Short-term emergency load capacity assessment method and system
By collecting the ambient temperature and service time of the transformer, calculating the hot spot temperature and equivalent operating time, and combining the cumulative failure probability, an evaluation model is constructed, which solves the problem of not considering the use time factor in the existing technology, and improves the accuracy and accuracy of the evaluation results. Safe operation time of transformer.
Patent Information
- Application Number
- CN202410935631.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-10-18
AI Technical Summary
The existing short-term emergency load capacity evaluation method fails to effectively consider the use time factor of the transformer, resulting in unreliable evaluation results under short-term emergency load, which may lead to transformer failure.
By collecting the ambient temperature and service time of the transformer, calculate the top oil temperature and hot spot temperature, use the hot spot temperature to calculate the equivalent operating time, input the cumulative failure rate model, and combine the top oil temperature, hot spot temperature and cumulative failure probability to construct a short-term emergency load capacity assessment. Model to get the maximum runtime.
The accuracy of the short-term emergency load capacity assessment of the transformer is improved, and unreliable assessment results and failure risks are reduced.
Smart Images

Figure CN118798679A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid fault detection, and in particular to a short-term emergency load capacity evaluation method and system. Background Art
[0002] With the continuous development of new power systems and the access of a large number of dynamic loads (such as electric vehicles) to the distribution network, the strong uncertainty and volatility brought about by it will inevitably cause power transformers to be subjected to more extreme and drastically changing load conditions. When an oil-immersed power transformer is in an overloaded operating state, the winding temperature and oil temperature will rise sharply, while reducing the oil-paper insulation strength, further accelerating the aging of the transformer, and even directly causing the transformer to fail, posing a threat to the safe and stable operation of the power grid.
[0003] The short-term emergency load capacity assessment methods given in various guidelines such as IEC and DL / T 572-2021 only consider the limitations of hot spot temperature, top oil temperature and maximum load factor to assess the maximum operating time of the transformer under different operating conditions. However, for transformers that have been in service for a long time, the probability of failure due to excessively high thermal indicators such as hot spot temperature and top oil temperature under short-term emergency load will be greater. If the influence of factors such as the transformer's service life is not considered when assessing the safe operating time of the transformer's short-term emergency load, unreliable assessment results will be obtained, which may lead to permanent failure of the transformer in severe cases. Summary of the invention
[0004] In order to solve the above technical problems, the embodiments of the present invention provide a short-term emergency load capacity evaluation method and system, which realize the evaluation of the short-term emergency load capacity of the transformer and improve the accuracy of the evaluation result.
[0005] A first aspect of an embodiment of the present invention provides a method for evaluating short-term emergency load capacity, the method comprising:
[0006] Collect the ambient temperature and service time of the transformer to be evaluated within a preset time period;
[0007] Calculate the top oil temperature and hot spot temperature of the transformer to be evaluated at each time point within a preset time period according to the ambient temperature;
[0008] The equivalent operating time at each time point is calculated using the hot spot temperature at each time point, and the equivalent operating time is input into the transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point;
[0009] The top oil temperature, hot spot temperature, and cumulative failure probability at each time point are input into the constructed short-term emergency load capacity evaluation model for calculation to obtain the maximum operational time.
[0010] In a possible implementation of the first aspect, calculating the top oil temperature and the hot spot temperature of the transformer to be evaluated at each time point within a preset time period according to the ambient temperature includes:
[0011] The top oil temperature and the hot spot temperature of the transformer to be evaluated at each time point within a preset time period are calculated according to the ambient temperature, wherein the calculation formula of the top oil temperature and the hot spot temperature is:
[0012]
[0013] Where t is the time variable, R is the ratio of the transformer rated load loss to the no-load loss, θ a is the ambient temperature, Δθ or , Δθ hr They represent the temperature rise of the top oil temperature to the ambient temperature and the temperature rise of the hot spot temperature to the top oil temperature under rated load, Δθ hs It represents the temperature rise of the hot spot temperature to the top oil temperature under a given load, which is Δθ hs1 With Δθ hs2 The difference between w , τ o They are the winding time constant and oil time constant, k 11 , k 21 , k 22 are thermal constants, K represents the transformer load factor, θ oil is the top oil temperature, θ hs is the hot spot temperature.
