferably, the support straightening frame platform is fixed to the ground, and the center of the steel lattice column and the center of the straightening frame platform are on the same plumb line; four first connecting sleeves are welded on the end of the steel lattice column, and four second connecting sleeves are provided on the support straightening frame platform; a limit groove is provided in the center of the straightening frame platform for hanging the steel lattice column, and four symmetrical adjustable screws are installed on the straightening frame platform for measuring the verticality of the steel lattice column, and a threaded rod is connected and fixed between the first connecting sleeve and the second connecting sleeve.

[0009] Preferably, the concrete pouring platform is placed above the straightening frame platform, the four corners of the bottom of the concrete pouring platform are fixedly connected to the straightening frame platform by supporting columns, and a ladder is provided on one side of the concrete pouring platform; a foldable integral installation protection system is provided on the concrete pouring platform, and the foldable integral installation protection system includes vertical bars, upper telescopic cross bars and lower telescopic cross bars are installed between laterally adjacent vertical bars, upper telescopic diagonal bars and lower telescopic diagonal bars are installed between longitudinally adjacent vertical bars, and a number of connecting bars are arranged between the upper telescopic cross bars and the lower telescopic cross bars and between the upper telescopic diagonal bars and the lower telescopic diagonal bars; a limit track is installed on the concrete pouring platform, and strip limit blocks are welded around the concrete pouring platform, the strip limit blocks are placed in the limit track, and a concrete pouring hole is provided in the central opening of the concrete pouring platform for pouring concrete for cast-in-place piles.

[0010] Preferably, when the steel lattice columns of the foundation pit conflict with the supporting beams of the basement structure, temporary supports are set on both sides of the steel lattice columns to be removed, which are used to remove the steel lattice columns that affect the column position; wherein the temporary supports are set between the supporting beams and the floor slabs and between the floor slabs and the bottom slabs; the temporary supports include an upper supporting steel pipe and a lower supporting steel pipe, and the upper supporting steel pipe and the lower supporting steel pipe are connected and fixed by flanges; positioning blocks are provided at the bottom of the lower supporting steel pipe and the top of the upper supporting steel pipe, and the positioning blocks are fixedly installed with right-angle connectors with diagonal braces, and the bottom of the right-angle connector at the bottom of the lower supporting steel pipe is connected with a jack; the positioning block is welded to the bottom of the lower supporting steel pipe, and a positioning groove is provided on the positioning block, and a threaded hole is provided in the positioning groove, and the back of the right-angle connector is fixed by inserting a tightening threaded rod into the threaded hole; a tightening screw is provided on the right-angle connector of the upper supporting steel pipe through a reserved through hole, which is used to tighten the supporting beam.

[0011] The deep foundation pit inner supporting lattice column construction method comprises the following steps:

[0012] Step 1: After drilling, the straightening frame platform is fixed to the ground; the steel lattice column is suspended and positioned using an adjustable screw rod, and the verticality of the steel lattice column is adjusted using a threaded rod;

[0013] Step 2: Use the concrete pouring holes of the concrete pouring platform to pour concrete to form cast-in-place piles;

[0014] Step 3: During basement structure construction, when the steel lattice columns conflict with the supporting beams of the basement structure, temporary supports are set on both sides of the steel lattice columns to be removed, and then the steel lattice columns that affect the column position are removed.

[0015] Preferably, in step one, four first connecting sleeves are welded to the ends of the steel lattice columns, four second connecting sleeves are provided on the bracket straightening frame platform, and threaded rods are connected and fixed between the first connecting sleeves and the second connecting sleeves. When the verticality deviation of the steel lattice column is outside the range required by the project, the threaded rods are fine-tuned until the verticality deviation is within the range required by the project, and then the threaded rods are directly used for fixing.

[0016] The beneficial effects of the present invention are:

[0017] 1) The present invention adopts a standardized lattice column bracket precise positioning and adjustment technology. The bracket is detachable and simple and easy to straighten. The bracket straightening frame platform is fixed to the ground by post-installed expansion bolts. The lattice column is suspended through the limit groove provided in the center of the straightening frame platform, and the symmetrical adjustable screws installed on the straightening frame platform are used for equidistant measurement for preliminary positioning. Finally, threaded rods are used for fine-tuning and fixing, which improves the straightening accuracy and ensures that the verticality and positioning meet the design requirements.

