Power grid electricity stealing detection method and device

By constructing a power grid graph theory model and network flow analysis technology to identify power flow abnormal points, it solves the shortcomings in accuracy and real-time performance of existing power grid electricity theft detection methods, and achieves more accurate and efficient identification and processing of electricity theft behavior. , improving the security and stability of the power grid.

CN118797518APending Publication Date: 2024-10-18STATE GRID HEBEI ELECTRIC POWER CO LTD POWER SUPPLY BRANCH OF FEIXIANG DISTRICT HANDAN CITY +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410787467.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing power grid power theft detection methods have insufficient accuracy and real-time performance when processing large-scale and complex power grid data. It is difficult to accurately identify illegal access points and abnormal power consumption patterns, and is inefficient. It cannot meet the real-time monitoring and management of power grid operations. need.

Method used

By obtaining the power grid data collection, constructing a power grid graph theory model and simulating power flow based on network flow analysis technology, identifying power flow abnormal points and identifying power theft behavior. Specific steps include collecting node phase angle differences, voltage waveform distortion, load change rate and dynamic impedance characteristic data, constructing a power grid data collection, constructing directed edges and setting weight values, and using the Ford-Folkerson algorithm to calculate the maximum power flow. , measure the actual power flow, and calculate the difference percentage to identify abnormal points.

Benefits of technology

It improves the accuracy and sensitivity of electricity theft detection, can promptly identify illegal connection points and abnormal power usage patterns, reduces economic losses, enhances the security and stability of the power grid, and improves the ability to prevent and control the risk of electricity theft.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118797518A_ABST
    Figure CN118797518A_ABST
Patent Text Reader

Abstract

The invention provides a power grid electricity larceny detection method and device, and the method comprises the steps: obtaining a power grid data set which comprises a plurality of nodes in a power grid and power grid data corresponding to each node, building a power grid graph theory model according to the power connection relation between each node and other nodes, and obtaining a power grid graph theory model based on a network flow analysis technology, power flow of the power grid graph theory model is simulated, a power flow model is constructed, the power flow model comprises a power simulation flow path of the power grid and simulation power flow corresponding to the power simulation flow path of the power grid, and actual power flow of an actual power flow path corresponding to the power simulation flow path is obtained; and according to the simulated power flow and the actual power flow, determining a power flow abnormal point, and according to the power flow abnormal point, determining whether an electricity stealing behavior occurs in the power grid. Through a power grid graph theory model and a network flow analysis technology, whether an electricity stealing behavior occurs in a power grid can be determined more accurately.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power grid electricity theft, and in particular to a power grid electricity theft detection and device. Background Art

[0002] In the current operation and management of power systems, electricity theft has always been a difficult problem to solve, which has had a serious impact on the safety and economic benefits of the power grid. Traditional methods of electricity theft detection mainly rely on simple power comparison or basic anomaly detection algorithms, which have obvious limitations when processing large-scale and complex power grid data. With the continuous expansion of the scale of the power grid and the increasing complexity of the power system structure, the shortcomings of traditional methods in terms of accuracy and real-time performance have gradually become apparent.

[0003] First, traditional electricity theft detection methods often rely on simple comparative analysis of historical electricity usage data, ignoring the dynamic changes of the power grid and the complex power flow patterns. This method may be effective when processing static data, but in actual applications, due to the constant changes in grid conditions and user electricity usage patterns, these methods are difficult to accurately reflect the actual state of the grid in real time, resulting in high false alarm and missed alarm rates.

[0004] Secondly, due to the lack of in-depth analysis of the grid topology and power flow characteristics, traditional methods lack accuracy in locating power theft. The diversity and complexity of power theft methods make it difficult to accurately identify illegal access points or abnormal power usage patterns by simply relying on power comparison, especially in a grid system with a wide coverage. This problem is more serious.

[0005] In addition, with the sharp increase in data volume, traditional electricity theft detection algorithms face huge processing pressure, and low efficiency has become another problem that cannot be ignored. In situations where rapid response and processing are required, these methods often cannot meet the real-time monitoring and management needs of power grid operations. Summary of the invention

[0006] In order to solve the above technical problems, the present application is proposed. The embodiments of the present application provide a power grid electricity theft detection and device, which solves the problem of lack of accuracy in locating electricity theft behavior in the prior art.

[0007] According to one aspect of the present application, a method for detecting power theft in a power grid is provided, comprising:

[0008] Acquire a power grid data set, wherein the power grid data set includes a plurality of nodes in the power grid and power grid data corresponding to each node;

[0009] According to the power connection relationship between each node and other nodes, a power grid graph model is constructed;

[0010] Based on the network flow analysis technology, the power flow of the power grid graph model is simulated and a power flow model is constructed; wherein the power flow model includes a power simulation flow path of the power grid and a simulated power flow corresponding to the power simulation flow path of the power grid;

[0011] Acquire an actual power flow rate of an actual power flow path corresponding to the power simulation flow path;

[0012] Determining a power flow abnormal point according to the simulated power flow and the actual power flow;

[0013] It is determined whether electricity theft occurs in the power grid according to the abnormal power flow point.

[0014] In one embodiment, acquiring the power grid data set includes:

[0015] Collecting phase angle difference data of each node in the power grid at a preset time point;

[0016] Collecting voltage waveform distortion data of each node in the power grid at the preset time point;

[0017] Collecting load change rate data of each node in the power grid at the preset time point;

[0018] Collecting dynamic impedance characteristic data of power flow when each node in the power grid is connected to other nodes at the preset time point;

[0019] The power grid data set is constructed according to the phase angle difference data, the voltage waveform distortion data, the load change rate data and the dynamic impedance characteristic data.

[0020] In one embodiment, constructing a power grid graph model according to the plurality of nodes corresponding to the power grid data set and the power connection relationship between each node and other nodes includes:

[0021] If there are other target nodes electrically connected to the target node in the power grid data set, constructing directed edges from the target node to the other target nodes electrically connected to the target node;

[0022] Determine the weight value corresponding to each directed edge;

[0023] The power grid graph model is constructed according to a plurality of directed edges, a weight value corresponding to each directed edge, and a plurality of target nodes.

