Pile top connecting device for core-filled PHC pipe pile and prefabricated bearing platform

By using a micro-expanded cement mortar body and multiple vertical force transmission devices in the pile top connection between PHC pipe piles and prefabricated support platforms, combined with the prefabricated structure, the problem of poor connection between PHC pipe piles and cast-in-place support platforms is solved, and the problem of poor connection between PHC pipe piles and cast-in-place support platforms is realized. Stable and reliable load transfer and efficient construction reduce the amount of water used for maintenance.

CN222083538UActive Publication Date: 2024-11-29TRANSFIGURE DESIGN CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420063507.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-11
Publication Date
2024-11-29
Estimated Expiration
2034-01-11

AI Technical Summary

Technical Problem

The connection effect between PHC pipe piles and cast-in-place bearing tables is poor, and there is easy to cause failure of pile top connection performance or insufficient shear bearing capacity. The pouring quality of core-filled concrete is not high, and segregated water is prone to occur, long construction period, and maintenance Use a lot of water.

Method used

A pile top connection device between core-filled PHC pipe piles and prefabricated support platforms is designed, including PHC prestressed high-strength concrete pipe piles, prefabricated support platforms, prefabricated support columns, steel hoops and structural steel cages, through micro-expanded cement The mortar body and multiple vertical force transmission devices ensure reliable load transmission, improve connection stability and shear bearing capacity, and use prefabricated structure to simplify construction.

Benefits of technology

The structural stability and reliability and construction efficiency of pile top connections have been improved, the risk of connection failure is reduced, the shear bearing capacity is improved, the construction process and maintenance water consumption is reduced, and the concrete quality and construction environment are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083538U_ABST
    Figure CN222083538U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses a pile top connecting device for a core-filled PHC (prestressed high-strength concrete) pipe pile and a prefabricated bearing platform, which comprises a PHC pipe pile, the prefabricated bearing platform, a prefabricated core-filled column and a steel hoop, a prefabricated core filling column is arranged in a pipe of the PHC prestressed high-strength concrete pipe pile, and the space between the prefabricated core filling column and the PHC prestressed high-strength concrete pipe pile is filled and fixed with micro-expansive cement mortar. A constructional reinforcement cage is embedded in the prefabricated core filling column; the PHC prestressed high-strength concrete pipe pile is sleeved with a fixed steel hoop, a plurality of profile steel shear keys are fixed to the positions, corresponding to the post-pouring hole grooves, of the outer wall of the steel hoop, and a plurality of L-shaped twisted steel bars are fixed to the positions, corresponding to the penetrating holes, of the outer wall of the steel hoop. The profile steel shear keys are fixedly connected with a bottom plate of the post-pouring hole groove through connecting pieces. The pile top connecting device has the advantages of being stable and reliable in structure, good in device connecting quality, high in assembly construction efficiency and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a pile top connection device for a core-filled PHC pipe pile and a prefabricated cap. Background Art

[0002] As the pace of urban infrastructure construction in my country continues to accelerate, more and more municipal road projects have entered the early design stage. Because new roads cannot interrupt the passage of existing roads and pedestrians, underpasses are often set up under the new roads. Due to the limitations of road network planning, landforms and geological conditions, some underpasses are set up on deep silt strata, and their foundations need to be deep soft foundation treated before construction.

[0003] PHC pipe piles are widely used in deep soft foundation treatment of underpass foundations because of their low engineering cost, fast construction speed, and low environmental pollution. In combination with cast-in-place caps, they can directly transfer the pile top load to the pile side and pile end soil layers.

[0004] During the actual construction, it was found that the connection between the PHC pipe pile and the cast-in-place cap was not good, and the pile top connection performance failure or insufficient shear bearing capacity was prone to occur. The pouring quality of the core-filled concrete was not high, and segregation and bleeding were prone to occur. The construction period of the cast-in-place cap formwork and steel bar binding was long, and a lot of water was used for maintenance, which easily softened the base soil. In view of the problems found in the construction of PHC pipe piles, it is an innovative work with economic value and social benefits to study a pile top connection device between the core-filled PHC pipe pile and the cap from the perspective of technological advancement, applicability, reliability, safety and economy. Utility Model Content

[0005] 1. Technical issues to be solved

[0006] In view of the shortcomings of the prior art, the utility model provides a pile top connection device for a core-filled PHC pipe pile and a prefabricated cap, which has the advantages of stable and reliable structure, good device connection quality and high assembly construction efficiency, and solves the technical problem of poor connection effect encountered in the use of traditional PHC pipe piles.

