Railway bridge prefabricated part production line and production method
By designing the railway bridge prefabricated parts production line, the cross-set of longitudinally shifted tracks and transversely shifted tracks can realize the automatic movement of mobile pedestals, which solves the problem of low production efficiency in the existing technology, improves production efficiency and site utilization, and realizes the Multi-station processing at the same time.
Patent Information
- Application Number
- CN202410852670.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-11-01
AI Technical Summary
The production efficiency of existing bridge prefabricated parts is low and the site takes up a long time, resulting in low production efficiency and utilization.
A railway bridge prefabricated parts production line is designed, including transverse stations, casting stations, steaming and raising stations, tensioning stations, longitudinal tracks and transverse trolleys. Through the intersection of longitudinal tracks and transverse tracks, Realize the automated movement and position detection of mobile pedestals, combine the hydraulic template system and the transportation and fabric system to realize simultaneous processing and cycling operations of multiple stations.
The production efficiency of bridge prefabricated parts and the utilization rate of factory sites are improved, and multiple prefabricated parts are simultaneously processed, reducing production costs.
Smart Images

Figure CN118876217A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of bridge beam prefabrication, and in particular to a railway bridge prefabricated parts production line and a production method. Background Art
[0002] Railway bridges are heavy and large in size, so they are usually divided into several modules. After each module is processed in the factory, it is transported to the construction site for assembly to improve construction efficiency. After the existing prefabricated bridge components are processed at the current station, they are generally transported manually or wait for lifting and other handling equipment to arrive to transport them to the next processing station. The site occupancy time is long, and the site utilization efficiency and prefabricated parts production efficiency are low. Summary of the invention
[0003] The invention aims to solve the technical problem of low production efficiency of existing bridge prefabricated parts.
[0004] On the one hand, the present invention proposes a railway bridge prefabricated parts production line, comprising a first transverse shifting station, a casting station, a steaming station, a tensioning station, a second transverse shifting station, a longitudinal shifting track, a transverse shifting track, a transverse shifting trolley and a movable pedestal, wherein the first transverse shifting station, the casting station, the steaming station, the tensioning station and the second transverse shifting station are sequentially arranged along a preset direction, the longitudinal shifting track extends along the preset direction and sequentially passes through the first transverse shifting station, the casting station, the steaming station, the tensioning station and the second transverse shifting station, and the longitudinal shifting track At least two are arranged at intervals along the preset direction vertically, and a plurality of the movable platforms are arranged on each of the longitudinal movement rails. The plurality of movable platforms are respectively located at different workstations or on different longitudinal movement rails at the same workstation. The first transverse movement station and the second transverse movement station are respectively provided with at least one transverse movement rail, and the transverse movement rails are cross-arranged with the longitudinal movement rails. The transverse movement trolleys are arranged in one-to-one correspondence with the transverse movement rails, and the transverse movement trolleys are used to move the movable platform on one of the longitudinal movement rails to another longitudinal movement rail.
[0005] Optionally, the transverse track includes two first tracks arranged in parallel and spaced apart, and two rollers arranged in spaced apart along the moving direction of the transverse track are respectively provided at the four corners of the transverse trolley, and the transverse trolley is spanned between the two first tracks through the rollers, and a break is provided on the first track for the longitudinal track to pass through, and the distance between the two rollers at each corner of the transverse trolley is greater than the length of the break.
[0006] Optionally, the height of the transverse track is greater than the height of the longitudinal track.
[0007] Optionally, the transverse movement trolley has a vertical lifting mechanism, and the transverse movement trolley is used to move along the transverse movement track to the bottom of the movable platform, and is used to lift the movable platform upward through the vertical lifting mechanism to make the movable platform leave the longitudinal movement track.
[0008] Optionally, the railway bridge prefabricated parts production line also includes a binding station and a position detection device, the binding station is arranged on the side of the first transverse moving station away from the casting station, and the longitudinal moving track extends to the binding station; the position detection device is respectively arranged around each of the longitudinal moving tracks of the binding station, the first transverse moving station, the casting station, the steaming station, the tensioning station and the second transverse moving station, and the movable platform on the longitudinal moving track corresponding to the current station is used to move according to the detection information of the position detection device on the longitudinal moving track corresponding to the next station.
[0009] Optionally, the railway bridge prefabricated parts production line further includes a control system, and each of the movable pedestals and each of the position detection devices are connected to the control system;
[0010] And / or, the movable platform is powered by a low-voltage busbar.
[0011] Optionally, the railway bridge prefabricated parts production line also includes a hydraulic formwork system, which is arranged at the casting station. The hydraulic formwork system is provided with multiple and is arranged one-to-one corresponding to the longitudinal movement track. The hydraulic formwork system includes two templates arranged opposite to each other, and the two templates are used to be located on both sides of the movable platform. When the movable platform moves to the casting station, the two templates move toward each other to close the mold, and the two templates and the movable platform enclose a casting space.
