Method for quickly blow-drying stator bar of water-cooled generator
By using the rubber air inlet pipe, dryer and pressure gauge in the stator bar of the water-cooled generator to quickly drain the water in the pipeline, the problem that the stator bar cannot meet the pressure leakage value test is solved, and maintenance is shortened. It shortens the construction period and slows down corrosion, avoiding the risk of high-cost modifications.
Patent Information
- Application Number
- CN202410952176.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-10-22
AI Technical Summary
The stator bar water collection pipe of the water-cooled generator is dead grounded, which makes it unable to meet the DC withstand voltage leakage value test, and the modification cost is high and the risk is high.
Using a quick drying method, the fixed cold water inlet and outlet pipes are connected to the rubber air inlet pipe, dryer, filter and pressure gauge, and multiple valves are controlled to drain the pipeline moisture to ensure that the stator coil is dry and meets the pressure leakage value test.
It shortens the generator maintenance period, keeps the stator bar dry, slows down the corrosion of the inner wall of the bar, and avoids a high-cost and risky transformation process.
Smart Images

Figure CN118826408A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of generator stator wire rod drying, in particular to a method for quickly drying a water-cooled generator stator wire rod. Background Art
[0002] A water-cooled generator is a generator that uses water to cool the inside of the conductor. Compared with traditional air cooling or hydrogen cooling, this cooling method has higher cooling efficiency and can significantly increase the current allowed to pass through the conductor per unit cross-section, thereby reducing the size of the generator. The main advantage of a water-cooled generator is its efficient cooling capacity, which can extend the service life of the winding insulation, reduce insulation system breakdown accidents, and allow for stronger short-term overload capacity. These characteristics make water-cooled generators widely used in large generators.
[0003] At present, the stator wire bar water pipe of the water-cooled generator is dead grounded. The original stator wire bar is only naturally drained, and the stator coil insulation cannot meet the requirements of the DC withstand voltage leakage value test, so it is impossible to determine whether the generator stator coil has insulation defects. If the method of "renovating the dead grounding of the stator wire bar water pipe of the water-cooled generator" is adopted, all water pipes need to be replaced, and the estimated cost is about 1 million. Not only is the cost of the renovation high, but the renovation process is also likely to bring uncontrollable risks to the equipment. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a method for quickly drying the stator wire rods of a water-cooled generator, which can drain the residual moisture in the generator pipeline, so that the stator coils of the water-cooled generator meet the DC withstand voltage leakage value test conditions, greatly shorten the generator maintenance period, and keep the stator wire rods dry, which can effectively solve the problems in the background technology.
[0005] To achieve the above-mentioned purpose, the technical scheme adopted by the present invention is: a method for quickly drying the stator wire rods of a water-cooled generator, the stator wire rods of a water-cooled generator used in the quick drying system comprises a cooling water inlet pipe connected to the outlet water collecting ring of the generator, a cooling water outlet pipe connected to the inlet water collecting ring of the generator, two drain pipes at the top of the generator are respectively fixed with a first drain pipe valve and a second drain pipe valve, a balancing pipe is connected between the cooling water inlet pipe and the cooling water outlet pipe, a first balancing pipe valve and a second balancing pipe valve are installed on the balancing pipe, a rubber air inlet pipe is connected to the balancing pipe, a pressure gauge is installed at one end of the rubber air inlet pipe close to the balancing pipe, a first air inlet pipe valve is installed between the rubber air inlet pipe and the balancing pipe, a pressure gauge valve is installed between the pressure gauge and the rubber air inlet pipe, a dryer and a filter are sequentially installed at one end of the rubber air inlet pipe away from the balancing pipe, and a second air inlet pipe valve is fixed at the air inlet end of the filter;
[0006] The ends of the fixed cooling water outlet pipe and the fixed cooling water inlet pipe away from the generator are both connected to a drain pipe, a third drain pipe valve is fixed on the drain pipe connected to the fixed cooling water inlet pipe, a fourth drain pipe valve is fixed on the drain pipe connected to the fixed cooling water outlet pipe, and the ends of the fixed cooling water inlet pipe and the fixed cooling water outlet pipe away from the drain pipe are respectively fixed with a fixed cooling water inlet pipe valve and a fixed cooling water outlet pipe valve;
[0007] The method for rapid drying comprises the following steps: S1, closing the cold water inlet valve and the cold water outlet valve, and opening the first drain pipe valve, the second drain pipe valve, the third drain pipe valve, and the fourth drain pipe valve to drain the cold water;
[0008] S2, first hang one end of the rubber inlet pipe in the air, open the dryer, filter and the second inlet pipe valve, purge the rubber inlet pipe until the rubber inlet pipe outlet gas is pure, close the second inlet pipe valve, and connect the suspended end of the rubber inlet pipe to the first inlet pipe valve;
[0009] S3, close the first drain pipe valve, the second drain pipe valve, the third drain pipe valve, the fourth drain pipe valve and the first balance pipe valve, and confirm that the second balance pipe valve is in an open state;
[0010] S4, open the second air inlet pipe valve, the first air inlet pipe valve and the pressure gauge valve in sequence, and pass the dried instrument air into the stator wire rods;
[0011] S5. Open the first balance pipe valve and pass the dried instrument gas into the stator wire rod again until no water mist appears in the first drain pipe valve, the second drain pipe valve, the third drain pipe valve, and the fourth drain pipe valve.