[0007] (II) Technical solution

[0008] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions:

[0009] A pile top connection device for a core-filled PHC pipe pile and a prefabricated cap, comprising a PHC prestressed high-strength concrete pipe pile and a prefabricated cap, wherein a post-casting hole groove is provided in the prefabricated cap, a through hole is provided at the bottom of the prefabricated cap corresponding to the post-casting hole groove, and the upper end of the PHC prestressed high-strength concrete pipe pile passes through the through hole, and the pile top connection device further comprises a prefabricated core-filled column and a steel hoop;

[0010] A prefabricated core-filled column with a diameter smaller than the inner diameter of the PHC prestressed high-strength concrete pipe pile is arranged inside the pipe, and a micro-expansion cement mortar is filled and fixed between the prefabricated core-filled column and the PHC prestressed high-strength concrete pipe pile; a structural steel cage is buried in the prefabricated core-filled column, and the upper end of the structural steel cage extends to the post-casting hole groove;

[0011] A fixed steel hoop is sleeved on the outside of the PHC prestressed high-strength concrete pipe pile, a plurality of steel shear keys are fixed on the outer wall of the steel hoop corresponding to the post-casting hole groove, and a plurality of L-shaped threaded steel bars are fixed on the outer wall of the steel hoop corresponding to the perforation; the steel shear key is fixedly connected to the bottom plate of the post-casting hole groove through a connecting piece.

[0012] Preferably, the steel hoop is composed of two semi-tubular steel plates connected by connecting bolts.

[0013] Preferably, the connecting member comprises a plurality of embedded threaded steel bars embedded in the bottom plate of the post-casting hole groove, and the upper ends of the embedded threaded steel bars pass through the through holes on the steel section shear keys and are fixedly connected to the steel section shear keys via stop nuts.

[0014] Preferably, two steel shear keys are welded on each semi-tubular steel plate, and four L-shaped threaded steel bars are welded on each semi-tubular steel plate; the steel shear keys are H-shaped steels made of Q235 material; through holes are opened on the lower flange of the steel shear keys corresponding to the embedded steel bars; the number of the through holes is four and they are respectively connected to four embedded threaded steel bars.

[0015] Preferably, a bottom tray steel plate is provided at the bottom of the prefabricated core-filled column, and the bottom tray steel plate is welded and fixedly connected to the bottom end of the structural steel cage;

[0016] A ring-shaped rubber block is fixed on the outer periphery of the upper end surface of the bottom tray steel plate, and the ring-shaped rubber block is extruded and sealed with the inner wall of the PHC prestressed high-strength concrete pipe pile;

[0017] A column top steel plate is welded and fixed on the top of the prefabricated core-filled column, and the column top steel plate is plug-welded to the structural steel cage; a plurality of circular holes for pouring mortar are opened on the column top steel plate corresponding to the micro-expansive cement mortar body.

[0018] Preferably, the annular rubber block is fixedly connected to the bottom tray steel plate by 8 annular rubber block connecting bolts, and the 8 annular rubber block connecting bolts are evenly arranged around the axis of the prefabricated core-filled column. The outer diameter of the annular rubber block is larger than the inner diameter of the PHC prestressed high-strength concrete pipe pile; the annular rubber block squeezes the inner wall of the PHC prestressed high-strength concrete pipe pile and forms a sealing groove; the structural steel cage passing through the outside of the column top steel plate is diffused in a trumpet shape.

[0019] Preferably, the outer peripheral side wall surface of the prefabricated core filling column is roughened; and the inner side wall surface of the post-casting hole groove and the through hole is roughened.

