Control method, control device, water treatment equipment and storage medium
By first operating the cooling water in the water treatment equipment, obtaining the cold water and then making ice, the problem of too long time to obtain ice particles after the ice making function is activated is solved, which improves the user experience and achieves more efficient ice production.
Patent Information
- Application Number
- CN202410950823.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-10-25
AI Technical Summary
After the ice-making and drinking water equipment turns on the ice-making function, it takes a long time to obtain normally usable ice particles for the first time, which affects the user experience.
The water treatment equipment is controlled to first perform refrigeration water operation to obtain cold water, and then use the cold water to make ice, thereby shortening the time to obtain ice particles for the first time.
Through this method, the time to obtain ice particles for the first time is shortened and the user experience is improved. Compared with directly using room temperature water to make ice, the time is shortened by about 15 minutes and the efficiency is increased by 30%.
Smart Images

Figure CN118836620A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water treatment equipment, and in particular to a control method, a control device, water treatment equipment and a storage medium for water treatment equipment. Background Art
[0002] In the related art, after the ice-making and refrigeration function is turned on, the ice-making and drinking water equipment usually adopts a direct ice-making method, which prolongs the time for obtaining normally usable ice particles for the first time, affecting the user experience. Summary of the invention
[0003] The embodiments of the present invention provide a control method, a control device, a water treatment device and a storage medium for water treatment equipment to solve at least one of the above-mentioned technical problems.
[0004] A control method according to an embodiment of the present invention is used for a water treatment device, wherein the water treatment device comprises a cold tank and an ice water box, wherein the cold tank and the ice water box are in communication with each other, and the control method comprises:
[0005] After the ice-making function is turned on, the water treatment device is controlled to perform a refrigeration water operation so that the water in the cold tank becomes cold water;
[0006] The water treatment device is controlled to perform an ice-making operation so that the cold water from the cold tank forms ice in the ice-making water box.
[0007] The above control method controls the water treatment equipment to first perform refrigeration water operation to obtain cold water, and then use the cold water to make ice, thereby shortening the time for first obtaining ice particles to a certain extent and improving the user experience.
[0008] In some embodiments, the water treatment device includes an ice storage room, and the control method includes:
[0009] After the ice-making operation continues for a preset time, the water treatment device is controlled to perform a first ice-removing action so that the ice in the ice-making water box falls into the ice storage chamber.
[0010] In some embodiments, the water treatment device includes an ice storage room, and the control method includes:
[0011] After the ice storage chamber is filled with ice, controlling the water treatment device to perform a second ice-removing action;
[0012] After the second deicing action, the water treatment equipment is controlled to enter a heat preservation state.
[0013] In some embodiments, the water treatment device includes an ice storage room, and the control method includes:
[0014] After the ice making and refrigeration functions are turned on at the same time, when the ice storage chamber is full of ice and the temperature of the cold water is lower than the first set temperature, controlling the water treatment device to perform a second ice removal action;
[0015] After the second deicing action, the water treatment equipment is controlled to enter a heat preservation state.
[0016] In some embodiments, the control method comprises:
[0017] When it is detected that the ice storage chamber is not full of ice after entering the heat preservation state, the water treatment device is controlled to perform the refrigeration water operation and the ice making operation in sequence.
[0018] In some embodiments, the water treatment device includes an ice storage room, and the control method includes:
[0019] After the ice making and refrigeration functions are turned on at the same time, when the ice storage chamber is full of ice and the temperature of the cold water is greater than or equal to the first set temperature, the water treatment device is controlled to perform refrigeration water operation until the temperature of the cold water is less than the first set temperature;
[0020] Controlling the water treatment equipment to perform a second deicing action;
[0021] After the second deicing action, the water treatment equipment is controlled to enter a heat preservation state.
[0022] In some embodiments, the control method comprises:
[0023] After entering the heat preservation state and when the temperature of the cold water is greater than the second set temperature, the water treatment equipment is controlled to perform refrigeration water operation until the temperature of the cold water is less than the first set temperature, and the second set temperature is greater than the first set temperature.
[0024] In some embodiments, the water treatment device includes an ice storage room, and the control method includes:
[0025] After the refrigeration function is turned on, when it is detected that the ice storage chamber is not full and there is cold water in the cold tank, the water treatment device is controlled to perform a second ice-removing action, and then the water treatment device is controlled to perform an ice-making operation;
[0026] After the refrigeration function is turned on, when it is detected that the ice storage chamber is not full of ice and the water in the cold tank has not formed cold water, the water treatment equipment is controlled to perform a refrigeration water operation until the water in the cold tank forms cold water, and then the water treatment equipment is controlled to perform a second ice-defrosting operation, and then the water treatment equipment is controlled to perform an ice-making operation.
