Pile foundation over-filling real-time detection equipment and method

Using a USB industrial camera to capture images of the concrete pouring interface, combined with scaled ropes and rollers, real-time detection of overfilling of pile foundations was achieved, solving the problem of difficulty in controlling the height of overfilling, ensuring the quality of pile foundations and reducing costs.

CN118814879APending Publication Date: 2024-10-22ZHEJIANG COMM CONSTR GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411216080.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

During the construction of bored piles in bridges, the overgrouting height is difficult to accurately control, resulting in insufficient or excessive pile foundation bearing capacity. Existing detection methods have low accuracy and are not suitable for large-scale applications.

Method used

A USB industrial camera is used to continuously capture images of the concrete pouring interface. By observing the thickness of the laitance and the density of the aggregate, it is judged whether the concrete is overfilled. Real-time detection is achieved by combining the scaled rope and the roller.

Benefits of technology

Precisely controls the amount of concrete overfilling to ensure the quality of pile foundations, reduces costs, is simple to operate, is suitable for pile foundations of various sizes and heights, and improves detection accuracy and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118814879A_ABST
    Figure CN118814879A_ABST
Patent Text Reader

Abstract

The invention discloses pile foundation over-filling real-time detection equipment and method. The equipment comprises a shooting part, a rope with scales, a roller and a display screen. The rope with the scales is wound on the roller, one end of the rope with the scales is connected with the display screen, the other end of the rope with the scales is connected with the shooting component, the roller rotates to drive the rope with the scales to descend and enable the shooting component to reach a concrete pouring interface, and an image of the concrete pouring interface can be shot; according to the method, the images of the concrete pouring interface are continuously shot through the USB industrial camera, the pile foundation laitance thickness and the aggregate compactness in the shot images are observed, whether pile foundation concrete is excessively poured in place or not is judged, the concrete excessively-poured amount is effectively controlled, and the cost is saved on the premise that the pile foundation pile forming quality is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge pile foundation construction, and in particular to a real-time detection device and method for pile foundation overfilling. Background Art

[0002] During the construction of bored cast-in-place piles for highway bridges, in order to effectively ensure the construction quality of the pile body and prevent the pile foundation from having insufficient bearing capacity due to excessive thickness of the top slurry, it is usually necessary to perform over-pouring to a certain height. However, due to the complex construction environment and strong concealment of bored cast-in-place piles, it is difficult to control the over-pouring height during the actual pouring process, and it is very easy to have insufficient or excessive over-pouring height, which seriously reduces the quality of the pile and affects the overall bearing capacity of the pile foundation.

[0003] Detecting the state of concrete at the concrete interface is the key to determining whether the bored piles are over-pouring normally. The following methods are generally used to determine the state of concrete at the concrete interface: First, traditionally, only manual experience is used to determine whether the concrete at the concrete interface has reached the standard. The error in the judgment is large, and the pouring height cannot be accurately controlled. Second, the density of the bored pile medium is obtained by drilling holes in the bored piles to detect the state of concrete at the concrete interface and thus control the concrete pouring height. This operation is relatively complicated and will damage the pile foundation. It is also not suitable for large-sized and large-volume bored piles. Third, magnetic detection technology is used to analyze the concrete at the concrete interface to determine whether the concrete at the concrete interface has reached the standard and then control the pouring height. However, magnetic detection technology is still in the verification stage and its detection accuracy is poor.

[0004] Although there are many devices and methods for pile foundation overfilling detection, they still cannot solve the problem of too little or too much concrete overfilling in the pile foundation. Based on this, a real-time detection device and method for pile foundation overfilling is designed. Summary of the invention

[0005] The present invention aims to overcome the defects in the above-mentioned prior art and provides a real-time detection device and method for pile foundation over-pouring. The device continuously captures images of the concrete pouring interface through a USB industrial camera, and judges whether the pile foundation concrete is over-pouring by observing the thickness of the pile foundation floating slurry and the density of aggregate in the captured images, thereby effectively controlling the amount of concrete over-pouring and saving costs while ensuring the quality of the pile foundation.