[0020] Preferably, the PHC prestressed high-strength concrete pipe pile, prefabricated core-filled column, and slightly expansive cement mortar body are coaxially arranged.

[0021] Preferably, the prefabricated core-filled column is a concrete component, and the concrete grade is C30; the strength grade of the micro-expansive cement mortar body is M50; and the concrete grade of the prefabricated foundation is C30.

[0022] Preferably, two annular shear rings are fixed in the middle of the inner wall of the post-cast hole groove; the minimum clear distance between the bottom of the post-cast hole groove and the outer side wall of the PHC prestressed high-strength concrete pipe pile is 9 cm.

[0023] (III) Beneficial effects

[0024] Compared with the prior art, the utility model provides a pile top connection device for a core-filled PHC pipe pile and a prefabricated cap, which has the following beneficial effects:

[0025] 1. In the pile top connection device of this embodiment, the PHC prestressed high-strength concrete pipe pile and the prefabricated core column are tightly connected through the micro-expansion cement mortar body, and the structure is stable. The steel shear key, L-shaped threaded steel bar, structural steel cage and prefabricated cap form multiple vertical force transmission devices on the top of the PHC prestressed high-strength concrete pipe pile, which effectively reduces the risk of failure of the pile top connection and ensures that the upper load can be reliably transmitted to the deep stable foundation through the prefabricated cap and the PHC prestressed high-strength concrete pipe pile. The overall structure of the pile top connection device is stable and reliable, and the connection performance between the pipe pile and the prefabricated cap is strong and the effect is good.

[0026] 2. The column top steel plate, steel hoop, bottom tray steel plate and annular rubber block in the utility model work together to effectively improve the horizontal shear bearing capacity of the pile top connection.

[0027] 3. By setting up prefabricated structures such as prefabricated core columns and prefabricated caps, the pile top connection device is easier to assemble and construct, with high construction efficiency, and it is easy to ensure the construction quality of concrete components and the working environment of construction personnel. No formwork is required when pouring concrete on site, which reduces the construction process and saves construction turnover materials. In addition, the maintenance of prefabricated core columns and prefabricated caps can be completed in the prefabrication site, and the amount of water used for on-site maintenance is small, reducing the risk of softening the base soil with maintenance water.

[0028] 4. The steel clamp in the utility model is easy to install and is suitable for the top connection of various PHC pipe piles. It can not only provide radial pre-pressure to the concrete on the top of the pile, but also improve the shear bearing capacity of the top of the pile. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic elevation view of the pile top connection device of the utility model;

[0030] Figure 2 This is a schematic diagram of the installation plan of the bottom tray steel plate and the annular rubber block of the utility model;

[0031] Figure 3 This is a schematic elevation diagram of the installation of the bottom tray steel plate and the annular rubber block of the utility model;

[0032] Figure 4 It is a plan view of the column top steel plate of the utility model;

[0033] Figure 5 It is a plan view of the tubular steel clamp of the utility model.

[0034] In the figure: 1. PHC prestressed high-strength concrete pipe pile; 2. Prefabricated core column; 3. Bottom tray steel plate; 4. Structural steel cage; 5. Annular rubber block; 6. Column top steel plate; 7. Micro-expanding cement mortar; 8. Gravel cushion; 9. Prefabricated pedestal; 10. Shear ring; 11. Steel hoop; 12. Steel shear key; 13. L-shaped threaded steel bar; 14. Embedded threaded steel bar; 15. Connecting bolt; 16. Annular rubber block fixing bolt; 17. Post-casting hole groove; 18. Perforation. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0036] Embodiment 1:

[0037] See also Figure 1-5 A pile top connection device for a core-filled PHC pipe pile and a prefabricated cap comprises a PHC prestressed high-strength concrete pipe pile 1 and a prefabricated cap 9, wherein a post-casting hole groove 17 is provided in the prefabricated cap 9, and a through hole 18 is provided at the bottom of the prefabricated cap 9 corresponding to the post-casting hole groove 17, and the upper end of the PHC prestressed high-strength concrete pipe pile 1 passes through the through hole 18, and the pile top connection device further comprises a prefabricated core-filled column 2 and a steel hoop 11;

