Hollow double-steel-pipe high-pressure gas pre-tensioning concrete column and construction method thereof

By filling the hollow double steel tube concrete columns with high-pressure gas and sandwich concrete, the local stability problem is solved, the load-bearing capacity and compression resistance are improved, the material weight is reduced, and the production efficiency is improved.

CN118815083APending Publication Date: 2024-10-22CHONGQING UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410941190.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

Existing hollow double steel tube concrete columns are prone to local stability failure and inward bulging when under pressure, resulting in reduced load-bearing capacity and even instability.

Method used

The hollow double steel pipe high-pressure gas pre-tensioned concrete column structure is used. High-pressure gas is filled between the outer steel pipe and the inner steel pipe to form an air cavity, and sandwich concrete is poured in the air cavity. The high-pressure gas is used to prevent local buckling of the steel pipe and improve the overall load-bearing capacity.

Benefits of technology

High-pressure gas effectively prevents local buckling of steel pipes, improves the vertical bearing capacity and compressive bearing capacity of the structure, reduces material weight, and greatly improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118815083A_ABST
    Figure CN118815083A_ABST
Patent Text Reader

Abstract

The invention provides a hollow double-steel-pipe high-pressure gas pre-tensioning concrete column and a construction method thereof. The pre-tensioning concrete column comprises an outer steel pipe, a cover plate I, an inner steel pipe, an inflation pipe, a cover plate II and interlayer concrete. The outer steel pipe is a hollow circular pipe with two open ends. And an inflation pipe through hole is formed in the pipe wall of the outer steel pipe. An air cavity is defined by the cover plate I and the inner steel pipe. And the gas cavity is filled with high-pressure gas. An annular pouring space is defined by the outer steel pipe, the cover plate I, the inner steel pipe and the cover plate II. Interlayer concrete is arranged in the annular pouring space. High-pressure gas prevents local buckling of the steel pipe, and the overall vertical bearing capacity of the structural component is improved. The compression bearing capacity of the structural member is improved through high-pressure gas, and the weight of building materials needed under the same stress condition can be effectively reduced. The prefabrication process is time-saving and labor-saving, and the production operation efficiency is
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to a hollow double steel tube high-pressure gas pre-tensioned concrete column and a construction method thereof. Background Art

[0002] The hollow double steel tube concrete column consists of two layers of steel tubes and concrete filled inside. The two layers of steel tubes constrain the internal concrete in the middle, forming a hollow tubular structure. The hollow double steel tube concrete column can control the slenderness ratio and cross-sectional development of the column by adjusting the diameter and thickness of the inner and outer layers of steel tubes and the strength of the internal concrete, so as to meet different force requirements. The hollow double steel tube concrete column also has the advantages of simple structure, convenient construction, material saving, and light weight. Therefore, the hollow double steel tube concrete column has been widely used in construction projects and has a good development prospect.

[0003] However, the existing hollow double steel tube concrete columns have great drawbacks in actual engineering: when the hollow double steel tube concrete columns are under pressure, the internal steel tubes are prone to local stability damage and inward bulging defects, which leads to a significant reduction in the bearing capacity of the entire column, or even overall instability and failure.

[0004] Therefore, it is of great significance to develop a hollow double steel tube high-pressure gas pre-tensioned concrete column and a construction method thereof. Summary of the invention

[0005] The purpose of the present invention is to provide a hollow double steel tube high-pressure gas pre-tensioned concrete column and a construction method thereof, so as to solve the problems existing in the prior art.

[0006] The technical solution adopted to achieve the purpose of the present invention is as follows: a hollow double steel tube high-pressure gas pre-tensioned concrete column, including an outer steel tube, a cover plate I, an inner steel tube, an inflation tube, a cover plate II, a sandwich concrete and a cover plate III.

[0007] The outer steel pipe is a hollow round pipe with two open ends. The wall of the outer steel pipe is provided with a hole for passing the air pipe. One open end of the outer steel pipe is sealed with a cover plate I, and the other open end is covered with a cover plate II. A casting hole is provided through the plate surface of the cover plate I. The plate surface of the cover plate II is provided with an inner steel pipe accommodating hole. The inner steel pipe accommodating hole is a stepped hole. The large diameter section of the stepped hole faces the inner cavity of the outer steel pipe.