[0006] In order to achieve the above purpose, the technical solution adopted by the present invention is: a real-time detection device for pile foundation over-pouring, including a shooting component, a scaled rope, a drum and a display screen; the scaled rope is wound on the drum, one end of the scaled rope is connected to the display screen, and the other end of the scaled rope is connected to the shooting component, and the rotation of the drum drives the scaled rope to be lowered and enables the shooting component to reach the concrete pouring interface, so as to capture the image of the concrete pouring interface.

[0007] As a preferred solution of the present invention, the shooting component includes a support plate, a screw is arranged in the middle of the support plate, a cross support frame is arranged along the axial direction of the screw, and a plurality of USB industrial cameras are arranged on the cross support frame.

[0008] As a preferred solution of the present invention, the cross support frame includes a mounting hole, a through hole and a threaded hole. The cross support frame is fixed on the screw rod through the mounting hole. A USB industrial camera is arranged in the through hole. Bolts pass through the threaded hole to fix the USB industrial camera in the through hole.

[0009] As a preferred solution of the present invention, there are at least two USB industrial cameras, which are symmetrically arranged left and right or front and back.

[0010] As a preferred solution of the present invention, the shooting component includes a PC material tube, a support plate is arranged inside the PC material tube, a plumb bob is installed at the bottom of the PC material tube, and a cover plate is installed at the top of the PC material tube.

[0011] As a preferred solution of the present invention, a data line is arranged inside the graduated rope, one end of the data line is connected to the display screen, and the other end of the data line is connected to a USB industrial camera.

[0012] A real-time detection method for pile foundation overfilling comprises the following steps: Step 1: Calculate the height of the concrete pouring plane by dividing the concrete pouring volume by the area of ​​the pile base surface. The top of the concrete pouring plane is the concrete pouring interface. Step 2: lowering the shooting component to the concrete pouring interface through a scaled rope, wherein the USB industrial camera in the shooting component is located below the concrete pouring interface and can capture an image of the concrete pouring interface; Step 3: The inspector controls the USB industrial camera of the shooting component through the display screen to obtain images of various positions of the concrete pouring interface, thereby monitoring the pouring quality of the pile foundation concrete interface.

[0013] As a preferred solution of the present invention, the step 4 is included: raising the shooting component to between 0-0.5m above the concrete pouring interface to take pictures.

[0014] As a preferred solution of the present invention, it includes step 1-1: determining the number of points where the shooting component is placed in the pile foundation according to the diameter of the pile foundation, if the diameter of the pile foundation is greater than 2m, 8 points for placing the shooting component are set at equal angles in the pile foundation; if the diameter of the pile foundation is less than or equal to 2m, 4 points for placing the shooting component are set at equal angles in the pile foundation.

[0015] As a preferred solution of the present invention, it includes step 1-2: determining the height of the plumb bob in the shooting component so that the shooting component can be stably placed on the concrete casting interface; and step 1-3: determining the length of the graduated rope so that the shooting component can reach the concrete casting interface.

[0016] The beneficial effects of the present invention are: 1. The USB industrial camera of the present invention continuously captures images of the concrete pouring interface, and determines whether the pile foundation concrete is over-filled by observing the thickness of the pile foundation slurry and the density of the aggregate in the captured images, and accurately controls the over-filling amount of concrete, thereby saving costs while ensuring the quality of the pile foundation.

[0017] 2. The present invention uses a USB industrial camera to capture underwater images and judges the quality of pile foundation concrete based on the image information. The shooting component can observe the pile foundation concrete at close range and with high precision, reducing the influence of possible deviations and uncontrollable factors in traditional methods such as data screening, threshold setting, and parameter calibration. The quality of pile foundation concrete is directly judged with visual image information, which has higher precision and is simple and convenient to operate.