[0024] In one embodiment, simulating the power flow of the power grid graph model and constructing the power flow model based on the network flow analysis technology includes:

[0025] Setting the capacity value corresponding to each directed edge in the power grid graph model;

[0026] Obtaining a power supply node set and a power consumption node set in the power grid graph model;

[0027] Based on the Ford-Folkson algorithm, according to the total power supply capacity and total power demand between the power supply node set and the power consumption node set, the maximum power flow between the power supply node set and the power consumption node set is determined;

[0028] According to the maximum power flow, determining an augmented path between a power supply node in the power supply node set and a corresponding power consumption node as the power simulation flow path;

[0029] Calculating the simulated power flow according to the capacity value corresponding to the simulated power flow path and the power flow corresponding to the simulated power flow path;

[0030] The power flow model is constructed according to a plurality of power simulation flow paths and the simulated power flow corresponding to each power simulation flow path.

[0031] In one embodiment, the determining the maximum power flow between the power supply node set and the power consumption node set based on the Ford-Folkson algorithm according to the total power supply capacity and the total power demand between the power supply node set and the power consumption node set includes:

[0032] Taking the power supply node set as the source point set;

[0033] Taking the electricity consumption node set as a sink set;

[0034] Establishing a residual network according to directed edges between source points in the source point set and other nodes and directed edges between sink points in the sink point set and other nodes;

[0035] Initialize the flow of all directed edges in the residual network to 0;

[0036] Resetting the power supply capacity values ​​of the source points in the source point set and the power demand values ​​of the sink points in the sink point set according to the total power supply capacity value and the total power demand value between the source point set and the sink point set;

[0037] Searching for a target path from a source node to a sink node in the residual network; wherein the difference between the original capacity value and the used flow of each directed edge in the target path is greater than 0;

[0038] Calculating the minimum residual capacity in the target path; wherein the minimum residual capacity is the capacity of the directed edge with the minimum residual capacity in the target path;

[0039] According to the minimum residual capacity, updating the flow of all directed edges of the target path and increasing the minimum residual capacity to update the residual network;

[0040] If there is no path from the source point to the sink point in the updated residual network, the maximum power flow between the power supply node set and the power consumption node set is calculated based on the sum of the flow from the source points in the source point set to the other nodes and the sum of the flow from the other nodes to the source points in the source point set.

[0041] In one embodiment, obtaining the actual power flow of the actual power flow path corresponding to the power simulation flow path includes:

[0042] Measuring the instantaneous current and instantaneous voltage of each node corresponding to the actual power flow path;

[0043] According to the instantaneous current and the instantaneous voltage, an actual power flow value corresponding to the actual power flow path is calculated as the actual power flow.

[0044] In one embodiment, determining the power flow abnormal point according to the simulated power flow and the actual power flow comprises:

[0045] calculating a percentage difference between the simulated current flow and the actual power flow;

[0046] If the difference percentage is greater than the preset difference percentage, the power simulation flow path and its corresponding node are determined to be the power flow abnormal point.

[0047] In one embodiment, after determining that the power flow abnormal point has electricity theft, the power grid electricity theft detection method further includes:

[0048] The amount of stolen electricity is calculated based on the actual power flow and simulated power flow at multiple power flow anomaly points.

[0049] In one embodiment, after determining that the power flow abnormal point has electricity theft, the power grid electricity theft detection method further includes:

[0050] Obtaining a first estimated value for adjusting a weight value corresponding to a directed edge of the power flow abnormal point;

[0051] Obtaining a second estimated value for adjusting a load change rate corresponding to a node at the power flow abnormal point;

[0052] According to the first estimated value, adjusting the weight corresponding to the directed edge of the power flow abnormal point;

[0053] According to the second estimated value, the load change rate corresponding to the node of the power flow abnormal point is adjusted.

[0054] According to another aspect of the present application, a power grid electricity theft detection device is provided, comprising:

[0055] A simulation module is used to obtain a power grid data set, wherein the power grid data set includes multiple nodes in the power grid and power grid data corresponding to each node; construct a power grid graph model according to the power connection relationship between each node and other nodes; simulate the power flow of the power grid graph model based on network flow analysis technology and construct a power flow model; wherein the power flow model includes a power simulation flow path of the power grid and a simulated power flow corresponding to the power simulation flow path of the power grid;

[0056] The actual module is used to obtain the actual power flow of the actual power flow path corresponding to the power simulation flow path; determine the power flow abnormality point according to the simulated power flow and the actual power flow; and determine whether power theft occurs in the power grid according to the power flow abnormality point.

[0057] The present application provides a method and device for detecting power theft in a power grid, the method comprising: obtaining a power grid data set, the power grid data set comprising a plurality of nodes in the power grid and power grid data corresponding to each node, constructing a power grid graph model according to the power connection relationship between each node and other nodes, simulating the power flow of the power grid graph model and constructing a power flow model based on network flow analysis technology, wherein the power flow model comprises a simulated power flow path of the power grid and a simulated power flow corresponding to the simulated power flow path of the power grid, obtaining the actual power flow of the actual power flow path corresponding to the simulated power flow path, determining power flow abnormal points according to the simulated power flow and the actual power flow, and determining whether power theft occurs in the power grid according to the abnormal power flow points. Through the power grid graph model and network flow analysis technology, the topological structure and power flow pattern of the power grid can be more deeply understood, so that power theft detection no longer relies solely on simple power comparison or basic anomaly detection algorithms, so that illegal connection points and abnormal power usage patterns can be more sensitively and accurately identified, and it can work effectively even when the means of power theft are becoming increasingly cunning and diverse. By monitoring the flow of electricity in the power grid in real time and comparing it with the theoretical model, it is possible to detect and deal with electricity theft in a timely manner, thereby reducing economic losses and improving the overall safety and stability of the power grid. In addition, by analyzing the identified anomalies and proposing suggestions for improving the safety and stability of the power grid, the power grid's ability to prevent and control security risks such as electricity theft is further enhanced. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] By describing the embodiments of the present application in more detail in conjunction with the accompanying drawings, the above and other purposes, features and advantages of the present application will become more apparent. The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the present application and do not constitute a limitation of the present application. In the accompanying drawings, the same reference numerals generally represent the same components or steps.

[0059] Figure 1 It is a flowchart of a method for detecting power theft in a power grid provided by an exemplary embodiment of the present application.

