Top coal flow state real-time monitoring system based on pressure pillow uniform distribution cluster

By evenly arranging pressure pillows on the hydraulic support of the top coal caving to collect data, judge the movement status of the coal flow and control the mining process, solving the problem of insufficient coal flow monitoring in the existing technology, and realizing automated and intelligent coal flow status monitoring. and control, improving mining efficiency and safety.

CN118857531AActive Publication Date: 2024-10-29SHANDONG UNIV OF SCI & TECH
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410804807.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-10-29
Estimated Expiration
2044-06-21

AI Technical Summary

Technical Problem

In the existing technology, there is little monitoring of the coal flow state behind the coal caving support during top coal caving mining, which affects mining efficiency, coal production quality, and the stability and safety of the support. Further improvements are needed to achieve real-time monitoring and automated control. .

Method used

A real-time monitoring system for the coal flow status of top coal caving based on uniformly distributed clusters of pressure pillows is adopted. By evenly arranging pressure pillows on the cover beam and tail beam of the top coal caving hydraulic support, the signal contact data is collected and processed to form a four-dimensional matrix data. Determine the movement status of the coal flow and control the opening and closing of the coal discharge port to achieve automated and intelligent mining.

Benefits of technology

The system can accurately judge the movement status of coal flow, improve coal placing efficiency, ensure safety, realize automated control, and improve mining efficiency and coal production quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118857531A_ABST
    Figure CN118857531A_ABST
Patent Text Reader

Abstract

The invention provides a top coal flow state real-time monitoring system based on a pressure pillow uniform distribution cluster, and relates to the technical field of top coal mining equipment and intelligent control. The system comprises a top coal caving hydraulic support, pressure pillows, a scraper conveyor, an information transmission cable, a signal processing and visualizing device, a signal collecting device, a hydraulic pipeline and a hydraulic control device, the multiple pressure pillows are evenly distributed on a shield beam and a tail beam of the top coal caving hydraulic support, and each pressure pillow comprises a signal contact and a contact signal line. Crushed top coal and crushed gangue fall to the upper surface of a shield beam under the influence of gravity, then fall to the upper surface of a tail beam and then fall into a scraper conveyor, a pressure pillow collects pressure signals and then sends the pressure signals to a signal collection device through an information transmission cable, and a signal processing and visualization device fits the spatial motion trail of coal flow particles and displays the spatial motion trail of the coal flow particles. And drawing a coal flow motion flow state space curve. The system can improve the coal caving efficiency, improve the coal caving quality and ensure safe mining.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of top coal caving mining equipment and intelligent control technology, and in particular provides a top coal caving coal flow state real-time monitoring system based on a uniformly distributed cluster of pressure pillows. Background Art

[0002] With the promotion of smart mines, the construction of smart mines aims to improve coal mine production efficiency, reduce safety risks, optimize resource utilization, and promote the transformation and upgrading of the coal mining industry. Based on intelligent detection, big data computing and artificial intelligence analysis technologies, automatic monitoring of the top coal caving process in fully mechanized caving mining is the key to building smart mines.

[0003] In the prior art, the monitoring and automatic control of the top coal caving mining process, the monitoring of the coal caving space behind the hydraulic support for top coal caving is less. The movement state of the coal flow behind the coal caving support not only affects the mining efficiency and coal production quality, but also affects the stability and safety of the coal caving support to a certain extent. By monitoring the movement state of the coal flow behind the coal caving support, it can help coal miners better grasp the coal caving situation in real time, ensure labor safety, speed up coal caving efficiency, and improve coal production quality. In order to further standardize the mining process, reasonably plan the coal caving process, and ensure safety and quality, it is of great significance, and further improvements need to be made to the existing top coal caving system. Summary of the invention

[0004] In order to improve the efficiency of top coal caving mining, improve the quality of coal caving and ensure safe mining, the present invention provides a real-time monitoring system for top coal caving coal flow status based on a uniformly distributed cluster of pressure pillows, and the specific technical scheme is as follows.

