Protective cylinder sinking and pouring operation integrated platform

The I-beam support structure and steel wire ropes are used to connect the casing, combined with the steel grating plate and steel mesh covering, to solve the problem of casing sinking and safety hazards, achieve platform stability and safety, and reduce construction costs and risk.

CN118854902APending Publication Date: 2024-10-29CHINA CONSTRUCTION THIRD ENGINEERING BUREAU (HUAIAN) INVESTMENT & CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411122825.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

When embedding the casing in soft ground, the casing is prone to sinking and cannot be pulled out, causing foundation damage and increased costs. At the same time, the hole mouth is slippery when the cast-in-place pile is drilled, posing safety risks.

Method used

An integrated platform for protective tube sinking and pouring operations is designed. The protective tube is connected through an I-beam support structure and a steel wire rope. It is covered with a steel grid plate and steel mesh. A height adjustment mechanism and a liquid level are set up to ensure the stability of the platform. sex and safety.

Benefits of technology

It effectively prevents the casing from sinking, provides a safe working surface, reduces the construction period, machinery and labor costs, and improves construction safety. The platform has a simple structure, is easy to install and disassemble, and can be recycled.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118854902A_ABST
    Figure CN118854902A_ABST
Patent Text Reader

Abstract

The invention discloses a protective cylinder sinking and pouring operation integrated platform which comprises a supporting structure, a protective cylinder and a protective structure, the protective cylinder is hung on the supporting structure, and the protective structure is laid on the supporting structure. The protective cylinder sinking and pouring operation integrated platform has the beneficial effects that the steel wire rope penetrates through the first hanging ring and the second hanging ring to connect the protective cylinder and the supporting structure, and the risk that the protective cylinder sinks can be effectively prevented; the surfaces of the pile casing and the supporting structure are covered with steel grating plates and steel bar meshes of different sizes, so that a working face can be effectively provided for operators, the safety of the construction operators around the orifice can be effectively protected, and the risk of falling is prevented; the protective cylinder sinking and pouring operation integrated platform is simple in structure, convenient to mount and dismount and low in manufacturing cost, and after concrete pouring is completed, the steel wire rope is dismounted, and the protective cylinder is pulled out for recycling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and in particular to an integrated platform for sinking and pouring protective tubes. Background Art

[0002] At present, bored piles with mud wall rotary drilling are widely used in the construction field. Bored piles require that steel casing must be configured at the wellhead to ensure the quality of the piles.

[0003] 1. For example, a Chinese patent discloses a safe working platform for bored piles (publication number: CN210459215U), the platform includes casing, bracket, steel mesh, bored pile conduit and conduit support steel plate, the bracket is the main frame of the whole operating platform, and is welded into a ladder shape by two longitudinal long steel pipes and multiple transverse short steel pipes, the bracket is placed on the casing; the two longitudinal long steel pipes of the bracket are welded with slideways on the outside, the steel mesh is connected to the bracket by sliding, and two conduit support steel plates hinged together are placed above the bracket, the bored pile conduit passes through the circular hole formed by the two conduit support steel plates and the square hole in the middle of the bracket, and is thus mounted on the bracket, and the size of the square hole in the middle of the bracket is slightly larger than the diameter of the bored pile conduit. The working platform is firm and well protected, ensuring the safety of the operation, while being easy to carry and use.

[0004] 2. For example, a Chinese patent discloses a bored pile water operation platform (publication number: CN213233454U), which includes a clamp, which is connected to the bored pile as a whole; support plates are fixed on the left and right of the clamp, and horizontal supports are fixed on the front and back of the support plates. The horizontal supports and vertical supports constitute the operation platform frame, and bamboo springboards are installed on the horizontal part of the operation platform frame to form an operation channel. A dense mesh safety vertical net is set around the operation platform frame to form a safety protection. It can provide a fixed operation point for bored pile water operations.

[0005] Although the prior art discloses some casing platforms, when burying casing in soft strata such as some silty soil and miscellaneous fill soil, especially when burying long casing, the casing often sinks during the bored pile drilling process, making it impossible to pull out the casing. It requires an excavator to dig large areas to find the casing before the steel casing can be pulled out smoothly, causing damage to the surrounding foundation and a significant increase in construction period costs, machinery costs, and labor costs. In addition, around the casing, due to the pollution of the hole mouth environment during bored pile drilling, the hole mouth becomes slippery, and the soil surface at the hole mouth is almost level with the casing, which poses a major safety hazard to construction workers when measuring the hole depth, cleaning the hole, and lowering the guide tube.

[0006] Therefore, it is necessary to propose an integrated platform for the sinking and pouring operations of the protective tube to solve the above problems. Summary of the invention

[0007] In view of the above-mentioned deficiencies in the prior art, the object of the present invention is to provide an integrated platform for sinking and pouring protective tubes to solve the above-mentioned problems.

[0008] A protective tube sinking and pouring operation integrated platform comprises a supporting structure, a protective tube and a protective structure. The protective tube is suspended on the supporting structure, and the protective structure is laid on the supporting structure.