[0018] 2) The present invention adopts an integrated platform rapid concrete pouring technology. The concrete pouring platform is placed above the straightening frame platform, and is provided with a foldable integral installation protection system. The installation is quickly completed by tensioning the telescopic rod. A concrete pouring hole is provided in the center of the concrete pouring platform, and the bored pile concrete is quickly poured using the hole to improve construction efficiency.

[0019] 3) The present invention adopts the technology of vertical underpinning and removal of lattice columns. When the steel lattice columns of the foundation pit conflict with the supporting beams of the basement structure, temporary supports are set on both sides of the steel lattice columns to be removed, and the lattice columns that affect the column position are removed. Jacks and tightening screws are set on the temporary supports to ensure the stability of the support system and the safety of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of a standardized lattice column support;

[0021] Figure 2 It is a structural schematic diagram of an integrated concrete pouring platform;

[0022] Figure 3 It is a structural diagram of a foldable integral installation protection system;

[0023] Figure 4 It is a schematic diagram of the vertical underpinning and excision technology of lattice columns;

[0024] Figure 5 It is a schematic diagram of the connection structure of the upper and lower supporting steel pipes;

[0025] Figure 6 It is a schematic diagram of the structure of the top right-angle connector;

[0026] Figure 7 It is a structural diagram of the bottom right-angle connector.

[0027] Description of the accompanying drawings: 1-straightening frame platform, 2-limiting groove, 3-steel lattice column, 4-ladder, 5-vertical rod, 6-upper telescopic cross bar, 7-connecting rod, 8-lower telescopic cross bar, 9-concrete pouring platform, 10-lower telescopic diagonal rod, 11-concrete pouring hole, 12-upper telescopic diagonal rod, 13-limiting track, 14-limiting block, 15-support column, 16-first connecting sleeve, 17-threaded rod, 18 -Second connecting sleeve, 19-adjustable screw, 20-nut, 21-cast pile, 22-jack, 23-right angle connector, 24-positioning block, 25-lower supporting steel pipe, 26-flange, 27-upper supporting steel pipe, 28-support beam, 29-floor slab, 30-tightening screw, 31-diagonal brace, 32-bottom plate, 33-reserved through hole, 34-fastening threaded rod, 35-positioning groove, 36-threaded hole. DETAILED DESCRIPTION

[0028] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for ordinary persons in the art, without departing from the principle of the present invention, the present invention can also be modified in some ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

[0029] Embodiment 1

[0030] As an embodiment, the present embodiment 1 proposes that the supporting lattice column in the deep foundation pit includes a straightening frame platform 1, a limit groove 2, a steel lattice column 3, a ladder 4, a vertical rod 5, an upper telescopic cross bar 6, a connecting rod 7, a lower telescopic cross bar 8, a concrete pouring platform 9, a lower telescopic diagonal rod 10, a concrete pouring hole 11, an upper telescopic diagonal rod 12, a limit rail 13, a limit block 14, a support column 15, a first connecting sleeve 16, and a threaded rod 17. , a second connecting sleeve 18, an adjustable screw 19, a nut 20, a cast-in-place pile 21, a jack 22, a right-angle connector 23, a positioning block 24, a lower supporting steel pipe 25, a flange 26, an upper supporting steel pipe 27, a supporting beam 28, a floor slab 29, a tightening screw 30, a diagonal brace 31, a base plate 32, a reserved through hole 33, a fastening threaded rod 34, a positioning groove 35, and a threaded hole 36; and involves a standardized lattice column bracket precise positioning and adjustment technology.

[0031] The support straightening frame platform 1 is fixed to the ground, a concrete pouring platform 9 is set up above the support straightening frame platform 1, a limit groove 2 is set at the center of the straightening frame platform 1, a steel lattice column 3 is hoisted into the foundation pit from the limit groove 2, a threaded rod 17 is set between the steel lattice column 3 and the straightening frame platform 1, and a concrete pouring hole 11 is set at the center of the concrete pouring platform 9 for pouring the steel lattice column 3 to form a cast-in-place pile 21;

[0032] When the foundation pit steel lattice columns 3 collide with the supporting beams 28 of the basement structure, temporary supports are provided on both sides of the steel lattice columns 3 to be removed.

