Lightweight construction method of remote sensing image geometric control data and related device
By extracting and processing corner points and feature information of remote sensing images, lightweight geometric control objects are generated, which solves the problem of long update cycle and high cost of geometric control data of remote sensing images, and enables the mixed use of different satellite loads, time images and resolutions. , improving the accuracy and stability of geometric correction.
Patent Information
- Application Number
- CN202410894040.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-29
AI Technical Summary
In the existing technology, the update cycle of geometric control data of remote sensing images is long and the cost is high, and the control data of different satellite loads, time images and resolutions cannot be mixed, resulting in unstable geometric correction accuracy.
By obtaining three-dimensional control data, preprocessing and grid construction are performed, corner points and feature information are extracted, geometric control objects are generated, and written into storage files to form lightweight geometric control data, allowing for different satellite loads, time images, and resolutions. Data are mixed.
It improves the reliability and accuracy of geometric correction, reduces the data volume of control data, and improves the stability of the correction process.
Smart Images

Figure CN118865152A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of optical remote sensing image processing, and in particular to a lightweight construction method and related device for remote sensing image geometric control data. Background Art
[0002] In the remote sensing imaging process, the image pixels generated by the sensor are squeezed, stretched, twisted, and offset relative to the actual position of the ground target. We call this phenomenon geometric distortion. Geometric distortion will cause errors in quantitative analysis, change detection, image fusion, map measurement or update based on remote sensing images, so it is necessary to correct the geometric distortion of the image, which is geometric correction. Geometric precision correction refers to the precise correction made using the geometric control data of the ground corner points. Geometric precision correction does not consider the cause of the distortion, but directly uses the ground corner points to establish a mathematical model between the pixel coordinates and the geographic coordinates of the target object to achieve the transformation of the pixel position in different coordinate systems.
[0003] The accuracy requirements for geometric correction are that the edge accuracy is better than 1 pixel, the positioning accuracy is better than 1 pixel in the plain area, and better than 2 pixels in the mountainous area. Due to the complexity of the actual production environment, the processing process is affected by many factors such as the surface coverage of the measured area, satellite payload, time image, resolution, etc., and the three-dimensional control data used in the production process is required to completely cover the production measurement area, and the resolution is required to be the same or close to the image to be produced. Therefore, the control data update cycle is very long and the cost is high. In addition, control data with different satellite payloads, time images and resolutions cannot be mixed, and it is difficult to adapt to the complex production environment, so the geometric correction accuracy fluctuates greatly in actual production and is very unstable.
[0004] Application Contents
[0005] The purpose of this application is to provide a lightweight construction method and related devices for remote sensing image geometric control data, so as to solve the technical problems in the prior art that the geometric control data update cycle is very long and the cost is high, and the control data of different satellite payloads, time images and resolutions cannot be mixed and used, and it is difficult to adapt to complex production environments, resulting in large fluctuations and instability in the geometric correction accuracy in actual production.
[0006] To achieve the above purpose, a technical solution adopted in this application is:
[0007] A lightweight construction method for remote sensing image geometric control data is provided, including:
[0008] Acquiring three-dimensional control data, the three-dimensional control data including reference images and digital elevation models;
[0009] Preprocessing the reference image to obtain a target reference image with consistent resolution and image meta-information, wherein the image meta-information includes ground resolution, temporal image, satellite payload, sensor type, and ground sampling distance;
[0010] constructing a grid on the target reference image;
[0011] Traversing the grids of the target reference image, extracting corner points of each grid, and collecting them into a first queue;
[0012] Traversing each corner point in the first queue, performing feature extraction on each corner point to obtain feature description information;
[0013] Based on the coordinates of the corner points in the first queue and the digital elevation model, obtaining the three-dimensional coordinates of the corner points;
[0014] Based on the three-dimensional coordinates of the corner points, the image meta-information, the feature description information and the algorithm for extracting the corner points, a geometric control object is generated and written into a storage file to obtain geometric control data.
[0015] In one or more embodiments, the step of preprocessing the reference image to obtain a target reference image with consistent resolution and image meta-information includes:
[0016] Performing band synthesis on the reference image and constructing an image pyramid;
[0017] Based on the image pyramid, obtaining the target reference image;
[0018] Extract image meta information of the target reference image.
