Overall adjusting device and method for catwalk rope of suspension bridge

By designing an overall catwalk rope adjustment device that includes steering beams, anchor beams, composite beams, temporary steel ropes and through-type jacks during the construction of suspension bridges, the problem of adjusting the catwalk load-bearing cables in the narrow anchor beam space is solved and achieved It provides fine adjustment without drilling and is suitable for catwalk load-bearing cable anchoring and adjustment in narrow working spaces.

CN118854792APending Publication Date: 2024-10-29CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410978578.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

In the construction of suspension bridges, the narrow working space of the anchor beam limits the adjustment of the catwalk load-bearing cables. The existing adjustment methods are not suitable, and the direct use of through-hole jacks requires drilling holes, which is inconvenient to operate.

Method used

An overall adjustment device for catwalk ropes in a suspension bridge is designed, including steering beams, anchor beams, composite beams, temporary steel ropes, through-core jacks and adjustment wires. The catwalk load-bearing cables are steered through the steering beams so that they can be adjusted on the anchor beams. For adjustment, use a through-type jack and adjustment wire to adjust the length and angle without drilling holes.

Benefits of technology

It achieves effective adjustment of catwalk load-bearing cables in a small space, avoids drilling operations, and ensures the balance and stability of the adjustment line. It is suitable for anchoring and adjustment of catwalk load-bearing cables in narrow operating spaces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118854792A_ABST
    Figure CN118854792A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of suspension bridge construction, and particularly relates to an overall adjusting device and method for a catwalk rope of a suspension bridge. The device comprises a steering beam, an anchoring beam located below the rear portion of the steering beam, a combination beam arranged in front of the steering beam, a distribution beam A temporarily fixed to the rear side face of the anchoring beam, a distribution beam D temporarily fixed to the rear side face of the distribution beam A, a center hole jack installed on the rear side face of the distribution beam D and an adjusting line. The number of the adjusting lines is at least two, and the two adjusting lines are symmetrically arranged in the vertical direction. According to the method, the overall adjusting device for the catwalk rope of the suspension bridge is used for adjusting the line shape of a catwalk bearing cable; the catwalk bearing cable is steered through the steering beam, so that the catwalk bearing cable can be anchored on the anchoring beam with a narrower space; holes do not need to be punched in the anchoring beam; the adjusting lines which are arranged up and down are symmetrical and have the same length, so that the upper and lower adjusting lines are stressed averagely when the upper and lower center hole jacks work synchronously.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of suspension bridge construction, and in particular relates to a suspension bridge catwalk rope integral adjustment device and an adjustment method. Background Art

[0002] The catwalk is a temporary construction access road in a linear shape erected under the main cable and parallel to the main cable during the construction of the suspension bridge. The catwalk is usually designed to be one upstream and one downstream. The catwalk is erected before the main cable, and in the process of erecting the main cable, the position and line shape of the catwalk need to be adjusted according to the main cable line shape of the suspension bridge, the bridge deck elevation, the wind load, the construction load and other parameters. It is generally achieved by setting an adjustable anchoring system at both ends of the catwalk load-bearing cable. For example, a common anchoring system has a large and small pull rod composition adjustment system, including a large pull rod anchored on the embedded part, an anchor box connected to the large pull rod, and a small pull rod connected to the anchor box. The catwalk weighing cable is connected to the small pull rod. The large pull rod is used for the overall retraction and release of the catwalk, and the small pull rod is used to adjust the length deviation of the catwalk cable so that all catwalk cables are stressed synchronously. When this method is adopted, the small pull rod is evenly anchored on the anchor box, and the large pull rod is at both ends of the anchor box, so a larger anchoring space is required.

[0003] In a certain project, a single-tower suspension bridge is used, with a two-span continuous catwalk, and the span combination is 555+160m. The design spacing of the load-bearing ropes of the side span catwalk from the center of the main cable is 1.7m, and the design spacing of the load-bearing ropes of the middle span catwalk from the center of the main cable is 1.5m. Figure 1 The anchorage of the catwalk load-bearing cables on the north bank of the cross-river suspension bridge in this project was designed. Due to the limitation of the onshore site, only a narrow working space was designed for the anchorage and adjustment of the catwalk load-bearing cables. The length of the anchor beam is 6.2m, with 1.1m pre-buried at both ends, and only 4m of catwalk load-bearing cable anchorage and adjustment space in the middle. The spacing between the catwalk weighing cables in the group is 630mm, and the spacing between the two groups of catwalk load-bearing cables is 650mm×2. There are 3×2 groups of catwalk load-bearing cables in total. Some catwalk load-bearing cables need to change direction before they can be connected to the anchor beam. Due to the small working space, the above-mentioned adjustment method of the large and small pull rod combination is not applicable. If a through-hole jack is used directly to adjust the catwalk load-bearing cable, a hole must be drilled on the anchor beam so that the through-hole jack is aligned with the center of the catwalk load-bearing cable. However, the working space reserved around the anchor beam in the north bank anchorage in this project is small, which is not convenient for drilling equipment to enter and personnel to operate. Therefore, in view of the working conditions of the anchorage in this project, the present invention proposes a device and method for adjusting the catwalk load-bearing cable in a narrow space. Summary of the invention

