Construction waste recycling equipment
By adopting the separation structure of capsule shell and spherical crushing body in construction waste treatment equipment, combined with the design of torque sensor and one-way valve plate, the problems of low efficiency and dust pollution of existing equipment in processing large waste are solved, achieving high efficiency and Uniform crushing effect and worker health protection.
Patent Information
- Application Number
- CN202410987827.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing construction waste treatment equipment is inefficient when processing large or hard waste, which can easily lead to tool jamming. The processing efficiency and uniformity are poor, and the dust is diffuse, which affects the health of workers.
It uses a capsule-shaped shell and a spherical crushing body to gradually crush construction waste through the separation structure of the coarse crushing cavity and fine crushing cavity, and uses a torque sensor and a cylinder to control the lifting and lowering of the crushing body to avoid jamming; at the same time, through the one-way valve plate design Create one-way airflow to prevent dust from spreading.
It improves the crushing efficiency and uniformity, avoids equipment damage and dust pollution, and protects the health and safety of workers.
Smart Images

Figure CN118807923A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction waste treatment, and in particular relates to construction waste recycling and treatment equipment. Background Art
[0002] Construction waste is a general term for slag, waste concrete, waste bricks and other wastes generated in the production activities of the construction industry such as demolition, construction, decoration, and repair. These construction wastes generated in the construction process, if randomly piled up, occupy space and affect the appearance, will also have a relatively long-term negative impact on environmental safety, water resources, air and other surrounding environments, so they need to be treated accordingly in order to achieve the ideal construction standards of the project.
[0003] The most common way to deal with construction waste is to use crushers and other crushing equipment to process large pieces of construction waste, so that waste concrete, waste bricks and stones are broken into smaller particles or even powder, which is convenient for subsequent recycling and reuse, thereby solving the problem of construction waste affecting the environment. However, the existing crushing equipment has low efficiency in processing construction waste, and the particles of the processed construction waste are uneven in size, which is not conducive to subsequent recycling. In addition, during the crushing process, the fragments of construction waste will inevitably splash everywhere, making the processing environment harsh and affecting the safety and health of workers.
[0004] A Chinese patent with authorization announcement number CN115487914B discloses an efficient and environmentally friendly construction waste recycling and processing equipment, including a crushing box and a crushing shaft block; the crushing box is installed at the front end of the base, and a feed port is opened on the top side of the crushing box, and a discharge port is opened at the bottom of the crushing box; a plurality of side connection holes are provided on the top of the front side of the crushing box, and a replacement port is opened on the front side of the crushing box; the sealing baffle is in an arc shape, and the sealing baffle is connected to the front side of the crushing box; the crushing shaft block is installed inside the crushing box, and the left end of the crushing shaft block is connected to the transmission belt; the driving motor is connected to the transmission belt; the feed elbow is connected to the top of the crushing box, and the screen basket is connected to the bottom of the crushing box; the crushing tool inside the crushing shaft block can be used for a long time After it is damaged, the sealing baffle on the front side of the crushing box is opened, and the crushing tools inside the crushing shaft block are replaced to ensure the efficiency of the crushing tools inside the crushing shaft block in crushing the construction waste. The setting of the feed elbow is conducive to the feeding of construction waste into the crushing box through the feed elbow. The splash plate inside the feed elbow blocks the construction waste fragments splashed from the feed port on the top of the crushing box to prevent the construction waste fragments from splashing from the feed port on the top of the crushing box. The construction waste fragments are screened through the sieve plate at the bottom of the sieve basket, so that small pieces of construction waste fragments fall into the receiving cloth bag through the sieve plate, and large pieces of construction waste fragments are intercepted in the sieve basket, so that the staff can put the large pieces of construction waste fragments inside the sieve basket into the crushing box again to ensure the crushing effect of construction waste.
[0005] However, the above patent still has the following disadvantages: 1. The above patent describes that by providing replaceable crushing tools, the crushing effect of the patent can be kept stable, thereby ensuring the efficiency of crushing and processing construction waste. However, in actual use, construction waste is complex and diverse, and the kinetic energy of the crushing tool remains unchanged during the rotation process, and the distance between the crushing tool and the shell remains unchanged. When the above patent processes larger or harder construction waste, if the kinetic energy of the crushing tool is not enough to crush the construction waste, it is easy to cause the tool to get stuck and fail to crush the construction waste, requiring manual troubleshooting, affecting the crushing efficiency, and easily causing damage to major components such as the tool and motor, resulting in economic losses.
