High-precision construction levelness intelligent detector based on artificial intelligence
Through a high-precision construction level detector based on artificial intelligence, machine vision technology and temperature and humidity correction modules are used to solve the problem of traditional measuring instruments being affected by light and background interference, and achieve high-precision detection and precise adjustment of construction level. Improved construction efficiency and accuracy.
Patent Information
- Application Number
- CN202410900177.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional construction level measurement instruments are easily affected by light changes and background interference, resulting in inaccurate measurements. They rely on the experience of construction workers for adjustment, cannot guarantee accuracy, and waste manpower and material resources.
It adopts a high-precision detector based on artificial intelligence, including intelligent identification and adaptation module, temperature and humidity correction module, historical measurement data acquisition module, dynamic correction and prediction module and report generation module. It uses machine vision technology to automatically identify reference objects and analyze temperature and humidity. Impact, dynamic correction and prediction of construction level, and generation of detailed inspection reports.
Ensure the accuracy and accuracy of construction level detection, improve work efficiency, reduce errors and waste, shorten the construction cycle, and ensure that the construction level meets the requirements.
Smart Images

Figure CN118857232A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction level intelligent detectors, and relates to a high-precision construction level intelligent detector based on artificial intelligence. Background Art
[0002] Construction levelness refers to the flatness of the construction surface or structure in the horizontal direction, ensuring its parallelism with the theoretical horizontal plane. This is an important indicator for measuring construction quality, especially in the process of laying the floor, installing walls, assembling mechanical equipment, etc. The control of construction levelness is essential to ensure the safety, functionality and aesthetics of the building. With the development of science and technology, the requirements for measuring instruments for construction levelness are getting higher and higher. Traditional measuring instruments, such as levels, laser levels, line projection instruments or sweepers, can meet certain construction level measurement accuracy requirements, but they still have certain limitations and measurement errors. Therefore, high-precision construction level detection instruments are of great significance and role.
[0003] Traditional construction level measuring instruments may be affected by factors such as light changes and background interference at the location to be detected, and cannot ensure the accuracy of the location to be detected, nor can they ensure the accuracy of the construction level measurement at the location to be detected.
[0004] When the construction level at the measured inspection location does not meet the requirements, traditional construction level measuring instruments mainly rely on the experience of construction workers to make adjustments, which cannot guarantee the accuracy of the construction level and wastes manpower and material resources to a certain extent. Summary of the invention
[0005] In view of this, in order to solve the problems raised in the above background technology, a high-precision construction level intelligent detection instrument based on artificial intelligence is proposed.
[0006] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides a high-precision construction level intelligent detector based on artificial intelligence, including: an intelligent recognition and adaptation module, a temperature and humidity correction module, a historical measurement data acquisition module, a dynamic correction and prediction module, a report generation module and a database.
[0007] The intelligent identification and adaptation module is connected to the temperature and humidity correction module, the temperature and humidity correction module is connected to the historical measurement data acquisition module, the historical measurement data acquisition module is connected to the dynamic correction and prediction module, the dynamic correction and prediction module is connected to the report generation module, and the database is connected to the temperature and humidity correction module and the dynamic correction and prediction module respectively.
[0008] The intelligent recognition and adaptation module is used to automatically identify the reference objects corresponding to various detection requirements during the target construction process based on machine vision technology.
[0009] The temperature and humidity correction module is used to obtain the temperature and humidity of the target construction environment, analyze the temperature and humidity influence of each reference object corresponding to each detection requirement during the target construction process, and then analyze the temperature and humidity correction coefficients of each reference object corresponding to each detection requirement during the target construction process.
[0010] The historical measurement data acquisition module is used to measure the construction levels of the reference objects corresponding to the detection requirements in the target construction process, and record them as the historical measurement data of the detection requirements in the target construction process.
[0011] The dynamic correction and prediction module is used to analyze the adjustment requirements of the construction level of each detection requirement in the target construction process based on the historical measurement data of each detection requirement in the target construction process. If adjustment is required, dynamic correction is performed. At the same time, the future deviation of the construction level of each detection requirement in the target construction process is predicted and feedback is provided.
[0012] The report generation module is used to automatically generate a detailed inspection report on the construction level of each inspection requirement during the target construction process.
[0013] The database is used to store the dimensional deviation of each material under various temperature conditions and the dimensional deviation under various humidity conditions during the target construction process, and to store the allowable deviation of the construction levelness.