[0004] The object of the present invention is to overcome the deficiencies of the prior art and to provide a suspension bridge catwalk rope integral adjustment device and adjustment method, which can adjust the catwalk load-bearing rope under the condition of narrow anchoring working space.

[0005] In order to achieve the above object, the present invention provides the following technical solutions:

[0006] A suspension bridge catwalk rope integral adjustment device, comprising:

[0007] A steering beam, wherein the steering beam is fixed to the anchor;

[0008] An anchor beam, the anchor beam is fixed on the anchor and is located at the rear and lower part of the turning beam; the catwalk load-bearing cable is passed through the turning beam and anchored on the anchor beam;

[0009] A composite beam, wherein the composite beam is suspended in front of the steering beam, a beam hole is provided through the composite beam in the front-rear direction, and a plurality of rope fixings are also provided on the composite beam;

[0010] A temporary steel rope, which is anchored on the rope fixing member and connected to the catwalk load-bearing rope through a plurality of temporary rope clamps;

[0011] A distribution beam A, wherein the distribution beam A is temporarily fixed to the rear side of the anchor beam;

[0012] A distribution beam D, which is temporarily fixed to the rear side of the distribution beam A, and is provided with upper holes and lower holes arranged up and down;

[0013] A through-type jack, which is installed on the rear side of the distribution beam D, and is arranged corresponding to the upper hole and the lower hole;

[0014] The adjustment line comprises at least two adjustment lines symmetrically arranged in the up-down direction; the rear end of the upper adjustment line is anchored at the rear side of the through-type jack corresponding to the upper hole, and the front end of the adjustment line passes through the upper hole and is anchored on the combined beam after passing through the steering beam; the rear end of the lower adjustment line is anchored at the rear side of the through-type jack corresponding to the lower hole, and the front end of the adjustment line passes through the lower hole and is anchored on the combined beam after merging with the upper adjustment line after passing through the steering beam; the upper and lower adjustment lines are regarded as a group, and at least one group of adjustment lines is respectively arranged on the left and right sides of the rear side surface of the anchor beam distribution beam A.

[0015] Furthermore, an adjustment line located above or below is composed of N steel strands, and a porous anchor plate is provided on the side of the composite beam facing away from the steering beam, and the number of holes in the porous anchor plate is not less than 2N; the steel strands of the adjustment line are anchored on the porous anchor plate by anchors.

[0016] Furthermore, the composite beam includes an elongated distribution beam B and a distribution beam C fixed to the front end surface of the distribution beam B; the upper adjustment line merges with the lower adjustment line, passes through the distribution beam B and the distribution beam C, and is anchored on the porous anchor plate.

[0017] Furthermore, the distribution beam A is protrudingly provided with a first support block, a second support block and a third support block on the rear front side. The first support block is arranged in the middle of the distribution beam A, corresponding to a position between two groups of catwalk load-bearing cables on the anchor beam, and the second support block and the third support block are arranged at the ends of the distribution beam A, each corresponding to a group of catwalk load-bearing cables; the first support block, the second support block and the third support block are respectively fixed to the anchor beam by spot welding.

[0018] Furthermore, a direction-changing mechanism is provided on one side of the steering beam, and one group of catwalk load-bearing cables passes through the steering beam in parallel, and part of the catwalk load-bearing cables in another group of catwalk load-bearing cables are changed in direction by the direction-changing mechanism to reach a designed parallel state.

[0019] Furthermore, a first arc-shaped steel plate protection is fixed to the upper part of the rear side of the steering beam, and the adjustment line passes through the first arc-shaped steel plate protection; the adjustment line located above and the adjustment line located below pass through the upper and lower sides of the anchor beam respectively, and second arc-shaped steel plate protections are fixed to the upper and lower ends of the front side of the anchor beam respectively.

[0020] Furthermore, the steering beam is fixed to the front side of the anchor; the angle between the catwalk load-bearing cable between the steering beam and the anchor beam and the horizontal direction is 15° to 17°.

