Repeated staggered flushing pressure swing adsorption system with flushing tank
By adopting multiple staggered flushing technology with two flushing tanks in the pressure-switching adsorption system, three staggered flushing and regeneration are achieved using high-pressure, medium-pressure and low-pressure modules, the problems of low regeneration efficiency and high investment in the existing technology are solved, and the problem of low regeneration efficiency and high investment in the existing technology is realized. Highly efficient hydrogen recovery and low investment in hydrogen separation and purification.
Patent Information
- Application Number
- CN202411141158.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-01
AI Technical Summary
The existing belt-stop tank and multiple-stop staggered flushing pressure-switching adsorption technology has problems such as low regeneration efficiency, high investment or poor regeneration efficiency uniformity, resulting in an increase in the volume of adsorption tower and the number of program-controlled valves, and the overall performance of the device has not reached its maximum. The balance between optimal and lowest investment.
Using a multiple interleaved rinsing pressure-transforming adsorption system with two flushing tanks, 6 or more adsorption towers, a high-pressure flushing tank and a medium-pressure flushing tank, three flushing modules realize at least three staggered rinsing regeneration, and use high-pressure , medium-pressure and low-pressure modules complete three flushing and regeneration, ensuring good consistency in each regeneration effect.
The flush gas regeneration is achieved divided by impurity concentration gradient, which improves the regeneration efficiency and product recovery rate, shortens the cycle time, reduces the amount of adsorbent and device investment, and the product recovery rate is stable at 88-93%, and the investment is reduced by 15-3% 30%.
Smart Images

Figure CN118874147A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of industrial gas separation and purification, and relates to gas separation and purification technologies in petrochemical industry, coal chemical industry, hydrogen energy, energy chemical industry and other fields, and is specifically a multiple staggered flushing pressure swing adsorption system with a flushing tank. Background Art
[0002] Pressure Swing Adsorption (PSA) gas separation and purification technology utilizes the characteristics of the difference in equilibrium adsorption capacity of different gas components on the adsorbent and the characteristics that the adsorption capacity changes with pressure. It achieves gas separation or purification through periodic pressure changes. It is a physical process and can be achieved at room temperature. The flushing regeneration methods include single flushing, double flushing or triple flushing with or without an intermediate tank. The more normal pressure flushing times, the better the regeneration effect, but the more hardware is required, and the higher the investment in the corresponding PSA device. Under the premise of achieving the same processing load, product quality and recovery rate, the investment in the process with a flushing tank is 15-25% lower than that in the process without a flushing tank.
[0003] For the pressure swing adsorption process without flushing and releasing tanks, no matter how many flushing processes are performed, the flushing and releasing processes are either one-to-one corresponding or non-corresponding mixed flushing processes. The one-to-one corresponding flushing process leads to a large number of adsorption towers and programmable valves, and it is not easy to shorten the period, and the device investment is high; while the regeneration efficiency of the mixed flushing process is low, and secondary pollution cannot be avoided. In the early days, under the premise of ensuring the regeneration time, the secondary flushing process without a releasing tank required a minimum of 90 seconds per cycle, and the tertiary flushing process without a flushing and releasing tank required a minimum of 60 seconds per cycle. It can be seen that when there is no releasing tank, the secondary flushing requires two periodic steps to complete the releasing and flushing regeneration process, and the tertiary flushing requires three periodic steps to complete the releasing and flushing regeneration process, resulting in a corresponding increase of 0.5 to 1.5 adsorption towers. The multiple sequential release and staggered flushing pressure swing adsorption process patent ZL200810044290.4 uses two rows of programmable valves and four regulating valves for flushing gas sequential release and flushing gas inlet, and correspondingly adjusts and controls the flushing gas volume and pressure. It uses the one-to-one correspondence between adsorption towers, and the regeneration process of sequential release and flushing is carried out synchronously; the regulating valves for two flushings in the three flushing processes are different, and the effects of the two regeneration processes are different, resulting in poor uniformity of regeneration efficiency and affecting the recovery rate. The operation steps of the 10-2-4 / P process with three sequential release and staggered flushing are shown in Table 1.
[0004] Table 1: 10-2-4 / P process flow chart
[0005]
[0006]
[0007] For example, the 10-2-4 / P process realizes a three-time flushing regeneration process, and the shortest cycle can be reduced to 60 seconds. Compared with the early conventional pressure swing adsorption process, the recovery rate of hydrogen purified by conversion gas can reach a high level of 88-89.5%, and the investment can be reduced by 10-15%. However, the shortest cycle can only be 60 seconds, the investment is relatively high, and the competitiveness is still not strong.
[0008] The patent for the pressure swing adsorption process with two downstream tanks (ZL200510020305.X) sets two downstream tanks and four regulating valves together, and realizes two staggered flushing and regeneration functions by storing the downstream gas in the downstream tanks. The cycle time can be shortened to about 60 seconds under the premise of ensuring the regeneration time of 90 seconds. Although two staggered flushings are achieved through two downstream tanks, the flushing times are small, and the utilization efficiency of the downstream gas is not high. The product recovery rate can only reach 87-89% when the conversion gas is used to purify hydrogen; because four regulating valves are used to realize the front and back flushing process of the single and double series, the effects of the early flushing and the late flushing of the single and double series are different, resulting in poor uniformity of the overall regeneration effect of the device, affecting the product hydrogen recovery rate by 0.5-1.0%.
[0009] The operating steps of the 10-3-4 / P process with two sequential tanks are shown in Table 2.
[0010] Table 2: 10-3-4 / P with two sequential tanks process operation steps
[0011]
[0012] A patent for a multi-tower pressure swing adsorption graded flushing device and method (CN201710979879.2) shows that according to the patent description and possible variations and combinations, only two staggered flushings can be achieved. With the flushing time of 90 seconds as the base, the shortest time cycle is 45 seconds, which cannot be reduced any further. There are still problems such as low flushing gas regeneration efficiency, high investment and low competitiveness.
[0013] The above two process flows have long sub-cycles, large adsorption tower volume and matching programmable valve diameter, large adsorbent dosage, high device investment, low market competitiveness, and cannot adapt to the fiercely competitive market. Although each has its own advantages, the investment is slightly higher when the recovery rate is higher, and the investment is lower but the recovery rate cannot reach the optimal state. Therefore, it is necessary to develop a technology with good flushing effect, high recovery rate and lowest system investment, in order to gain an invincible position in the fiercely competitive market. Summary of the invention
[0014] Whether it is the existing pressure swing adsorption gas separation technology with two sequential discharge tanks or multiple sequential discharge staggered flushing, there are shortcomings such as low regeneration efficiency, high investment, or poor uniformity of regeneration efficiency, resulting in a large adsorption tower volume and a matching programmable valve diameter, a large amount of adsorbent, and the overall performance of the device does not reach the optimal balance state with the lowest investment. In view of the problems existing in these separation and purification technologies, the purpose of the present invention is to provide a multiple staggered flushing pressure swing adsorption system with a flushing tank, which ensures that the product recovery rate reaches the optimal state and reduces the system investment, and the two reach the best balance state.
[0015] In order to achieve the purpose of the present invention, the specific technical scheme of the present invention is as follows:
[0016] A multiple staggered flushing pressure swing adsorption system with a flushing tank, the pressure swing adsorption system is equipped with 6 or more adsorption towers, a high-pressure flushing tank and a medium-pressure flushing tank, and corresponding program-controlled valves and regulating valves, and at least three staggered flushing regenerations are achieved through three flushing modules. According to the requirements of raw gas, product gas, desorbed gas and process performance, a raw gas gas-liquid separator, a product gas buffer tank, a desorbed gas buffer tank and a desorbed gas mixing tank can also be provided. The pressure swing adsorption system uses a low-pressure flushing regeneration process to complete the separation and purification of the gas.
