High-efficiency pressure swing adsorption system of sequentially-placed tank

By introducing interlaced flushing and regeneration technology into the pressure-switching adsorption system, the use of the straight-release tank to divide and degass according to the impurity concentration, the problems of low performance or high investment in the existing technology are solved, and the effect of efficient hydrogen recovery and investment reduction is achieved.

CN118874148APending Publication Date: 2024-11-01SOUTHWEST RES & DESIGN INST OF CHEM IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411141326.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In the existing pressure-switching adsorption gas separation and purification technology, the single-screw tanking process has the shortcomings of low performance or high investment, and it is difficult to meet the functions of high performance and low investment at the same time.

Method used

An efficient pressure-switching adsorption system for the straight-release tank is designed. By setting up a high-pressure and low-pressure flushing and regeneration module composed of a straight-release tank, a program-controlled valve and a regulating valve on the PSA system, the straight-release tank is divided into impurity concentration gradients. The two flush gases adopt the interlaced flushing regeneration function to improve product recovery.

Benefits of technology

It achieves efficient hydrogen recovery rate, shortens cycle time, reduces device investment, and improves the overall competitiveness of the device. The product hydrogen recovery rate reaches 87-91%, and the investment is reduced by 15-30%.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118874148A_ABST
    Figure CN118874148A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of industrial gas separation and purification, and particularly relates to a high-efficiency pressure swing adsorption system of a clockwise release tank. According to the system, only one sequential discharge tank is arranged on a PSA system, and a high-pressure and low-pressure flushing regeneration module composed of a sequencing valve and a regulating valve is configured; according to the present invention, the clockwise release gas is divided into two flushing gases according to the impurity concentration gradient through the clockwise release tank, the clockwise release gas with the high impurity content is controlled to flush the adsorption tower through the regulating valve and the program control valve in the clockwise release later stage, and the clockwise release gas with the low impurity content is stored through the clockwise release tank and then flushes the adsorption tower through the regulating valve and the program control valve in the clockwise release early stage so as to achieve the two-time staggered flushing regeneration function; the product recovery rate is improved. In addition, through a high-pressure flushing regeneration module and a low-pressure flushing regeneration module, the two-time sequential discharging staggered flushing regeneration process that sequential discharging gas is distributed twice according to the impurity concentration gradient from low to high and then flushing is carried out according to the impurity concentration gradient from high to low is adopted, the product recovery rate is increased, and the device investment is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of industrial gas separation and purification, and specifically is a high-efficiency pressure swing adsorption system for a downstream tank, that is, a pressure swing adsorption separation technology system for purifying hydrogen resources from low-hydrogen sources in refineries, coal-to-gas, industrial by-product gas, industrial exhaust gas, and hydrogen-blended pipeline natural gas in petrochemical, coal chemical, hydrogen energy and other industries. Background Art

[0002] Pressure swing adsorption gas separation and purification technology utilizes the differences in adsorption characteristics such as equilibrium adsorption capacity and adsorption rate of different gas components on the adsorbent, as well as the characteristics that the adsorption capacity changes accordingly with pressure changes. Through periodic pressure changes, the adsorption and desorption processes are alternately carried out, thereby achieving gas separation or purification. It is a physical process and can be achieved at room temperature. Its regeneration method is mainly atmospheric pressure flushing regeneration, and negative pressure regeneration is used in some special cases. The flushing regeneration methods include single flushing, double flushing and triple flushing. The more atmospheric pressure flushing times, the better the regeneration effect, but the more hardware needs to be configured, and the corresponding PSA system investment is higher. Different flushing regeneration processes can be with or without a sequential release tank. Under the premise of achieving the same product quality, processing load and recovery rate, the investment of the process with a sequential release tank is reduced by 15-25% compared with the flushing process without a sequential release tank.

[0003] At present, there are shortcomings in the pressure swing adsorption gas separation and purification technology without a downstream tank or with a downstream tank process. The pressure swing adsorption gas separation and purification technology without a downstream tank has a simple process and a simple control program, but to ensure sufficient flushing and regeneration time, a long period is required to meet the requirements, resulting in a large adsorption tower volume and a large programmable valve diameter, and a high device investment. The current pressure swing adsorption technology with a downstream tank can shorten the downstream time and extend the flushing time, but the existing technology cannot achieve distribution according to the concentration of downstream gas impurities, so there is only one flushing process, and two adsorption towers will be flushed at the same time during the flushing, and the downstream gas will be biased, resulting in poor flushing efficiency. The technical level of the downstream tank at this time is low and the device performance is poor.

[0004] The 10-3-4 / P process without a sequential release tank introduced in China earlier has two steps in each sub-cycle. To ensure the regeneration time, the sub-cycle time needs to be 90 seconds. This process is mainly used in the gas separation and purification of hydrogen process under a pressure of 2.5MPa(g). The operation steps of the 10-3-4 process without a sequential release tank are shown in Table 1.

[0005] Table 1: 10-3-4 process operation steps without sequential tank discharge

[0006]

[0007]

[0008] Description: A: adsorption, E1~4D: 1~4 pressure drops, PP1 / 2: forward release 1 / 2, D: reverse release, P2 / 1: flushing 2 / 1, E4~1R: 1~4 pressure increases, FR: final pressure increase.

[0009] The flushing process uses two rows of programmable valves and two regulating valves for the discharge and inlet of the downstream gas, and the corresponding adjustments are used to control the flow and pressure of the downstream gas. The adsorption towers are one-to-one correspondence, and the regeneration process is carried out synchronously. The process divides the downstream gas twice by pressure equalization to obtain two downstream gases with different impurity concentrations. For the adsorption tower that needs to be flushed and regenerated, the second downstream gas (PP2) with high impurity concentration is first used for the first flushing regeneration (P2), and then the first downstream gas (PP1) with relatively low impurity concentration is used for the second flushing regeneration (P1). The process uses staggered flushing to make the adsorbent regeneration effect better and the product gas recovery rate high. When treating 2.5MPa(g) and 40℃ medium-changed gas, the product gas recovery rate fluctuates in the range of 85-87%, but in order to ensure sufficient regeneration time, the cycle time needs to be more than 90 seconds, resulting in a relatively large adsorption tower volume and adsorbent usage, large investment and land occupation, and low overall competitiveness of the device.