[0021] The present invention also proposes a method for adjusting the overall rope of a suspension bridge catwalk, which uses the above-mentioned overall rope adjustment device for the suspension bridge catwalk, and comprises the following steps:

[0022] Step 1: Set up an operating platform at the anchor beam, and use the lifting equipment to install the distribution beam A, the combined beam, and the distribution beam D; one end of the temporary steel rope is anchored on the rope fixture, and the other end is connected to the catwalk load-bearing rope through a number of temporary rope clamps;

[0023] Step 2: Install the jack support seat on the distribution beam A and distribution beam D, and then install the through-type jack and adjustment line;

[0024] Step 3: Start the through-type jack and start tightening the adjustment line and temporary steel rope; the through-type jack tensions the adjustment line in stages and pulls the composite beam until it is tensioned in place;

[0025] Step 4: After tensioning is in place, release the anchor rope clamps of the catwalk load-bearing cables one by one, tighten the catwalk load-bearing cables in time, and reinstall the anchor rope clamps; remove the through-type jack, install the jack seat, and reinstall the through-type jack;

[0026] Start the jack to tension the adjustment line, release the anchor clip at the jack seat, and then release the tension of the adjustment line to 0;

[0027] Dismantle the temporary cable adjustment structure; the temporary cable adjustment structure includes through-type jacks, jack seats, adjustment lines, temporary steel ropes, distribution beams A, combined beams, and distribution beams D.

[0028] Furthermore, in step three, the traction distance of the composite beam is graded into 15 cm. The mid-span elevation needs to be measured every 15 cm of traction and compared with the theoretical data. Only after it is correct can the next level of tensioning be carried out until it is in place.

[0029] Furthermore, when adjusting the catwalk load-bearing cables in step 4, the next catwalk load-bearing cable can be adjusted only after one catwalk load-bearing cable is adjusted.

[0030] The beneficial effects of the present invention are:

[0031] The present invention uses a steering beam to steer the catwalk load-bearing cable, so that the catwalk load-bearing cable can be anchored on an anchoring beam with a narrower space; the present invention uses two through-type jacks arranged up and down to adjust the line shape of the catwalk load-bearing cable by using adjustment lines passing through the upper and lower surfaces of the anchoring beam, without drilling holes on the anchoring beam;

[0032] The upper and lower adjustment lines are symmetrical and thus have the same length, which can ensure that the upper and lower adjustment lines are evenly stressed when the upper and lower through-type jacks work synchronously; at the same time, the distribution beams A and D are reasonably designed to provide stable support points for the through-type jacks, ensuring the balance and stability of the through-type jacks when working, so that the present invention can be applied to the anchoring and adjustment of catwalk load-bearing cables in narrow working spaces. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. Among them:

[0034] Figure 1 The anchorage condition of the catwalk load-bearing cables in a project.

[0035] Figure 2 It is a schematic diagram of the plan structure of the overall adjustment device for the catwalk rope of a suspension bridge according to an embodiment of the present invention.

[0036] Figure 3 for Figure 1 Schematic diagram of the elevation structure along the 1-1 direction.

[0037] Figure 4 for Figure 1 Schematic diagram of the elevation structure along the 2-2 direction.

[0038] Figure 5 The overall adjustment method of the catwalk rope of the suspension bridge of the present invention is as follows: Figure 1 .

[0039] Figure 6 The overall adjustment method of the catwalk rope of the suspension bridge of the present invention is as follows: Figure 2 .

[0040] Figure 7 The overall adjustment method of the catwalk rope of the suspension bridge of the present invention is as follows: Figure 3 .

[0041] Figure 8 The overall adjustment method of the catwalk rope of the suspension bridge of the present invention is as follows: Figure 4 .

[0042] Fig. 9 The overall adjustment method of the catwalk rope of the suspension bridge of the present invention is as follows: Figure 5 .

[0043] Fig.10 for Figure 8 Schematic diagram of the elevation structure along the 1-1 direction.

[0044] Fig.11 It is a schematic diagram of the rear structural view of the distribution beam A according to an embodiment of the present invention.

[0045] Fig.12 It is a schematic elevation view of a distribution beam B according to an embodiment of the present invention.

[0046] Fig.13 It is a schematic diagram of the rear structural view of the distribution beam C according to an embodiment of the present invention.

[0047] Fig.14 It is a schematic diagram of the rear structural view of the distribution beam D according to an embodiment of the present invention.

[0048] In the figure: 1-through-type jack, 2-adjustment line, 3-distribution beam A, 4-distribution beam B, 5-distribution beam C, 6-distribution beam D, 61-upper hole, 62-lower hole, 7-anchor beam, 8-steering beam, 9-first arc steel plate protection, 10-second arc steel plate protection, 11-temporary steel rope, 12-temporary rope clamp, 13-steel rod, 14-multi-porous anchor plate, 15-jack seat, 16-anchor rope clamp, 100-catwalk load-bearing cable. DETAILED DESCRIPTION

[0049] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0050] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present invention. The terms "connected" and "connected" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0051] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.