[0027] In some embodiments, the second defrosting action is performed at least twice.
[0028] A control device for a water treatment device according to an embodiment of the present invention comprises:
[0029] processor, and;
[0030] A memory storing a computer program, wherein the computer program, when executed by the processor, implements the steps of the control method of any of the above-mentioned embodiments.
[0031] A water treatment device according to an embodiment of the present invention includes the control device according to the above embodiment.
[0032] An embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by the processor, the steps of the control method of any of the above embodiments are implemented.
[0033] The above-mentioned control device, water treatment equipment and storage medium control the water treatment equipment to first perform refrigeration water operation, obtain cold water, and then use the cold water to make ice, thereby shortening the time for first obtaining ice particles to a certain extent and improving user experience.
[0034] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0036] Figure 1 is a flow chart of a control method according to an embodiment of the present invention;
[0037] Figure 2 is a three-dimensional schematic diagram of a water treatment device according to an embodiment of the present invention;
[0038] Figure 3 It is a partial structural schematic diagram of a water treatment device according to an embodiment of the present invention;
[0039] Figure 4 yes Figure 2 A schematic cross-sectional view of a water treatment equipment along line AA;
[0040] Figure 5 is a schematic diagram of a module of a water treatment device according to an embodiment of the present invention;
[0041] Figures 6 to 10 It is a flow chart of a control method according to an embodiment of the present invention.
[0042] Description of main component symbols:
[0043] Water treatment equipment 100, cold tank 12, ice water box 14, circulating water pump 16, compressor 18, first heat exchanger 20, cooling fan 22, input component 24, control device 26, ice storage room 28, motor 30, ice receiving box 32, ice shovel 34, detection component 36, processor 38, memory 40. DETAILED DESCRIPTION
[0044] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals represent the same or similar elements or elements having the same or similar functions from beginning to end. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the embodiments of the present invention, and cannot be understood as limiting the embodiments of the present invention.
[0045] Please refer to Figures 1 to 5 A control method provided by an embodiment of the present invention is used for a water treatment device 100, the water treatment device 100 includes a cold tank 12 and an ice water box 14, and the cold tank 12 and the ice water box 14 are connected. The control method includes:
[0046] 01, after the ice making function is turned on, the water treatment device 100 is controlled to perform a refrigeration water operation so that the water in the cold tank 12 becomes cold water;
[0047] 03, control the water treatment device 100 to perform ice making operation so that the cold water from the cold tank 12 forms ice in the ice making water box 14.
[0048] The above control method controls the water treatment equipment 100 to first perform a refrigeration water operation to obtain cold water, and then use the cold water to make ice, thereby shortening the time for first obtaining ice particles to a certain extent and improving the user experience.
[0049] Specifically, there are many types of water treatment equipment 100. In one embodiment, the water treatment equipment 100 may be a drinking water device, which may have an ice-dispensing function, a normal temperature water-dispensing function, a hot water-dispensing function, and a cold water-dispensing function. The drinking water device may be in the form of a desktop drinking water device, a vertical drinking water device, an embedded drinking water device, a pipeline drinking water device, etc. In one embodiment, the water treatment equipment 100 may be a drinking water purification device. The drinking water purification device may have a water purification function, and on the basis of the water purification function, it may also have an ice-dispensing function, a normal temperature water-dispensing function, a hot water-dispensing function, and a cold water-dispensing function. The drinking water purification device may be in the form of a desktop drinking water purification device, a vertical drinking water purification device, an embedded drinking water purification device, a pipeline drinking water purification device, etc. In other embodiments, the water treatment equipment 100 may include, but is not limited to, coffee machines, tea machines, foaming machines, and other devices, so as to enrich the functions.
[0050] Please combine Figures 3 to 5 The water equipment treatment also includes a circulating water pump 16, a compressor 18, a first heat exchanger 20, an electronic expansion valve, a second heat exchanger and a cooling fan 22. The circulating water pump 16 connects the cold tank 12 and the ice water box 14. The circulating water pump 16 is used to form a circulating water circuit between the cold tank 12 and the ice water box 14. The compressor 18, the first heat exchanger 20, the electronic expansion valve and the second heat exchanger are connected in sequence to form a refrigerant pipeline. The first heat exchanger 20 can be located in the ice water box 14. After the refrigeration function and / or the ice making function are turned on, the compressor 18 runs the refrigeration mode, so that the first heat exchanger 20 cools the water in the ice water box 14, and the cooled water flows back to the cold tank 12, and the cycle is repeated, so that the normal temperature water in the cold tank 12 can be formed into cold water. The cooling fan 22 is used to dissipate heat from the second heat exchanger.