[0008] The inner steel pipe is a hollow round pipe with open ends. The inner steel pipe is provided with a hole for passing the air pipe on its peripheral wall. The inner steel pipe is inserted into the inner cavity of the outer steel pipe. One end of the inner steel pipe is pressed against the cover plate I, and the other end extends into the large diameter section of the inner steel pipe receiving hole. The inner steel pipe is welded to the cover plate II.

[0009] The cover plate III is embedded in the small diameter section of the inner steel pipe accommodating hole. The cover plate I, the inner steel pipe and the cover plate III enclose an air cavity. The air cavity is filled with high pressure gas.

[0010] The outer steel pipe, cover plate I, inner steel pipe and cover plate II enclose an annular casting space. The annular casting space has a sandwich concrete. The inflation pipe passes through the outer steel pipe, sandwich concrete and inner steel pipe in sequence to connect the air cavity with the external environment. A sealing valve is arranged on the pipeline of the inflation pipe.

[0011] The invention also discloses a hollow double steel tube high-pressure gas pre-tensioned concrete column, comprising an outer steel tube, a cover plate I, an inner steel tube, an air-filled tube, a cover plate II and sandwich concrete.

[0012] The outer steel pipe is a hollow round pipe with two open ends. The wall of the outer steel pipe is provided with a hole for passing the air pipe. One open end of the outer steel pipe is sealed with a cover plate I, and the other open end is covered with a cover plate II. A casting hole is provided through the plate surface of the cover plate I. The plate surface of the cover plate II is provided with a hole for receiving the inner steel pipe.

[0013] The inner steel pipe is a hollow round pipe with one end open and the other end closed. The peripheral wall of the inner steel pipe is provided with a hole for passing the air pipe. The inner steel pipe is inserted into the inner cavity of the outer steel pipe. The open end of the inner steel pipe is against the cover plate I. The cover plate I and the inner steel pipe enclose an air cavity. The air cavity is filled with high-pressure gas. The closed end of the inner steel pipe is accommodated in the inner steel pipe accommodation hole and welded to the cover plate II. The outer steel pipe, the cover plate I, the inner steel pipe and the cover plate II enclose an annular casting space. There is a sandwich concrete in the annular casting space.

[0014] The inflation tube passes through the outer steel tube, the sandwich concrete and the inner steel tube in sequence to connect the air cavity with the external environment. A sealing valve is arranged on the pipeline of the inflation tube.

[0015] Furthermore, the ratio of the outer diameter to the wall thickness of the inner steel pipe is greater than 20. The ratio of the outer diameter to the wall thickness of the outer steel pipe is less than 15.

[0016] Furthermore, the high-pressure gas is air or an inert gas.

[0017] Furthermore, the high-pressure gas is nitrogen.

[0018] Furthermore, the outer steel pipe is formed by splicing a plurality of steel pipe sections, and a liner pipe is welded and fixed to the inner sides of the ends of two adjacent steel pipe sections.

[0019] Furthermore, a stiffening plate is arranged on the inner wall of the outer steel pipe, and a plurality of concrete self-flowing holes are arranged on the plate surface of the stiffening plate.

[0020] Furthermore, the sealing valve is a one-way air pressure valve and is connected to an air pressure pump.

[0021] The present invention also discloses a construction method of the hollow double steel tube high pressure gas pre-tensioned concrete column, comprising the following steps:

[0022] 1) Weld the open end of the inner steel pipe to the surface of cover plate I.

[0023] 2) Weld the open end of the outer steel pipe to cover plate II.

[0024] 3) Insert the inner steel pipe into the outer steel pipe. Weld the outer steel pipe to the cover plate I. Weld the inner steel pipe to the cover plate II.

[0025] 4) Insert the cover plate III into the small diameter section of the inner steel pipe receiving hole and weld the cover plate III to the cover plate II.

[0026] 5) Arrange the inflation pipe. The inflation pipe passes through the inflation pipe through holes on the outer steel pipe and the inner steel pipe in sequence. The inflation pipe is welded to the outer steel pipe.

[0027] 6) Pump concrete into the annular pouring space through the pouring holes and vibrate it.

