BIM design method for high-pile wharf based on digital two-dimensional geological profile

Through the secondary development technology of the Revit platform, the two-dimensional geological profile is digitally processed and the pile foundation type and geometric parameters are combined, which solves the problem of inefficient design efficiency of high pile terminals in water transportation projects, and realizes efficient and accurate pile foundation bearing capacity calculation and design Optimization improves the efficiency and accuracy of BIM design.

CN118797790BActive Publication Date: 2024-11-26CCCC SECOND HARBOR CONSULTANTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411278802.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-26
Estimated Expiration
2044-09-12

AI Technical Summary

Technical Problem

In the design of high pile docks for water transport projects, the traditional two-dimensional geological profile analysis is inefficient, the three-dimensional geological model files are large and integrated affects the BIM design efficiency, how to improve work efficiency and calculation accuracy.

Method used

Using the secondary development technology on the Revit platform, the two-dimensional geological profile is digitally processed to realize its three-dimensional application, import the geological profile to the cross-section view of the dock platform, obtain the geological parameters required for the calculation of pile foundation bearing capacity, and combine the pile foundation type and geometric parameters. Carry out load capacity calculation and optimize pile length design.

Benefits of technology

It improves the work efficiency and calculation accuracy of BIM design in water transport engineering, solves the problem of lag caused by large three-dimensional geological model files, realizes convenient pile foundation bearing capacity calculation and drawing, and improves the reliability and efficiency of the design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118797790B_ABST
    Figure CN118797790B_ABST
Patent Text Reader

Abstract

The present invention relates to a BIM design method for a high-pile wharf based on a digital two-dimensional geological profile, comprising the following steps: S1, quickly creating a BIM model of a high-pile wharf for a water transport project in a Revit platform; S2, digitally processing a two-dimensional geological profile; S3, importing a two-dimensional geological profile at a spatial position corresponding to the cross section; S4, obtaining geological parameters required for pile foundation bearing capacity calculation; S5, identifying pile foundation burial attribute information in Revit according to the pile axis extension intersection method, and calculating the depth of the pile foundation entering different geotechnical unit layers; S6, obtaining pile foundation design calculation parameters; S7, completing pile foundation bearing capacity calculation and displaying the result; S8, optimizing the pile length design according to the pile foundation bearing capacity calculation result; S9, completing the drawing of the BIM model of the wharf structure. The present invention realizes the calculation, design optimization and drawing of the pile foundation bearing capacity of the high-pile wharf BIM model, expands the application mode and ideas of basic geological data in the BIM design of water transport projects, and provides application and reference for designers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water transport engineering, and more specifically, to a BIM design method for a high-pile wharf based on a digital two-dimensional geological profile. Background Art

[0002] In the field of high-pile wharf design for water transport projects, geological profile analysis is an important task that can help designers understand the geological development within the wharf structure site in detail and provide a basis for engineering design. In the design of high-pile wharf pile foundations, the traditional calculation of pile foundation bearing capacity mainly involves inserting a two-dimensional geological profile into the wharf cross-section and elevation drawings, and manually calculating according to the standard formula through nearby drilling or linear difference algorithms, or writing Excel spreadsheets to assist in calculation, which is relatively inefficient.

[0003] At present, with the extensive development and application of BIM technology in the field of water transport engineering, the use of Revit platform for dock structure modeling, drawing and calculation has become a relatively common technical means in this field. As a BIM expression form of geological basic data, the interpolation algorithm of the three-dimensional geological model and the reliability of model application are also the main issues studied and discussed in the field of engineering construction in recent years. At the same time, due to the surface network construction method of the geological model and the large scope of the survey area, the three-dimensional geological model formed is often very large in file. After integration with the superstructure BIM model, the model is stuck, which seriously affects the efficiency of BIM design.

[0004] At present, the results in the field of water transport engineering survey are mainly in two-dimensional form. How to better utilize and analyze geological basic data in the BIM design of water transport engineering, digitally process two-dimensional geological profiles, and realize three-dimensional application of two-dimensional profiles to assist BIM design, calculation and drawing, and improve work efficiency and calculation accuracy are the main problems that need to be solved at present. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a BIM design method for high-pile docks based on digital two-dimensional geological profiles, which can effectively improve the work efficiency and calculation accuracy of BIM design of water transport projects.