[0051] The water treatment device also includes a temperature sensor, which is used to detect the water temperature in the cold tank 12. In one example, when the water temperature in the cold tank 12 is less than or equal to 11 degrees (Celsius), it can be considered that cold water is formed in the cold tank 12. It can be understood that the water temperature of the cold water in the present invention can also be other temperatures, and is not limited to the water temperature being less than or equal to 11 degrees. The temperature sensor includes but is not limited to NTC (Negative Temperature Coefficient) thermistors and PTC (Positive Temperature Coefficient) thermistors.
[0052] The water treatment device 100 may further include an input component 24 and a control device 26, and the control device 26 is electrically connected to the input component 24. The input component 24 includes but is not limited to a touch screen, a button, a knob, a voice component, etc. The user can select functions including but not limited to ice making function, cooling function, etc. through the input component 24. For example, there is an ice making button on the touch screen, and the user can touch the ice making button, the input component 24 generates an ice making instruction, and the control device 26 starts the ice making function after obtaining the ice making instruction.
[0053] The refrigeration water operation before ice making is to cool the room temperature water in the cold tank 12 to cold water (e.g., the water temperature drops to 11 degrees). During the refrigeration water operation, the control device 26 controls the circulation water pump 16 to operate, and the control device 26 controls the compressor 18 to operate the refrigeration mode according to the target temperature of the refrigeration water, and uses the first heat exchanger 20 to cool the water in the ice making water box 14, and the cooled water flows back to the cold tank 12, thereby cooling the water in the cold tank 12.
[0054] The ice-making operation is to form ice from the water in the ice-making water box 14. During the ice-making operation, the control device 26 controls the circulation water pump 16 to operate, and the control device 26 controls the compressor 18 to operate the refrigeration mode at the target temperature for ice-making, and uses the first heat exchanger 20 to further cool the cold water in the ice-making water box 14, so that the cold water in the ice-making water box 14 freezes.
[0055] In the embodiment of the present invention, since the water treatment device 100 is controlled to first perform the refrigeration water operation, obtain cold water, and then use the cold water to make ice, compared with directly using room temperature water to make ice, the time for first obtaining ice particles can be shortened to a certain extent, thereby improving the user experience. According to actual measurements, as a comparative example, the time for directly using room temperature water to make ice and obtaining cold water and normal ice particles at the same time is about 50 minutes. The control method of the present invention can shorten the time to 35 minutes, improve the efficiency by 30%, and greatly improve the user experience.
[0056] Optionally, after the ice making function is turned on, the compressor may not be started first and enter a protection period after power is supplied to the compressor. After the protection period, the compressor is started. In one example, the protection period is 3 minutes.
[0057] In certain embodiments, see Figure 6 The water treatment device 100 includes an ice storage room 28, and the control method includes:
[0058] 05. After the ice-making operation continues for a preset time, the water treatment device 100 is controlled to perform a first ice-removing action to make the ice in the ice-making water box 14 fall into the ice storage chamber 28.
[0059] Thus, the produced ice can be put into the ice storage chamber 28 .
[0060] Specifically, in one embodiment, please combine Figures 3 to 5 The water treatment device 100 further includes a motor 30, an ice receiving box 32, and an ice shovel 34. The cold tank 12 may be located below the ice receiving box 32 and the ice storage chamber 28. The ice receiving box 32 may be located below the ice-making water box 14, and the motor 30 is connected to the ice-making water box 14 and is used to drive the ice-making water box 14 and the ice shovel 34 to rotate (pour ice and shovel ice). The ice shovel 34 is connected to the ice-making water box 14, and the ice shovel 34 may rotate with the rotation of the ice-making water box 14 to push the ice cubes poured into the ice receiving box 32 to the ice storage chamber 28. In this embodiment, the ice shovel 34 is connected to the outer wall of the ice-making water box 14 to rotate in the ice receiving box 32 with the rotation of the ice-making water box 14. The ice scraper 34 can push the ice cubes in the ice receiving box 32 when the ice making water box 14 is turned over, and can also push the ice cubes in the ice making water box 14 when the ice making water box 14 is reset, so that the ice scraper 34 can push the ice cubes out of the ice receiving box 32 when the ice making water box 14 rotates.
[0061] In practical applications, such as Figure 4As shown, the inner wall surface of the ice receiving box 32 is set in an arc surface corresponding to the movement trajectory of the ice shovel 34. The ice shovel 34 is connected to the side of the ice-making water box 14 close to the ice storage chamber 28, so that after the ice-making water box 14 rotates to pour the ice cubes into the ice receiving box 32, during the resetting process, the ice shovel 34 pushes the ice cubes in the ice receiving box 32 to the ice storage chamber 28.