[0017] Each adsorption tower is equipped with connected but not limited to raw gas inlet valve, product gas outlet valve, pressure equalizing valve, flushing gas release valve, flushing gas release common valve, flushing gas inlet valve, flushing gas common valve, reverse valve, flushing waste gas outlet valve and other functional programmable valves and flushing gas regulating valves.
[0018] Each adsorption tower in the pressure swing adsorption system undergoes adsorption (A), multiple pressure drops (E1D, E2D, E3D, ...), at least three steps of forward release (PP1, PP2, PP3, ...), reverse release (D), at least three steps of flushing (..., P3, P2, P1), multiple pressure increases (..., E3R, E2R, E1R) and final pressure increase (FR) in one cycle. The PSA system completes the gas separation and purification process through the control system with suitable process and control function modules.
[0019] The operating pressure of the pressure swing adsorption system is 0.4-10.0MPa(G), preferably 1.6-6.0MPa(G); the pressure of the flushing regeneration step is 0.001-0.40MPa(G), preferably 0.01-0.05MPa(G); the operating temperature is 10-60°C, preferably 20-40°C (specifically 20°C, 25°C, 30°C, 35°C, 40°C, etc.). The volume of the flushing tank is designed to be 1.0-3.0 times the volume of the adsorption tower, preferably 1.5-2.0 times, to ensure that sufficient flushing gas is stored in the downstream tank.
[0020] The odd-numbered adsorption towers of the pressure swing adsorption system are combined into a single (or odd) series, and the even-numbered adsorption towers are combined into a double (or even) series. The outlets of the functional valves at the inlet and outlet of the single (or odd) series adsorption tower are connected to form a collection pipe, and the outlets of the functional valves at the inlet and outlet of the double (or even) series adsorption tower are connected to form a collection pipe. The collection pipes of the functional valves of the single (or odd) series and the double (or even) series are then connected through a regulating valve or a manual valve or directly. The collection pipes of the flushing gas discharge valves of the single (or odd) series and the double (or even) series are connected to a flushing gas discharge common valve or a flushing gas regulating valve. The flushing gas discharge common valve is connected to the inlet of the high-pressure or medium-pressure flushing tank. The outlet of the high-pressure or medium-pressure flushing tank is connected to the flushing gas regulating valve, which is then connected to the flushing gas common valve, and finally connected to the adsorption tower through the flushing gas inlet valve collection pipe. When the single (or odd) series and double (or even) series flushing gas discharge valve collection pipe is directly connected to the flushing gas regulating valve, the flushing gas regulating valve is directly connected to the pipe adsorption tower through the flushing gas inlet valve collection pipe. Among them, the high-pressure or medium-pressure flushing tank, a flushing gas discharge common valve, a flushing gas regulating valve and two flushing gas common valves constitute a high-pressure or medium-pressure flushing module, and the functions of the high-pressure flushing module and the medium-pressure flushing module are interchangeable. The flushing gas discharge valve and the flushing gas inlet valve are directly connected through a regulating valve to form a low-pressure flushing module. The high-pressure flushing module and the medium-pressure flushing module are respectively connected to the flushing gas discharge valve collection pipe and the flushing gas inlet valve collection pipe, and the low-pressure flushing module is directly connected to all adsorption towers.
[0021] The present invention divides the discharged gas into three parts according to the impurity content. The first discharged gas with the lowest impurity content is stored in a high-pressure discharged tank and is flushed for the third time by a high-pressure module for the adsorption tower. The second discharged gas with a lower impurity content is stored in a medium-pressure discharged tank and is flushed for the second time by a medium-pressure module for the adsorption tower. The third discharged gas with a higher impurity content is flushed for the first time by a low-pressure module for the adsorption tower.
[0022] The present invention sets three flushing modules of high pressure, medium pressure and low pressure to complete at least three staggered flushing and regeneration. The flushing gas with more impurities is released for the third time through the low-pressure flushing module to complete the first flushing, the flushing gas with less impurities is released for the second time through the medium-pressure flushing module to complete the second flushing and regeneration, and the flushing gas with the least impurities is released for the first time through the high-pressure flushing module to complete the third flushing and regeneration. Each flushing and regeneration process is controlled by the same regulating valve, and the regeneration effect of all adsorption towers is the same, and the uniformity is good.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] Compared with the existing double tank or multiple sequential staggered flushing processes, the present invention can realize the division of flushing gas into at least three streams of different impurity concentrations according to the impurity concentration gradient through the scheme with two flushing tanks; during regeneration, the flushing gas with a higher impurity concentration is first used for regeneration, followed by the flushing gas with a lower impurity concentration, and finally the flushing gas with the lowest impurity concentration is used for regeneration, achieving at least three staggered flushing functions, improving the efficiency of the regenerated gas, reducing the amount of regenerated gas, and improving the product gas recovery rate. Through the pressure swing adsorption system with two flushing tanks, the cycle time is greatly shortened, the tower volume is reduced, the amount of adsorbent is reduced, and the device investment is greatly reduced. Through the three regeneration modules of high pressure, medium pressure and low pressure, the three flushing regeneration functions are completed respectively, and the regeneration effect of all adsorption towers is consistent after each regeneration, ensuring product quality and recovery rate.
[0025] The present invention is applicable to large-scale integrated refining and chemical industry, modern coal chemical industry, hydrogen pipeline transportation and hydrogen energy industries, and is used for hydrogenation reforming, preparation of synthetic industrial raw gas and pressure swing adsorption separation and purification of large amounts of hydrogen and other product gases required for hydrogen energy in refining and chemical industry. In the future, large-scale hydrogen-blended natural gas transportation of hydrogen will achieve hydrogen purification of millions of standard cubic meters to solve the technical problems of medium-sized, large-scale and extra-large-scale hydrogen separation and purification in industrial production. In the future rapid development of the hydrogen energy field, affected by many factors such as investment, energy consumption and land occupation, a multiple staggered flushing pressure swing adsorption system with a flushing tank is used to provide key purification technology support for large-scale hydrogen demand for hydrogen energy, and to provide technical support for solving key problems such as recovery rate, investment, energy consumption and land occupation.
[0026] The present invention ensures that the regeneration time reaches 90 seconds, and the impurity content gradually decreases through at least three staggered flushing regeneration methods. Under the same equipment specifications, the device regeneration time is longer, the processing load is greater, and the product gas recovery rate can be stabilized in the range of 88-93% according to factors such as the raw gas state, product gas requirements and investment requirements. The product recovery rate is better than multiple staggered flushing or the traditional pressure swing adsorption process with two sequential release tanks. When the regeneration time is guaranteed to be 90 seconds, the cycle time can be shortened to less than 42 seconds, and the overall investment of the device can be greatly reduced. Compared with the three staggered flushing pressure swing adsorption process technology without sequential release tanks, the investment can be reduced by 20-30%, and compared with the process with two sequential release tanks, the investment can be reduced by 15-25%. Therefore, the product hydrogen recovery rate is effectively guaranteed by the present invention, and the device investment is greatly reduced by at least 15%. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is one of the schematic diagrams of the conventional multiple sequential and staggered flushing process;
[0028] Figure 2 This is one of the schematic diagrams of the pressure swing adsorption process with two downstream tanks;
[0029] Figure 3 This is one of the process flow diagrams used in Example 1 of the present invention;
[0030] Figure 4 This is one of the process flow diagrams used in Example 2 of the present invention;
[0031] Figure 5 This is one of the process flow diagrams used in Example 3 of the present invention.