[0010] As market competition intensifies, in order to reduce investment, an early one-time flushing regeneration pressure swing adsorption process with a downstream tank without staggered flushing function was developed, and the cycle can be shortened to 60 seconds. This separation process sets a downstream tank and corresponding programmable valves and regulating valves to control pressure and flow. All the downstream gas is mixed in the downstream tank and then used to flush the regeneration adsorption tower. It does not have the function of distributing the downstream gas according to the impurity concentration gradient, the regeneration effect is poor, and it is easy to have a bias flow phenomenon, resulting in low regeneration effect.

[0011] The patent CN1868570A first disclosed a pressure swing adsorption flushing and regeneration process with a discharge tank, which shortened the discharge step and extended the flushing step to shorten the cycle time and reduce the investment. Since there is only one discharge tank to store the discharge gas and the two towers are mixed and flushed at the same time, the product hydrogen yield is lower than the two flushing processes. CN1498670A first disclosed a regeneration process in which the discharge gas directly or through a discharge tank is used to flush other adsorption towers, realizing continuous or mixed flushing of the pressure swing adsorption system with single bed simultaneous adsorption, and shortening its cycle time, thereby improving the utilization rate of the adsorbent of the pressure swing adsorption system and reducing the investment of the pressure swing adsorption system. Compared with the traditional hydrogen production or two staggered flushing technology, the above patent can save ~15% of investment, but since there is only one flushing and the two towers are in a mixed flushing state during flushing, the flushing gas bias phenomenon will occur, and the secondary pollution phenomenon in the later stage of regeneration cannot be avoided. The staggered flushing regeneration function cannot be realized, and the product gas recovery rate has not been substantially improved. For example, the single discharge tank process of the 8-tower process, its operating steps are shown in Table 2.

[0012] Table 2: 8-1-4 / P single tank discharge process operation steps

[0013]

[0014] Since the process cycle time can be shortened to a minimum of 60 seconds, the amount of adsorbent used is greatly reduced compared with the process without a sequential release tank. However, only one flushing regeneration results in incomplete adsorbent regeneration. Although the adsorption capacity is slightly lower than the two-flushing process, the total investment is still greatly reduced due to the greatly shortened adsorption time.

[0015] Since the single-sequential discharge tank process without staggered flushing function has only one sequential discharge and one flushing regeneration process, the utilization rate of regeneration gas is not high. During flushing, two adsorption towers will be in the flushing and regeneration state at the same time, which belongs to the mixed flushing mode. During the flushing process, there will be flushing bias phenomenon, and there is a technical problem of uneven distribution of sequential discharge gas. Although each process is the same, due to piping reasons, the flushing process of each tower will actually be very different, resulting in large differences in regeneration effects, affecting the processing volume and recovery rate. The product operation recovery rate can reach 84-88%.

[0016] For small-scale hydrogen production equipment, due to its scale, there are high requirements for both investment and performance. How to achieve a balanced design in which investment and performance constrain each other, both to reduce investment and to ensure high performance, requires balancing the relationship between process and equipment, giving full play to a sequential release tank to ensure process performance, achieving the highest efficiency with the least equipment, and improving the overall competitiveness of the device. Summary of the invention

[0017] Whether it is the existing single-tank process or the pressure swing adsorption gas separation technology without a tank, either there is a disadvantage of low performance or a defect of high investment, and it is difficult to simultaneously meet the functions of high performance and low investment. In view of the problems existing in these separation and purification technologies, the present invention provides a high-efficiency pressure swing adsorption system with a tank, which can solve the technical problems of high investment and low recovery rate.

[0018] In order to achieve the above invention object, the specific technical solution of the present invention is:

[0019] A high-efficiency pressure swing adsorption system with a downstream discharge tank, wherein the PSA system is provided with only one downstream discharge tank, and is equipped with a high-pressure and low-pressure flushing and regeneration module composed of a programmable valve and a regulating valve. The downstream discharge tank is used to divide the downstream discharge gas into two flushing gases according to the impurity concentration gradient. The downstream discharge gas with a slightly higher impurity content in the later stage of the downstream discharge is controlled by the regulating valve and the programmable valve to flush the adsorption tower, and the downstream discharge gas with less impurities in the early stage of the downstream discharge is stored in the downstream discharge tank and then flushes the adsorption tower through the regulating valve and the programmable valve, thereby realizing two staggered flushing and regeneration functions and improving the product recovery rate.

[0020] Furthermore, the high-efficiency pressure swing adsorption system of the downstream tank is provided with 6 or more adsorption towers and a downstream tank, and can be equipped with equipment such as a raw gas gas-liquid separator, a product gas buffer tank, a desorbed gas buffer tank, and a desorbed gas mixing tank according to the requirements of the raw gas, product gas, and desorbed gas. Each adsorption tower is equipped with a directly connected raw gas inlet valve, a product gas outlet valve, multiple pressure equalizing valves, a booster valve, a downstream gas downstream valve, a downstream gas inlet valve, a reverse valve, and a flushing waste gas outlet valve, and an indirectly connected downstream gas common valve and a regulating valve. In some process flows, the reverse valve and the flushing waste gas outlet valve can be combined into one. Through the control system and the unique process and control functions, the PSA system can be operated continuously to complete the gas separation and purification process.