[0052] For the convenience of description, the invention takes one of the anchors on both sides as an example for explanation, and Figure 2 , Figure 3 As shown in the figure, the direction of the catwalk load-bearing cable toward the opposite bank is defined as the front, and the anchor side of this bank is defined as the rear.

[0053] like Figures 2 to 4 , Figures 10 to 14 As shown, a suspension bridge catwalk rope integral adjustment device comprises: a steering beam 8, an anchor beam 7, a distribution beam A3, a distribution beam B4, a distribution beam C5, a distribution beam D6, a temporary steel rope 11, a through-type jack 1 and an adjustment line 2;

[0054] The steering beam 8 is bolted to the front side of the anchor; the two ends of the anchor beam 7 are pre-buried in the anchor and located at the rear and lower part of the steering beam 8; the catwalk load-bearing cable 100 is passed through the steering beam 8 and anchored on the anchor beam 7 through the anchor rope clamp 16, and the rear side of the anchor beam 7 is arranged toward the steering beam 8, so that the anchor beam 7 is in an inclined state as a whole, and the angle between the bottom surface of the anchor beam 7 and the horizontal direction is about 15° to 17°;

[0055] The combined beam is suspended in front of the steering beam 8, a beam hole is provided through the combined beam in the front-to-back direction, and a plurality of rope fixings are also provided on the combined beam;

[0056] The temporary steel rope 11 is anchored on the rope fixture and connected to the catwalk load-bearing rope 100 through a plurality of temporary rope clips 12; in this embodiment, 15 temporary rope clips 12 are specifically used;

[0057] The distribution beam A3 is temporarily fixed to the rear side of the anchor beam 7;

[0058] The distribution beam D6 is temporarily fixed to the rear side of the distribution beam A3, and the distribution beam D6 is provided with an upper hole 61 and a lower hole 62 arranged up and down; the distance between the upper hole 61 and the lower hole 62 is greater than the height of the distribution beam A3 and the height of the anchor beam 7, so that there is a height difference between the rear ends of the upper and lower adjustment lines; these adjustment lines can pass through the upper and lower sides of the anchor beam 7 respectively, without changing the structure of the anchor beam 7 itself;

[0059] A through-type jack 1, which is installed on the rear side of the distribution beam D6, and the through-type jack 1 is arranged corresponding to the upper hole 61 and the lower hole 62;

[0060] The adjustment line 2 includes at least two adjustment lines symmetrically arranged in the up-down direction; the rear end of the upper adjustment line 2 is anchored to the rear side of the through-type jack 1 corresponding to the upper hole 61 through an anchor, and the front end before adjustment passes through the upper hole 61 and is anchored on the composite beam after passing through the steering beam 8; the rear end of the lower adjustment line 2 is anchored to the rear side of the through-type jack 1 corresponding to the lower hole 62 through an anchor, and the front end of the adjustment line 2 passes through the lower hole 62 and is anchored on the composite beam after merging with the upper adjustment line 2 after passing through the steering beam 8; the upper and lower adjustment lines 2 are recorded as a group, and preferably, a group of adjustment lines 2 is arranged on the left and right sides of the distribution beam A3.

[0061] In this project, a steel wire rope with a specification of Φ48mm 6*36WS+IWR 1960MPa is used as the catwalk load-bearing cable 100; the adjustment device uses 4 adjustment lines 2 and 4 through-type jacks 1 of the same model, and an oil pump controls the synchronous movement of the 4 through-type jacks 1. The maximum stroke of the through-type jack 1 is 20cm. The line shape of the catwalk is adjusted once before the catwalk is re-hoisted. This adjustment is divided into four strokes, and each stroke tensions a safety range of about 15cm; when adjusting, through-type jacks of the same model and more than 250t are uniformly used; after the catwalk is re-hoisted, the catwalk is changed from the original fixed method to hanging under the main cable, and most of the catwalk force is transferred to the main cable. The force of a single catwalk load-bearing cable 100 is about 3t~5t. At this time, a winch or electric hoist can be used to adjust the line shape of the catwalk load-bearing cable 100.

