Device and method for preparing laminated wall without turning plate superposition
By assembling the lower hoarding mold and the upper hoarding mold, combined with the secondary pouring platform and the foam filling board, the safety hazards and quality issues in the preparation of the laminated plate shear wall flaps are solved, and flap-free preparation is achieved, improving production. efficiency and environmental cleanliness.
Patent Information
- Application Number
- CN202411014977.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-22
AI Technical Summary
The existing flap preparation process for laminated plate shear walls has safety hazards, high costs, and can easily lead to wall panel deformation and local cracking. The sand spreading method has uneven thickness and pollutes the environment, reducing production efficiency.
The lower hoarding mold and the upper hoarding mold are stacked and assembled to form an integral pouring mold. The secondary pouring platform is combined with the foam filling board to avoid flipping operations and ensure consistent thickness of the concrete wall panels. The mold is disassembled with the help of an oil cylinder to reduce Risk of deformation.
It achieves flap-free preparation, improves preparation quality and production efficiency, ensures thickness consistency and environmental cleanliness of concrete wall panels, and reduces equipment investment and subsequent cleaning difficulties.
Smart Images

Figure CN118809802A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of prefabricated buildings, and in particular to a device and a method for preparing a composite wall by stacking flaps without flaps. Background Art
[0002] The composite slab shear wall, also known as the double-skin wall, is a prefabricated wall panel structure composed of two "pieces" of concrete wall panels. The two concrete wall panels are connected by a steel truss to form a cavity, which is convenient for on-site casting after assembly to form a solid wall. It is a more important product among prefabricated components. The thickness of a single concrete wall panel needs to be greater than 50mm, and the thickness of the cavity needs to be greater than 100mm.
[0003] Since the composite slab shear wall is composed of two concrete wall panels with a cavity in the middle, the two concrete wall panels cannot be cast and formed at the same time during preparation, and need to be prepared one after another. In order to ensure the formation of the cavity, after the first concrete wall panel is prepared and cured, it is necessary to cast the second concrete wall panel on the formwork, and then flip the first concrete wall panel 180 degrees and combine it with the second concrete wall panel through a steel truss. This is a flip panel preparation process.
[0004] The above-mentioned flap preparation process has the advantages of low preparation difficulty, but during the flapping process, due to its heavy weight, manual flipping poses a great safety hazard, so it is usually necessary to use a large-scale flapping device, which has a large investment cost and increases the preparation cost. In addition, during the flapping process, due to the small thickness of the concrete wall panel, it is easy to cause deformation and local cracking of the wall panel.
[0005] There are also some technical ideas that hope to use the sand-laying method to solve the flapping problem. The main idea is to lay sand and other fillers on the first concrete wall panel to fill the cavity to be formed, and then pour a second time on the sand surface to form the second concrete wall panel. This preparation method can indeed save the investment of large equipment, but it has major preparation defects:
[0006] 1. When pouring the second concrete wall panel, since the fillers such as sand are not a whole and the density is not high, vibration will cause the concrete and fillers to be mixed together, that is, the thickness of the second concrete wall panel cannot be guaranteed, the thickness is uneven, and the preparation quality is greatly reduced.
[0007] 2. The filling material needs to be cleaned out. When concrete is combined with fillers such as sand, it cannot be cleaned up, and a high-pressure water gun is required, which causes the filler and water to mix to form pollutants, polluting the working environment. Subsequent cleaning is troublesome, unsustainable, and has low production efficiency. Summary of the invention
[0008] The technical problem to be solved by the present invention is to provide a device and method for preparing a composite wall without flapping plates. The template can be quickly removed without flapping plates, the preparation quality is high, the grinding plates can be recycled, and the production efficiency is improved.