[0032] Description of some numbers in the figure
[0033] 1. V101 / 2 flushing tank, KV-011 raw gas inlet valve, KV-012 product gas outlet valve, KV-013 reverse discharge valve, KV-014 flushing gas inlet valve, KV-015 booster valve, KV-016 flushing gas discharge / equalizing valve, KV-017 flushing gas discharge / inlet / equalizing valve, KV-018 flushing waste gas outlet valve, KV-019 equalizing valve; KV-1 / 2 flushing gas discharge common valve, KV-3 / 4 / 5 / 6 flushing gas common valve; HV-1 / 2 / 3 flushing gas regulating valve.
[0034] 2. Explanation of codes such as KV-011: The first and second digits represent the number of the adsorption tower, from 01, 02, 03, ..., and the third digit represents the serial number of the program-controlled valve connected to each adsorption tower, from 1, 2, 3, ...
[0035] 3. KV-1 / 2 / 3 / 4 / 5 / 6 code description: The numbers represent the public valve numbers, from 1, 2, 3, ...
[0036] 4. HV-1 / 2 / 3 code description: 1 / 2 / 3 represents the flushing gas regulating valve number, from 1, 2, 3, ... DETAILED DESCRIPTION
[0037] The multiple staggered flushing pressure swing adsorption system with flushing tank is a multi-tower continuous operation system composed of 6 or more adsorption towers and two flushing tanks (one high-pressure flushing tank and one medium-pressure flushing tank), programmable valves and regulating valves, etc., and at least three staggered flushing regenerations are achieved through three flushing modules. According to the requirements of raw gas, product gas, desorbed gas and process performance, a raw gas gas-liquid separator, a product gas buffer tank, a desorbed gas buffer tank and a desorbed gas mixing tank can also be set. Each adsorption tower is equipped with connected but not limited to raw gas inlet valve, product gas outlet valve, pressure equalizing valve, flushing gas release valve, flushing gas release common valve, flushing gas inlet valve, flushing gas common valve, reverse valve, flushing waste gas outlet valve and other functional programmable valves and flushing gas regulating valves.
[0038] The pressure swing adsorption system can realize at least three divisions of the discharged gas according to the impurity concentration. The first discharged gas with the lowest impurity content is stored in the high-pressure discharged gas tank and is flushed for the third time by the high-pressure module for the adsorption tower. The second discharged gas with lower impurity content is stored in the medium-pressure discharged gas tank and is flushed for the second time by the medium-pressure module for the adsorption tower. The third discharged gas with higher impurity content is flushed for the first time by the low-pressure module for the adsorption tower.
[0039] The pressure swing adsorption system can realize at least three times of staggered flushing and regeneration process. When the adsorption tower is regenerated, firstly, the flushing gas with high impurity content in the late stage of the discharge is directly used to flush the adsorption tower through the regulation and control of the regulating valve and the program-controlled valve, and then the mid-stage flushing gas with less impurities stored in the medium-pressure flushing tank is used to flush the adsorption tower through the regulation and control of the regulating valve and the program-controlled valve, and finally the early stage flushing gas with the least impurities stored in the high-pressure flushing tank is used to flush the adsorption tower through the regulation and control of the regulating valve and the program-controlled valve. The volume of the flushing tank is designed to be 1.2 to 3.0 times the volume of the adsorption tower, and preferably 1.5 to 2.0 times, to ensure that enough flushing gas is stored in the discharge tank.
[0040] Each adsorption tower undergoes adsorption (A), multiple pressure drops (E1D, E2D, E3D, ...), at least three steps of forward release (PP1, PP2, PP3, ...), reverse release (D), at least three steps of flushing (..., P3, P2, P1), multiple pressure increases (..., E3R, E2R, E1R) and final pressure increase (FR) in one cycle. Each adsorption tower completes the same sequence of steps, but the process steps are staggered by one sub-cycle to ensure the continuous separation process.
[0041] The odd-numbered adsorption towers of the pressure swing adsorption system are combined into a single (or odd) series, and the even-numbered adsorption towers are combined into a double (or even) series. The outlets of the functional valves at the inlet and outlet of the single (or odd) series adsorption tower are connected to form a collection pipe, and the outlets of the functional valves at the inlet and outlet of the double (or even) series adsorption tower are connected to form a collection pipe. The collection pipes of the functional valves of the single (or odd) series and double (or even) series are then connected through regulating valves or manual valves or directly connected.
[0042] The single (or odd) series and double (or even) series flushing gas discharge valve collection pipe is connected to a flushing gas discharge common valve or flushing gas regulating valve. The flushing gas discharge common valve is connected to the inlet of the high-pressure or medium-pressure flushing tank. The outlet of the high-pressure or medium-pressure flushing tank is connected to the flushing gas regulating valve, and the flushing gas regulating valve is connected to the flushing gas common valve, and finally connected to the adsorption tower through the flushing gas inlet valve collection pipe. When the single (or odd) series and double (or even) series flushing gas discharge valve collection pipe is directly connected to the flushing gas regulating valve, the flushing gas regulating valve is directly connected to the adsorption tower through the flushing gas inlet valve collection pipe. Among them, the high-pressure or medium-pressure flushing tank, a flushing gas discharge common valve, a flushing gas regulating valve and two flushing gas common valves constitute a high-pressure or medium-pressure flushing module, and the functions of the high-pressure flushing module and the medium-pressure flushing module can be interchanged. The flushing gas discharge valve and the flushing gas inlet valve are directly connected through the regulating valve to form a low-pressure flushing module.
[0043] The multiple staggered flushing process is completed through three sequential release and flushing modules: high pressure, medium pressure and low pressure.
[0044] Sequential release steps: the flushing gas is divided into at least three streams through the flushing tank, the flushing gas sequential release common valve and the regulating valve. The impurity component concentrations of the multiple flushing gases are distributed in a gradient increasing order. During regeneration, the adsorption tower is flushed in the order of gradually increasing impurity concentrations of the flushing gas to complete the reverse release process.
[0045] Flushing steps: First, use the low-pressure flushing module to complete the early flushing regeneration by using the flushing gas (PP4 or PP3) with slightly higher impurity content and the flushing gas discharge valve KV-017, the regulating valve HV-3 connected to the flushing gas discharge valve collection pipe, and the flushing gas inlet valve of the adsorption tower that completes the reverse discharge process; secondly, use the medium-pressure flushing module to use the flushing gas (PP2) with lower impurity content and the flushing gas discharge valve KV-016, the flushing gas discharge common valve KV-2 connected to the flushing gas discharge valve collection pipe, the flushing tank V102, the regulating valve HV-2 connected to the flushing tank V102, and the two flushing gas common valves KV-5 or KV-6 that follow, to flush the adsorption tower. The adsorbents in different series of adsorption towers that still adsorb a small amount of impurities after washing are flushed and regenerated again; finally, a high-pressure flushing module is used to use the flushing gas with the lowest impurity content (PP1) and the flushing gas discharge valve KV-016, the flushing gas discharge common valve KV-1 connected to the flushing gas discharge valve collection pipe, the flushing tank V101, the regulating valve HV-1 connected to the flushing tank V101 and the two subsequent flushing gas common valves KV-3 or KV-4, to carry out the final flushing and regeneration of the adsorbents in different series of adsorption towers that still adsorb trace impurities after flushing, so as to ensure the cleanliness of the regeneration of the adsorbent and avoid secondary contamination of flushing gas impurities.