[0006] 2. The above patent describes that by setting a screen frame, larger construction waste after crushing can be screened and collected, and the operator will put the collected larger construction waste into the above patent again for crushing, so that the treated construction waste particles are uniform and consistent, ensuring the crushing effect. However, the repeated crushing method of the above patent is inconvenient to operate and wastes manpower. In particular, even if the crushing is performed for the second time, some larger particles of construction waste may still remain, and the crushing process needs to be repeated many times, resulting in poor crushing effect and crushing uniformity, and low processing efficiency.
[0007] 3. The above patent describes that the feed pipe is designed as a curved pipe to prevent debris from splashing outward during the crushing process of construction waste. However, in actual use, the design of the feed pipe as a curved pipe can only reduce the splashing of debris to a certain extent and cannot completely avoid it. Especially in the crushing of construction waste, dust is inevitably generated, and the curved pipe setting of the above patent cannot prevent dust from spreading in the air. Long-term inhalation of dust by operators will affect the health of operators. Summary of the invention
[0008] In order to overcome the shortcomings of the prior art, the present invention solves the technical problem of crushing construction waste by setting a capsule-shaped shell and cooperating with the rotation of a spherical crushing body. After gradually crushing the construction waste into smaller particles in the coarse crushing chamber, the construction waste is dropped into the fine crushing chamber and completely crushed into fine particles or even powder, thereby greatly improving the crushing effect and eliminating the need for multiple crushings. The crushing efficiency is high. By setting a torque sensor, the torque on the crushing body can be detected in real time. When the torque is too large and is about to get stuck, the crushing body can be driven up and down by controlling the extension and contraction of the cylinder to increase the gap between the crushing body and the inner wall of the ball cover, thereby preventing the crushing body from being stuck by the construction waste, which affects the crushing efficiency, and avoiding economic losses caused by equipment damage. By setting the second valve plate and the first valve plate, the effect of a one-way valve is achieved, forming a one-way airflow from the feed port to the sieve hole, thereby preventing dust from being diffused in the air during the crushing process, and improving the screening efficiency of the construction waste after crushing.
[0009] In order to achieve the above-mentioned purpose, the present invention provides the following technical solution: a construction waste recycling and processing equipment, comprising: A shell, wherein a ball cover is fixedly connected to the upper end of the shell, and the shell and the ball cover are closed to form a capsule-shaped shell; A crushing body, wherein the crushing body is spherical, a transmission shaft is connected to the axis of the crushing body, and the transmission shaft is rotatably connected to the bottom of the shell; There is a gap between the crushing body composed of the two crushing bodies and the inner walls of the shell and the ball cover. The space above the crushing body in the shell and the ball cover is a coarse crushing cavity, and the space below the crushing body in the shell and the ball cover is a fine crushing cavity. A feed port is provided at one side of the top of the ball cover, and a plurality of sieve holes are evenly distributed on the bottom of the shell.
[0010] Furthermore, a cylinder is fixedly connected to the top of the ball cover, a rotating sleeve is fixedly connected to the top of the crushing body, the extended end of the cylinder passes through the ball cover and is rotatably connected to the rotating sleeve, a plurality of key slots are provided inside the crushing body around the outside of the transmission shaft, a spline is provided at the top of the transmission shaft at a position corresponding to each key slot, and each of the splines is slidably connected to the corresponding key slot.
[0011] By providing a capsule-shaped shell and a spherical crushing body, larger construction waste can be gradually crushed into smaller particles in the coarse crushing chamber, and the smaller particles can be further crushed into powder in the fine crushing chamber, without the need for repeated crushing, thereby improving the crushing effect and efficiency.
[0012] Furthermore, a plurality of crushing rings are fixedly connected to the surface of the crushing body, a plurality of crushing protrusions are evenly distributed on the surface of each crushing ring, and a plurality of ridges are evenly distributed on the inner wall of the shell and the ball cover.
[0013] By setting a crushing ring, it can be replaced after being worn, so as to keep the crushing effect of the crushing body consistent and increase the service life of the equipment. The quota and setting of crushing protrusions and ridges can fully crush the construction waste when the crushing body rotates, thereby improving the crushing effect and efficiency.