[0028] 7) Open the sealing valve and inflate the air cavity to the specified pressure, then close the sealing valve.

[0029] The present invention also discloses a construction method of the hollow double steel tube high pressure gas pre-tensioned concrete column, comprising the following steps:

[0030] 1) Weld the open end of the inner steel pipe to the surface of cover plate I.

[0031] 2) Weld the open end of the outer steel pipe to cover plate II.

[0032] 3) Insert the inner steel pipe into the outer steel pipe. Weld the outer steel pipe to the cover plate I. Weld the inner steel pipe to the cover plate II.

[0033] 4) Arrange the inflation pipe. The inflation pipe passes through the inflation pipe through holes on the outer steel pipe and the inner steel pipe in sequence. The inflation pipe is welded to the outer steel pipe.

[0034] 5) Pump concrete into the annular pouring space through the pouring holes and vibrate it.

[0035] 6) Open the sealing valve and inflate the air cavity to the specified pressure, then close the sealing valve.

[0036] The technical effects of the present invention are unquestionable:

[0037] A. High-pressure gas prevents local buckling of the steel pipe and improves the overall vertical bearing capacity of the structural member;

[0038] B. High-pressure gas improves the compressive bearing capacity of structural components and can effectively reduce the weight of building materials required under the same stress conditions;

[0039] C. The prefabrication process saves time and effort, greatly improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 This is a schematic diagram of a hollow double steel tube high pressure gas pre-tensioned concrete column in Example 1;

[0041] Figure 2 This is a schematic diagram of the hollow double steel tube high-pressure gas pre-tensioned concrete column in Example 2.

[0042] In the figure: outer steel pipe 1, cover plate I 2, casting hole 201, air cavity 3, inner steel pipe 4, sealing valve 5, inflation pipe 6, cover plate II 7, sandwich concrete 8, cover plate III 9. DETAILED DESCRIPTION

[0043] The present invention is further described below in conjunction with the embodiments, but it should not be understood that the above subject matter of the present invention is limited to the following embodiments. Without departing from the above technical ideas of the present invention, various substitutions and changes are made according to the common technical knowledge and customary means in the art, which should all be included in the protection scope of the present invention.

[0044] Embodiment 1:

[0045] See also Figure 1 The present embodiment provides a hollow double steel tube high-pressure gas pre-tensioned concrete column, comprising an outer steel tube 1, a cover plate I2, an inner steel tube 4, an inflation tube 6, a cover plate II7, a sandwich concrete 8 and a cover plate III9.

[0046] The outer steel pipe 1 is a hollow round pipe with both ends open. The wall of the outer steel pipe 1 is provided with an air pipe passage hole. One end of the outer steel pipe 1 is blocked by a cover plate Ⅰ2, and the other end is covered with a cover plate Ⅱ7. A casting hole 201 is provided on the plate surface of the cover plate Ⅰ2. An inner steel pipe accommodating hole is provided on the plate surface of the cover plate Ⅱ7. The inner steel pipe accommodating hole is a stepped hole. The large diameter section of the stepped hole faces the inner cavity of the outer steel pipe.

[0047] The inner steel tube 4 is a hollow round tube with open ends. The peripheral wall of the inner steel tube 4 is provided with a hole for the air tube to pass through. The inner steel tube 4 is inserted into the inner cavity of the outer steel tube 1. One end of the inner steel tube 4 abuts against the cover plate I2, and the other end extends into the large diameter section of the inner steel tube receiving hole. The inner steel tube 4 is welded to the cover plate II7.

[0048] The cover plate III 9 is embedded in the small diameter section of the inner steel pipe accommodating hole. The cover plate I2, the inner steel pipe 4 and the cover plate III 9 enclose an air cavity 3. The air cavity 3 is filled with high pressure gas.

[0049] The outer steel pipe 1, cover plate I2, inner steel pipe 4 and cover plate II7 enclose an annular casting space. The annular casting space has a sandwich concrete 8. The inflation pipe 6 passes through the outer steel pipe 1, the sandwich concrete 8 and the inner steel pipe 4 in sequence, connecting the air cavity 3 with the external environment. A sealing valve 5 is arranged on the pipeline of the inflation pipe 6.