[0014] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The present invention automatically identifies the reference objects corresponding to the various detection requirements in the target construction process based on machine vision technology, thereby ensuring that the detection of the construction level of each detection requirement in the target construction process is not affected by factors such as light changes and background interference, which helps to ensure the detection accuracy and precision of the construction level of each detection requirement in the target construction process and also improves work efficiency.
[0015] 2. The present invention avoids the interference of the temperature and humidity in the environment on the detection of the construction level of each detection requirement in the target construction process by analyzing the temperature and humidity correction coefficients of each reference object corresponding to each detection requirement in the target construction process.
[0016] 3. The present invention analyzes the adjustment requirements of the construction level for each detection requirement in the target construction process based on the historical measurement data of each detection requirement in the target construction process, and predicts the future deviation of the construction level for each detection requirement in the target construction process, so that construction workers can clearly understand the adjustment requirements of the construction level, improve construction accuracy, ensure that the construction level meets the requirements, reduce errors and waste in the construction process, and shorten the construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0018] Figure 1 It is a schematic diagram of system module connection of the present invention. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] See also Figure 1 As shown, the present invention provides a high-precision construction level intelligent detector based on artificial intelligence, and the specific modules are distributed as follows: intelligent identification and adaptation module, temperature and humidity correction module, historical measurement data acquisition module, dynamic correction and prediction module, report generation module and database. Among them, the connection mode between the modules is: the intelligent identification and adaptation module is connected to the temperature and humidity correction module, the temperature and humidity correction module is connected to the historical measurement data acquisition module, the historical measurement data acquisition module is connected to the dynamic correction and prediction module, the dynamic correction and prediction module is connected to the report generation module, and the database is connected to the temperature and humidity correction module and the dynamic correction and prediction module respectively.
[0021] The intelligent recognition and adaptation module is used to automatically identify the reference objects corresponding to various detection requirements during the target construction process based on machine vision technology.
[0022] As a preferred feasible example, the specific operations of automatically identifying the reference objects corresponding to the detection requirements in the target construction process include: A1. Acquisition of reference object feature patterns: Training the neural network model to learn and memorize the feature patterns of each reference object, wherein the feature patterns of each reference object include pictures of each reference object under different lighting conditions, different viewing angle conditions and different environmental complexity conditions.
[0023] A2. Determination of reference objects: High-definition cameras are deployed to capture images and video streams of the target construction area, and then image processing algorithms are used to identify area pictures corresponding to various detection requirements in the target construction process from the images and video streams of the target construction area. These area pictures are then matched with the characteristic patterns of each reference object to obtain the reference objects corresponding to various detection requirements in the target construction process.
[0024] The present invention automatically identifies the reference objects corresponding to the various detection requirements in the target construction process based on machine vision technology, thereby ensuring that the detection of the construction level of each detection requirement in the target construction process is not affected by factors such as light changes and background interference, which helps to ensure the detection accuracy and precision of the construction level of each detection requirement in the target construction process and also improves work efficiency.
[0025] The temperature and humidity correction module is used to obtain the temperature and humidity of the target construction environment, analyze the temperature and humidity influence of each reference object corresponding to each detection requirement during the target construction process, and then analyze the temperature and humidity correction coefficients of each reference object corresponding to each detection requirement during the target construction process.
[0026] It should be further explained that the specific method of obtaining the temperature and humidity of the target construction environment is: using the deployed temperature and humidity sensors to measure the temperature and humidity of the target construction environment.
[0027] As a preferred feasible example, the specific analysis method of the influence of temperature and humidity on the target construction environment includes: extracting the dimensional deviation of each material under each temperature condition and the dimensional deviation under each humidity condition in the target construction process from the database, and determining the dimensional deviation of each reference object corresponding to each detection requirement in the target construction process under each temperature condition and the dimensional deviation of each humidity condition.
[0028] The temperature and humidity of the target construction environment are extracted, and then the dimensional deviation of each reference object corresponding to each detection requirement in the target construction process under the current temperature condition and the dimensional deviation under the current humidity condition are obtained, which are recorded as Wherein, i=1,2,...,a, i is the number corresponding to each detection requirement, j=1,2,...,b, j is the number corresponding to each reference object.
[0029] Analyze the temperature and humidity influence coefficients of each reference object corresponding to each detection requirement during the target construction process in They are the allowable dimensional deviation under the set temperature conditions and the allowable dimensional deviation under the set humidity conditions.