[0009] In order to solve the above technical problems, the present invention provides a device for preparing a composite wall by stacking a flap-free panel, comprising a lower panel mold and an upper panel mold, wherein the lower panel mold is arranged on a mold platform, and the upper panel mold is stacked on the top of the lower panel mold to form an integral casting mold, wherein a secondary casting platform is arranged in the integral casting mold, the lower panel mold cooperates with the mold platform to prepare a first concrete wall panel, the upper panel mold cooperates with the secondary casting platform to prepare a second concrete wall panel, and a plurality of steel trusses are arranged between the first concrete wall panel and the second concrete wall panel;
[0010] The secondary pouring platform includes a plurality of metal platforms arranged along the width direction of the steel truss, a steel truss is provided between two adjacent metal platforms, and a foam filling plate is provided between two adjacent metal platforms, the foam filling plate is provided with a groove for avoiding the web of the steel truss, and the surface of the foam filling plate and the surface of the metal platform are coated with a retarder;
[0011] The metal platform comprises a top plate in the shape of a Chinese character "J", a surface of the top plate in the shape of a Chinese character "J", a mounting bottom plate at the bottom of the top plate in the shape of a Chinese character "J", two ends of the mounting bottom plate are locked and connected with the top of the lower enclosure plate mold, a supporting oil cylinder extending downward is arranged on the mounting bottom plate, a separation oil cylinder extending upward is arranged at the bottom of the top plate in the shape of a Chinese character "J", and a separation avoidance opening is opened on the top plate in the shape of a Chinese character "J" corresponding to the separation oil cylinder;
[0012] A support plate is placed in the middle of the side between two adjacent "X"-shaped top plates, and the support plate is used for supporting the bottom of the foam filling plate.
[0013] Furthermore, the installation base plate includes a lower support plate and a cross beam, and oblong positioning slots and positioning columns are respectively provided on the side of the I-shaped top plate and the corresponding part of the lower support plate, and the two ends of the cross beam are connected to the top of the lower enclosure plate mold.
[0014] Furthermore, the height of the lower enclosure plate mold is consistent with the thickness of the first concrete wall panel, and a supporting protrusion is provided on the lower enclosure plate mold corresponding to the cross beam, and the supporting protrusion is locked and connected to the cross beam.
[0015] Furthermore, the number of the "X"-shaped top plates is at least 3 and they are arranged in sequence along the length direction of the steel truss.
[0016] Furthermore, sealing glue or sand and gravel are used to fill between the upper enclosure mold and the secondary casting platform, between the upper enclosure mold and the foam filling plate, and between the foam filling plate and the secondary casting platform.
[0017] Furthermore, the surface of the X-shaped top plate is provided with an embossed layer or a frosted surface.
[0018] Furthermore, the distance from the surface of the secondary casting platform to the top of the upper enclosure mold is the thickness of the second concrete wall panel.
[0019] A method for preparing a composite wall by stacking flap-free panels, using any one of the above-mentioned devices, comprises the following steps:
[0020] Step 1) first build a lower enclosure mold on a mold platform to form a first pouring space, then place the lower steel mesh and steel truss in the first pouring space, pour concrete in the first pouring space, and roughen it after initial setting, and form the first concrete wall panel after curing;
[0021] Step 2) Fix the installation base plate on the lower enclosure plate mold, and each truss steel bar is provided with installation base plates on both sides along the width direction, then operate the support cylinder to extend and abut against the surface of the first concrete wall panel, and keep the installation base plate straight, then place the "J"-shaped top plate loaded with the separation cylinder on the installation base plate, and at the same time place the foam filling plate between the two "J"-shaped top plates, and the two ends of the foam filling plate are laid on the side of the "J"-shaped top plate, so as to form a secondary casting platform, and apply a retarder on the surface of the secondary casting platform;
[0022] Step 3) Then install the upper enclosure mold, surround and cooperate with the secondary pouring platform to form a second pouring space, pour concrete in the second pouring space, and form a second concrete wall panel after curing;
[0023] Step 4) demoulding: first remove the upper panel mold, then separate the installation base plate from the lower panel mold and remove the lower panel mold;
[0024] Operate the support cylinder to reset, so that the installation base plate is released from support and falls onto the surface of the first concrete wall panel, and then pull out the installation base plate to complete the removal;
[0025] The separation cylinder is operated to extend, and the separation cylinder pushes against the second concrete wall panel and applies force to the "J"-shaped top plate, so that the "J"-shaped top plate is separated from the bottom surface of the second concrete wall panel, and the "J"-shaped top plate is pulled out to complete the demolition;
[0026] The foam filling board is separated from the bottom surface of the second concrete wall panel by using a metal rod or a spatula and removed, and then the foam particles remaining on the bottom surface of the second concrete wall panel are burned by a flamethrower to complete the preparation.