[0006] The technical solution adopted by the present invention to solve the technical problem is to construct a high-pile wharf BIM design method based on digital two-dimensional geological profile, including the following steps:

[0007] S1. Quickly create a BIM model of a high-pile wharf for water transport engineering in the Revit platform;

[0008] S2, digital processing of two-dimensional geological sections;

[0009] S3. In the cross-section view of the dock platform, the two-dimensional geological profile at the corresponding spatial position of the cross-section, including the topographic line and the rock and soil layer stratification line, is imported, and automatically positioned in the cross-section view according to the coordinates and elevation;

[0010] S4, traversing the stratum attribute information on the rock and soil layer stratification line of the imported two-dimensional geological profile to obtain the geological parameters required for the calculation of the pile foundation bearing capacity;

[0011] S5. In Revit, the pile foundation soil attribute information is identified according to the pile axis extension intersection method, and the depth of the pile foundation entering different geotechnical unit layers is calculated;

[0012] S6. Select a calculation formula for pile foundation bearing capacity according to pile foundation type attributes, and obtain pile foundation design calculation parameters based on pile foundation geometric parameters and soil layer type;

[0013] S7. Complete the calculation of pile foundation bearing capacity and display the results;

[0014] S8. Optimize the pile length design based on the calculation results of pile foundation bearing capacity;

[0015] S9. Complete the BIM model drawing of the wharf structure.

[0016] According to the above scheme, in step S1, the following method is used: Revit platform secondary development technology is used to assist in the rapid creation of a BIM model of a high-pile wharf structure for a water transport project, specifically by creating a component family to build a wharf rack, building a wharf platform structure segment based on the wharf rack, and completing the wharf platform BIM model based on the wharf platform structure segment.

[0017] According to the above scheme, in step S2, the two-dimensional geological profile to be imported is digitized to realize the three-dimensional application of the two-dimensional profile, including the following steps:

[0018] S201. Scale and organize the geological profile according to the design ratio and delete redundant geological information;

[0019] S202, topographic lines and stratigraphic stratification lines are continuous multi-segment lines;

[0020] S203, the terrain line belongs to the layer DXX alone, and the other stratum stratification lines refer to the names of the geotechnical unit layers above the stratum stratification lines to determine the layer names;

[0021] S204, assigning stratigraphic stratification line attributes, customizing the addition of geotechnical layer attribute information in the form of extended data, including geotechnical unit layer number, geotechnical name, soil layer type, geotechnical mechanics index, and geotechnical design index;

[0022] S205. Adjust the coordinate origin of the geological section to be consistent with the coordinate origin of the dock structure BIM model in the Revit platform.

[0023] According to the above scheme, in step S3, the high-pile wharf platform, approach bridge or pier section is automatically and accurately positioned according to the coordinates and elevation.

[0024] According to the above scheme, in step S4, the stratum attributes exist in the two-dimensional geological profile in the form of extended data; the geological parameters required for the calculation of the pile foundation bearing capacity are obtained, and the geological parameters include the rock and soil unit layer number, rock and soil name, soil layer type, the standard value of the ultimate side resistance of driven piles and cast-in-place piles, and the standard value of the ultimate end resistance of driven piles and cast-in-place piles.

[0025] According to the above scheme, step S5 is implemented by the following method, including the following steps:

[0026] S501. Identify the pile foundation soil attribute information according to the pile axis extension intersection method in Revit, specifically: assume that the pile foundation axis extends infinitely downward, determine whether the pile axis intersects with the rock and soil stratification line of the two-dimensional geological section, and if so, obtain the pile foundation soil layer attribute information according to the intersection position, including the rock and soil unit layer number, rock and soil name, and soil layer type;

[0027] S502: According to the extension trajectory of the pile axis, the depth of the pile foundation entering different geotechnical unit layers is calculated by obtaining the coordinates of the intersections of the upper and lower geotechnical unit layers and the coordinates of the pile end.