[0012] Preferably, the cooling water inlet pipe and the cooling water outlet pipe are both located at the bottom of the generator, and the first drain pipe valve and the second drain pipe valve are located at the top of the generator.
[0013] Preferably, the pressure gauge has a range of 0-1 MPa and a scale of 0.05 MPa.
[0014] Preferably, in step S4, the dried instrument gas is passed into the interior of the stator wire rod while observing the pressure change in the pressure gauge. When the pressure value of the pressure gauge is 0.3 MPa, the first drain pipe valve, the second drain pipe valve, the third drain pipe valve and the fourth drain pipe valve are opened in sequence to exhaust the gas until the pressure drops to 0.1 MPa and then closed.
[0015] Preferably, after step S5, the insulation of the three-phase windings of the generator stator to ground is measured respectively until the insulation of the three phases to ground is greater than 1 GΩ, and the three-phase insulation deviation is not greater than 100%, and the absorption ratio is greater than 1.3. If the insulation does not meet the requirements, continue the operation of steps S3 and S4.
[0016] Preferably, after the three-phase insulation of the stator winding of the generator meets the requirements, the second air inlet pipe valve of the instrument gas is closed, the dryer is shut down, the instrument gas in the stator rod is emptied, and then all valves are checked and closed.
[0017] Compared with the prior art, the present invention provides a method for quickly drying the stator wire rods of a water-cooled generator, which has the following beneficial effects:
[0018] The present invention adds a rubber air inlet pipe, a dryer, a filter and a pressure gauge to the original generator pipeline, so as to pass the dried instrument air into the stator wire rod. Combined with the coordinated control among the newly added third exhaust pipe valve, the fourth exhaust pipe valve, the first air inlet pipe valve and the pressure gauge valve, it is helpful to exhaust the residual moisture in the generator pipeline, so that the stator coil of the water-cooled generator meets the DC withstand voltage leakage value test conditions, greatly shortens the generator maintenance period, and can also keep the stator wire rod dry, slowing down the rust of the inner wall of the wire rod. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the pipeline connection of the improved generator of the present invention;
[0020] Figure 2 This is a schematic diagram of the piping connection of an existing generator.
[0021] In the figure:
[0022] 1 generator, 2 outlet water collecting ring, 3 inlet water collecting ring, 4 cold water inlet pipe, 5 cold water outlet pipe, 6 balance pipe, 7 dryer, 8 filter, 9 pressure gauge, 10 cold water inlet pipe valve, 11 cold water outlet pipe valve, 12 first drain pipe valve, 13 second drain pipe valve, 14 first balance pipe valve, 15 second balance pipe valve, 16 first air intake pipe valve, 17 pressure gauge valve, 18 third drain pipe valve, 19 fourth drain pipe valve, 20 second air intake pipe valve, 21 rubber air intake pipe. DETAILED DESCRIPTION
[0023] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.
[0024] like Figure 2 As shown, the outlet water collecting ring 2 of the existing generator 1 is connected with the fixed cooling water inlet pipe 4, the inlet water collecting ring 3 of the generator 1 is connected with the fixed cooling water outlet pipe 5, the two drain pipes at the top of the generator 1 are respectively fixed with the first drain pipe valve 12 and the second drain pipe valve 13, the fixed cooling water inlet pipe 4 and the fixed cooling water outlet pipe 5 are connected with a balance pipe 6, the balance pipe 6 is installed with the first balance pipe valve 14 and the second balance pipe valve 15, and the fixed cooling water inlet pipe 4 and the fixed cooling water outlet pipe 5 are respectively fixed with the fixed cooling water inlet pipe valve 10 and the fixed cooling water outlet pipe valve 11 at one end away from the drain pipe;
[0025] like Figure 1 As shown, on the basis of the above structure, the newly added structure of the present invention includes: the balance pipe 6 located between the first balance pipe valve 14 and the second balance pipe valve 15 is connected with a rubber air intake pipe 21, a pressure gauge 9 is installed at one end of the rubber air intake pipe 21 close to the balance pipe 6, a first air intake pipe valve 16 is installed between the rubber air intake pipe 21 and the balance pipe 6, a pressure gauge valve 17 is installed between the pressure gauge 9 and the rubber air intake pipe 21, a dryer 7 and a filter 8 are installed in sequence at one end of the rubber air intake pipe 21 away from the balance pipe 6, and a second air intake pipe valve 20 is fixed to the air intake end of the filter 8;
[0026] Drain pipes are connected to the ends of the cooling water outlet pipe 5 and the cooling water inlet pipe 4 away from the generator 1. A third drain pipe valve 18 is fixed on the drain pipe connected to the cooling water inlet pipe 4, and a fourth drain pipe valve 19 is fixed on the drain pipe connected to the cooling water outlet pipe 5.