[0062] In one embodiment, Figures 2 to 4 , Fig.12 , Fig.13As shown, the composite beam includes a long distribution beam B4 and a distribution beam C5 fixed on the front end surface of the distribution beam B4; a porous anchor plate 14 is arranged on the front side of the distribution beam B4; the adjustment line 2 located above merges with the adjustment line 2 located below, passes through the distribution beam B4 and the distribution beam C5 and is anchored on the porous anchor plate 14; an adjustment line 2 located above or below is composed of N steel strands, and the number of holes in the porous anchor plate 14 is not less than 2N; the adjustment line 2 located above is anchored in the upper half of the porous anchor plate 14, and the adjustment line 2 located below is anchored in the lower half of the porous anchor plate 14, the purpose of which is to prevent the steel strands from crossing, making it smooth and better stressed; in this project, an adjustment line 2 is composed of a harness of 7 steel strands, a single steel strand is φ15.24mm, and has a tensile strength of 1860MPa, and the porous anchor plate 14 uses a fourteen-hole anchor plate.

[0063] In one embodiment, the distribution beam B4 is formed by two symmetrically arranged distribution sub-beams connected by bolts; Fig.12 As shown, four mounting feet are fixed on opposite sides of the distribution sub-beams, and the two distribution sub-beams are connected into a whole by M27 bolts; the gap between the two distribution sub-beams serves as a beam hole for the catwalk load-bearing cable 100, the adjustment line 2, and the temporary steel rope 11 to pass through; the rope fasteners are steel rods 13 fixed on the two distribution sub-beams, and one end of the temporary steel rope 11 is sleeved on the steel rod 13; the distribution beam B4 adopts the assembly form of two distribution sub-beams, which is convenient for disassembly and assembly; specifically, during installation, the distribution sub-beam above the catwalk load-bearing cable 100 can be installed by a tower crane, and the distribution sub-beam below the catwalk weighing cable can be installed by a tower crane and a fall chain.

[0064] In this project, if Figure 2 , Fig.11 As shown, the distribution beam A3 is protrudingly provided with a first support block, a second support block and a third support block on the front side. The first support block is arranged in the middle of the distribution beam A3, corresponding to a position between two groups of catwalk load-bearing cables 100 on the anchor beam 7. The second support block and the third support block are arranged at both ends of the distribution beam A3, each corresponding to a group of catwalk load-bearing cables 100; the first support block, the second support block and the third support block are respectively fixed to the anchor beam 7 by spot welding; the distribution beam D6 and the distribution beam D6 are small in size and easy to construct in the narrow working space of the north bank anchorage, and the use of spot welding to fix the anchor beam 7 has little impact on the structure and is easy to dismantle.

[0065] In this project, if Figure 2 , Fig. 9 As shown, a direction-changing mechanism is provided on one side of the steering beam 8, and a group of catwalk load-bearing cables 100 pass through the steering beam 8 in parallel, and part of the catwalk load-bearing cables 100 in another group of catwalk load-bearing cables 100 reach the designed parallel state after being changed by the direction-changing mechanism.

[0066] Preferably, Figure 2 , Figure 3 , Fig. 9 , Fig.10 As shown, a first arc-shaped steel plate protection 9 is fixed to the upper part of the rear side of the steering beam 8, and the adjustment line 2 passes around the first arc-shaped steel plate protection 9; the upper adjustment line 2 and the lower adjustment line 2 pass from above and below the anchor beam 7 respectively, and second arc-shaped steel plate protections 10 are fixed to the upper and lower ends of the front side of the anchor beam 7 respectively; the first arc-shaped steel plate protection 9 and the second arc-shaped steel plate protection 10 are used to reduce the wear of the beam corner structure on the adjustment line 2 and the catwalk load-bearing cable 100.

[0067] In a specific embodiment, Figure 2 , Figure 3 , Fig. 9 , Fig.10 As shown, the steering beam 8 is fixed on the front side of the anchor; the angle between the catwalk load-bearing cable 100 between the steering beam 8 and the anchor beam 7 and the horizontal direction is 15°~17°; the direction of the anchor beam 7 is consistent with the direction of the catwalk load-bearing cable 100 between the steering beam 8 and the anchor beam 7; the angle between the bottom surface of the anchor beam 7 and the horizontal direction in this project is 16.444°, the horizontal distance from the center of the anchor beam 7 to the mounting surface of the steering beam 8 is 3500mm, and the distance from the distribution beam B4 to the mounting surface of the steering beam 8 is 3000mm.

[0068] The overall adjustment device for the catwalk rope of the suspension bridge of the present invention has no structure passing through the anchor beam during adjustment, and the adjustment line only passes through the anchor beam from above and below. Therefore, there is no need to introduce punching equipment and perform punching operations in the working space of the anchor; and the length of the catwalk load-bearing cable is adjusted by four through-type jacks in cooperation with the adjustment line. The through-type jacks and the distribution beams A and D are convenient for entering the working space of the anchor and are easy to install and remove, so that the present invention is suitable for the anchoring and adjustment of the catwalk load-bearing cable 100 in a narrow working space.