[0062] In this embodiment, the side of the ice scraper 34 away from the ice making water box 14 can remain close to the inner wall of the ice receiving box 32 during the rotation process, thereby ensuring that all ice cubes in the ice receiving box 32 are pushed. Figure 4 In the process of resetting, the ice shovel 34 can directly push the ice cubes in the ice receiving box 32 to the ice storage room 28. Therefore, in the process of resetting the ice water box 14 after each flip, the ice cubes can be quickly pushed to the ice storage room 28 by the ice shovel 34 after being poured into the ice receiving box 32, so as to avoid the ice cubes being retained in the ice receiving box 32 and improve the timeliness of taking the ice cubes.
[0063] When making ice, cold water gradually cools in the ice-making water box 14 and forms ice cubes on the first heat exchanger 20. When performing the first de-icing operation, the control device 26 can control the compressor 18 to operate in a heating mode, so that the ice cubes on the first heat exchanger 20 fall off to the ice-making water box 14. Afterwards, the control device 26 can control the motor 30 to operate, so that the ice-making water box 14 and the ice shovel 34 are turned over, and the water and ice cubes in the ice-making water box 14 are poured into the ice receiving box 32. The water in the ice receiving box 32 can flow into the cold tank 12. When the ice-making water box 14 and the ice shovel 34 are reset, the ice shovel 34 can shovel the ice cubes in the ice receiving box 32 to the ice storage chamber 28.
[0064] Optionally, a through hole is provided in the ice storage chamber 28, and water in the ice storage chamber 28 (for example, water formed after the ice cubes melt) can flow into the cold tank 12 through the through hole to prevent the ice cubes in the ice storage chamber 28 from agglomerating.
[0065] The preset duration can be pre-calibrated and stored according to simulation, testing, etc. After the ice making operation continues for the preset duration, the amount of ice formed on the first heat exchanger 20 has reached the desired amount, and the control device 26 controls the water treatment equipment 100 to perform the first de-icing action. In one example, the preset duration can be 10 minutes. It is understood that the preset duration is not specifically limited in the present invention. It is understood that the preset duration is positively correlated with the ambient temperature of the water treatment equipment 100, and the higher the ambient temperature, the greater the preset duration.
[0066] In some embodiments, see Figure 7The water treatment device 100 includes an ice storage room 28, and the control method includes:
[0067] 07, after the ice storage chamber 28 is full of ice, the water treatment device 100 is controlled to perform a second ice-removing action;
[0068] 09. After the second deicing action, the water treatment equipment 100 is controlled to enter a heat preservation state.
[0069] Thus, it is possible to prevent ice cubes from remaining in the ice making water box 14 and affecting the next ice making operation.
[0070] Specifically, the water treatment device 100 may include a detection component 36, which is used to detect whether the ice storage chamber 28 is full of ice. The detection component 36 detects whether the ice storage chamber 28 is full of ice in a manner including but not limited to infrared sensing and weight sensing.
[0071] The control device 26 can be electrically connected to the detection component 36. The control device 26 can determine whether the ice storage chamber 28 is full of ice through the detection component 36. After the ice storage chamber 28 is full of ice, the control device 26 can control the water treatment device 100 to perform a second ice-removing action. The second ice-removing action is to prevent ice cubes from remaining in the ice-making water box 14 and affecting the next ice-making operation. For example, the water treatment device 100 is controlled to perform the second ice-removing action to prevent the residual ice cubes from the previous ice-making from causing large ice cubes to be generated when making ice again.
[0072] When performing the second de-icing operation, the control device 26 can control the compressor 18 to operate in a heating mode, so that the ice cubes remaining on the first heat exchanger 20 fall off to the ice water box 14. Afterwards, the control device 26 can control the motor 30 to operate, so that the ice water box 14 and the ice shovel 34 are turned over, and the water and ice cubes in the ice water box 14 are poured into the ice receiving box 32. The water in the ice receiving box 32 can flow into the cold tank 12. When the ice water box 14 and the ice shovel 34 are reset, the ice shovel 34 can shovel the ice cubes in the ice receiving box 32 to the ice storage chamber 28.
[0073] After the second deicing action, the control device 26 can control the water treatment equipment 100 to enter the heat preservation state. In the heat preservation state, the compressor 18 is stopped, which can reduce the energy consumption of the water treatment equipment 100.
[0074] In some embodiments, see Figure 8 The water treatment device 100 includes an ice storage room 28, and the control method includes:
[0075] 11. After the ice making and refrigeration functions are turned on at the same time, when the ice storage chamber 28 is full of ice and the temperature of the cold water is lower than the first set temperature, the water treatment device 100 is controlled to perform a second ice removal action;
[0076] 13. After the second deicing action, the water treatment equipment 100 is controlled to enter a heat preservation state.