[0046] All features disclosed in this specification, or steps in all methods or processes disclosed, except mutually exclusive features and / or steps, can be combined in any manner.
[0047] Any feature disclosed in this specification (including claims and abstract), unless otherwise stated, may be replaced by other equivalent or alternative features having similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.
[0048] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.
[0049] Embodiment 1:
[0050] 8-tower multiple staggered flushing pressure swing adsorption system with flushing tank
[0051] The 8-tower multiple staggered flushing pressure swing adsorption system with flushing tanks has an operating process as shown in Table 3 or Table 4, and the operating cycle is within the range of 35 to 40 seconds.
[0052] Table 3: Operation process table of 8-tower multiple staggered flushing pressure swing adsorption system with flushing tank
[0053]
[0054] Table 4: Operation process table of 8-tower multiple staggered flushing pressure swing adsorption system with flushing tank
[0055]
[0056]
[0057] From the operation process table 3 or table 4 of this example, it can be known that the 8-tower multiple staggered flushing pressure swing adsorption system with flushing tanks includes 8 adsorption towers, a high-pressure flushing tank, a low-pressure flushing tank, a gas-liquid separator, a product tank, a desorption gas buffer tank and a desorption gas mixing tank. Each adsorption tower undergoes adsorption (A), the first pressure drop (E1D), the second pressure drop (E2D), the third pressure drop (E3D), sequential release one (PP1), sequential release two (PP2), sequential release three (PP3), reverse release (D), flushing three (P3), flushing two (P2), flushing one (P1), the third pressure rise (E3R), the second pressure rise (E2R), the first pressure rise (E1R) and the final pressure rise (FR) in one cycle, and the remaining adsorption towers also undergo the same process, but the time is staggered by one sub-cycle.
[0058] Among them, the odd-numbered adsorption towers T101, T103, T105 and T107 are grouped into a single (odd) series, and the even-numbered adsorption towers T102, T104, T106 and T108 are grouped into a double (even) series;
[0059] The flushing gas discharge common valve KV-1, high-pressure flushing tank V101, flushing gas regulating valve HV-1 and flushing gas common valve KV-03 / 04 form a high-pressure flushing module; the flushing gas discharge common valve KV-2, medium-pressure flushing tank V102, flushing gas regulating valve HV-2 and flushing gas common valve KV-05 / 06 form a medium-pressure flushing module; the flushing gas discharge (or flushing in) valve KV-017 and the flushing gas regulating valve HV-3 form a low-pressure flushing module.
[0060] The multiple staggered flushing processes are completed through the flushing gas discharge valve, flushing module and flushing gas inlet valve connected to the adsorption tower product gas outlet pipeline. First, the low-pressure flushing module is used to complete the flushing regeneration process, using the flushing gas with a slightly higher impurity content (PP3) to complete the flushing regeneration using the flushing gas discharge valve KV-017, the regulating valve HV-3 connected to the flushing gas discharge valve manifold and the flushing gas inlet valve KV-017; secondly, the medium-pressure flushing module is used to complete the flushing regeneration process, using the flushing gas with a low impurity content (PP2) to complete the flushing gas discharge valve KV-016, the flushing gas discharge common valve KV-2 connected to the flushing gas discharge valve manifold, the flushing tank V102, the regulating valve HV-2 connected to the flushing tank V102 and the two subsequent flushing gas common valves KV-5 Or KV-6, the adsorbents in different series of adsorption towers that still adsorb a small amount of impurities after flushing are flushed and regenerated again; finally, the high-pressure flushing module is used to complete the last flushing and regeneration process, using the flushing gas with the lowest impurity content (PP1) using the flushing gas release valve KV-016, the flushing gas release common valve KV-1 connected to the flushing gas release valve collection pipe, the flushing tank V101, the regulating valve HV-1 connected to the flushing tank V101 and the subsequent two flushing gas common valves KV-3 or KV-4, the adsorbents in different series of adsorption towers that still adsorb a small amount of impurities after flushing are flushed and regenerated for the last time.
[0061] Among them, the flushing gas common valves KV-3 and KV-4, KV-5 and KV-6 can use adjustable programmable valves, then the flushing gas regulating valves HV-1 and HV-2 are cancelled, and similar changes will no longer be explained in the description of the process operation process of other process flows with different numbers of towers.
[0062] The schematic diagram of the 8-tower process flow of the multiple staggered flushing pressure swing adsorption system with flushing tanks is shown in Figure 3 This example only uses Figure 3This example takes the adsorption pressure of ~2.5MPa(G), the regeneration pressure of ~0.02MPa(G), and the feed gas temperature of 20-40℃ as an example to illustrate the completion process of the 8-tower multiple staggered flushing pressure swing adsorption system with flushing tanks:
[0063] 1. Adsorption (A): After the liquid components are removed by the gas-liquid separator at 2.5MPa (G) and 20-40°C, the raw gas enters the adsorption tower T101 from the bottom of the adsorption tower through the raw gas pipeline and the raw gas inlet valve KV-011. The impurity components in the raw gas are adsorbed by the adsorbent in the adsorption tower T101, and the weakly adsorbable product components such as hydrogen are sent out of the boundary area from the upper part of the adsorption tower T101 through the product pipeline and the product gas outlet valve KV-012. When the concentration of impurity components in the product gas reaches the requirement and is sent out of the boundary area after being buffered by the product tank V106, the raw gas inlet valve KV-011 and the product gas outlet valve KV-012 are closed to stop the adsorption process.
[0064] 2. Pressure drop (EiD): After the adsorption (A) step is completed, open the equalizing pressure drop valve KV-015 of the adsorption tower T101 and perform a pressure drop with the adsorption tower T103, close the equalizing pressure drop valve KV-015, open the equalizing pressure drop valve KV-016 and perform the second and third pressure drops with the adsorption towers (T104 and T105) in sequence, and open the equalizing pressure increase valves connected to the corresponding towers respectively, and transfer the product gas components adsorbed by the adsorbent in the gap in the tower to the adsorption tower with increased pressure. After completion, close KV-016 and the corresponding equalizing valves of other towers. According to the adsorption pressure, number of adsorption towers, adsorbent performance, product quality and yield requirements, the pressure drop in this example is completed in three times, which are abbreviated as E1D, E2D and E3 respectively.
[0065] 3. PP: After multiple equalization and pressure drop (EiD) steps are completed, a small amount of effective components are still adsorbed in the gaps in the tower and on the adsorbent. The PP process is completed through the PP valve and the PP common valve or regulating valve connected to the PP valve manifold and its connected subsequent equipment. First, the flushing gas (PP1) released for the first time passes through the flushing gas release valve KV-016 and the flushing gas release common valve KV-1, enters the flushing tank V101 for storage, and is flushed for the third time (P1) on the adsorption tower (T106) through the flushing gas common valve KV-4 and the flushing gas inlet valve; the flushing gas (PP2) released for the second time passes through the flushing gas release valve KV-016 and the flushing gas release common valve KV-2, enters the flushing tank V102 for storage, and is flushed for the second time (P2) on the adsorption tower (T107) through the flushing gas common valve KV-5 and the flushing gas inlet valve; the flushing gas released for the third time passes through the flushing gas release valve KV-017 and the regulating valve HV-3 to flush the adsorption tower (T108) for the first time (P3).