[0033] Standardized lattice column support precise positioning and adjustment technology: the support straightening frame platform 1 is fixed to the ground by post-planting expansion bolts, so that the center of the steel lattice column 3 and the center of the straightening frame platform 1 are on the same plumb line; before the steel lattice column 3 is suspended, four first connecting sleeves 16 are welded at the column end; four second connecting sleeves 18 are provided on the support straightening frame platform 1;

[0034] When the steel lattice column 3 is suspended, it is suspended through the limit groove 2 provided in the center of the straightening frame platform 1, and the four symmetrical adjustable screws 19 installed on the straightening frame platform 1 are used to measure the equal distance for preliminary positioning, and then the verticality of the lattice column is measured. If the verticality deviation is outside the required range of the project, the threaded rod 17 respectively connected and fixed to the first connecting sleeve 16 and the second connecting sleeve 18 is used for fine adjustment. If the verticality deviation is within the required range of the project, the threaded rod 17 is directly used for fixing.

[0035] Embodiment 2

[0036] As another embodiment, based on the embodiment one, the second embodiment proposes a more specific lattice column supporting a deep foundation pit, and also involves an integrated platform concrete rapid pouring technology and a lattice column vertical underpinning and removal technology.

[0037] Integrated platform concrete rapid pouring technology: the concrete pouring platform 9 is placed above the straightening frame platform 1, and the four corners of the bottom of the concrete pouring platform 9 are fixedly connected to the straightening frame platform 1 by supporting columns 15. A ladder 4 is provided on one side of the concrete pouring platform 9, and construction workers enter the platform from the ground through the ladder 4; a foldable integral installation protection system is provided on the concrete pouring platform 9, and the foldable integral installation protection system includes vertical rods 5, and upper telescopic cross rods 6 and lower telescopic cross rods 8 are installed between adjacent vertical rods 5 in the horizontal direction, and upper telescopic diagonal rods 12 and lower telescopic diagonal rods 10 are installed between adjacent vertical rods 5 in the longitudinal direction. The protection system is folded by using the telescopic rods, which is convenient for transportation and installation. A number of connecting rods 7 are evenly arranged between the upper telescopic cross rod 6 and the lower telescopic cross rod 8, and between the upper telescopic diagonal rod 12 and the lower telescopic diagonal rod 10.

[0038] When the protection system is installed, the concrete pouring platform 9 is installed with a limit track 13, and strip limit blocks 14 are welded around the concrete pouring platform 9. The strip limit blocks 14 are placed in the limit track 13, and the installation is completed quickly by tensioning the telescopic rod; a concrete pouring hole 11 is provided in the center of the concrete pouring platform 9, and the concrete of the bored pile 21 is poured using the hole.

[0039] Vertical replacement and removal technology of lattice columns: When the foundation pit steel lattice column 3 conflicts with the supporting beam 28 of the basement structure, temporary supports are set on both sides of the steel lattice column 3 to be removed, and the lattice column affecting the column position is removed; wherein the temporary supports are set between the supporting beam 28 and the floor slab 29 and between the floor slab 29 and the bottom plate 32; the temporary supports are composed of upper supporting steel pipes 27 and lower supporting steel pipes 25 in sections, and the upper supporting steel pipes 27 and the lower supporting steel pipes 25 are connected and fixed by flanges 26; positioning blocks 24 are provided at the bottom of the lower supporting steel pipe 25 and the top of the upper supporting steel pipe 27, and the positioning blocks 24 are fixedly installed with right-angle connectors 23 with diagonal braces 31, and the bottom of the right-angle connector 23 at the bottom of the lower supporting steel pipe 25 is connected with a jack 22.

[0040] The positioning block 24 is welded to the bottom of the lower supporting steel pipe 25 and is provided with a positioning groove 35. The groove is provided with a threaded hole 36. The fastening threaded rods 34 evenly arranged on the back of the right-angle connector 23 are inserted into the threaded hole 36 for fixation; a right-angle connector 23 is also provided on the top of the upper supporting steel pipe 27, and the connection method of the remaining steel pipes is the same as that of the lower supporting steel pipe 25. The reserved through hole 33 on the right-angle connector 23 is provided with a tightening screw 30, and the support beam 28 is tightened by rotating the nut thereon.

[0041] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.

[0042] Embodiment 3

[0043] As another embodiment, this embodiment 3 proposes, based on the embodiments 1 and 2, a construction method for supporting lattice columns in a deep foundation pit, and its main construction steps are as follows:

[0044] Step 1. Production and installation of standardized lattice column brackets: Based on past construction experience, the overall design and production of the assembled detachable straightening frame system is carried out. The bracket straightening frame platform 1 is fixed to the ground by post-installed expansion bolts, so that the center of the steel lattice column 3 and the center of the straightening frame platform 1 are on the same plumb line.