[0005] A real-time monitoring system for coal flow status of top coal caving based on evenly distributed clusters of pressure pillows, comprising a top coal caving hydraulic support, a pressure pillow, a scraper conveyor, an information transmission cable, a signal processing and visualization device, a signal acquisition device, a hydraulic pipeline, and a hydraulic control device. A plurality of pressure pillows are evenly arranged on the cover beam and tail beam of the top coal caving hydraulic support. The pressure pillow comprises a signal contact and a contact signal line. The contact signal line is connected to the signal acquisition device via an information transmission cable, and the signal acquisition device is connected to the signal processing and visualization device. The scraper conveyor is arranged below the tail beam, and the hydraulic control device is connected to control the tail beam jack via a hydraulic pipeline.

[0006] Preferably, the top coal caving hydraulic support is arranged below the top coal seam, and above the top coal seam is a gangue rock layer; after the top coal seam and the gangue rock layer are crushed, flowing crushed top coal and crushed gangue are generated.

[0007] Preferably, the crushed top coal and crushed gangue roll on the upper surface of the shield beam to trigger the pressure pillow in turn, and the pressure pillow has signal contacts evenly arranged inside, the signal contacts are connected to the contact signal lines, and the pressure pillow collects pressure and vibration information.

[0008] Preferably, the signal acquisition device acquires and stores the monitoring signal from the pressure pillow at each time node, and the signal processing and visualization device obtains the real-time signal matrix of the pressure pillow.

[0009] It is further preferred that the signal processing and visualization device obtains the position coordinates of all pressure pillows, and calls the position coordinates according to the working posture of the top coal caving hydraulic support; the signal processing and visualization device numbers and names the coal particles contacting the pressure pillows according to the time nodes, and processes the signals into four-dimensional matrix data of coal particle numbers, time nodes, position coordinates, and pressure values ​​through big data processing and data separation methods, and then fits the four-dimensional data into the spatial motion trajectory of each coal particle to draw the spatial curve of the coal flow motion state.

[0010] It is further preferred that the coal flow motion state and coal flow properties are judged according to the four-dimensional matrix data of coal particle number, time node, position coordinates and pressure value, and the coal flow motion state includes the coal flow motion state being laminar flow, the coal flow motion state being turbulent flow, the coal flow direction being from upper left to lower right, the coal flow direction being directly above to directly below, and the coal flow direction being from upper right to lower left; the coal flow properties are pure coal state or gangue-interposed state.

[0011] It is further preferred that the coal flow state is laminar flow state, indicating that the coal flow is very smooth, and the coal flow state is turbulent flow state, indicating that the coal flow is stuck or blocked. The hydraulic control device adjusts the opening of the coal discharge port according to the coal flow state, and adjusts the swinging tail beam to disturb the coal flow; determines the direction of the coal flow according to the coal flow movement state and controls the opening and closing sequence of the coal discharge port; determines the gangue content according to the coal flow properties, and controls the opening and closing of the coal discharge port.

[0012] The beneficial effect of the real-time monitoring system for the flow status of top coal caving based on the evenly distributed cluster of pressure pillows provided by the present invention is that the top coal caving hydraulic support of the system can realize automatic control to improve the coal caving efficiency and ensure the safety of coal caving according to the monitoring of the coal flow conditions; the system evenly arranges and determines the coordinates of the pressure pillow structure on the cover beam and the tail beam, and comprehensively obtains a four-dimensional data matrix of coal particle number, time node, position coordinate, and pressure value, so as to accurately judge the flow state of coal flow movement and draw spatial curves, thereby realizing automated and intelligent mining. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the layout of the real-time monitoring system for top coal flow status based on the uniformly distributed cluster of pressure pillows;

[0014] Figure 2 This is a schematic diagram of the structure of the hydraulic support for top coal caving;

[0015] Figure 3 It is a schematic diagram of the arrangement of the pressure pillow;

[0016] Figure 4 It is a schematic diagram of the arrangement of the pressure pillow signal contacts;