[0018] 3. The support plate, cross support frame and cover plate in the PC material tube of the present invention can support the lower, middle and upper positions of the PC material tube to resist the pressure of water in the concrete or mud in the pile foundation, and at the same time increase the density inside the PC material tube, which facilitates the sinking of the PC material tube and enables the shooting component to be used normally in the pile foundation.

[0019] 4. A plumb bob is fixed at the bottom of the PC material tube of the present invention to resist the buoyancy of concrete or mud, thereby ensuring that the shooting component can sink smoothly.

[0020] 5. The shooting component of the present invention adopts a PC material tube, which has good sealing, durability and anti-destruction properties and is suitable for concrete.

[0021] 6. The present invention can perform multi-angle and multi-faceted shooting at the same shooting point on the concrete pouring interface, avoiding detection blind spots, and accurately determine whether the concrete in the pile foundation is over-poured by comparing multiple captured images.

[0022] 7. The present invention sets up different numbers of shooting points according to the size of the pile foundation diameter. The shooting component can shoot concrete images at different positions of the same interface of the same pile foundation. By comparing multiple shot images, it can accurately determine whether the concrete in the pile foundation is over-filled.

[0023] 8. In the present invention, when the concrete is continuously poured, the photographing measuring point can also be set in the range of 0-0.5 meters above the concrete pouring interface, and the image of the concrete at the concrete pouring interface is compared with the image of the concrete above it to determine whether the concrete in the pile foundation is over-poured.

[0024] 9. The present invention can be applied to pile foundations of various sizes and heights, and has a wider range of applications. Compared with traditional measurement methods, it saves materials, reduces costs, shortens construction periods, and is safe and easy.

[0025] 10. The USB industrial camera of the present invention transmits signals to the display screen via a data line, making image transmission more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 It is a structural schematic diagram of the shooting component of the present invention; Figure 3 It is a schematic diagram of the structure of the graduated rope of the present invention; Figure 4 It is a structural schematic diagram of the USB interface of the present invention; Reference numerals in the figure: 1. shooting component, 2. rope with scale, 3. roller, 4. display screen, 5. pile foundation cover plate, 11. plumb bob head, 12. PC material tube, 13. USB industrial camera, 14. cross support frame, 15. support plate, 16. cover plate, 17. screw, 21. data cable, 22. USB interface, 141. mounting hole, 142. through hole, 143. threaded hole. DETAILED DESCRIPTION

[0027] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0028] like Figure 1-Figure 4 As shown, a real-time detection device for pile foundation over-pouring includes a shooting component 1, a scaled rope 2, a drum 3 and a display screen 4; the scaled rope 2 is wound on the drum 3, one end of the scaled rope 2 is connected to the display screen 4, and the other end of the scaled rope 2 is connected to the shooting component 1. The rotation of the drum 3 drives the scaled rope 2 to be lowered and enables the shooting component 1 to reach the concrete pouring interface, so as to capture the image of the concrete pouring interface.

[0029] Specifically, the position of the concrete pouring interface is obtained by dividing the concrete pouring volume by the area of ​​the pile foundation bottom surface. The graduated rope 2 on the drum 3 is lowered so that the shooting component 1 reaches the concrete pouring interface. After the shooting component 1 reaches the concrete pouring interface, concrete continues to be poured into the pile foundation. The shooting component 1 continuously captures the image of the concrete pouring interface. Based on the image information, it is determined whether the concrete in the pile foundation is over-poured into place. By over-pour the concrete in the pile foundation into place, it is ensured that the poured pile foundation meets the requirements.

[0030] The shooting component 1 of the present invention can observe the pile foundation concrete at close range and with high precision, reducing the influence of possible deviations and uncontrollable factors in traditional methods such as data screening, threshold setting, and parameter calibration, and directly using visual image information to judge the quality of the pile foundation concrete with higher precision and easy operation.