[0014] Furthermore, a piston ring is rotatably connected in the middle of the crushing body, and the piston ring is slidably connected to each ridge. A sliding sealing ring is fixedly connected to the outer ring of the piston ring and fits tightly with the inner wall of the shell and the ridge and slides relatively. A rotating sealing ring is arranged on the inner ring of the piston ring, and a plurality of through blanking holes are evenly distributed on the annular area of the piston ring.
[0015] Furthermore, a second valve plate is provided on the remaining lower side of the piston ring at a position corresponding to each blanking hole, each of the second valve plates is hinged to the piston ring, a second spring plate is fixedly connected inside each of the second valve plates, and one end of each of the second spring plates away from the second valve plate is fixedly connected to the bottom side of the piston ring, a hopper is fixedly connected to the top of the feed port, a first valve plate is hinged inside the feed port, a surface of the first valve plate is tightly fitted with the bottom end of the hopper, and a first spring plate is fixedly connected between the inner wall of the feed port and the bottom side of the first valve plate.
[0016] By setting the second valve plate and the first valve plate, a one-way valve is used to form a one-way airflow from the feed inlet to the sieve hole, thereby preventing dust from being diffused in the air during the crushing process and improving the screening efficiency of the crushed construction waste.
[0017] Furthermore, a collecting box is fixedly connected to the bottom of the shell, the collecting box covers the range of all the sieve holes, a cloth bag is installed at one end of the outer outlet of the collecting box, and a ball cover is fixedly connected to the outer side of the shell.
[0018] Furthermore, a first bracket is fixedly connected to one side of the outer wall of the collection box, a driving wheel is rotatably connected to the bottom side of the first bracket, the bottom end of the transmission shaft passes through the collection box and is rotatably connected to the collection box, one end of the transmission shaft passing through the collection box is fixedly connected to a driven wheel, a transmission belt is transmission-connected between the driven wheel and the driving wheel, a third bracket is fixedly connected to the bottom side of the collection box below the driven wheel, a second bracket is fixedly connected to the upper side of the first bracket, a motor is fixedly connected to the upper side, a power output end of the motor passes through the second bracket and is transmission-connected to a torque sensor, and the torque sensor is transmission-connected to the top end of the driving wheel extending out of the first bracket.
[0019] By setting up a torque sensor, the torque of the crushing body can be detected in real time. When the torque is too large, the cylinder can be controlled to expand and contract to increase the gap between the crushing body and the shell or ball cover, thereby preventing the crushing body from being stuck by construction waste and causing damage to the equipment.
[0020] In summary, compared with the prior art, the beneficial effects of the present invention are: (1) By providing a capsule-shaped shell and a spherical crushing body, the interior of the shell can be divided into a coarse crushing chamber and a fine crushing chamber. In conjunction with the up and down movement of the crushing body, the construction waste is gradually crushed into smaller particles in the coarse crushing chamber, and then falls into the fine crushing chamber to be completely crushed into uniform and fine particles, greatly improving the crushing effect. There is no need for multiple crushing, and the crushing efficiency is high.
[0021] (2) By setting the spherical crushing body to move up and down, when the construction waste is too hard or too large to be directly crushed, the gap between the crushing body and the shell can be increased to prevent the construction waste from getting stuck on the cutter. Then the gap can be reduced again to gradually squeeze and crush the construction waste, thereby ensuring the crushing effect and efficiency, avoiding damage to the device, and increasing its service life to reduce economic losses.
[0022] (3) By utilizing the up and down movement of the spherical crushing body and cooperating with the first valve plate and the second valve plate, a one-way airflow is formed from the feed port to the cloth bag, thereby effectively preventing the dust generated during the crushing process from spreading in the air and effectively protecting the health and safety of workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a three-dimensional schematic diagram of this patent.
[0024] Figure 2 This is a side view of the patent.
[0025] Figure 3 for Figure 2 Stereoscopic cross-sectional view at AA in the middle.
[0026] Figure 4 for Figure 3 A partial enlarged view of point B in the middle.
[0027] Figure 5 This is a schematic diagram of the internal structure of this patent.
[0028] Figure 6 for Figure 5 A partial enlarged view of point C in the middle.
[0029] Figure 7 for Figure 5 A partial enlarged view of point D in the middle.
[0030] Figure 8 It is a schematic diagram of the structure of the crushing body 25.
