A digital twin construction method for data interactive display

By calculating the suppressed attention and model completion of the digital twin display node, and reasonably allocating computing resources, the problem of uneven allocation of resources of digital twin processors is solved, and the user experience and system display effect are improved.

CN118838720BActive Publication Date: 2024-11-29JIANGSU ZEQINCHUANG CULTURE TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411311120.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-29
Estimated Expiration
2044-09-20

AI Technical Summary

Technical Problem

In the prior art, the processors of digital twins have different allocations of computing resources to different interactive nodes, resulting in uneven integrated data processing, rendering effects and interactive logic, affecting the user experience.

Method used

By obtaining the node data of each display node in the historical opening process of the digital twin, the suppressed attention, process information, process simulation and integrated resources of each display node will be calculated, and the system contribution ratio of the node will be obtained. The model is completed and the calculation resources are allocated based on these indicators to ensure that the resource allocation weight is reasonable.

Benefits of technology

The data processing, rendering effects and interactive logic of each node of the digital twin system are optimized, which improves the user experience and ensures that the system can smoothly and fully display the system content it simulates.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118838720B_ABST
    Figure CN118838720B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of electrical digital data processing technology, and in particular to a method for constructing a digital twin for interactive data display. The method includes: obtaining the node data of each display node, obtaining the degree of attention, process information, process simulation and system contribution ratio of each display node after suppression according to the node data, obtaining the model completion of each display node according to the process information, process simulation and system contribution ratio of each display node, obtaining the computing resource allocation weight of each display node according to the degree of attention after suppression of each display node and the model completion of each display node, and allocating the computing resources of each display node according to the processor computing resource configuration and the computing resource allocation weight of each display node. The present invention can realize that the digital twin system for interactive data display can more smoothly and fully display the specific content of the system it simulates.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electronic digital data processing, and in particular to a method for constructing a digital twin for interactive data display. Background Art

[0002] Data interactive display usually refers to the use of digital technology to display information and content, while allowing users to explore, operate and communicate through interactive interfaces. Digital twins simulate real-world entities, processes or systems by creating a virtual copy. The digital twin construction method for data interactive display allows users to interactively test, monitor and optimize entities such as production lines in a safe virtual environment without directly intervening in the entity itself.

[0003] In the existing technology, digital twin technology can help developers collect user experience and optimize interactive systems. The continuous interaction between the system and the user will generate a lot of interactive access and interactive data, but in most cases, the computing resources of the digital twin are limited, and the processor allocates computing resources to different interactive nodes differently, resulting in uneven integrated data processing, rendering effects, and interactive logic of each node, affecting the user experience. If the strategy of adjusting the allocation of digital twin resources is based solely on user feedback, there are also certain limitations. If the computing power of the processor is increased, the cost of the digital twin system for data interactive display will be greatly increased. Summary of the invention

[0004] In order to solve the technical problem in the prior art that in the digital twins for data interactive display, the processors allocate computing resources to different interactive nodes differently, resulting in uneven integrated data processing, rendering effects, interactive logic, etc. of each node, which affects the user experience, the purpose of the present invention is to provide a method for constructing a digital twin for data interactive display, and the technical scheme adopted is as follows:

[0005] A method for constructing a digital twin for interactive data display, the method comprising:

[0006] Step S1: Obtain node data of each display node in the historical opening process of the digital twin;

[0007] Step S2: obtaining the suppressed attention degree, process information amount, process simulation amount and contribution ratio of the integrated resources of each display node to the system constructed by the node according to the node data;

[0008] Step S3: Obtain the model completion degree of each display node according to the process information amount, process simulation amount and the contribution ratio of the integrated resources of each display node to the system constructed by the node;

[0009] Step S4: obtaining a computing resource allocation weight of each display node according to the suppressed attention of each display node and the model completion of each display node;

[0010] Step S5: Allocate computing resources to each display node according to the processor computing resource configuration of the digital twin and the computing resource allocation weight of each display node.

[0011] Furthermore, each display node is specifically a node of each production process output in the virtual production line constructed by the digital twin.