[0021] Furthermore, a high-efficiency pressure swing adsorption system with a sequential release tank is a continuously operated system consisting of 6 or more adsorption towers and a sequential release tank. Each adsorption tower undergoes adsorption (A), multiple pressure drops (E1D, E2D, ...), two-step sequential release (PP1, PP2), reverse release (D), two-step flushing (P2, P1), multiple pressure increases (..., E2R, E1R) and final pressure increase (FR) in one cycle. Each adsorption tower completes the same sequence of steps, but the process steps are staggered by one sub-cycle to ensure the continuous separation process.

[0022] Furthermore, each adsorption tower is equipped with connected but not limited to raw gas inlet valve, product gas outlet valve, equalizing valve, flushing gas forward valve, flushing gas forward common valve, flushing gas inlet valve, flushing gas common valve, reverse valve, flushing waste gas outlet valve and other functional program-controlled valves and flushing gas regulating valves. In some process flows, the reverse valve and flushing waste gas outlet valve can be combined into one. Through the control system and the unique process and control functions, the PSA system can be operated continuously to complete the gas separation and purification process.

[0023] Furthermore, a common bleed gas program-controlled valve is arranged on the bleed gas and bleed gas valve collecting pipeline of the PSA system to control the bleed gas to be stored in the bleed gas tank.

[0024] Furthermore, a discharge tank is arranged behind the discharge common valve connected to the discharge valve collecting pipeline of the PSA system to buffer and store the discharge gas with low impurity concentration in the early stage of discharge, so as to flush and regenerate other adsorption towers when needed.

[0025] Furthermore, the volume of the discharge tank of the PSA system is designed to be 1.5 to 4.0 times, preferably 2.0 to 3.0 times, of the volume of the adsorption tower to ensure that there is enough discharge gas stored in the discharge tank during the discharge process.

[0026] Furthermore, a regulating valve is arranged on the outlet pipeline of the discharge tank to control the discharge gas with lower impurity concentration in the early stage of discharge for regeneration regulation and control. Two discharge gas common valves are arranged behind the regulating valve to be connected for switching the flushing regeneration process between different series of adsorption towers.

[0027] Furthermore, a regulating valve is arranged on the gas discharge and discharge valve collecting pipeline of the PSA system, and two gas discharge and discharge common valves are arranged behind the regulating valve for switching the flushing and regeneration process between different series of adsorption towers by the gas discharge in the later stage.

[0028] Preferably, the operating pressure of the PSA system is 0.4-6.0 MPa(G), with ≥1.5 MPa(G) for best effect; the pressure of the flushing and regeneration step is 0.001-0.40 MPa(G), with 0.01-0.05 MPa(G) being the most suitable; the operating temperature is 10-60°C, and is generally designed to be 20-40°C.

[0029] In the present invention, the discharge step is divided into two streams of discharge gas by a discharge tank, a discharge gas common valve and a regulating valve, and the impurity component concentrations of the two streams of discharge gas are distributed in a gradient increasing order, wherein the first discharge gas (PP1) has a low impurity content and is sent to the discharge tank for buffer storage to flush and regenerate other adsorption towers as needed, and the second discharge gas (PP2) has a slightly higher impurity concentration and is directly used to flush and regenerate other adsorption towers. The flushing process is completed by the discharge gas discharge valve connected to the adsorption tower product gas outlet pipeline, the discharge gas inlet valve, the discharge tank, the discharge gas common valve and the regulating valve. First, the second discharge gas (PP2) with a slightly higher impurity content is used to use the discharge gas discharge valve, the regulating valve HV-B connected to the discharge gas discharge valve manifold and the two discharge gas common valves KV-4 and KV-5 thereafter, to perform the first flushing and regeneration of the adsorbent in different series of adsorption towers that still adsorb a large amount of impurities after the reverse discharge is completed. Secondly, the first bleed gas (PP1) with low impurity content is used to utilize the bleed gas bleed valve, the bleed gas common valve KV-1 connected to the bleed gas bleed valve collecting pipe, the bleed tank V101, the regulating valve HV-A connected to the bleed tank V101 and the subsequent two bleed gas common valves KV-2 and KV-3 to perform a second flushing and regeneration of the adsorbents in different series of adsorption towers that still adsorb a small amount of impurities after the first flushing.

[0030] The high-efficiency pressure swing adsorption system of a cascade tank has high utilization rate of cascade gas and good adsorbent regeneration effect through this staggered flushing and regeneration method, while ensuring that there will be no secondary pollution in the flushing and regeneration process of the adsorbent, and the product hydrogen recovery rate can reach 87-91%. The product hydrogen recovery rate is 1.0-2.0% higher than the two staggered flushing process without cascade tanks, and the product recovery rate can be increased by 1.5-3% compared with the single cascade tank process technology without staggered flushing function.

[0031] The flushing and regeneration steps of a high-efficiency pressure swing adsorption system with a sequential discharge tank are relatively large. Under the premise of ensuring the regeneration time of 90 seconds, the sub-cycle time can be shortened to less than 60 seconds. The shorter the sub-cycle, the lower the device investment. Compared with the pressure swing adsorption process technology without sequential discharge tanks, the investment can be reduced by 15-30%, and compared with the single sequential discharge tank process without staggered flushing function, the investment can be reduced by 8-20%.

[0032] Compared with the prior art, the present invention has the following beneficial effects:

[0033] Through a high-efficiency pressure swing adsorption system of a downstream gas tank, under the premise of ensuring the same regeneration time, the downstream gas with different impurity concentrations can be divided into two streams according to the impurity concentration gradient; the downstream gas with high impurity concentration is used for flushing and regeneration first, and then the downstream gas with low impurity concentration is used for flushing and regeneration, so as to achieve the purpose of staggered flushing, improve regeneration efficiency, reduce effective gas loss, and thus improve the product hydrogen recovery rate; the cycle time is greatly shortened, the tower volume is reduced, the adsorbent dosage is reduced, and the overall investment of the device is greatly reduced.