[0028] According to the above scheme, step S6 is implemented by the following method, including the following steps:

[0029] S601, selecting a pile foundation bearing capacity calculation formula according to pile foundation type attributes, and obtaining pile foundation design calculation parameters based on pile foundation geometric parameters and soil layer type;

[0030] The bearing capacity calculation formula of driven piles is:

[0031]

[0032] In the formula, Q d is the design value of the axial bearing capacity of a single pile; γ R is the partial coefficient of the axial bearing capacity of a single pile; U is the circumference of the pile section; q fi is the standard value of the ultimate pile side friction resistance per unit area of ​​the i-th layer of soil for a single pile; l i is the length of the pile body passing through the i-th soil layer; q R is the standard value of the ultimate pile end resistance per unit area of ​​a single pile; A is the cross-sectional area of ​​the pile body;

[0033] The bearing capacity calculation formula of cast-in-place piles is:

[0034]

[0035] In the formula, Qd is the design value of the axial bearing capacity of a single pile; γ R is the partial coefficient of the axial bearing capacity of a single pile; U is the circumference of the pile section; ψ si is the size effect coefficient of pile side resistance; ψ p is the end resistance size effect coefficient; q fi is the standard value of the ultimate pile side friction resistance per unit area of ​​the i-th layer of soil for a single pile; l i is the length of the pile body passing through the i-th soil layer; q R is the standard value of the ultimate pile end resistance per unit area of ​​a single pile; A is the cross-sectional area of ​​the pile body;

[0036] Based on the geometric parameters of the pile foundation, when the pile diameter is ≤0.8m and the pile diameter is >0.8m, combined with the soil layer types of different geotechnical unit layers, the size effect coefficient ψ of the pile side resistance and end resistance in the cast-in-place pile design calculation formula is determined. si , p , the cross-sectional perimeter and cross-sectional area of ​​the pile body are directly obtained from the pile foundation model for geometric parameter calculation;

[0037] S602. Based on the secondary development of Revit, relevant parameters in the calculation formula for the bearing capacity of pile foundations of different pile types are formed into a calculation parameter panel.

[0038] According to the above scheme, in step S8, according to the bearing capacity calculation result, by comparing with the allowable bearing capacity of the pile foundation structure and the axial pressure of the pile body, the pile length is adjusted to optimize the design.

[0039] According to the above scheme, in step S9, the BIM model drawing is realized based on the optimized and adjusted wharf structure BIM model and the two-dimensional geological profile.

[0040] The implementation of the BIM design method for high-pile wharf based on digital two-dimensional geological profile of the present invention has the following beneficial effects:

[0041] 1. The present invention realizes the three-dimensional application of two-dimensional sections through secondary development on the Revit platform in the BIM design of high-pile docks of water transport projects by digital processing of two-dimensional geological sections. On the one hand, it solves the problem of large file attributes of three-dimensional geological models and the influence of file jamming after integrating the hydraulic structure BIM model. On the other hand, it refers to the traditional geological section auxiliary pile foundation bearing capacity calculation theory to realize the convenient calculation and drawing of digital two-dimensional sections combined with the dock platform BIM model, and the calculation method is reliable and accurate.

[0042] 2. The present invention expands the application methods and ideas of basic geological data in the BIM design of water transport projects, conforms to the current application of digital technology and advanced technical concepts of BIM forward design, can effectively improve the work efficiency and calculation accuracy of BIM design of water transport projects, and has broad application and promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0044] Figure 1 It is a flow chart of the BIM design method of a high-pile wharf based on a digital two-dimensional geological profile of the present invention. DETAILED DESCRIPTION

[0045] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.

[0046] like Figure 1 As shown, the BIM design method for high-pile wharf based on digital two-dimensional geological profile of the present invention comprises the following steps:

[0047] S1: Quickly create a BIM model of a high-pile wharf for water transport engineering in the Revit platform;

[0048] The secondary development technology of the Revit platform is used to assist in the rapid creation of the BIM model of the high-pile wharf structure of the water transport project. That is, the wharf frame is built by creating a component family, the wharf platform structure segment is built based on the wharf frame, and the wharf platform BIM model is completed based on the wharf platform structure segment.