[0050] Embodiment 2:

[0051] See also Figure 2 This embodiment provides a hollow double steel tube high-pressure gas pre-tensioned concrete column, including an outer steel tube 1, a cover plate I 2, an inner steel tube 4, an inflation tube 6, a cover plate II 7 and a sandwich concrete 8.

[0052] The outer steel pipe 1 is a hollow round pipe with both ends open. The wall of the outer steel pipe 1 is provided with a hole for passing the air pipe. One end of the outer steel pipe 1 is blocked by a cover plate Ⅰ2, and the other end is covered with a cover plate Ⅱ7. A casting hole 201 is provided through the plate surface of the cover plate Ⅰ2. The plate surface of the cover plate Ⅱ7 is provided with a hole for accommodating the inner steel pipe.

[0053] The inner steel pipe 4 is a hollow round pipe with one end open and the other end closed. The peripheral wall of the inner steel pipe 4 is provided with a hole for passing the air pipe. The inner steel pipe 4 is inserted into the inner cavity of the outer steel pipe 1. The open end of the inner steel pipe 4 is against the cover plate Ⅰ2. The cover plate Ⅰ2 and the inner steel pipe 4 enclose an air cavity 3. The air cavity 3 is filled with high-pressure gas. The closed end of the inner steel pipe 4 is accommodated in the inner steel pipe accommodation hole and welded to the cover plate Ⅱ7. The outer steel pipe 1, the cover plate Ⅰ2, the inner steel pipe 4 and the cover plate Ⅱ7 enclose an annular casting space. There is a sandwich concrete 8 in the annular casting space.

[0054] The inflation tube 6 passes through the outer steel tube 1, the sandwich concrete 8 and the inner steel tube 4 in sequence, connecting the air cavity 3 with the external environment. A sealing valve 5 is arranged on the pipeline of the inflation tube 6.

[0055] Embodiment 3:

[0056] The main contents of this embodiment are the same as those of Embodiment 1 or 2, wherein the ratio of the outer diameter to the wall thickness of the inner steel tube 4 is greater than 20. The ratio of the outer diameter to the wall thickness of the outer steel tube 1 is less than 15.

[0057] Embodiment 4:

[0058] The main contents of this embodiment are the same as those of Embodiment 1 or 2, wherein the high-pressure gas is air or an inert gas.

[0059] Embodiment 5:

[0060] The main contents of this embodiment are the same as those of embodiment 4, wherein the high-pressure gas is nitrogen. Nitrogen has low corrosiveness, small volume change with temperature change, and stable chemical properties.

[0061] Embodiment 6:

[0062] The main content of this embodiment is the same as any one of the embodiments 1 to 5, wherein the outer steel pipe 1 is formed by splicing a plurality of steel pipe sections. A liner pipe is welded and fixed to the inner sides of the ends of two adjacent steel pipe sections.

[0063] Embodiment 7:

[0064] The main content of this embodiment is the same as any one of embodiments 1 to 6, wherein a stiffening plate is provided on the inner wall of the outer steel pipe 1. A plurality of concrete self-flowing holes are provided on the plate surface of the stiffening plate.

[0065] Embodiment 8:

[0066] The main content of this embodiment is the same as any one of embodiments 1 to 7, wherein the sealing valve 5 is a one-way air pressure valve. The sealing valve 5 is connected to an air pressure pump.

[0067] Embodiment 9:

[0068] This embodiment provides a construction method of the hollow double steel tube high-pressure gas pre-tensioned concrete column according to Embodiment 1, comprising the following steps:

[0069] 1) Weld the open end of the inner steel tube 4 to the surface of the cover plate Ⅰ2.

[0070] 2) Weld the open end of the outer steel pipe 1 to the cover plate II 7.

[0071] 3) Insert the inner steel pipe 4 into the outer steel pipe 1. Connect the outer steel pipe 1 to the cover plate Ⅰ2 by welding. Connect the inner steel pipe 4 to the cover plate Ⅱ7 by welding.

[0072] 4) Insert the cover plate III9 into the small diameter section of the inner steel pipe receiving hole and weld the cover plate III9 to the cover plate II7.

[0073] 5) Arrange the air-filled pipe 6. The air-filled pipe 6 passes through the air-filled pipe through holes on the outer steel pipe 1 and the inner steel pipe 4 in sequence. The air-filled pipe 6 is connected to the outer steel pipe 1 by welding.