[0031] Explanation of the reference numerals: housing 10; ball cover 11; support foot 12; collecting box 13; cloth bag 14; first bracket 15; second bracket 16; motor 17; torque sensor 18; driving wheel 19; driven wheel 20; transmission belt 21; third bracket 22; transmission shaft 23; sieve hole 24; crushing body 25; crushing ring 26; crushing protrusion 27; rotating sleeve 28; cylinder 29; feed port 30; hopper 31; first valve plate 32; first spring plate 33; piston ring 34; drop hole 35; rotating sealing ring 36; sliding sealing ring 37; second valve plate 38; second spring plate 39; ridge 40; keyway 41; spline 42. DETAILED DESCRIPTION
[0032] In order to enable those skilled in the art to better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Embodiment 1:
[0033] like Figure 1 , Figure 2 and Figure 5 As shown, a construction waste recycling and processing equipment includes a shell 10, a ball cover 11 is fixedly connected to the top of the shell 10, the shell 10 and the ball cover 11 are combined into a capsule-shaped shell, a feed port 30 connected to the inside of the ball cover 11 is arranged on the top spherical surface of the ball cover 11, a plurality of sieve holes 24 are evenly distributed on the bottom spherical surface of the shell 10, a collecting box 13 covering the range of all the sieve holes 24 is fixedly connected to the bottom of the shell 10, a cloth bag 14 is installed at one end of the discharge port of the collecting box 13, and a support foot 12 is fixedly connected to the outside of the shell 10.
[0034] By setting a capsule-shaped shell and cooperating with the spherical crushing body 25 to rotate, the construction waste can be crushed, and after the construction waste is gradually crushed into smaller particles in the coarse crushing cavity, it falls into the fine crushing cavity and is completely crushed into fine particles or even powder, thereby greatly improving the crushing effect, and there is no need for multiple crushing, and the crushing efficiency is high.
[0035] like Figure 3 , Figure 5 and Figure 8 As shown, a transmission shaft 23 is rotatably connected at the bottom center of the shell 10, and one end of the transmission shaft 23 extending into the shell 10 is transmission-connected to a crushing body 25, and a gap is left between the crushing body 25 and the inner walls of the shell 10 and the ball cover 11. A plurality of key slots 41 are evenly distributed around the outer side of the transmission shaft 23 in the crushing body 25, and a spline 42 is provided at the top of the transmission shaft 23 at a position corresponding to each key slot 41, and each spline 42 is slidably connected to the corresponding key slot 41, and a rotating sleeve 28 is fixedly connected to the top of the crushing body 25, and a cylinder 29 is fixedly connected to the top of the ball cover 11, and the extended end of the cylinder 29 extends into the ball cover 11 and is rotationally connected to the rotating sleeve 28.
[0036] like Figure 1 , Figure 2 , Figure 3 and Figure 5As shown, the bottom end of the transmission shaft 23 passes through the collecting box 13 and is rotatably connected to the collecting box 13, a driven wheel 20 is fixedly connected to the bottom end of the collecting box 13, a third bracket 22 is fixedly connected to the bottom side of the collecting box 13, the third bracket 22 is rotatably connected to the bottom end of the transmission shaft 23, a first bracket 15 is fixedly connected to the side of the outer wall of the collecting box 13 away from the cloth bag 14, a driving wheel 19 is rotatably connected to the bottom side of the first bracket 15, a second bracket 16 is fixedly connected to the upper side of the first bracket 15, a motor 17 is fixedly connected to the upper side of the second bracket 16, a torque sensor 18 is transmission-connected between the power output end of the motor 17 and the top end of the rotating shaft part of the driving wheel 19, and a transmission belt 21 is transmission-connected between the driving wheel 19 and the driven wheel 20.
[0037] By setting up a torque sensor 18, the torque on the crushing body 25 can be detected in real time. When the torque is too large and is about to get stuck, the crushing body 25 can be driven up and down by controlling the extension and contraction of the cylinder 29, so that the gap between the crushing body 25 and the inner wall of the ball cover 11 is increased, thereby preventing the crushing body 25 from being stuck by construction waste, which affects the crushing efficiency, and avoiding economic losses caused by equipment damage.
[0038] like Figure 3 , Figure 4 , Figure 5 and Figure 8 As shown, multiple crushing rings 26 are evenly distributed and fixedly connected to the outside of the crushing body 25, and the surfaces of each crushing ring 26 are pieced together to form a complete sphere. Crushing protrusions 27 are evenly distributed on the outer surface of each crushing ring 26, and multiple vertical ridges 40 are evenly distributed on the inner walls of the shell 10 and the ball cover 11.
