By adopting underwater foundation trench excavation and prefabricated assembly methods in the reclamation (lake) area, the problems of difficulty in handling boulders and risk of leakage in the construction of shallow tunnels have been solved, and efficient and low-cost tunnel construction has been achieved, which has significant economic and social benefits.
Patent Information
- Application Number
- CN202410980355.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-10-18
AI Technical Summary
When constructing shallow tunnels in reclamation (lake) areas, there are a large number of large-diameter stones in the deep under-consolidated backfill strata with high groundwater levels, which makes the construction of retaining piles with the traditional open-cut method difficult, leakage risk and high cost. .
Adopting the construction method of underwater foundation trench excavation combined with underwater prefabricated assembly, the foundation trench is excavated by grading the ground in the reclamation (lake) area, centralized foundations and large-diameter engineering piles are set, and the prefabricated tunnel sections are hoisted and pulled together using erection equipment. Sections are gradually assembled to form a shallow tunnel, which avoids the difficulty in handling boulders and the risk of leakage caused by the traditional open-cut method.
It achieves safe and efficient construction under high water level conditions, reduces the amount of earth and stone excavation, reduces construction costs and risks, and has huge economic and social benefits.
Smart Images

Figure CN118793091A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shallow buried tunnels, in particular to a prefabricated assembly construction method for shallow buried tunnels in sea and lake reclamation areas. Background Art
[0002] At present, the construction of shallow buried tunnels in reclamation (lake) areas, especially in deep under-consolidated backfill strata with high groundwater levels, is difficult due to the presence of a large number of large-diameter blocks (isolated) stones in the backfill, large permeability coefficients, and strong hydraulic connections with adjacent waters. If conventional open-cut method is used to support piles (walls), it will be difficult to form piles (walls), the risk of leakage is high, and the cost of emergency rescue is high.
[0003] Therefore, how to construct shallow buried tunnels in reclamation (lake) areas is a technical problem that needs to be solved urgently. Summary of the invention
[0004] The purpose of the present invention is to provide a prefabricated assembly construction method for shallow tunnels in reclamation and lake reclamation areas based on the above-mentioned deficiencies of the prior art. The method adopts underwater foundation trench excavation combined with underwater prefabrication and assembly to complete the construction of shallow tunnels in reclamation (lake) areas, which can avoid the contradiction that the traditional open-cut method in the direct filling area of the reclamation (lake) section is difficult to enclose and pile in the stratum with numerous isolated rocks, has a high risk of leakage and cannot be used for dry operation and cast-in-place construction.
[0005] The purpose of the present invention is achieved by the following technical solutions: A prefabricated assembly construction method for a shallow buried tunnel in a sea or lake reclamation area, characterized in that the construction method comprises the following steps: In the land reclamation and lake reclamation areas, the ground is excavated to above the highest water level and the site is leveled; The foundation trench is excavated without drainage, and centralized foundations are set up one by one at the joints of each tunnel segment on the site; The first prefabricated tunnel segment is hoisted by erection equipment and placed on the said centralized foundation corresponding to both ends; A transport vehicle is arranged above the top surface of the prefabricated tunnel segment that has been installed, and the prefabricated tunnel segments to be installed next are transported one by one to the feeding point of the erection equipment by the transport vehicle, and the prefabricated tunnel segments to be installed are placed one by one on the corresponding centralized foundation by the erection equipment; Pull the prefabricated tunnel segment to be installed together with the prefabricated tunnel segment that has been installed, and lock the joint between the two; The erection equipment is moved forward to the installation position of the next prefabricated tunnel segment, and the next prefabricated tunnel segment to be installed is transported to the feeding point after the erection equipment is moved into position by the transport vehicle, and the prefabricated tunnel segments are hoisted and pulled together in sequence; In this reciprocating manner, each of the prefabricated tunnel segments is constructed, and each of the prefabricated tunnel segments is finally assembled to form a shallow buried tunnel located in the sea and lake reclamation area.
[0006] The centralized foundation includes a cap and large-diameter engineering piles, and the cap is connected above the large-diameter engineering piles.
[0007] The cap is constructed by using a steel casing or a prefabricated cap.
[0008] A positioning device is preset on the support platform, and the erection equipment is positioned underwater through the positioning device.
[0009] A temporary water retaining plate is arranged on the top surface of the installed prefabricated tunnel segment, and the temporary water retaining plate is used to enclose the running area of the transport vehicle to prevent water intrusion.
[0010] When the prefabricated tunnel segment is lowered, sealing doors and temporary ballast water tanks are set at both ends of the prefabricated tunnel segment to adjust the negative buoyancy of the prefabricated tunnel segment and balance the buoyancy of the prefabricated tunnel segment when it sinks after being hoisted into the water.
[0011] During the foundation pit excavation process, the boulders and isolated rocks in the sea and lake reclamation areas are processed.