[0038] A prefabricated core-filled column 2 having a diameter smaller than the inner diameter of the PHC prestressed high-strength concrete pipe pile 1 is arranged inside the pipe, and a micro-expansion cement mortar body 7 is filled and fixed between the prefabricated core-filled column 2 and the PHC prestressed high-strength concrete pipe pile 1; a structural steel cage 4 is buried in the prefabricated core-filled column 2, and the upper end of the structural steel cage 4 extends to the post-casting hole groove 17;

[0039] A fixed steel hoop 11 is sleeved on the outside of the PHC prestressed high-strength concrete pipe pile 1, a plurality of steel shear keys 12 are fixed on the outer wall of the steel hoop 11 corresponding to the post-cast hole groove 17, and a plurality of L-shaped threaded steel bars 13 are fixed on the outer wall of the steel hoop 11 corresponding to the through hole 18; the steel shear key 12 is fixedly connected to the bottom plate of the post-cast hole groove 17 through a connecting piece.

[0040] In the pile top connection device of this embodiment, a precast concrete cap 9 is arranged on the upper part of the gravel cushion layer 8, and the PHC prestressed high-strength concrete pipe pile 1 and the precast core column 2 are tightly connected through the micro-expansion cement mortar body 7 to form a whole. The steel shear key 12, L-shaped threaded steel bar 13, structural steel cage 4 and precast cap 9 are arranged to form multiple vertical force transmission devices on the top of the PHC prestressed high-strength concrete pipe pile 1, which effectively reduces the risk of failure of the pile top connection and ensures that the upper load can be reliably transmitted to the deep stable foundation through the precast cap 9 and the PHC prestressed high-strength concrete pipe pile 1.

[0041] The overall structure of the pile top connection device in this embodiment is stable and reliable, and the connection performance between the PHC prestressed high-strength concrete pipe pile 1 and the prefabricated cap 9 is strong and effective. In addition, by providing prefabricated structures such as the prefabricated core column 2 and the prefabricated cap 9, the pile top connection device is easier to assemble and construct, which not only solves the problem of segregation and seepage of on-site concrete pouring, but also reduces the workload of on-site concrete pouring, and effectively improves the construction efficiency of the connection between the PHC pipe pile and the cap.

[0042] In this embodiment, the steel hoop 11 is composed of two semi-tubular steel plates connected by connecting bolts 15. That is, the steel hoop 11 includes two semi-tubular steel plates, and both ends of the semi-tubular steel plates are fixedly connected to the two ends of the other semi-tubular steel plates by connecting bolts 15. After the steel hoop 11 is formed into a whole by connecting bolts 15, it is fixed to the PHC prestressed high-strength concrete pipe pile 1. The steel hoop 11 of the above structure is easy to install and is suitable for the pile top connection of various PHC pipe piles. It can not only provide radial preload to the concrete at the pile top, but also improve the shear bearing capacity of the pile top.

[0043] In this embodiment, the connecting parts include a plurality of embedded threaded steel bars 14 buried in the bottom plate of the post-casting hole groove 17. The upper ends of the embedded threaded steel bars pass through the through holes on the steel shear key 12 and are fixedly connected to the steel shear key 12 through stop nuts.

[0044] In this embodiment, two steel shear keys 12 are welded on each semi-tubular steel plate, and the length of the steel shear keys 12 can be set to 25 cm. Four L-shaped threaded steel bars 13 are welded on each semi-tubular steel plate, and the length of the L-shaped threaded steel bars 13 can be set to 20 cm. The steel shear keys 12 are H-shaped steels made of Q235 material. Through holes are opened on the lower flange of the steel shear keys 12 corresponding to the embedded steel bars 14. The number of through holes is four and they are respectively connected to the four embedded threaded steel bars 14, and the diameter of the threaded steel bars 14 is 25 mm.