[0014] In a possible implementation manner of the first aspect, calculating the equivalent running time at each time point by using the hot spot temperature at each time point includes:
[0015] The equivalent operating time at each time point is calculated using the hot spot temperature at each time point, wherein the calculation formula for the equivalent operating time is:
[0016]
[0017] In the formula, θ hs is the hot spot temperature, θ0 is the reference temperature, θ hs (Δt) is the hot spot temperature during the operating time interval.
[0018] In a possible implementation of the first aspect, the equivalent operating time is input into a constructed transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point, including:
[0019] The equivalent operating time is input into the constructed transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point, wherein the expression of the cumulative failure probability is:
[0020]
[0021] Where P ta represents the cumulative failure probability, θ0 is the reference temperature, T eq is the cumulative insulation life loss, μ HI is the health index, m is the parameter to be fitted, and B and C are empirical constants.
[0022] In a possible implementation of the first aspect, the top oil temperature, hot spot temperature, and cumulative failure probability at each time point are input into a constructed short-term emergency load capacity evaluation model for calculation to obtain a maximum operational time, including:
[0023] The top oil temperature, hot spot temperature, and cumulative failure probability at each time point are input into the short-term emergency load capacity evaluation model. If the top oil temperature, the hot spot temperature, or the cumulative failure probability is greater than a preset threshold at a time point, the maximum operational time is obtained, wherein the short-term emergency load capacity evaluation model is:
[0024]
[0025] A second aspect of an embodiment of the present invention provides a short-term emergency load capacity evaluation system, the system comprising a collection module, a calculation module and an evaluation module.
[0026] Among them, the acquisition module is used to collect the ambient temperature and service time of the transformer to be evaluated within a preset time period, and calculate the top oil temperature and hot spot temperature of the transformer to be evaluated at each time point within the preset time period according to the ambient temperature;
[0027] The calculation module is used to calculate the equivalent operation time at each time point using the hot spot temperature at each time point, input the equivalent operation time into the transformer cumulative failure rate calculation model for calculation, and obtain the cumulative failure probability at each time point;
[0028] The evaluation module is used to input the top oil temperature, hot spot temperature, and cumulative failure probability at each time point into the constructed short-term emergency load capacity evaluation model for calculation to obtain the maximum operational time.
[0029] In a possible implementation of the second aspect, calculating the top oil temperature and the hot spot temperature of the transformer to be evaluated at each time point within a preset time period according to the ambient temperature includes:
[0030] The top oil temperature and hot spot temperature of the transformer to be evaluated at each time point within the preset time period are calculated according to the ambient temperature. The calculation formula of the top oil temperature and hot spot temperature is:
[0031]
[0032] Where t is the time variable, R is the ratio of the transformer rated load loss to the no-load loss, θ a is the ambient temperature, Δθ or , Δθ hr They represent the temperature rise of the top oil temperature to the ambient temperature and the temperature rise of the hot spot temperature to the top oil temperature under rated load, Δθ hs It represents the temperature rise of the hot spot temperature to the top oil temperature under a given load, which is Δθ hs1 With Δθ hs2 The difference between w , τ o They are the winding time constant and oil time constant, k 11 , k 21 , k 22 are thermal constants, K represents the transformer load factor, θ oil is the top oil temperature, θ hs is the hot spot temperature.
[0033] In a possible implementation of the second aspect, calculating the equivalent running time at each time point by using the hot spot temperature at each time point includes:
[0034] The equivalent running time at each time point is calculated using the hot spot temperature at each time point, where the calculation formula for the equivalent running time is:
[0035]
[0036] In the formula, θ hs is the hot spot temperature, θ0 is the reference temperature, θ hs (Δt) is the hot spot temperature during the operating time interval.
[0037] A third aspect of an embodiment of the present invention provides a computer device, including:
[0038] Memory for storing computer programs;
[0039] A processor is used to implement the short-term emergency load capacity assessment method of the first aspect when executing the computer program.
[0040] A fourth aspect of an embodiment of the present invention provides a storage medium having a computer program stored thereon. When the computer program is executed by a processor, the steps of the short-term emergency load capacity assessment method of the first aspect are implemented.