[0012] The advantages of the present invention are: no isolation (drainage) of groundwater, use of water conditions to increase the trench excavation slope, and reduce the amount of earth and stone excavation; water pressure can be used when pulling and closing; all tunnel segments are prefabricated and assembled, low-carbon and environmentally friendly; avoiding the problems of difficult rock handling, difficult to ensure water-stopping effect, and high excavation risk in traditional open-cut support methods, and has huge economic and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 The construction steps of the present invention Figure Ⅰ ; Figure 2 The construction steps of the present invention Figure II ; Figure 3 The construction steps of the present invention Figure III ; Figure 4 The construction steps of the present invention Figure IV ; Figure 5 The construction steps of the present invention Figure V ; Figure 6 The construction steps of the present invention Figure VI ; Figure 7 The construction steps of the present invention Figure VII ; Figure 8 The construction steps of the present invention Figure VIII ; Fig. 9 The construction steps of the present invention are Figure VIII Side view of. DETAILED DESCRIPTION
[0014] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art: like Figure 1-9 As shown, the marks 1-6 in the figure respectively represent: abutment 1, installed prefabricated tunnel segment 2, prefabricated tunnel segment to be installed 3, transport vehicle 4, erection equipment 5, and water retaining plate 6.
[0015] Embodiment: The prefabricated assembly construction method for shallow tunnels in reclamation (lake) areas in this embodiment is used for the construction of shallow tunnels in reclamation (lake) areas, especially for areas with high groundwater levels, deep and under-consolidated backfill strata, a large number of large-diameter boulders and boulders, large permeability coefficients, and strong hydraulic connections with adjacent waters, where it is difficult to support piles (walls) using conventional open-cut retaining piles (walls), the risk of leakage is high, and the cost is high.
[0016] like Figures 1 to 9 As shown, the prefabrication assembly construction method in this embodiment includes the following steps: 1) In the reclamation (lake) area, the ground is excavated to above the highest water level and the site is leveled.
[0017] 2) Construction of large diameter engineering piles.
[0018] 3) Excavate the foundation trench underwater without drainage, use steel casing or prefabricated foundation to construct foundation 1, and connect each foundation 1 to its corresponding large-diameter project. Handle the isolated rocks during the large excavation of the foundation trench, which will facilitate the construction of foundation 1 and greatly reduce the construction difficulty. If the steel sheet pile cofferdam method is used to construct foundation 1 and the stone-filled stratum is difficult to construct, the prefabricated foundation can be hoisted into place, and after the bottom is sealed, the secondary pouring and fine-tuning of the support elevation can be carried out in a dry working environment, which is more operable.
[0019] In this embodiment, since the settlement of the under-consolidated direct filling area of the reclamation (lake) is large, even if the foundation treatment measures are taken, the post-construction settlement may reach tens of centimeters, so the use of engineering piles is considered to solve the long-term settlement problem. Furthermore, it is considered to set up a centralized foundation at the joint of the tunnel segment and use a large-diameter pile foundation to reduce the number of piles and reduce the contradiction of pile construction in the backfill layer with isolated rocks.
[0020] 4) The first prefabricated tunnel segment is placed on the caps 1 at both ends through the erection equipment 5. This embodiment uses the longitudinal stiffness and bearing capacity of the prefabricated tunnel segment itself to support it on the cap-pile foundation. In view of the possible corrosion and long-term maintenance problems of groundwater in the reclamation area, the prefabricated tunnel segment does not consider the use of prestressing, and the tunnel segment is calculated and configured with ordinary steel bars in the transverse and longitudinal directions.
[0021] 5) If Figure 1 As shown in the figure, the top of the installed prefabricated tunnel segment 2 is used as the transportation channel for the preset tunnel segment 3 to be installed, and the transport vehicle 4 travels on it for transportation, which can save the temporary ground reinforcement costs for conventional ground transportation. Fig. 9 As shown, temporary water retaining plates 6 are arranged on both sides and the front end of the installed prefabricated tunnel segment 2, and the running area of the transport vehicle 4 is enclosed by the water retaining plates 6 to prevent water from intruding. In some cases, a water-enterable rail transport vehicle can also be used for transportation.
[0022] The transport vehicle 4 travels on top of the erected prefabricated tunnel segment 2 and delivers a new prefabricated tunnel segment 3 to be installed to the feeding point of the erection equipment 5 .
[0023] 6) Combination Figures 2 to 4 As shown, the erection equipment 5 transports the transport vehicle 4 to its feeding point and hoists and lowers the prefabricated tunnel segment 3 to be installed to the underwater platform 1. The prefabricated tunnel segment 3 to be installed is provided with sealing doors at both ends and a temporary ballast water tank. By adjusting the negative buoyancy of the segment, the buoyancy of the prefabricated tunnel segment 3 to be installed is balanced when it sinks after being hoisted into the water, ensuring that it can be accurately installed on the platform 1. At the same time, while the erection equipment 5 is performing the hoisting operation below, the transport vehicle 4 can return to the lifting point to prepare to transport the next prefabricated tunnel segment, and the construction is carried out synchronously to improve the construction efficiency.