[0012] Optionally, the length of the casting station is at least twice the length of the hydraulic formwork system, and adjacent hydraulic formwork systems are staggered along the length direction of the casting station.
[0013] Optionally, the railway bridge prefabricated parts production line also includes a transport and material distribution system, which includes a transport and material distribution track and a material distribution mechanism arranged on the transport and material distribution track, and the transport and material distribution track is arranged above the casting station. The transport and material distribution track is a single track, a double track or a circular track, and the material distribution mechanism is used to move along the transport and material distribution track to cast the material into the casting space.
[0014] On the other hand, the present invention provides a method for producing railway bridge prefabricated parts, using the above-mentioned railway bridge prefabricated parts production line, comprising the following steps:
[0015] The mobile pedestal moves the steel bar skeleton that has been tied from the first transverse moving station to the casting station, and casts the steel bar skeleton that has been tied at the casting station to form a beam body prefabricated part;
[0016] The movable platform moves the casted beam body prefabricated parts to the steaming station, and performs steam curing on the casted beam body prefabricated parts at the steaming station;
[0017] The movable platform moves the beam body prefabricated part that has been steam cured to the tensioning station, and performs tensioning and trimming on the beam body prefabricated part that has been steam cured at the tensioning station, and the beam body prefabricated part that has been trimmed is removed from the movable platform;
[0018] The movable platform moves to the second transverse shifting station, and the transverse shifting trolley of the second transverse shifting station moves the movable platform from the current longitudinal shifting track to another longitudinal shifting track;
[0019] The movable platform returns to the first transverse movement station along the corresponding longitudinal movement track, and the transverse movement trolley of the first transverse movement station moves the movable platform to the preset longitudinal movement track.
[0020] Optionally, the process of casting the tied steel skeleton at the casting station to form a beam prefabricated part includes:
[0021] The two templates of the hydraulic template system move toward each other from both sides of the movable platform to close the mold;
[0022] The transport and material distribution system pours concrete on the steel frame after mold closing to form a preliminary beam body;
[0023] If the strength of the preliminary beam body reaches a preset strength, the two templates of the hydraulic template system move away from each other to remove the templates, thereby obtaining the beam body prefabricated component.
[0024] The railway bridge prefabricated parts production line and production method of the present invention have at least the following advantages compared with the prior art:
[0025] Three longitudinal tracks can be set, including a first longitudinal track, a second longitudinal track and a third longitudinal track. The tied steel bars are first placed on the movable pedestal, and the movable pedestal is placed on the first longitudinal track. In the process of the movable pedestal moving along the first longitudinal track, the steel bars carried on the movable pedestal are cast in sequence at the casting station, steamed at the steaming station, and tensioned at the tensioning station to form a beam prefabricated component. The beam prefabricated component is lifted away by the lifting equipment, and the empty movable pedestal moves to the second transverse station, and the transverse trolley of the second transverse station moves along the corresponding transverse track to move the movable pedestal to the second longitudinal track. The movable pedestal moves in the opposite direction along the second longitudinal track to the first transverse station, and the transverse trolley of the first transverse station moves along the corresponding transverse track to move the movable pedestal to the first longitudinal track or the third longitudinal track, waiting for the processing of the next prefabricated component. By realizing cyclic operation, the production efficiency of the beam prefabricated components and the utilization rate of the factory site are improved. In addition, there are a total of multiple mobile platforms on each longitudinal track, such as three mobile platforms. At a certain moment of the production line, the three mobile platforms are respectively located at the steaming station, the tensioning station and the pouring station of the same longitudinal track, or the three mobile platforms are respectively located on three different longitudinal tracks of the steaming station, or two of the mobile platforms are respectively located on the two longitudinal tracks of the steaming station, and the other mobile platform is located on a longitudinal track of the tensioning station. The three mobile platforms operate independently of each other without interfering with each other, and the three beam prefabricated parts can be processed simultaneously. By analogy, when there are enough longitudinal tracks, multiple beam prefabricated parts can be processed simultaneously by setting an appropriate number of mobile platforms, thereby further improving the production efficiency of the beam prefabricated parts and the utilization rate of the factory site. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a structural schematic diagram of a railway bridge prefabricated parts production line according to an embodiment of the present invention; wherein the dotted line represents the boundary line between adjacent workstations;
[0027] Figure 2 It is a structural schematic diagram of a pouring station according to an embodiment of the present invention;
[0028] Figure 3 This is a schematic diagram of the state of the transverse moving trolley according to an embodiment of the present invention when traveling on the transverse moving track;
[0029] Figure 4 It is a schematic structural diagram of the transverse shifting trolley according to an embodiment of the present invention.