[0069] In addition, the conventional catwalk anchor rod or anchor box cannot be bent, and the main cable line shape after the bridge is completed has a higher verticality than when the main cable is empty. Therefore, the anchor point of the conventional catwalk tie rod or the anchor position of the anchor box is higher. Although such a setting is more in line with the main cable line shape after the bridge is completed, when the main cable is first erected, due to the low verticality, the main cable may fall on the catwalk, causing the catwalk to be subjected to increased stress, posing a safety hazard. The conventional method is to change the anchor point of the catwalk load-bearing cable 100 to avoid this situation, but it is more troublesome. In the present invention, due to the turning beam 8 Therefore, the position of the anchor beam 7 is lower than that of the traditional anchor beam 7. When the main cable is at a low position at the beginning, the steering beam 8 is not used first, but a composite beam or other displacement frame is used to displace the catwalk load-bearing cable 100. This will make the position of the end of the catwalk load-bearing cable 100 lower, and can prevent the main cable from falling on the catwalk; after the main cable position is raised, the steering beam 8 is installed to raise the starting point of the catwalk linear adjustment, so as to facilitate the coordination of the main cable verticality after the bridge is built; therefore, compared with the traditional catwalk anchoring and adjustment method, the present invention can install the anchor beam 7 in place at one time.

[0070] The present invention also proposes a method for adjusting the overall rope of a suspension bridge catwalk, which adopts the above-mentioned overall rope adjustment device for the suspension bridge catwalk, taking four adjustment wires 2 as an example, and comprises the following steps:

[0071] Step 1:

[0072] Step 1.1 Set up an operating platform at the anchor beam 7, and use a tower crane or other lifting equipment to install the distribution beam A3 and distribution beam D6;

[0073] Step 1.2: Use a tower crane to install the distribution sub-beam above the catwalk load-bearing cable 100, use a tower crane and a fall chain to install the distribution sub-beam below the catwalk load-bearing cable 100, and connect the two distribution sub-beams into a whole through M27 bolts to form a distribution beam B4; install a number of steel bars 13 on the distribution beam B4 as rope fasteners;

[0074] Step 1.3 Install the φ48mm temporary steel rope 11. One end of the temporary steel rope 11 is put on the distribution beam B4 steel rod 13, and the other end is connected to the catwalk load-bearing rope 100 through 15 rope clamps. During installation, ensure that the steel ropes remain straight;

[0075] Adjustment of the linearity / sag of the catwalk load-bearing cable 100 requires adjustment of the anchoring length of the end of the catwalk load-bearing cable 100; Figure 5 As shown, the purpose of this step is to connect the temporary steel rope 11 with the catwalk load-bearing cable 100 at the combined beam, so as to facilitate the transfer of the force of the catwalk weighing cable from the anchor beam 7 to the combined beam, thereby facilitating the adjustment of the anchoring length of the end of the catwalk load-bearing cable 100;

[0076] Step 2:

[0077] Step 2.1 Weld jack support steel on distribution beam A3 and distribution beam D6 as jack support seat, install through-type jack 1, four through-type jacks 1 are installed on two distribution beams D6 corresponding to upper hole 61 and lower hole 62 respectively; through-type jack 1 is equipped with working anchor and tool anchor, and the working anchor and tool anchor are matched with through-type jack for conventional use; note that four jacks of the same model must be set in a single width;

[0078] Step 2.2 Install the tensioning adjustment wire 2; after the preparation work is completed, the overall structure of the suspension bridge catwalk rope adjustment device is as follows Figure 6 As shown;

[0079] Step 3:

[0080] Step 3.1 After the preparation work is completed, start the through-type jack 1, start tightening the steel strand and temporary steel rope 11, and check whether all steel ropes can be tightened;

[0081] Step 3.2 Use jacks to apply pressure in stages to tension the steel strands, and observation should be strengthened during the pressure application process;

[0082] Step 3.3: Gradually tension and tug the distribution beam B4. The tug distance of the distribution beam B4 is graded to be 15 cm. The mid-span elevation needs to be measured for every 15 cm tug and compared with the theoretical data. Only after it is correct can the next level of tensioning be carried out until it is in place. In this project, one adjustment is divided into 4 strokes, the total tensioning distance is 665 mm, and the vertical change is 2.565 m.