[0012] Furthermore, in step S2, obtaining the suppressed attention of each display node according to the node data is specifically:

[0013] Obtaining the attention of each display node according to the number of users who interactively visit each display node in the node data and the total number of users who visit all display nodes;

[0014] Obtaining redundant attention of each display node according to all interactive access times of each display node in the node data, the number of users who interactively access each display node, and the information entropy of all interactive access types of each display node;

[0015] According to the attention degree and redundant attention degree of each display node, the suppressed attention degree of each display node is obtained.

[0016] Furthermore, in step S2, the contribution ratio of the integrated resources of each display node to the system constructed by the node is obtained according to the node data as follows: an input data set and an output data set are formed according to all the integrated data generated in the actual production process of each day in the node data, and the average value of the maximum Pearson correlation coefficient between all the input data sets and all the output data sets is calculated to obtain the contribution ratio of the integrated resources of each display node to the system constructed by the node.

[0017] Furthermore, the process information amount of each display node obtained according to the node data in step S2 is specifically:

[0018] According to the input data set and the output data set, a k-means clustering method is used to obtain a plurality of input clusters and output clusters;

[0019] Obtaining the DBI index of the input cluster and the DBI index of the output cluster according to the ratio of the intra-class difference to the inter-class difference of the input cluster and the output cluster;

[0020] The process information amount of each display node is obtained according to the number of input clusters, the number of output clusters, the DBI index of the input clusters, and the DBI index of the output clusters.

[0021] Furthermore, the process simulation quantity of each display node is obtained according to the node data in step S2 as follows:

[0022] According to all interactive access data and interactive display data of each display node in the node data, a k-means clustering method is used to obtain a number of interactive access clusters and interactive display clusters;

[0023] According to the ratio of the intra-class difference to the inter-class difference of the interactive access cluster and the interactive display cluster, the DBI index of all interactive access clusters and the DBI index of the interactive display cluster are obtained;

[0024] The process simulation quantity of each display node is obtained according to the number of data clusters of interactive access data, the number of data clusters of interactive display data, the DBI index of the data clusters of interactive access data, and the DBI index of the data clusters of interactive display data.

[0025] Furthermore, the larger the average value of the maximum Pearson correlation coefficient between all the input data sets and all the output data sets is, the greater the contribution ratio of the integrated resources of the display node to the system constructed by the node is.

[0026] Furthermore, in step S3, the model completion of each display node is obtained according to the process information amount, process simulation amount and the contribution ratio of the integrated resources of each display node to the system constructed by the node. Specifically, the model completion of each display node is obtained according to the contribution ratio of the integrated resources of each display node to the system constructed by the node and the absolute value of the information difference between each process information amount and process simulation amount.

[0027] Furthermore, the smaller the absolute value of the information difference between the process information amount and the process simulation amount of the display node is, the more complete the model construction of the display node is, and the better the model completion of the display node is.

[0028] Furthermore, when the attention degree and model completion degree of the suppressed display node are higher, the computing resource allocation weight of the display node is greater.

[0029] The present invention has the following beneficial effects:

[0030] The problem that the processor of the digital twin of the existing data interactive display has different computing resource allocations to different interactive nodes, resulting in uneven integrated data processing, rendering effects, interactive logic, etc. of each node, which affects the user experience, can be solved, and the digital twin system of data interactive display can more smoothly and fully display the specific content of the simulated system. By obtaining the node data of each display node in the historical opening process of the digital twin, and obtaining the attention degree, process information amount, process simulation amount and the integrated resource contribution ratio of each display node to the system constructed by the node after suppression of each display node according to the node data, then obtaining the model completion degree of each display node according to the process information amount, process simulation amount and the integrated resource contribution ratio of each display node to the system constructed by the node, and then obtaining the computing resource allocation weight of each display node according to the attention degree after suppression of each display node and the model completion degree of each display node, and finally allocating the computing resources of each display node according to the computing resource configuration of the processor of the digital twin and the computing resource allocation weight of each display node. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 A flow chart of a method for constructing a digital twin for interactive data display provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0033] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of the digital twin construction method for data interactive display proposed by the present invention, its specific implementation method, structure, characteristics and effects, in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. Unless otherwise defined, all technical and scientific terms used in this article have the same meaning as those generally understood by technicians in the technical field of the present invention.