[0077] Thus, it is possible to prevent ice cubes from remaining in the ice making water box 14 and affecting the next ice making operation, and to obtain cold water as desired by the refrigeration function.
[0078] Specifically, in one embodiment, the user can select the simultaneous ice-making and refrigeration function through the input component 24. For example, there are an ice-making button and a refrigeration button on the touch screen, the user can touch the ice-making button and the refrigeration button, the input component 24 generates a simultaneous ice-making and refrigeration instruction, and the control device 26 starts the ice-making and refrigeration functions at the same time after obtaining the simultaneous ice-making and refrigeration instruction; for another example, there are ice-making and refrigeration buttons on the touch screen, the user can touch the ice-making and refrigeration buttons, the input component 24 generates a simultaneous ice-making and refrigeration instruction, and the control device 26 starts the ice-making and refrigeration functions at the same time after obtaining the simultaneous ice-making and refrigeration instruction.
[0079] The refrigeration function refers to the function of cooling water. The water treatment device 100 reduces the water temperature in the cold tank 12 to the desired temperature of the refrigeration function. After the ice making and refrigeration functions are turned on at the same time, the control device 26 controls the water treatment device 100 to make ice first, and then refrigerate water after the ice is full.
[0080] After the ice making and refrigeration functions are turned on at the same time, the control device 26 can control the water treatment equipment 100 to first perform the refrigeration water operation and then the ice making operation, so that the ice storage chamber 28 is filled with ice cubes. Afterwards, the control device 26 collects the temperature of the cold water in the cold tank 12 through the temperature sensor.
[0081] The case where the temperature of the cold water is lower than the first set temperature is the case where the water temperature in the cold tank 12 meets the water temperature expected by the refrigeration function, and therefore, the control device 26 can control the water treatment device 100 to perform the second deicing action. After the second deicing action, the control device 26 can control the water treatment device 100 to enter the heat preservation state. In the heat preservation state, the compressor 18 is stopped, which can reduce the energy consumption of the water treatment device 100.
[0082] The first set temperature can be specifically limited according to the demand, and the present invention does not make specific limitations on this. In one example, the first set temperature is 5 degrees. Generally, the water temperature required for the refrigeration water operation before the ice making operation is greater than the water temperature required for the refrigeration function.
[0083] In certain embodiments, the control method comprises:
[0084] When it is detected that the ice storage chamber 28 is not full of ice after entering the heat preservation state, the water treatment device 100 is controlled to perform the cooling water operation and the ice making operation in sequence.
[0085] Thereby, the ice in the ice storage chamber 28 can be filled up again.
[0086] Specifically, after the ice in the ice storage chamber 28 is full, the water treatment device 100 can be in a heat preservation state, and the compressor 18 is shut down. As time goes by, the ice in the ice storage chamber 28 will melt into water, and the water can flow into the cold tank 12 through the through hole.
[0087] After the control device 26 detects that the ice storage chamber 28 is not full of ice through the detection component 36, it can control the water treatment device 100 to perform the refrigeration water operation and the ice making operation in sequence to refill the ice storage chamber 28. For example, please refer to Figure 7 and Figure 8 Controlling the water treatment equipment 100 to perform the cooling water operation and the ice making operation in sequence may be executing step 01 and step 03.
[0088] In some embodiments, see Fig. 9 The water treatment device 100 includes an ice storage room 28, and the control method includes:
[0089] 15. After the ice making and refrigeration functions are turned on at the same time, when the ice storage chamber 28 is full of ice and the temperature of the cold water is greater than or equal to the first set temperature, the water treatment device 100 is controlled to perform the refrigeration water operation until the temperature of the cold water is less than the first set temperature;
[0090] 17, controlling the water treatment equipment 100 to perform a second deicing operation;
[0091] 19. After the second deicing action, the water treatment equipment 100 is controlled to enter a heat preservation state.
[0092] Thus, it is possible to prevent ice cubes from remaining in the ice making water box 14 to affect the next ice making operation and obtain cold water desired by the refrigeration function.
[0093] Specifically, in one embodiment, the user can select the simultaneous ice-making and refrigeration function through the input component 24. For example, there are an ice-making button and a refrigeration button on the touch screen, the user can touch the ice-making button and the refrigeration button, the input component 24 generates a simultaneous ice-making and refrigeration instruction, and the control device 26 starts the ice-making and refrigeration functions at the same time after obtaining the simultaneous ice-making and refrigeration instruction; for another example, there are ice-making and refrigeration buttons on the touch screen, the user can touch the ice-making and refrigeration buttons, the input component 24 generates a simultaneous ice-making and refrigeration instruction, and the control device 26 starts the ice-making and refrigeration functions at the same time after obtaining the simultaneous ice-making and refrigeration instruction.
