SAGD capacity-increasing and cavity-expanding process method

Through the downhole temperature measurement system and fine control of steam injection, the problems of slow development of steam chambers and uneven reservoirs in SAGD mode were solved, efficient expansion of steam chambers and thermal energy utilization were achieved, and single well production and production efficiency were improved.

CN118815434APending Publication Date: 2024-10-22PETROCHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310422330.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-19
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

Under the conventional SAGD mode, the steam chamber develops slowly, and the poor physical properties and strong heterogeneity of the reservoir lead to uneven development of the steam chamber, which is prone to steam channeling. There is also a lack of effective monitoring means that affects the production of oil wells in the block.

Method used

Through the downhole temperature measurement system and fine control of steam injection, we can determine the reasonable steam injection pressure and temperature, monitor the changes in downhole temperature and pressure in real time, adjust the steam injection method and well soaking time, ensure the saturation and safety of the steam chamber, and avoid channeling. By extending the duration of oil blowouts to increase production.

Benefits of technology

It effectively improves the heat utilization rate of steam, increases the degree of formation utilization, increases single well production, reduces steam wellbore heat loss, reduces the frequency of steam channeling, expands the scale of steam chamber development, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118815434A_ABST
    Figure CN118815434A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of super heavy oil block production in an SAGD mode, in particular to an SAGD capacity-increasing and cavity-expanding process method, which comprises the following steps of: a preparation stage before measures: firstly, determining the capacity-increasing and cavity-expanding implementation steam injection pressure, and determining the well cementation quality of an oil well; in the steam injection stage, a steam injection well is adopted for steam injection, a production well is closed, and the use degree of a horizontal section is judged according to the horizontal section temperature recorded by an underground temperature measurement system; in the soaking stage, reasonable soaking time is set according to the steam injection amount and the injection pressure of each measure well; and in the well opening stage, whether the measure is effective or not is judged, and the oil well blowout duration is regulated and prolonged. By means of the underground temperature measurement technology and the steam injection fine regulation and control means of the SAGD well group, the heat utilization rate of the steam can be improved, the stratum production degree is effectively improved, and the single well yield is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of super-heavy oil block production in a SAGD mode, and is a process method for increasing the volume and expanding the cavity of a SAGD. Background Art

[0002] Steam Assisted Gravity Drainage (SAGD) is an oil recovery method that injects steam into the reservoir from a vertical well or a horizontal well above the horizontal production well near the bottom of the reservoir, and the heated crude oil and steam condensate are produced from the horizontal well at the bottom of the reservoir. Due to its dual horizontal well development method, SAGD oil recovery technology has high production, high oil-gas ratio, oil recovery rate and ultimate recovery rate that are much higher than conventional super-heavy oil development methods.

[0003] Conventional SAGD has the following problems: 1. Conventional SAGD can only expand the steam chamber development through continuous accumulation during the production process, and the steam chamber development is slow; 2. Conventional SAGD is used for reservoirs with poor physical properties, strong heterogeneity, and uneven horizontal production. Rapidly increasing the development of steam chambers can easily cause steam channeling and well interference. 3. Conventional SAGD has few effective means for oil wells with extensive interlayer development, small steam chamber development, and frequent steam channeling. It can only control the steam injection intensity and slow down the steam chamber development speed. 4. Increasing the development of steam chambers in conventional heavy oil can only increase the steam injection pressure. Due to the lack of effective monitoring methods, it is very easy to cause inter-layer or inter-well cross-talk, affecting the production of oil wells in the block.

[0004] At present, the geological reserves of super-heavy oil SAGD steam injection reservoirs in the Fengcheng Oilfield operating area are 14.47 million tons (accounting for 35.4%). After nearly 3 to 9 years of development and adjustment, the development effect is still poor, with an average utilization rate of only 14.97%. It is still necessary to explore efficient development policies. Summary of the invention

[0005] The present invention provides a process method for increasing the capacity and expanding the cavity of SAGD, which overcomes the deficiencies of the above-mentioned prior art and can effectively solve the problems of slow steam cavity development, increased difficulty in production regulation and control, and high difficulty in increasing production in the existing SAGD well group in the later stage of production.