[0030] Description of reference numerals:
[0031] S1, first transverse shift station; S2, casting station; S3, steaming station; S4, tensioning station; S5, second transverse shift station; S6, binding station; 1, longitudinal shift track; 11, second track; 2, transverse shift track; 21, first track; 211, fracture; 3, transverse shift trolley; 31, roller; 32, vertical jacking mechanism; 4, mobile pedestal; 5, position detection device; 6, hydraulic formwork system; 61, formwork. DETAILED DESCRIPTION
[0032] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0033] In the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "matched" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] In addition, it should be noted that in the description of the present invention, it should be noted that the terminology nouns in the various embodiments, such as "upper", "lower", "front", "back" and other words indicating directions, are only for simplifying the description of the positional relationship based on the drawings in the specification, and do not mean that the referred elements and devices must be operated in accordance with the specific directions and defined operations and methods and structures in the specification. Such directional nouns do not constitute limitations on the present invention.
[0035] A coordinate system XYZ is established herein, wherein the positive direction of the X axis represents the left, the reverse direction of the X axis represents the right, the positive direction of the Y axis represents the front, the reverse direction of the Y axis represents the back, the positive direction of the Z axis represents the top, and the reverse direction of the Z axis represents the bottom. It should be noted that the aforementioned X axis, Y axis, and Z axis are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention.
[0036] like Figure 1As shown, an embodiment of the present invention provides a railway bridge prefabricated parts production line, including a first transverse moving station S1, a casting station S2, a steaming station S3, a tensioning station S4, a second transverse moving station S5, a longitudinal moving track 1, a transverse moving track 2, a transverse moving trolley 3 and a movable platform 4, wherein the first transverse moving station S1, the casting station S2, the steaming station S3, the tensioning station S4 and the second transverse moving station S5 are sequentially arranged along a preset direction, and the longitudinal moving track 1 extends along the preset direction and sequentially passes through the first transverse moving station S1, the casting station S2, the steaming station S3, the tensioning station S4 and the second transverse moving station S5. Position S5, at least two of the longitudinal movement rails 1 are arranged at intervals along the preset direction perpendicular to the preset direction, and a plurality of the movable platforms 4 are arranged on each of the longitudinal movement rails 1. The plurality of movable platforms 4 are respectively located in different workstations or on different longitudinal movement rails 1 at the same workstation. The first transverse movement station S1 and the second transverse movement station S5 are respectively provided with at least one transverse movement rail 2, and the transverse movement rail 2 is cross-arranged with the longitudinal movement rail 1. The transverse movement trolley 3 is arranged one-to-one with the transverse movement rail 2, and the transverse movement trolley 3 is used to move the movable platform 4 on one of the longitudinal movement rails 1 to another longitudinal movement rail 1.
[0037] Specifically, the first transverse station S1, the pouring station S2, the steaming station S3, the tensioning station S4, and the second transverse station S5 are sequentially arranged along the left-right direction, i.e., the X direction, and the longitudinal track 1 extends along the X direction and sequentially passes through the first transverse station S1, the pouring station S2, the steaming station S3, the tensioning station S4, and the second transverse station S5. The longitudinal track 1 can be arranged two, three or more at intervals along the front-to-back direction, i.e., the Y direction, and the number of longitudinal tracks 1 can be flexibly set according to the size of the factory site. The steaming station S3 here can be understood as having multiple steaming sheds spaced along the Y direction, and the steaming sheds are arranged one-to-one with the longitudinal track 1. The tensioning station S4 can be understood as having multiple tensioning devices spaced along the Y direction, and the tensioning devices are arranged one-to-one with the longitudinal track 1. The understanding of other stations can be similar.
[0038] The first transverse shift station S1 and the second transverse shift station S5 can both be provided with two transverse shift rails 2, which are extended along the Y direction. The two transverse shift rails 2 of the first transverse shift station S1 are respectively provided with transverse shift trolleys 3. When the mobile pedestal 4 moves to the first transverse shift station S1 along the corresponding longitudinal shift rail 1, the two transverse shift trolleys 3 can respectively lift the mobile pedestal 4 from both ends and move it along the transverse shift rail 2 to move the mobile pedestal 4 to another longitudinal shift rail 1. The transverse shift of the second transverse shift station S5 is similar. By respectively providing two transverse shift rails 2 and two transverse shift trolleys 3 at each transverse shift station, the mobile pedestal 4 can be lifted smoothly, the force on the mobile pedestal 4 is more uniform, and the transverse shift stability is better.
[0039] The number of movable platforms 4 may be consistent with the number of longitudinal tracks 1, or may be inconsistent. Specifically, some of the longitudinal tracks 1 are empty, and / or some of the longitudinal tracks 1 have only one movable platform 4 on each longitudinal track 1, and / or some of the longitudinal tracks 1 have multiple movable platforms 4 on each longitudinal track 1, but the movable platforms 4 on the same longitudinal track 1 are at different workstations and will not interfere with each other.