[0041] The short-term emergency load capacity evaluation method provided by the embodiment of the present invention collects the ambient temperature and service time of the transformer to be evaluated within a preset time period; calculates the top oil temperature and hot spot temperature of the transformer to be evaluated at each time point within the preset time period according to the ambient temperature; uses the hot spot temperature at each time point to calculate the equivalent operation time at each time point, inputs the equivalent operation time into the transformer cumulative failure rate calculation model for calculation, and obtains the cumulative failure probability at each time point; inputs the top oil temperature, hot spot temperature, and cumulative failure probability at each time point into the constructed short-term emergency load capacity evaluation model for calculation, and obtains the maximum operable time. Through the above method, the evaluation of the short-term emergency load capacity of the transformer is realized, and the accuracy of the evaluation result is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 : A schematic diagram of an evaluation process of an embodiment of a short-term emergency load capacity evaluation method provided by the present invention;
[0043] Figure 2 : A curve diagram corresponding to different m values of an embodiment of the short-term emergency load capacity evaluation method provided by the present invention;
[0044] Figure 3 : A comparison curve diagram of the maximum operating time of a short-term emergency load with and without cumulative failure rate limitation in one embodiment of the short-term emergency load capacity evaluation method provided by the present invention;
[0045] Figure 4 : A system block diagram of an embodiment of the short-term emergency load capacity assessment method provided by the present invention. DETAILED DESCRIPTION
[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0047] Please refer to Figure 1 , which is a flow chart of an embodiment of a method for evaluating short-term emergency load capacity provided by an embodiment of the present invention, including steps S101 to S104, each of which is specifically as follows:
[0048] S101. Collecting the ambient temperature and service time of the transformer to be evaluated within a preset time period.
[0049] In this embodiment, the ambient temperature of the transformer, the initial load factor, the overload factor, the health index and the service age are determined. The initial time t0 and the end time t m The top oil temperature and the hot spot temperature of the transformer to be evaluated at each time point within a preset time period are calculated according to the ambient temperature.
[0050] The initial time of the preset time period is t0, and the end time is t m .
[0051] In some embodiments, the step S101 of "calculating the top oil temperature and hot spot temperature of the transformer to be evaluated at each time point within a preset time period according to the ambient temperature" includes but is not limited to the following steps:
[0052] The top oil temperature and hot spot temperature of the transformer to be evaluated at each time point within the preset time period are calculated according to the ambient temperature. The calculation formula of the top oil temperature and hot spot temperature is:
[0053]
[0054]
[0055] Where t is the time variable, R is the ratio of the transformer rated load loss to the no-load loss, θ a is the ambient temperature, Δθ or , Δθ hr They represent the temperature rise of the top oil temperature to the ambient temperature and the temperature rise of the hot spot temperature to the top oil temperature under rated load, Δθ hs It represents the temperature rise of the hot spot temperature to the top oil temperature under a given load, which is Δθ hs1 With Δθ hs2 The difference between w , τ o They are the winding time constant and oil time constant, k 11 , k 21 , k 22 are thermal constants, K represents the transformer load factor, θ oil is the top oil temperature, θ hs is the hot spot temperature.
[0056] Specifically, the changes of the top oil temperature and the hot spot temperature at different times t are calculated, and the top oil temperature and the hot spot temperature of the transformer to be evaluated at different times t within a preset time period are calculated according to the ambient temperature. The calculation formula of the top oil temperature and the hot spot temperature is:
[0057]
[0058] Where t is the time variable, R is the ratio of the transformer rated load loss to the no-load loss, θ a is the ambient temperature, Δθ or , Δθ hr They represent the temperature rise of the top oil temperature to the ambient temperature and the temperature rise of the hot spot temperature to the top oil temperature under rated load, Δθ hs It represents the temperature rise of the hot spot temperature to the top oil temperature under a given load, which is Δθ hs1 With Δθ hs2 The difference between w , τ o They are the winding time constant and oil time constant, k 11 , k 21 , k 22 are thermal constants. Their values are related to the transformer capacity and cooling method. K represents the transformer load factor, θ oil is the top oil temperature, θ hs is the hot spot temperature.
[0059] S102, using the hot spot temperature at each time point to calculate the equivalent operating time at each time point, inputting the equivalent operating time into the constructed transformer cumulative failure rate calculation model for calculation, and obtaining the cumulative failure probability at each time point.
[0060] In this embodiment, the hot spot temperature is substituted into the calculation formula to obtain the equivalent running time Δt of the subsequent running time interval Δt eq The equivalent operating time is input into the constructed transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point.