[0060] Figure 2 It is a flowchart of a method for constructing a power grid graph theory model provided by an exemplary embodiment of the present application.

[0061] Figure 3 It is a flowchart of a method for obtaining actual power flow provided by an exemplary embodiment of the present application.

[0062] Figure 4 It is a structural schematic diagram of a power grid electricity theft detection device provided by an exemplary embodiment of the present application.

[0063] Figure 5 It is a structural schematic diagram of a power grid electricity theft detection device provided by another exemplary embodiment of the present application.

[0064] Figure 6 It is a structural diagram of an electronic device provided by an exemplary embodiment of the present application. DETAILED DESCRIPTION

[0065] Below, the exemplary embodiments according to the present application will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments of the present application, and it should be understood that the present application is not limited to the exemplary embodiments described here.

[0066] Figure 1 It is a flowchart of a method for detecting power theft in a power grid provided by an exemplary embodiment of the present application. Figure 2 FIG. 1 is a flow chart of a method for constructing a power grid graph model provided by an exemplary embodiment of the present application. Figure 1-2 As shown, the power grid electricity theft detection method includes:

[0067] Step 110: Acquire a power grid data set, where the power grid data set includes a plurality of nodes in the power grid and power grid data corresponding to each node.

[0068] In the embodiment of the present application, in order to quickly determine the abnormal points of power flow, and thus determine the behavior of electricity theft based on the abnormal points of power flow, it is necessary to obtain enough power grid data as the training basis of the power graph theory model. The present application can construct a power grid data set, and the specific construction method of the power grid data set includes:

[0069] Step 111: collecting phase angle difference data of each node in the power grid at a preset time point;

[0070] In the embodiments of the present application, phase angle, voltage waveform distortion, load change rate, dynamic impedance characteristic data, etc. can be collected through devices such as electric meters and sensors.

[0071] Specifically, each node is set as i, the preset time point is t, and the phase angle difference data is expressed as The calculation formula for phase angle difference data is:

[0072]

[0073] Where N represents the total number of nodes connected to node i, and They represent the phase angle of node n and its previous node at time point t respectively.

[0074] Step 112: collecting voltage waveform distortion data of each node in the power grid at a preset time point;

[0075] In the embodiment of the present application, the node is set to i, the preset time point is t, and the voltage waveform distortion data is represented by V i,t By calculating the deviation of the voltage waveform of node i at time point t from the ideal sinusoidal waveform, we can obtain:

[0076]

[0077] Among them, V i,t (t) represents the actual voltage waveform of node i at time point t, V sin,t (t) is the ideal sinusoidal waveform voltage, and T is the measurement period.

[0078] Step 113: Collecting load change rate data of each node in the power grid at a preset time point;

[0079] In the embodiment of the present application, the node is set to i, the preset time point is t, and the load change rate data is represented by R i,t :

[0080]

[0081] Among them, P i,t is the power of node i at time t, V i,t and Ii,t are the instantaneous values ​​of voltage and current respectively.

[0082] Step 114: Collect dynamic impedance characteristic data of power flow when each node in the power grid is connected to other nodes at a preset time point:

[0083] In the embodiment of the present application, the node is set as i, the other nodes are set as j, the preset time point is set as t, and the dynamic impedance characteristic data is represented as Z ij,t , dynamic impedance characteristic data Z ij,t represents the connection impedance value between node i and node j at time point t, combined with the time-dependent changes in the resistance, inductance, and capacitance of the connection line:

[0084]

[0085] Among them, R ij is the resistance, L ij is the inductor, C ij is the capacitance, ω is the angular frequency, and j is the imaginary unit.

[0086] Step 115: construct a power grid data set according to the phase angle difference data, the voltage waveform distortion data, the load change rate data and the dynamic impedance characteristic data.

[0087] In the embodiment of the present application, the power grid data set is set to be represented as D t ,but:

[0088] D t ={Δφ i,t ,V i,t , R i,t , Z ij,t |,j∈N,t};

[0089] Where N is the total number of nodes in the power grid, t is the time series, and R i,t Represented as the load change rate data of node i at time point t, Represented as the phase angle difference data of node i at time point t, V i,t It is represented as the voltage waveform distortion data of node i at time point t, Z ij,t It is represented as the dynamic impedance characteristic data between node i and node j at time point t.

[0090] Step 120: Construct a power grid graph model based on the power connection relationship between each node and other nodes.

[0091] In the embodiments of the present application, Figure 2 As shown, step 120 may include:

[0092] Step 121: If there are other target nodes electrically connected to the target node in the power grid data set, construct directed edges from the target node to the other target nodes electrically connected to the target node.

[0093] In the embodiment of the present application, for any two nodes i and j in the power grid, if there is a power connection relationship at time point t, that is, there are other target nodes connected to the target node in the power grid data set, then a directed edge between the target node and the other target nodes is constructed, that is, the target node and the other target nodes are respectively represented as a vertex in the graph theory model and the power connection relationship between the target node and the other target nodes is used as an edge in the graph theory model, so that a directed edge from vertex V i To the top V j The directed edge E ij The properties of this edge are determined by the dynamic impedance characteristic Z of the connection between nodes i and j. ij,t , phase angle difference Δφ i,t , voltage waveform distortion V i,t and load change rate R i,t definition:

[0094] E ij =(V i ,V j , {Z ij,t ,Δφ i,t ,V i,t ,R i,t});

[0095] Among them, edge E ij Represents the physical connection and the dynamic power characteristics between the two nodes, including dynamic impedance, phase angle difference, voltage waveform distortion and load change rate, R i,t Represented as the load change rate data of node i at time point t, Represented as the phase angle difference data of node i at time point t, V i,t It is represented as the voltage waveform distortion data of node i at time point t, Z ij,t It is represented as the dynamic impedance characteristic data between node i and node j at time point t.

[0096] Step 122: Determine the weight value corresponding to each directed edge.