[0045] In this embodiment, a bottom tray steel plate 3 is provided at the bottom of the prefabricated core column 2, and the bottom tray steel plate 3 is welded and fixedly connected to the bottom end of the structural steel cage 4;

[0046] A circle of annular rubber blocks 5 are fixed to the outer periphery of the upper end surface of the bottom tray steel plate 3. The annular rubber blocks 5 are squeezed and sealed to the inner wall of the PHC prestressed high-strength concrete pipe pile 1. The annular rubber blocks 5 can be made of waste tires.

[0047] A column top steel plate 6 is welded and fixed to the top of the prefabricated core-filled column 2, and the column top steel plate 6 is plug-welded to the structural steel cage 4; a plurality of circular holes for pouring mortar are opened on the column top steel plate 6 corresponding to the micro-expansive cement mortar body 7, specifically 8 circular holes, which are evenly arranged around the axis of the column top steel plate 6, and the micro-expansive cement mortar body 7 can be symmetrically poured between the prefabricated core-filled column 2 and the PHC prestressed high-strength concrete pipe pile 1 through the circular holes with micro-expansive cement mortar, and then maintained after it is strengthened.

[0048] In this embodiment, the above-mentioned column top steel plate 6, steel hoop 11, bottom tray steel plate 3 and annular rubber block 5 work together to effectively improve the horizontal shear bearing capacity of the pile top connection.

[0049] In this embodiment, the annular rubber block 5 is fixedly connected to the bottom tray steel plate 3 by 8 annular rubber block connecting bolts 16. The 8 annular rubber block connecting bolts 16 are evenly arranged around the axis of the prefabricated filling core column 2. The outer diameter of the annular rubber block 5 is larger than the inner diameter of the PHC prestressed high-strength concrete pipe pile 1. The specific larger value can be 1 cm. The annular rubber block 5 squeezes the inner wall of the PHC prestressed high-strength concrete pipe pile 1 and forms a sealing groove. Through the above arrangement, leakage and segregation can be avoided when pouring micro-expansion cement mortar.

[0050] The bottom tray steel plate 3 and the column top steel plate 6 are made of Q235 steel and are made of engineering waste materials; the structural steel cage 4 is connected to the column top steel plate 6 by plug welding, and the structural steel cage 4 passing through the column top steel plate 6 is diffused in a trumpet shape. During preparation, the structural steel cage 4 is first welded to the bottom tray steel plate 3, and then plug welded to the column top steel plate 6. The length of the structural steel cage 4 passing through the column top steel plate 6 is 70cm, and it is bent into a 15-degree diffuser head.

[0051] In this embodiment, the outer peripheral side wall surface of the prefabricated core column 2 is roughened; the inner side wall surface of the post-casting hole groove 17 and the through hole 18 is roughened.

[0052] In this embodiment, the PHC prestressed high-strength concrete pipe pile 1, the prefabricated core column 2, and the slightly expansive cement mortar body 7 are coaxially arranged.

[0053] In this embodiment, the prefabricated core column 2 is a concrete component, which can be made of recycled aggregate concrete and then roughened; the diameter is 6 cm smaller than the inner diameter of the PHC prestressed high-strength concrete pipe pile 1, and the concrete grade is C30;

[0054] The strength grade of the micro-expansive cement mortar body 7 is M50, and the concrete grade of the prefabricated cap 9 is C30. It can be prefabricated with recycled aggregate concrete.

[0055] In this embodiment, two annular shear rings 10 are fixed to the middle of the inner wall of the post-cast hole groove 17; the minimum clear distance between the bottom of the post-cast hole groove 17 and the outer wall of the PHC prestressed high-strength concrete pipe pile 1 is 9 cm.

[0056] The construction method corresponding to the pile top connection device of the core-filled PHC pile and the prefabricated cap in this embodiment is:

[0057] S1: Construction preparation. According to the design drawings, topography, geology and on-site road conditions, determine whether the location, inlet and outlet elevations and design dimensions of the underpass meet actual needs, prepare the materials and equipment required for the construction of the underpass, determine the material stacking, prefabrication and hoisting sites, and harden the construction access road.