[0030] The temperature and humidity influence coefficients of each reference object corresponding to each detection requirement in the target construction process are compared with the preset temperature and humidity influence coefficient thresholds. If the temperature and humidity influence coefficient of a reference object corresponding to a certain detection requirement in the target construction process is less than the temperature and humidity influence coefficient threshold, the temperature and humidity influence of the reference object corresponding to the detection requirement in the target construction process is recorded as no temperature and humidity influence. Otherwise, the temperature and humidity influence of the reference object corresponding to the detection requirement in the target construction process is recorded as the existence of temperature and humidity influence, thereby obtaining the temperature and humidity influence of each reference object corresponding to each detection requirement in the target construction process.
[0031] As a preferred feasible example, the temperature and humidity correction coefficients of each reference object corresponding to each detection requirement during the target construction process are specifically analyzed in the following manner: according to the analysis formula Get the temperature and humidity correction coefficient THC of each reference object corresponding to each detection requirement during the target construction process ij , where THI0 is the preset temperature and humidity influence coefficient threshold, and e is a natural constant.
[0032] The present invention avoids the interference of the temperature and humidity in the environment on the detection of the construction level of each detection requirement in the target construction process by analyzing the temperature and humidity correction coefficients of each reference object corresponding to each detection requirement in the target construction process.
[0033] The historical measurement data acquisition module is used to measure the construction levels of the reference objects corresponding to the detection requirements in the target construction process, and record them as the historical measurement data of the detection requirements in the target construction process.
[0034] The specific measurement method of the construction levels of the reference objects corresponding to the detection requirements in the target construction process includes: setting a baseline based on the reference objects corresponding to the detection requirements in the target construction process, and recording it as the baseline of the reference objects corresponding to the detection requirements in the target construction process, and then measuring the deviation angle between the measured object corresponding to each detection requirement in the target construction process and the baseline of the reference objects corresponding to each detection requirement in the target construction process, and recording it as the construction levels of the reference objects corresponding to each detection requirement in the target construction process.
[0035] Further, multiple measurements are performed at fixed intervals within a set time period to obtain the construction levels of each reference object corresponding to each detection requirement in the target construction process.
[0036] The dynamic correction and prediction module is used to analyze the adjustment requirements of the construction level of each detection requirement in the target construction process based on the historical measurement data of each detection requirement in the target construction process. If adjustment is required, dynamic correction is performed. At the same time, the future deviation of the construction level of each detection requirement in the target construction process is predicted and feedback is provided.
[0037] As a preferred feasible example, the adjustment requirements of the construction level of each detection requirement in the target construction process, the specific analysis method includes: extracting the construction level conl of each reference object corresponding to each detection requirement in the target construction process ijg , where i=1,2,...,a, i is the number corresponding to each detection requirement, j=1,2,...,b, j is the number corresponding to each reference object, b is the number corresponding to the reference object, g=1,2,...,c, g is the number corresponding to each construction level, c is the number corresponding to the construction level.
[0038] Analyze the deviation of construction level of each inspection requirement during the target construction process
[0039] Where conl0 is the permissible deviation of the construction level extracted from the database, is the fluctuation coefficient of the construction level of the jth reference object corresponding to the i-th detection requirement in the target construction process, is the fluctuation coefficient of the g-th construction level of the reference object corresponding to the ith detection requirement in the target construction process, β1 and β2 are the weight factors of the deviation corresponding to the set construction level and fluctuation coefficient, respectively, and e is a natural constant.
[0040] It should be further explained that the weight factors of the deviation corresponding to the set construction level and fluctuation coefficient can be set to 0.55 and 0.45 respectively.
[0041] Construction levelness is a key indicator for measuring construction quality and precision. High levels of construction precision and accuracy can ensure the stability and durability of the project. Therefore, the weight factor of the deviation corresponding to the construction levelness is assigned to 0.55.
[0042] The fluctuation coefficient reflects the stability and consistency of the construction level. Therefore, the weight factor of the deviation corresponding to the fluctuation coefficient is assigned to 0.45.
[0043] The deviation of the construction level of each inspection requirement in the target construction process is compared with the set deviation threshold. If the deviation of the construction level of a certain inspection requirement in the target construction process is greater than the deviation threshold, the adjustment requirement of the construction level of the inspection requirement in the target construction process is recorded as a requirement requiring adjustment; otherwise, the adjustment requirement of the construction level of the inspection requirement in the target construction process is recorded as a requirement not requiring adjustment.