[0097] In the embodiment of the present application, each directed edge E is set ij The corresponding weight value W ij,t The weight is calculated based on the attributes of the edge. Combined with the dynamic impedance characteristics of the power connection, the phase angle difference, the voltage waveform distortion and the impact of the load change rate on the power flow, the weight calculation formula is:

[0098]

[0099] Among them, α, β and γ are weight coefficients pre-set according to the characteristics of the power grid and the analysis requirements, e is the base of the natural logarithm, R i,t Represented as the load change rate data of node i at time point t, Represented as the phase angle difference data of node i at time point t, V i,t It is represented as the voltage waveform distortion data of node i at time point t, Z ij,t It is represented as the dynamic impedance characteristic data between node i and node j at time point t.

[0100] Step 123: construct a power grid graph model according to the multiple directed edges, the weight value corresponding to each directed edge, and the multiple target nodes.

[0101] In the embodiment of the present application, all vertices V i , directed edge E ij and its weight W ij,t , construct a graph model that reflects the power flow state and dynamic changes of the grid structure at any given time point t:

[0102] G t =(V, E, W t );

[0103] Where V is the node set, representing each node in the power grid, such as substations, distribution stations or users, E is the edge set, representing the power connection between nodes, and W t It is the weight set of edges associated with time point t, reflecting the characteristics and efficiency of power transmission.

[0104] Step 130: Based on network flow analysis technology, simulate the power flow of the power grid graph model and construct a power flow model, wherein the power flow model includes a simulated power flow path of the power grid and a simulated power flow corresponding to the simulated power flow path of the power grid.

[0105] In an embodiment of the present application, since the power grid graph theory model is a mathematical model for describing the flow of power in a power system, the model can be used to simulate the flow of power between nodes in the power system, thereby obtaining a power flow model. Among them, through the power flow model, the power grid system can be comprehensively analyzed to find out the problems in the system and optimize them. This includes optimization of load distribution, line capacity, voltage stability, etc. The power flow model can help analyze fault conditions in the power system, including short circuits, overloads, etc., so as to provide early warnings and take corresponding measures to ensure the safety and stable operation of the system. In the planning and design stage of the power system, the power flow model can help determine the optimal line layout, transformer capacity and other parameters to ensure the efficient operation and reliability of the system.

[0106] Specifically, step 130 may include:

[0107] Step 131: Set the capacity value corresponding to each directed edge in the power grid graph model.

[0108] In the embodiment of the present application, the power grid diagram model G is first initialized. t =(V, E, W t ), define the capacity value C(e) and initial flow f(e) = 0 for each edge e∈E, and the capacity of the edge is determined by the weight W ij,t The weights are calculated to reflect the power transmission efficiency and loss of the edge:

[0109]

[0110] Where C(e) represents the capacity of edge e, based on weight W ij,t Calculate, which represents the maximum amount of power that edge e can transmit at time point t. α, β, and γ are weight coefficients pre-set according to grid characteristics and analysis requirements. R i,t Represented as the load change rate data of node i at time point t, Represented as the phase angle difference data of node i at time point t, V i,t It is represented as the voltage waveform distortion data of node i at time point t, Z ij,t It is represented as the dynamic impedance characteristic data between node i and node j at time point t.

[0111] Step 132: Obtain a power supply node set and a power consumption node set in a power grid graph model.

[0112] Step 133: Based on the Ford-Folkson algorithm, the maximum power flow between the power supply node set and the power consumption node set is determined according to the total power supply capacity and the total power demand between the power supply node set and the power consumption node set.

[0113] Step 134: According to the maximum power flow, determine the augmented path between the power supply node in the power supply node set and the corresponding power consumption node as the power simulation flow path.

[0114] In the embodiment of the present application, the augmented paths between the power supply nodes in the power supply node set and the corresponding power consumption nodes are determined, and each augmented path is assigned a value according to the maximum power flow in the power supply node set and the power consumption node set, so that the sum of the power flow corresponding to all augmented paths cannot exceed the maximum power flow, that is, the sum of the power flow corresponding to all augmented paths is less than or equal to the maximum power flow. Then, the augmented paths between the power supply nodes and the corresponding power consumption nodes are set as power simulation flow paths.

[0115] Step 135: Calculate the minimum remaining capacity as the simulated power flow according to the capacity value corresponding to the power simulation flow path and the power flow corresponding to the power simulation flow path.

[0116] In the embodiment of the present application, all augmenting paths are constructed as a path set P, and the traffic corresponding to the augmenting paths is constructed as a traffic set F, and the minimum remaining capacity of each augmenting path is calculated:

[0117]

[0118] C(e) defines the capacity of each edge e∈E, and f(e) is the initial flow. Then, based on the minimum remaining capacity, the simulated power flow of each node and its corresponding directed edge is calculated, and the calculation formula is:

[0119]

[0120] Among them, P i,e is the set of all paths containing edge e, F(p) is the minimum remaining capacity on the augmenting path p, δ e,p is an indicator function that is 1 if path p passes through edge e and 0 otherwise.

[0121] Step 136: construct a power flow model according to the multiple power simulation flow paths and the simulated power flow corresponding to each power simulation flow path.

[0122] Step 140: Obtaining the actual power flow of the actual power flow path corresponding to the power simulation flow path.

[0123] Step 150: Determine the power flow abnormal point according to the simulated power flow and the actual power flow.

[0124] In the embodiment of the present application, preset conditions are set and the abnormal points of power flow in the graph theory model are determined according to the simulated power flow and the actual power flow, that is, the points of abnormal power flow in the graph theory model are marked.

[0125] Specifically, step 150 may include:

[0126] Step 151: Calculate the difference percentage between the simulated current flow and the actual power flow.

[0127] In the embodiment of the present application, since the actual power flow is determined to be the actual power flow value, for each directed edge e in the power grid graph model, the actual power flow value P is calculated. i,act (e, t) and simulated power flow f i,theo (e) The difference percentage between e , and its calculation formula is:

[0128]

[0129] Among them, P i,act (e, t) is the actual power flow value, f i,theo (e) is the simulated power flow.

[0130] Step 152: If the difference percentage is greater than the preset difference percentage, the power simulation flow path and the corresponding node are determined to be power flow abnormal points.

[0131] In the embodiment of the present application, the difference threshold Diff is set threshold Thenmark, for all calculated Diff e , if Diff e >Diff threshold Thenmarkasanomaly, then mark the directed edge e and the corresponding node i as power flow anomaly points.

[0132] Step 160: Determine whether electricity theft occurs in the power grid based on the abnormal points of power flow.