[0034] The following is a specific solution of a digital twin construction method for data interactive display provided by the present invention described in detail with reference to the accompanying drawings.

[0035] The specific scenario targeted by the embodiment of the present invention is: in the digital exhibition hall design in the contemporary exhibition hall design field, a digital twin for interactive data display is constructed, and through the use of a series of innovative technologies, audience participation is attracted to create a new human-computer interaction experience, so as to better display production dynamic data to visitors and achieve good visual and sensory effects for users. This embodiment takes the field of industrial intelligent manufacturing as an example to illustrate the method for constructing a digital twin for interactive data display.

[0036] See also Figure 1 , which shows a flow chart of a digital twin construction method for data interactive display provided by an embodiment of the present invention, the method comprising the following steps:

[0037] Step S1: Obtain the node data of each display node in the historical opening process of the digital twin.

[0038] Among them, the model construction of the digital twin proposed in this implementation is divided into six sections: construction, assembly, integration, verification, calibration, and management. Here, the theoretical system of model construction of the digital twin is a well-known technology, and this embodiment will not go into details. Generally, after the model of the digital twin is constructed, the physical model of the production line is established using simulation software, and the model parameters and behaviors are set according to the collected data. The production process can be highly restored. Through the fusion analysis of data and video, the production dynamics of each assembly line can be tracked and displayed in real time, and interact with users. Users can simulate the operation of production equipment and intervene in the production process in a virtual environment to observe and experience the changes in the product production line, and make suggestions and feedback.

[0039] Furthermore, each display node is specifically a node of each production process output in the virtual production line constructed by the digital twin. For example, the heating process, grinding process, cutting process, etc. in the field of industrial intelligent manufacturing each represent a display node in the digital twin.

[0040] Furthermore, the node data includes the production dynamic data collected in the actual production process by using the integrated sensors, monitoring systems or manual recording of the Internet of Things. The production dynamic data is collected in the form of days, and all daily production dynamic data include the input data and output data of each day; at the same time, it also includes the interactive access data and interactive display data for users of each display node during the period when the digital twin is open to users for experience. For example, the interactive access data is the user operation record, which includes different types of operations, such as users adjusting temperature, increasing power, changing shape, etc. During the process, users pay more attention to certain display nodes, and the number of users experiencing these nodes will be larger, and the node data generated will also be larger. In other words, the node data includes the integrated data of the actual production dynamic process during the period when the digital twin is open to users for experience, that is, before the final debugging of the digital twin. The integrated data includes input data and output data, and also includes the interactive access data and interactive display data of users of each display node every day.

[0041] In this way, by obtaining the node data of each display node in the historical opening process of the initially constructed digital twin to the user, these node data can be analyzed, and then the computing resources of each display node of the digital twin can be reasonably weighted. Finally, the computing resources of each display node can be allocated, thereby achieving the optimal integrated data processing, rendering effect, and interaction logic of each node, greatly improving the user experience of the digital twin.

[0042] Step S2: Obtain the suppressed attention degree, process information amount, process simulation amount and the contribution ratio of the integrated resources of each display node to the system constructed by the node according to the node data.

[0043] Since these node data can directly count the interactive visits that users often pay attention to, as well as the completion of the interactive visits, if only based on this situation to adjust the processor resource allocation of each display node in the digital twin process, usually higher resource allocation will be made to the display nodes with higher user interaction frequency and attention. However, this is not necessarily due to the completion of the display node and the good display effect, but the node itself has a rich structure and a large operability space, which attracts users to try. However, the application of digital twins in most fields is not for fun, but to show the actual state of the system it simulates, such as the production process, products, process characteristics, efficiency, etc. in the field of industrial manufacturing. Specifically, the redundant attention of the display node is manifested as more operations attempted by users in a certain display node and more types of interactive visits generated, which means that the display node is highly operable and interesting, but this situation will affect the display of the actual state of the system it simulates by the display node. Therefore, it is necessary to obtain the redundant attention of the display node and suppress the redundant attraction of each display node.