[0094] The refrigeration function refers to a water cooling function, and the water treatment device 100 reduces the water temperature in the cold tank 12 to a desired temperature for the refrigeration function.
[0095] After the ice making and refrigeration functions are turned on at the same time, the control device 26 can control the water treatment equipment 100 to first perform the refrigeration water operation and then the ice making operation, so that the ice cubes in the ice storage chamber 28 are filled. Afterwards, the control device 26 collects the temperature of the cold water in the cold tank 12 through the temperature sensor.
[0096] The situation where the temperature of the cold water is greater than or equal to the first set temperature is the situation where the water temperature in the cold tank 12 does not meet the water temperature expected by the refrigeration function. Therefore, the control device 26 can control the water treatment equipment 100 to perform refrigeration water operation until the temperature of the cold water is less than the first set temperature, that is, the water temperature in the cold tank 12 meets the water temperature expected by the refrigeration function.
[0097] Afterwards, the control device 26 can control the water treatment device 100 to perform a second deicing action. After the second deicing action, the control device 26 can control the water treatment device 100 to enter a heat preservation state. In the heat preservation state, the compressor 18 is shut down, which can reduce the energy consumption of the water treatment device 100.
[0098] The first set temperature can be specifically limited according to the demand, and the present invention does not make specific limitations on this. In one example, the first set temperature is 5 degrees. Generally, the water temperature required for the refrigeration water operation before the ice making operation is greater than the water temperature required for the refrigeration function.
[0099] In some embodiments, see Fig.10 , control methods include:
[0100] 21. After entering the heat preservation state and when the temperature of the cold water is greater than the second set temperature, the water treatment equipment 100 is controlled to perform the refrigeration water operation until the temperature of the cold water is less than the first set temperature and the second set temperature is greater than the first set temperature.
[0101] Thereby, the cold water storage amount of the water treatment equipment 100 can be made sufficient.
[0102] Specifically, after entering the insulation state, the compressor 18 is shut down. As time goes by, the water temperature in the cold tank 12 gradually rises. When the temperature of the cold water is greater than the second set temperature, it indicates that the water temperature in the cold tank 12 does not meet the water temperature expected by the refrigeration function. Therefore, the control device 26 can control the water treatment device 100 to perform the refrigeration water operation until the temperature of the cold water is less than the first set temperature.
[0103] The second set temperature can be specifically defined according to the demand, and the present invention does not make specific limitations on this. The first set temperature and the second set temperature can define a heat preservation interval. In one example, the first set temperature is 5 degrees and the second set temperature is 7 degrees. That is, when the temperature of the cold water is less than 5 degrees, the water treatment equipment 100 enters the heat preservation state and the compressor 18 stops; when the temperature of the cold water is greater than 7 degrees, the water treatment equipment 100 performs the refrigeration water operation, and the compressor 18 runs the refrigeration mode to make the temperature of the cold water less than 5 degrees.
[0104] In some embodiments, the water treatment device 100 includes an ice storage room 28, and the control method includes:
[0105] After the refrigeration function is turned on, when it is detected that the ice in the ice storage chamber 28 is not full and there is cold water in the cold tank 12, the water treatment device 100 is controlled to perform a second ice-removing action, and then the water treatment device 100 is controlled to perform an ice-making operation;
[0106] After the refrigeration function is turned on, when it is detected that the ice in the ice storage chamber 28 is not full and the water in the cold tank 12 has not formed cold water, the water treatment device 100 is controlled to perform a refrigeration water operation until the water in the cold tank 12 forms cold water, and then the water treatment device 100 is controlled to perform a second ice-defrosting operation, and then the water treatment device 100 is controlled to perform an ice-making operation.
[0107] Thus, the ice storage chamber 28 can be filled with ice, making it convenient for users to take ice.
[0108] Specifically, in one embodiment, the user can select the refrigeration function through the input component 24. For example, there is a refrigeration button on the touch screen, and the user touches the refrigeration button, the input component 24 generates a refrigeration instruction, and the control device 26 starts the refrigeration function after obtaining the refrigeration instruction. The refrigeration function refers to the refrigeration water function, and the water treatment device 100 reduces the water temperature in the cold tank 12 to the desired temperature of the refrigeration function.
[0109] After the refrigeration function is turned on, when it is detected that the ice storage chamber 28 is not full and there is cold water in the cold tank 12 (such as the water temperature is less than or equal to 11 degrees), the control device 26 can control the water treatment equipment 100 to perform a second ice-defrosting action, and then control the water treatment equipment 100 to perform an ice-making operation, thereby speeding up the ice output speed and improving the user experience.