[0044] As a preferred feasible example, the fluctuation coefficient of the construction level of each reference object corresponding to each detection requirement in the target construction process and the fluctuation coefficient of the construction level of each reference object corresponding to each detection requirement in the target construction process are specifically obtained as follows: according to the analysis formula Obtain the fluctuation coefficient of the construction level of each reference object corresponding to each detection requirement during the target construction process Where σ0 is the set standard deviation threshold of construction levelness.
[0045] According to the analytical formula Obtain the fluctuation coefficient of each construction level of the reference object corresponding to each detection requirement during the target construction process
[0046] As a preferred feasible example, the construction level of each detection requirement in the target construction process that requires adjustment is dynamically corrected, and its specific operations include: B1. Building Information Model Integration: Using the building information model, the design drawings of the target construction are converted into a three-dimensional model of the target construction, and it is combined with the on-site real scene of the target construction through AR technology to obtain a three-dimensional virtual model of the target construction.
[0047] It should be further explained that the building information model is an advanced digital technology used in the fields of architecture, engineering, construction and facility management. BIM is not just a three-dimensional model, but a comprehensive information database that integrates the physical and functional characteristics of a building project. This model contains all relevant information during the design, construction and maintenance phases, enabling all project participants to work together on a shared platform.
[0048] B2. Position tracking and calibration: Construction workers wear smart glasses to achieve precise positioning and matching of the three-dimensional virtual model of the target construction with the real environment.
[0049] It should be further explained that the software in the smart glasses can read the building information model data and accurately overlay the design blueprint on the actual construction environment. The smart glasses are equipped with multiple sensors such as GPS, gyroscope, accelerometer, etc. to ensure that the wearer's position and line of sight are accurately tracked.
[0050] B3. Real-time feedback and adjustment: The smart glasses worn by construction workers capture the construction process in real time, automatically compare the actual operation with the design requirements, and immediately give visual and voice prompts when deviations are found to guide construction workers to adjust the construction direction and angle.
[0051] It should be further explained that the smart glasses are equipped with a camera and image recognition function, which can capture the construction process of construction workers in real time.
[0052] As a preferred feasible example, the future deviation of the construction level of each detection requirement in the target construction process is predicted, and the specific analysis method includes: extracting the construction level conl of each reference object corresponding to each detection requirement in the target construction process ijg , according to the analytical model Obtain the trend evaluation coefficient Trend of the construction level of each detection requirement during the target construction process ij .
[0053] If the trend evaluation coefficient of the construction level of a certain detection requirement in the target construction process is greater than 0, the future deviation of the construction level of the detection requirement in the target construction process will be recorded as no deviation; otherwise, the deviation of the construction level of the detection requirement in the target construction process will be recorded as deviation, thereby obtaining the future deviation of the construction level of each detection requirement in the target construction process.
[0054] The report generation module is used to automatically generate a detailed inspection report on the construction level of each inspection requirement during the target construction process.
[0055] As a preferred feasible example, the automatic generation of a detailed inspection report on the construction level of each inspection requirement in the target construction process specifically includes automatically generating a detailed inspection report on the construction level of each inspection requirement in the target construction process according to the construction levels of each reference object corresponding to each inspection requirement in the target construction process, the adjustment requirements of the construction level of each inspection requirement in the target construction process, and the future offset of the construction level of each inspection requirement in the target construction process.
[0056] The database is used to store the dimensional deviation of each material under each temperature condition and the dimensional deviation under each humidity condition during the target construction process, and to store the allowable deviation of the construction levelness.
[0057] The present invention analyzes the adjustment requirements of the construction level for each detection requirement in the target construction process based on the historical measurement data of each detection requirement in the target construction process, and predicts the future deviation of the construction level for each detection requirement in the target construction process, so that construction workers can clearly understand the adjustment requirements of the construction level, improve construction accuracy, ensure that the construction level meets the requirements, reduce errors and waste in the construction process, and shorten the construction period.