[0058] S2: PHC prestressed high-strength concrete pipe piles 1 are buried under the channel foundation according to the requirements of the design drawings. The bottom tray steel plate 3, column top steel plate 6, steel hoop 11, L-shaped threaded steel bar 13 and steel shear key 12 are processed using the engineering waste materials. The structural steel cage 4 is welded to the bottom tray steel plate 3 and the column top steel plate 6 respectively to form a skeleton. The steel hoop 11 is welded to the L-shaped threaded steel bar 13 and the steel shear key 12. The prefabrication yard simultaneously prefabricates the core column 2 and the prefabricated pedestal 9. The outer peripheral side wall surface of the prefabricated core column 2 and the inner side wall surface of the post-casting hole groove 17 and the through hole 18 are roughened, and then numbered and stored.

[0059] S3: Construction layout, leveling the construction site, making temporary drainage measures, laying gravel cushion layer 8, and leveling.

[0060] S4: transport the prefabricated core-filled column 2 to the construction site according to the number, fix the annular rubber block 5 with the annular rubber block fixing bolts 16, install it in the PHC prestressed high-strength concrete pipe pile 1 by a car crane, fix it to the top of the PHC prestressed high-strength concrete pipe pile 1 through the column top steel plate 6, symmetrically pour micro-expansion cement mortar from the 8 circular holes of the column top steel plate 6 into the gap between the PHC prestressed high-strength concrete pipe pile 1 and the roughened prefabricated core-filled column 2, and after equal strength curing, form a micro-expansion cement mortar body 7, and tightly connect the PHC prestressed high-strength concrete pipe pile 1 and the prefabricated core-filled column 2 to form a whole.

[0061] S5: transport the precast cap 9 to the construction site according to the number, align the post-cast hole groove 17 and the through hole 18 of the precast cap 9 with the buried position of the PHC prestressed high-strength concrete pipe pile 1, install it on the gravel cushion layer 8, fine-tune the position of the steel clamp 11, install the lower flange of the steel shear key 12 and the retaining nut of the embedded threaded steel bar 14, and then install the connecting bolt 15.

[0062] S6: After all the steel hoops 11 of the multiple prefabricated caps 9 and the embedded parts required for the next stage are installed, the concrete required for the post-casting grooves 17 and the perforations 18 of the multiple prefabricated caps 9 is poured in sequence, and after strong curing, a whole is formed.

[0063] S7: Proceed to the next stage of construction.

[0064] In the above construction method, the prefabricated core column 2 and the prefabricated cap 9 are assembled and mechanized, which reduces the waste pollution on the construction site and implements the green building design concept. The assembled construction makes the most of the existing hoisting and transportation machinery and equipment on site, reduces labor costs, and improves the economic benefits of the project.

[0065] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pile top connection device for a core-filled PHC pipe pile and a prefabricated cap, comprising a PHC prestressed high-strength concrete pipe pile (1) and a prefabricated cap (9), wherein the prefabricated cap (9) is provided with a post-casting hole groove (17), and a through hole (18) is provided at the bottom of the prefabricated cap (9) corresponding to the post-casting hole groove (17), and the upper end of the PHC prestressed high-strength concrete pipe pile (1) passes through the through hole (18), Features: It also includes a prefabricated core-filled column (2) and a steel hoop (11); A prefabricated core-filled column (2) having a diameter smaller than the inner diameter of the PHC prestressed high-strength concrete pipe pile (1) is arranged inside the pipe, and a micro-expansion cement mortar (7) is filled and fixed between the prefabricated core-filled column (2) and the PHC prestressed high-strength concrete pipe pile (1); a structural steel cage (4) is embedded in the prefabricated core-filled column (2), and the upper end of the structural steel cage (4) extends into the post-casting hole groove (17); A fixed steel hoop (11) is sleeved on the outside of the PHC prestressed high-strength concrete pipe pile (1), a plurality of steel shear keys (12) are fixed on the outer wall of the steel hoop (11) corresponding to the post-casting hole groove (17), and a plurality of L-shaped threaded steel bars (13) are fixed on the outer wall of the steel hoop (11) corresponding to the through hole (18); the steel shear keys (12) are fixedly connected to the bottom plate of the post-casting hole groove (17) via a connecting piece.