[0027] Furthermore, during the disassembly of the "J"-shaped top plate, the oil pump is connected to the oil pipe of the separation oil cylinder on the "J"-shaped top plate, and the oil pump is operated to supply oil. The oil supply steps are as follows:
[0028] A. Observe the pressure gauge on the oil pump. When the value shows the reference separation pressure, stop supplying oil.
[0029] B. Wait for the first time and observe whether the pressure gauge on the oil pump changes. If it decreases, continue to wait until the "X"-shaped top plate separates or the pressure remains unchanged. If the pressure remains unchanged, continue to supply oil. The step ends when the "X"-shaped top plate separates.
[0030] C. Continue to supply oil according to the adjusted pressure and execute step B until the "X"-shaped top plate separates.
[0031] Furthermore, separation samples of simulated concrete slabs and simulated I-shaped top plates are prepared, and then separation operations are performed, with oil supply continuously until separation occurs, to obtain a maximum separation pressure. A separation coefficient is given, and a reference separation pressure is calculated based on the maximum separation pressure and the separation coefficient. The difference between the maximum separation pressure and the reference separation pressure is the adjustment zone value, and the adjustment zone value is obtained by dividing the value by half or decreasing the value according to the number of adjustments to obtain the regulated pressure.
[0032] Beneficial effects of the present invention:
[0033] 1. The casting area is formed by superimposing and assembling the lower enclosure mold and the upper enclosure mold, so that the preparation of the two concrete wall panels does not affect or interfere with each other, and a secondary casting platform is set above the first concrete wall panel. The secondary casting platform serves as the base of the second concrete wall panel, eliminating the operation process of flipping the panel, eliminating the deformation and cracking problems caused by flipping the panel from the source, and effectively improving the preparation quality.
[0034] 2. The secondary pouring platform is formed by a metal platform and a foam filling plate. The metal platform and the foam filling plate have poor bonding with the concrete and have a good separation interface. They will not penetrate and combine with each other, thereby ensuring the thickness quality of the concrete wall panels after the secondary pouring. The metal platform is used to support large areas of unobstructed parts, and the foam is used to support some parts of the steel truss. This can ensure good support effects while meeting the purpose of convenient disassembly.
[0035] 3. The metal platform and foam filling plate are both overhead, so there is enough space for operation during disassembly. The "J"-shaped top plate uses a cylinder as the disassembly power. The force is applied in an accurate direction, the disassembly effect is good, and the deformation problem caused by uneven force during disassembly is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a schematic diagram of the structure of the device for preparing the first concrete wallboard of the present invention;
[0037] Figure 2 It is a structural schematic diagram of the metal platform assembled and installed in the present invention;
[0038] Figure 3 It is a schematic diagram of the structure of the cooperation and positioning between the X-shaped top plate and the installation bottom plate of the present invention;
[0039] Figure 4 It is a schematic diagram of the structure of the present invention after the support plate is assembled;
[0040] Figure 5 It is a schematic diagram of the structure of the present invention after assembling the foam filling board;
[0041] Figure 6 It is a schematic diagram of the structure after the lower enclosure plate mold is assembled in the present invention;
[0042] Figure 7 It is a schematic diagram of the cross-sectional structure of the secondary pouring platform before demoulding of the present invention;
[0043] Figure 8 It is a schematic diagram of the cross-sectional structure after demoulding and separation of the present invention. DETAILED DESCRIPTION
[0044] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.