[0034] The present invention is applicable to the pressure swing adsorption separation and purification of industrial gases such as low hydrogen sources, coal-to-gas, hydrogen-containing waste gas and industrial by-product gas in refineries of various sizes. Especially in the early stage of the hydrogen energy field, it is affected by many factors such as the scale of hydrogen use, device investment and land occupation. The use of a high-efficiency pressure swing adsorption system with a sequential tank can not only achieve staggered flushing to improve the yield, but also reduce equipment and reduce investment, and save land. The present invention is also suitable for small and medium-scale hydrogen purification application scenarios after hydrogen-blended natural gas is transported to the station, with low investment, small land occupation and high efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 This is one of the process flow diagrams that may be used in Example 1 of the present invention;

[0036] Figure 2 This is one of the schematic diagrams of the flushing regulating valve process that may be used in Example 1 of the present invention;

[0037] Figure 3 This is one of the process flow diagrams that may be used in Example 2 of the present invention;

[0038] Figure 4 This is one of the process flow diagrams that may be used in Example 3 of the present invention.

[0039] Description of some codes in the figure:

[0040] 1. V101 forward discharge tank, KV-011 raw gas inlet valve, KV-012 product gas outlet valve, KV-013 reverse discharge valve, KV-014 forward and backward discharge valve, KV-015 booster valve, KV-016 forward and backward discharge inlet valve, KV-017 equalizing valve, KV-018 equalizing valve, KV-019 flushing waste gas outlet valve, KV-1 / 2 / 3 / 4 / 5 forward and backward discharge common valve, HV-A / B regulating valve.

[0041] 2. Explanation of codes such as KV-011: The first and second digits represent the number of the adsorption tower, from 01, 02, 03, ..., and the third digit represents the number of the program-controlled valve connected to each adsorption tower, from 1, 2, 3, ...

[0042] 3. KV-1 / 2 / 3 / 4 / 5 code description: The numbers represent the numbers of the common valves for both upstream and downstream air discharge, from 1, 2, 3, ... DETAILED DESCRIPTION

[0043] All features disclosed in this specification, or steps in all methods or processes disclosed, except mutually exclusive features and / or steps, can be combined in any manner.

[0044] Any feature disclosed in this specification (including claims and abstract), unless otherwise stated, may be replaced by other equivalent or alternative features having similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.

[0045] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.

[0046] Example 1: High-efficiency pressure swing adsorption system with one downstream tank of 8 towers

[0047] The multiple staggered flushing pressure swing adsorption system of 8 towers with flushing tanks has the operating process shown in Table 3.

[0048] Table 3: Operation process table of 8 towers of a high-efficiency pressure swing adsorption system with a downstream tank

[0049]

[0050]

[0051] From the operation process table 3 of this example, it can be seen that each adsorption tower undergoes adsorption (A), the 1st to 4th pressure drops (E1~4D), forward release 1 / 2 (PP1 / 2), reverse release (D), flushing 2 / 1 (P2 / 1), the 4th to 1st pressure increases (E4~1R) and final pressure increase (FR) in sequence within one cycle, and the remaining adsorption towers also undergo the same process, but they are staggered in time by one sub-cycle.

[0052] Among them, T01, T03, T05 and T07 adsorption towers are grouped into one flushing series, and T02, T04, T06 and T08 adsorption towers are grouped into another flushing series;

[0053] A common venting valve KV-1 and a regulating valve HV-B are installed on the venting and discharge valve collection pipeline. The common venting valves KV-4 and KV-5 are connected after the regulating valve HV-B. This route completes the second venting of the venting gas (PP2) for the first flushing and regeneration process. The venting tank V101 is connected after the common venting valve KV-1. The regulating valve HV-A is connected behind the venting tank V101. The common venting valves KV-2 and KV-3 are connected after the regulating valve HV-A. This route completes the first venting of the venting gas (PP1) for the second flushing and regeneration process. The schematic diagram of the process flow of an 8-tower high-efficiency pressure swing adsorption system with a venting tank is shown as follows: Figure 1 shown.

[0054] Among them, the common valves KV-2, KV-3, KV-4 and KV-5 can be adjustable program-controlled valves, and the regulating valves HV-A and HV-B are cancelled. The process flow diagram of the high-efficiency pressure swing adsorption system 8 towers of a downstream tank is as follows: Figure 2 As shown, similar variations will not be described again in other implementation cases with different numbers of towers.

[0055] This example only Figure 1 Taking the flow diagram as an example, it is planned to use the adsorption pressure ~2.5MPa(G), regeneration pressure ~0.02MPa(G), and feed gas temperature 20~40℃ working conditions, taking the operation steps of adsorption tower T01 as an example to illustrate the completion process of a high-efficiency pressure swing adsorption system of a sequential tank of 8 towers:

[0056] 1. Adsorption (A): The raw gas enters the adsorption tower T01 from the bottom of the adsorption tower through the raw gas pipeline and the raw gas inlet valve KV-011 at ~2.5MPa (G) and 20~40℃. The impurity components in the raw gas are adsorbed by the adsorbent, and the weakly adsorbable product components such as hydrogen are sent out of the boundary area from the upper part of the adsorption tower T01 through the product pipeline and the product gas outlet valve KV-012. When the concentration of impurity components in the product gas reaches the requirement, close the raw gas inlet valve KV-011 and the product gas outlet valve KV-012 to stop the adsorption process;

[0057] 2. Pressure drop (ED): After the adsorption (A) step is completed, open the equalizing pressure drop valves KV-015 and KV-017 of the adsorption tower T01 and the adsorption towers (T03, T04, T05 and T06) to equalize the pressure in turn, and open the equalizing pressure increase valves connected to the corresponding towers respectively to transfer the product gas components adsorbed by the adsorbent in the gaps in the tower to the adsorption tower with increased pressure. After the pressure increase and pressure drop of the adsorption tower are equal, close the corresponding equalizing valve. According to the adsorption pressure, number of adsorption towers, adsorbent performance, product quality and yield requirements, the pressure drop in this example is completed in four times, which are abbreviated as E1D, E2D, E3D and E4D respectively;