[0024] In this embodiment, the weight of a single prefabricated tunnel segment is controlled at about 800 tons, and the length and weight of the prefabricated tunnel segment can also be adjusted according to the cost performance of the erection equipment 5. The erection equipment 5 can use an existing bridge erection machine to transform the tunnel structure and underwater environment to save investment.
[0025] 7) Pull the prefabricated tunnel segments together with the jack (which can be reused), pull the prefabricated tunnel segment 3 to be installed toward the prefabricated tunnel segment 2 that has been installed, temporarily stop the water with the water stop strip (the internal water stop strip will be applied in the pipe segment later as a water stop during the use phase), and lock the joint. From then on, the construction of the prefabricated tunnel segment 3 to be installed is completed and becomes the prefabricated tunnel segment 2 that has been installed.
[0026] 8) Combination Figures 5 to 8As shown, the erection equipment 5 moves forward to the installation position of the next prefabricated tunnel segment, and is positioned underwater by the positioning device preset on the cap 1, preparing for the installation of the next prefabricated tunnel segment. In this embodiment, the cap 3 located in the front also serves as a support for the legs of the erection equipment 5, so the size of the cap meets the needs of supporting the legs of the erection equipment 5 and the local end of the prefabricated tunnel segment at the same time, ensuring construction safety.
[0027] Although the above embodiments have described in detail the concepts and embodiments of the present invention with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and changes can still be made to the present invention without departing from the scope of the claims, so they are not described one by one here.
Claims
1. A prefabricated assembly construction method for shallow buried tunnels in sea and lake reclamation areas, characterized by: The construction method comprises the following steps: In the land reclamation and lake reclamation areas, the ground is excavated to above the highest water level and the site is leveled; The foundation trench is excavated without drainage, and centralized foundations are set up one by one at the joints of each tunnel segment on the site; The first prefabricated tunnel segment is hoisted by erection equipment and placed on the said centralized foundation corresponding to both ends; A transport vehicle is arranged above the top surface of the prefabricated tunnel segment that has been installed, and the prefabricated tunnel segments to be installed next are transported one by one to the feeding point of the erection equipment by the transport vehicle, and the prefabricated tunnel segments to be installed are placed one by one on the corresponding centralized foundation by the erection equipment; Pull the prefabricated tunnel segment to be installed together with the prefabricated tunnel segment that has been installed, and lock the joint between the two; The erection equipment is moved forward to the installation position of the next prefabricated tunnel segment, and the next prefabricated tunnel segment to be installed is transported to the feeding point after the erection equipment is moved into position by the transport vehicle, and the prefabricated tunnel segments are hoisted and pulled together in sequence; In this reciprocating manner, each of the prefabricated tunnel segments is constructed, and each of the prefabricated tunnel segments is finally assembled to form a shallow buried tunnel located in the sea and lake reclamation area.
2. The prefabrication and assembly construction method of a shallow buried tunnel in a sea or lake reclamation area according to claim 1 is characterized by: The centralized foundation includes a cap and large-diameter engineering piles, and the cap is connected above the large-diameter engineering piles.
3. The prefabrication and assembly construction method of a shallow buried tunnel in a sea or lake reclamation area according to claim 2 is characterized by: The cap is constructed by using a steel casing or a prefabricated cap.
4. The prefabrication and assembly construction method of a shallow buried tunnel in a sea or lake reclamation area according to claim 2 is characterized by: A positioning device is preset on the support platform, and the erection equipment is positioned underwater through the positioning device.
5. The prefabrication and assembly construction method of a shallow buried tunnel in a sea or lake reclamation area according to claim 1 is characterized by: A temporary water retaining plate is arranged on the top surface of the installed prefabricated tunnel segment, and the temporary water retaining plate is used to enclose the running area of the transport vehicle to prevent water intrusion.
6. The prefabrication and assembly construction method for shallow buried tunnels in sea and lake reclamation areas according to claim 1 is characterized by: When the prefabricated tunnel segment is lowered, sealing doors and temporary ballast water tanks are set at both ends of the prefabricated tunnel segment to adjust the negative buoyancy of the prefabricated tunnel segment and balance the buoyancy of the prefabricated tunnel segment when it sinks after being hoisted into the water.
7. The prefabrication and assembly construction method for shallow buried tunnels in sea and lake reclamation areas according to claim 1 is characterized by: During the foundation pit excavation process, the boulders and isolated rocks in the sea and lake reclamation areas are processed.
Citation Information
Cited By
Fabricated subway tunnel construction method in high-water-level area
CN119021275A