[0133] In the embodiment of the present application, after the abnormal power flow point is determined, the present application can use the distribution analysis method of the abnormal point to accurately find the area where the power theft occurs in the power grid through the abnormal power flow point. Specifically, if there is an area containing multiple abnormal power flow points or an area with multiple directed edges where abnormal power flow occurs continuously, it is determined that the power theft occurs in the area.

[0134] Optionally, connection relationship comparison can be used to determine whether electricity theft occurs in the power grid. Specifically, the actual power flow paths of multiple power flow abnormal points are compared with the preset connection model of the power grid, wherein the preset connection model includes multiple preset power flow points and preset power flow paths between the Meige preset power flow points and other power flow points. If it is determined that there are power flow abnormal points in the actual power flow path that are not recorded or do not meet the preset power flow path, the power flow abnormal points are determined to be illegal access points.

[0135] Optionally, an abnormal model can be used to identify whether electricity theft occurs in the power grid. Specifically, the power flow pattern of the abnormal power flow point is identified. If the power flow pattern indicates that the power flow amount increases or decreases within a preset time period, it is determined that electricity theft occurs at the abnormal power flow point.

[0136] After determining that the power flow abnormal point has stolen electricity, the node number or geographic location information of the power flow abnormal point where the power theft occurred is marked, and the amount of stolen electricity is estimated for each node or edge marked as a suspected power theft point, and then a power theft detection report is generated, where the power theft detection report includes the location of the power theft, the estimated amount of stolen electricity, and related grid safety recommendations (proposing grid safety and stability improvement recommendations for suspected power theft points, including strengthening monitoring, optimizing network design, increasing detection frequency, and implementing stricter safety measures). The power theft detection report is then sent to an electronic device so that the grid operator and relevant departments can provide the power theft detection report for further investigation and taking corresponding measures.

[0137] The present application provides a method and device for detecting power theft in a power grid, the method comprising: obtaining a power grid data set, the power grid data set comprising a plurality of nodes in the power grid and power grid data corresponding to each node, constructing a power grid graph model according to the power connection relationship between each node and other nodes, simulating the power flow of the power grid graph model and constructing a power flow model based on network flow analysis technology, wherein the power flow model comprises a simulated power flow path of the power grid and a simulated power flow corresponding to the simulated power flow path of the power grid, obtaining the actual power flow of the actual power flow path corresponding to the simulated power flow path, determining power flow abnormal points according to the simulated power flow and the actual power flow, and determining whether power theft occurs in the power grid according to the abnormal power flow points. Through the power grid graph model and network flow analysis technology, the topological structure and power flow pattern of the power grid can be more deeply understood, so that power theft detection no longer relies solely on simple power comparison or basic anomaly detection algorithms, so that illegal connection points and abnormal power usage patterns can be more sensitively and accurately identified, and it can work effectively even when the means of power theft are becoming increasingly cunning and diverse. By monitoring the flow of electricity in the power grid in real time and comparing it with the theoretical model, it is possible to detect and deal with electricity theft in a timely manner, thereby reducing economic losses and improving the overall safety and stability of the power grid. In addition, by analyzing the identified anomalies and proposing suggestions for improving the safety and stability of the power grid, the power grid's ability to prevent and control security risks such as electricity theft is further enhanced.

[0138] In one embodiment, step 133 can be specifically implemented as follows: taking the power supply node set as the source point set; taking the power consumption node set as the sink point set; establishing a residual network according to the directed edges between the source points in the source point set and other nodes and the directed edges between the sink points in the sink point set and other nodes; initializing the flow of all directed edges in the residual network to 0; resetting the power supply capacity value of the source points in the source point set and the power demand value of the sink points in the sink point set according to the total power supply capacity value and the total power demand value between the source point set and the sink point set; searching for the target path from the source point to the sink point in the residual network; wherein, The difference between the original capacity value and the used flow of each directed edge in the target path is greater than 0; the minimum residual capacity in the target path is calculated; wherein the minimum residual capacity is the capacity of the directed edge with the smallest residual capacity in the target path; according to the minimum residual capacity, the flow of all directed edges in the target path is updated and the minimum residual capacity is increased to update the residual network; if there is no path from the source point to the sink point in the updated residual network, the maximum power flow between the power supply node set and the power consumption node set is calculated according to the sum of the flow from the source point in the source point set to other nodes and the sum of the flow from other nodes to the source point in the source point set.

[0139] In an embodiment of the present application, multiple power supply nodes are selected to construct a power supply node set, and the power supply node set is used as a source point set, and each power supply node is used as a source point, wherein the source point is set to s, the source point set is S, and the source point represents the power input point of the power grid. Multiple power consumption nodes are selected to construct a sink node set, and the power consumption node set is used as a sink set, and each power consumption node is used as a sink, wherein the sink is defined as t, the sink set is T, and the sink represents a power consumption point or a load center. Then, according to the directed edges between the source point in the source point set and other nodes and the directed edges between the sink point in the sink set and other nodes, a residual network is established, and the flow of all directed edges in the residual network is initialized to 0. According to the total power supply capacity value and the total power demand value between the source point set and the sink point set, the power supply capacity value of the source points in the source point set and the power demand value of the sink points in the sink point set are reset, that is, the source points in the source point set and the sink points in the sink point set are reassigned, and the total power supply capacity value between the assigned source point set and the assigned sink point set cannot exceed the total power supply capacity value between the source point set and the sink point set, that is, the total power supply capacity value between the assigned source point set and the assigned sink point set is less than or equal to the total power supply capacity value between the source point set and the sink point set, and the total power demand value between the assigned source point set and the assigned sink point set cannot exceed the total power demand value between the source point set and the sink point set, that is, the total power demand value between the assigned source point set and the assigned sink point set is less than or equal to the total power demand value between the source point set and the sink point set. The path from s to t is found in the residual network through depth-first search, that is, the target path from the source to the sink is searched in the residual network, and the difference between the original capacity value and the used flow of each directed edge in the target path is greater than 0. The total power supply capacity Supply (S) and the total power demand Demand (T) are calculated based on the load change rate R of the source and sink, respectively. i,t Estimate:

[0140]

[0141] Among them, Supply(S) represents the total power supply capacity of the source point set S, based on the load change rate R of the power supply node s, t calculation, Demand(T) represents the total power demand of the sink set T, based on the load change rate R of the power node t,t calculate.