[0058] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. A high-precision construction level intelligent detector based on artificial intelligence, characterized by: include: Intelligent recognition and adaptation module, used to automatically identify the reference objects corresponding to the various detection requirements during the target construction process based on machine vision technology; The temperature and humidity correction module is used to obtain the temperature and humidity of the target construction environment, analyze the temperature and humidity influence of each reference object corresponding to each detection requirement during the target construction process, and then analyze the temperature and humidity correction coefficient of each reference object corresponding to each detection requirement during the target construction process; A historical measurement data acquisition module is used to measure each reference object corresponding to each detection requirement in the target construction process, obtain each construction level of each reference object corresponding to each detection requirement in the target construction process, and record it as historical measurement data of each detection requirement in the target construction process; The dynamic correction and prediction module is used to analyze the adjustment requirements of the construction level of each detection requirement in the target construction process based on the historical measurement data of each detection requirement in the target construction process, and perform dynamic correction if it is necessary to adjust the requirements. At the same time, it predicts the future deviation of the construction level of each detection requirement in the target construction process and provides feedback; Report generation module, used to automatically generate detailed inspection reports of construction level for each inspection requirement during the target construction process; The database is used to store the dimensional deviation of each material under various temperature conditions and the dimensional deviation under various humidity conditions during the target construction process, and to store the allowable deviation of the construction levelness.
2. According to claim 1, a high-precision construction level intelligent detector based on artificial intelligence is characterized by: The specific operations of automatically identifying the reference objects corresponding to the detection requirements during the target construction process include: A1. Acquisition of reference object feature patterns: By training the neural network model, it is made to learn and memorize the feature patterns of each reference object, wherein the feature patterns of each reference object include pictures of each reference object under different lighting conditions, different viewing angles and different environmental complexity conditions; A2. Determination of reference objects: High-definition cameras are deployed to capture images and video streams of the target construction area, and then image processing algorithms are used to identify area pictures corresponding to various detection requirements in the target construction process from the images and video streams of the target construction area. These area pictures are then matched with the characteristic patterns of each reference object to obtain the reference objects corresponding to various detection requirements in the target construction process.
3. The high-precision construction level intelligent detector based on artificial intelligence according to claim 1 is characterized in that: The specific analysis methods for the influence of temperature and humidity on the target construction environment include: Extract the dimensional deviation of each material under each temperature condition and the dimensional deviation of each humidity condition in the target construction process from the database, and determine the dimensional deviation of each reference object under each temperature condition and the dimensional deviation of each humidity condition corresponding to each detection requirement in the target construction process; The temperature and humidity of the target construction environment are extracted, and then the dimensional deviation of each reference object corresponding to each detection requirement in the target construction process under the current temperature condition and the dimensional deviation under the current humidity condition are obtained, which are recorded as Where i = 1, 2, ..., a, i is the number corresponding to each detection requirement, j = 1, 2, ..., b, j is the number corresponding to each reference object; Analyze the temperature and humidity influence coefficients of each reference object corresponding to each detection requirement during the target construction process in They are the permissible dimensional deviation under the set temperature conditions and the permissible dimensional deviation under the set humidity conditions; The temperature and humidity influence coefficients of each reference object corresponding to each detection requirement in the target construction process are compared with the preset temperature and humidity influence coefficient thresholds. If the temperature and humidity influence coefficient of a reference object corresponding to a certain detection requirement in the target construction process is less than the temperature and humidity influence coefficient threshold, the temperature and humidity influence of the reference object corresponding to the detection requirement in the target construction process is recorded as no temperature and humidity influence. Otherwise, the temperature and humidity influence of the reference object corresponding to the detection requirement in the target construction process is recorded as the existence of temperature and humidity influence, thereby obtaining the temperature and humidity influence of each reference object corresponding to each detection requirement in the target construction process.
4. The high-precision construction level intelligent detector based on artificial intelligence according to claim 3 is characterized by: The specific analysis method of the temperature and humidity correction coefficients of each reference object corresponding to each detection requirement during the target construction process includes: According to the analytical formula Get the temperature and humidity correction coefficient THC of each reference object corresponding to each detection requirement during the target construction process ij , where THI0 is the preset temperature and humidity influence coefficient threshold, and e is a natural constant.
5. The high-precision construction level intelligent detector based on artificial intelligence according to claim 1 is characterized by: The specific measurement methods of the construction levels of the reference objects corresponding to the detection requirements in the target construction process include: A baseline is set based on each reference object corresponding to each detection requirement in the target construction process, and recorded as the baseline of each reference object corresponding to each detection requirement in the target construction process, and then the deviation angle between the measured object corresponding to each detection requirement in the target construction process and the baseline of each reference object corresponding to each detection requirement in the target construction process is measured, and recorded as the construction level of each reference object corresponding to each detection requirement in the target construction process; Further, multiple measurements are performed at fixed intervals within a set time period to obtain the construction levels of each reference object corresponding to each detection requirement in the target construction process.