[0044] The method of obtaining the suppressed attention of each display node according to the node data is as follows: obtaining the attention of each display node according to the number of users who interactively visit each display node and the total number of users who visit all display nodes in the node data; obtaining the redundant attention of each display node according to the number of all interactive visits to each display node, the number of users who interactively visit each display node and the information entropy of all interactive visit types of each display node in the node data; and obtaining the suppressed attention of each display node according to the attention and redundant attention of each display node.

[0045] Specifically, if the digital twin is open to users for experience, and users pay more attention to certain display nodes, the number of users experiencing these nodes will be larger. First, the number of users who interactively visit each display node is obtained, and then the probability of the number of users who interactively visit each display node in the total number of users who visit all display nodes is calculated as the attention level of the display node.

[0046] Specifically, the information entropy of all interactive access types of each display node can be obtained by obtaining all interactive access times of each display node and the probability of each type of interactive access type.

[0047] In this embodiment, the redundant attention calculation formula of the display node in the digital twin construction method for data interactive display can be expressed as:

[0048]

[0049] in, represents the number of all interactive visits to the vth display node, represents the number of users who interactively visited the vth display node, Represents the information entropy of all interactive access types of the v-th display node; As the redundant attention of the vth display node.

[0050] In the redundant attention calculation formula of the display node in the above-mentioned digital twin construction method for data interactive display: Represents the ratio of all interactive visits to the vth display node to the number of users. The larger the value, the more interactive visits each user has made. In addition, the larger the information entropy of all interactive visit types, the more decentralized the access types of all users are. Therefore, this means that the user may have made multiple purposeless interactive visits; that is, the operability of this display node is more attractive to users, but in the actual interactive display process, the computing resources obtained by such display nodes should be suppressed. Therefore, The redundant attention of the vth display node can be reflected. When the ratio of all interactive visits to the vth display node to the number of users is larger, and the information entropy of all interactive visit types of the vth display node is larger, the redundant attention of the vth display node is The bigger.

[0051] Furthermore, it is necessary to analyze the degree of attention of each display node after being suppressed. In this embodiment, the calculation formula for the degree of attention of each display node after being suppressed in the digital twin construction method for data interactive display can be expressed as:

[0052]

[0053] in, Represents the attention of the vth display node, As the redundant attention of the vth display node, Representatives Normalize the deviation, Represents the attention of the vth display node after suppression.

[0054] In the above-mentioned digital twin construction method for interactive data display, the calculation formula for the degree of attention after each display node is suppressed, the more redundant the display node is, the greater the suppression of its attention is, so It represents the suppression coefficient; The average of the suppression coefficient and the attention degree is added to get the attention degree of the vth display node after suppression.

[0055] In this way, by calculating the suppressed attention of each display node, the attention of nodes affected by purposeless user interactive visits can be suppressed, avoiding excessive inclination of computing resources to display nodes that users pay attention to.

[0056] Furthermore, in step S2, the contribution ratio of the integrated resources of each display node to the system constructed by the node is obtained according to the node data as follows: an input data set and an output data set are formed according to all the integrated data generated in the actual production process of each day in the node data, and the average value of the maximum Pearson correlation coefficient between all the input data sets and all the output data sets is calculated to obtain the contribution ratio of the integrated resources of each display node to the system constructed by the node.

[0057] First, all the integrated data in each node data used to build the digital twin are obtained, and all the integrated data generated in the actual daily production process are taken as an integrated data. All the integrated data are standardized, such as data cleaning, data integration, data conversion, data storage, etc. Then, according to all the integrated data generated in the actual production process of each day in the node data, input data sets and output data sets are formed. For example, the input data set includes, production line layout: including the location and size of machines, equipment, tools, conveyor belts, etc.; equipment specifications: including machine performance parameters, working range, speed, accuracy, etc.; production plan: including raw material quantity, specifications, dimensions, hardness, density, thermal expansion coefficient, etc.; operation records: such as machine start / stop time, production quantity, fault records, etc.; environmental conditions: such as temperature, humidity, light, etc. For another example, the output data set includes, production results: finished product quantity, specifications, dimensions, volume, density, quality indicators, etc.; real-time monitoring data: such as temperature, pressure, speed, position, vibration, etc.; status monitoring data: such as machine health, wear degree, fault history, etc.