[0040] In this embodiment, three longitudinal tracks 1 can be provided, including a first longitudinal track, a second longitudinal track and a third longitudinal track. The tied steel bars are first placed on the mobile pedestal 4, and the mobile pedestal 4 is placed on the first longitudinal track. During the movement of the mobile pedestal 4 along the first longitudinal track, the steel bars carried on the mobile pedestal 4 are successively cast at the casting station S2, steamed at the steaming station S3, and tensioned at the tensioning station S4 to form a beam prefabricated part. The beam prefabricated part is lifted away by the lifting equipment, and the empty mobile pedestal 4 moves to the second transverse track. The mobile platform 4 moves in the opposite direction along the second longitudinal track to the first transverse station S1, and the transverse station 3 of the first transverse station S1 moves along the corresponding transverse track 2 to transfer the mobile platform 4 to the first longitudinal track or the third longitudinal track, waiting for the processing of the next prefabricated part. By realizing the cyclic operation, the production efficiency of the beam prefabricated parts and the utilization rate of the factory site are improved. In addition, each longitudinal track 1 is provided with a total of multiple movable platforms 4, such as three movable platforms 4. At a certain moment of the production line operation, the three movable platforms 4 are respectively located at the steaming station S3, the tensioning station S4 and the pouring station S2 of the same longitudinal track, or the three movable platforms 4 are respectively located on three different longitudinal tracks 1 of the steaming station S3, or two of the movable platforms 4 are respectively located on two longitudinal tracks 1 of the steaming station S3, and the other movable platform 4 is located on a longitudinal track 1 of the tensioning station S4. The three movable platforms 4 operate independently of each other without interfering with each other, and the simultaneous processing of three beam prefabricated parts can be realized. By analogy, when there are enough longitudinal tracks 1, the simultaneous processing of multiple beam prefabricated parts can be realized by setting an appropriate number of movable platforms 4, thereby further improving the production efficiency of the beam prefabricated parts and the utilization rate of the factory site, and reducing the production cost.
[0041] It should be noted that the railway bridge prefabricated parts production line described in the present invention can not only produce beam prefabricated parts, but also produce other prefabricated parts on the railway bridge.
[0042] like Figure 1 , 3As shown in Figure 4, optionally, the transverse track 2 includes two first tracks 21 arranged in parallel and spaced apart, and two rollers 31 arranged in spaced apart along the moving direction of the transverse track 3 are respectively provided at the four corners of the transverse track 3, and the transverse track 3 is spanned between the two first tracks 21 through the rollers 31, and the first track 21 is provided with a break 211 for the longitudinal track 1 to pass through, and the distance between the two rollers 31 at each corner of the transverse track 3 is greater than the length of the break 211.
[0043] Since the transverse track 2 and the longitudinal track 1 are arranged crosswise, one of the two needs to be disconnected at the intersection to allow the other to pass through, so as to achieve the cross-setting. The longitudinal track 1 needs to carry the mobile platform 4 and the beam body prefabricated parts, and the load-bearing weight is large and the load-bearing requirements are high. Therefore, the longitudinal track 1 cannot be disconnected, so a break 211 is set on the transverse track 2, and the longitudinal track 1 passes through the break 211 of the transverse track 2 to achieve the cross-setting of the two. In order to prevent the transverse track 2 from interfering with the longitudinal movement of the mobile platform 4, the size of the break 211 on the transverse track 2 is usually relatively large. In this way, if a roller 31 is set at each of the four corners of the transverse trolley 3, when the roller 31 of the transverse trolley 3 moves to the break 211 along the Y direction, the two front rollers 31 will fall and get stuck at the break 211, and the technical problem of being unable to move smoothly will occur.
[0044] In this embodiment, two rollers 31 are respectively provided at the four corners of the transverse moving trolley 3, that is, the transverse moving trolley 3 is moved on the transverse moving track 2 through eight rollers 31, and the transverse moving track 2 includes two first tracks 21 which are parallel and spaced apart along the X direction. The four rollers 31 on the left side of the transverse moving trolley 3 are provided on the first track 21 on the left side, and the four rollers 31 on the right side are provided on the first track 21 on the right side.
[0045] Since the movements of the rollers 31 on the left and right sides of the transverse moving trolley 3 are the same, the movement of the roller 31 on the left side of the transverse moving trolley 3 is taken as an example for analysis: since the distance between the two rollers 31 on the left front of the transverse moving trolley 3 is greater than the length of the break 211 along the Y direction, the distance L1 between the two rollers 31 on the left rear of the transverse moving trolley 3 is greater than the length L2 of the break 211 along the Y direction, when the transverse moving trolley 3 moves forward along the Y direction, the front roller 31 of the two rollers 31 on the left front first moves from the first track 21 on the left to the break 211, at this time, the rear roller 31 of the two rollers 31 on the left front is still on the first track 21, which can ensure the normal movement of the transverse moving trolley 3; the rear roller 31 of the two rollers 31 on the left front moves from the first track 21 on the left to the break 211, at this time, the front roller 31 on the left front has passed through the break 211 and moved to the first track 21, ensuring that the transverse moving trolley 3 passes the break smoothly without getting stuck. The principle of the two rollers 31 at the left rear of the traverse trolley 3 passing through the break 211 is similar to the above. Compared with setting one roller 31 at each of the four corners, this embodiment can effectively solve the technical problem that the roller 31 falls to the break 211 and cannot move by setting two rollers 31 at the four corners of the traverse trolley 3, and the operation stability is more guaranteed.