[0019] In one or more embodiments, the step of traversing the grids of the target reference image, extracting corner points from each grid, and collecting the corner points into the first queue includes:
[0020] Based on the ground resolution of the target reference image, the Harris operator is used to extract corner points in each grid and collected into a first queue;
[0021] Cleaning the corner points in the first queue;
[0022] Determine whether the number of corner points of a single grid in the first queue is less than a threshold;
[0023] If not, a first queue including the corner points of each grid is obtained.
[0024] In one or more embodiments, it further includes:
[0025] If there is a single grid in the first queue whose number of corner points is less than the threshold, Shi-Tomas, ORB, and FAST operators are used in sequence to extract corner points from the grid whose number of corner points is less than the threshold until the number of corner points of a single grid in the first queue is greater than or equal to the threshold.
[0026] In one or more embodiments, the three-dimensional control data further includes a control mask, wherein the control mask is used to describe an area of interest showing ground topography in the reference image;
[0027] The step of cleaning the corner points in the first queue comprises:
[0028] Based on the control mask, poor quality corner points in the first queue are removed, and the poor quality corner points do not show the ground topography.
[0029] In one or more implementations, the step of traversing each corner point in the first queue, extracting features from each corner point, and obtaining feature description information includes:
[0030] The correlation coefficient algorithm, ORB algorithm, BRIEF algorithm and SIFT algorithm are used in sequence to extract features from each corner point in the first queue to obtain feature description information.
[0031] In one or more embodiments, the step of generating a geometric control object based on the three-dimensional coordinates of the corner point, the image meta information, the feature description information and the algorithm for extracting the corner point, and writing the object into a storage file to obtain the geometric control data includes:
[0032] Obtaining a geographic code of the corner point based on the three-dimensional coordinates of the corner point and a global hexagonal grid code;
[0033] Based on the geographic code of the corner point, the image metadata and the algorithm for extracting the corner point, a unique code of the corner point is obtained;
[0034] Based on the unique code of the corner point, the three-dimensional coordinates and the feature description information, a geometric control object is generated and written into a storage file to obtain geometric control data.
[0035] In one or more embodiments, the data object of the geometric control object includes a code segment consisting of the unique code and a body segment consisting of the three-dimensional coordinates and the feature description information;
[0036] The storage file includes a file header segment, a data header segment, and a body segment including a plurality of the geometric control objects.
[0037] In order to achieve the above purpose, another technical solution adopted by this application is:
[0038] A lightweight construction device for remote sensing image geometric control data is provided, comprising:
[0039] An acquisition module, used for acquiring three-dimensional control data, wherein the three-dimensional control data includes a reference image and a digital elevation model;
[0040] A preprocessing module, used to preprocess the reference image to obtain a target reference image with consistent resolution and image meta-information, wherein the image meta-information includes ground resolution, time image, satellite payload, sensor type and ground sampling distance;
[0041] A grid division module, used for constructing a grid on the target reference image;
[0042] A corner point extraction module, used for traversing the grids of the target reference image, extracting corner points from each grid, and collecting the corner points into a first queue;
[0043] A feature extraction module, used for traversing each corner point in the first queue, performing feature extraction, and obtaining feature description information;
[0044] A coordinate calculation module, used for obtaining three-dimensional coordinates of corner points based on the coordinates of the corner points in the first queue and the digital elevation model;
[0045] The storage module is used to generate a geometric control object based on the three-dimensional coordinates of the corner point, the image meta information, the feature description information and the algorithm for extracting the corner point, and write it into a storage file to obtain geometric control data.
[0046] In order to achieve the above purpose, another technical solution adopted by this application is:
[0047] An electronic device is provided, comprising:
[0048] at least one processor; and
[0049] A memory storing instructions, which, when executed by the at least one processor, enables the at least one processor to execute the lightweight construction method as described in any of the above embodiments.
[0050] In order to achieve the above purpose, another technical solution adopted by this application is:
[0051] A machine-readable storage medium is provided, which stores executable instructions, and when the instructions are executed, the machine executes the lightweight construction method as described in any of the above embodiments.
[0052] Different from the prior art, the beneficial effects of this application are:
[0053] This application constructs a geometric control object by extracting corner points and feature description information of the extracted corner points, and combining image metadata. The geometric control object describes the satellite payload, time image, resolution and algorithm information of the control data, and can form the best match with the image data to be produced in a fine-grained manner, thereby improving the reliability of geometric correction of remote sensing images.