[0045] Step 2: Drilling, making and placing steel cages: Use a rotary drilling rig to drill holes. After the holes are completed, measure the hole depth and check the verticality. When the requirements are met, lower the steel cages in sections. The steel cages are made and trial-assembled in advance at the construction site.

[0046] Step 3, hoisting and straightening of steel lattice columns: after the steel cage is hoisted, the steel plate of the hoisting and straightening frame platform 1 is centered in place and fixed to the ground by post-planted expansion bolts; before the steel lattice column 3 is hoisted, four first connecting sleeves 16 are welded to the column end; when the steel lattice column 3 is hoisted, it is hoisted through the limit groove 2 provided in the center of the straightening frame platform 1, and the four symmetrical adjustable screws 19 installed on the straightening frame platform 1 are used to measure the same distance for preliminary positioning, and then the verticality of the lattice column is measured. If the verticality deviation is outside the engineering requirement range, the threaded rod 17 respectively connected and fixed to the first connecting sleeve 16 and the second connecting sleeve 18 is used for fine adjustment. If the verticality deviation is within the engineering requirement range, the threaded rod 17 is directly used for fixing.

[0047] Step 4: Cast-in-place pile concrete pouring: Before pouring, check the hole depth and bottom slag thickness first. When pouring, bury a Ф250 conduit at a depth of 2 to 8m in the concrete. A concrete pouring platform 9 is used for pouring concrete for bored piles. The pouring platform is placed above the straightening frame platform 1 and is fixedly connected by supporting columns 15. Construction workers enter the platform from the ground through ladders 4. A foldable integral installation protection system is provided on the concrete pouring platform 9. An upper telescopic cross bar 6 and a lower telescopic cross bar 8 are installed between 5 adjacent vertical bars in the horizontal direction, and an upper telescopic diagonal bar 12 and a lower telescopic diagonal bar 10 are installed between 5 adjacent vertical bars in the longitudinal direction. The telescopic bar is used to fold the protection system for convenient transportation and installation. A number of connecting rods 7 are evenly arranged between the upper and lower telescopic bars. When the protection system is installed, the strip limit blocks 14 welded around the concrete pouring platform 9 are placed in the limit rails 13 installed at the bottom of the system, and the installation is quickly completed by tensioning the telescopic bar. A concrete pouring hole 11 is provided in the central opening of the concrete pouring platform 9, and the hole is used for pouring concrete for the bored pile 21.

[0048] Embodiment 4

[0049] As another embodiment, this embodiment 4 proposes a more specific construction method for supporting lattice columns in a deep foundation pit on the basis of the embodiment 3, and there are steps 5 and 6 after step 4.

[0050] Step 5: Basement structure construction: Carry out basement structure construction according to the requirements of the construction design drawings. Pay attention to observation during the construction process. If there is a conflict between the temporary steel lattice column 3 and the underground structure, adjust and deal with it in time and set up temporary support top.

[0051] Step 6, temporary support installation and removal of lattice columns affecting column position: When the foundation pit steel lattice column 3 conflicts with the supporting beam 28 of the basement structure, temporary supports are set on both sides of the steel lattice column 3 to be removed, and then the lattice columns affecting the column position are removed; the temporary supports are set between the supporting beam 28 and the floor slab 29 and between the floor slab 29 and the bottom plate 32; the temporary supports are composed of upper supporting steel pipes 27 and lower supporting steel pipes 25 in sections, which are connected and fixed by flanges 26; a straight support with diagonal braces 31 is installed at the bottom of the lower supporting steel pipe 25 The angle connector 23 is connected to the jack 22; the positioning block 24 is welded to the bottom of the lower supporting steel pipe 25, and is provided with a positioning groove 35, in which a threaded hole 36 is provided. The fastening threaded rods 34 evenly arranged on the back of the right-angle connector 23 are inserted into the threaded hole 36 for fixation; a right-angle connector 23 is also provided on the top of the upper supporting steel pipe 27, and the connection method of the remaining steel pipes is the same as that of the lower supporting steel pipe 25, and the reserved through hole 33 on the right-angle connector 23 is provided with a tightening screw 30, and the support beam 28 is tightened by rotating the nut thereon.

[0052] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

Claims

1. A lattice column supporting a deep foundation pit, characterized in that: It includes straightening frame platform, steel lattice columns, concrete pouring platform and support beams; The support straightening frame platform is fixed to the ground, a concrete pouring platform is set above the support straightening frame platform, a limit groove is set at the center of the straightening frame platform, the steel lattice column is hoisted into the foundation pit from the limit groove, a threaded rod is set between the steel lattice column and the straightening frame platform, and a concrete pouring hole is set at the center of the concrete pouring platform for pouring the steel lattice column to form a cast-in-place pile; When the steel lattice columns of the foundation pit collide with the supporting beams of the basement structure, temporary supports are set on both sides of the steel lattice columns to be removed.