[0031] When the shooting component 1 enters the concrete pouring interface, each surface of the shooting component 1 will be subjected to the pressure of the water in the concrete or mud in the pile foundation. Therefore, it is necessary to increase the strength of each surface of the shooting component 1 to resist the pressure of the external concrete or mud on the shooting component 1. On the other hand, the density of the shooting component 1 also needs to be increased to facilitate sinking.

[0032] The shooting component 1 includes a support plate 15, a screw rod 17 is arranged in the middle of the support plate 15, a cross support frame 14 is arranged along the axial direction of the screw rod 17, and a plurality of USB industrial cameras 13 are arranged on the cross support frame 14. The cross support frame 14 can move up and down along the axial direction of the screw rod 17, so that the USB industrial camera 13 can reach a suitable height for accurate shooting.

[0033] The cross support frame 14 includes a mounting hole 141, a through hole 142 and a threaded hole 143. The through hole 142 is vertically arranged, and the threaded hole 143 is perpendicular to the through hole 142. The threaded hole 143 passes through the through hole 142 from the outside of the cross support frame 14. A USB industrial camera 13 is arranged in the through hole 142. Bolts pass through the threaded hole 143 to fix the USB industrial camera 13 in the through hole 142. The cross support frame 14 is fixed on the screw 17 through the mounting hole 141.

[0034] There are at least two USB industrial cameras 13, and they are symmetrically arranged left and right or front and back.

[0035] Specifically, in this embodiment, there are two USB industrial cameras 13 that are symmetrical on the left and right. They can be fixed inside the shooting component 1 and their heights can be adjusted through a cross support frame 14. The two USB industrial cameras 13 are responsible for shooting one side of the picture respectively. By alternately using the two USB industrial cameras 13, the full-section shooting of the concrete pouring interface can be achieved. Based on the image information, it can be determined whether the concrete in the pile foundation is over-filled in place. By over-filling the concrete in the pile foundation, it can be ensured that the poured pile foundation meets the requirements.

[0036] Furthermore, the number of through holes 142, threaded holes 143 and USB industrial cameras 13 on the cross support frame 14 can also be adjusted according to actual conditions. At most four through holes 142 can be set on the cross support frame 14, and one USB industrial camera 13 can be set in one through hole 142 on the cross support frame 14.

[0037] The present invention uses USB industrial cameras at different positions to capture images at different angles at the same position in the pile foundation, and by comparing the images at different angles at the same position, it can be determined whether the concrete in the pile foundation is poured in place.

[0038] The shooting component 1 includes a PC material tube 12 , a support plate 15 is arranged inside the PC material tube 12 , a plumb bob 11 is installed at the bottom of the PC material tube 12 , and a cover plate 16 is installed at the top of the PC material tube 12 .

[0039] PC material pipe refers to the pipe made of polycarbonate, referred to as PC. Polycarbonate is a colorless, transparent, amorphous thermoplastic material with high mechanical strength and heat resistance, excellent impact resistance, and UL94 V-0 flame retardant performance. PC pipe has high transparency and light transmittance of up to 92%. This material has a heat resistance of up to 160 degrees Celsius and a cold resistance of up to minus 60 degrees Celsius, and has good chemical corrosion resistance and dimensional stability.

[0040] The camera component 1 adopts a PC material tube, which has good sealing, durability and anti-destruction properties and is suitable for concrete.

[0041] Specifically, the support plate 15, the cross support frame 14 and the cover plate 16 are respectively located at the lower, middle and upper positions of the PC material tube 12, the outer walls of the support plate 15 and the cover plate 16 are in contact with the inner wall of the PC material tube 12, the cross support frame 14 and the PC material tube 12 are gap-matched, the support plate 15, the cross support frame 14 and the cover plate 16 increase the strength of the PC material tube 12, thereby making the strength of each surface of the shooting component 1 able to withstand the pressure of external concrete or mud on the shooting component 1; on the other hand, the support plate 15, the cross support frame 14 and the cover plate 16 inside the PC material tube 12 increase the internal density of the PC material tube 12, making it easier for the shooting component 1 to sink.