[0046] Of course, in some other embodiments, the transverse moving trolley 3 may also be provided with 12 rollers, etc., and three rollers 31 are respectively provided at the four corners and are spaced apart along the moving direction of the transverse moving trolley 3 .
[0047] It should be noted that the longitudinal track 1 may include two second tracks 11 arranged in parallel and spaced apart from each other, and the movable platform 4 is movably arranged on the two second tracks 11 .
[0048] like Figure 3 As shown, optionally, the height of the transverse movement track 2 is greater than the height of the longitudinal movement track 1.
[0049] In this embodiment, since the movements of the rollers 31 on the left and right sides of the transverse moving trolley 3 are the same, the movement of the left side roller 31 of the transverse moving trolley 3 is taken as an example for explanation: since the height of the longitudinal moving track 1 is set relatively low, when the front roller 31 of the two rollers 31 on the left front of the transverse moving trolley 3 moves to the break position of the transverse moving track 2, the roller 31 is suspended above the longitudinal moving track 1, and the rear roller 31 on the left front of the transverse moving trolley 3 and the two rollers 31 on the left rear are still supported on the transverse moving track 2, ensuring that the transverse moving trolley 3 can move normally; when the rear roller 31 on the left front of the transverse moving trolley 3 moves to the break position of the transverse moving track 2, the roller 31 is suspended above the longitudinal moving track 1, and the front roller 31 on the left front of the transverse moving trolley 3 and the two rollers 31 on the left rear are still supported on the transverse moving track 2, ensuring that the transverse moving trolley 3 can move normally. By setting the height of the longitudinal track 1 to be relatively low, the transverse trolley 3 can smoothly pass through the break 211 without any motion interference.
[0050] like Figure 3 As shown, optionally, the transverse movement trolley 3 has a vertical lifting mechanism 32, and the transverse movement trolley 3 is used to move along the transverse movement track 2 to the bottom of the mobile platform 4, and to lift the mobile platform 4 upward through the vertical lifting mechanism 32 to make the mobile platform 4 detach from the longitudinal movement track 1.
[0051] Specifically, the transverse movement trolley 3 may include a trolley body, rollers 31, a vertical lifting mechanism 32 and a motor, etc. The motor provides driving force. The vertical lifting mechanism 32 may be a lifting cylinder that can be lifted and lowered along the Z direction. Two vertical lifting mechanisms 32 may be arranged at intervals along the Y direction to improve the lifting stability.
[0052] In this embodiment, when the mobile platform 4 moves along the longitudinal track 1 to the corresponding transverse station, the transverse trolley 3 of the corresponding transverse station moves along the Y direction to the bottom of the mobile platform 4, and makes the vertical lifting mechanism 32 lift upward to lift the mobile platform 4 from the longitudinal track 1. Then the transverse trolley 3 can drive the mobile platform 4 to move along the Y direction on the transverse track 2 until it reaches the designated longitudinal track 1. At this time, the vertical lifting mechanism 32 descends, causing the mobile platform 4 to fall onto the longitudinal track 1, the transverse trolley 3 returns, and the mobile platform 4 moves along the corresponding longitudinal track 1.
[0053] The lifting of the movable platform 4 is achieved by lifting and lowering the vertical lifting mechanism 32 on the transverse movement trolley 3, ensuring that the transverse movement trolley 3 can smoothly transport the movable platform 4 from one longitudinal movement track 1 to another longitudinal movement track 1.
[0054] like Figure 1As shown, optionally, the railway bridge prefabricated parts production line also includes a binding station S6 and a position detection device 5, the binding station S6 is arranged on the side of the first transverse station S1 away from the casting station S2, and the longitudinal track 1 extends to the binding station S6; the position detection device 5 is respectively arranged around each of the longitudinal tracks 1 of the binding station S6, the first transverse station S1, the casting station S2, the steaming station S3, the tensioning station S4 and the second transverse station S5, and the movable platform 4 on the longitudinal track 1 corresponding to the current station is used to act according to the detection information of the position detection device 5 on the longitudinal track 1 corresponding to the next station.