6. The high-precision construction level intelligent detector based on artificial intelligence according to claim 4 is characterized by: The specific analysis method of the adjustment requirements of the construction level of each detection requirement during the target construction process includes: Extract the construction level conl of each reference object corresponding to each detection requirement during the target construction process ijg , where i = 1, 2, ..., a, i is the number corresponding to each detection requirement, j = 1, 2, ..., b, j is the number corresponding to each reference object, b is the number corresponding to the reference object, g = 1, 2, ..., c, g is the number corresponding to each construction level, c is the number corresponding to the construction level; Analyze the deviation of construction level of each inspection requirement during the target construction process Where conl0 is the permissible deviation of the construction level extracted from the database, is the fluctuation coefficient of the construction level of the jth reference object corresponding to the i-th detection requirement in the target construction process, is the fluctuation coefficient of the g-th construction level of the reference object corresponding to the i-th detection requirement in the target construction process, β1 and β2 are the weight factors of the deviation corresponding to the set construction level and fluctuation coefficient, respectively, and e is a natural constant; The deviation of the construction level of each inspection requirement in the target construction process is compared with the set deviation threshold. If the deviation of the construction level of a certain inspection requirement in the target construction process is greater than the deviation threshold, the adjustment requirement of the construction level of the inspection requirement in the target construction process is recorded as a requirement requiring adjustment; otherwise, the adjustment requirement of the construction level of the inspection requirement in the target construction process is recorded as a requirement not requiring adjustment.
7. The high-precision construction level intelligent detector based on artificial intelligence according to claim 6 is characterized by: The specific acquisition method of the fluctuation coefficient of the construction level of each reference object corresponding to each detection requirement in the target construction process and the fluctuation coefficient of the construction level of each reference object corresponding to each detection requirement in the target construction process is: According to the analytical formula Obtain the fluctuation coefficient of the construction level of each reference object corresponding to each detection requirement during the target construction process Where σ0 is the set standard deviation threshold of construction levelness; According to the analytical formula Obtain the fluctuation coefficient of each construction level of the reference object corresponding to each detection requirement during the target construction process 8. The high-precision construction level intelligent detector based on artificial intelligence according to claim 6 is characterized by: The specific operation of dynamically correcting the construction level of each detection requirement during the target construction process where the adjustment requirement is required includes: B1. Building Information Model Integration: Using the building information model, the design drawings of the target construction are converted into a 3D model of the target construction, and then combined with the on-site real scene of the target construction through AR technology to obtain a 3D virtual model of the target construction; B2. Position tracking and calibration: Construction workers wear smart glasses to achieve precise positioning and matching of the 3D virtual model of the target construction with the real environment; B3. Real-time feedback and adjustment: The smart glasses worn by construction workers capture the construction process in real time, automatically compare the actual operation with the design requirements, and immediately give visual and voice prompts when deviations are found to guide construction workers to adjust the construction direction and angle.
9. The high-precision construction level intelligent detector based on artificial intelligence according to claim 6 is characterized by: The specific analysis method of predicting the future deviation of the construction level of each detection requirement during the target construction process includes: Extract the construction level conl of each reference object corresponding to each detection requirement during the target construction process ijg , according to the analytical model Obtain the trend evaluation coefficient Trend of the construction level of each detection requirement during the target construction process ij ; If the trend evaluation coefficient of the construction level of a certain detection requirement in the target construction process is greater than 0, the future deviation of the construction level of the detection requirement in the target construction process will be recorded as no deviation; otherwise, the deviation of the construction level of the detection requirement in the target construction process will be recorded as deviation, thereby obtaining the future deviation of the construction level of each detection requirement in the target construction process.
10. The high-precision construction level intelligent detector based on artificial intelligence according to claim 1, characterized in that: The automatic generation of a detailed inspection report on the construction level for each inspection requirement during the target construction process specifically includes: automatically generating a detailed inspection report on the construction level for each inspection requirement during the target construction process based on the construction levels of each reference object corresponding to each inspection requirement during the target construction process, the adjustment requirements for the construction level for each inspection requirement during the target construction process, and the future offset of the construction level for each inspection requirement during the target construction process.
Citation Information
Patent Citations
Method and device for testing stability of temporary steel platform
CN108286995A
Design and construction system
CN108845663A
Heat supply pipeline displacement measurement and diagnosis system and working method thereof
CN109631825A
Frequency converter intelligent monitoring system based on data analysis
CN116961240A
Building construction deviation detection system and application method thereof
CN117475332A