[0058] Since the digital twin collects more integrated data when constructing each display node, the richer the integrated data, the higher the benefit of the twin model. If the contribution of integrated data resources to node construction is relatively small, it means that when all the integrated data collected in the process are converted into the display node of the digital twin, more invalid data will be required for additional calculation. If all the integrated data of such nodes are forcibly converted into the display node of the digital twin, the computing resource utilization of such nodes will be very low. Therefore, it is necessary to calculate the contribution ratio of the integrated resources of each display node to the system constructed by the node.

[0059] In this embodiment, the calculation formula for the contribution ratio of the integrated resources of each display node to the system constructed by the node in the digital twin construction method for data interactive display can be expressed as:

[0060]

[0061] Among them, X represents each type of input data set in the integrated data of each display node. represents the mth type of input data set of the vth display node; Y represents each type of output data set in the integrated data of each display node. represents the nth type of output data set of the vth display node; M represents the number of input data sets; represents the absolute value of the Pearson correlation coefficient between the m-th input data set and the n-th output data set of the v-th display node, It represents the maximum absolute value of the Pearson correlation coefficient of the m-th input data set among all output data sets; Indicates the contribution ratio of the integrated resources of the vth display node to the system constructed by this node.

[0062] In the calculation formula of the system contribution ratio of the integrated resources of each display node to the construction of the node in the above-mentioned digital twin construction method for data interactive display, Represents the average value of the maximum Pearson correlation coefficient of all types of input data sets in all output data sets. The larger the value is, the better the correlation feedback can be obtained at the output end for all types of input data sets of the v-th display node. This means that the integrated resources of the v-th display node have a greater system contribution ratio to the node. That is, the display node with a greater system contribution ratio should have a more agile and accurate output response, and less invalid calculation.

[0063] Furthermore, the larger the average value of the maximum Pearson correlation coefficient between all input data sets and all output data sets, the better feedback all types of input data sets of the display node can get at the output end, that is, the greater the contribution ratio of the integrated resources of the display node to the system constructed by the node.

[0064] In this way, by calculating the contribution ratio of the integrated resources of each display node to the system constructed by the node, the expected computing resource utilization of the display node when the process flow is converted into a digital twin display node can be obtained based on the input-output related response efficiency of the process flow represented by each display node.

[0065] Furthermore, in step S2, the process information amount of each display node is obtained according to the node data as follows:

[0066] According to the input data set and the output data set, a k-means clustering method is used to obtain several input clusters and output clusters; according to the ratio of the intra-class difference to the inter-class difference of the input cluster and the output cluster, the input cluster DBI index (Davies-Bouldin index, also known as classification accuracy index, an indicator for evaluating the quality of clustering algorithms) and the output cluster DBI index are obtained; according to the number of input clusters, the number of output clusters and the input cluster DBI index and the output cluster DBI index, the process information amount of each display node is obtained.

[0067] Specifically, for each display node, first, all the integrated data for constructing its digital twin are classified according to the input data. The clustering distance adopts the Manhattan distance of the input data of any two days. The clustering method is k-means to obtain several input clusters; then all the integrated data are classified according to the output data to obtain several output clusters; for all input clusters, it contains the input type of all the integrated data of the display node, and similarly for all output data, it also contains the output type of all the integrated data of the node; therefore, the ratio of input to output represents the amount of process information from input to output of the display node in actual production; specifically: obtain the DBI index of all input clusters and the DBI index of all output clusters; the DBI index is the ratio of intra-class difference to inter-class difference, and the smaller the ratio, the clearer the division of input / output data.

[0068] In this embodiment, the process information amount calculation formula of each display node in the digital twin construction method for data interactive display can be expressed as:

[0069]

[0070] Among them, a and b represent input and output respectively, and G represents the number of clusters. represents the number of input clusters, represents the number of output clusters, Represents the DBI index of the output cluster, represents the DBI index of the input cluster, Represents the process information amount of this display node.