[0110] After the refrigeration function is turned on, when it is detected that the ice in the ice storage chamber 28 is not full and the water in the cold tank 12 has not formed cold water (such as the water temperature in the cold tank 12 is greater than 11 degrees), the control device 26 can control the water treatment equipment 100 to first perform the refrigeration water operation until the water in the cold tank 12 forms cold water. At this time, the water in the cold tank 12 (water temperature is greater than 11 degrees) is converted into cold water (such as water temperature is less than or equal to 11 degrees). Afterwards, the control device 26 controls the water treatment equipment 100 to perform the second de-icing action, and then controls the water treatment equipment 100 to perform the ice making operation. In this way, the water in the cold tank 12 can be formed into cold water first, and then the ice making operation can be performed, which can speed up the ice output speed and improve the user experience.
[0111] In some embodiments, the second defrosting action is performed at least twice.
[0112] Thereby, it can be further ensured that no ice cubes or less ice cubes remain in the ice water box 14.
[0113] Specifically, the second deicing action is performed at least twice, including but not limited to performing the second deicing action twice, performing the second deicing action three times, performing the second deicing action more than three times, etc.
[0114] In one embodiment, after the ice making function is turned on, when the ice storage chamber 28 is full of ice, the control device 26 can control the water treatment device 100 to perform two second ice-removing actions. The two second ice-removing actions can further ensure that there are no ice cubes or fewer ice cubes remaining in the ice-making water box 14, thereby preventing the residual ice cubes from the previous ice making from causing large ice cubes to be generated when making ice again.
[0115] In one embodiment, after the ice making and refrigeration functions are turned on at the same time, when the ice in the ice storage chamber 28 is full and the temperature of the cold water is lower than the first set temperature, the control device 26 can control the water treatment device 100 to perform two second ice-removing actions. The two second ice-removing actions can further ensure that there are no ice cubes or fewer ice cubes remaining in the ice-making water box 14, thereby preventing the residual ice cubes from the previous ice making from causing large ice cubes to be generated when making ice again.
[0116] In one embodiment, after the ice making and refrigeration functions are turned on at the same time, when the ice in the ice storage chamber 28 is full and the temperature of the cold water is greater than or equal to the first set temperature, the control device 26 can control the water treatment device 100 to perform the refrigeration water operation until the temperature of the cold water is less than the first set temperature, and then the control device 26 can control the water treatment device 100 to perform two second ice-defrosting actions. The two second ice-defrosting actions can further ensure that there are no ice cubes or less ice cubes left in the ice-making water box 14, thereby preventing the residual ice cubes from the previous ice making from causing large ice cubes to be generated when making ice again.
[0117] In one embodiment, after the refrigeration function is turned on, when the ice in the ice storage chamber 28 is not full and there is cold water in the cold tank 12, the control device 26 can control the water treatment device 100 to perform two second ice-removing actions. The two second ice-removing actions can further ensure that there are no ice cubes or fewer ice cubes remaining in the ice-making water box 14, thereby preventing the residual ice cubes from the previous ice making from causing large ice cubes to be generated when making ice again.
[0118] In one embodiment, after the refrigeration function is turned on, when the ice in the ice storage chamber 28 is not full and the water in the cold tank 12 is not cold water, the control device 26 can control the water treatment device 100 to perform a refrigeration water operation to make the water in the cold tank 12 cold water, and then control the water treatment device 100 to perform two second ice-defrosting actions. The two second ice-defrosting actions can further ensure that there are no ice cubes or fewer ice cubes remaining in the ice-making water box 14, thereby preventing the residual ice cubes from the previous ice making from causing large ice cubes to be generated when making ice again.
[0119] Please refer to Figure 5 The control device 26 of a water treatment device 100 according to an embodiment of the present invention includes a processor 38 and a memory 40. The memory 40 stores a computer program, and when the computer program is executed by the processor 38, the steps of the control method of any of the above embodiments are implemented.
[0120] Please refer to Figure 5 A water treatment device 100 according to an embodiment of the present invention includes the control device 26 according to the above embodiment.
[0121] Specifically, the water treatment equipment 100 also includes but is not limited to a motor 30, a compressor 18, a cooling fan 22, a circulating water pump 16, a detection component 36 and an input component 24, etc. The control device 26 can electrically connect the motor 30, the compressor 18, the cooling fan 22, the circulating water pump 16, the detection component 36 and the input component 24, and control the operation of the motor 30, the compressor 18, the cooling fan 22, the circulating water pump 16, the detection component 36 and the input component 24.
[0122] An embodiment of the present invention provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by the processor 38, the steps of the control method of any of the above embodiments are implemented.