[0045] Reference Figure 1-Figure 8 As shown, an embodiment of the device and method for preparing a composite wall by stacking flap-free panels of the present invention, the device for preparation comprises a lower panel mold 1 and an upper panel mold 2, the lower panel mold is arranged on a mold platform 3, the upper panel mold is superimposed and arranged on the top of the lower panel mold to form an integral casting mold, a secondary casting platform 4 is arranged in the integral casting mold, the lower panel mold cooperates with the mold platform to prepare a first concrete wall panel 5, the upper panel mold cooperates with the secondary casting platform to prepare a second concrete wall panel 6, and a plurality of steel trusses 7 are arranged between the first concrete wall panel and the second concrete wall panel;
[0046] Specifically, first build the lower enclosure mold on the mold platform to form the first pouring space, then place the lower steel mesh and steel truss in the first pouring space, pour concrete in the first pouring space, and roughen it after initial setting. After the curing is completed, the first concrete wall panel is formed. After the curing reaches a certain hardness, it can provide good support without damage. Figure 1 As shown;
[0047] Then fix the secondary pouring platform on the lower enclosure mold, refer to Figure 2 and Figure 3As shown, specifically, the secondary pouring platform includes a plurality of metal platforms 8 arranged along the width direction of the steel truss. The metal platform has a good supporting effect. There is a steel truss between two adjacent metal platforms, such as Figure 2 As shown, three steel trusses are provided with five metal platforms, and a foam filling plate 10 is provided between two adjacent metal platforms. The foam filling plate is used to fill and support the corresponding parts of the steel trusses that cannot be effectively supported by the metal platform. Since a large number of webs are provided at the steel trusses, when the metal platform extends to the web position, it needs to be avoided. The structure after the avoidance is easy to cause deformation during demoulding. Therefore, the foam filling plate is used for auxiliary support. The foam filling plate is provided with a groove for avoiding the web of the steel truss. The setting position of the web in the steel truss can be prepared in advance, and it can also be cut by a utility knife according to the on-site construction. The operation is convenient; and the metal platform includes a "J" shape A top plate 11, a plurality of top plates in the shape of an "I" shape can be provided to reduce the bonding force between the top plate in the shape of an "I" shape and the second concrete wall panel during demoulding; a "I" shaped protrusion 12 is provided on the surface of the top plate in the shape of an "I" shape, and the "I" shaped protrusion can form a groove when pouring the second concrete wall panel to achieve a roughening effect; a mounting base plate 13 is provided at the bottom of the top plate in the shape of an "I" shape, and the mounting base plate is used to effectively support and position the top plate in the shape of an "I" shape, and both ends of the mounting base plate are locked and connected to the top of the lower enclosure plate mold; a supporting oil cylinder 14 extending downward is provided on the mounting base plate, and the supporting oil cylinder is arranged in the middle of the mounting base plate or evenly distributed to ensure that the mounting base plate is not bent downward when the size is relatively long. A separation cylinder 15 extending upward is provided at the bottom of the Chinese-shaped top plate, and the separation cylinder can be locked on the Chinese-shaped top plate. A separation avoidance port 16 is provided on the Chinese-shaped top plate corresponding to the separation cylinder. The separation cylinder extends to convert the acting force into a demoulding force. The top surface of the Chinese-shaped top plate serves as the first supporting plane of the secondary casting platform, and the two extending sides of the Chinese-shaped top plate are used to support the foam filling plate. The foam filling plate is accurately placed and can ensure that the top height of the foam filling plate is consistent with the first supporting plane, and the surface of the foam filling plate is the second supporting plane; the above-mentioned installation base plate includes a lower support plate 18 and a crossbeam 19, and the lower support plate holds up the Chinese-shaped top plate, and the lower support plate The structure can be consistent with the "J"-shaped top plate. While improving its own strength, a larger cavity space is formed between the lower support plate and the "J"-shaped top plate, which is convenient for the selection of the separation cylinder. The lower support plate and the "J"-shaped top plate are detachable structures, which are convenient for the repair and maintenance of the separation cylinder and the placement of the oil pipe of the separation cylinder. The side of the "J"-shaped top plate and the part corresponding to the lower support plate are respectively provided with oblong positioning slots 20 and positioning columns 21. Through the cooperation of the oblong positioning slots and the positioning columns, the "J"-shaped top plate cannot move in the width direction and is limited, and can be adaptively adjusted and assembled in the length direction. The requirements for mold preparation accuracy are greatly reduced, and the two ends of the beam are connected to the top of the lower enclosure plate mold.