[0006] One of the technical solutions of the present invention is achieved through the following measures: a process method for increasing the capacity and expanding the cavity of SAGD, which is carried out according to the following steps: the first step is the preparation stage before the measure: first, determine the steam injection pressure for increasing the capacity and expanding the cavity, and according to the existing steam injection boiler and pipeline network, it is required to be able to realize separate steam injection in the measure well to ensure the steam injection pressure and injection volume, and then determine the quality of oil well cementing to ensure the safety of the wellbore under high steam injection pressure, and then check whether the steam injection process valves are flexible and easy to use, and there is no valve internal leakage to ensure the quality of steam injection, and finally, check whether the adjacent wells near the measure well are connected; the second step is the steam injection stage: first, use the steam injection well to inject steam, and shut down the production well. As the steam injection time increases, the steam injection pressure at the wellhead of the steam injection well, the steam injection temperature, the casing pressure of the steam injection well, and the boiler pressure should show an upward trend. The steam injection pressure and temperature should be in a one-to-one correspondence according to the saturated temperature-pressure comparison table, and then pass The utilization degree of the horizontal section is judged by the temperature of the horizontal section recorded by the downhole temperature measurement system, and then the saturation degree of the underground steam chamber and whether it is necessary to shut down the well in advance are judged by the wellhead casing pressure, steam injection volume and downhole temperature during the steam injection process. Finally, the changes in downhole temperature and pressure of the adjacent production wells are monitored in real time to determine whether there is a channeling situation when the steam injection pressure is increased; the third step is the well shut-in stage: first, according to the steam injection volume and injection pressure of each measure well, a reasonable well shut-in time is formulated, and then the changes in the wellhead casing pressure and downhole temperature are monitored in real time during the well shut-in process, and whether to open the well in advance is determined according to the changes in the wellhead casing pressure and downhole temperature; the fourth step is the well opening stage: first, after opening the well, the effectiveness of the measure is determined by the wellhead liquid discharge, wellhead pressure and downhole temperature, and then the oil blowout duration is extended by regulation. Finally, when the machine production conditions are met, the machine production mode is restored in time to ensure maximum liquid production.

[0007] The following is a further optimization and / or improvement of one of the above-mentioned technical solutions: In the first step above, when adjacent wells near the measure well are connected, it is necessary to shut down the connected wells, or group the connected wells together and increase the capacity and expand the cavity at the same time.

[0008] In the above second step, boiler pressure>steam injection pressure at the wellhead of the steam injection well>casing pressure of the steam injection well.

[0009] In the above second step, the temperature of the horizontal section recorded by the downhole temperature measurement system is used to judge the specific circumstances of the utilization degree of the horizontal section, including: first, when the temperature at the far end of the horizontal section is significantly lower than the temperature at the front end of the horizontal section, it indicates that the utilization degree of the far end of the horizontal section is low, and the main pipe is used to inject steam from the far end of the horizontal section to improve the utilization degree of the far end of the horizontal section; second, when the temperature at the front end of the horizontal section is significantly higher than the temperature at the far end of the horizontal section, it indicates that the utilization degree of the front end of the horizontal section is low, and the auxiliary pipe is used to inject steam from the near end of the horizontal section to improve the utilization degree of the near end of the horizontal section; third, when the temperature of the horizontal section is relatively stable, the main and auxiliary pipes are used to inject steam simultaneously, and the steam is injected into the well at the maximum steam injection rate to improve the utilization degree of the entire horizontal section.

[0010] In the above third step, the well-stemming time is 1 to 3 days.

[0011] The present invention utilizes the downhole temperature measurement technology and steam injection fine control means possessed by the SAGD well group itself, which can improve the thermal utilization rate of steam, effectively increase the formation production degree, and increase the single well production. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Attached Figure 1 It is a schematic diagram of the underground structure of the steam injection well in the present invention.

[0014] Attached Figure 2 This is a simplified diagram of the downhole structure of the production well in the present invention.

[0015] Attached Figure 1 The codes are: 1 for casing, 2 for oil pipe, 3 for auxiliary pipe, 4 for oil layer, and 5 for downhole screen.