[0042] Among them, the outer walls of the support plate 15 and the cover plate 16 are coated with slow-drying glue, so that the support plate 15, the cover plate 16 and the PC material tube 12 are sealed; a sealing ring is provided at the junction of the scale rope 2 and the cover plate 16, so that the inside of the PC material tube 12 is sealed to prevent external concrete or mud from entering the PC material tube 12 and affecting the shooting results.

[0043] A plumb bob 11 is fixed at the bottom of the shooting component 1 to resist the buoyancy of concrete or mud and ensure that the shooting component 1 can sink smoothly.

[0044] A data cable 21 is wrapped inside the scaled rope 2 , one end of the data cable 21 is connected to the display screen 4 , and the other end of the data cable 21 is connected to the USB industrial camera 13 .

[0045] Specifically, the scaled rope 2 is wound around the drum 3, and the drum 3 is rocked by hand to lower the scaled rope 2. The surface of the scaled rope 2 is marked with scales. When the shooting component 1 is lowered, the lowering depth can be determined by observing the scale lines to reach the designated shooting position. A data cable 21 is wrapped inside the rope, and the upper end of the data cable 21 has a USB interface 22 for connecting to the display screen 4. The lower end of the data cable 21 is connected to the USB industrial camera 13 in the shooting component 1 to capture images.

[0046] The USB industrial camera 13 of the present invention is connected to the display screen 4 via a data line 21. By shooting with two symmetrical cameras, the entire cross-section of the concrete pouring interface can be shot, which is convenient for practical use.

[0047] The roller 3 is located on the pile foundation cover plate 5. Accordingly, the roller 3 can move on the pile foundation cover plate 5, so that the shooting component 1 moves inside the pile foundation. Specifically, the number of points where the shooting component 1 is placed in the pile foundation is determined according to the size of the pile foundation diameter. If the pile foundation diameter is less than or equal to 2m, 4 points for placing the shooting component 1 are set at equal angles in the pile foundation. If the pile foundation diameter is greater than 2m, 8 points for placing the shooting component 1 are set at equal angles in the pile foundation. When the concrete images at various positions on the same interface of the pile foundation meet the over-pouring standard, the pile foundation is poured in place.

[0048] The reasonable internal structure and multiple shooting points of the shooting component 1 of the present invention make the captured images more reasonable and accurate, and can always feedback the concrete pouring situation inside the pile foundation, making it convenient for the pile foundation to be over-cast in place.

[0049] A real-time detection method for pile foundation overfilling comprises the following steps: Step 1: Calculate the height of the concrete pouring plane by dividing the concrete pouring volume by the area of ​​the pile base surface. The top of the concrete pouring plane is the concrete pouring interface. Step 2: lowering the shooting component 1 to the concrete pouring interface through the graduated rope 2, wherein the USB industrial camera 13 in the shooting component 1 is located below the concrete pouring interface and can capture images of the concrete pouring interface; Step 3: The inspector controls the USB industrial camera 13 of the shooting component 1 through the display screen 4 to obtain images of various positions of the concrete pouring interface, thereby monitoring the pouring quality of the pile foundation concrete interface.

[0050] In step 3, the shooting component 1 is located at the concrete pouring interface, and the shooting component 1 captures the image at the concrete pouring interface. When the floating slurry in the image captured by the shooting component 1 meets the requirements and the aggregate is dense, it means that the pile foundation concrete is over-poured in place, and the pouring of the pile foundation is stopped.

[0051] That is, the height of the concrete pouring plane is calculated by the concrete pouring volume, so as to determine the concrete pouring interface, which facilitates the lowering of the shooting component 1 to the designated position for shooting. When the concrete pouring interface is not over-poured, the top surface of the pile foundation photographed by the shooting component 1 is loose concrete aggregate and floating slurry. When the concrete pouring interface is over-poured, the top surface of the pile foundation photographed by the shooting component 1 is dense concrete aggregate and the floating slurry meets the requirements.