[0142] Then, the minimum residual capacity in the target path is calculated, that is, the capacity of the directed edge with the minimum residual capacity on the path, and based on the minimum residual capacity, the flow of all directed edges in the target path is updated and the minimum residual capacity is increased to update the flow of directed edges in the residual network. If there is no path from the source point to the sink point in the updated residual network, the maximum power flow between the source point node set and the sink point node set is calculated based on the sum of the flow from the source point in the source point set to other nodes and the sum of the flow from other nodes to the source point in the source point set, that is, the maximum power flow between the power supply node set and the power consumption node set. Among them, the maximum power flow F max The calculation formula is:

[0143]

[0144] Among them, F max Represents the maximum power flow from the source point set S to the sink point set T calculated using the Ford-Fulkerson algorithm. represents the sum of the traffic from the source point set S to all connected nodes v, where v is the node directly connected to S, f(S, v) is the traffic from node S to node v, and E is the set of edges. The sum of flows from all connected nodes v to the source set S, where v is a node directly connected to a node in S, and f(v,S) is the flow from node v to node s.

[0145] Figure 3 FIG. 1 is a flow chart of a method for obtaining actual power flow provided by an exemplary embodiment of the present application. Figure 3 As shown, step 140 may include:

[0146] Step 141: Measure the instantaneous current and instantaneous voltage of each node corresponding to the actual power flow path.

[0147] In the embodiment of the present application, the instantaneous current I of each node corresponding to the actual flow path of the power can be measured by a sensor or an electric meter. i,act (t) and voltage V i,act (t):

[0148]

[0149] P i,act (e,t)=V i,act (t)·I i,act (t)·cos(θ i (t));

[0150] in, and are the real and imaginary parts of the current at node i at time t, (t) and are the real and imaginary parts of the voltage, θ i (t) is the phase angle difference

[0151] Step 142: Calculate the actual power flow value corresponding to the actual power flow path according to the instantaneous current and the instantaneous voltage as the actual power flow.

[0152] In the embodiment of the present application, the actual power flow value corresponding to the actual power flow path is calculated based on the instantaneous current and instantaneous voltage as the actual power flow, and the calculation formula is:

[0153] P i,act (e,t)=V i,act (t)·I i,act (t)·cos(θ i (t));

[0154] Among them, V i,act (t) is the instantaneous voltage, θ i (t) is the phase angle difference, I i,act (t) is the instantaneous current.

[0155] In one embodiment, after step 160 , the power grid electricity theft detection method may be specifically implemented as follows: calculating the amount of electricity theft according to actual power flow and simulated power flow at multiple power flow abnormal points.

[0156] In the embodiment of the present application, the estimation of the amount of stolen electricity is based on the actual amount of electricity flow f i,act (e) and simulated power flow f i,theo (e) The difference between:

[0157]

[0158] Among them, E anomaly is the set of all directed edges marked as abnormal, Q theft represents the estimated total amount of electricity stolen, P i,act (e,t) is the actual power flow value, f i,theo (e) is the simulated power flow.

[0159] In one embodiment, after step 160, the power grid electricity theft detection method can be specifically implemented as follows: obtaining a first estimated value for adjusting the weight value corresponding to the directed edge of the power flow anomaly point; obtaining a second estimated value for adjusting the load change rate corresponding to the node of the power flow anomaly point; adjusting the weight corresponding to the directed edge of the power flow anomaly point according to the first estimated value; and adjusting the load change rate corresponding to the node of the power flow anomaly point according to the second estimated value.

[0160] In the embodiment of the present application, the weight corresponding to the abnormal point of power flow is adjusted according to the weight value and the estimated value corresponding to the abnormal point of power flow:

[0161]

[0162] Where λ is the adjustment factor, To adjust the first estimate of the weights of directed edges, Adjust the second estimated value of the load change rate of node i, W ij,t The weight of the directed edge, R i,t It is the load change rate data.

[0163] After implementing the method, Company A conducted a pilot test in a specific test area in the first quarter of 2023. The pilot area includes 5,000 households and 100 industrial users. By applying this method, 30 suspected electricity theft points were successfully identified, including 25 residential users and 5 industrial users. Compared with the traditional method, the number of suspected electricity theft points identified increased by 55.34% and the false alarm rate decreased by 30.67%.

[0164] In estimating the amount of electricity theft, the total amount of electricity theft from these 30 suspected points during the test period was estimated to be 541,562 kWh, an increase of about 20.34% compared to the amount of electricity theft estimated by traditional methods in the past. This shows that the new method can more accurately identify and estimate electricity theft.

[0165] Based on these data, Company A formulated targeted electricity theft control measures, including strengthening on-site inspections of suspected points, optimizing the grid structure, and strengthening user education. Through the implementation of these measures, the grid losses in the pilot area were reduced by 15.64% in the following three months, and the overall stability and security of the grid were significantly improved.

[0166] The above implementation method proposes a method for detecting power theft in a power grid. Compared with traditional methods, this new method has obvious advantages. First, it constructs a graph theory model of the power grid and deeply analyzes the topology of the power grid and the characteristics of power flow, effectively improving the accuracy and sensitivity of power theft detection. In addition, by using network flow analysis technology, the simulation analysis of power flow can be optimized, illegal access points and abnormal power consumption patterns can be more accurately identified and located, and high efficiency and accuracy can be maintained even in a complex and changing power grid environment.

[0167] Furthermore, by combining data analysis and machine learning technology, it is possible to automatically identify electricity theft patterns, improve the automation level of electricity theft detection and the ability to process large-scale power grid data. By monitoring the power flow of the power grid in real time and comparing it with the theoretical model, it is possible to promptly detect and handle electricity theft, greatly improving the operating efficiency and safety of the power grid.

[0168] Figure 4 Schematic diagram of the structure of a power grid electricity theft detection device provided by an exemplary embodiment of the present application. Figure 4 As shown, the power grid electricity theft detection device 20 includes:

[0169] The simulation module 201 is used to obtain a power grid data set, which includes multiple nodes in the power grid and the power grid data corresponding to each node; construct a power grid graph model based on the power connection relationship between each node and other nodes; simulate the power flow of the power grid graph model based on network flow analysis technology and construct a power flow model; wherein the power flow model includes a simulated power flow path of the power grid and a simulated power flow corresponding to the simulated power flow path of the power grid; the actual module 202 is used to obtain the actual power flow of the actual power flow path corresponding to the simulated power flow path; determine the power flow abnormality point based on the simulated power flow and the actual power flow; determine whether power theft occurs in the power grid based on the abnormal power flow point.