[0009] Preferably, the supporting structure is formed by welding I-beams.

[0010] Preferably, a plurality of first suspension rings are provided inside the supporting structure.

[0011] Preferably, the casing is a hollow cylinder formed by folding a steel plate.

[0012] Preferably, a plurality of second hanging rings are provided on the outer wall of one end of the casing.

[0013] Preferably, the first lifting ring and the second lifting ring are connected by a steel wire rope.

[0014] Preferably, the protective structure comprises a steel grating plate and a steel mesh, the steel grating plate is laid on the supporting structure, and the steel mesh is laid on the steel grating plate.

[0015] Preferably, a hole cooperating with the casing is provided in the middle of the steel mesh.

[0016] Preferably, steel wires are bundled between the steel grating plate and the supporting structure, and steel wires are bundled between the steel grating plate and the steel mesh.

[0017] Preferably, a plurality of height adjustment mechanisms are arranged around the supporting structure, and the height adjustment mechanisms include a lifting cylinder and a pad. The lifting cylinder is installed on the supporting structure, and the output end of the lifting cylinder is connected to the pad.

[0018] Compared with the prior art, the present invention has the following beneficial effects: the present invention connects the casing and the supporting structure by passing the steel wire rope through the first lifting ring and the second lifting ring, which can effectively prevent the risk of the casing sinking; the surfaces of the casing and the supporting structure are covered with steel grating plates and steel mesh sheets of different sizes, which can effectively provide a working surface for the workers, and can also effectively protect the safety of construction workers around the hole and prevent the risk of falling; the integrated platform for sinking and pouring operations of the protective tube has a simple structure, is easy to install and disassemble, and has a low production cost. After the concrete is poured, the steel wire rope is removed, the casing is pulled out, and it is recycled. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 and Figure 2 This is a structural diagram of the integrated platform for sinking and pouring operations of the protective tube of the present invention;

[0020] Figure 3 is a top view of the present invention;

[0021] Figure 4 is a support structure diagram of the present invention;

[0022] Figure 5 is a top view of the support structure of the present invention;

[0023] Figure 6 It is a structural diagram of the casing of the present invention;

[0024] Figure 7 is a top view of the protective structure of the present invention;

[0025] Figure 8 It is a structural diagram of the height adjustment mechanism of the present invention.

[0026] Reference numerals in the figure: 1. Support structure; 101. First lifting ring; 102. Third lifting ring; 2. Casing; 201. Second lifting ring; 3. Protective structure; 301. Steel grating; 302. Steel mesh; 30201. Holes; 4. Steel wire rope; 5. Ground; 6. Height adjustment mechanism; 601. Lifting cylinder; 602. Pad; 7. Level. DETAILED DESCRIPTION

[0027] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0028] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0029] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0030] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.

[0031] like Figure 1 Combined with Figures 2 to 8 As shown, a protective tube sinking and pouring operation integrated platform includes a supporting structure 1, a protective tube 2 and a protective structure 3, wherein the protective tube 2 is suspended on the supporting structure 1, and the protective structure 3 is laid on the supporting structure 1.

[0032] Furthermore, the support structure 1 is formed by welding I-beams.

[0033] Furthermore, a plurality of first suspension rings 101 are provided inside the support structure 1 .

[0034] Furthermore, the casing 2 is a hollow cylinder formed by folding a steel plate.

[0035] Furthermore, a plurality of second hanging rings 201 are provided on the outer wall of one end of the casing 2 .

[0036] Furthermore, the first lifting ring 101 and the second lifting ring 201 are connected by a steel wire rope 4 .

[0037] Furthermore, the protective structure 3 includes a steel grating plate 301 and a steel mesh 302 . The steel grating plate 301 is laid on the supporting structure 1 , and the steel mesh 302 is laid on the steel grating plate 301 .

[0038] Furthermore, a hole 30201 cooperating with the casing 2 is provided in the middle of the steel mesh 302 .

[0039] Furthermore, steel wires are bundled between the steel grating plate 301 and the supporting structure 1 , and steel wires are bundled between the steel grating plate 301 and the steel mesh 302 .

[0040] Furthermore, a plurality of height adjustment mechanisms 6 are arranged around the support structure 1, and the height adjustment mechanism 6 includes a lifting cylinder 601 and a pad 602. The lifting cylinder 601 is installed on the support structure 1, and the output end of the lifting cylinder 601 is connected to the pad 602; a third lifting ring 102 is arranged on the upper part of the support structure 1.

[0041] Compared with the prior art, the present invention has the following beneficial effects: the present invention connects the casing 2 and the supporting structure 1 by passing the steel wire rope 4 through the first lifting ring 101 and the second lifting ring 201, which can effectively prevent the risk of the casing 2 sinking; the surfaces of the casing 2 and the supporting structure 1 are covered with steel grating plates 301 and steel mesh sheets 302 of different sizes, which can effectively provide a working surface for the workers, and can also effectively protect the safety of construction workers around the hole and prevent the risk of falling; the integrated platform for sinking and pouring operations of the protective tube is simple in structure, easy to install and disassemble, and has a low production cost. After the concrete is poured, the steel wire rope 4 is removed, and the casing 2 is pulled out for recycling.