[0058] 3. Release (PP): After multiple equalization and pressure drop (ED) steps are completed, a small amount of effective components are still adsorbed in the gaps in the tower and in the adsorbent, and the release process is completed through the release valve and the release common valve or regulating valve connected to the release valve manifold and its connected subsequent equipment. First, the release gas (PP1) from the first release passes through the release valve KV-014 and the release common valve KV-1, and enters the release tank V101 for storage, and the adsorption tower (T07) is flushed for the second time (P1). Secondly, the release gas (PP2) from the second release passes through the release valve KV-014, the regulating valve HV-B and the release common valve KV-4, and the adsorption tower (T08) is flushed for the first time (P2);

[0059] 4. Reverse discharge (D): After the forward discharge (PP) step is completed, the remaining gas in the adsorption tower is discharged through the reverse discharge valve KV-013 at the bottom feed end of the adsorption tower. After the reverse discharge is completed, the pressure in the adsorption tower is 0.04-0.05MPa (G);

[0060] 5. Flushing (P): In order to regenerate the adsorbent in the adsorption tower more thoroughly, the bleed gas (PP) discharged from the bleed step is used to flush the adsorbent in the tower that has completed the reverse discharge (D) step, and the residual impurities are completely regenerated from the adsorbent. First, the bleed gas (PP2) discharged from the adsorption tower (T02) for the second time is regulated and controlled by the bleed common valve KV-5, the bleed inlet valve KV-016 and the regulating valve HV-B to perform the first flushing regeneration (i.e., the P2 process) on the adsorption tower (T01) that has completed the reverse discharge (D) step; then the bleed gas (PP1) discharged from the adsorption tower (T03) for the first time is regulated and controlled by the bleed common valve KV-1, the bleed tank V101, the bleed common valve KV-3, the bleed inlet valve KV-016 and the regulating valve HV-A to complete the second flushing regeneration (i.e., the P1 process). The flushing waste gas is removed from the absorption gas stabilization system through the reverse discharge valve KV-013. During the flushing process, the pressure in the adsorption tower (T01) dropped to 0.02-0.03 MPa (G);

[0061] 6. Pressure increase (ER): This step corresponds to the pressure drop (EiD) step. After the flushing (P) step is completed, the pressure-reduced gas discharged from the adsorption towers (T04, T05, T06 and T07) in the equalizing pressure drop (EiD) step is used to gradually increase the pressure of the adsorption tower (T01) through the equalizing pressure increase valves KV-015 and KV-017. The pressure increase step of this example is completed in four times, which are referred to as E4R, E3R, E2R and E1R respectively;

[0062] 7. Final pressure increase (FR): The pressure of the adsorption tower cannot reach the adsorption state pressure through multiple pressure increase (ER) steps, so the product gas is used to increase the pressure from the top of the adsorption tower, or the raw gas can be used to increase the pressure of the adsorption tower from the bed feed end, or both are used to increase the pressure of the adsorption tower at the same time until the adsorption pressure is reached. The product gas is controlled by the regulating valve and then increases the pressure of the adsorption tower (T01) to the adsorption pressure through the booster valve KV-015, and then enters the next adsorption process.

[0063] Each adsorption tower undergoes the same steps, but the operation sequence is staggered by one sub-cycle to ensure the continuous separation process.

[0064] In this implementation case, under the premise of ensuring a 90-second regeneration time, the cycle time can be designed to be 55 seconds. Compared with the 8-1-4 / P process without a sequential release tank with a cycle of 90 seconds, the yield is improved and the investment can be saved by 15-20%. Due to the realization of the staggered flushing regeneration function, compared with the 8-1-4 / P process with a sequential release tank without staggered flushing, the yield is increased by 1.0-2.0%, and compared with the single sequential release tank process, the investment can be reduced by 8-10%. Therefore, under a certain operating pressure, sufficient pressure equalization times and staggered flushing regeneration process, through a high-efficiency pressure swing adsorption system with a sequential release tank, it can not only reduce the device investment by 8-20%, but also increase the product recovery rate to a stable level of 87-89%.

[0065] Example 2: High-efficiency pressure swing adsorption system with one downstream tank of 10 towers

[0066] The operating process of the 10-tower multiple staggered flushing pressure swing adsorption system with flushing tanks is shown in Table 4, Table 5, etc.

[0067] Table 4: Operation process table of 10 towers of a high-efficiency pressure swing adsorption system with a downstream tank

[0068]

[0069]

[0070] Table 5: Operation process table of 10 towers of a high-efficiency pressure swing adsorption system with a downstream tank

[0071]

[0072] From the operation process table 4 of this example, it can be seen that each adsorption tower undergoes adsorption (A), the 1st to 5th pressure drops (E1~5D), forward release 1 / 2 (PP1 / 2), reverse release (D), flushing 1 / 2 (P1 / 2), the 5th to 1st pressure increases (E5~1R) and final pressure increase (FR) in sequence within one cycle, and the remaining adsorption towers also undergo the same process, but they are staggered in time by one sub-cycle.

[0073] The gas inlet valves of T01, T03, T05, T07 and T09 adsorption towers are grouped into one flushing series, and the gas inlet valves of T02, T04, T06, T08 and T10 adsorption towers are grouped into another flushing series;

[0074] A bleed and discharge valve KV-1 and a regulating valve HV-B are set on the bleed and discharge valve collection pipeline, and the bleed and discharge common valve KV-1 is connected to the discharge tank V101. The bleed and discharge common valves KV-4 and KV-5 are connected after the regulating valve HV-B. This route completes the second bleed and discharge (PP2) for the first flushing and regeneration process. The regulating valve HV-A is connected behind the discharge tank V101, and the bleed and discharge common valves KV-2 and KV-3 are connected after the regulating valve HV-A. This route completes the first bleed and discharge (PP1) for the last flushing and regeneration process.

[0075] A schematic diagram of the process flow of a high-efficiency pressure swing adsorption system with 10 towers in a downstream tank is shown in Figure 3 shown.