[0071] In the process information amount calculation formula of each display node in the above-mentioned digital twin construction method for data interactive display, Represents the ratio of the number of input clusters to the number of output clusters; since the DBI index is better the smaller the better, Represents the inverse of the ratio of the input cluster DBI to the output cluster DBI. The changes in the number of clusters and DBI from input to output are all generated in the process of input to output, which represents the production attributes of the display node. Represents the amount of process information for any display node.

[0072] Further, in step S2, the process simulation quantity of each display node is obtained according to the node data as follows: according to all interactive access data and interactive display data of each display node in the node data, a number of interactive access clusters and interactive display clusters are obtained using the k-means clustering method; according to the ratio of intra-class difference to inter-class difference of the interactive access clusters and interactive display clusters, the DBI index of all interactive access clusters and the DBI index of interactive display clusters are obtained; according to the number of data clusters of interactive access data, the number of data clusters of interactive display data, the DBI index of data clusters of interactive access data, and the DBI index of data clusters of interactive display data, the process simulation quantity of each display node is obtained. The specific calculation process is consistent with the above-mentioned process information quantity calculation process, and this embodiment will not elaborate on the calculation formula.

[0073] It should be noted that the input and output display simulated by the digital twin is generally consistent with the integrated data actually collected, that is, the digital twin only simulates the input and output of the actual system; but after the integrated data is constructed into a digital twin, all interactive visits by users at each display node represent the simulated input data. For example, users can adjust the process parameters at each display node as needed. The data of this process is the interactive access data, and the output data at this time becomes the result display of the digital twin's interactive access to the user, that is, the interactive display data. The difference is that in the digital twin, the input of an interactive visit by the user and the output of the corresponding digital twin are one sample, rather than one sample per day as in the calculation of the process information volume of each display node.

[0074] By obtaining all interactive access data and interactive display data of each display node, the data is standardized, and then clustered and the process information amount is calculated. The process information amount is called process simulation amount.

[0075] Step S3: According to the process information amount, process simulation amount and the contribution ratio of the integrated resources of each display node to the system constructed by the node, the model completion degree of each display node is obtained. Specifically, according to the contribution ratio of the integrated resources of each display node to the system constructed by the node, the absolute value of the information difference between each process information amount and process simulation amount, the model completion degree of each display node is obtained.

[0076] In this embodiment, the information difference calculation formula of the process information amount and the process simulation amount of each display node in the digital twin construction method for data interactive display can be expressed as:

[0077]

[0078] in, represents the process information amount of the vth display node, Represents the process simulation quantity of the vth display node, Represents the information difference between the process information and the process simulation of the vth display node.

[0079] In the above-mentioned digital twin construction method for interactive data display, the information difference calculation formula of the process information amount and the process simulation amount of each display node is: It represents the absolute value of the information difference between the process information and the process simulation of the vth display node. The absolute value of the information difference represents the expression ability of the vth display node for the process system it represents in the digital twin. The greater the difference between the process simulation and the process information of the display node, the more incomplete the model construction of the display node is, which is insufficient to describe the process changes from input to output in the actual system; the smaller the absolute value of the information difference between the process information and the process simulation of the display node, the more complete the model construction of the display node is, and the better the model completion of the display node is.

[0080] Furthermore, the model completion of each display node is calculated according to the contribution ratio of the integrated resources of each display node to the system constructed by the node, the process information amount of each display node and the information difference of the process simulation amount.

[0081] In this embodiment, the model completion calculation formula of each display node in the digital twin construction method for data interactive display can be expressed as:

[0082]

[0083] in, It represents the contribution ratio of the integrated resources of the vth display node to the system constructed by the node. represents the information difference between the process information and the process simulation of the vth display node, Indicates the model completion degree of the vth display node.

[0084] In the above-mentioned digital twin construction method for interactive data display, the model completion calculation formula of each display node is: It represents the ratio of the system contribution ratio to the information difference of the vth display node. The larger the value is, the better the expected resource utilization of the vth display node is, and the better the expression ability of the display node is, that is, in the digital twin, the better the model completion of the display node is.