[0066] 4. Reverse discharge (D): After the forward discharge (PP) step is completed, the gas remaining in the adsorption tower is discharged to the desorption gas buffer tank V104 through the reverse discharge valve KV-013 at the bottom feed end of the adsorption tower. After the reverse discharge is completed, the reverse discharge valve KV-013 is closed, and the pressure in the adsorption tower is 0.04~0.05MPa (G).
[0067] 5. Flushing (P): In order to regenerate the adsorbent in the adsorption tower more thoroughly, the vent gas (PP) discharged from the venting step is used to flush and regenerate the adsorbent in the adsorption tower that has completed the reverse release (D) step, so as to completely flush out the residual impurities from the adsorbent. First, a low-pressure flushing module is used to complete the first flushing process, and the vent gas (PP3) discharged from the adsorption tower (T102) for the third time is used to adjust the flow through the flushing gas regulating valve HV-3, and then the first flushing and regeneration (i.e., P3 process) is performed on the adsorption tower (T101) that has completed the reverse release (D) step through the flushing gas inlet valve KV-017; secondly, a medium-pressure flushing module is used to complete the second flushing process, and the vent gas (PP2) discharged from the adsorption tower (T103) for the second time is used through the flushing gas common valve KV- 2. The second flushing regeneration (i.e., P2 process) is completed by regulating and controlling the discharge tank V102, flushing gas common valve KV-5, flushing gas inlet valve KV-014, and regulating valve HV-2; finally, the third flushing process is completed by using the high-pressure flushing module, and the first discharge gas (PP1) from the adsorption tower (T104) is regulated and controlled through the flushing gas discharge common valve KV-1, discharge tank V101, flushing gas common valve KV-3, flushing gas inlet valve KV-014, and regulating valve HV-1 to complete the third flushing regeneration (i.e., P1 process). The flushing waste gas is sent to the desorption gas mixing tank V105 through the flushing waste gas outlet valve KV-018. During the flushing process, the pressure in the adsorption tower (T101) drops to ~0.02MPa(G).
[0068] 6. Pressure increase (EiR): This step corresponds to the pressure drop (EiD) step. After the flushing (P) step is completed, the pressure of the adsorption tower (T101) is gradually increased by using the depressurized gas discharged from the adsorption towers (T105, T106 and T107) in the pressure equalization pressure drop (EiD) step. The pressure increase step of this example is completed in three times, which are referred to as E3R, E2R and E1R respectively.
[0069] 7. Final pressure increase (FR): The pressure of the adsorption tower cannot reach the adsorption state pressure through multiple pressure increase (EiR) steps, so the product gas is used to increase the pressure from the top of the adsorption tower, or the raw gas can be used to increase the pressure of the adsorption tower from the bed feed end, or both are used to increase the pressure of the adsorption tower at the same time until the adsorption pressure is reached. After the product gas is controlled by the regulating valve, it is pressurized to the adsorption tower (T101) through the still open booster valve KV-015, and then enters the next adsorption process.
[0070] Each adsorption tower undergoes the same steps, but the operation sequence is staggered by one sub-cycle to ensure the continuous separation process.
[0071] Due to the realization of three staggered flushing and regeneration functions, compared with the two staggered flushing process of 8 towers without a downstream tank, the yield is increased by 1.0-1.5% and the investment can be saved by 25-30%. Compared with the process of 8 towers with two downstream tanks, the yield is increased by 1.0% and the investment is reduced by 20-25%. Therefore, under a certain operating pressure, sufficient pressure equalization times and staggered flushing and regeneration process, the multiple staggered flushing pressure swing adsorption system with flushing tanks can reduce the device investment by 20-30%, increase the product gas recovery rate by 1.0-1.5%, and stabilize the product gas recovery rate at 88-90%.
[0072] Example 2: 10-tower multiple staggered flushing pressure swing adsorption system with flushing tanks
[0073] The 10-tower multiple staggered flushing pressure swing adsorption system with flushing tanks has an operating process as shown in Table 5 or Table 6, and the operating cycle is in the range of 32 to 40 seconds.
[0074] Table 5: Operation process table of 10-tower multiple staggered flushing pressure swing adsorption system with flushing tank
[0075]
[0076]
[0077] Table 6: Operation process table of 10-tower multiple staggered flushing pressure swing adsorption system with flushing tank
[0078]
[0079] From the operation process table 5 or table 6 of this example, it can be known that the 10-tower multiple staggered flushing pressure swing adsorption system with flushing tanks includes 10 adsorption towers, a high / low pressure flushing tank, a gas-liquid separator, a product tank, a desorption gas buffer tank and a mixing tank. Each adsorption tower undergoes adsorption (A), four pressure drops (E1-4D), forward release (PP1-3), reverse release (D), flushing (P3-1), four pressure increases (E4-1R) and final pressure increase (FR) in sequence in one cycle, and the remaining adsorption towers also undergo the same process, but they are staggered by one sub-cycle in time.
[0080] Among them, the odd-numbered adsorption towers T101, T103, T105, T107 and T109 are grouped into a single (odd) series, and the even-numbered adsorption towers T102, T104, T106, T108 and T110 are grouped into a double (even) series;
[0081] The flushing gas discharge common valve KV-1, high-pressure flushing tank V101, flushing gas regulating valve HV-1 and flushing gas common valve KV-03 / 04 form a high-pressure flushing module; the flushing gas discharge common valve KV-2, medium-pressure flushing tank V102, flushing gas regulating valve HV-2 and flushing gas common valve KV-05 / 06 form a medium-pressure flushing module; the flushing gas discharge (or flushing in) valve KV-017 and the flushing gas regulating valve HV-3 form a low-pressure flushing module.
[0082] From the operation process table 5 or table 6 of this example, it can be known that the 10-tower multiple staggered flushing pressure swing adsorption system with flushing tanks includes 10 adsorption towers, a high / low pressure flushing tank, a gas-liquid separator, a product tank, a desorption gas buffer tank and a mixing tank. Each adsorption tower undergoes adsorption (A), four pressure drops (E1-4D), forward release (PP1-3), reverse release (D), flushing (P3-1), four pressure increases (E4-1R) and final pressure increase (FR) in sequence in one cycle, and the remaining adsorption towers also undergo the same process, but they are staggered by one sub-cycle in time.
[0083] Among them, the odd-numbered adsorption towers T101, T103, T105, T107 and T109 are grouped into a single (odd) series, and the even-numbered adsorption towers T102, T104, T106, T108 and T110 are grouped into a double (even) series;
[0084] The flushing gas discharge common valve KV-1, high-pressure flushing tank V101, flushing gas regulating valve HV-1 and flushing gas common valve KV-03 / 04 form a high-pressure flushing module; the flushing gas discharge common valve KV-2, medium-pressure flushing tank V102, flushing gas regulating valve HV-2 and flushing gas common valve KV-05 / 06 form a medium-pressure flushing module; the flushing gas discharge (or flushing in) valve KV-017 and the flushing gas regulating valve HV-3 form a low-pressure flushing module.