[0076] This example only Figure 3 Taking the flow diagram as an example, it is planned to take the adsorption tower T01 operation steps as an example to illustrate the completion process of a high-efficiency pressure swing adsorption system of a downstream tank of 10 towers under the conditions of adsorption pressure ~4.0MPa(G), regeneration pressure ~0.02MPa(G), and feed gas temperature 20~40℃:

[0077] 1. Adsorption (A): The raw gas enters the adsorption tower T01 from the bottom of the adsorption tower through the raw gas pipeline and the raw gas inlet valve KV-011 at ~4.0MPa (G) and 20~40℃. The impurity components in the raw gas are adsorbed by the adsorbent in the adsorption tower T01, and the weakly adsorbable product components such as hydrogen are sent out of the boundary area from the upper part of the adsorption tower T01 through the product pipeline and the product gas outlet valve KV-012. When the concentration of impurity components in the product gas reaches the requirement, close the raw gas inlet valve KV-011 and the product gas outlet valve KV-012 to stop the adsorption process;

[0078] 2. Pressure drop (ED): After the adsorption (A) step is completed, open the equalizing pressure drop valves KV-015, KV-017 and KV-018 of the adsorption tower T01 and the adsorption towers (T04, T05, T06, T07 and T08) in sequence to equalize the pressure, and open the equalizing pressure increase valves connected to the corresponding towers respectively to transfer the product gas components adsorbed by the adsorbent in the gaps in the tower to the adsorption tower with increased pressure. After the pressure increase and pressure drop of the adsorption tower are equal, close the corresponding equalizing valve. According to the adsorption pressure, number of adsorption towers, adsorbent performance, product quality and yield requirements, the pressure drop in this example is completed in five times, which are abbreviated as E1D, E2D, E3D, E4D and E5D respectively;

[0079] 3. Release (PP): After multiple equalization and pressure drop (ED) steps are completed, a small amount of effective components are still adsorbed in the gaps in the tower and in the adsorbent. The release process is completed through the release valve and the release common valve or regulating valve connected to the release valve manifold and its connected subsequent equipment. First, the release gas (PP1) from the first release passes through the release valve KV-014 and the release common valve KV-1, and enters the release tank V101 for storage, and the adsorption tower (T09) is flushed for the second time (P1). Then the release gas (PP2) from the second release passes through the release valve KV-014, the regulating valve HV-B and the release common valve KV-4 to flush the adsorption tower (T10) for the first time (P2);

[0080] 4. Reverse discharge (D): After the forward discharge (PP) step is completed, the remaining gas in the adsorption tower is discharged through the reverse discharge valve KV-013 at the bottom feed end of the adsorption tower. After the reverse discharge is completed, the pressure in the adsorption tower is 0.04-0.05MPa (G);

[0081] 5. Flushing (P): In order to regenerate the adsorbent in the adsorption tower more thoroughly, the bleed gas (PP) discharged from the bleed step is used to flush the adsorbent in the tower that has completed the reverse discharge (D) step, and the residual impurities are completely regenerated from the adsorbent. First, the bleed gas (PP2) discharged from the adsorption tower (T02) for the second time is regulated and controlled by the bleed gas common valve KV-5, the bleed gas inlet valve KV-016 and the regulating valve HV-B to perform the first flushing and regeneration (i.e., the P2 process) on the adsorption tower (T01) that has completed the reverse discharge (D) step. Then, the bleed gas (PP1) discharged from the adsorption tower (T03) for the first time is regulated and controlled by the bleed gas common valve KV-1, the bleed tank V101, the bleed gas common valve KV-3, the bleed gas inlet valve KV-016 and the regulating valve HV-A to perform the second flushing and regeneration (i.e., the P1 process) on the adsorption tower (T01) that has completed the first flushing and regeneration. The flushing waste gas passes through the reverse valve KV-013 to desorb the gas stabilization system. During the flushing process, the pressure in the adsorption tower (T01) drops to 0.02-0.03MPa (G);

[0082] 6. Pressure increase (ER): This step corresponds to the pressure drop (ED) step. After the flushing (P2 / 1) step is completed, the pressure-reduced gas discharged from the adsorption towers (T04, T05, T06, T07 and T08) in the equalizing pressure drop (ED) step is used to gradually increase the pressure of the adsorption tower (T01) through the equalizing pressure valves KV-015, KV-017 and KV-018. The pressure increase step in this example is completed in five times, which are referred to as E5R, E4R, E3R, E2R and E1R respectively;

[0083] 7. Final pressure increase (FR): The pressure of the adsorption tower cannot reach the adsorption state pressure through multiple pressure increase (ER) steps, so the product gas is used to increase the pressure from the top of the adsorption tower, or the raw gas can be used to increase the pressure of the adsorption tower from the bed feed end, or both are used to increase the pressure of the adsorption tower at the same time until the adsorption pressure is reached. The product gas is controlled by the regulating valve and then increases the pressure of the adsorption tower (T01) to the adsorption pressure through the booster valve KV-015, and then enters the next adsorption process.

[0084] Each adsorption tower undergoes the same steps, but the operation sequence is staggered by one sub-cycle to ensure the continuous separation process.

[0085] In this implementation case, under the premise of ensuring a 90-second regeneration time, the cycle time can be designed to be 45 to 55 seconds. Compared with the 10-2-5 / P process with a 90-second cycle and without a sequential release tank, the yield is improved and the investment can be saved by 20 to 30%. Due to the realization of the staggered flushing regeneration function, compared with the 10-2-5 / P process with a sequential release tank without staggered flushing, the yield is increased by 2.0 to 2.5%, and the investment can be reduced by 8 to 10%. Therefore, under a certain operating pressure, sufficient pressure equalization times and staggered flushing regeneration process, through a high-efficiency pressure swing adsorption system with a sequential release tank, it can not only reduce the device investment by 8 to 30%, but also increase the product recovery rate to a stable level of 88 to 90%.