[0054] This application writes the geometric control object into a storage file to obtain geometric control data. The data volume of the geometric control data is reduced by 98% compared with the existing three-dimensional control data, which helps to simultaneously use control data with different satellite payloads, time images and resolutions, and helps to improve the accuracy and stability of geometric correction. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the drawings required for use in the embodiments or the prior art description are briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present application, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0056] Figure 1 It is a flow chart of an implementation method of a lightweight construction method of remote sensing image geometric control data of the present application;
[0057] Figure 2 yes Figure 1 A schematic diagram of a flow chart of an implementation method corresponding to S200;
[0058] Figure 3 yes Figure 1 A schematic diagram of a flow chart of an implementation method corresponding to S400;
[0059] Figure 4 yes Figure 1 A schematic diagram of a flow chart of an implementation method corresponding to S700;
[0060] Figure 5 is a schematic diagram of an implementation of a data structure of a geometric control object of the present application;
[0061] Figure 6 It is a schematic diagram of an implementation method of a data structure for storing files of the present application;
[0062] Figure 7 It is a structural schematic diagram of an embodiment of a lightweight construction device for remote sensing image geometric control data of the present application;
[0063] Figure 8 It is a structural schematic diagram of the electronic device of the present application. DETAILED DESCRIPTION
[0064] In order to enable those skilled in the art to better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work should fall within the scope of protection of this application.
[0065] At present, the three-dimensional control data used for the geometric correction of optical remote sensing images is required to completely cover the production survey area, and the resolution is required to be the same or close to that of the image to be produced. Therefore, the control data update cycle is very long and the cost is high. In addition, control data with different satellite payloads, time images and resolutions cannot be mixed, and it is difficult to adapt to complex production environments. As a result, the accuracy of geometric correction fluctuates greatly and is very unstable in actual production.
[0066] In order to solve the above problems, the applicant has developed a method for constructing lightweight geometric control data. This method makes full use of geometric control data of different satellite payloads, time images, and resolutions during the geometric correction process by lightweighting the geometric control data, thereby achieving self-adaptation of geometric correction payloads and measurement areas, thereby improving the reliability of geometric correction accuracy.
[0067] Specifically, see Figure 1 , Figure 1 It is a flow chart of an implementation method of a lightweight construction method of remote sensing image geometric control data of the present application.
[0068] like Figure 1 As shown, the lightweight construction method includes:
[0069] S100, obtaining three-dimensional control data.
[0070] In one embodiment, the three-dimensional control data includes reference images and a digital elevation model (DEM).
[0071] The reference image is a previously captured image registered with the remote sensing image to be corrected. The reference image and the remote sensing image to be corrected have the same points as each other and are used to correct the remote sensing image.
[0072] Among them, the method for obtaining the reference image is a conventional technical means in this field, which does not involve the lightweight construction method of the present application and will not be described here.
[0073] Digital Elevation Model (DEM) is a digital model that expresses the terrain features of the earth's surface. It provides ground elevation information in the form of a regular grid, and each grid node contains an elevation value. This model can be used to describe the ups and downs of the surface and provide basic data for various geographic information system (GIS) analyses and map production.
[0074] S200 , preprocessing the reference image to obtain a target reference image with consistent resolution and image meta-information.
[0075] In one embodiment, the image meta-information may include ground resolution, temporal image, satellite payload, sensor type and ground sampling distance; in other embodiments, the image meta-information may also include other image parameters.
[0076] See also Figure 2 , Figure 2 yes Figure 1 A flow chart of an implementation method corresponding to S200 in FIG.
[0077] like Figure 2 As shown, in one embodiment, the pre-processing method includes:
[0078] S201, perform band synthesis on the reference image and construct an image pyramid.
[0079] Among them, band synthesis is the process of combining image data from different bands to generate a new image. This process can be completed through the band synthesis tool in remote sensing software.
[0080] Image pyramids are arranged in a pyramid shape with resolution decreasing from high resolution at the bottom to low resolution at the top.
[0081] S202: Obtain a target reference image based on the image pyramid.
[0082] By selecting a layer of images from the image pyramid, a target reference image with consistent resolution can be obtained.
[0083] S203: Extract image meta-information of the target reference image.
[0084] S300: construct a grid on the target reference image.
[0085] In one implementation, a 1 km*1 km grid may be constructed based on the image range of the target reference image.
[0086] S400 , traverse the grids of the target reference image, extract corner points of each grid, and collect them into a first queue.
[0087] Based on the grid constructed by S300, each grid can be traversed to extract corner points.