[0055] Specifically, the binding station S6 can be on the same horizontal line with other stations such as the first transverse station S1, the pouring station S2, the steaming station S3, etc. The longitudinal track 1 extends to the binding station S6, and the mobile platform 4 can move along the longitudinal track 1 to the binding station S6; in some cases, the binding station S6 can also be set at other locations. After the binding station S6 binds the steel bars, it is transported to the mobile platform 4 at the first transverse station S1.
[0056] The position detection device 5 may be a radar, a photoelectric switch, or an RFID (Radio Frequency Identification) system.
[0057] In this embodiment, each workstation is provided with a position detection device 5 around the corresponding longitudinal movement track 1. The position detection device 5 can detect whether there is a movable platform 4 on the corresponding longitudinal movement track 1 of the corresponding workstation. If the movable platform 4 on the corresponding longitudinal movement track 1 of a certain workstation wants to move to the next workstation along the longitudinal movement track 1, it is necessary to first obtain the detection result of the position detection device 5 around the longitudinal movement track 1 of the next workstation. If the position detection device 5 around the longitudinal movement track 1 of the next workstation detects the presence of a movable platform 4, the movable platform 4 on the current workstation will stop moving to the next workstation and wait until the movable platform 4 on the next workstation moves away before moving the movable platform 4 on the current workstation to the next workstation, so as to avoid collision and interference among the movable platforms 4 and ensure the smooth progress of production.
[0058] In some embodiments, after the steel bars on the mobile pedestal 4 are cast at the casting station to form a prefabricated beam, a chip can be implanted in the prefabricated beam to record the processing time of the prefabricated beam and which mobile pedestal (each mobile pedestal can be numbered in advance) it is transported by, and the relevant information of subsequent steaming and tensioning is also recorded. This makes it convenient for construction personnel to accurately understand the relevant information of the prefabricated beam when transporting the prefabricated beam to the site for use later, and to quickly analyze and find out the cause if any problem occurs.
[0059] Optionally, the railway bridge prefabricated parts production line further includes a control system, and each of the movable pedestals 4 and each of the position detection devices 5 are connected to the control system;
[0060] And / or, the movable platform 4 is powered by a low-voltage busbar.
[0061] In this embodiment, the position detection device 5 detects whether there is a mobile platform 4 at the corresponding workstation, that is, whether it is occupied, and transmits the detection information to the control system. The control system can control whether the corresponding mobile platform 4 continues to move forward to the next workstation or pauses. The control system realizes the automatic control of the movement of the mobile platform 4, that is, the intelligent production of the beam prefabricated parts. The control system can be a wireless remote control held by the operator. The control system has a multi-speed adjustment function, which can control and adjust the moving speed of the mobile platform 4. The operator can grasp the moving speed of the mobile platform 4, that is, the moving speed of the beam prefabricated parts on it, in real time to ensure the safety of the beam prefabricated parts during the entire production and processing process.
[0062] The mobile platform 4 uses a low-voltage busbar to draw power from the longitudinal track 1. The low-voltage power supply is safer and more reliable. The mobile platform 4 adopts flexible start and stop during the running process to avoid the prefabricated beam body from being broken due to inertial impact when the mobile platform 4 starts and stops, thereby improving the safety of production. Of course, other power supply methods can also be used in some embodiments.
[0063] like Figure 1-2 As shown, optionally, the railway bridge prefabricated parts production line also includes a hydraulic formwork system 6, which is arranged at the casting station S2. The hydraulic formwork system 6 is provided with multiple and one-to-one corresponding to the longitudinal movement track 1. The hydraulic formwork system 6 includes two relatively arranged formworks 61, and the two formworks 61 are used to be located on both sides of the movable platform 4. When the movable platform 4 moves to the casting station S2, the two formworks 61 move toward each other to close the mold, and the two formworks 61 and the movable platform 4 enclose a casting space.
[0064] Specifically, each longitudinal track 1 corresponds to a hydraulic template system 6, and the hydraulic template system 6 is located above the casting station S2. The tied steel bars carried by the mobile pedestal 4 of each longitudinal track 1 can be cast separately and independently. The two templates 61 of the hydraulic template system 6 are arranged in parallel along the Y direction, and the two templates 61 of the hydraulic template system 6 move toward or away from each other along the Y direction to achieve mold closing or demolding. The structure is simple and easy to use. The hydraulic template system 6 can be controlled by hydraulic and electrical means, and has the functions of one-key demolding and one-key opening and closing.
[0065] When the mobile pedestal 4 moves the tied steel skeleton to the casting station, the hydraulic template system 6 is used to close the mold, and the two templates 61 and the mobile pedestal 4 are enclosed to form a casting space, and concrete is poured into the steel skeleton in the casting space to form a prefabricated beam body.
[0066] like Figure 1-2 As shown, optionally, the length of the casting station S2 is at least twice the length of the hydraulic formwork system 6, and adjacent hydraulic formwork systems 6 are staggered along the length direction of the casting station S2.