[0085] The multiple staggered flushing processes are completed through the flushing gas discharge valve, flushing module and flushing gas inlet valve connected to the adsorption tower product gas outlet pipeline. First, the low-pressure flushing module is used to complete the flushing regeneration process, and the flushing gas with slightly higher impurity content (PP3) is used to complete the first flushing regeneration with the flushing gas discharge valve KV-017 and the regulating valve HV-3 connected to the flushing gas discharge valve collection pipe; secondly, the medium-pressure flushing module is used to complete the flushing regeneration process, and the flushing gas with low impurity content (PP2) is used to complete the flushing regeneration with the flushing gas discharge valve KV-016, the flushing gas discharge common valve KV-2 connected to the flushing gas discharge valve collection pipe, the flushing tank V102, and the regulating valve HV-3 connected to the flushing tank V102. The throttle valve HV-2 and the two subsequent flushing gas common valves KV-5 or KV-6 complete the second flushing regeneration; finally, the high-pressure flushing module is used to complete the last flushing regeneration process, using the flushing gas with the lowest impurity content (PP1) using the flushing gas release valve KV-016, the flushing gas release common valve KV-2 connected to the flushing gas release valve manifold, the flushing tank V102, the regulating valve HV-2 connected to the flushing tank V102 and the two subsequent flushing gas common valves KV-3 or KV-4 to complete the last flushing regeneration.
[0086] 10 tower with multiple staggered flushing pressure swing adsorption system process flow diagram Figure 4 shown.
[0087] This example only Figure 4 This example takes the adsorption pressure of ~3.0MPa(G), the regeneration pressure of ~0.02MPa(G), and the feed gas temperature of 20-40℃ as an example to illustrate the completion process of the 10-tower multiple staggered flushing pressure swing adsorption system with flushing tanks:
[0088] 1. Adsorption (A): After the liquid components are removed by the gas-liquid separator at 3.0MPa (G) and 20-40°C, the raw gas enters the adsorption tower T101 from the bottom of the adsorption tower through the raw gas pipeline and the raw gas inlet valve KV-011. The impurity components in the raw gas are adsorbed by the adsorbent in the adsorption tower T101, and the weakly adsorbable product components such as hydrogen are sent out of the boundary area from the upper part of the adsorption tower T101 through the product pipeline and the product gas outlet valve KV-012. When the concentration of impurity components in the product gas reaches the requirement and is sent out of the boundary area after being buffered by the product tank V106, the raw gas inlet valve KV-011 and the product gas outlet valve KV-012 are closed to stop the adsorption process.
[0089] 2. Pressure drop (EiD): After the adsorption (A) step is completed, open the equalizing pressure drop valve KV-015 of the adsorption tower T101 and the adsorption tower T104 to perform a pressure drop, and close the equalizing pressure drop valve KV-015; open the equalizing pressure drop valve KV-019 and the adsorption towers (T105, T106 and T107) to perform the 2nd to 4th pressure drops in sequence, and open the equalizing pressure increase valves connected to the corresponding towers respectively, and transfer the product gas components adsorbed by the adsorbent in the gap in the tower to the adsorption tower with increased pressure. After completion, close KV-019 and the corresponding equalizing valves of other towers. According to the adsorption pressure, number of adsorption towers, adsorbent performance, product quality and yield requirements, the pressure drop in this example is completed in four times, which are abbreviated as E1D, E2D, E3D and E4D respectively.
[0090] 3. PP: After multiple equalization and pressure drop (EiD) steps are completed, a small amount of effective components are still adsorbed in the gaps in the tower and on the adsorbent. The PP process is completed through the PP valve and the PP common valve or regulating valve connected to the PP valve manifold and its connected subsequent equipment. First, the flushing gas (PP1) released for the first time passes through the flushing gas release valve KV-016 and the flushing gas release common valve KV-1, enters the flushing tank V101 for storage, and is flushed for the third time (P1) on the adsorption tower (T108) through the flushing gas common valve KV-4 and the flushing gas inlet valve; the flushing gas (PP2) released for the second time passes through the flushing gas release valve KV-016 and the flushing gas release common valve KV-2, enters the flushing tank V102 for storage, and is flushed for the second time (P2) on the adsorption tower (T109) through the flushing gas common valve KV-5 and the flushing gas inlet valve; the flushing gas released for the third time passes through the flushing gas release valve KV-107 and the regulating valve HV-3 to flush the adsorption tower (T110) for the first time (P3).
[0091] 4. Reverse discharge (D): After the forward discharge (PP) step is completed, the gas remaining in the adsorption tower is discharged to the desorption gas buffer tank V104 through the reverse discharge valve KV-013 at the bottom feed end of the adsorption tower. After the reverse discharge is completed, the reverse discharge valve KV-013 is closed, and the pressure in the adsorption tower is 0.04~0.05MPa (G).
[0092] 5. Flushing (P): In order to regenerate the adsorbent in the adsorption tower more thoroughly, the bleed gas (PP) discharged from the forward discharge step is used to flush and regenerate the adsorbent in the adsorption tower that has completed the reverse discharge (D) step, so as to completely flush out the residual impurities from the adsorbent. First, a low-pressure flushing module is used to complete the first flushing process, and the bleed gas (PP3) discharged from the third forward discharge from the adsorption tower (T102) is used to perform the first flushing and regeneration (i.e., the P3 process) on the adsorption tower (T101) that has completed the reverse discharge (D) step through the flushing gas regulating valve HV-3 and the flushing gas inlet valve KV-017; secondly, a medium-pressure flushing module is used to complete the second flushing process, and the bleed gas (PP2) discharged from the second forward discharge from the adsorption tower (T103) is used through the flushing gas forward discharge common valve KV-2 and the forward discharge tank V 102. The flushing gas common valve KV-5, the flushing gas inlet valve KV-014 and the regulating valve HV-2 are regulated and controlled to complete the second flushing regeneration (i.e., the P2 process); finally, the high-pressure flushing module is used to complete the third flushing process, and the first discharge gas (PP1) from the adsorption tower (T104) is used to pass through the flushing gas discharge common valve KV-1, the discharge tank V101, the flushing gas common valve KV-3, the flushing gas inlet valve KV-014 and the regulating valve HV-1 to complete the third flushing regeneration (i.e., the P1 process).
[0093] 6. Pressure increase (EiR): This step corresponds to the pressure drop (EiD) step. After the flushing (P) step is completed, the pressure of the adsorption tower (T101) is gradually increased by using the reduced pressure gas discharged from the adsorption towers (T105, T106, T107 and T108) in the equalizing pressure drop (EiD) step, and the E4R, E3R, E2R and E1R processes are completed in sequence.
[0094] 7. Final pressure increase (FR): The pressure of the adsorption tower cannot reach the adsorption state pressure through multiple pressure increase (EiR) steps, so the product gas is used to increase the pressure from the top of the adsorption tower, or the raw gas can be used to increase the pressure of the adsorption tower from the bed feed end, or both are used to increase the pressure of the adsorption tower at the same time until the adsorption pressure is reached. After the product gas is controlled by the regulating valve, it is pressurized to the adsorption tower (T101) through the still open booster valve KV-015, and then enters the next adsorption process.
[0095] Each adsorption tower undergoes the same steps, but the operation sequence is staggered by one sub-cycle to ensure the continuous separation process.
[0096] Due to the realization of three staggered flushing and regeneration functions, the yield is increased by 1.0-1.5% and the investment can be saved by 25-30% compared with the multiple staggered flushing process of 10 towers without a discharge tank, and the yield is increased by 1.5-2.0% and the investment is reduced by 20-25% compared with the process of 10 towers with two discharge tanks. Therefore, under certain operating pressure, sufficient pressure equalization times and multiple staggered flushing and regeneration processes, the multiple staggered flushing pressure swing adsorption system with flushing tanks can reduce the device investment by 20-30%, increase the product gas recovery rate by 1.0-2.0%, and stabilize the product gas recovery rate at 89-91.0%.