[0088] See also Figure 3 , Figure 3 yes Figure 1 A flow chart of an implementation method corresponding to S400 in FIG.
[0089] like Figure 3 As shown, in one embodiment, the method for extracting corner points may include:
[0090] S401. Based on the ground resolution of the target reference image, use the Harris operator to extract corner points in each grid and collect them into the first queue.
[0091] First, the Harris operator can be used to extract corner points in the grid. Harris corner detection is a corner detection method based on grayscale images. It determines the corner points by calculating the gradient change in the pixel neighborhood. Corner points are points in the image where the grayscale changes greatly in different directions, usually points with the greatest curvature on the edge curve of the object.
[0092] S402: Clean the corner points in the first queue.
[0093] Since some of the corner points extracted by the Harris operator cannot display the ground topography, such as corner points falling into roofs, clouds, and waters, these poor quality corner points need to be cleaned.
[0094] In one embodiment, the three-dimensional control data may also include a control mask, which is used to describe the area of interest that displays the ground topography in the reference image, that is, the control mask may be a binary image, in which the area that can display the ground topography may be 1, and correspondingly, the area that falls into the roof, clouds, water, etc. and cannot display the ground topography may be 0.
[0095] Based on the control mask, the inferior corner points in the first queue can be removed to achieve corner point cleaning.
[0096] S403: Determine whether the number of corner points of a single grid in the first queue is less than a threshold.
[0097] In order to ensure that the number of corner points in each grid meets the requirements and improve the accuracy of subsequent correction, it is necessary to determine whether the number of corner points of a single grid is less than the threshold.
[0098] The threshold is preset based on actual working conditions. For example, the threshold may be 10.
[0099] If the number of corner points of a single grid is greater than or equal to the threshold, the extraction of corner points is completed, and a first queue including corner points of each grid is obtained.
[0100] If the number of corner points of a single grid in the first queue is less than the threshold, it also includes:
[0101] S404, sequentially use Shi-Tomas, ORB, and FAST operators to extract corner points from grids whose number of corner points is less than a threshold, until the number of corner points of a single grid in the first queue is greater than or equal to the threshold.
[0102] It is understandable that when the number of corner points extracted using the Harris operator cannot meet the requirement, other operators can be used in turn to extract corner points.
[0103] Among them, the Shi-Tomas operator is similar to the Harris operator, but uses a different scoring function to identify corners with high contrast. The ORB operator is a fast feature point detection and descriptor extraction method that detects key points by comparing the grayscale values of the central pixel with its neighboring pixels. The FAST operator is a corner point detection method based on grayscale images. It identifies corner points by judging the brightness difference between a pixel in the image and its surrounding neighboring pixels.
[0104] Through the above steps, corner points no less than a threshold number are extracted from each grid and collected into a first queue.
[0105] S500, traverse each corner point in the first queue, extract features from each corner point, and obtain feature description information.
[0106] Specifically, the feature extraction algorithms of corner points may include a correlation coefficient algorithm, an ORB algorithm, a BRIEF algorithm, and a SIFT algorithm.
[0107] In one implementation, the correlation coefficient algorithm, the ORB algorithm, the BRIEF algorithm, and the SIFT algorithm may be used in sequence to extract features from each corner point in the first queue to obtain feature description information.
[0108] S600: Obtain three-dimensional coordinates of the corner points based on the coordinates of the corner points in the first queue and the digital elevation model.
[0109] Through the known two-dimensional coordinates of the corner points, the elevation of the corner points can be obtained based on the digital elevation model to obtain the three-dimensional coordinates of the corner points.
[0110] S700, based on the three-dimensional coordinates of the corner points, image metadata, feature description information and an algorithm for extracting corner points, a geometric control object is generated and written into a storage file to obtain geometric control data.
[0111] It can be understood that the geometric control object describes the satellite payload, time image, resolution and algorithm information of the control data, which can form the best match with the image data to be produced in a fine-grained manner and improve the reliability of geometric correction of remote sensing images.
[0112] At the same time, the data volume of the geometric control data obtained based on S700 is reduced by 98% compared with the existing three-dimensional control data, which is conducive to the simultaneous use of control data with different satellite payloads, time images and resolutions, and helps to improve the accuracy and stability of geometric correction.
[0113] In one embodiment, see Figure 4 , Figure 4 yes Figure 1 A flowchart of an implementation method corresponding to S700 is shown in FIG.