[0042] Working principle: The pile driver drives the casing 2 into the ground 5, and then uses a crane to lift the casing 2 to the ground 5 next to the casing 2 through the third lifting ring 102, and fixes the first lifting ring 101 at the lower part of the supporting structure 1 to the second lifting ring 201 of the casing 2 through the steel wire rope 4, and the steel grating plate 301 is laid on the supporting structure 1, and the steel mesh 302 is laid on the steel grating plate 301.

[0043] The support structure 1 is welded from I-beams, which have high strength and are not easily deformed. The size of the I-beam skeleton can be adjusted according to the geological conditions to prevent the platform structure from sinking into poor soil.

[0044] A plurality of first lifting rings 101 are provided on the inner side of the supporting structure 1, and a plurality of second lifting rings 201 are provided on the outer wall of one end of the casing 2. The first lifting ring 101 is connected to the second lifting ring 201 by a steel wire rope to prevent the casing from sinking; the first lifting ring 101, the second lifting ring 201 and the third lifting ring 102 can be selected according to the diameter of the casing.

[0045] The casing 2 is a hollow cylinder formed by folding a steel plate, and the steel plate has high strength.

[0046] The protective structure 3 includes a steel grating plate 301 and a steel mesh 302. The steel grating plate 301 is laid on the supporting structure 1, and the steel mesh 302 is laid on the steel grating plate 301. The steel grating plate 301 and the steel mesh 302 can effectively provide a working surface for workers and prevent workers from falling.

[0047] A hole 30201 is provided in the middle of the steel mesh 302 to cooperate with the casing 2.

[0048] Steel wires are tied between the steel grating plate 301 and the supporting structure 1 , and steel wires are tied between the steel grating plate 301 and the steel mesh 302 , and the steel wires are tied to ensure a stable connection.

[0049] A number of height adjustment mechanisms 6 are arranged around the supporting structure 1, and the height adjustment mechanism 6 includes a lifting cylinder 601 and a pad 602. The lifting cylinder 601 is installed on the supporting structure 1, and the output end of the lifting cylinder 601 is connected to the pad 602; a third lifting ring 102 is arranged on the upper part of the supporting structure 1, and a level 7 is arranged at the four corners of the supporting structure 1, and the level includes a liquid level and an electronic level.

[0050] The height adjustment mechanism 6 can adjust the height of the supporting structure 1. When the supporting structure 1 is unstable and not level, it can be adjusted through the height adjustment mechanism 6 to make it stable. The pad 602 reduces the pressure of the supporting structure 1 so that it is not easy to sink into the ground 5. The level meter 7 can observe and monitor the horizontal state of the supporting structure 1, so that the staff can know which side of the supporting structure is higher or lower.

[0051] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A protective tube sinking and pouring operation integrated platform, characterized in that: It comprises a supporting structure (1), a casing (2) and a protective structure (3), wherein the casing (2) is suspended on the supporting structure (1) and the protective structure (3) is laid on the supporting structure (1).

2. The integrated platform for sinking and pouring protective tubes as claimed in claim 1, characterized in that: The support structure (1) is formed by welding I-beams.

3. The integrated platform for sinking and pouring protective tubes as claimed in claim 1, characterized in that: A plurality of first suspension rings (101) are provided on the inner side of the support structure (1).

4. The integrated platform for sinking and pouring protective tubes as claimed in claim 1, characterized in that: The casing (2) is a hollow cylinder formed by folding a steel plate.

5. The integrated platform for sinking and pouring protective tubes as claimed in claim 3, characterized in that: A plurality of second hanging rings (201) are provided on the outer wall of one end of the casing (2).

6. The integrated platform for sinking and pouring protective tubes as claimed in claim 5, characterized in that: The first lifting ring (101) and the second lifting ring (201) are connected via a steel wire rope (4).

7. The integrated platform for sinking and pouring protective tubes as claimed in claim 1, characterized in that: The protective structure (3) comprises a steel grating plate (301) and a steel mesh (302), wherein the steel grating plate (301) is laid on the supporting structure (1), and the steel mesh (302) is laid on the steel grating plate (301).

8. The integrated platform for sinking and pouring protective tubes as claimed in claim 7, characterized in that: The steel mesh (302) is provided in the middle with a hole (30201) that matches the casing (2).

9. The integrated platform for sinking and pouring protective tubes as claimed in claim 7, characterized in that: Steel wires are bundled between the steel grating plate (301) and the supporting structure (1), and steel wires are bundled between the steel grating plate (301) and the steel mesh (302).

10. The integrated platform for sinking and pouring protective tubes according to claim 1, characterized in that: A plurality of height adjustment mechanisms (6) are arranged around the support structure (1), and the height adjustment mechanism (6) comprises a lifting cylinder (601) and a pad (602). The lifting cylinder (601) is installed on the support structure (1), and the output end of the lifting cylinder (601) is connected to the pad (602); a third lifting ring (102) is arranged on the upper part of the support structure (1).