[0048] During assembly, the two ends of the crossbeam of the installation base plate are locked with the corresponding positions on the top of the lower enclosure plate mold respectively. A supporting protrusion 22 is provided on the lower enclosure plate mold corresponding to the crossbeam. The supporting protrusion is locked and connected with the crossbeam. The supporting protrusion can effectively set the metal platform overhead. Then, the supporting oil cylinder is operated to extend and abut against the surface of the first concrete wall panel, and keep the installation base plate straight without bending and other problems. Subsequently, the "J"-shaped top plate loaded with the separation oil cylinder is placed on the lower support plate to complete the assembly of the installation base plate; then, a support plate 17 is placed in the middle of the side between two adjacent "J"-shaped top plates. The support plate is used to support the bottom of the foam filling plate. Refer to Figure 4 As shown, after the placement is completed, place the foam filling board between the two "X"-shaped top boards, referring to Figure 5 As shown, both ends of the foam filling board are placed on the side of the "J"-shaped top board, and a support board is installed at the bottom. The foam filling board is effectively fixed and can bear a larger weight. The support board does not need to be fixed and can be placed. It can be located in the middle of the web, that is, to strengthen the support at the weak position of the foam filling board. In this way, a secondary pouring platform is formed, and a retarder is coated on the surface of the secondary pouring platform to further reduce the bonding force between the second concrete wall panel and the secondary pouring platform.
[0049] Then install the upper panel mold, refer to Figure 6 As shown, the secondary pouring platform is surrounded and matched to form a second pouring space. One side of the "J"-shaped top plate located on the side will form a concave portion, so a foam filling plate can be placed here to ensure the integrity of the platform structure; and because the secondary pouring platform is formed by modular assembly, it has gaps, so sealing putty or sand and gravel can be used to fill between the upper enclosure mold and the secondary pouring platform, between the upper enclosure mold and the foam filling plate, and between the foam filling plate and the secondary pouring platform. The sealing putty has good plasticity and can achieve a good sealing effect after filling the gap, while the sand and gravel can effectively slow down the fluidity of the concrete in the gap, and can also achieve the effect of caulking treatment with low cost. The above-mentioned retarder can also be applied after this operation is completed; finally, concrete is poured in the second pouring space, and the second concrete wall panel is formed after the curing is completed.
[0050] The above preparation method does not require flipping of the first concrete wall, so it can achieve the effect of flip-free preparation, and the height of the lower enclosure mold is consistent with the thickness of the first concrete wall panel, and the distance from the surface of the secondary casting platform to the top of the upper enclosure mold is the thickness of the second concrete wall panel. Such a limitation can ensure the thickness of the corresponding wall during the casting process.