[0114] like Figure 4 As shown, the method for obtaining geometric control data may include:
[0115] S701. Obtaining a geographic code of the corner point based on the three-dimensional coordinates of the corner point and the global hexagonal grid code.
[0116] Among them, the global hexagonal grid coding is a system that divides the earth's surface into hexagonal grids and encodes them; based on the three-dimensional coordinates of the corner points, the geographical codes of the corner points can be obtained through the global hexagonal grid coding.
[0117] In one implementation, the geocoding of the corner points may be calculated based on Level 15 and a ground resolution of 1 meter.
[0118] S702: Based on the geographic coding of the corner point, image metadata and an algorithm for extracting the corner point, a unique coding of the corner point is obtained.
[0119] S703. Generate a geometric control object based on the unique code, three-dimensional coordinates and feature description information of the corner point, and write it into a storage file to obtain geometric control data.
[0120] In one embodiment, see Figure 5 , Figure 5 It is a schematic diagram of an implementation of the data structure of a geometric control object of the present application.
[0121] like Figure 5 As shown, the unique code of the corner point may include the following fields: geographic code Geocode, satellite payload SatType, sensor type Scensor, time image Temporal, ground sampling distance Gsd, and corner point extraction algorithm Algo.
[0122] like Figure 5 As shown, the geometric control object may include a coding segment Cdocode composed of a unique code and a body segment Cdobody composed of three-dimensional coordinates (Longtitude, Latitude, Altitude) and feature description information.
[0123] Based on the obtained geometric control object, it can be written into a storage file to obtain geometric control data.
[0124] See also Figure 6 , Figure 6 It is a schematic diagram of an implementation method of a data structure for storing files in the present application.
[0125] like Figure 6 As shown, the storage file may include a file header segment CdpfileHeader, a data header segment CdoPackHeader, and a body segment including multiple geometric control objects Cdo1~n.
[0126] Among them, the file header segment CdpfileHeader includes basic parameters of the storage file, such as version, bounding box, frame distance, etc.; the data packet header segment CdoPackHeader can include data parameters such as geocoding and the number of geometric control objects.
[0127] It can be understood that the geometric control data obtained based on the above steps has a greatly reduced data volume compared to the three-dimensional control data, which helps to simultaneously use control data with different satellite payloads, time images and resolutions, and helps to improve the accuracy and stability of geometric correction.
[0128] This application also provides a lightweight construction device for remote sensing image geometric control data, please refer to Figure 7 , Figure 7 It is a structural schematic diagram of an implementation method of a lightweight construction device for remote sensing image geometric control data of the present application.
[0129] like Figure 7 As shown, the lightweight construction device includes an acquisition module 21, a preprocessing module 22, a grid division module 23, a corner point extraction module 24, a feature extraction module 25, a coordinate calculation module 26 and a storage module 27.
[0130] The acquisition module 21 is used to acquire three-dimensional control data, which includes reference images and digital elevation models;
[0131] The preprocessing module 22 is used to preprocess the reference image to obtain a target reference image with consistent resolution and image meta-information, where the image meta-information includes ground resolution, time image, satellite payload, sensor type and ground sampling distance;
[0132] The grid division module 23 is used to construct a grid on the target reference image;
[0133] The corner point extraction module 24 is used to traverse the grids of the target reference image, extract corner points from each grid, and collect them into a first queue;
[0134] The feature extraction module 25 is used to traverse each corner point in the first queue, perform feature extraction, and obtain feature description information;
[0135] The coordinate calculation module 26 is used to obtain the three-dimensional coordinates of the corner points based on the coordinates of the corner points in the first queue and the digital elevation model;
[0136] The storage module 27 is used to generate a geometric control object based on the three-dimensional coordinates of the corner points, image metadata, feature description information and an algorithm for extracting corner points, and write the object into a storage file to obtain geometric control data.
[0137] As above Figures 1 to 6 , a lightweight construction method according to an embodiment of this specification is described. The details mentioned in the above description of the method embodiment are also applicable to the lightweight construction device of the embodiment of this specification. The above lightweight construction device can be implemented by hardware, or by software, or a combination of hardware and software.
[0138] This application also provides an electronic device, see Figure 8 , Figure 8 Schematic diagram of the structure of the electronic device of this application. Figure 8 As shown, the electronic device 30 may include at least one processor 31, a memory 32 (e.g., a non-volatile memory), a memory 33, and a communication interface 34, and the at least one processor 31, the memory 32, the memory 33, and the communication interface 34 are connected together via a bus 35. At least one processor 31 executes at least one computer-readable instruction stored or encoded in the memory 32.