[0027] Based on the above structure, the present invention provides a method for quickly drying stator wire rods of a water-cooled generator, and the specific steps are as follows:
[0028] Step 1: shut down the cooling water system of the generator 1, close the cooling water inlet valve 10 and the cooling water outlet valve 11, and open the first drain pipe valve 12, the second drain pipe valve 13, the third drain pipe valve 18, and the fourth drain pipe valve 19 to drain the cooling water.
[0029] Step 2: Connect the first air intake pipe valve 16 and the pressure gauge valve 17 to the balance pipe 6, and install a pressure gauge 9 (with a range of 0-1MPa and a scale of 0.05MPa) at the pressure gauge valve 17.
[0030] Step 3: Connect one end of the rubber air inlet pipe 21 to the air outlet of the dryer 7 and leave the other end suspended in the air. Then install the dryer 7 and the filter 8, open the second air inlet pipe valve 20, and use the instrument air to purge the rubber air inlet pipe 21 until the air outlet of the rubber air inlet pipe 21 is pure.
[0031] Step 4: Close the second air intake valve 20 for the air intake of the controller, and connect one end of the suspended rubber air intake pipe 21 to the first air intake valve 16. The preparation work is now complete.
[0032] Step 5: Close the first drain pipe valve 12, the second drain pipe valve 13, the third drain pipe valve 18, the fourth drain pipe valve 19 and the first balance pipe valve 14 in the cooling water system, and confirm that the second balance pipe valve 15 is in the open state.
[0033] Step six, open the second air inlet pipe valve 20, the first air inlet pipe valve 16 and the pressure gauge valve 17 of the instrument air intake in turn, pass the dried instrument air into the stator wire rod, observe the pressure gauge 9 to 0.3MPa, immediately open the first exhaust pipe valve 12 to exhaust, when the pressure drops to 0.1MPa, close the first exhaust pipe valve 12 again, repeat the above operation until there is no water mist in the first exhaust pipe valve 12, then close the first exhaust pipe valve 12.
[0034] Continue to maintain the stamping. When the pressure gauge 9 reaches 0.3MPa, immediately open the second drain pipe valve 13. When the pressure drops to 0.1MPa, close the second drain pipe valve 13 again. Repeat the above operation until no water mist appears at the second drain pipe valve 13, and then close the second drain pipe valve 13.
[0035] Continue to maintain the stamping. When the pressure gauge reaches 0.3MPa, immediately open the third drain pipe valve 18. When the pressure drops to 0.1MPa, close the third drain pipe valve 18 again. Repeat the above operation until no water mist appears at the third drain pipe valve 18, and then close the third drain pipe valve 18.
[0036] Continue to maintain the punching pressure. When the pressure gauge 9 reaches 0.3MPa, immediately open the fourth drain pipe valve 19. When the pressure drops to 0.1MPa, close the fourth drain pipe valve 19 again. Repeat the above operation until no water mist appears at the fourth drain pipe valve 19. Close the second balance pipe valve 15 first, and then close the fourth drain pipe valve 19.
[0037] Step seven, open the first balance pipe valve 14, and pass the dried instrument gas into the stator wire rod again. When the pressure gauge 9 reaches 0.3MPa, immediately open the first drain pipe valve 12 to exhaust. When the pressure drops to 0.1MPa, close the first drain pipe valve 12 again. Repeat the above operation until there is no water mist in the first drain pipe valve 12, and then close the first drain pipe valve 12.
[0038] Continue to maintain the stamping. When the pressure gauge 9 reaches 0.3MPa, immediately open the second drain pipe valve 13. When the pressure drops to 0.1MPa, close the second drain pipe valve 13 again. Repeat the above operation until no water mist appears at the second drain pipe valve 13, and then close the second drain pipe valve 13.