[0039] By setting the crushing ring 26, the crushing ring 26 can be replaced after being worn, thereby maintaining the crushing effect of the crushing body 25 consistent and increasing the service life of the equipment. The quota and setting of the crushing protrusions 27 and the ridges 40 can fully crush the construction waste when the crushing body 25 rotates, thereby improving the crushing effect and efficiency.
[0040] like Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8As shown, a piston ring 34 is rotatably connected at the middle waist of the crushing body 25, a rotating sealing ring 36 is provided at the rotatable connection between the inner ring of the piston ring 34 and the crushing body 25, a sliding sealing ring 37 is fixedly connected at the outer ring of the piston ring 34, and the sliding sealing ring 37 fits tightly with the inner wall of the shell 10 and each ridge 40 and slides relatively, a plurality of blanking holes 35 are evenly distributed on the piston ring 34, a second valve plate 38 is hingedly connected to the bottom side of the piston ring 34 at the corresponding position of each blanking hole 35, a second spring plate 39 is connected between each second valve plate 38 and the piston ring 34, a hopper 31 is fixedly connected to the top of the feed port 30, a first valve plate 32 that fits tightly with the bottom end of the hopper 31 is hinged in the feed port 30, and a first spring plate 33 is connected between the bottom side of the first valve plate 32 and the inner wall of the feed port 30.
[0041] By providing the second valve plate 38 and the first valve plate 32, a one-way valve is provided to form a one-way airflow from the feed port 30 to the sieve hole 24, thereby preventing dust from being diffused in the air during the crushing process and improving the screening efficiency of the crushed construction waste.
[0042] In this embodiment, initially, the present invention is connected to the power supply and the control system, and the cylinder 29 is connected to the air source and the control system. At this time, the crushing body 25 is exactly in the middle position of the capsule-shaped shell composed of the shell 10 and the ball cover 11. A coarse crushing cavity is formed between the upper half of the crushing body 25 and the ball cover 11, and the distance between the upper half of the crushing body 25 and the inner wall of the ball cover 11 gradually decreases from top to bottom, and a fine crushing cavity is formed between the lower half of the crushing body 25 and the bottom of the shell 10.
[0043] When in use, the operator puts the construction waste to be crushed into the equipment through the hopper 31. The weight of the construction waste will press the first valve plate 32 to flip, so that the first valve plate 32 opens to allow the construction waste to enter the equipment smoothly. After no more construction waste is added, the first valve plate 32 is reset under the elastic action of the first spring plate 33 and rests against the bottom of the hopper 31 again.
[0044] Subsequently, the operator starts the motor 17, and drives the transmission shaft 23 to rotate the crushing body 25 through the transmission connection between the driving wheel 19 and the driven wheel 20, thereby crushing the construction waste. At this time, the crushing body 25 is in the middle position between the shell 10 and the ball cover 11, so that the gap between the inner wall of the ball cover 11 and the contour of the crushing body 25 gradually decreases. In the process of the crushing body 25 crushing the construction waste, the construction waste is gradually crushed from a larger volume to a smaller volume in the larger gap, and the smaller volume of construction waste falls down into the smaller gap and is further crushed to a smaller volume.
[0045] During the crushing process, the crushing protrusions 27 and the ridges 40 on the surface of the crushing ring 26 continuously impact the construction waste, thereby achieving the crushing of the construction waste. At this time, the cylinder 29 continuously and repeatedly expands and contracts, so that the crushing body 25 rises and falls periodically in the ball cover 11, so that the gap between the crushing body 25 and the ball cover 11 changes periodically, thereby periodically squeezing the construction waste while crushing it, thereby improving the crushing effect and crushing efficiency.
[0046] When larger or harder construction waste is about to get stuck in the crushing body 25, the torque sensor 18 can detect the change in the output torque, thereby transmitting the detection signal to the control system. The control system then controls the cylinder 29 to extend outward, causing the crushing body 25 to descend, increasing the gap between the crushing body 25 and the ball cover 11, thereby preventing the crushing body 25 from being stuck in the construction waste. After the torque detected by the torque sensor 18 is restored, the cylinder 29 is restored to the repeated extension and retraction state.