[0170] Figure 5 FIG. 1 is a schematic diagram of a power grid electricity theft detection device provided by another exemplary embodiment of the present application. Figure 5 As shown, the simulation module 201 can be specifically configured as follows: collecting phase angle difference data of each node in the power grid at a preset time point; collecting voltage waveform distortion data of each node in the power grid at a preset time point; collecting load change rate data of each node in the power grid at a preset time point; collecting dynamic impedance characteristic data of power flow when each node in the power grid is connected to other nodes at a preset time point; and constructing a power grid data set based on the phase angle difference data, voltage waveform distortion data, load change rate data and dynamic impedance characteristic data.

[0171] In one embodiment, the simulation module 201 may include: a construction unit 2011, which is used to construct directed edges from the target node to other target nodes electrically connected to the target node if there are other target nodes electrically connected to the target node in the power grid data set; a determination unit 2012, which is used to determine the weight value corresponding to each directed edge; and a construction unit 2013, which is used to construct a power grid graph model based on multiple directed edges, the weight value corresponding to each directed edge, and multiple target nodes.

[0172] In one embodiment, the simulation module 201 can be specifically configured as follows: setting the capacity value corresponding to each directed edge in the power grid graph model; obtaining the power supply node set and the power consumption node set in the power grid graph model; based on the Ford-Folkson algorithm, determining the maximum power flow between the power supply node set and the power consumption node set according to the total power supply capacity and the total power demand between the power supply node set and the power consumption node set; determining the augmented path between the power supply node and the corresponding power consumption node in the power supply node set as the power simulation flow path according to the maximum power flow; calculating the simulated power flow according to the capacity value corresponding to the power simulation flow path and the power flow corresponding to the power simulation flow path; constructing a power flow model according to multiple power simulation flow paths and the simulated power flow corresponding to each power simulation flow path.

[0173] In one embodiment, the simulation module 201 can be specifically configured as follows: taking the power supply node set as the source point set; taking the power consumption node set as the sink point set; establishing a residual network based on the directed edges between the source points in the source point set and other nodes and the directed edges between the sink points in the sink point set and other nodes; initializing the flow of all directed edges in the residual network to 0; resetting the power supply capacity value of the source points in the source point set and the power demand value of the sink points in the sink point set based on the total power supply capacity value and the total power demand value between the source point set and the sink point set; searching for the target path from the source point to the sink point in the residual network; wherein , the difference between the original capacity value and the used flow of each directed edge in the target path is greater than 0; calculate the minimum residual capacity in the target path; where the minimum residual capacity is the capacity of the directed edge with the smallest residual capacity in the target path; according to the minimum residual capacity, update the flow of all directed edges of the target path and increase the minimum residual capacity to update the residual network; if there is no path from the source point to the sink point in the updated residual network, calculate the maximum power flow between the power supply node set and the power consumption node set according to the sum of the flow from the source point in the source point set to other nodes and the sum of the flow from other nodes to the source point in the source point set.

[0174] In one embodiment, the actual module 202 may include: a measuring unit 2021, used to measure the instantaneous current and instantaneous voltage of each node corresponding to the actual power flow path; a calculating unit 2022, used to calculate the actual power flow value corresponding to the actual power flow path according to the instantaneous current and instantaneous voltage as the actual power flow.

[0175] In one embodiment, the actual module 202 may be specifically configured to: calculate the difference percentage between the simulated current flow and the actual power flow; if the difference percentage is greater than a preset difference percentage, determine the power simulation flow path and its corresponding node as a power flow abnormal point.

[0176] In one embodiment, the power grid electricity theft detection device 20 may include: an electricity theft module 203, configured to calculate the amount of electricity theft according to actual power flow and simulated power flow at multiple power flow abnormal points.

[0177] In one embodiment, the power grid electricity theft detection device 20 is specifically configured as follows: obtaining a first estimated value for adjusting the weight value corresponding to the directed edge of the power flow anomaly point; obtaining a second estimated value for adjusting the load change rate corresponding to the node of the power flow anomaly point; adjusting the weight corresponding to the directed edge of the power flow anomaly point according to the first estimated value; and adjusting the load change rate corresponding to the node of the power flow anomaly point according to the second estimated value.

[0178] Figure 6 A block diagram of an electronic device according to an embodiment of the present application is illustrated.

[0179] like Figure 6 As shown, the electronic device 10 includes one or more processors 11 and a memory 12 .

[0180] The processor 11 may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the electronic device 10 to perform desired functions.

[0181] The memory 12 may include one or more computer program products, and the computer program product may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 11 may run the program instructions to implement the power grid electricity theft detection method of each embodiment of the present application described above and / or other desired functions. Various contents such as input signals, signal components, noise components, etc. may also be stored in the computer-readable storage medium.

[0182] In one example, the electronic device 10 may further include: an input device 13 and an output device 14, and these components are interconnected via a bus system and / or other forms of connection mechanisms (not shown).

[0183] When the electronic device is a stand-alone device, the input device 13 may be a communication network connector, which is used to receive the collected input signals from the first device and the second device.

[0184] In addition, the input device 13 may also include, for example, a keyboard, a mouse, and the like.

[0185] The output device 14 can output various information to the outside, including the determined distance information, direction information, etc. The output device 14 can include, for example, a display, a speaker, a printer, a communication network and a remote output device connected thereto, and the like.

[0186] Of course, to simplify, Figure 6 Only some of the components related to the present application in the electronic device 10 are shown, and components such as a bus, an input / output interface, etc. are omitted. In addition, according to specific application situations, the electronic device 10 may also include any other appropriate components.

[0187] The computer program product may be written in any combination of one or more programming languages ​​to write program codes for performing the operations of the embodiments of the present application, including object-oriented programming languages, such as Java, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as an independent software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.

[0188] The computer readable storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.

[0189] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present application to the forms disclosed herein. Although multiple example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.