[0039] Continue to maintain the stamping. When the pressure gauge reaches 0.3MPa, immediately open the third drain pipe valve 18. When the pressure drops to 0.1MPa, close the third drain pipe valve 18 again. Repeat the above operation until no water mist appears at the third drain pipe valve 18, and then close the third drain pipe valve 18.
[0040] Continue to maintain the punching, when the pressure gauge 9 reaches 0.3MPa, immediately open the fourth drain pipe valve 19, when the pressure drops to 0.1MPa, close the fourth drain pipe valve 19 again, repeat the above operation until no water mist appears in the fourth drain pipe valve 19. First close the first balance pipe valve 14, and then close the fourth drain pipe valve 19.
[0041] Step 8: Measure the insulation of the three-phase stator winding of the generator 1 to the ground respectively until the insulation of the three phases to the ground is greater than 1GΩ, and the three-phase insulation deviation is not greater than 100%, and the absorption ratio is greater than 1.3. If the insulation does not meet the requirements, continue the operations of steps 5 and 6.
[0042] Step 9: After the three-phase insulation of the stator winding of the generator 1 meets the requirements, close the second air inlet pipe valve 20, stop the dryer, and after the instrument air in the stator rod is emptied, check and close the valves on all the exhaust pipes.
[0043] The above method can quickly make the stator coil of the water-cooled generator meet the DC withstand voltage leakage value test conditions, greatly shorten the generator maintenance period, and keep the stator wire rod dry, slowing down the corrosion of the inner wall of the wire rod.
[0044] At the same time, it can also avoid the high cost and risk problems caused by the method of "modifying the dead grounding of the stator wire bar manifold of the water-cooled generator", killing two birds with one stone.
[0045] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. A method for quickly drying stator wire rods of a water-cooled generator, characterized in that: The following steps are involved: S1, close the cold water inlet valve (10) and the cold water outlet valve (11), and open the first drain pipe valve (12), the second drain pipe valve (13), the third drain pipe valve (18), and the fourth drain pipe valve (19) to drain the cold water; S2, firstly, suspend one end of the rubber air inlet pipe (21), open the dryer (7), the filter (8) and the second air inlet pipe valve (20), purge the rubber air inlet pipe (21) until the air out of the rubber air inlet pipe (21) is pure, close the second air inlet pipe valve (20), and connect the suspended end of the rubber air inlet pipe (21) to the first air inlet pipe valve (16); S3, close the first drain pipe valve (12), the second drain pipe valve (13), the third drain pipe valve (18), the fourth drain pipe valve (19) and the first balance pipe valve (14), and confirm that the second balance pipe valve (15) is in an open state; S4, opening the second air inlet pipe valve (20), the first air inlet pipe valve (16) and the pressure gauge valve (17) in sequence, and passing the dried instrument air into the stator wire rods; S5. Open the first balance pipe valve (14) and pass the dried instrument gas into the stator wire rod again until no water mist appears in the first drain pipe valve (12), the second drain pipe valve (13), the third drain pipe valve (18) and the fourth drain pipe valve (19).
2. The method for quickly drying the stator wire rods of a water-cooled generator according to claim 1, characterized in that: The cooling water inlet pipe (4) and the cooling water outlet pipe (5) are both located at the bottom of the generator (1), and the first drain pipe valve (12) and the second drain pipe valve (13) are located at the top of the generator (1).
3. The method for quickly drying stator wire rods of a water-cooled generator according to claim 1, characterized in that: The pressure gauge (9) has a measuring range of 0-1 MPa and a scale of 0.05 MPa.
4. The method for quickly drying stator wire rods of a water-cooled generator according to claim 1, characterized in that: In step S4, the dried instrument air is introduced into the interior of the stator wire rod while observing the pressure change in the pressure gauge (9). When the pressure value of the pressure gauge (9) is 0.3 MPa, the first drain pipe valve (12), the second drain pipe valve (13), the third drain pipe valve (18) and the fourth drain pipe valve (19) are opened in sequence to exhaust air until the pressure drops to 0.1 MPa and then closed.
5. The method for quickly drying stator wire rods of a water-cooled generator according to claim 1, characterized in that: After step S5, measure the insulation of the three-phase windings of the generator stator to ground respectively until the insulation of the three phases to ground is greater than 1GΩ, and the three-phase insulation deviation is not greater than 100%, and the absorption ratio is greater than 1.
3. If the insulation does not meet the requirements, continue the operation of steps S3 and S4.
6. A method for rapidly drying stator wire rods of a water-cooled generator according to claim 5, characterized in that: After the three-phase insulation of the stator winding of the generator (1) meets the requirements, the second air inlet pipe valve (20) of the instrument air is closed, the dryer (7) is stopped, the instrument air in the stator wire rod is emptied, and then all valves are checked and closed.