[0097] Example 3: 12-tower multiple staggered flushing pressure swing adsorption system with flushing tanks
[0098] The 12-tower multiple staggered flushing pressure swing adsorption system with flushing tanks has an operating process shown in Table 7, etc., and the operating cycle is in the range of 30 to 40 seconds.
[0099] Table 7: Operation process table of 12 towers of multiple staggered flushing pressure swing adsorption system with flushing tank
[0100]
[0101] From the operation process table 7 of this example, it can be seen that each adsorption tower undergoes adsorption (A), six pressure drops (E1~6D), forward release (PP1~3), reverse release (D), flushing (P3~1), six pressure increases (E6~1R) and final pressure increase (FR) in sequence within one cycle, and the remaining adsorption towers also undergo the same process, but they are staggered in time by one sub-cycle.
[0102] Among them, the adsorption towers T101, T103, T105, T107, T109 and T111 are grouped into one flushing series, and the adsorption towers T102, T104, T106, T108, T110 and T112 are grouped into another flushing series;
[0103] The flushing gas discharge common valve KV-1, high-pressure flushing tank V101, flushing gas regulating valve HV-1 and flushing gas common valve KV-03 / 04 form a high-pressure flushing module; the flushing gas discharge common valve KV-2, medium-pressure flushing tank V102, flushing gas regulating valve HV-2 and flushing gas common valve KV-05 / 06 form a medium-pressure flushing module; the flushing gas discharge (or flushing in) valve KV-017 and the flushing gas regulating valve HV-3 form a low-pressure flushing module.
[0104] The schematic diagram of the process flow of the 12-tower pressure swing adsorption system with multiple staggered flushing of flushing tanks is as follows Figure 5 shown.
[0105] This example only Figure 5Taking the flow diagram as an example, it is planned to take the operation steps of adsorption tower T101 as an example to illustrate the completion process of the multiple staggered flushing pressure swing adsorption system with flushing tanks of 12 towers under the conditions of adsorption pressure ~6.0MPa(G), regeneration pressure ~0.05MPa(G), and feed gas temperature 20~40℃:
[0106] From the operation process table 7 of this example, it can be seen that each adsorption tower undergoes adsorption (A), six pressure drops (E1~6D), forward release (PP1~3), reverse release (D), flushing (P3~1), six pressure increases (E6~1R) and final pressure increase (FR) in sequence within one cycle, and the remaining adsorption towers also undergo the same process, but they are staggered in time by one sub-cycle.
[0107] Among them, the adsorption towers T101, T103, T105, T107, T109 and T111 are grouped into one flushing series, and the adsorption towers T102, T104, T106, T108, T110 and T112 are grouped into another flushing series;
[0108] The flushing gas discharge common valve KV-1, high-pressure flushing tank V101, flushing gas regulating valve HV-1 and flushing gas common valve KV-03 / 04 form a high-pressure flushing module; the flushing gas discharge common valve KV-2, medium-pressure flushing tank V102, flushing gas regulating valve HV-2 and flushing gas common valve KV-05 / 06 form a medium-pressure flushing module; the flushing gas discharge (or flushing in) valve KV-017 and the flushing gas regulating valve HV-3 form a low-pressure flushing module.
[0109] The schematic diagram of the process flow of the 12-tower pressure swing adsorption system with multiple staggered flushing of flushing tanks is as follows Figure 5 shown.
[0110] This example only Figure 5 Taking the flow diagram as an example, it is planned to take the operation steps of adsorption tower T101 as an example to illustrate the completion process of the multiple staggered flushing pressure swing adsorption system with flushing tanks of 12 towers under the conditions of adsorption pressure ~6.0MPa(G), regeneration pressure ~0.05MPa(G), and feed gas temperature 20~40℃:
[0111] 1. Adsorption (A): After the liquid components are removed by the gas-liquid separator at 6.0MPa (G) and 20-40°C, the raw gas enters the adsorption tower T101 from the bottom of the adsorption tower through the raw gas pipeline and the raw gas inlet valve KV-011. The impurity components in the raw gas are adsorbed by the adsorbent in the adsorption tower T101, and the weakly adsorbable product components such as hydrogen are sent out of the boundary area from the upper part of the adsorption tower T101 through the product pipeline and the product gas outlet valve KV-012. When the concentration of impurity components in the product gas reaches the requirement, it is sent out of the boundary area after being buffered by the product tank V106, and the raw gas inlet valve KV-011 and the product gas outlet valve KV-012 are closed to stop the adsorption process;
[0112] 2. Pressure drop (EiD): After the adsorption (A) step is completed, the equalizing pressure drop valves connected to the corresponding adsorption towers (T104, T105, T106, T107, T108 and T109) are opened respectively to transfer the product gas components adsorbed by the adsorbent in the gaps in the towers to the adsorption tower with pressure rise. After the pressure rise and pressure drop of the adsorption tower are equal, close the equalizing pressure valve. According to the adsorption pressure, number of adsorption towers, adsorbent performance, product quality and yield requirements, the pressure drop in this example is completed in six times, which are respectively referred to as E1D, E2D, E3D, E4D, E5D and E6D;
[0113] 3. Forward discharge (PP): After the pressure drop (EiD) step is completed, a small amount of effective components are still adsorbed in the gaps in the tower and on the adsorbent. The flushing gas forward discharge process is completed through the flushing gas forward discharge valve and the flushing gas common valve or regulating valve connected to the flushing gas forward discharge valve manifold and its connected subsequent equipment. First, the flushing gas (PP1) released for the first time through the flushing gas forward discharge common valve KV-1 enters the flushing tank V101 for storage. Secondly, the flushing gas (PP2) released for the first time through the flushing gas forward discharge common valve KV-2 enters the flushing tank V102 for storage. Finally, the flushing gas (PP3) released for the third time through the regulating valve HV-3 and the flushing gas KV-017 is used to flush other adsorption towers.