[0016] Attached Figure 2 The codes are: 1 for casing, 2 for oil pipe, 3 for downhole temperature measuring pipe, 4 for auxiliary pipe, 5 for oil pump, 6 for oil layer, and 7 for downhole screen pipe. DETAILED DESCRIPTION

[0017] The present invention is not limited by the following embodiments, and specific implementation methods can be determined based on the technical solution of the present invention and actual conditions.

[0018] The present invention will be further described below in conjunction with embodiments: Embodiment 1: The process method for increasing the capacity and expanding the cavity of SAGD is carried out according to the following steps: The first step is the pre-measure preparation stage: First, determine the steam injection pressure for increasing the capacity and expanding the cavity. According to the existing steam injection boiler and pipeline network, it is required to be able to realize separate steam injection in the measure well to ensure the steam injection pressure and injection volume. Then, determine the quality of oil well cementing to ensure the safety of the wellbore under high steam injection pressure. Then check whether the valves in the steam injection process are flexible and easy to use, and there is no internal leakage of the valve to ensure the quality of steam injection. Finally, check whether there is connectivity between adjacent wells near the measure well. The second step is the steam injection stage: First, use the steam injection well to inject steam, and shut down the production well. As the steam injection time increases, the steam injection pressure at the wellhead of the steam injection well, the steam injection temperature, the casing pressure of the steam injection well, and the boiler pressure should show an upward trend. The steam injection pressure and temperature should be in a one-to-one correspondence according to the saturated temperature-pressure comparison table, and then recorded through the downhole temperature measurement system. The temperature of the horizontal section is used to judge the degree of utilization of the horizontal section. Then, during the steam injection process, the wellhead casing pressure, steam injection volume, and downhole temperature are used to judge the saturation degree of the underground steam chamber and whether it is necessary to shut down the well in advance. Finally, the changes in downhole temperature and pressure of the adjacent production wells are monitored in real time to judge whether there is a channeling situation when the steam injection pressure is increased; the third step is the well shut-in stage: first, according to the steam injection volume and injection pressure of each measure well, a reasonable well shut-in time is formulated, and then the changes in the wellhead casing pressure and downhole temperature are monitored in real time during the well shut-in process, and whether to open the well in advance is judged according to the changes in the wellhead casing pressure and downhole temperature; the fourth step is the well opening stage: first, after opening the well, the effectiveness of the measure is judged by the wellhead liquid discharge, wellhead pressure, and downhole temperature, and then the oil blowout duration is extended by regulation. Finally, when the machine production conditions are met, the machine production mode is restored in time to ensure maximum liquid production.

[0019] The present invention is applicable to the production of super-heavy oil (heavy oil) blocks under the SAGD mode, and can significantly improve the production degree of oil reservoirs with poor reservoir properties, strong heterogeneity, and uneven horizontal section production. For oil wells with extensive interlayer development, small-scale steam chamber development, and frequent steam channeling, the steam chamber development can be effectively expanded to improve the production degree of the horizontal section. For wells with low single-well production levels and poor production benefits, the formation production degree can be effectively improved, and the single-well production can be increased.

[0020] Embodiment 2: As an optimization of the above embodiment, in the first step, when adjacent wells near the measure well are connected, it is necessary to shut down the connected wells, or group the connected wells into a group and increase the capacity and expand the cavity at the same time.

[0021] Embodiment 3: As an optimization of the above embodiment, in the second step, boiler pressure>steam injection pressure at the wellhead of the steam injection well>casing pressure of the steam injection well.

[0022] Embodiment 4: As an optimization of the above embodiment, in the second step, the temperature of the horizontal section recorded by the downhole temperature measurement system is used to judge the specific conditions of the utilization degree of the horizontal section, including: first, when the temperature at the far end of the horizontal section is significantly lower than the temperature at the front end of the horizontal section, it indicates that the utilization degree of the far end of the horizontal section is low, and the main pipe is used to inject steam from the far end of the horizontal section to improve the utilization degree of the far end of the horizontal section; second, when the temperature at the front end of the horizontal section is significantly higher than the temperature at the far end of the horizontal section, it indicates that the utilization degree of the front end of the horizontal section is low, and the auxiliary pipe is used to inject steam from the proximal end of the horizontal section to improve the utilization degree of the proximal end of the horizontal section; third, when the temperature of the horizontal section is relatively stable, the main and auxiliary pipes are used to inject steam simultaneously, and the steam is injected into the downhole at the maximum steam injection rate to improve the utilization degree of the entire horizontal section.