[0074] 6) Pump concrete into the annular pouring space through the pouring holes 201 and vibrate it.

[0075] 7) Open the sealing valve 5 to inflate the air cavity 3 to a specified pressure, and then close the sealing valve 5.

[0076] Embodiment 10:

[0077] This embodiment provides a construction method of the hollow double steel tube high-pressure gas pre-tensioned concrete column according to Embodiment 2, comprising the following steps:

[0078] 1) Weld the open end of the inner steel pipe 4 to the plate surface of the cover plate Ⅰ2.

[0079] 2) Weld the open end of the outer steel pipe 1 to the cover plate II 7.

[0080] 3) Insert the inner steel pipe 4 into the outer steel pipe 1. Connect the outer steel pipe 1 to the cover plate Ⅰ2 by welding. Connect the inner steel pipe 4 to the cover plate Ⅱ7 by welding.

[0081] 4) Arrange the air-filling pipe 6. The air-filling pipe 6 passes through the air-filling pipe through holes on the outer steel pipe 1 and the inner steel pipe 4 in sequence. The air-filling pipe 6 is connected to the outer steel pipe 1 by welding.

[0082] 5) Pump concrete into the annular pouring space through the pouring holes 201 and vibrate it.

[0083] 6) Open the sealing valve 5 to inflate the air cavity 3 to a specified pressure, and then close the sealing valve 5.

Claims

1. A hollow double steel tube high pressure gas pre-tensioned concrete column, Features: It comprises an outer steel pipe (1), a cover plate I (2), an inner steel pipe (4), an air-filled pipe (6), a cover plate II (7), a sandwich concrete (8) and a cover plate III (9); The outer steel pipe (1) is a hollow round pipe with two open ends; a hole for passing the air pipe is provided on the wall of the outer steel pipe (1); one open end of the outer steel pipe (1) is sealed by a cover plate I (2), and the other open end is covered by a cover plate II (7); a casting hole (201) is provided through the plate surface of the cover plate I (2); an inner steel pipe accommodating hole is provided on the plate surface of the cover plate II (7); the inner steel pipe accommodating hole is a stepped hole; the large diameter section of the stepped hole faces the inner cavity of the outer steel pipe; The inner steel pipe (4) is a hollow round pipe with open ends; a hole for passing the air pipe is provided on the peripheral wall of the inner steel pipe (4); the inner steel pipe (4) is inserted into the inner cavity of the outer steel pipe (1); one end of the inner steel pipe (4) is pressed against the cover plate I (2), and the other end extends into the large diameter section of the inner steel pipe receiving hole; the inner steel pipe (4) is welded to the cover plate II (7); The cover plate III (9) is embedded in the small diameter section of the inner steel pipe accommodating hole; the cover plate I (2), the inner steel pipe (4) and the cover plate III (9) enclose an air cavity (3); the air cavity (3) is filled with high pressure gas; The outer steel pipe (1), cover plate I (2), inner steel pipe (4) and cover plate II (7) enclose an annular casting space; The annular casting space is provided with a sandwich concrete (8); the inflation pipe (6) passes through the outer steel pipe (1), the sandwich concrete (8) and the inner steel pipe (4) in sequence, connecting the air cavity (3) with the external environment; and a sealing valve (5) is provided on the pipeline of the inflation pipe (6).