[0086] Case Study 3: High-efficiency PSA system with a 12-tower downstream tank

[0087] The high efficiency pressure swing adsorption system with a downstream tank of 12 towers has the operating process shown in Table 6, etc.

[0088] Table 6: Operation process table of 12 towers of a high-efficiency pressure swing adsorption system with a downstream tank

[0089]

[0090] From the operation process table 6 of this example, it can be seen that each adsorption tower undergoes adsorption (A), the 1st to 6th pressure drops (E1~6D), forward release 1 / 2 (PP1 / 2), reverse release (D), flushing 1 / 2 (P1 / 2), the 6th to 1st pressure increases (E6~1R) and final pressure increase (FR) in sequence within one cycle, and the remaining adsorption towers also undergo the same process, but they are staggered in time by one sub-cycle.

[0091] The gas inlet valves of T01, T03, T05, T07, T09 and T11 adsorption towers are grouped into one flushing series, and the gas inlet valves of T02, T04, T06, T08, T10 and T12 adsorption towers are grouped into another flushing series;

[0092] A downstream gas release valve KV-1 and a regulating valve HV-B are installed on the downstream gas release valve collection pipeline, and the downstream gas release common valve KV-1 is connected to the downstream tank V101. Connect the regulating valve HV-A behind the downstream tank V101, and connect the downstream gas release common valves KV-2 and KV-3 behind the regulating valve HV-A. This route completes the second flushing and regeneration process (P1). Connect the downstream gas release common valves KV-4 and KV-5 behind the regulating valve HV-B. This route completes the first flushing and regeneration process (P2). The schematic diagram of the process flow of a high-efficiency pressure swing adsorption system with 12 towers for a downstream tank is shown in the figure below. Figure 4 shown.

[0093] This example only Figure 4 Taking the process diagram of as an example, it is planned to take the adsorption tower T01 operation steps as an example to illustrate the completion process of a high-efficiency pressure swing adsorption system of a sequential tank of 12 towers under the conditions of adsorption pressure ~5.6MPa(G), regeneration pressure ~0.02MPa(G), and feed gas temperature 20~40℃:

[0094] 1. Adsorption (A): The raw gas enters the adsorption tower T01 from the bottom of the adsorption tower through the raw gas pipeline and the raw gas inlet valve KV-011 at ~5.6MPa (G) and 20~40℃. The impurity components in the raw gas are adsorbed by the adsorbent in the adsorption tower T01, and the weakly adsorbable product components such as hydrogen are sent out of the boundary area from the upper part of the adsorption tower T01 through the product pipeline and the product gas outlet valve KV-012. When the concentration of impurity components in the product gas reaches the requirement, close the raw gas inlet valve KV-011 and the product gas outlet valve KV-012 to stop the adsorption process;

[0095] 2. Pressure drop (ED): After the adsorption (A) step is completed, open the equalizing pressure drop valves KV-015, KV-017 and KV-018 of the adsorption tower T01 and the adsorption towers (T04, T05, T06, T07, T08 and T09) to equalize the pressure in turn, and open the equalizing pressure increase valves connected to the corresponding towers respectively to transfer the product gas components adsorbed by the adsorbent in the gaps in the tower to the adsorption tower with increased pressure. After the pressure increase and pressure drop of the adsorption tower are equal, close the corresponding equalizing valve. According to the adsorption pressure, number of adsorption towers, adsorbent performance, product quality and yield requirements, the pressure drop in this example is completed in six times, which are abbreviated as E1D, E2D, E3D, E4D, E5D and E6D respectively;

[0096] 3. Release (PP): After multiple equalization and pressure drop (ED) steps are completed, a small amount of effective components are still adsorbed in the gaps in the tower and in the adsorbent. The release process is completed through the release valve and the release common valve or regulating valve connected to the release valve manifold and its connected subsequent equipment. First, the release gas (PP1) from the first release passes through the release valve KV-014 and the release common valve KV-1, and enters the release tank V101 for storage, and the adsorption tower (T10) is flushed for the second time (P1). The release gas (PP2) from the second release passes through the release valve KV-014, the regulating valve HV-B and the release common valve KV-5 to flush the adsorption tower (T11) for the first time (P2);

[0097] 4. Reverse discharge (D): After the forward discharge (PP) step is completed, the remaining gas in the adsorption tower is discharged through the reverse discharge valve KV-013 at the bottom feed end of the adsorption tower. After the reverse discharge is completed, the pressure in the adsorption tower is 0.04-0.05MPa (G);

[0098] 5. Flushing (P): In order to regenerate the adsorbent in the adsorption tower more thoroughly, the bleed gas (PP) discharged from the bleed step is used to flush the adsorbent in the tower that has completed the reverse discharge (D) step, and the residual impurities are completely regenerated from the adsorbent. First, the bleed gas (PP2) discharged from the adsorption tower (T02) for the second time is regulated and controlled by the bleed gas common valve KV-5, the bleed gas inlet valve KV-016 and the regulating valve HV-B to perform the first flushing and regeneration (i.e., P2 process) on the adsorption tower (T01) that has completed the reverse discharge (D) step. Then, the bleed gas (PP1) discharged from the adsorption tower (T03) for the first time is regulated and controlled by the bleed gas common valve KV-1, the bleed tank V101, the bleed gas common valve KV-3, the bleed gas inlet valve KV-016 and the regulating valve HV-A to perform the second flushing and regeneration (i.e., P1 process) on the adsorption tower (T01) that has completed the first flushing and regeneration. The flushing waste gas is discharged through the flushing waste gas outlet valve KV-019 to desorb the gas stabilization system. During the flushing process, the pressure in the adsorption tower (T01) drops to 0.02-0.03 MPa (G);