[0023] Embodiment 5: As an optimization of the above embodiment, in the third step, the soaking time is 1 day to 3 days.

[0024] Example 6: Taking Well I as an example, the process method of SAGD capacity expansion and cavity expansion is carried out according to the following steps: Step 1, pre-measure preparation stage: Determine the steam injection pressure for capacity expansion and cavity expansion. According to the existing steam injection boiler and pipeline network, it is required to realize the steam injection of the measure well alone to ensure the steam injection pressure and steam injection volume. Determine the quality of oil well cementing to ensure the safety of the wellbore under high steam injection pressure, especially the wellhead casing must be in an open and unobstructed state for the horn valve. Check that the valves in the steam injection process are flexible and easy to use, and there is no valve internal leakage to ensure the quality of steam injection. Check whether there is a connection between the adjacent wells near the measure well. If there is a connection, the connected well needs to be shut down and coordinated with the measures, or the connected wells need to be grouped into a group and the capacity expansion and cavity expansion measures are carried out at the same time. Step 2, steam injection stage: As the steam injection time increases, the steam injection pressure, steam injection temperature, casing pressure, and boiler pressure at the wellhead of Well I should show an upward trend, and the steam injection pressure and temperature should be in a one-to-one correspondence according to the saturated temperature pressure comparison table. And the boiler pressure> steam injection pressure at the wellhead of the steam injection well and casing pressure of the steam injection well of Well I. The utilization degree of the horizontal section is judged by the temperature of the horizontal section recorded by the underground temperature measurement system. If the temperature at the far end of the horizontal section is obviously higher than that at the front end of the horizontal section, it means that the utilization degree of the far end of the horizontal section is low. The main pipe can be used to inject steam from the far end of the horizontal section to improve the utilization degree of the far end. Otherwise, the auxiliary pipe can be used to inject steam from the near end of the horizontal section to improve the utilization degree of the near end. If the temperature of the horizontal section is relatively stable, the main and auxiliary pipes can be used to inject steam at the same time to improve the utilization degree of the entire horizontal section. Steam is injected into the well at the maximum steam injection speed to minimize the loss of steam energy during the injection process and achieve the purpose of increasing the volume and expanding the cavity. During the steam injection process, the saturation degree of the underground steam cavity is judged by the wellhead casing pressure, steam injection volume, and underground temperature, and whether the well needs to be stewed in advance. During the steam injection stage, the changes in the underground temperature and pressure of the adjacent production wells should be monitored in real time to determine whether there is a channeling situation when the steam injection pressure is increased. During the whole process of steam injection, attention should be paid to whether the wellhead horn valve discharges steam and liquid. Under the rapid changes in temperature and pressure, the underground cement ring is very likely to be channeled, especially for the well group with poor cementing quality. The third step is the well-holding stage: a reasonable well-holding time is set according to the amount of steam injected and the injection pressure of each measure well. According to continuous experiments and optimization on site, the well-holding time is maintained at 1 to 3 days. During the well-holding process, the changes in the wellhead casing pressure and downhole temperature are monitored in real time, and whether to open the well in advance is determined based on the changes. The fourth step is the well-opening stage: after the well is opened, the effectiveness of the measure is determined by the wellhead liquid discharge, wellhead pressure, and downhole temperature. The self-flowing time of the oil well is extended through reasonable production system regulation. When the machine-production conditions are met, the machine-production mode is restored in time to ensure maximum liquid production.