[0049] S2: Digitally process the two-dimensional geological profile, specifically: digitally process the two-dimensional geological profile to be imported to realize the three-dimensional application of the two-dimensional profile, including the following steps:

[0050] (1) The geological profile is scaled and organized according to the design ratio, and redundant geological information such as standard penetration and sampling information is deleted; (2) Topographic lines and stratigraphic stratification lines are continuous multi-segment lines; (3) Topographic lines belong to a separate layer DXX, and other stratigraphic stratification lines refer to the names of the geotechnical unit layers above the stratigraphic stratification lines to determine the layer names; (4) The stratigraphic stratification lines are assigned attributes, and the geotechnical layer attribute information is added in the form of extended data, mainly including the geotechnical unit layer number, geotechnical name, soil layer type, geotechnical mechanics indicators, geotechnical design indicators, etc.; (5) The coordinate origin of the geological profile is adjusted to be consistent with the coordinate origin of the dock structure BIM model in the Revit platform.

[0051] S3: In the cross-section view of the dock platform, import the two-dimensional geological profile at the corresponding spatial position of the cross-section, including the topographic line and the rock and soil layer stratification line, and automatically locate it in the cross-section view according to the coordinates and elevation;

[0052] In the cross-sectional view of the high-pile wharf platform, approach bridge or pier, the digital two-dimensional geological profile at the corresponding spatial position of the cross-section is imported. At the same time, it is automatically and accurately positioned in the cross-sectional view of the high-pile wharf platform, approach bridge or pier according to the coordinates and elevation.

[0053] S4: traverse the stratum attribute information on the rock and soil layer stratification line of the imported two-dimensional geological profile to obtain the geological parameters required for the calculation of the pile foundation bearing capacity;

[0054] Traverse the stratigraphic attribute information on all rock and soil layer stratification lines in the imported digital two-dimensional geological profile, where the stratigraphic attributes exist in the two-dimensional geological profile in the form of extended data; obtain the geological parameters required for the calculation of pile foundation bearing capacity, which mainly include the rock and soil unit layer number, rock and soil name, soil layer type, standard value of the ultimate side resistance of driven piles or cast-in-place piles, standard value of the ultimate end resistance of driven piles or cast-in-place piles, etc.

[0055] S5: In Revit, the pile foundation soil attribute information is identified according to the pile axis extension intersection method, and the depth of the pile foundation entering different geotechnical unit layers is calculated;

[0056] In Revit, the pile foundation soil attribute information is identified according to the pile axis extension intersection method, that is, assuming that the pile foundation axis extends infinitely downward, determine whether the pile axis intersects with the rock and soil stratification line of the two-dimensional geological profile. If so, the pile foundation enters the rock and soil layer attribute information based on the intersection position, mainly including the rock and soil unit layer number, rock and soil name, soil layer type, etc.; at the same time, according to the pile axis extension trajectory, the depth of the pile foundation entering different rock and soil unit layers is calculated by obtaining the coordinates of the intersection of the upper and lower rock and soil unit layers and the pile end coordinates.

[0057] S6: Select the pile foundation bearing capacity calculation formula according to the pile foundation type attributes, and obtain the pile foundation design calculation parameters based on the pile foundation geometric parameters and the soil layer type;

[0058] The pile foundation bearing capacity calculation formula is selected according to the pile foundation type attributes, and the pile foundation design calculation parameters are obtained based on the pile foundation geometric parameters and combined with the soil layer type. The specific method is as follows:

[0059] Automatically match the pile foundation bearing capacity calculation formula according to the pile foundation type attributes, mainly including driven piles and cast-in-place piles;

[0060] The bearing capacity calculation formula of driven piles is:

[0061]

[0062] In the formula, Q d is the design value of the axial bearing capacity of a single pile (KN); γ R is the partial coefficient of the axial bearing capacity of a single pile; U is the circumference of the pile section (m); qfi is the standard value of the ultimate pile side friction resistance per unit area of ​​the i-th layer of soil for a single pile (kPa); l i is the length of the pile body passing through the i-th soil layer (m); q R is the standard value of the ultimate pile end resistance per unit area of ​​a single pile (kPa); A is the cross-sectional area of ​​the pile body (m 2 ).