[0114] 4. Reverse discharge (D): After the forward discharge (PP) step is completed, the gas remaining in the adsorption tower is discharged through the reverse discharge valve at the bottom feed end of the adsorption tower. After the reverse discharge is completed, the pressure in the adsorption tower is 0.06-0.08MPa (G);
[0115] 5. Flushing (P): In order to regenerate the adsorbent in the adsorption tower more thoroughly, the flushing gas (PP) discharged from the forward discharge step is used to flush the adsorbent in the tower that has completed the reverse discharge (D) step, so as to completely regenerate the residual impurities from the adsorbent. First, a low-pressure flushing module is used to complete the first flushing process, and the forward discharge gas (PP3) from the adsorption tower (T102) that has completed the reverse discharge (D) step is used to perform the first flushing regeneration (i.e., the P3 process) on the adsorption tower (T101) that has completed the reverse discharge (D) step through the flushing gas regulating valve HV-3 and the flushing gas inlet valve KV-017; secondly, a medium-pressure flushing module is used to complete the second flushing process, and the forward discharge gas (PP2) from the adsorption tower (T103) that has completed the second flushing step is used through the flushing gas forward discharge common valve KV-2 and the forward discharge tank V 102. The flushing gas common valve KV-5, the flushing gas inlet valve KV-014 and the regulating valve HV-2 are regulated and controlled to complete the second flushing regeneration (i.e., the P2 process); finally, the high-pressure flushing module is used to complete the third flushing process, and the first discharge gas (PP1) from the adsorption tower (T104) is used to pass through the flushing gas discharge common valve KV-1, the discharge tank V101, the flushing gas common valve KV-3, the flushing gas inlet valve KV-014 and the regulating valve HV-1 to complete the third flushing regeneration (i.e., the P1 process);
[0116] 6. Pressure increase (EiR): This step corresponds to the pressure drop (EiD) step. After the flushing (P) step is completed, the pressure of this tower is gradually increased by using the depressurized gas discharged from the adsorption towers (T105, T106, T107, T108, T109 and T110) in the pressure drop (EiD) step. The pressure increase step of this example is completed in six times, which are abbreviated as E6R, E5R, E4R, E3R, E2R and E1R respectively;
[0117] 7. Final pressure increase (FR): The pressure of the adsorption tower cannot reach the adsorption state pressure through multiple pressure increase (EiR) steps. Therefore, the product gas is used to increase the pressure from the top of the adsorption tower, or the raw gas is used to increase the pressure from the bed feed end, or both are used to increase the pressure of the adsorption tower at the same time until the adsorption pressure is reached.
[0118] Each adsorption tower undergoes the same steps, but the operation sequence is staggered by one sub-cycle to ensure the continuous separation process.
[0119] The flushing process time of this implementation case is close to 3 sub-cycles. Under the premise of ensuring 90 seconds of regeneration time, the sub-cycle time can be designed to be 32 to 38 seconds, which can save 25 to 30% of investment compared with the 12-2-6 / P process without a flushing tank with a sub-cycle of 60 seconds. Due to the realization of the staggered flushing and regeneration function, compared with the 12-2-6 / P process with one flushing tank but no staggered flushing, the yield is increased by 2.0 to 3.0%, and the investment can be saved by 20 to 25%. Therefore, in this case, sufficient pressure equalization times combined with the staggered flushing and regeneration process can not only reduce the investment of the device by 20 to 30%, but also increase the product yield to a stable level of 90 to 93%.
[0120] The above-mentioned embodiments only express the specific implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the protection scope of the present application. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the technical solution concept of the present application, and these all belong to the protection scope of the present application.
[0121] This background section is provided to generally present the context of the invention, and the work of the presently named inventors, the work to the extent described in this background section, and aspects of this section that did not constitute prior art at the time of application are neither explicitly nor implicitly admitted to be prior art to the present invention.
Claims
1. A multiple staggered flushing pressure swing adsorption system with a flushing tank, characterized in that: The pressure swing adsorption system includes 6 or more adsorption towers, a high-pressure flushing tank and a medium-pressure flushing tank, and corresponding programmable valves and regulating valves, and realizes at least three staggered flushing and regeneration through three flushing modules; each adsorption tower is equipped with connected but not limited to raw gas inlet valve, product gas outlet valve, equalizing valve, flushing gas forward release valve, flushing gas forward release common valve, flushing gas inlet valve, flushing gas common valve, reverse release valve, flushing waste gas outlet valve functional programmable valve and flushing gas regulating valve; each adsorption tower undergoes adsorption, multiple pressure drops, at least three steps of forward release, reverse release, at least three steps of flushing, multiple pressure increases and final pressure increase steps in one cycle; and the continuous operation of the PSA system is realized through the control system, thereby completing the gas separation and purification process; the pressure swing adsorption system adopts a low-pressure flushing regeneration process to complete the gas separation and purification process.
2. The pressure swing adsorption system according to claim 1, characterized in that: The pressure swing adsorption system is divided at least three times according to the impurity concentration of the discharged gas; the first discharged gas with the lowest impurity content is stored in a high-pressure discharged tank, and the adsorption tower is flushed for the third time through the high-pressure module; the second discharged gas with a lower impurity content is stored in a medium-pressure discharged tank, and the adsorption tower is flushed for the second time through the medium-pressure module; the third discharged gas with a higher impurity content is flushed for the first time through the low-pressure module.
3. The pressure swing adsorption system according to claim 1 or 2, characterized in that: The pressure swing adsorption system realizes at least three times of staggered flushing regeneration process; when the adsorption tower is regenerated, first, the late flushing gas with a relatively high impurity content is used to directly flush the adsorption tower through the regulation control of the regulating valve and the program-controlled valve; secondly, the mid-term flushing gas with a small impurity content stored in the medium-pressure flushing tank is used to flush the adsorption tower through the regulation control of the regulating valve and the program-controlled valve; finally, the early-stage flushing gas with the least impurity content stored in the high-pressure flushing tank is used to flush the adsorption tower through the regulation control of the regulating valve and the program-controlled valve; the volume of the flushing tank is 1.2 to 3.0 times the volume of the adsorption tower.
4. The pressure swing adsorption system according to claim 3, characterized in that: The odd-numbered adsorption towers of the pressure swing adsorption system are combined into a single or odd series, and the even-numbered adsorption towers are combined into a double or even series; the outlets of the functional valves at the inlet and outlet of the single or odd series adsorption towers are connected to form a collection pipe; the outlets of the functional valves at the inlet and outlet of the double or even series adsorption towers are connected to form a collection pipe; the collection pipes of the functional valves of the single or odd series and the double or even series are then connected through regulating valves or manual valves or directly.
5. The pressure swing adsorption system according to claim 1 or 4, characterized in that: The single or odd series and double or even series flushing gas discharge valve collecting pipes of the pressure swing adsorption system are connected to a flushing gas discharge common valve or a flushing gas regulating valve, and the flushing gas discharge common valve is connected to the high-pressure or medium-pressure flushing tank inlet; the flushing gas regulating valve is directly connected to the adsorption tower flushing gas inlet valve collecting pipe; the high-pressure or medium-pressure flushing tank outlet is connected to the flushing gas regulating valve, and the flushing gas regulating valve is connected to the flushing gas common valve, and finally connected through the flushing gas inlet valve collecting pipe.
6. The pressure swing adsorption system according to claim 5, characterized in that: The pressure swing adsorption system comprises a high-pressure or medium-pressure flushing tank, a flushing gas discharge common valve, a flushing gas regulating valve and two flushing gas common valves, which are respectively connected to the flushing gas discharge valve collecting pipe and the flushing gas inlet valve collecting pipe; a low-pressure flushing module is formed when the flushing gas discharge valve and the flushing gas inlet valve are directly connected through a regulating valve.
7. The pressure swing adsorption system according to claim 1 or 2 or 4 or 6, characterized in that: Each flushing and regeneration process of the pressure swing adsorption system is completed by a regulating valve.
8. The pressure swing adsorption system according to claim 7, characterized in that: The functions of the high-pressure flushing module and the medium-pressure flushing module of the pressure swing adsorption system are interchangeable.
9. The pressure swing adsorption system according to claim 1 or 2 or 4 or 6 or 8, characterized in that: The operating pressure of the pressure swing adsorption system is 0.4-10.0 MPa(G); the pressure of the flushing and regeneration step is 0.001-0.50 MPa(G); and the operating temperature is 10-60°C.
10. The pressure swing adsorption system according to claim 9, characterized in that: The operating pressure of the pressure swing adsorption system is 1.6-8.0 MPa(G); the pressure of the flushing and regeneration step is 0.005-0.10 MPa(G); and the operating temperature is 20-40°C.