[0061] In some embodiments, the step S102 of "using the hot spot temperature at each time point to calculate the equivalent running time at each time point" includes but is not limited to the following steps:
[0062] The equivalent running time at each time point is calculated using the hot spot temperature at each time point, where the calculation formula for the equivalent running time is:
[0063]
[0064] In the formula, θ hs is the hot spot temperature, θ0 is the reference temperature, θ hs (Δt) is the hot spot temperature during the operating time interval.
[0065] Specifically, the equivalent operating time at each time point is calculated using the hot spot temperature at each time point, where the calculation formula for the equivalent operating time is:
[0066]
[0067] In the formula, θ hs is the hot spot temperature, θ0 is the reference temperature, θ hs (Δt) is the hot spot temperature during the operating time interval.
[0068] The transformer cumulative failure probability model calculates the probability of a transformer failing within the subsequent operating time Δt after the transformer has been in service for T time. In order to facilitate the model expression, since the transformer is not always operating under constant operating conditions, it is necessary to convert the time corresponding to the load rate curve in actual fluctuations and the corresponding hot spot temperature curve into the time corresponding to the constant θ hs To obtain the equivalent value under the condition, it is necessary to first introduce the transformer equivalent operation time t eq The service time T is divided into n intervals t according to the hot spot temperature. i , and it is considered that the hot spot temperature θ in the interval hs (t i ) remains constant, interval t i Loss of internal insulation life t ei It can be calculated as follows:
[0069]
[0070] The total insulation life loss during the service period T is accumulated as follows:
[0071]
[0072] In the formula, B is an empirical constant, T eq That is, the equivalent operating time of the service time T at the reference temperature θ0. The equivalent operating time of the subsequent operating time interval Δt can also be calculated according to the following calculation formula Δt eq .
[0073]
[0074] In the formula, θ hs is the hot spot temperature, θ0 is the reference temperature, θ hs (Δt) is the hot spot temperature during the operating time interval.
[0075] In some embodiments, step S102 of "inputting the equivalent operating time into the constructed transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point" includes but is not limited to the following steps:
[0076] The equivalent operating time is input into the constructed transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point, where the expression of the cumulative failure probability is:
[0077]
[0078] Where P ta represents the cumulative failure probability, θ0 is the reference temperature, T eq is the cumulative insulation life loss, μ HI is the health index, m is the parameter to be fitted, and B and C are empirical constants.
[0079] Specifically, the equivalent operating time is input into the constructed transformer cumulative failure rate calculation model for calculation, and the cumulative failure probability at different times t is calculated, where the expression of the cumulative failure probability is:
[0080]
[0081] Where P ta represents the cumulative failure probability, θ0 is the reference temperature, T eq is the cumulative insulation life loss, μ HI is the health index, m is the parameter to be fitted, and B and C are empirical constants.
[0082] The calculation process of cumulative failure probability is as follows: Arrhenius theorem converts the hot spot temperature θ hs The relationship with insulation life L0 is expressed as:
[0083]
[0084] In the formula, B and C are empirical constants, B is 15000, and C is 1.7634×10 -12 In other words, when the transformer is always in rated operation, that is, θ hs At 110°C, the calculated standard insulation life L0 is 180,000h, which is about 20 years of service life.
[0085] Further introduce the health index μ HI , the health index is normalized to a value in the interval [0,1], where 1 represents a completely healthy state and 0 represents a completely unhealthy state. This is used to correct the insulation life of transformers with different health levels.
[0086]
[0087] In the formula, m is the parameter to be fitted. For different values of m, the corresponding L(μ HI ,θ H |m) curves also have differences, and the specific intuitive performance is as follows Figure 2As shown. It can be seen that under different m values, the curve includes convex functions, concave functions and approximate linear function relationships. The physical meaning of the m value is: it reflects the relationship between a set of health indicator systems and the expected life of the equipment. However, due to different health indicator rules in different places, even with the same health index score, the health level of the equipment represented may be different, and the life span obtained by substituting into the function may also be different. Therefore, it is necessary to use historical data to fit the m value in order to avoid the impact of this health index score system not meeting the corresponding specific equipment insulation life. Due to the lack of historical data for fitting, refer to the results of existing literature and set m = -3.6771.