Claims

1. A method for detecting power theft in a power grid, characterized in that: include: Acquire a power grid data set, wherein the power grid data set includes a plurality of nodes in the power grid and power grid data corresponding to each node; According to the power connection relationship between each node and other nodes, a power grid graph model is constructed; Based on the network flow analysis technology, the power flow of the power grid graph model is simulated and a power flow model is constructed; wherein the power flow model includes a power simulation flow path of the power grid and a simulated power flow corresponding to the power simulation flow path of the power grid; Acquire an actual power flow rate of an actual power flow path corresponding to the power simulation flow path; Determining a power flow abnormal point according to the simulated power flow and the actual power flow; It is determined whether electricity theft occurs in the power grid according to the abnormal power flow point.

2. The method for detecting power theft in a power grid according to claim 1, characterized in that: The obtaining of the power grid data set comprises: Collecting phase angle difference data of each node in the power grid at a preset time point; Collecting voltage waveform distortion data of each node in the power grid at the preset time point; Collecting load change rate data of each node in the power grid at the preset time point; Collecting dynamic impedance characteristic data of power flow when each node in the power grid is connected to other nodes at the preset time point; The power grid data set is constructed according to the phase angle difference data, the voltage waveform distortion data, the load change rate data and the dynamic impedance characteristic data.

3. The method for detecting power theft in a power grid according to claim 1, characterized in that: The constructing of a power grid graph model according to the plurality of nodes corresponding to the power grid data set and the power connection relationship between each node and other nodes comprises: If there are other target nodes electrically connected to the target node in the power grid data set, constructing directed edges from the target node to the other target nodes electrically connected to the target node; Determine the weight value corresponding to each directed edge; The power grid graph model is constructed according to a plurality of directed edges, a weight value corresponding to each directed edge, and a plurality of target nodes.

4. The method for detecting power theft in a power grid according to claim 1, characterized in that: The method of simulating the power flow of the power grid graph model and constructing a power flow model based on the network flow analysis technology includes: Setting the capacity value corresponding to each directed edge in the power grid graph model; Obtaining a power supply node set and a power consumption node set in the power grid graph model; Based on the Ford-Folkson algorithm, according to the total power supply capacity and total power demand between the power supply node set and the power consumption node set, the maximum power flow between the power supply node set and the power consumption node set is determined; According to the maximum power flow, determining an augmented path between a power supply node in the power supply node set and a corresponding power consumption node as the power simulation flow path; Calculating the simulated power flow according to the capacity value corresponding to the simulated power flow path and the power flow corresponding to the simulated power flow path; The power flow model is constructed according to a plurality of power simulation flow paths and the simulated power flow corresponding to each power simulation flow path.

5. The method for detecting power theft in a power grid according to claim 4, characterized in that: The determining of the maximum power flow between the power supply node set and the power consumption node set based on the Ford-Folkson algorithm according to the total power supply capacity and the total power demand between the power supply node set and the power consumption node set comprises: Taking the power supply node set as a source point set; Taking the electricity consumption node set as a sink set; Establishing a residual network according to directed edges between source points in the source point set and other nodes and directed edges between sink points in the sink point set and other nodes; Initialize the flow of all directed edges in the residual network to 0; Resetting the power supply capacity values ​​of the source points in the source point set and the power demand values ​​of the sink points in the sink point set according to the total power supply capacity value and the total power demand value between the source point set and the sink point set; Searching for a target path from a source node to a sink node in the residual network; wherein the difference between the original capacity value and the used flow of each directed edge in the target path is greater than 0; Calculating the minimum residual capacity in the target path; wherein the minimum residual capacity is the capacity of the directed edge with the minimum residual capacity in the target path; According to the minimum residual capacity, updating the flow of all directed edges of the target path and increasing the minimum residual capacity to update the residual network; If there is no path from the source point to the sink point in the updated residual network, the maximum power flow between the power supply node set and the power consumption node set is calculated based on the sum of the flow from the source points in the source point set to the other nodes and the sum of the flow from the other nodes to the source points in the source point set.

6. The method for detecting power theft in a power grid according to claim 1, characterized in that: The step of obtaining the actual power flow of the actual power flow path corresponding to the power simulation flow path comprises: Measuring the instantaneous current and instantaneous voltage of each node corresponding to the actual power flow path; According to the instantaneous current and the instantaneous voltage, an actual power flow value corresponding to the actual power flow path is calculated as the actual power flow.

7. The method for detecting power theft in a power grid according to claim 1, characterized in that: The determining of the power flow abnormal point according to the simulated power flow and the actual power flow comprises: calculating a percentage difference between the simulated current flow and the actual power flow; If the difference percentage is greater than the preset difference percentage, the power simulation flow path and its corresponding node are determined to be the power flow abnormal point.

8. The method for detecting power theft in a power grid according to claim 1, characterized in that: After determining that the power flow abnormal point has the power theft behavior, the method further includes: The amount of stolen electricity is calculated based on the actual power flow and simulated power flow at multiple power flow anomaly points.

9. The method for detecting power theft in a power grid according to claim 1, characterized in that: After determining that the power flow abnormal point has the power theft behavior, the method further includes: Obtaining a first estimated value for adjusting a weight value corresponding to a directed edge of the power flow abnormal point; Obtaining a second estimated value for adjusting a load change rate corresponding to a node at the power flow abnormal point; According to the first estimated value, adjusting the weight corresponding to the directed edge of the power flow abnormal point; According to the second estimated value, the load change rate corresponding to the node of the power flow abnormal point is adjusted.

10. A power grid electricity theft detection device, characterized in that: include: A simulation module is used to obtain a power grid data set, wherein the power grid data set includes multiple nodes in the power grid and power grid data corresponding to each node; construct a power grid graph model according to the power connection relationship between each node and other nodes; simulate the power flow of the power grid graph model based on network flow analysis technology and construct a power flow model; wherein the power flow model includes a power simulation flow path of the power grid and a simulated power flow corresponding to the power simulation flow path of the power grid; An actual module, used to obtain an actual power flow of an actual power flow path corresponding to the power simulation flow path; and determine a power flow abnormal point according to the simulated power flow and the actual power flow; According to the abnormal point of power flow, it is determined whether power theft occurs in the power grid.