[0017] Figure 5 It is a schematic diagram of the principle of real-time monitoring of top coal flow state based on uniformly distributed clusters of pressure pillows;

[0018] In the figure: 1- hydraulic support for top coal caving, 2- gangue rock layer, 3- top coal seam, 4- crushed gangue, 5- crushed top coal, 6- uniformly distributed pressure pillows, 7- scraper conveyor, 8- information transmission cable, 9- signal processing and visualization device, 10- signal acquisition device, 11- hydraulic pipeline, 12- hydraulic control device, 101- tail beam, 102- tail beam jack, 103, shielding beam, 61- pressure pillow for shielding beam, 62- pressure pillow for tail beam, 601- signal contact, 602- contact signal line. DETAILED DESCRIPTION

[0019] Combination Figures 1 to 5 As shown, a specific implementation manner of a real-time monitoring system for top coal caving flow status based on a uniformly distributed cluster of pressure pillows provided by the present invention is described.

[0020] A real-time monitoring system for coal flow state of top coal caving based on uniformly distributed clusters of pressure pillows, comprising a top coal caving hydraulic support 1, a gangue rock layer 2, a top coal layer 3, crushed gangue 4, crushed top coal 5, a pressure pillow 6, a scraper conveyor 7, an information transmission cable 8, a signal processing and visualization device 9, a signal acquisition device 10, a hydraulic pipeline 11, a hydraulic control device 12, etc. The system monitors the coal caving process in real time through the pressure pillow 6, and controls the top coal caving hydraulic support to caving coal stably according to the monitoring results. Among them, a plurality of pressure pillows 6 are uniformly arranged on the shield beam and tail beam of the top coal caving hydraulic support 1, and the number of pressure pillows 6 is set according to the arrangement and size of the shield beam 103 and the tail beam 101, and the pressure pillow 6 includes a signal contact 601 and a contact signal line 602, and the contact signal line 602 is connected to the signal acquisition device 10 through the information transmission cable 8, and the signal acquisition device 10 is connected to the signal processing and visualization device 9. The scraper conveyor 7 is arranged below the tail beam 101. The coal and gangue discharged from the coal discharge port are stored on the scraper conveyor 7. The hydraulic control device 12 is connected to control the tail beam jack 102 through the hydraulic pipeline 11, thereby controlling the opening and closing of the coal discharge port.

[0021] The top coal caving hydraulic support 1 is arranged below the top coal seam 3, and above the top coal seam 3 is the gangue rock layer 2. After the top coal seam 3 and the gangue rock layer 2 are crushed, flowing crushed top coal 5 and crushed gangue 4 are generated. During the top coal caving mining process, the tail beam jack 102 is controlled by the hydraulic control device 12 to open the hydraulic support coal caving port 13. Afterwards, the top coal seam 3 and the gangue rock layer 2 above the top coal caving hydraulic support 1 are successively crushed under the action of mine pressure and gravity, and flowing crushed top coal 5 and crushed gangue 4 are generated respectively. The crushed top coal 5 or crushed gangue 4 falls onto the upper surface of the shielding beam 103 under the influence of gravity, and continues to roll along the upper surface of the shielding beam 103 to the upper surface of the tail beam 102, and finally falls onto the scraper conveyor 7.

[0022] The crushed top coal 5 and crushed gangue 4 roll on the upper surface of the shielding beam and trigger the pressure pillow 6 in turn. Signal contacts 601 are evenly arranged inside the pressure pillow 6, and the signal contacts 601 are connected to the contact signal line 602. The pressure pillow 6 collects pressure and vibration information. When the crushed top coal 5 or the crushed gangue 4 rolls on the upper surface of the shielding beam 103, the impact force generated by its rolling will trigger the beam pressure pillow 61 of the shielding beam on the rolling path in turn. After the pressure pillow 61 of the shielding beam is triggered, the trigger signal will be transmitted to the signal acquisition device 10 through the information transmission cable 8. Similarly, when the crushed top coal 5 or the crushed gangue 4 rolls to the upper surface of the tail beam 101, the pressure pillow 62 of the tail beam will also transmit the trigger signal on the rolling path to the signal acquisition device 10.