[0123] It should be noted that the above explanations of the implementation methods and beneficial effects of the control method are also applicable to the control device 26, water treatment equipment 100 and storage medium of the implementation methods of the present invention, and will not be elaborated here in order to avoid redundancy.
[0124] In one embodiment, when the computer program is executed by the processor 38, the control method implemented includes:
[0125] 01, after the ice making function is turned on, the water treatment device 100 is controlled to perform a refrigeration water operation so that the water in the cold tank 12 becomes cold water;
[0126] 03, control the water treatment device 100 to perform ice making operation so that the cold water from the cold tank 12 forms ice in the ice making water box 14.
[0127] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiments or examples are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0128] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable actions for implementing a specific logical function or process step, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.
[0129] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, combine, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A control method for a water treatment device, wherein the water treatment device comprises a cold tank and an ice water box, wherein the cold tank and the ice water box are in communication, and wherein: The control method comprises: After the ice-making function is turned on, the water treatment device is controlled to perform a refrigeration water operation so that the water in the cold tank becomes cold water; The water treatment device is controlled to perform an ice-making operation so that the cold water from the cold tank forms ice in the ice-making water box.
2. The control method according to claim 1, characterized in that: The water treatment equipment includes an ice storage room, and the control method includes: After the ice-making operation continues for a preset time, the water treatment device is controlled to perform a first ice-removing action so that the ice in the ice-making water box falls into the ice storage chamber.
3. The control method according to claim 1, characterized in that: The water treatment equipment includes an ice storage room, and the control method includes: After the ice storage chamber is filled with ice, controlling the water treatment device to perform a second ice-removing action; After the second deicing action, the water treatment equipment is controlled to enter a heat preservation state.
4. The control method according to claim 1, characterized in that: The water treatment equipment includes an ice storage room, and the control method includes: After the ice making and refrigeration functions are turned on at the same time, when the ice storage chamber is full of ice and the temperature of the cold water is lower than the first set temperature, controlling the water treatment device to perform a second ice removal action; After the second deicing action, the water treatment equipment is controlled to enter a heat preservation state.
5. The control method according to claim 3 or 4, characterized in that: The control method comprises: When it is detected that the ice storage chamber is not full of ice after entering the heat preservation state, the water treatment device is controlled to perform the refrigeration water operation and the ice making operation in sequence.
6. The control method according to claim 1, characterized in that: The water treatment equipment includes an ice storage room, and the control method includes: After the ice making and refrigeration functions are turned on at the same time, when the ice storage chamber is full of ice and the temperature of the cold water is greater than or equal to the first set temperature, the water treatment device is controlled to perform refrigeration water operation until the temperature of the cold water is less than the first set temperature; Controlling the water treatment equipment to perform a second deicing action; After the second deicing action, the water treatment equipment is controlled to enter a heat preservation state.
7. The control method according to claim 6, characterized in that: The control method comprises: After entering the heat preservation state and when the temperature of the cold water is greater than the second set temperature, the water treatment equipment is controlled to perform refrigeration water operation until the temperature of the cold water is less than the first set temperature, and the second set temperature is greater than the first set temperature.
8. The control method according to claim 1, characterized in that: The water treatment equipment includes an ice storage room, and the control method includes: After the refrigeration function is turned on, when it is detected that the ice storage chamber is not full and there is cold water in the cold tank, the water treatment device is controlled to perform a second ice-removing action, and then the water treatment device is controlled to perform an ice-making operation; After the refrigeration function is turned on, when it is detected that the ice storage chamber is not full of ice and the water in the cold tank has not formed cold water, the water treatment equipment is controlled to perform a refrigeration water operation until the water in the cold tank forms cold water, and then the water treatment equipment is controlled to perform a second ice-defrosting operation, and then the water treatment equipment is controlled to perform an ice-making operation.
9. The control method according to claim 3, 4, 6 or 8, characterized in that: The second deicing action is performed at least twice.
10. A control device for water treatment equipment, characterized in that: include: processor, and; A memory, wherein the memory stores a computer program, and when the computer program is executed by the processor, the steps of the control method according to any one of claims 1 to 9 are implemented.
11. A water treatment device, characterized in that: Comprising the control device as claimed in claim 10.
12. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by the processor, the steps of the control method according to any one of claims 1 to 9 are implemented.
Citation Information
Cited By
Refrigerating system of water drinking equipment and water drinking equipment
CN119791455A
Refrigeration system for drinking water equipment, drinking water equipment
CN119791455B
Water drinking equipment, control method and device thereof and computer readable storage medium
CN119791459A
Refrigeration control system of water drinking equipment and water drinking equipment
CN119791460A
Water drinking equipment, control method and device thereof and computer readable storage medium
CN119791461A