[0083] like Figure 7 The figure shows the position of the distribution beam B4 after tensioning. Figure 2 , the position of the distribution beam B4 obviously moves backward (towards the bank);

[0084] Step 4:

[0085] Step 4.1 After tensioning in place, release the anchor rope clamps 16 of the catwalk load-bearing cables 100 in turn, tighten the catwalk load-bearing cables 100 in time, and reinstall the anchor rope clamps 16; after adjusting one catwalk load-bearing cable 100, the next temporary steel rope 11 can be adjusted;

[0086] Step 4.2 Remove the through-type jack 1, install the jack seat 15, and reinstall the through-type jack 1; Figure 8 The structure after the jack seat 15 is installed is shown.

[0087] Step 4.3: Start the jack to tension the adjustment line 2. The end of the adjustment line 2 is anchored only by the tool anchor. Release the anchor clip at the jack seat 15, then release the tension of the adjustment line 2 to 0, and remove the temporary structure of the adjustment cable. At this time, the force of the catwalk load-bearing cable 100 is completely transferred to the anchor beam 7, which can ensure the safety of the catwalk when in use.

[0088] The temporary cable adjustment structure includes a through-type jack 1, a jack seat 15, an adjustment line 2, a temporary steel rope 11, a distribution beam A3, a distribution beam B4, and a distribution beam D6; the catwalk load-bearing cable 100 anchoring structure after the temporary cable adjustment structure is removed is as follows: Fig. 9 , Fig.10 As shown, the catwalk load-bearing cable 100 is anchored on the anchor beam 7 after passing through the turning beam 8.

[0089] The overall adjustment method of the catwalk rope of the suspension bridge of the present invention first connects the end of the catwalk load-bearing cable 100 with the temporary steel rope 11 through the temporary rope clamp 12, and transfers the stress point of the catwalk load-bearing cable 100 from the anchor beam 7 to the combined beam. Then, the length of the four adjustment lines 2 is adjusted by the through-hole jack to accurately adjust the position and angle of the combined beam, and then the catwalk load-bearing cables 100 are re-anchored to achieve fine adjustment of their position and length; finally, the temporary cable adjustment structure is dismantled, and the catwalk load-bearing cables 100 are anchored on the anchor beam 7.

[0090] The adjustment device and adjustment method of the present invention are used when the linearity of the catwalk needs to be adjusted at different stages of the main cable installation; the adjustment takes 1 to 2 days. After the adjustment is completed, since the temporary structure of the cable adjustment relies on multiple distribution beams and the adjustment line 2 to bear the load, the safety factor is low. Therefore, it needs to be dismantled after the adjustment is completed, so that the catwalk load-bearing cable 100 can be restored to the state of being anchored on the anchor beam 7 to achieve the safety factor required by the construction.

[0091] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are within the scope of protection of the pending claims of the present invention.

Claims

1. A suspension bridge catwalk rope integral adjustment device, characterized in that: include: A steering beam (8), wherein the steering beam (8) is fixed on an anchor; An anchor beam (7), the anchor beam (7) is fixed on the anchor and is located at the rear and lower part of the steering beam (8); the catwalk load-bearing cable (100) passes through the steering beam (8) and is anchored on the anchor beam (7); A composite beam, the composite beam being suspended in front of the steering beam (8), the composite beam being provided with beam holes extending through the composite beam in the front-rear direction, and the composite beam being provided with a plurality of rope fixings; A temporary steel rope (11), wherein the temporary steel rope (11) is anchored on the rope fixing member and connected to the catwalk load-bearing rope (100) via a plurality of temporary rope clamps (12); A distribution beam A (3), the distribution beam A (3) being temporarily fixed to the rear side of the anchor beam (7); A distribution beam D (6), the distribution beam D (6) is temporarily fixed to the rear side of the distribution beam A (3), and the distribution beam D (6) is provided with an upper hole (61) and a lower hole (62) arranged up and down; A through-type jack (1), the through-type jack (1) being installed on the rear side of the distribution beam D (6), the through-type jack (1) being arranged corresponding to the upper hole (61) and the lower hole (62); An adjustment line (2), the adjustment line (2) comprising at least two symmetrically arranged in the up-down direction; the rear end of the adjustment line (2) located at the top is anchored at the rear side of the through-type jack (1) corresponding to the upper hole (61), the front end of the adjustment line (2) passes through the upper hole (61) and is anchored on the composite beam after passing through the steering beam (8); the rear end of the adjustment line (2) located at the bottom is anchored at the rear side of the through-type jack (1) corresponding to the lower hole (62), the front end of the adjustment line (2) passes through the lower hole (62) and is anchored on the composite beam after merging with the upper adjustment line (2); the upper and lower adjustment lines (2) are regarded as a group, and at least one group of adjustment lines (2) is arranged on the left and right sides of the distribution beam A (3).