[0051] After the second concrete wall panel is prepared, it needs to be demolded to obtain the finished product. When demolding, first remove the upper panel mold, then separate the installation base plate from the lower panel mold and remove the lower panel mold. At this time, there is no support at both ends of the installation base plate, but the support cylinder is fixed inside. Refer to Figure 7 As shown, the supporting oil cylinder is then operated to reset, so that the installation base plate is released from the support and can fall onto the surface of the first concrete wall panel. Due to the matching limit of the oblong positioning slot and the positioning column, there is no limit on the longitudinal direction of the installation base plate and the "J"-shaped top plate, and the installation base plate can be pulled out to complete the removal; at this time, only the foam filling plate and the "J"-shaped top plate are still adhered to the second concrete wall panel, and then the separation oil cylinder is operated to extend, and the separation oil cylinder pushes the second concrete wall panel and applies force to the "J"-shaped top plate to separate the "J"-shaped top plate from the bottom surface of the second concrete wall panel. At this time, only a small part of the part pushed out by the separation oil cylinder is adhered between the second concrete wall panel and the "J"-shaped top plate, which can be separated by simply shaking or knocking, and then the "J"-shaped top plate is pulled out to complete the removal of the "J"-shaped top plate, refer to Figure 8 As shown; then use a metal rod or a spatula to separate the foam filling board from the bottom surface of the second concrete wall panel. The metal rod can pry the foam filling board, and the spatula can effectively separate and remove the bonding parts. Of course, a small part of the foam filling board will remain after separation, and it is foam particles. You can use a flamethrower to burn the foam particles remaining on the bottom surface of the second concrete wall panel, and the finished product can be obtained after burning.
[0052] In the above-mentioned disassembly process of the "J"-shaped top plate, the oil pump is first connected to the oil pipe of the separation cylinder on the "J"-shaped top plate. Two separation cylinders can be set on the "J"-shaped top plate to supply oil synchronously. The oil pump is operated to supply oil. First, observe the pressure gauge on the oil pump. When the value shows the reference separation pressure, suspend the oil supply; wait for the first time for 10S, and observe whether the pressure gauge on the oil pump changes. At this time, the pressure gauge will not increase, but will only decrease or remain unchanged. If the pressure value decreases, continue to wait, indicating that it is in a state of slow separation at this time, until the "J"-shaped top plate is separated or the pressure remains unchanged. If the "J"-shaped top plate is not separated, it cannot be removed manually and the pressure remains unchanged, then continue to supply oil according to the adjusted pressure, and repeat the waiting and judgment until the "J"-shaped top plate is separated.
[0053] The above-mentioned reference separation pressure and adjustment pressure are obtained by the following method: first, prepare a separation sample of a simulated concrete slab and a simulated I-shaped top plate, a separation oil cylinder is provided on the simulated I-shaped top plate, and then perform a separation operation, continuously supply oil until separation, and obtain a maximum separation pressure. When the area of the simulated I-shaped top plate is consistent with that of the I-shaped top plate actually used, the maximum separation pressure can be used directly. When they are inconsistent, first convert the area ratio of the simulated I-shaped top plate to that of the I-shaped top plate actually used, and calculate the maximum separation pressure during the actual operation according to the area ratio. In actual operation, a separation coefficient needs to be given, such as 0.9, to avoid excessive pressure resulting in the I-shaped top plate transferring too much concrete when the separation is completed at one time. The soil is carried away from the second piece of concrete, and the benchmark separation pressure is calculated based on the maximum separation pressure and the separation coefficient. The difference between the maximum separation pressure and the benchmark separation pressure is the adjustment zone value. The adjustment zone value is divided equally or decremented according to the number of adjustments to obtain the regulated pressure. The number of adjustments can be selected as 4 times. When the value is divided equally, the pressure value corresponding to each increase in the adjustment zone value is divided into four parts, and the pressure is increased step by step; when the value is decremented, the pressure value corresponding to the adjustment zone value is increased each time by 40%, 30%, 20% and 10%. A larger adjustment pressure can be obtained in the early stage of adjustment to improve the separation effect, and a smaller adjustment pressure can be obtained in the later stage of adjustment to avoid excessive force causing a large amount of concrete to be carried during separation.