[0025] In the present invention, when high-speed steam injection is performed, the thermal utilization rate of steam can be improved. Different from conventional SAGD, the SAGD capacity expansion and cavity expansion process of the present invention adopts a production well shut-down and a high-speed steam injection development mode of the main and auxiliary pipes of the steam injection well, which reduces the frequency of steam channeling in the production well, reduces the heat loss of the steam wellbore, improves the steam dryness at the bottom of the well, and improves the thermal utilization rate. Among them, the schematic diagram of the downhole structure of the steam injection well is as follows Figure 1 As shown, in Figure 1 In the figure, the entire downhole structure of the steam injection well is lowered into the oil layer 4, the lower part of the casing 1 is located in the horizontal section of the oil layer and the well is completed by the downhole screen pipe 5, and the steam for steam injection is injected into the formation from the oil pipe 2 or the auxiliary pipe 3, wherein the injected steam enters the formation from the oil pipe 2 and is injected from the front section of the horizontal section, and the effect is mainly on the front section of the horizontal section, and the injected steam enters the formation from the auxiliary pipe 3 and is injected from the end section of the horizontal section, and the effect is mainly on the rear section of the horizontal section.

[0026] The schematic diagram of the underground structure of the production well is as follows: Figure 2 As shown, in Figure 2 In the process, the entire downhole structure of the production well is lowered into the oil layer 6, the lower part of the casing 1 is located in the horizontal section of the oil layer and is completed by the screen pipe 7, the oil produced in the horizontal section of the formation is brought out of the ground by the oil pump 5, and can also be injected into the steam circulation by the auxiliary pipe 4, wherein the downhole temperature measuring tube 3 can monitor the temperature of the entire horizontal section in real time, so as to judge the utilization degree of the horizontal section, if the temperature of the front section is high and the temperature of the rear section is low, it proves that the utilization degree of the rear section is low, and the rear section steam injection can be used in the steam injection well to improve the utilization degree of the rear section oil layer.

[0027] Conventional steam throughput cannot accurately grasp the amount of injected steam and the temperature and pressure of injected steam. The process method of SAGD volume expansion and cavity expansion of the present invention is different from conventional heavy oil steam throughput production. In the process method of SAGD volume expansion and cavity expansion of the present invention, relying on the downhole temperature measurement system of SAGD, the injection degree and injection intensity can be effectively and finely regulated to ensure the effectiveness and reliability of cavity expansion. At the same time, continuous high-pressure displacement increases the steam sweep range, mobilizes difficult-to-mobilize reservoirs, and improves the degree of mobilization. Moreover, periodic strong injection and strong production expand the scale of the steam cavity. Through continuous injection and production, the reservoir above the steam injection well is accelerated to make room for steam cavity expansion. Therefore, by injecting steam at a high speed to reduce heat loss during steam injection, improve the steam dryness at the bottom of the well, and achieve efficient utilization of thermal energy, the body stress of the underground rock formation changes under the action of high temperature and high pressure, changing its porosity and permeability, so as to achieve the purpose of increasing the amount of steam injection and volume expansion.

[0028] In summary, the present invention utilizes the downhole temperature measurement technology and steam injection fine control means inherent in the SAGD well group itself to improve the thermal utilization rate of steam, effectively increase the formation production degree, and increase the single well production.

[0029] The above technical features constitute the embodiments of the present invention, which have strong adaptability and implementation effect. Non-essential technical features can be added or reduced according to actual needs to meet the requirements of different situations.