2. The overall adjustment device for catwalk ropes of a suspension bridge according to claim 1, characterized in that: An adjustment line (2) located above or below is composed of N steel strands, and a porous anchor plate (14) is provided on the side of the composite beam facing away from the steering beam (8), and the number of holes in the porous anchor plate (14) is not less than 2N; the steel strands of the adjustment line (2) are anchored on the porous anchor plate (14) by anchors.

3. The overall adjustment device for catwalk ropes of a suspension bridge according to claim 2, characterized in that: The composite beam comprises an elongated distribution beam B (4) and a distribution beam C (5) fixed to the front end surface of the distribution beam B (4); an adjustment line (2) located above and an adjustment line (2) located below merge and then pass through the distribution beam B (4) and the distribution beam C (5) and are anchored on a porous anchor plate (14).

4. The overall adjustment device for catwalk ropes of a suspension bridge according to claim 1, characterized in that: A first support block, a second support block and a third support block are protrudingly provided on the front side of the distribution beam A (3); the first support block is arranged in the middle of the distribution beam A (3) and corresponds to a position between two groups of catwalk load-bearing cables (100) on the anchor beam (7); the second support block and the third support block are arranged at the ends of the distribution beam A (3) and correspond to one group of catwalk load-bearing cables (100); the first support block, the second support block and the third support block are respectively fixed to the anchor beam (7) by spot welding.

5. The overall adjustment device for catwalk ropes of a suspension bridge according to claim 1, characterized in that: A direction-changing mechanism is provided on one side of the steering beam (8); a group of catwalk load-bearing cables (100) pass through the steering beam (8) in parallel; and part of the catwalk load-bearing cables (100) in another group of catwalk load-bearing cables (100) are changed in direction by the direction-changing mechanism to reach a designed parallel state.

6. The overall adjustment device for catwalk ropes of a suspension bridge according to claim 1, characterized in that: A first arc-shaped steel plate protection (9) is fixed to the upper part of the rear side of the steering beam (8), and the adjustment line (2) passes around the first arc-shaped steel plate protection (9); the adjustment line (2) located above and the adjustment line (2) located below pass through the upper and lower parts of the anchor beam (7) respectively, and second arc-shaped steel plate protections (10) are fixed to the upper and lower ends of the front side of the anchor beam (7) respectively.

7. The overall adjustment device for catwalk ropes of a suspension bridge according to claim 1, characterized in that: The steering beam (8) is fixed on the front side of the anchor; the included angle between the catwalk load-bearing cable (100) between the steering beam (8) and the anchor beam (7) and the horizontal direction is 15° to 17°.

8. A method for adjusting the overall rope of a suspension bridge catwalk, using the overall rope adjustment device for a suspension bridge catwalk as claimed in any one of claims 1 to 7, characterized in that: The following steps are involved: Step 1: Set up an operating platform at the anchor beam (7), and use a lifting device to install the distribution beam A (3), the combined beam, and the distribution beam D (6); one end of the temporary steel rope (11) is anchored on the rope fixture, and the other end is connected to the catwalk load-bearing rope (100) through a plurality of temporary rope clamps (12); Step 2: Install the jack support seat on the distribution beam A (3) and the distribution beam D (6), and then install the through-type jack (1) and the adjustment line (2); Step 3: Start the through-type jack (1) and start tightening the adjustment line (2) and the temporary steel rope (11); the through-type jack (1) tensions the adjustment line (2) in stages and pulls the composite beam until it is tensioned in place; Step 4: After tensioning in place, release the catwalk load-bearing cable (100) and the anchoring rope clamp (16) in turn, tighten the catwalk load-bearing cable (100) in time, and then reinstall the anchoring rope clamp (16); remove the through-type jack (1), install the jack seat (15), and reinstall the through-type jack (1); Start the jack to tension the adjustment line (2), release the anchor clip at the jack seat (15), and then release the tension of the adjustment line (2) to 0; The temporary cable adjustment structure is dismantled; the temporary cable adjustment structure comprises a through-type jack (1), a jack seat (15), an adjustment line (2), a temporary steel rope (11), a distribution beam A (3), a combined beam, and a distribution beam D (6).

9. The method for adjusting the overall rope of a suspension bridge catwalk according to claim 8, characterized in that: In step three, the traction distance of the composite beam is graded into 15cm. The mid-span elevation needs to be measured every 15cm traction and compared with the theoretical data. Only after it is correct can the next level of tensioning be carried out until it is in place.

10. The method for adjusting the overall rope of a suspension bridge catwalk according to claim 8, characterized in that: When the catwalk load-bearing cable (100) is adjusted in step 4, the next catwalk load-bearing cable (100) can be adjusted only after one catwalk load-bearing cable (100) is adjusted.