[0085] Step S4: Obtain the computing resource allocation weight of each display node according to the attention degree of each display node after suppression and the model completion degree of each display node. Furthermore, when the attention degree and model completion degree of the display node after suppression are higher, the computing resource allocation weight of the display node is greater.

[0086] Specifically, when allocating rendering resources to all display nodes in the digital twin system, in addition to user feedback, the strategy that should be followed is to prioritize the allocation of display nodes with higher model completion to ensure the highest overall resource utilization of the digital twin.

[0087] In this embodiment, the calculation formula for the computing resource allocation weight of each display node in the digital twin construction method for data interactive display can be expressed as:

[0088]

[0089] in, represents the attention of the vth display node after suppression, Indicates the model completion of the vth display node, SN represents sum normalization, Represents the computing resource allocation weight of the vth display node.

[0090] In the calculation formula for the computing resource allocation weight of each display node in the above-mentioned digital twin construction method for data interactive display, when the attention of the suppressed display node is higher, it means that the user feedback of the node operation is more popular, so the computing resource allocation weight of the display node should be increased; when the model completion degree of the display node is higher, the resource utilization expectation and expression ability of the display node are better, and the computing resource allocation weight of the display node should be increased; therefore, It represents the display nodes that comprehensively consider user feedback and have a high degree of model completion, ensuring the highest overall resource utilization of the digital twin.

[0091] Step S5: Allocate computing resources to each display node according to the processor computing resource configuration of the digital twin and the computing resource allocation weight of each display node.

[0092] Specifically, the computing power of the processor is quantified, for example, by calculating the total computing power unit through the number of cores and the core frequency. For example, if a CPU has 8 cores and the frequency of each core is 3GHz, then we can simply say that the total computing power of this CPU is 24GHz. Then multiply the total computing resources by , the computing resources of each display node can be allocated.

[0093] In this way, after the digital twin is open to users for experience, the digital twin can be finally debugged through the digital twin construction method for data interactive display provided in this embodiment, so that the digital twin system for data interactive display can more smoothly and fully display the specific content of the system it simulates.

[0094] The above-mentioned digital twin construction method for data interactive display obtains the node data of each display node in the historical opening process of the digital twin, and obtains the attention degree, process information amount, process simulation amount and the integrated resource contribution ratio of each display node to the system constructed by the node after suppression according to the node data, and then obtains the model completion degree of each display node according to the process information amount, process simulation amount and the integrated resource contribution ratio of each display node to the system constructed by the node, and then obtains the computing resource allocation weight of each display node according to the attention degree after suppression of each display node and the model completion degree of each display node, and finally allocates the computing resources of each display node according to the processor computing resource configuration of the digital twin and the computing resource allocation weight of each display node. This can solve the problem that the processor of the existing digital twin for data interactive display has different computing resource allocations to different interactive nodes, resulting in uneven integrated data processing, rendering effects, interactive logic, etc. of each node, which affects the user experience, and can realize that the digital twin system for data interactive display can more smoothly and fully display the specific content of the system it simulates.