[0054] In order to increase the roughness of the inner surface of the second concrete wall panel, an embossed layer or a frosted surface may be provided on the surface of the "J"-shaped top plate. Although this improves the bonding strength with the concrete, the use of an oil cylinder to assist in demolding can be ignored.
[0055] Since the support plates are placed and not fixed, they will naturally fall onto the first concrete wall panel when the formwork is removed. Those that are easy to collect can be taken out directly. For some support plates that are not convenient to collect inside, the product will be hoisted and stored after the formwork is removed. During this process, the support plates will slide off the product and can be collected and reused.
[0056] The above-mentioned coagulant can reduce the bonding force between the secondary pouring platform and the second concrete wall panel, and in the process of removing the film, it will also take away a small amount of concrete on the inner wall of the second concrete wall panel, that is, it can further form a rough surface. In addition, the above-mentioned separation cylinder and support cylinder adopt an ultra-thin disc structure, and its minimum thickness can reach 41mm (can be directly purchased) to meet the separation operation in a limited space. The support cylinder and the separation cylinder can be set in the same space, but need to be staggered to ensure that there is no interference during movement.
[0057] The above embodiments are only preferred embodiments for fully illustrating the present invention, and the protection scope of the present invention is not limited thereto. Any equivalent substitution or change made by a person skilled in the art based on the present invention is within the protection scope of the present invention.
Claims
1. A device for preparing a composite wall without flap stacking, characterized in that: It comprises a lower enclosure plate mold and an upper enclosure plate mold, wherein the lower enclosure plate mold is arranged on a mold platform, and the upper enclosure plate mold is overlapped and arranged on the top of the lower enclosure plate mold to form an integral casting mold, wherein a secondary casting platform is arranged in the integral casting mold, and the lower enclosure plate mold cooperates with the mold platform to prepare a first concrete wall panel, and the upper enclosure plate mold cooperates with the secondary casting platform to prepare a second concrete wall panel, and a plurality of steel bar trusses are arranged between the first concrete wall panel and the second concrete wall panel; The secondary pouring platform includes a plurality of metal platforms arranged along the width direction of the steel truss, a steel truss is provided between two adjacent metal platforms, and a foam filling plate is provided between two adjacent metal platforms, the foam filling plate is provided with a groove for avoiding the web of the steel truss, and the surface of the foam filling plate and the surface of the metal platform are coated with a retarder; The metal platform comprises a top plate in the shape of a Chinese character "J", a surface of the top plate in the shape of a Chinese character "J", a mounting bottom plate at the bottom of the top plate in the shape of a Chinese character "J", two ends of the mounting bottom plate are locked and connected with the top of the lower enclosure plate mold, a supporting oil cylinder extending downward is arranged on the mounting bottom plate, a separation oil cylinder extending upward is arranged at the bottom of the top plate in the shape of a Chinese character "J", and a separation avoidance opening is opened on the top plate in the shape of a Chinese character "J" corresponding to the separation oil cylinder; A support plate is placed in the middle of the side between two adjacent "X"-shaped top plates, and the support plate is used for supporting the bottom of the foam filling plate.
2. The device for preparing a composite wall by stacking flap-free panels as claimed in claim 1, characterized in that: The installation base plate includes a lower support plate and a crossbeam. The side of the "X"-shaped top plate and the part corresponding to the lower support plate are respectively provided with oblong positioning slots and positioning columns. The two ends of the crossbeam are connected to the top of the lower enclosure plate mold.
3. The device for preparing a composite wall by stacking flaps without flaps as claimed in claim 2, characterized in that: The height of the lower enclosure plate mold is consistent with the thickness of the first concrete wall panel, and a supporting protrusion is provided on the lower enclosure plate mold corresponding to the cross beam, and the supporting protrusion is locked and connected with the cross beam.
4. The device for preparing a composite wall by stacking flap-free panels as claimed in claim 1, characterized in that: The number of the "X"-shaped top plates is at least 3 and they are arranged in sequence along the length direction of the steel bar truss.