[0023] Among them, the pressure pillow 6 is composed of 36 pressure pillows 61 of the shield beams and 24 pressure pillows 62 of the tail beams, which are evenly arranged on the upper surfaces of the shield beam 103 and the tail beam 101. The pressure pillows 61 of the 36 shield beams are arranged in 6 rows and 6 columns, and the pressure pillows 62 of the 24 tail beams are arranged in 4 rows and 6 columns. Each pressure pillow is composed of 9 rows and 9 columns of evenly distributed signal contacts 601. The contacts 601 communicate with the information transmission cable 8 through the contact signal line 602, that is, one pressure pillow can collect pressure vibration data at 81 contact positions. The pressure pillows 6 are evenly arranged to form a pressure pillow evenly distributed cluster, and a total of 4860 pressure vibration data can be collected at one time node.

[0024] The signal acquisition device 10 collects and stores the monitoring signals from the pressure pillow at each time node, and the signal processing and visualization device obtains the real-time signal matrix of the pressure pillow 6. The 4860 signals from the pressure pillow uniform distribution cluster are transmitted to the signal processing and visualization device 9 with time as the index.

[0025] The signal processing and visualization device 9 obtains the position coordinates of all the pressure pillows, and calls the position coordinates according to the working posture of the top coal caving hydraulic support 1. The signal processing and visualization device 9 numbers and names the coal particles contacting the pressure pillows according to the time nodes, and processes the signals into four-dimensional matrix data of coal particle number, time node, position coordinate, and pressure value through big data processing and data separation methods, and then fits the four-dimensional data into the spatial motion trajectory of each coal particle to draw the spatial curve of the coal flow motion state.

[0026] The coal flow motion state and coal flow properties are judged according to the four-dimensional matrix data of coal particle number, time node, position coordinates and pressure value. The coal flow motion state includes the coal flow motion state being laminar flow, the coal flow motion state being turbulent flow, the coal flow direction being from upper left to lower right, the coal flow direction being directly above to directly below, and the coal flow direction being from upper right to lower left; the coal flow properties are pure coal state or gangue-intercalated state.

[0027] The coal flow state is laminar flow, which means the coal flow is very smooth. The coal flow state is turbulent flow, which means the coal flow is stuck or blocked. The hydraulic control device adjusts the opening of the coal discharge port according to the coal flow state, and adjusts the swing tail beam to disturb the coal flow; judges the direction of the coal flow according to the movement state of the coal flow and controls the opening and closing sequence of the coal discharge port; judges the gangue content according to the coal flow properties, and controls the opening and closing of the coal discharge port. The monitoring function of the coal flow direction can also display the specific angle value of the coal flow direction, which provides a reference for the top coal caving process in the mining process, especially the top coal caving process in the coal seam with a large dip angle, helps the coal caving workers to judge the direction of the coal flow and correctly control the opening and closing sequence of the coal discharge port for group frame caving. The coal flow property monitoring function can identify whether gangue appears in the coal flow and the specific proportion of gangue according to the pressure change of the pressure pillow, which provides a reference for the time in the mining process, helps the coal caving workers to judge whether the top coal has been caved and whether gangue appears, and timely controls the closure of the coal discharge port to prevent over-cavitation and under-cavitation of the top coal, thereby improving the top coal recovery rate and reducing the gangue content.

[0028] The top coal caving hydraulic support of this system can realize automatic control based on the monitoring of coal flow conditions to improve coal caving efficiency and ensure coal caving safety; the system evenly arranges and determines the coordinates of the pressure pillow structure on the cover beam and tail beam, and comprehensively obtains the four-dimensional data matrix of coal particle number, time node, position coordinate, and pressure value, so as to accurately judge the flow state of coal flow and draw spatial curves, realizing automated and intelligent mining.

[0029] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.