[0139] It should be understood that the computer executable instructions stored in the memory 32, when executed, cause at least one processor 31 to perform the above combined operations in various embodiments of the present specification. Figure 1-Figure 6 Describes the various operations and functions.
[0140] In the embodiments of the present specification, the electronic device 30 may include, but is not limited to, personal computers, server computers, workstations, desktop computers, laptop computers, notebook computers, mobile electronic devices, smart phones, tablet computers, cellular phones, personal digital assistants (PDAs), handheld devices, messaging devices, wearable electronic devices, consumer electronic devices, and the like.
[0141] According to one embodiment, a program product such as a machine-readable medium is provided. The machine-readable medium may have instructions (i.e., the above-mentioned elements implemented in the form of software), which, when executed by a machine, causes the machine to perform the above-mentioned combination of various embodiments of this specification. Figure 1-Figure 6 Specifically, a system or device equipped with a readable storage medium may be provided, on which a software program code implementing the functions of any of the above-mentioned embodiments is stored, and a computer or processor of the system or device reads and executes the instructions stored in the readable storage medium.
[0142] In this case, the program code itself read from the machine-readable medium can realize the function of any one of the above embodiments, and thus the machine-readable code and the machine-readable storage medium storing the machine-readable code constitute part of this specification.
[0143] Examples of readable storage media include floppy disks, hard disks, magneto-optical disks, optical disks (such as CD-ROM, CD-R, CD-RW, DVD-ROM, DVD-RAM, DVD-RW, DVD-RW), magnetic tapes, non-volatile memory cards, and ROMs. Alternatively, the program code may be downloaded from a server computer or a cloud via a communication network.
[0144] Those skilled in the art should understand that the various embodiments disclosed above can be modified and altered in various ways without departing from the essence of the invention. Therefore, the protection scope of this specification should be defined by the appended claims.
[0145] It should be noted that not all steps and units in the above-mentioned processes and system structure diagrams are necessary, and some steps or units can be ignored according to actual needs. The execution order of each step is not fixed and can be determined as needed. The device structure described in the above-mentioned embodiments can be a physical structure or a logical structure, that is, some units may be implemented by the same physical client, or some units may be implemented by multiple physical clients, or some components in multiple independent devices may be implemented together.
[0146] In the above embodiments, the hardware unit or module can be realized by mechanical or electrical means. For example, a hardware unit, module or processor can include permanent dedicated circuit or logic (such as special processor, FPGA or ASIC) to complete the corresponding operation. The hardware unit or processor can also include programmable logic or circuit (such as general-purpose processor or other programmable processor), which can be temporarily set by software to complete the corresponding operation. Specific implementation (mechanical method or dedicated permanent circuit or temporary circuit) can be determined based on cost and time consideration.
[0147] The specific embodiments described above in conjunction with the accompanying drawings describe exemplary embodiments, but do not represent all embodiments that can be implemented or fall within the scope of protection of the claims. The term "exemplary" used throughout this specification means "used as an example, instance or illustration" and does not mean "preferred" or "having advantages" over other embodiments. For the purpose of providing an understanding of the described technology, the specific embodiments include specific details. However, these technologies can be implemented without these specific details. In some instances, in order to avoid making the concepts of the described embodiments difficult to understand, well-known structures and devices are shown in block diagram form.
[0148] The above description of the present disclosure is provided to enable any person of ordinary skill in the art to implement or use the present disclosure. Various modifications to the present disclosure will be apparent to those of ordinary skill in the art, and the general principles corresponding to the present disclosure may be applied to other variations without departing from the scope of protection of the present disclosure. Therefore, the present disclosure is not limited to the examples and designs described herein, but is consistent with the widest range of principles and novel features disclosed herein.
Claims
1. A lightweight construction method for remote sensing image geometric control data, characterized in that: include: Acquiring three-dimensional control data, the three-dimensional control data including reference images and digital elevation models; Preprocessing the reference image to obtain a target reference image with consistent resolution and image meta-information, wherein the image meta-information includes ground resolution, temporal image, satellite payload, sensor type, and ground sampling distance; constructing a grid on the target reference image; Traversing the grids of the target reference image, extracting corner points of each grid, and collecting them into a first queue; Traversing each corner point in the first queue, performing feature extraction on each corner point to obtain feature description information; Based on the coordinates of the corner points in the first queue and the digital elevation model, obtaining three-dimensional coordinates of the corner points; Based on the three-dimensional coordinates of the corner points, the image meta-information, the feature description information and the algorithm for extracting the corner points, a geometric control object is generated and written into a storage file to obtain geometric control data.