5. The device for preparing a composite wall by stacking flap-free panels as claimed in claim 1, characterized in that: Sealing glue or sand and gravel are used to fill between the upper enclosure plate mold and the secondary casting platform, between the upper enclosure plate mold and the foam filling plate, and between the foam filling plate and the secondary casting platform.
6. The device for preparing a composite wall by stacking flap-free panels as claimed in claim 1, characterized in that: The surface of the X-shaped top plate is provided with an embossed layer or a frosted surface.
7. The device for preparing a composite wall by stacking flap-free panels as claimed in claim 1, characterized in that: The distance from the surface of the secondary casting platform to the top of the upper enclosure mold is the thickness of the second concrete wall panel.
8. A method for preparing a composite wall without flap stacking, characterized in that: The device according to any one of claims 1 to 6 comprises the following steps: Step 1) first build a lower enclosure mold on a mold platform to form a first pouring space, then place the lower steel mesh and steel truss in the first pouring space, pour concrete in the first pouring space, and roughen it after initial setting, and form the first concrete wall panel after curing; Step 2) Fix the installation base plate on the lower enclosure plate mold, and each truss steel bar is provided with installation base plates on both sides along the width direction, then operate the support cylinder to extend and abut against the surface of the first concrete wall panel, and keep the installation base plate straight, then place the "J"-shaped top plate loaded with the separation cylinder on the installation base plate, and at the same time place the foam filling plate between the two "J"-shaped top plates, and the two ends of the foam filling plate are laid on the side of the "J"-shaped top plate, so as to form a secondary casting platform, and apply a retarder on the surface of the secondary casting platform; Step 3) Then install the upper enclosure mold, surround and cooperate with the secondary pouring platform to form a second pouring space, pour concrete in the second pouring space, and form a second concrete wall panel after curing; Step 4) demoulding: first remove the upper panel mold, then separate the installation base plate from the lower panel mold and remove the lower panel mold; Operate the support cylinder to reset, so that the installation base plate is released from support and falls onto the surface of the first concrete wall panel, and then pull out the installation base plate to complete the removal; The separation cylinder is operated to extend, and the separation cylinder pushes against the second concrete wall panel and applies force to the "J"-shaped top plate, so that the "J"-shaped top plate is separated from the bottom surface of the second concrete wall panel, and the "J"-shaped top plate is pulled out to complete the demolition; The foam filling board is separated from the bottom surface of the second concrete wall panel by using a metal rod or a spatula and removed, and then the foam particles remaining on the bottom surface of the second concrete wall panel are burned by a flamethrower to complete the preparation.
9. The method for preparing a composite wall by stacking flap-free panels as claimed in claim 7, characterized in that: During the removal of the "J"-shaped top plate, connect the oil pump to the oil pipe of the separation cylinder on the "J"-shaped top plate, and operate the oil pump to supply oil. The oil supply steps are as follows: A. Observe the pressure gauge on the oil pump. When the value shows the reference separation pressure, stop supplying oil. B. Wait for the first time and observe whether the pressure gauge on the oil pump changes. If it decreases, continue to wait until the "X"-shaped top plate separates or the pressure remains unchanged. If the pressure remains unchanged, continue to supply oil. The step ends when the "X"-shaped top plate separates. C. Continue to supply oil according to the adjusted pressure and execute step B until the "X"-shaped top plate separates.
10. The method for preparing a composite wall by stacking flap-free panels as claimed in claim 7, characterized in that: Prepare separation samples of simulated concrete slabs and simulated "X"-shaped top plates, and then perform separation operations. Continue to supply oil until separation to obtain the maximum separation pressure. Given a separation coefficient, calculate the reference separation pressure based on the maximum separation pressure and the separation coefficient. The difference between the maximum separation pressure and the reference separation pressure is the adjustment zone value. The adjustment zone value is divided equally or decremented according to the number of adjustments to obtain the regulated pressure.