Claims

1. A real-time monitoring system for top coal flow status based on uniformly distributed clusters of pressure pillows, characterized in that: It includes a top coal caving hydraulic support, a pressure pillow, a scraper conveyor, an information transmission cable, a signal processing and visualization device, a signal acquisition device, a hydraulic pipeline, and a hydraulic control device. A plurality of pressure pillows are evenly arranged on the cover beam and the tail beam of the top coal caving hydraulic support. The pressure pillow includes a signal contact and a contact signal line. The contact signal line is connected to the signal acquisition device through the information transmission cable, and the signal acquisition device is connected to the signal processing and visualization device. The scraper conveyor is arranged below the tail beam, and the hydraulic control device is connected to the tail beam jack through a hydraulic pipeline.

2. A real-time monitoring system for top coal flow status based on pressure pillow uniformly distributed clusters according to claim 1, characterized in that: The top coal caving hydraulic support is arranged below the top coal seam, and above the top coal seam is a gangue rock layer; after the top coal seam and the gangue rock layer are crushed, flowing crushed top coal and crushed gangue are generated.

3. The real-time monitoring system for top coal flow status based on pressure pillow uniformly distributed clusters according to claim 2 is characterized in that: The crushed top coal and crushed gangue roll on the upper surface of the shield beam to trigger the pressure pillow in turn. Signal contacts are evenly arranged inside the pressure pillow. The signal contacts are connected to the contact signal lines. The pressure pillow collects pressure and vibration information.

4. The real-time monitoring system for top coal flow status based on pressure pillow uniformly distributed clusters according to claim 2 is characterized in that: The signal acquisition device acquires and stores the monitoring signal from the pressure pillow at each time node, and the signal processing and visualization device obtains the real-time signal matrix of the pressure pillow.

5. A real-time monitoring system for top coal flow status based on pressure pillow uniformly distributed clusters according to any one of claims 1 to 4, characterized in that: The signal processing and visualization device obtains the position coordinates of all pressure pillows, and calls the position coordinates according to the working posture of the top coal caving hydraulic support; the signal processing and visualization device numbers and names the coal particles that contact the pressure pillows according to the time nodes, and processes the signals into four-dimensional matrix data of coal particle numbers, time nodes, position coordinates, and pressure values ​​through big data processing and data separation methods, and then fits the four-dimensional data into the spatial motion trajectory of each coal particle to draw the spatial curve of the coal flow motion state.

6. A real-time monitoring system for top coal flow status based on pressure pillow uniformly distributed clusters according to claim 5, characterized in that: The coal flow movement state and coal flow properties are judged according to the four-dimensional matrix data of coal particle number, time node, position coordinates and pressure value. The coal flow movement state includes the coal flow movement state as laminar flow, the coal flow movement state as turbulent flow, the coal flow direction from upper left to lower right, the coal flow direction from directly above to directly below, and the coal flow direction from upper right to lower left; the coal flow properties are pure coal state or gangue-intercalated state.

7. A real-time monitoring system for top coal flow status based on pressure pillow uniformly distributed clusters according to claim 6, characterized in that: The coal flow state of laminar flow indicates that the coal flow is very smooth, and the coal flow state of turbulent flow indicates that the coal flow is stuck or blocked. The hydraulic control device adjusts the opening of the coal discharge port according to the coal flow state, and adjusts the swinging tail beam to disturb the coal flow; determines the direction of the coal flow according to the coal flow movement state and controls the opening and closing sequence of the coal discharge port; determines the gangue content according to the coal flow properties, and controls the opening and closing of the coal discharge port.

Citation Information

Patent Citations

  • Four-dimensional transparent visual experiment table and method for simulating top coal drawing

    CN104504988A

  • Coal face coal seam three-dimensional display method based on geologic body modeling and application thereof

    CN110675495A

  • Intelligent coal control device and method for full-mechanized caving mining bracket of thick coal seam

    CN111980739A

  • Device for monitoring similar simulation coal seam floor pressure field change and using method

    CN112665982A

  • Coal gangue content identification system and method based on high-frequency dynamic pressure sensor

    CN116429675A