2. The deep foundation pit supporting lattice column according to claim 1, characterized in that: The support straightening frame platform is fixed to the ground, and the center of the steel lattice column and the center of the straightening frame platform are on the same plumb line; four first connecting sleeves are welded to the end of the steel lattice column, and four second connecting sleeves are provided on the support straightening frame platform; a limit groove is provided in the center of the straightening frame platform for hanging the steel lattice column, and four symmetrical adjustable screws are installed on the straightening frame platform for measuring the verticality of the steel lattice column, and a threaded rod is connected and fixed between the first connecting sleeve and the second connecting sleeve.

3. The deep foundation pit supporting lattice column according to claim 1, characterized in that: The concrete pouring platform is placed above the straightening frame platform, and the four corners of the bottom of the concrete pouring platform are fixedly connected to the straightening frame platform by supporting columns, and a ladder is provided on one side of the concrete pouring platform; a foldable integral installation protection system is provided on the concrete pouring platform, and the foldable integral installation protection system includes vertical bars, and upper telescopic cross bars and lower telescopic cross bars are installed between the vertical bars adjacent to each other in the horizontal direction, and upper telescopic diagonal bars and lower telescopic diagonal bars are installed between the vertical bars adjacent to each other in the longitudinal direction, and a plurality of connecting bars are arranged between the upper telescopic cross bars and the lower telescopic cross bars, and between the upper telescopic diagonal bars and the lower telescopic diagonal bars; a limit track is installed on the concrete pouring platform, and strip limit blocks are welded around the concrete pouring platform, and the strip limit blocks are placed in the limit track, and a concrete pouring hole is provided in the central opening of the concrete pouring platform for pouring concrete for cast-in-place piles.

4. The deep foundation pit supporting lattice column according to claim 1, characterized in that: When the steel lattice columns of the foundation pit conflict with the supporting beams of the basement structure, temporary supports are set on both sides of the steel lattice columns to be removed, which are used to remove the steel lattice columns that affect the column positions; wherein the temporary supports are set between the supporting beams and the floor slabs and between the floor slabs and the bottom slabs; the temporary supports include an upper supporting steel pipe and a lower supporting steel pipe, and the upper supporting steel pipe and the lower supporting steel pipe are connected and fixed by flanges; positioning blocks are provided at the bottom of the lower supporting steel pipe and the top of the upper supporting steel pipe, and a right-angle connector with a diagonal brace is fixedly installed on the positioning block, and a jack is connected to the bottom of the right-angle connector at the bottom of the lower supporting steel pipe; the positioning block is welded to the bottom of the lower supporting steel pipe, and a positioning groove is provided on the positioning block, and a threaded hole is provided in the positioning groove, and the back of the right-angle connector is fixed by inserting a tightening threaded rod into the threaded hole; a tightening screw is provided on the right-angle connector of the upper supporting steel pipe through a reserved through hole, which is used to tighten the supporting beam.

5. The method for constructing supporting lattice columns in a deep foundation pit according to any one of claims 1 to 4, characterized in that: The following steps are involved: Step 1: After drilling, the straightening frame platform is fixed to the ground; the steel lattice column is suspended and positioned using an adjustable screw rod, and the verticality of the steel lattice column is adjusted using a threaded rod; Step 2: Use the concrete pouring holes of the concrete pouring platform to pour concrete to form cast-in-place piles; Step 3: During basement structure construction, when the steel lattice columns conflict with the supporting beams of the basement structure, temporary supports are set on both sides of the steel lattice columns to be removed, and then the steel lattice columns that affect the column position are removed.

6. The method for constructing supporting lattice columns in a deep foundation pit according to claim 5, characterized in that: In step one, four first connecting sleeves are welded on the end of the steel lattice column, four second connecting sleeves are provided on the bracket straightening frame platform, and threaded rods are connected and fixed between the first connecting sleeves and the second connecting sleeves. When the verticality deviation of the steel lattice column is outside the range required by the project, the threaded rods are fine-tuned until the verticality deviation is within the range required by the project, and then the threaded rods are directly used for fixing.

Citation Information

Cited By

  • Positioning guide frame for vertical supporting latticed column of deep foundation pit

    CN119686338A