[0052] It also includes step 4, in which the image around the concrete pouring interface is taken to further determine whether the concrete pouring interface has indeed reached the over-pouring position. Step 4: Continuously monitor the pile foundation concrete. When the concrete at the concrete pouring interface meets the requirements, the shooting component is raised to between 0-0.5m above the concrete pouring interface. According to the actual situation, several height points are selected to take pictures and output them, and the comparison between images at different heights is used to determine whether the pile foundation meets the specified over-pouring requirements.

[0053] The actual pile foundation height after over-pouring is 0.5m-1m higher than the concrete pouring interface.

[0054] The USB industrial camera 13 can automatically focus, and the USB industrial camera 13 can receive the electrical signal of the display screen 4 for shooting. The image shot by the USB industrial camera 13 is converted into an optical signal, and then converted into an electrical signal by the optical signal, and transmitted to the display screen 4.

[0055] The method comprises step 1-1: determining the number of points where the shooting component 1 is placed in the pile foundation according to the diameter of the pile foundation; if the diameter of the pile foundation is greater than 2m, 8 points for placing the shooting component 1 are set at equal angles in the pile foundation; if the diameter of the pile foundation is less than or equal to 2m, 4 points for placing the shooting component 1 are set at equal angles in the pile foundation.

[0056] The method comprises steps 1-2: determining the height of the plumb bob 11 in the shooting component 1 so that the shooting component 1 can be stably placed on the concrete pouring interface.

[0057] The method comprises steps 1-3: determining the length of the graduated rope 2 so that the photographing component 1 can reach the concrete pouring interface.

[0058] Steps 1-1, 1-2 and 1-3 are all located before step 2, so that the photographing component 1 can be stably placed on the concrete pouring interface without floating.

[0059] Wherein, ignoring the weight of the photographing component 1, the mass of the plumb bob 11 = f (floating). In this embodiment: the density of the pile foundation concrete is set to 2.4*10 3 kg / m 3 , the density of the plumb bob is set to 11.34*10 3 kg / m 3, the radius of the PC material tube is set to 0.05m, and the total height of the PC material tube is set to 0.125 meters, then the volume of the cylindrical part is approximately: π*0.05 2 *0.125=0.00098175 m 3 ; The volume of the plumb bob is: π*0.05 2 *h*(1 / 3)=0.002618*hm 3 ; Gravity of the plumb bob = ρgv = 11.34*10 3 *10*0.002618*h = 296.8812*h, f(float)=ρgvrow= 2.4*10 3 *10*(0.00098175+0.002618*h), since the weight of the plumb bob is the same as the buoyancy, we can solve for h = 0.10067m≈0.10m = 10cm. Therefore, the height of the plumb bob under this experimental data must be greater than or equal to 10cm.

[0060] The length of the graduated rope 2>the height of the pile foundation cover plate-the height of the concrete pouring interface.

[0061] The pile foundation is cylindrical, and the height of the concrete pouring interface is the concrete pouring volume / π* R 2 , R is the radius of the pile foundation, and the graduated rope 2 is lowered from the height of the pile foundation cover 5. Therefore, the length of the graduated rope 2 needs to be greater than the height of the pile foundation cover - the amount of concrete poured / π* R 2 The present invention continuously captures images of the concrete pouring interface through a USB industrial camera, and determines whether the pile foundation concrete is over-filled by observing the thickness of the pile foundation floating slurry and the density of aggregate in the captured images, thereby effectively controlling the over-filling amount of concrete, saving costs while ensuring the quality of the pile foundation.

[0062] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention; therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

[0063] Although this article uses the following terms more frequently: 1. shooting component, 2. rope with scale, 3. drum, 4. display screen, 5. pile foundation cover, 11. plumb head, 12. PC material tube, 13. USB industrial camera, 14. cross support frame, 15. support plate, 16. cover plate, 17. screw, 21. data cable, 22. USB interface, 141. mounting hole, 142. through hole, 143. threaded hole, etc., it does not exclude the possibility of using other terms; these terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional limitations is contrary to the spirit of the present invention.