[0067] It should be noted that the length of the casting station S2, that is, the dimension of the casting station S2 along the X direction, is set larger, so that the hydraulic formwork systems 6 corresponding to the two adjacent longitudinal movement rails 1 can be staggered along the X direction, and when the Y direction dimension of the factory is insufficient, multiple hydraulic formwork systems 6 with relatively large Y direction width can be arranged.
[0068] Optionally, the railway bridge prefabricated parts production line also includes a transport and material distribution system, which includes a transport and material distribution track and a material distribution mechanism arranged on the transport and material distribution track, and the transport and material distribution track is arranged above the casting station. The transport and material distribution track is a single track, a double track or a circular track, and the material distribution mechanism is used to move along the transport and material distribution track to cast materials into the casting space.
[0069] Specifically, the transport and material distribution system includes a concrete mixing device, which feeds the material distribution mechanism. The transport and material distribution track is arranged above the hydraulic formwork system 6. The transport and material distribution track can be a single track or a double track extending along the Y direction, or a circular track with a larger Y direction dimension.
[0070] In this embodiment, when the material distribution mechanism moves on the transport material distribution track, it can pour concrete on the mobile pedestals 4 on different longitudinal tracks 1 as needed. When a large number of mobile pedestals 4 are provided, multiple material distribution mechanisms can be provided on the transport material distribution track. Different material distribution mechanisms can respectively pour concrete on the mobile pedestals 4 on different longitudinal tracks 1, thereby improving processing efficiency.
[0071] Another embodiment of the present invention provides a method for producing railway bridge prefabricated parts, using the above-mentioned railway bridge prefabricated parts production line, comprising the following steps:
[0072] The mobile pedestal 4 moves the steel bar skeleton after binding from the first transverse movement station S1 to the casting station S2, and casts the steel bar skeleton after binding at the casting station S2 to form a beam body prefabricated part;
[0073] The movable platform 4 moves the cast beam prefabricated parts to the steaming station S3, and performs steam curing on the cast beam prefabricated parts at the steaming station S3;
[0074] The movable platform 4 moves the beam body prefabricated part that has been steam cured to the tensioning station S4, and tensions and trims the beam body prefabricated part that has been steam cured at the tensioning station S4, and the trimmed beam body prefabricated part is removed from the movable platform 4;
[0075] The movable platform 4 moves to the second transverse shifting station S5, and the transverse shifting trolley 3 of the second transverse shifting station S5 moves the movable platform 4 from the current longitudinal shifting track 1 to another longitudinal shifting track 1;
[0076] The movable platform 4 returns to the first transverse movement station S1 along the corresponding longitudinal movement track 1 , and the transverse movement trolley 3 of the first transverse movement station S1 moves the movable platform 4 to the preset longitudinal movement track 1 .
[0077] The advantages of the production method of railway bridge prefabricated parts described in the present invention compared with the prior art are the same as those of the above-mentioned railway bridge prefabricated parts production line, and will not be repeated.
[0078] Optionally, the process of casting the tied steel skeleton at the casting station S2 to form a beam prefabricated part includes:
[0079] The two templates of the hydraulic template system move toward each other from both sides of the movable platform 4 to close the mold;
[0080] The transport and material distribution system pours concrete on the steel frame after mold closing to form a preliminary beam body;
[0081] If the strength of the preliminary beam body reaches a preset strength, the two templates of the hydraulic template system move away from each other to remove the templates, thereby obtaining the beam body prefabricated component.
[0082] In this embodiment, the strength of the preliminary beam body formed is tested during the pouring process. If it does not meet the strength design, rework can be required, or pouring can be continued until the requirements are met. This can ensure that the final processed beam prefabricated parts meet the design requirements and are safer and more reliable.
[0083] Although the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.
Claims
1. A railway bridge prefabricated parts production line, characterized in that: The invention comprises a first transverse shift station (S1), a casting station (S2), a steaming station (S3), a tensioning station (S4), a second transverse shift station (S5), a longitudinal shift track (1), a transverse shift track (2), a transverse shift trolley (3) and a movable platform (4), wherein the first transverse shift station (S1), the casting station (S2), the steaming station (S3), the tensioning station (S4) and the second transverse shift station (S5) are arranged in sequence along a preset direction, the longitudinal shift track (1) extends along the preset direction and passes through the first transverse shift station (S1), the casting station (S2), the steaming station (S3), the tensioning station (S4) and the second transverse shift station (S5) in sequence, and the longitudinal shift track (2) is arranged in sequence along a preset direction. At least two rails (1) are arranged at intervals along a direction perpendicular to the preset direction, and a plurality of movable platforms (4) are arranged on each longitudinal rail (1). The plurality of movable platforms (4) are respectively located at different workstations or on different longitudinal rails (1) at the same workstation. The first transverse workstation (S1) and the second transverse workstation (S5) are respectively provided with at least one transverse rail (2). The transverse rail (2) and the longitudinal rail (1) are arranged crosswise. The transverse trolley (3) and the transverse rail (2) are arranged one-to-one in correspondence. The transverse trolley (3) is used to move the movable platform (4) on one of the longitudinal rails (1) to another longitudinal rail (1).