[0063] The cross-sectional perimeter and cross-sectional area of ​​the pile body are directly calculated by obtaining geometric parameters in the pile foundation model.

[0064] The bearing capacity calculation formula of cast-in-place piles is:

[0065]

[0066] In the formula, Q d is the design value of the axial bearing capacity of a single pile (KN); γ R is the partial coefficient of the axial bearing capacity of a single pile; U is the circumference of the pile section (m); ψ si is the size effect coefficient of pile side resistance; ψ p is the end resistance size effect coefficient; q fi is the standard value of the ultimate pile side friction resistance per unit area of ​​the i-th layer of soil for a single pile (kPa); l i is the length of the pile body passing through the i-th soil layer (m); q R is the standard value of the ultimate pile end resistance per unit area of ​​a single pile (kPa); A is the cross-sectional area of ​​the pile body (m 2 ).

[0067] Based on the geometric parameters of the pile foundation, when the pile diameter is ≤0.8m and the pile diameter is >0.8m, combined with the soil layer types of different geotechnical unit layers, the soil layer types mainly include clay, silt, sand, and gravel soil, determine the size effect coefficient ψ of the pile side resistance and end resistance in the design calculation formula of the cast-in-place pile si , p The cross-sectional perimeter and cross-sectional area of ​​the pile body are directly calculated by obtaining geometric parameters in the pile foundation model.

[0068] Based on Revit secondary development, the relevant parameters in the calculation formulas for the bearing capacity of pile foundations of different pile types are formed into a calculation parameter panel. On the one hand, it solves the trouble of designers entering data manually, and on the other hand, it makes it easier for designers to understand the calculation process intuitively, which is accurate and efficient.

[0069] S7: Complete the pile foundation bearing capacity calculation and display the results; Perform the pile foundation bearing capacity calculation and display the results.

[0070] S8: Optimize the pile length design based on the pile foundation bearing capacity calculation results;

[0071] According to the bearing capacity calculation results, by comparing with the allowable bearing capacity of the pile foundation structure and the axial pressure of the pile body, the pile length is adjusted and the design is optimized.

[0072] S9: Complete the drawing of the BIM model of the wharf structure, specifically: based on the optimized and adjusted BIM model of the wharf structure and the two-dimensional geological profile, realize the BIM model drawing.

[0073] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.

Claims

1. A BIM design method for high-pile wharf based on digital two-dimensional geological profile, characterized in that: The following steps are involved: S1. Quickly create a BIM model of a high-pile wharf for water transport engineering in the Revit platform; S2, digital processing of two-dimensional geological sections; S3. In the cross-section view of the dock platform, the two-dimensional geological profile at the corresponding spatial position of the cross-section, including the topographic line and the rock and soil layer stratification line, is imported, and automatically positioned in the cross-section view according to the coordinates and elevation; S4, traversing the stratum attribute information on the rock and soil layer stratification line of the imported two-dimensional geological profile to obtain the geological parameters required for the calculation of the pile foundation bearing capacity; S5. In Revit, the pile foundation soil attribute information is identified according to the pile axis extension intersection method, and the depth of the pile foundation entering different geotechnical unit layers is calculated; S6. Select a calculation formula for pile foundation bearing capacity according to pile foundation type attributes, and obtain pile foundation design calculation parameters based on pile foundation geometric parameters and soil layer type; S7. Complete the calculation of pile foundation bearing capacity and display the results; S8. Optimize the pile length design based on the calculation results of pile foundation bearing capacity; S9. Complete the BIM model drawing of the wharf structure; In step S2, the two-dimensional geological profile to be imported is digitized to realize the three-dimensional application of the two-dimensional profile, which includes the following steps: S201. Scale and organize the geological profile according to the design ratio and delete redundant geological information; S202, topographic lines and stratigraphic stratification lines are continuous multi-segment lines; S203, the terrain line belongs to the layer DXX alone, and the other stratum stratification lines refer to the names of the geotechnical unit layers above the stratum stratification lines to determine the layer names; S204, assigning stratigraphic stratification line attributes, customizing the addition of geotechnical layer attribute information in the form of extended data, including geotechnical unit layer number, geotechnical name, soil layer type, geotechnical mechanics index, and geotechnical design index; S205. Adjust the coordinate origin of the geological section to be consistent with the coordinate origin of the dock structure BIM model in the Revit platform; The step S5 comprises the following steps: S501. Identify the pile foundation soil attribute information according to the pile axis extension intersection method in Revit, specifically: assume that the pile foundation axis extends infinitely downward, determine whether the pile axis intersects with the rock and soil stratification line of the two-dimensional geological section, and if so, obtain the pile foundation soil layer attribute information according to the intersection position, including the rock and soil unit layer number, rock and soil name, and soil layer type; S502: According to the extension trajectory of the pile axis, the depth of the pile foundation entering different geotechnical unit layers is calculated by obtaining the coordinates of the intersections of the upper and lower geotechnical unit layers and the coordinates of the pile end.