2. A hollow double steel tube high pressure gas pre-tensioned concrete column, Features: It comprises an outer steel pipe (1), a cover plate I (2), an inner steel pipe (4), an air-filled pipe (6), a cover plate II (7) and a sandwich concrete (8); The outer steel pipe (1) is a hollow round pipe with two open ends; a hole for passing the air pipe is provided on the wall of the outer steel pipe (1); one open end of the outer steel pipe (1) is sealed by a cover plate I (2), and the other open end is covered by a cover plate II (7); a casting hole (201) is provided through the plate surface of the cover plate I (2); and an inner steel pipe accommodating hole is provided on the plate surface of the cover plate II (7); The inner steel pipe (4) is a hollow round pipe with one end open and the other end closed; a hole for passing the air pipe is provided on the peripheral wall of the inner steel pipe (4); the inner steel pipe (4) is inserted into the inner cavity of the outer steel pipe (1); the open end of the inner steel pipe (4) abuts against the cover plate I (2); the cover plate I (2) and the inner steel pipe (4) together enclose an air cavity (3); the air cavity (3) is filled with high-pressure gas; the closed end of the inner steel pipe (4) is accommodated in the inner steel pipe accommodation hole and is welded to the cover plate II (7); the outer steel pipe (1), the cover plate I (2), the inner steel pipe (4) and the cover plate II (7) enclose an annular casting space; The annular casting space has a sandwich concrete (8); The inflation tube (6) passes through the outer steel tube (1), the sandwich concrete (8) and the inner steel tube (4) in sequence, connecting the air cavity (3) with the external environment; a sealing valve (5) is provided on the pipeline of the inflation tube (6).

3. A hollow double steel tube high pressure gas pre-tensioned concrete column according to claim 1 or 2, Features: The ratio of the outer diameter to the wall thickness of the inner steel pipe (4) is greater than 20; and the ratio of the outer diameter to the wall thickness of the outer steel pipe (1) is less than 15.

4. A hollow double steel tube high pressure gas pre-tensioned concrete column according to claim 1 or 2, Features: The high-pressure gas is air or an inert gas.

5. A hollow double steel tube high pressure gas pre-tensioned concrete column according to claim 4, Features: The high-pressure gas is nitrogen.

6. A hollow double steel tube high pressure gas pre-tensioned concrete column according to claim 1 or 2, Features: The outer steel pipe (1) is formed by splicing together a number of steel pipe sections; a liner pipe is welded and fixed to the inner sides of the ends of two adjacent steel pipe sections.

7. A hollow double steel tube high pressure gas pre-tensioned concrete column according to claim 1 or 2, Features: A stiffening plate is provided on the inner wall of the outer steel pipe (1); a plurality of concrete self-flowing holes are provided on the plate surface of the stiffening plate.

8. A hollow double steel tube high pressure gas pre-tensioned concrete column according to claim 1 or 2, Features: The sealing valve (5) is a one-way air pressure valve; the sealing valve (5) is connected to the air pressure pump.

9. A construction method for hollow double steel tube high pressure gas pre-tensioned concrete columns according to claim 1, It is characterized in that The following steps are involved: 1) Welding one open end of the inner steel pipe (4) to the surface of the cover plate I (2); 2) Welding the open end of the outer steel pipe (1) to the cover plate II (7); 3) inserting the inner steel pipe (4) into the outer steel pipe (1); welding the outer steel pipe (1) to the cover plate I (2); welding the inner steel pipe (4) to the cover plate II (7); 4) embedding the cover plate III (9) into the small diameter section of the inner steel pipe receiving hole; welding the cover plate III (9) and the cover plate II (7) together; 5) arranging an air-filling pipe (6); the air-filling pipe (6) passes through the air-filling pipe through holes on the outer steel pipe (1) and the inner steel pipe (4) in sequence; and welding the air-filling pipe (6) to the outer steel pipe (1); 6) pumping concrete into the annular pouring space through the pouring hole (201) and vibrating the concrete; 7) Open the sealing valve (5) to inflate the air chamber (3) to a specified pressure, and then close the sealing valve (5).

10. A construction method for hollow double steel tube high pressure gas pre-tensioned concrete columns according to claim 2, It is characterized in that The following steps are involved: 1) Welding the open end of the inner steel pipe (4) to the plate surface of the cover plate I (2); 2) Welding the open end of the outer steel pipe (1) to the cover plate II (7); 3) inserting the inner steel pipe (4) into the outer steel pipe (1); welding the outer steel pipe (1) to the cover plate I (2); welding the inner steel pipe (4) to the cover plate II (7); 4) arranging an air-filling pipe (6); the air-filling pipe (6) passes through the air-filling pipe through holes on the outer steel pipe (1) and the inner steel pipe (4) in sequence; and welding the air-filling pipe (6) to the outer steel pipe (1); 5) pumping concrete into the annular pouring space through the pouring hole (201) and vibrating the concrete; 6) Open the sealing valve (5) to inflate the air chamber (3) to a specified pressure, and then close the sealing valve (5).