2. The railway bridge prefabricated parts production line according to claim 1 is characterized in that: The transverse track (2) comprises two first tracks (21) arranged in parallel and spaced apart from each other. Two rollers (31) are respectively arranged at four corners of the transverse trolley (3) and spaced apart from each other along the moving direction of the transverse trolley (3). The transverse trolley (3) is spanned between the two first tracks (21) via the rollers (31). A break (211) is provided on the first track (21) for the longitudinal track (1) to pass through. The distance between the two rollers (31) at each corner of the transverse trolley (3) is greater than the length of the break (211).
3. The railway bridge prefabricated parts production line according to claim 2 is characterized in that: The height of the transverse movement track (2) is greater than the height of the longitudinal movement track (1).
4. The railway bridge prefabricated parts production line according to claim 1 is characterized in that: The transverse movement trolley (3) has a vertical lifting mechanism (32), and the transverse movement trolley (3) is used to move along the transverse movement track (2) to the bottom of the movable platform (4), and to lift the movable platform (4) upward through the vertical lifting mechanism (32) so that the movable platform (4) is separated from the longitudinal movement track (1).
5. The railway bridge prefabricated parts production line according to claim 1 is characterized in that: It also includes a binding station (S6) and a position detection device (5), wherein the binding station (S6) is arranged on a side of the first transverse station (S1) away from the casting station (S2), and the longitudinal track (1) extends to the binding station (S6); the position detection device (5) is respectively arranged around each of the longitudinal tracks (1) of the binding station (S6), the first transverse station (S1), the casting station (S2), the steaming station (S3), the tensioning station (S4) and the second transverse station (S5), and the movable platform (4) on the longitudinal track (1) corresponding to the current station is used to act according to the detection information of the position detection device (5) on the longitudinal track (1) corresponding to the next station.
6. The railway bridge prefabricated parts production line according to claim 5, characterized in that: It also includes a control system, and each of the movable platforms (4) and each of the position detection devices (5) are connected to the control system; And / or, the movable platform (4) is powered by a low-voltage busbar.
7. The railway bridge prefabricated parts production line according to claim 1 is characterized in that: It also includes a hydraulic formwork system (6), which is arranged at the casting station (S2). The hydraulic formwork system (6) is provided with a plurality of templates and is arranged one-to-one with the longitudinal movement track (1). The hydraulic formwork system (6) includes two templates (61) arranged opposite to each other. The two templates (61) are used to be located on both sides of the movable platform (4). When the movable platform (4) moves to the casting station (S2), the two templates (61) move towards each other to close the mold, and the two templates (61) and the movable platform (4) are enclosed to form a casting space.
8. The railway bridge prefabricated parts production line according to claim 7, characterized in that: The length of the casting station (S2) is at least twice the length of the hydraulic formwork system (6), and adjacent hydraulic formwork systems (6) are arranged in a staggered manner along the length direction of the casting station (S2).
9. The railway bridge prefabricated parts production line according to claim 7, characterized in that: It also includes a transport and material distribution system, which includes a transport and material distribution track and a material distribution mechanism arranged on the transport and material distribution track. The transport and material distribution track is arranged above the casting station (S2). The transport and material distribution track is a single track, a double track or a circular track. The material distribution mechanism is used to move along the transport and material distribution track to cast the material into the casting space.
10. A method for producing prefabricated parts for railway bridges, characterized in that: The railway bridge prefabricated parts production line according to any one of claims 1 to 9 comprises the following steps: The movable platform (4) moves the steel bar skeleton that has been tied from the first transverse movement station (S1) to the casting station (S2), and the steel bar skeleton that has been tied is cast at the casting station (S2) to form a beam body prefabricated part; The movable platform (4) moves the casted beam body prefabricated parts to a steaming and curing station (S3), and performs steam curing on the casted beam body prefabricated parts at the steaming and curing station (S3); The movable platform (4) moves the steam-cured beam prefabricated part to a tensioning station (S4), and tensions and trims the steam-cured beam prefabricated part at the tensioning station (S4), and the trimmed beam prefabricated part is removed from the movable platform (4); The movable platform (4) moves to the second transverse shifting station (S5), and the transverse shifting trolley (3) of the second transverse shifting station (S5) moves the movable platform (4) from the current longitudinal shifting track (1) to another longitudinal shifting track (1); The movable platform (4) returns to the first transverse shift station (S1) along the corresponding longitudinal shift track (1), and the movable platform (4) is moved to the preset longitudinal shift track (1) by the transverse shift trolley (3) of the first transverse shift station (S1).