[0047] During the crushing process, the first valve plate 32 rests against the bottom of the hopper 31 under the elasticity of the first spring plate 33, thereby closing the feed port 30 to prevent dust or debris generated in the crushing process inside the shell 10 and the ball cover 11 from spreading or splashing, thereby ensuring a good working environment and protecting the health and safety of workers.
[0048] During the downward movement of the crushing body 25, the piston ring 34 moves downward therewith, and the second valve plate 38 is blocked at the bottom of the blanking hole 35 under the action of air pressure. The space between the ball cover 11 and the crushing body 25 becomes atmospheric pressure reduced, and the external air pushes the first valve plate 32 to open and flow into the shell 10 and the ball cover 11, forming an airflow to the inside of the equipment, so there is still no problem of dust diffusion or debris splashing.
[0049] During the upward movement of the crushing body 25, the piston ring 34 moves upward therewith, and the second valve plate 38 overcomes the elasticity of the second spring plate 39 and opens under the action of air pressure and the dead weight of the construction waste, while the first valve plate 32 is always closed under the action of air pressure to block the feed inlet 30 to prevent dust and debris from leaking out. At this time, the air in the coarse crushing cavity and the smaller volume of construction waste will enter the fine crushing cavity at the bottom from the drop hole 35.
[0050] When the crushing body 25 moves down again, the space in the fine crushing chamber is reduced, so that the crushing body 25 can further crush the smaller construction waste in the fine crushing chamber, and during the downward movement of the crushing body 25, the second valve plate 38 blocks the drop hole 35 under the combined action of the elasticity of the second spring plate 39 and the air pressure, and the air in the fine crushing chamber will be squeezed through the sieve hole 24, forming an airflow from the inside of the shell 10 to the collection box 13 and the cloth bag 14, and the particles that have been fully crushed are carried by the airflow through the sieve hole 24 and finally enter the cloth bag 14 to be collected, and the air dissipates into the external environment through the cloth bag 14, and the construction waste that has not been fully crushed is intercepted by the sieve hole 24, waiting to be further crushed by the crushing body 25 until it can pass through the sieve hole 24.
[0051] Finally, after all the construction waste is crushed, the evenly crushed construction waste with fine particles is collected in the cloth bag 14, and there is no need to crush it again. The crushing efficiency is high and the crushing effect is good. The operator can complete the collection by removing the cloth bag 14. Embodiment 2:
[0052] In this embodiment, construction waste is often mixed with other forms of waste, such as wooden waste generated in building decoration, or waste geotextiles generated in road construction, etc., and such construction waste is not easy to be crushed by using spherical crushing protrusions 27 during crushing. When such construction waste needs to be crushed, the operator can remove the crushing ring 26 with the spherical crushing protrusions 27 from the crushing body 25, and replace it with the crushing ring 26 with the blade-shaped crushing protrusions 27. The blade-shaped crushing protrusions 27 can then efficiently crush wooden or textile waste during rotation, thereby increasing the scope of application of the equipment and improving its versatility.
[0053] When the crushing ring 26 and the crushing protrusion 27 are worn, the operator can remove the crushing ring 26 from the crushing body 25 and replace it with a new crushing ring 26, thereby ensuring that the crushing effect of the device is consistent and prolonging the service life of the equipment.
[0054] The cloth bag 14, motor 17, cylinder 29, rotating seal ring 36, and sliding seal ring 37 are mature existing technologies and will not be described in detail herein.
[0055] For example, certain words are used in the specification and claims to refer to specific components. Those skilled in the art should understand that hardware manufacturers may use different terms to refer to the same component. This specification and claims do not use differences in names as a way to distinguish components, but use differences in the functions of components as the criteria for distinction. For example, "including" mentioned throughout the specification and claims is an open term, so it should be interpreted as "including but not limited to". "Approximately" means that within an acceptable error range, those skilled in the art can solve the technical problem within a certain error range and basically achieve the technical effect.
[0056] It should be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a product or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such product or system. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the product or system including the elements.
[0057] The above description shows and describes several preferred embodiments of the present application, but as mentioned above, it should be understood that the present application is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the application concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not deviate from the spirit and scope of the present application, and should be within the scope of protection of the claims attached to the present application.