Claims

1. A process for increasing the capacity and expanding the cavity of SAGD, characterized in that Follow the steps below: Step 1, pre-measure preparation stage: First, determine the steam injection pressure for increasing the capacity and expanding the cavity. According to the existing steam injection boiler and pipeline network, it is required to be able to inject steam into the measure well alone to ensure the steam injection pressure and injection volume. Then, determine the quality of oil well cementing to ensure the safety of the wellbore under high steam injection pressure. Then check whether the steam injection process valves are flexible and easy to use, and there is no internal leakage of the valve to ensure the quality of steam injection. Finally, check whether the adjacent wells near the measure well are connected. Step 2, steam injection stage: First, use the steam injection well to inject steam, and shut down the production well. With the increase of steam injection time, the steam injection pressure at the wellhead of the steam injection well, the steam injection temperature, the casing pressure of the steam injection well, and the boiler pressure should show an upward trend. The steam injection pressure and temperature The degree should be in one-to-one correspondence according to the saturation temperature and pressure comparison table, and then the horizontal section temperature recorded by the downhole temperature measurement system is used to determine the degree of use of the horizontal section. Then, during the steam injection process, the wellhead casing pressure, steam injection volume, and downhole temperature are used to determine the saturation degree of the underground steam chamber and whether it is necessary to shut down the well in advance. Finally, the downhole temperature and pressure changes of the adjacent production wells should be monitored in real time to determine whether there is a channeling situation when the steam injection pressure is increased; the third step is the well shut-in stage: first, according to the steam injection volume and injection pressure of each measure well, a reasonable well shut-in time is formulated, and then during the well shut-in process, the changes in the wellhead casing pressure and downhole temperature are monitored in real time, and whether the well should be opened in advance is determined according to the changes in the wellhead casing pressure and downhole temperature; The fourth step is the well opening stage: first, after the well is opened, the effectiveness of the measures is judged by the wellhead liquid discharge, wellhead pressure, and downhole temperature, and then the oil blowout duration is extended by regulation. Finally, when the conditions for machine production are met, the machine production mode is restored in time to ensure maximum liquid production.

2. The SAGD capacity expansion and cavity expansion process according to claim 1 is characterized in that In the first step, when adjacent wells near the measure well are connected, it is necessary to shut down the connected wells or group the connected wells together and increase the capacity and expand the cavity at the same time.

3. The SAGD capacity expansion and cavity expansion process according to claim 1 or 2, characterized in that In the second step, boiler pressure > steam injection pressure at the wellhead of the steam injection well > casing pressure of the steam injection well.

4. The SAGD capacity expansion and cavity expansion process according to claim 1 or 2, characterized in that In the second step, the horizontal section temperature recorded by the downhole temperature measurement system is used to judge the specific conditions of the utilization degree of the horizontal section, including: first, when the temperature at the far end of the horizontal section is significantly lower than the temperature at the front end of the horizontal section, it indicates that the utilization degree of the far end of the horizontal section is low, and the main pipe is used to inject steam from the far end of the horizontal section to improve the utilization degree of the far end of the horizontal section; second, when the temperature at the front end of the horizontal section is significantly higher than the temperature at the far end of the horizontal section, it indicates that the utilization degree of the front end of the horizontal section is low, and the auxiliary pipe is used to inject steam from the near end of the horizontal section to improve the utilization degree of the near end of the horizontal section; third, when the temperature of the horizontal section is relatively stable, the main and auxiliary pipes are used to inject steam simultaneously, and the steam is injected into the well at the maximum steam injection rate to improve the utilization degree of the entire horizontal section.

5. The SAGD capacity expansion and cavity expansion process according to claim 3 is characterized in that In the second step, the horizontal section temperature recorded by the downhole temperature measurement system is used to judge the specific conditions of the utilization degree of the horizontal section, including: first, when the temperature at the far end of the horizontal section is significantly lower than the temperature at the front end of the horizontal section, it indicates that the utilization degree of the far end of the horizontal section is low, and the main pipe is used to inject steam from the far end of the horizontal section to improve the utilization degree of the far end of the horizontal section; second, when the temperature at the front end of the horizontal section is significantly higher than the temperature at the far end of the horizontal section, it indicates that the utilization degree of the front end of the horizontal section is low, and the auxiliary pipe is used to inject steam from the near end of the horizontal section to improve the utilization degree of the near end of the horizontal section; third, when the temperature of the horizontal section is relatively stable, the main and auxiliary pipes are used to inject steam simultaneously, and the steam is injected into the well at the maximum steam injection rate to improve the utilization degree of the entire horizontal section.

6. The SAGD capacity expansion and cavity expansion process according to claim 1, 2 or 5, characterized in that In the third step, the well is stewed for 1 to 3 days.

7. The SAGD capacity expansion and cavity expansion process according to claim 3 is characterized in that In the third step, the well is stewed for 1 to 3 days.

8. The SAGD capacity expansion and cavity expansion process according to claim 4 is characterized in that In the third step, the well is stewed for 1 to 3 days.