2. The lightweight construction method according to claim 1, characterized in that: The step of preprocessing the reference image to obtain a target reference image with consistent resolution and image meta-information comprises: Performing band synthesis on the reference image and constructing an image pyramid; Based on the image pyramid, obtaining the target reference image; Extract image meta information of the target reference image.
3. The lightweight construction method according to claim 1, characterized in that: The step of traversing the grids of the target reference image, extracting corner points of each grid, and collecting the corner points into the first queue comprises: Based on the ground resolution of the target reference image, the Harris operator is used to extract corner points in each grid and collected into a first queue; Cleaning the corner points in the first queue; Determine whether the number of corner points of a single grid in the first queue is less than a threshold; If not, a first queue including the corner points of each grid is obtained.
4. The lightweight construction method according to claim 3, characterized in that: Also includes: If there is a single grid in the first queue whose number of corner points is less than the threshold, Shi-Tomas, ORB, and FAST operators are used in sequence to extract corner points from the grid whose number of corner points is less than the threshold until the number of corner points of a single grid in the first queue is greater than or equal to the threshold.
5. The lightweight construction method according to claim 3, characterized in that: The three-dimensional control data also includes a control mask, and the control mask is used to describe the region of interest showing the ground topography in the reference image; The step of cleaning the corner points in the first queue comprises: Based on the control mask, poor quality corner points in the first queue are removed, and the poor quality corner points do not show the ground topography.
6. The lightweight construction method according to claim 1, characterized in that: The step of traversing each corner point in the first queue, extracting features from each corner point, and obtaining feature description information comprises: The correlation coefficient algorithm, ORB algorithm, BRIEF algorithm and SIFT algorithm are used in sequence to extract features from each corner point in the first queue to obtain feature description information.
7. The lightweight construction method according to claim 1, characterized in that: The step of generating a geometric control object based on the three-dimensional coordinates of the corner point, the image meta information, the feature description information and the algorithm for extracting the corner point, and writing the object into a storage file to obtain the geometric control data includes: Obtaining a geographic code of the corner point based on the three-dimensional coordinates of the corner point and a global hexagonal grid code; Based on the geographic code of the corner point, the image metadata and the algorithm for extracting the corner point, a unique code of the corner point is obtained; Based on the unique code of the corner point, the three-dimensional coordinates and the feature description information, a geometric control object is generated and written into a storage file to obtain geometric control data.
8. The lightweight construction method according to claim 7, characterized in that: The data object of the geometric control object includes a code segment consisting of the unique code and a body segment consisting of the three-dimensional coordinates and the feature description information; The storage file includes a file header segment, a data header segment, and a body segment including a plurality of the geometric control objects.
9. A lightweight construction device for remote sensing image geometric control data, characterized in that: include: An acquisition module, used for acquiring three-dimensional control data, wherein the three-dimensional control data includes a reference image and a digital elevation model; A preprocessing module, used to preprocess the reference image to obtain a target reference image with consistent resolution and image meta-information, wherein the image meta-information includes ground resolution, time image, satellite payload, sensor type and ground sampling distance; A grid division module, used for constructing a grid on the target reference image; A corner point extraction module, used for traversing the grids of the target reference image, extracting corner points from each grid, and collecting the corner points into a first queue; A feature extraction module, used for traversing each corner point in the first queue, performing feature extraction, and obtaining feature description information; A coordinate calculation module, used for obtaining three-dimensional coordinates of corner points based on the coordinates of the corner points in the first queue and the digital elevation model; The storage module is used to generate a geometric control object based on the three-dimensional coordinates of the corner point, the image meta information, the feature description information and the algorithm for extracting the corner point, and write it into a storage file to obtain geometric control data.
10. An electronic device, comprising: at least one processor; as well as A memory storing instructions, which, when executed by the at least one processor, enables the at least one processor to execute the lightweight construction method according to any one of claims 1 to 8.
11. A machine-readable storage medium storing executable instructions, wherein when the instructions are executed, the machine executes the lightweight construction method according to any one of claims 1 to 8.
Citation Information