2. The high-pile wharf BIM design method based on digital two-dimensional geological profile according to claim 1 is characterized in that: In the step S1, the following method is used: Revit platform secondary development technology is used to assist in the rapid creation of a BIM model of a high-pile wharf structure of a water transport project, specifically by creating a component family to build a wharf rack, building a wharf platform structure segment based on the wharf rack, and completing the wharf platform BIM model based on the wharf platform structure segment.

3. The high-pile wharf BIM design method based on digital two-dimensional geological profile according to claim 1 is characterized in that: In the step S3, the high-pile wharf platform, approach bridge or pier section is automatically and accurately positioned according to the coordinates and elevation.

4. The high-pile wharf BIM design method based on digital two-dimensional geological profile according to claim 1 is characterized in that: In step S4, the stratum attributes exist in the form of extended data in the two-dimensional geological profile; the geological parameters required for calculating the pile foundation bearing capacity are obtained, and the geological parameters include the rock and soil unit layer number, rock and soil name, soil layer type, the standard value of the ultimate side resistance of driven piles and cast-in-place piles, and the standard value of the ultimate end resistance of driven piles and cast-in-place piles.

5. The high-pile wharf BIM design method based on digital two-dimensional geological profile according to claim 1 is characterized in that: In the step S6, the method is implemented as follows, including the following steps: S601, selecting a pile foundation bearing capacity calculation formula according to pile foundation type attributes, and obtaining pile foundation design calculation parameters based on pile foundation geometric parameters and soil layer type; The bearing capacity calculation formula of driven piles is: In the formula, Q d is the design value of the axial bearing capacity of a single pile; γ R is the partial coefficient of the axial bearing capacity of a single pile; U is the circumference of the pile section; q fi is the standard value of the ultimate pile side friction resistance per unit area of ​​the i-th layer of soil for a single pile; l i is the length of the pile body passing through the i-th soil layer; q R is the standard value of the ultimate pile end resistance per unit area of ​​a single pile; A is the cross-sectional area of ​​the pile body; The bearing capacity calculation formula of cast-in-place piles is: In the formula, Q d is the design value of the axial bearing capacity of a single pile; γ R is the partial coefficient of the axial bearing capacity of a single pile; U is the circumference of the pile section; ψ si is the size effect coefficient of pile side resistance; ψ p is the end resistance size effect coefficient; q fi is the standard value of the ultimate pile side friction resistance per unit area of ​​the i-th layer of soil for a single pile; l i is the length of the pile body passing through the i-th soil layer; q R is the standard value of the ultimate pile end resistance per unit area of ​​a single pile; A is the cross-sectional area of ​​the pile body; S602. Based on Revit secondary development, the relevant parameters in the calculation formulas for the bearing capacity of pile foundations of different pile types are formed into a calculation parameter panel.

6. The high-pile wharf BIM design method based on digital two-dimensional geological profile according to claim 1 is characterized in that: In step S8, the pile length is adjusted and the design is optimized based on the bearing capacity calculation result by comparing it with the allowable bearing capacity of the pile foundation structure and the axial pressure of the pile body.

7. The high-pile wharf BIM design method based on digital two-dimensional geological profile according to claim 1 is characterized in that: In step S9, the BIM model is drawn based on the optimized and adjusted wharf structure BIM model and the two-dimensional geological profile.