[0088] Weibull distribution is a probability function that describes the aging failure process in the time domain. The failure rate function is:
[0089]
[0090] Where β is the shape parameter; η is the scale parameter, which describes the life characteristics of the equipment, and β can be taken as 10.
[0091] The cumulative probability distribution function is:
[0092]
[0093] Let η = L, and according to the above formula, the Arrhenius-Weibull model of transformer long-term failure is obtained, and its failure rate and cumulative probability distribution function are:
[0094]
[0095] Where θ0 is the reference temperature, T eq is the cumulative insulation life loss, μ HI is the health index, m is the parameter to be fitted, B and C are empirical constants, θ hs is the hot spot temperature.
[0096] Therefore, according to the definition of conditional probability, the probability of a transformer failing in the subsequent time interval Δt after serving for T time is:
[0097]
[0098] Where P ta represents the cumulative failure probability, θ0 is the reference temperature, T eq is the cumulative insulation life loss, μ HI is the health index, m is the parameter to be fitted, and B and C are empirical constants.
[0099] Substituting the cumulative probability distribution function into the probability of failure, we can get the cumulative failure probability of the transformer. The expression of the cumulative failure probability of the transformer is:
[0100]
[0101] Where P ta represents the cumulative failure probability, θ0 is the reference temperature, T eq is the cumulative insulation life loss, μ HI is the health index, m is the parameter to be fitted, and B and C are empirical constants.
[0102] In actual application, if you want to calculate the equivalent running time T in such a detailed and accurate way, eq The historical data is very demanding, so it is often difficult to obtain accurately. Therefore, according to experience, it can also be calculated based on the daily average equivalent ratio T eq / T=0.64, multiply the service time T by 0.64 to convert it into the equivalent operating time T eq For easy conversion.
[0103] S103, inputting the top oil temperature, hot spot temperature, and cumulative failure probability at each time point into the constructed short-term emergency load capacity evaluation model for calculation to obtain the maximum operational time.
[0104] In this embodiment, the hot spot temperature, top oil temperature, and cumulative failure probability at different times t are compared with the thresholds specified in the short-term emergency load capacity evaluation model. If one of the above three parameters exceeds the threshold at a certain time t1, the maximum operating time is t1-t0; otherwise, the value of t continues to increase until the specified end time t is reached. m , then the maximum running time is t m -t0.
[0105] In some embodiments, step S103 of "inputting the top oil temperature, hot spot temperature, and cumulative failure probability at each time point into the constructed short-term emergency load capacity assessment model for calculation to obtain the maximum operational time" includes but is not limited to the following steps:
[0106] The top oil temperature, hot spot temperature, and cumulative failure probability at each time point are input into the short-term emergency load capacity evaluation model. If the top oil temperature, hot spot temperature, or cumulative failure probability at a time point is greater than the preset threshold, the maximum operational time is obtained. The short-term emergency load capacity evaluation model is:
[0107]
[0108] In this embodiment, the hot spot temperature, top oil temperature, and cumulative failure probability at different times t are compared with the thresholds specified in the short-term emergency load capacity evaluation model. If at a certain time t1, one of the hot spot temperature, top oil temperature, and cumulative failure probability exceeds the threshold, the maximum operating time is t1-t0; otherwise, the value of t continues to increase until the specified end time t is reached. m , then the maximum running time is t m -t0.
[0109] Specifically, for the short-term emergency load type, combined with the threshold limits for the hot spot temperature, top oil temperature and load factor of the transformer, for medium-sized transformers: the top oil temperature limit is 115°C, the winding hot spot temperature limit is 160°C, the load factor limit is 1.8, and the upper limit P of the cumulative failure probability of the transformer of this patent is set max 3.2×10 -6 Based on the above conditions, a load capacity assessment model for short-term emergency load type can be established:
[0110]
[0111] In the formula, θ hs is the transformer hot spot temperature, θ oil is the top oil temperature, K represents the transformer load factor, which is equal to the ratio of load current to rated current, P ta is the cumulative failure probability of the transformer.
[0112] This application also implements the technical solution provided in the embodiment of this application, and in order to demonstrate the limiting effect of the cumulative failure rate on the short-term emergency load capacity assessment, a case analysis is conducted on a 110kV transformer. The health index of the transformer is 0.9 and the service time is 10 years.