[0095] It should be noted that the sequence of the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0096] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for constructing a digital twin for interactive data display, characterized in that: The method comprises: Step S1: Obtain node data of each display node in the historical opening process of the digital twin; Step S2: obtaining the suppressed attention degree, process information amount, process simulation amount and contribution ratio of the integrated resources of each display node to the system constructed by the node according to the node data; Step S3: Obtain the model completion degree of each display node according to the process information amount, process simulation amount and the contribution ratio of the integrated resources of each display node to the system constructed by the node; Step S4: Obtain the computing resource allocation weight of each display node according to the suppressed attention of each display node and the model completion of each display node; Step S5: Allocate computing resources to each display node according to the processor computing resource configuration of the digital twin and the computing resource allocation weight of each display node; In step S2, obtaining the suppressed attention degree of each display node according to the node data is specifically as follows: Obtaining the attention of each display node according to the number of users who interactively visit each display node in the node data and the total number of users who visit all display nodes; Obtaining redundant attention of each display node according to the number of all interactive visits to each display node in the node data, the number of users who interactively visit each display node, and the information entropy of all interactive visit types of each display node; According to the attention degree and redundant attention degree of each display node, the attention degree after suppression of each display node is obtained; The method for obtaining the attention degree includes: obtaining the number of users who have interactively visited each display node, and calculating the probability of the number of users who have interactively visited each display node to the total number of users who have visited all display nodes as the attention degree of the display node; The redundant attention calculation formula can be expressed as: in, represents the number of all interactive visits to the vth display node, represents the number of users who interactively visited the vth display node, Represents the information entropy of all interactive access types of the v-th display node; As the redundant attention of the vth display node; The calculation formula for the attention degree of each display node after suppression can be expressed as: in, Represents the attention of the vth display node, As the redundant attention of the vth display node, Representatives Normalize the deviation, represents the attention degree of the vth display node after suppression; The step S2 of obtaining the contribution ratio of the integrated resources of each display node to the system constructed by the node according to the node data is specifically as follows: forming an input data set and an output data set according to all the integrated data generated in the actual production process of each day in the node data, calculating the average value of the maximum Pearson correlation coefficient between all the input data sets and all the output data sets, and obtaining the contribution ratio of the integrated resources of each display node to the system constructed by the node; The calculation formula of system contribution ratio can be expressed as: Among them, X represents each type of input data set in the integrated data of each display node. represents the mth type of input data set of the vth display node; Y represents each type of output data set in the integrated data of each display node. represents the nth type of output data set of the vth display node; M represents the number of input data sets; represents the absolute value of the Pearson correlation coefficient between the m-th input data set and the n-th output data set of the v-th display node, It represents the maximum absolute value of the Pearson correlation coefficient of the m-th input data set among all output data sets; It represents the contribution ratio of the integrated resources of the vth display node to the system constructed by the node; In step S3, the model completion degree of each display node is obtained according to the process information amount, process simulation amount and the contribution ratio of the integrated resources of each display node to the system constructed by the node: The model completion of each display node is obtained based on the contribution ratio of the integrated resources of each display node to the system constructed by the node, the absolute value of the information difference between each process information and process simulation quantity; The model completion calculation formula can be expressed as: in, It represents the contribution ratio of the integrated resources of the vth display node to the system constructed by the node. represents the information difference between the process information and the process simulation of the vth display node, Indicates the model completion degree of the vth display node; The process information amount of each display node obtained according to the node data in step S2 is specifically: According to the input data set and the output data set, a k-means clustering method is used to obtain a plurality of input clusters and output clusters; Obtaining the DBI index of the input cluster and the DBI index of the output cluster according to the ratio of the intra-class difference to the inter-class difference of the input cluster and the output cluster; The process information amount of each display node is obtained according to the number of input clusters, the number of output clusters, the DBI index of the input clusters, and the DBI index of the output clusters; The process information calculation formula can be expressed as: Among them, a and b represent input and output respectively, and G represents the number of clusters. represents the number of input clusters, represents the number of output clusters, Represents the DBI index of the output cluster, represents the DBI index of the input cluster, Represents the process information amount of this display node; The process simulation quantity of each display node obtained according to the node data in step S2 is specifically: According to all interactive access data and interactive display data of each display node in the node data, a k-means clustering method is used to obtain a number of interactive access clusters and interactive display clusters; According to the ratio of the intra-class difference to the inter-class difference of the interactive access cluster and the interactive display cluster, the DBI index of all interactive access clusters and the DBI index of the interactive display cluster are obtained; The process simulation quantity of each display node is obtained according to the number of data clusters of interactive access data, the number of data clusters of interactive display data, the DBI index of data clusters of interactive access data, and the DBI index of data clusters of interactive display data; the formula relationship of the process simulation quantity is the same as the formula relationship of the process information quantity.

2. A digital twin construction method for data interactive display according to claim 1, characterized in that: Each display node is specifically a node of each production process output in the virtual production line constructed by the digital twin.

Citation Information

Patent Citations

  • Unmanned aerial vehicle auxiliary edge calculation method for crowded venue

    CN114745666A

  • QoE guarantee fair resource optimization method based on digital twinborn

    CN116996937A