Claims
1. A construction waste recycling and processing equipment, characterized in that: The construction waste recycling and processing equipment comprises: A shell (10), wherein a spherical cover (11) is fixedly connected to the upper end of the shell (10), and the shell (10) and the spherical cover (11) are closed to form a capsule-shaped shell; A crushing body (25), the crushing body (25) is spherical, the axis of the crushing body (25) is connected to a transmission shaft (23), and the transmission shaft (23) is rotatably connected to the bottom of the shell (10); A gap is left between the crushing body formed by the two crushing bodies (25) and the inner walls of the shell (10) and the ball cover (11); the space above the crushing body (25) in the shell (10) and the ball cover (11) is a coarse crushing cavity; the space below the crushing body (25) in the shell (10) and the ball cover (11) is a fine crushing cavity; a feed port (30) is provided at one side of the top of the ball cover (11); and a plurality of sieve holes (24) are evenly distributed at the bottom of the shell (10).
2. The construction waste recycling and processing equipment according to claim 1, characterized in that: The top of the ball cover (11) is fixedly connected to a cylinder (29), the top of the crushing body (25) is fixedly connected to a rotating sleeve (28), the extended end of the cylinder (29) passes through the ball cover (11) and is rotatably connected to the rotating sleeve (28), the crushing body (25) is provided with a plurality of key slots (41) around the outside of the transmission shaft (23), the top of the transmission shaft (23) is provided with a spline (42) at a position corresponding to each key slot (41), and each spline (42) is slidably connected to the corresponding key slot (41).
3. The construction waste recycling and processing equipment according to claim 1, characterized in that: A plurality of crushing rings (26) are fixedly connected to the surface of the crushing body (25), a plurality of crushing protrusions (27) are evenly distributed on the surface of each crushing ring (26), and a plurality of ridges (40) are evenly distributed on the inner wall of the shell (10) and the ball cover (11).
4. The construction waste recycling and processing equipment according to claim 3 is characterized in that: A piston ring (34) is rotatably connected to the middle of the crushing body (25), and the piston ring (34) is slidably connected to each ridge (40). A sliding seal ring (37) is fixedly connected to the outer ring of the piston ring (34) and is tightly fitted with the inner wall of the shell (10) and the ridge (40) for relative sliding. A rotating seal ring (36) is arranged at the inner ring of the piston ring (34), and a plurality of through-holes (35) are evenly distributed on the annular area of the piston ring (34).
5. The construction waste recycling and processing equipment according to claim 4, characterized in that: A second valve plate (38) is provided on the remaining lower side of the annular shape of the piston ring (34) at a position corresponding to each blanking hole (35); each of the second valve plates (38) is hinged to the piston ring (34); a second spring plate (39) is fixedly connected inside each of the second valve plates (38); and one end of each of the second spring plates (39) away from the second valve plate (38) is fixedly connected to the bottom side of the piston ring (34).
6. The construction waste recycling and processing equipment according to claim 5, characterized in that: The top of the feed port (30) is fixedly connected to a hopper (31), a first valve plate (32) is hinged inside the feed port (30), the surface of the first valve plate (32) is tightly fitted with the bottom end of the hopper (31), and a first spring plate (33) is fixedly connected between the inner wall of the feed port (30) and the bottom side of the first valve plate (32).
7. The construction waste recycling and processing equipment according to claim 1, characterized in that: A collecting box (13) is fixedly connected to the bottom of the shell (10), the collecting box (13) covers the range of all the sieve holes (24), a cloth bag (14) is installed at one end of the outer outlet of the collecting box (13), and a ball cover (11) is fixedly connected to the outside of the shell (10).
8. The construction waste recycling and processing equipment according to claim 7, characterized in that: A first bracket (15) is fixedly connected to one side of the outer wall of the collection box (13); a driving wheel (19) is rotatably connected to the bottom side of the first bracket (15); a bottom end of the transmission shaft (23) passes through the collection box (13) and is rotatably connected to the collection box (13); one end of the transmission shaft (23) passing through the collection box (13) is fixedly connected to a driven wheel (20); a transmission belt (21) is transmission-connected between the driven wheel (20) and the driving wheel (19); and a third bracket (22) is fixedly connected to the bottom side of the collection box (13) below the driven wheel (20).
9. The construction waste recycling and processing equipment according to claim 8, characterized in that: A second bracket (16) is fixedly connected to the upper side of the first bracket (15), a motor (17) is fixedly connected to the upper side of the first bracket (15), a power output end of the motor (17) passes through the second bracket (16) and is transmission-connected to a torque sensor (18), and the torque sensor (18) is transmission-connected to the top end of a driving wheel (19) extending out of the first bracket (15).