[0113] Assuming that the initial load factor of the transformer is 0.7, the data comparison of two groups of short-term emergency load capacity evaluation with and without cumulative failure rate limit under different ambient temperatures and different overload factors is shown in Table 1 and plotted into a curve graph, as shown in Figure 3 shown.
[0114] Table 1 Comparison of short-term emergency load capacity evaluation results with and without cumulative failure rate limit
[0115]
[0116] As can be seen from the chart, for low ambient temperature and low overload factor, the cumulative failure rate limit has a great impact on the maximum operating time. At this time, the operating time is longer. When the hotspot temperature has not reached the upper threshold or does not reach the upper threshold at all, the cumulative failure rate will reach the upper threshold first due to the cumulative effect of time, thereby limiting the maximum operating time. For high ambient temperature and high overload factor, the cumulative failure rate limit has a much smaller impact on the maximum operating time. At this time, the hotspot temperature can quickly reach the upper threshold in a short time, and due to the short overload operating time, the cumulative failure rate will not accumulate to the upper threshold. Under such operating conditions, the maximum operating time may be limited by the maximum hotspot temperature first, rather than the cumulative failure rate.
[0117] It should be understood that although Figure 1 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 1 At least part of the steps may include multiple steps or multiple stages. These steps or stages are not necessarily performed at the same time, but can be performed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed in turn or alternately with other steps or at least part of the steps or stages in other steps.
[0118] In some embodiments, Figure 4 As shown, it shows a block diagram of a short-term emergency load capacity assessment system 400 provided in an embodiment of the present application, including: a collection module 401, a calculation module 402 and an assessment module 403, wherein:
[0119] The acquisition module 401 is used to collect the ambient temperature and service time of the transformer to be evaluated within a preset time period, and calculate the top oil temperature and hot spot temperature of the transformer to be evaluated at each time point within the preset time period according to the ambient temperature;
[0120] The calculation module 402 is used to calculate the equivalent operation time at each time point using the hot spot temperature at each time point, input the equivalent operation time into the constructed transformer cumulative failure rate calculation model for calculation, and obtain the cumulative failure probability at each time point;
[0121] The evaluation module 403 is used to input the top oil temperature, hot spot temperature and cumulative failure probability at each time point into the constructed short-term emergency load capacity evaluation model for calculation to obtain the maximum operational time.
[0122] The specific implementation of the short-term emergency load capacity evaluation system is substantially the same as the specific implementation of the short-term emergency load capacity evaluation method described above, and will not be described in detail herein.
[0123] In one embodiment of the present application, a computer device is provided, which includes a memory and a processor, wherein a computer program is stored in the memory, and the above steps are implemented when the processor executes the computer program; the computer device provided in this embodiment has an implementation principle and technical effects similar to those of the above method embodiments, and will not be repeated here.
[0124] In one embodiment of the present application, a computer-readable storage medium is provided, on which a computer program is stored, and the above steps are implemented when the computer program is executed by a processor; the computer-readable storage medium provided in this embodiment has an implementation principle and technical effects similar to those of the above method embodiment, and will not be repeated here.
[0125] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0126] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0127] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for evaluating short-term emergency load capacity, characterized in that: include: Collecting the ambient temperature and service time of the transformer to be evaluated within a preset time period, and calculating the top oil temperature and hot spot temperature of the transformer to be evaluated at each time point within the preset time period according to the ambient temperature; The equivalent operating time at each time point is calculated using the hot spot temperature at each time point, and the equivalent operating time is input into the constructed transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point; The top oil temperature, hot spot temperature, and cumulative failure probability at each time point are input into the constructed short-term emergency load capacity evaluation model for calculation to obtain the maximum operational time.
2. The short-term emergency load capacity assessment method according to claim 1, characterized in that: The step of calculating the top oil temperature and the hot spot temperature of the transformer to be evaluated at each time point within a preset time period according to the ambient temperature includes: The top oil temperature and the hot spot temperature of the transformer to be evaluated at each time point within a preset time period are calculated according to the ambient temperature, wherein the calculation formula of the top oil temperature and the hot spot temperature is: Where t is the time variable, R is the ratio of the transformer rated load loss to the no-load loss, θ a is the ambient temperature, Δθ or , Δθ hr They represent the temperature rise of the top oil temperature to the ambient temperature and the temperature rise of the hot spot temperature to the top oil temperature under rated load, Δθ hs It represents the temperature rise of the hot spot temperature to the top oil temperature under a given load, which is Δθ hs1 With Δθ hs2 The difference between w , τ o They are the winding time constant and oil time constant, k 11 , k 21 , k 22 are thermal constants, K represents the transformer load factor, θ oil is the top oil temperature, θ hs is the hot spot temperature.