2. The pile top connection device of the core-filled PHC pile and the prefabricated cap according to claim 1, Features: The steel hoop (11) is composed of two semi-tubular steel plates connected by connecting bolts (15).

3. The pile top connection device of the core-filled PHC pile and the prefabricated cap according to claim 2, Features: The connecting member comprises a plurality of embedded threaded steel bars (14) embedded in the bottom plate of the post-casting hole groove (17), the upper ends of the embedded threaded steel bars passing through through holes on the section steel shear key (12) and being fixedly connected to the section steel shear key (12) via a stop nut.

4. The pile top connection device of the core-filled PHC pipe pile and the prefabricated cap according to claim 3, Features: Two steel shear keys (12) are welded on each semi-tubular steel plate, and four L-shaped threaded steel bars (13) are welded on each semi-tubular steel plate; the steel shear keys (12) are H-shaped steels made of Q235 material; through holes are provided at the lower flange of the steel shear keys (12) corresponding to the embedded threaded steel bars (14); the number of the through holes is four and they are respectively connected to the four embedded threaded steel bars (14).

5. The pile top connection device of the core-filled PHC pipe pile and the prefabricated cap according to claim 1, Features: A bottom tray steel plate (3) is provided at the bottom of the prefabricated core-filled column (2), and the bottom tray steel plate (3) is welded and fixedly connected to the bottom end of the structural steel cage (4); A ring-shaped rubber block (5) is fixed to the outer periphery of the upper end surface of the bottom tray steel plate (3), and the ring-shaped rubber block (5) is extruded and sealed with the inner wall of the PHC prestressed high-strength concrete pipe pile (1); A column top steel plate (6) is welded and fixed to the top of the prefabricated core-filled column (2), and the column top steel plate (6) is plug-welded to the structural steel cage (4); a plurality of circular holes for pouring mortar are provided on the column top steel plate (6) corresponding to the micro-expansive cement mortar body (7).

6. The pile top connection device of the core-filled PHC pipe pile and the prefabricated cap according to claim 5, Features: The annular rubber block (5) is fixedly connected to the bottom tray steel plate (3) via eight annular rubber block connecting bolts (16), the eight annular rubber block connecting bolts (16) being evenly arranged around the axis of the prefabricated core-filled column (2), the outer diameter of the annular rubber block (5) being larger than the inner diameter of the PHC prestressed high-strength concrete pipe pile (1); the annular rubber block (5) squeezes the inner wall of the PHC prestressed high-strength concrete pipe pile (1) and forms a sealing groove; the structural steel cage (4) passing through the outside of the column top steel plate (6) is diffused in a trumpet shape.

7. The pile top connection device of the core-filled PHC pipe pile and the prefabricated cap according to any one of claims 1 to 6, Features: The outer peripheral side wall surface of the prefabricated core-filling column (2) is roughened; and the inner side wall surfaces of the post-casting hole groove (17) and the through hole (18) are roughened.

8. The pile top connection device of the core-filled PHC pipe pile and the prefabricated cap according to any one of claims 1 to 6, Features: The PHC prestressed high-strength concrete pipe pile (1), the prefabricated core column (2), and the micro-expansive cement mortar body (7) are coaxially arranged.

9. The pile top connection device of the core-filled PHC pipe pile and the prefabricated cap according to any one of claims 1 to 6, Features: The prefabricated core-filled column (2) is a concrete component, and the concrete grade is C30; the strength grade of the micro-expansive cement mortar body (7) is M50; and the concrete grade of the prefabricated foundation (9) is C30.

10. The pile top connection device of the core-filled PHC pipe pile and the prefabricated cap according to any one of claims 1 to 6, Features: Two annular shear rings (10) are fixed in the middle of the inner wall of the post-cast hole groove (17); the minimum clear distance between the bottom of the post-cast hole groove (17) and the outer wall of the PHC prestressed high-strength concrete pipe pile (1) is 9 cm.

Citation Information

Cited By

  • Connecting device and method for steel pipe pile and prefabricated bearing platform

    CN121161848A