Claims

1. A real-time detection device for pile foundation overfilling, characterized in that: The device comprises a shooting component (1), a scaled rope (2), a drum (3) and a display screen (4); the scaled rope (2) is wound around the drum (3), one end of the scaled rope (2) is connected to the display screen (4), and the other end of the scaled rope (2) is connected to the shooting component (1); the drum (3) rotates to drive the scaled rope (2) downward and enables the shooting component (1) to reach a concrete pouring interface, so that an image of the concrete pouring interface can be captured.

2. A pile foundation overfilling real-time detection device according to claim 1, characterized in that: The photographing component (1) comprises a support plate (15), a screw rod (17) is arranged in the middle of the support plate (15), a cross support frame (14) is arranged along the axial direction of the screw rod (17), and a plurality of USB industrial cameras (13) are arranged on the cross support frame (14).

3. A pile foundation overfilling real-time detection device according to claim 2, characterized in that: The cross support frame (14) comprises a mounting hole (141), a through hole (142) and a threaded hole (143); the cross support frame (14) is fixed to the screw rod (17) via the mounting hole (141); a USB industrial camera (13) is arranged in the through hole (142); a bolt passes through the threaded hole (143) to fix the USB industrial camera (13) in the through hole (142).

4. A pile foundation overfilling real-time detection device according to claim 2, characterized in that: The number of the USB industrial cameras (13) is at least two and they are symmetrically arranged left and right or front and back.

5. The real-time detection device for pile foundation overfilling according to claim 1 is characterized by: The shooting component (1) comprises a PC material tube (12), a support plate (15) is arranged inside the PC material tube (12), a plumb bob (11) is installed at the bottom of the PC material tube (12), and a cover plate (16) is installed at the top of the PC material tube (12).

6. A real-time detection device for pile foundation overfilling according to claim 1, characterized in that: The graduated rope (2) is internally coated with a data cable (21), one end of the data cable (21) is connected to the display screen (4), and the other end of the data cable (21) is connected to a USB industrial camera (13).

7. A real-time detection method for pile foundation overfilling, characterized in that: Referring to the device according to any one of claims 1 to 6, The following steps are included: Step 1: Calculate the height of the concrete pouring plane by dividing the concrete pouring volume by the area of ​​the pile base surface. The top of the concrete pouring plane is the concrete pouring interface. Step 2: lowering the photographing component (1) to the concrete pouring interface via a scaled rope (2), wherein the USB industrial camera (13) in the photographing component (1) is located below the concrete pouring interface and can capture an image of the concrete pouring interface; Step 3: The inspector controls the USB industrial camera (13) of the shooting component (1) through the display screen (4) to obtain images of various positions of the concrete pouring interface, thereby monitoring the pouring quality of the pile foundation concrete interface.

8. A real-time detection method for pile foundation overfilling according to claim 7, characterized in that: The method comprises step 4: raising the photographing component (1) to a height between 0 and 0.5 m above the concrete pouring interface to take photos.

9. A real-time detection method for pile foundation overfilling according to claim 7, characterized in that: The method comprises step 1-1: determining the number of points where a photographing component (1) is placed in a pile foundation according to the diameter of the pile foundation; if the diameter of the pile foundation is greater than 2 m, 8 points where the photographing component (1) is placed are set at equal angles in the pile foundation; if the diameter of the pile foundation is less than or equal to 2 m, 4 points where the photographing component (1) is placed are set at equal angles in the pile foundation.

10. A real-time detection method for pile foundation overfilling according to claim 7, characterized in that: The method comprises steps 1-2: determining the height of the plumb bob (11) in the shooting component (1) so that the shooting component (1) can be stably placed on the concrete pouring interface; The method comprises steps 1-3: determining the length of the graduated rope (2) so that the photographing component (1) can reach the concrete pouring interface.