[0099] 6. Pressure increase (ER): This step corresponds to the pressure drop (ED) step. After the flushing (P) step is completed, the pressure-reduced gas discharged from the adsorption towers (T05, T06, T07, T08, T09 and T10) in the equalizing pressure drop (ED) step is used to gradually increase the pressure of the adsorption tower (T01) through the equalizing pressure valves KV-015, KV-017 and KV-018. The pressure increase step of this example is completed in six times, which are abbreviated as E6R, E5R, E4R, E3R, E2R and E1R respectively;

[0100] 7. Final pressure increase (FR): The pressure of the adsorption tower cannot reach the adsorption state pressure through multiple pressure increase (ER) steps, so the product gas is used to increase the pressure from the top of the adsorption tower, or the raw gas can be used to increase the pressure of the adsorption tower from the bed feed end, or both are used to increase the pressure of the adsorption tower at the same time until the adsorption pressure is reached. The product gas is controlled by the regulating valve and then increases the pressure of the adsorption tower (T01) to the adsorption pressure through the booster valve KV-015, and then enters the next adsorption process.

[0101] Each adsorption tower undergoes the same steps, but the operation sequence is staggered by one sub-cycle to ensure the separation process is continuous.

[0102] In this implementation case, under the premise of ensuring a 90-second regeneration time, the sub-cycle time can be designed to be 45 to 50 seconds. Compared with the 12-2-6 / P process without a sequential release tank with a sub-cycle of 90 seconds, the yield is improved and the investment can be saved by 10 to 15%. Due to the realization of the staggered flushing regeneration function, compared with the 12-2-6 / P process with a sequential release tank without staggered flushing, the yield is increased by 2.0 to 3.0%, and the investment can be reduced by 12 to 24% compared with the single sequential release tank process. Therefore, under a certain operating pressure, sufficient pressure equalization times and staggered flushing regeneration process, through a high-efficiency pressure swing adsorption system with a sequential release tank, it can not only reduce the device investment by 10 to 24%, but also increase the product recovery rate to a stable level of 89 to 91%.

[0103] The above-mentioned embodiments only express the specific implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the protection scope of the present application. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the technical solution concept of the present application, and these all belong to the protection scope of the present application.

[0104] This background section is provided to generally present the context of the invention, and the work of the presently named inventors, the work to the extent described in this background section, and aspects of this section that did not constitute prior art at the time of application are neither explicitly nor implicitly admitted to be prior art to the present invention.

Claims

1. A high-efficiency pressure swing adsorption system with a downstream tank, characterized by: Only one downstream discharge tank is set on the PSA system, and a high-pressure and low-pressure flushing and regeneration module composed of a programmable valve and a regulating valve is configured. The downstream discharge gas is divided into two flushing gases according to the impurity concentration gradient through the downstream discharge tank. In the later stage of downstream discharge, the downstream discharge gas with a slightly higher impurity content is controlled by the regulating valve and the programmable valve to flush the adsorption tower. In the early stage of downstream discharge, the downstream discharge gas with less impurities is stored in the downstream discharge tank and then flushes the adsorption tower through the regulating valve and the programmable valve, thereby realizing two staggered flushing and regeneration functions and improving the product recovery rate.

2. The high-efficiency pressure swing adsorption system according to claim 1, characterized in that: The PSA system is a continuously operated system consisting of ≥6 adsorption towers, a discharge tank and supporting equipment; each adsorption tower undergoes adsorption, multiple pressure drops, two-step discharge, reverse discharge, two-step flushing, multiple pressure increases and final pressure increase steps in one cycle.

3. The high-efficiency pressure swing adsorption system according to claim 2, characterized in that: Each adsorption tower of the PSA system is equipped with a directly connected raw gas inlet valve, a product gas outlet valve, multiple pressure equalizing valves, a booster valve, a forward and backward gas release valve, a forward and backward gas inlet valve, a reverse release valve and a flushing waste gas outlet valve, and an indirectly connected forward and backward gas common valve and a regulating valve; and the control system is used to realize continuous operation of the PSA system to complete the gas separation and purification process.

4. The high-efficiency pressure swing adsorption system according to claim 3, characterized in that: A common gas discharge program-controlled valve is arranged on the gas discharge valve collecting pipeline of the PSA system to control the gas discharge to be stored in the discharge tank.

5. The high-efficiency pressure swing adsorption system according to claim 4, characterized in that: A discharge tank is installed behind the discharge common valve connected to the discharge valve collection pipeline of the PSA system to buffer and store the discharge gas with low impurity concentration in the early stage of discharge, so as to flush and regenerate other adsorption towers when needed.

6. The high-efficiency pressure swing adsorption system according to claim 5, characterized in that: The volume of the downstream tank of the PSA system is 1.5 to 4.0 times the volume of the adsorption tower.

7. The high-efficiency pressure swing adsorption system according to claim 5 or 6, characterized in that: A regulating valve is arranged on the outlet pipeline of the discharge tank to perform regeneration regulation and control on the discharge gas with low impurity concentration in the early stage of discharge; two discharge gas common valves are arranged behind the regulating valve to realize the switching of flushing and regeneration processes between different series of adsorption towers.

8. The high-efficiency pressure swing adsorption system according to claim 7, characterized in that: A regulating valve is set on the PSA system's downstream gas and downstream gas valve collecting pipeline; two downstream gas common valves are set behind the regulating valve to switch the downstream gas in the later stage of downstream gas flushing and regeneration process between different series of adsorption towers.

9. The high efficiency pressure swing adsorption system according to claim 1, 2, 3, 4, 5, 6 or 8, characterized in that: The operating pressure of the PSA system is 0.4-6.0 MPa(G); the pressure of the flushing and regeneration step is 0.001-0.40 MPa(G); and the temperature is 10-60°C.

10. The high-efficiency pressure swing adsorption system according to claim 9, characterized in that: The operating pressure of the PSA system is 1.5MPa~6.0MPa(G); the pressure of the flushing and regeneration step is 0.01~0.05MPa(G); and the temperature is 20~40℃.