3. The short-term emergency load capacity assessment method according to claim 1, characterized in that: The step of calculating the equivalent running time at each time point by using the hot spot temperature at each time point includes: The equivalent operating time at each time point is calculated using the hot spot temperature at each time point, wherein the calculation formula for the equivalent operating time is: In the formula, θ hs is the hot spot temperature, θ0 is the reference temperature, θ hs (Δt) is the hot spot temperature during the operating time interval.
4. The short-term emergency load capacity assessment method according to claim 1, characterized in that: The equivalent operation time is input into the constructed transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point, including: The equivalent operating time is input into the constructed transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point, wherein the expression of the cumulative failure probability is: Where P ta represents the cumulative failure probability, θ0 is the reference temperature, T eq is the cumulative insulation life loss, μ HI is the health index, m is the parameter to be fitted, and B and C are empirical constants.
5. The short-term emergency load capacity assessment method according to claim 1, characterized in that: The top oil temperature, hot spot temperature, and cumulative failure probability at each time point are input into the constructed short-term emergency load capacity evaluation model for calculation to obtain the maximum operational time, including: The top oil temperature, hot spot temperature, and cumulative failure probability at each time point are input into the short-term emergency load capacity evaluation model. If the top oil temperature, the hot spot temperature, or the cumulative failure probability is greater than a preset threshold at a time point, the maximum operational time is obtained, wherein the short-term emergency load capacity evaluation model is:
6. A short-term emergency load capacity assessment system, characterized in that: It includes an acquisition module, a calculation module, a second calculation module and an evaluation module. The acquisition module is used to collect the ambient temperature and service time of the transformer to be evaluated within a preset time period, and calculate the top oil temperature and hot spot temperature of the transformer to be evaluated at each time point within the preset time period according to the ambient temperature; The second calculation module is used to calculate the equivalent operating time at each time point using the hot spot temperature at each time point, and input the equivalent operating time into the constructed transformer cumulative failure rate calculation model for calculation to obtain the cumulative failure probability at each time point; The evaluation module is used to input the top oil temperature, hot spot temperature and cumulative failure probability at each time point into the constructed short-term emergency load capacity evaluation model for calculation to obtain the maximum operational time.
7. The short-term emergency load capacity assessment system according to claim 6, characterized in that: The step of calculating the top oil temperature and the hot spot temperature of the transformer to be evaluated at each time point within a preset time period according to the ambient temperature includes: The top oil temperature and the hot spot temperature of the transformer to be evaluated at each time point within a preset time period are calculated according to the ambient temperature, wherein the calculation formula of the top oil temperature and the hot spot temperature is: Where t is the time variable, R is the ratio of the transformer rated load loss to the no-load loss, θ a is the ambient temperature, Δθ or , Δθ hr They represent the temperature rise of the top oil temperature to the ambient temperature and the temperature rise of the hot spot temperature to the top oil temperature under rated load, Δθ hs It represents the temperature rise of the hot spot temperature to the top oil temperature under a given load, which is Δθ hs1 With Δθ hs2 The difference between w , τ o They are the winding time constant and oil time constant, k 11 , k 21 , k 22 are thermal constants, K represents the transformer load factor, θ oil is the top oil temperature, θ hs is the hot spot temperature.
8. The short-term emergency load capacity assessment system according to claim 6, characterized in that: The step of calculating the equivalent running time at each time point by using the hot spot temperature at each time point includes: The equivalent operating time at each time point is calculated using the hot spot temperature at each time point, wherein the calculation formula for the equivalent operating time is: In the formula, θ hs is the hot spot temperature, θ0 is the reference temperature, θ hs (Δt) is the hot spot temperature during the operating time interval.
9. A computer device, characterized in that: include: Memory for storing computer programs; A processor, configured to implement the short-term emergency load capacity assessment method as described in any one of claims 1 to 6 when executing the computer program.
10. A storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by the processor, the steps of the short-term emergency load capacity assessment method according to any one of claims 1 to 6 are implemented.
